Regulation (EU) No 1303/2013 of the European Parliament and of the Council of 17 December 2013 laying down common provisions on the European Regional Development Fund, the European Social Fund, the Cohesion Fund, the European Agricultural Fund for Rural Development and the European Maritime and Fisheries Fund and laying down general provisions on the European Regional Development Fund, the European Social Fund, the Cohesion Fund and the European Maritime and Fisheries Fund and repealing Council Regulation (EC) No 1083/2006
Consolidated text: Regulation (EU) No 1303/2013 of the European Parliament and of the Council of 17 December 2013 laying down common provisions on the European Regional Development Fund, the European Social Fund, the Cohesion Fund, the European Agricultural Fund for Rural Development and the European Maritime and Fisheries Fund and laying down general provisions on the European Regional Development Fund, the European Social Fund, the Cohesion Fund and the European Maritime and Fisheries Fund and repealing Council Regulation (EC) No 1083/2006
Regulation (EU) No 1303/2013 of the European Parliament and of the Council of 17 December 2013 laying down common provisions on the European Regional Development Fund, the European Social Fund, the Cohesion Fund, the European Agricultural Fund for Rural Development and the European Maritime and Fisheries Fund and laying down general provisions on the European Regional Development Fund, the European Social Fund, the Cohesion Fund and the European Maritime and Fisheries Fund and repealing Council Regulation (EC) No 1083/2006
02013R1303 — EN — 29.12.2020 — 012.001
This text is meant purely as a documentation tool and has no legal effect. The Union's institutions do not assume any liability for its contents. The authentic versions of the relevant acts, including their preambles, are those published in the Official Journal of the European Union and available in EUR-Lex. Those official texts are directly accessible through the links embedded in this document
REGULATION (EU) No 1303/2013 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 17 December 2013 (OJ L 347 20.12.2013, p. 320) |
Amended by:
Corrected by:
REGULATION (EU) No 1303/2013 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL
of 17 December 2013
laying down common provisions on the European Regional Development Fund, the European Social Fund, the Cohesion Fund, the European Agricultural Fund for Rural Development and the European Maritime and Fisheries Fund and laying down general provisions on the European Regional Development Fund, the European Social Fund, the Cohesion Fund and the European Maritime and Fisheries Fund and repealing Council Regulation (EC) No 1083/2006
PART ONE
SUBJECT-MATTER AND DEFINITIONS
Article 1
Subject-matter
This Regulation lays down the common rules applicable to the European Regional Development Fund (ERDF), the European Social Fund (ESF), the Cohesion Fund, the European Agricultural Fund for Rural Development (EAFRD) and the European Maritime and Fisheries Fund (EMFF), which operate under a common framework (the 'European Structural and Investment' - 'ESI Funds'). It also lays down the provisions necessary to ensure the effectiveness of the ESI Funds and their coordination with one another and with other Union instruments. The common rules applying to the ESI Funds are set out in Part Two.
Part Three lays down the general rules governing the ERDF, the ESF (together referred to as the 'Structural Funds') and the Cohesion Fund concerning the tasks, priority objectives and organisation of the Structural Funds and the Cohesion Fund (the 'Funds'), the criteria that Member States and regions are required to fulfil in order to be eligible for support from the Funds, the financial resources available and the criteria for their allocation.
Part Four lays down general rules applicable to the Funds and the EMFF on management and control, financial management, accounts and financial corrections.
The rules set out in this Regulation shall apply without prejudice to the provisions laid down in Regulation (EU) No 1306/2013 of the European Parliament and of the Council ( 1 ) and to the specific provisions laid down in the following Regulations (the 'Fund-specific Regulations') in accordance with the fifth paragraph of this Article:
Regulation (EU) No 1301/2013 (the 'ERDF Regulation');
Regulation (EU) No 1304/2013 (the 'ESF Regulation');
Regulation (EU) No 1300/2013 (the 'CF Regulation');
Regulation (EU) No 1299/2013 (the 'ETC Regulation');
Regulation (EU) No 1305/2013 (the 'EAFRD Regulation'); and
a future Union legal act establishing the conditions for the financial support for maritime and fisheries policy for the programming period 2014 - 2020 (the 'EMFF Regulation").
Part Two of this Regulation shall apply to all the ESI Funds except when it explicitly allows for derogations. Parts Three and Four of this Regulation shall establish complementary rules to Part Two that apply respectively to the Funds and to the Funds and the EMFF and may explicitly allow for derogations in the Fund-specific Regulations concerned. The Fund-specific Regulations may establish complementary rules to Part Two of this Regulation for the ESI Funds, to Part Three of this Regulation for the Funds and to Part Four of this Regulation for the Funds and the EMFF. The complementary rules in the Fund-specific Regulations shall not be in contradiction with Parts Two, Three or Four of this Regulation. In case of doubt about the application between provisions, Part Two of this Regulation shall prevail over the Fund-specific rules, and Parts Two, Three and Four of this Regulation shall prevail over the Fund-specific Regulations.
Article 2
Definitions
For the purposes of this Regulation, the following definitions apply;
'Union strategy for smart, sustainable and inclusive growth' means the targets and shared objectives guiding the action of Member States and the Union set out in the Conclusions adopted by the European Council of 17 June 2010 as Annex I (New European Strategy for Jobs and Growth, EU Headline Targets), Council Recommendation of 13 July 2010 ( 2 ) and in Council Decision 2010/707/EU ( 3 ), and any revision of such targets and shared objectives;
'a strategic policy framework' means a document or a set of documents established at national or regional level, which sets out a limited number of coherent priorities established on the basis of evidence and a timeframe for the implementation of those priorities and which may include a monitoring mechanism;
'smart specialisation strategy' means the national or regional innovation strategies which set priorities in order to build competitive advantage by developing and matching research and innovation own strengths to business needs in order to address emerging opportunities and market developments in a coherent manner, while avoiding duplication and fragmentation of efforts; a smart specialisation strategy may take the form of, or be included in, a national or regional research and innovation (R&I) strategic policy framework;
'Fund-specific rules' means the provisions laid down in, or established on the basis of, Part Three or Part Four of this Regulation or a Regulation governing one or more of the ESI Funds listed in the fourth paragraph of Article 1;
'programming' means the process of organisation, decision-making and allocation of financial resources in several stages, with the involvement of partners in accordance with Article 5, intended to implement, on a multi-annual basis, joint action by the Union and the Member States to achieve the objectives of the Union strategy for smart, sustainable and inclusive growth;
'programme' means an 'operational programme' as referred to in Part Three or Part Four of this Regulation and in the EMFF Regulation, and 'rural development programme' as referred to in the EAFRD Regulation;
'programme area' means a geographical area covered by a specific programme or, in the case of a programme covering more than one category of region, the geographical area corresponding to each separate category of region;
'priority' in Parts Two and Four of this Regulation means the 'priority axis' referred to in Part Three of this Regulation for ERDF, ESF and the Cohesion Fund and the 'Union priority' referred to in the EMFF Regulation and in the EAFRD Regulation;
'operation' means a project, contract, action or group of projects selected by the managing authorities of the programmes concerned, or under their responsibility, that contributes to the objectives of a priority or priorities; in the context of financial instruments, an operation is constituted by the financial contributions from a programme to financial instruments and the subsequent financial support provided by those financial instruments;
'beneficiary' means a public or private body or a natural person, responsible for initiating or both initiating and implementing operations, and:
in the context of State aid, the body which receives the aid, except where the aid per undertaking is less than EUR 200 000 , in which case the Member State concerned may decide that the beneficiary is the body granting the aid, without prejudice to Commission Regulations (EU) No 1407/2013 ( 4 ), (EU) No 1408/2013 ( 5 ) and (EU) No 717/2014 ( 6 ); and
in the context of financial instruments under Title IV of Part Two of this Regulation, the body that implements the financial instrument or the fund of funds as appropriate;
'financial instruments' means financial instruments as defined in the Financial Regulation, save where otherwise provided in this Regulation;
'final recipient' means a legal or natural person receiving financial support from a financial instrument;
'State aid' means aid falling under Article 107(1) TFEU which shall be deemed for the purposes of this Regulation also to include de minimis aid within the meaning of Commission Regulation (EC) No 1998/2006 ( 7 ), Commission Regulation (EC) No 1535/2007 ( 8 ) and Commission Regulation (EC) No 875/2007 ( 9 );
'completed operation' means an operation that has been physically completed or fully implemented and in respect of which all related payments have been made by beneficiaries and the corresponding public contribution has been paid to the beneficiaries;
'public expenditure' means any public contribution to the financing of operations the source of which is the budget of national, regional or local public authorities, the budget of the Union related to the ESI Funds, the budget of public law bodies or the budget of associations of public authorities or of public law bodies and, for the purpose of determining the co-financing rate for ESF programmes or priorities, may include any financial resources collectively contributed by employers and workers;
'public law body' means any body governed by public law within the meaning of point 9 of Article 1 of Directive 2004/18/EC of the European Parliament and of the Council ( 10 ) and any European grouping of territorial cooperation (EGTC) established in accordance with Regulation (EC) No 1082/2006 of the European Parliament and of the Council ( 11 ), regardless of whether the EGTC is considered to be a public law body or a private law body under the relevant national implementing provisions;
'document' means a paper or an electronic medium bearing information of relevance in the context of this Regulation;
'intermediate body' means any public or private body which acts under the responsibility of a managing or certifying authority, or which carries out duties on behalf of such an authority, in relation to beneficiaries implementing operations;
'community-led local development strategy' means a coherent set of operations the purpose of which is to meet local objectives and needs, and which contributes to achieving the Union strategy for smart, sustainable and inclusive growth, and which is designed and implemented by a local action group;
'Partnership Agreement' means a document prepared by a Member State with the involvement of partners in line with the multi-level governance approach, which sets out that Member State's strategy, priorities and arrangements for using the ESI Funds in an effective and efficient way so as to pursue the Union strategy for smart, sustainable and inclusive growth, and which is approved by the Commission following assessment and dialogue with the Member State concerned;
'category of regions' means the categorisation of regions as 'less developed regions', 'transition regions' or 'more developed regions' in accordance with Article 90(2);
'payment application' means a payment application or declaration of expenditure submitted by the Member State to the Commission;
'EIB' means the European Investment Bank, the European Investment Fund or any subsidiary of the European Investment Bank;
'Public private partnerships' (PPPs) means forms of cooperation between public bodies and the private sector, which aim to improve the delivery of investments in infrastructure projects or other types of operations, delivering public services through risk sharing, pooling of private sector expertise or additional sources of capital;
'PPP operation' means an operation which is implemented or intended to be implemented under a public-private-partnership structure;
'escrow account' means a bank account covered by a written agreement between a managing authority or an intermediate body and the body implementing a financial instrument, or, in the case of a PPP operation, a written agreement between a public body beneficiary and the private partner approved by the managing authority or an intermediate body, set up specifically to hold funds to be paid out after the eligibility period in the case of a financial instrument, or during the eligibility period and/or after the eligibility period in the case of a PPP operation, exclusively ◄ for the purposes provided for in point (c) of Article 42(1), Article 42(2), Article 42(3) and Article 64, or a bank account set up on terms providing equivalent guarantees on the payments out of the funds;
'fund of funds' means a fund set up with the objective of contributing support from a programme or programmes to several financial instruments. Where financial instruments are implemented through a fund of funds, the body implementing the fund of funds shall be considered to be the only beneficiary within the meaning of point 10 of this Article;
'SME' means a micro, small or medium sized enterprise as defined in Commission Recommendation 2003/361/EC ( 12 );
'accounting year', means, for the purposes of Part Three and Part Four, the period from 1 July to 30 June, except for the first accounting year of the programming period, in respect of which it means the period from the start date for eligibility of expenditure until 30 June 2015. The final accounting year shall be from 1 July 2023 to 30 June 2024;
'financial year', means, for the purposes of Part Three and Part Four, the period from 1 January to 31 December;
'macroregional strategy' means an integrated framework agreed by the Council and, where appropriate, endorsed by the European Council, which may be supported by the ESI Funds among others, to address common challenges faced by a defined geographical area relating to Member States and third countries located in the same geographical area which thereby benefit from strengthened cooperation contributing to achievement of economic, social and territorial cohesion;
'sea basin strategy' means a structured framework of cooperation in relation to a given geographical area, developed by Union institutions, Member States, their regions and where appropriate third countries sharing a sea basin; a sea basin strategy takes into account the geographic, climatic, economic and political specificities of the sea basin;
'applicable ex ante conditionality' means a concrete and precisely pre-defined critical factor, which is a prerequisite for and has a direct and genuine link to, and direct impact on, the effective and efficient achievement of a specific objective for an investment priority or a Union priority;
'specific objective' means the result to which an investment priority or Union priority contributes in a specific national or regional context through actions or measures undertaken within such a priority;
'relevant country-specific recommendations adopted in accordance with Article 121(2) TFEU' and 'relevant Council recommendations adopted in accordance with Article 148(4) TFEU' mean recommendations relating to structural challenges which it is appropriate to address through multiannual investments that fall directly within the scope of the ESI Funds as set out in the Fund-specific Regulations;
'irregularity' means any breach of Union law, or of national law relating to its application, resulting from an act or omission by an economic operator involved in the implementation of the ESI Funds, which has, or would have, the effect of prejudicing the budget of the Union by charging an unjustified item of expenditure to the budget of the Union.
'economic operator' means any natural or legal person or other entity taking part in the implementation of assistance from the ESI Funds, with the exception of a Member State exercising its prerogatives as a public authority;
'systemic irregularity' means any irregularity, which may be of a recurring nature, with a high probability of occurrence in similar types of operations, which results from a serious deficiency in the effective functioning of a management and control system, including a failure to establish appropriate procedures in accordance with this Regulation and the Fund-specific rules;
'serious deficiency in the effective functioning of a management and control system' means, for the purposes of implementation of the Funds and the EMFF under Part Four, a deficiency for which substantial improvements in the system are required, which exposes the Funds and the EMFF to a significant risk of irregularities, and the existence of which is incompatible with an unqualified audit opinion on the functioning of the management and control system.
Article 3
Calculation of time limits for Commission decisions
►C1 Where, pursuant to Articles 16(2) and (4), 29(4), 30 (2) and (3) ◄ , 102(2), 107(2), and 108(3), a time limit is set for the Commission to adopt or amend a decision, by means of an implementing act, that time limit shall not include the period which starts on the date following the date on which the Commission sends its observations to the Member State and lasts until the Member State responds to the observations.
PART TWO
COMMON PROVISIONS APPLICABLE TO THE ESI FUNDS
TITLE I
PRINCIPLES OF UNION SUPPORT FOR THE ESI FUNDS
Article 4
General principles
Article 5
Partnership and multi-level governance
For the Partnership Agreement and each programme, each Member State shall in accordance with its institutional and legal framework organise a partnership with the competent regional and local authorities. The partnership shall also include the following partners:
competent urban and other public authorities;
economic and social partners; and
relevant bodies representing civil society, including environmental partners, non-governmental organisations, and bodies responsible for promoting social inclusion, gender equality and non-discrimination.
The Commission shall be empowered to adopt a delegated act in accordance with Article 149 to provide for a European code of conduct on partnership (the 'code of conduct') in order to support and facilitate Member States in the organisation of partnership in accordance with paragraphs 1 and 2 of this Article. The code of conduct shall set out the framework within which the Member States, in accordance with their institutional and legal framework as well as their national and regional competences, shall pursue the implementation of partnership. The code of conduct, while fully respecting the principles of subsidiarity and proportionality, shall lay down the following elements:
the main principles concerning transparent procedures to be followed for the identification of the relevant partners including, where appropriate, their umbrella organisations in order to facilitate Member States in designating the most representative relevant partners, in accordance with their institutional and legal framework;
the main principles and good practices concerning the involvement of the different categories of relevant partners set out in paragraph 1 in the preparation of the Partnership Agreement and programmes, the information to be provided concerning their involvement, and at the various stages of implementation;
the good practices concerning the formulation of the rules of membership and internal procedures of monitoring committees to be decided, as appropriate, by the Member States or the monitoring committees of programmes in accordance with the relevant provisions of this Regulation and the Fund-specific rules;
the main objectives and good practices in cases where the managing authority involves the relevant partners in the preparation of calls for proposals and in particular good practices for avoiding potential conflicts of interest in cases where there is a possibility of relevant partners also being potential beneficiaries, and for the involvement of the relevant partners in the preparation of progress reports and in relation to monitoring and evaluation of programmes in accordance with the relevant provisions of this Regulation and the Fund-specific rules;
the indicative areas, themes and good practices concerning how the competent authorities of the Member States may use the ESI Funds including technical assistance to strengthen the institutional capacity of relevant partners in accordance with the relevant provisions of this Regulation and the Fund-specific rules;
the role of the Commission in the dissemination of good practices;
the main principles and good practices that are apt to facilitate the Member States' assessment of the implementation of partnership and its added value.
The provisions of the code of conduct shall not in any way contradict the relevant provisions of this Regulation or the Fund-specific rules.
Article 6
Compliance with Union and national law
Operations supported by the ESI Funds shall comply with applicable Union law and the national law relating to its application ('applicable law').
Article 7
Promotion of equality between men and women and non-discrimination
The Member States and the Commission shall ensure that equality between men and women and the integration of gender perspective are taken into account and promoted throughout the preparation and implementation of programmes, including in relation to monitoring, reporting and evaluation.
The Member States and the Commission shall take appropriate steps to prevent any discrimination based on sex, racial or ethnic origin, religion or belief, disability, age or sexual orientation during the preparation and implementation of programmes. In particular, accessibility for persons with disabilities shall be taken into account throughout the preparation and implementation of programmes.
Article 8
Sustainable development
The objectives of the ESI Funds shall be pursued in line with the principle of sustainable development and with the Union's promotion of the aim of preserving, protecting and improving the quality of the environment, as set out in Article 11 and Article 191(1) TFEU, taking into account the polluter pays principle.
The Member States and the Commission shall ensure that environmental protection requirements, resource efficiency, climate change mitigation and adaptation, biodiversity, disaster resilience, and risk prevention and management are promoted in the preparation and implementation of Partnership Agreements and programmes. Member States shall provide information on the support for climate change objectives using a methodology based on the categories of intervention, focus areas or measures, as appropriate, for each of the ESI Funds. That methodology shall consist of assigning a specific weighting to the support provided under the ESI Funds at a level which reflects the extent to which such support makes a contribution to climate change mitigation and adaptation goals. The specific weighting assigned shall be differentiated on the basis of whether the support makes a significant or a moderate contribution towards climate change objectives. Where the support does not contribute towards those objectives or the contribution is insignificant, a weighting of zero shall be assigned. In the case of the ERDF, the ESF and the Cohesion Fund weightings shall be attached to categories of intervention established within the nomenclature adopted by the Commission. In the case of the EAFRD weightings shall be attached to focus areas set out in the EAFRD Regulation and in the case of the EMFF to measures set out in the EMFF Regulation.
The Commission shall set out uniform conditions for each of the ESI Funds for the application of the methodology referred to in the second paragraph by means of an implementing act. That implementing act shall be adopted in accordance with the examination procedure referred to in Article 150(3).
TITLE II
STRATEGIC APPROACH
CHAPTER I
Thematic objectives for the ESI Funds and Common Strategic Framework
Article 9
Thematic objectives
In order to contribute to the Union strategy for smart, sustainable and inclusive growth as well as the Fund-specific missions pursuant to their Treaty-based objectives, including economic, social and territorial cohesion, each ESI Fund shall support the following thematic objectives:
strengthening research, technological development and innovation;
enhancing access to, and use and quality of, ICT;
enhancing the competitiveness of SMEs, of the agricultural sector (for the EAFRD) and of the fishery and aquaculture sector (for the EMFF);
supporting the shift towards a low-carbon economy in all sectors;
promoting climate change adaptation, risk prevention and management;
preserving and protecting the environment and promoting resource efficiency;
promoting sustainable transport and removing bottlenecks in key network infrastructures;
promoting sustainable and quality employment and supporting labour mobility;
promoting social inclusion, combating poverty and any discrimination;
investing in education, training and vocational training for skills and lifelong learning;
enhancing institutional capacity of public authorities and stakeholders and efficient public administration.
Thematic objectives shall be translated into priorities that are specific to each of the ESI Funds and are set out in the Fund-specific rules.
The priorities established for each of the ESI Funds in the Fund-specific rules shall in particular cover the appropriate use of each ESI Fund in the areas of migration and asylum. In that context, coordination with the Asylum, Migration and Integration Fund established by Regulation (EU) No 516/2014 of the European Parliament and of the Council ( 13 ) shall be ensured, where appropriate.
Article 10
Common Strategic Framework
Article 11
Content
The CSF shall establish:
mechanisms for ensuring the contribution of the ESI Funds to the Union strategy for smart, sustainable and inclusive growth, and the coherence and consistency of the programming of the ESI Funds in relation to the relevant country-specific recommendations adopted in accordance with Article 121(2) TFEU, the relevant Council recommendations adopted in accordance with 148(4) TFEU, and where appropriate at national level, to the National Reform Programme;
arrangements to promote an integrated use of the ESI Funds;
arrangements for coordination between the ESI Funds and other relevant Union policies and instruments, including external instruments for cooperation;
horizontal principles referred to in Articles 5, 7 and 8 and cross-cutting policy objectives for the implementation of the ESI Funds;
arrangements to address the key territorial challenges for urban, rural, coastal and fisheries areas, the demographic challenges of regions or specific needs of geographical areas which suffer from severe and permanent natural or demographic handicaps as referred to in Article 174 TFEU, and the specific challenges of outermost regions within the meaning of Article 349 TFEU;
priority areas for cooperation activities under the ESI Funds, where appropriate, taking account of macro-regional and sea basin strategies.
Article 12
Review
Where there are major changes in the social and economic situation in the Union, or changes are made to the Union strategy for smart, sustainable and inclusive growth, the Commission may submit a proposal to review the CSF, or the European Parliament or the Council, acting in accordance with Articles 225 or 241 TFEU respectively, may request the Commission to submit such a proposal.
The Commission shall be empowered to adopt delegated acts in accordance with Article 149 in order to supplement or amend Sections 4 and 7 of Annex I where it is necessary to take account of changes in the Union policies or instruments referred to in Section 4 or changes in the cooperation activities referred to in Section 7 or to take account of the introduction of new Union policies, instruments or cooperation activities.
Article 13
Guidance for beneficiaries
CHAPTER II
Partnership Agreement
Article 14
Preparation of the Partnership Agreement
Article 15
Content of the Partnership Agreement
The Partnership Agreement shall set out:
arrangements to ensure alignment with the Union strategy for smart, sustainable and inclusive growth as well as the Fund-specific missions pursuant to their Treaty-based objectives, including economic, social and territorial cohesion, including:
an analysis of disparities, development needs and growth potential with reference to the thematic objectives and the territorial challenges, and taking account of the National Reform Programme, where appropriate, and relevant country-specific recommendations adopted in accordance with Article 121(2) TFEU and relevant Council recommendations adopted in accordance with Article 148(4) TFEU;
a summary of the ex ante evaluations of the programmes, or key findings of the ex ante evaluation of the Partnership Agreement, where the latter evaluation is undertaken by the Member State at its own initiative;
selected thematic objectives, and for each of the selected thematic objectives a summary of the main results expected for each of the ESI Funds;
the indicative allocation of support by the Union by thematic objective at national level for each of the ESI Funds, as well as the total indicative amount of support envisaged for climate change objectives;
the application of the horizontal principles referred to in Articles 5, 7 and 8 and policy objectives for the implementation of the ESI Funds;
the list of the programmes under the ERDF, the ESF and the Cohesion Fund, except those under the European territorial cooperation goal, and of the programmes of the EAFRD and the EMFF, with the respective indicative allocations by ESI Fund and by year;
information on the allocation related to the performance reserve, broken down by ESI Fund and, where appropriate, by category of region, and on the amounts excluded for the purpose of calculating the performance reserve in accordance with Article 20;
arrangements to ensure effective implementation of the ESI Funds, including:
arrangements, in line with the institutional framework of the Member States, that ensure coordination between the ESI Funds and other Union and national funding instruments and with the EIB;
the information required for ex ante verification of compliance with the rules on additionality as they are defined in Part Three;
a summary of the assessment of the fulfilment of applicable ex ante conditionalities in accordance with Article 19 and Annex XI at national level and, in the event that the applicable ex ante conditionalities are not fulfilled, of the actions to be taken, the bodies responsible and the timetable for implementation of those actions;
the methodology and mechanisms to ensure consistency in the functioning of the performance framework in accordance with Article 21;
an assessment of whether there is a need to reinforce the administrative capacity of the authorities involved in the management and control of the programmes and, where appropriate, of beneficiaries as well as, where necessary, a summary of actions to be taken for that purpose;
a summary of the actions planned in the programmes, including an indicative timetable for achievement of a reduction in the administrative burden on beneficiaries;
arrangements for the partnership principle as referred in Article 5;
an indicative list of the partners referred to in Article 5 and a summary of the actions taken to involve them in accordance with Article 5 and of their role in the preparation of the Partnership Agreement and the progress report as referred to in Article 52.
The Partnership Agreement shall also indicate:
an integrated approach to territorial development supported by the ESI Funds or a summary of the integrated approaches to territorial development based on the content of the programmes, setting out:
the arrangements to ensure an integrated approach to the use of the ESI Funds for the territorial development of specific subregional areas, in particular the implementation arrangements for Articles 32, 33 and 36 accompanied by the principles for identifying the urban areas where integrated actions for sustainable urban development are to be implemented;
the main priority areas for cooperation under the ESI Funds, taking account, where appropriate, of macro-regional strategies and sea basin strategies;
where appropriate, an integrated approach to addressing the specific needs of geographical areas most affected by poverty or of target groups at highest risk of discrimination or social exclusion, with special regard to marginalised communities, persons with disabilities, the long term unemployed and young people not in employment, education or training;
where appropriate, an integrated approach to address the demographic challenges of regions or specific needs of geographical areas which suffer from severe and permanent natural or demographic handicaps as referred to in Article 174 TFEU;
arrangements to ensure efficient implementation of the ESI Funds, including an assessment of the existing systems for electronic data exchange, and a summary of the actions planned to gradually permit all exchanges of information between beneficiaries, and authorities responsible for management and control of programmes, to be carried out by electronic data exchange.
Article 16
Adoption and amendment of the Partnership Agreement
The Commission shall adopt each year by 31 March a decision confirming that the amendments to the Partnership Agreement reflect one or more programme amendments approved by the Commission in the preceding calendar year.
That decision may include the amendment of other elements of the Partnership Agreement pursuant to a proposal referred to in paragraph 4, provided that the proposal is submitted to the Commission by 31 December of the preceding calendar year.
Article 17
Adoption of the revised Partnership Agreement in the event of delay in the entry into force of a Fund-specific Regulation
CHAPTER III
Thematic concentration, ex ante conditionalities and performance review
Article 18
Thematic concentration
Member States shall concentrate support, in accordance with the Fund-specific rules, on interventions that bring the greatest added value in relation to the Union strategy for smart, sustainable and inclusive growth taking into account the key territorial challenges of the various types of territories in line with the CSF, the challenges identified in the National Reform Programmes, where appropriate, and relevant country-specific recommendations under Article 121(2) TFEU and the relevant Council recommendations adopted under Article 148(4) TFEU. Provisions on thematic concentration under the Fund-specific rules shall not apply to technical assistance.
Article 19
Ex ante conditionalities
Ex ante conditionalities shall apply only to the extent and provided that they comply with the definition laid down in point (33) of Article 2 regarding the specific objectives pursued within the priorities of the programme. The assessment of applicability shall, without prejudice to the definition laid down in point (33) of Article 2, take account of the principle of proportionality in accordance with Article 4(5) having regard to the level of support allocated, where appropriate. The assessment of fulfilment shall be limited to the criteria laid down in the Fund-specific rules and in Part II of Annex XI.
That assessment of applicability by the Commission shall, in accordance with Article 4(5), take account of the principle of proportionality having regard to the level of support allocated, where appropriate. The assessment of fulfilment by the Commission shall be limited to the criteria laid down in the Fund-specific rules and in Part II of Annex XI, and shall respect national and regional competences to decide on the specific and adequate policy measures including the content of strategies.
Article 20
Performance reserve
6 % of the resources allocated to the ERDF, ESF and the Cohesion Fund under the Investment for Growth and Jobs goal referred to in point (a) of Article 89(2) of this Regulation, as well as to the EAFRD and to measures financed under shared management in accordance with the EMFF Regulation shall constitute a performance reserve which shall be established in the Partnership Agreement and programmes and allocated to specific priorities in accordance with Article 22 of this Regulation.
The following resources are excluded for the purpose of calculating the performance reserve:
resources allocated to the YEI as defined in the operational programme in accordance with Article 18 of the ESF Regulation;
resources allocated to technical assistance at the initiative of the Commission;
resources transferred from the first pillar of the CAP to the EAFRD under Articles 7(2) and 14(1) of Regulation (EU) No 1307/2013;
transfers to the EAFRD in application of Articles 10b, 136 and 136b of Council Regulation (EC) No 73/2009 in respect of calendar years 2013 and 2014 respectively;
resources transferred to the CEF from the Cohesion Fund in accordance with Article 92(6) of this Regulation;
resources transferred to the Fund for European Aid for the Most Deprived in accordance with Article 92(7) of this Regulation;
resources allocated for innovative actions for sustainable urban development in accordance with Article 92(8) of this Regulation.
Article 21
Performance review
Article 22
Application of the performance framework
The Commission shall approve, in accordance with Article 30(3) and (4), the amendment of the programmes concerned. Where a Member State fails to submit the information in accordance with Article 50(5) and (6), the performance reserve for the programmes or the priorities concerned shall not be allocated to the programmes or the priorities concerned.
The Commission shall without delay lift the suspension of interim payments when the Member State has taken the necessary corrective action. Where the corrective action concerns the transfer of financial allocations to other programmes or priorities, which have achieved their milestones, the Commission shall approve, by means of an implementing act, the necessary amendment of the programmes concerned in accordance with Article 30(2). By way of derogation from Article 30(2), in such case the Commission shall decide on the amendment no later than two months after the submission of the Member State request for amendment.
When applying financial corrections, the Commission shall take into account, with due regard to the principle of proportionality, the absorption level and external factors contributing to the failure.
Financial corrections shall not be applied where the failure to achieve targets is due to the impact of socio-economic or environmental factors, significant changes in the economic or environmental conditions in the Member State concerned or because of reasons of force majeure seriously affecting implementation of the priorities concerned.
The Commission shall be empowered to adopt delegated acts in accordance with Article 149 to establish detailed rules on criteria for determining the level of financial correction to be applied.
The Commission shall adopt implementing acts, laying down the detailed arrangements to ensure a consistent approach for determining the milestones and targets in the performance framework for each priority and for assessing the achievement of the milestones and targets. Those implementing acts shall be adopted in accordance with the examination procedure referred to in Article 150(3).
CHAPTER IV
Measures linked to sound economic governance
Article 23
Measures linking effectiveness of ESI Funds to sound economic governance
Such a request may be made for the following purposes:
to support the implementation of a relevant country-specific recommendation adopted in accordance with Article 121(2) TFEU and of a relevant Council recommendation adopted in accordance with Article 148(4) TFEU, addressed to the Member State concerned;
to support the implementation of relevant Council Recommendations addressed to the Member State concerned and adopted in accordance with Articles 7(2) or 8(2) of Regulation (EU) No 1176/2011 ( 14 ) of the European Parliament and of the Council provided that these amendments are deemed necessary to help correct the macro-economic imbalances; or
to maximise the growth and competitiveness impact of the available ESI Funds, if a Member State meets one of the following conditions:
Union financial assistance is made available to it under Council Regulation (EU) No 407/2010 ( 15 );
financial assistance is made available to it in accordance with Council Regulation (EC) No 332/2002 ( 16 );
financial assistance is made available to it that triggers a macroeconomic adjustment programme in accordance with Regulation (EU) No 472/2013 of the European Parliament and of the Council ( 17 ) or that triggers a decision of the Council in accordance with Article 136(1) TFEU.
►C1 For the purposes of point (c) of the second subparagraph, each of those conditions shall be deemed to be satisfied where ◄ such assistance has been made available to the Member State before or after 21 December 2013 and remains available to it.
The Council shall decide on that proposal, by means of an implementing act. ►C1 That implementing act shall only apply with respect to payment applications submitted after the date of the adoption of that implementing act. ◄
The suspension of payments shall not exceed 50 % of the payments of each of the programmes concerned. The decision may provide for an increase in the level of the suspension up to 100 % of payments if the Member State fails to take effective action in response to a request made in accordance with paragraph 1, within three months of the decision to suspend payments referred to in paragraph 6.
The Commission shall make a proposal to the Council to suspend part or all of the commitments or payments for the programmes of a Member State in the following cases:
where the Council decides in accordance with Article 126(8) or Article 126(11) TFEU that a Member State has not taken effective action to correct its excessive deficit;
where the Council adopts two successive recommendations in the same imbalance procedure, in accordance with Article 8(3) of Regulation (EU) No 1176/2011 on the grounds that a Member State has submitted an insufficient corrective action plan;
where the Council adopts two successive decisions in the same imbalance procedure in accordance with Article 10(4) of Regulation (EU) No 1176/2011 establishing non-compliance by a Member State on the grounds that it has not taken the recommended corrective action;
where the Commission concludes that a Member State has not taken measures to implement the adjustment programme referred to in Regulation (EU) No 407/2010 or Regulation (EC) No 332/2002 and as a consequence decides not to authorise the disbursement of the financial assistance granted to that Member State;
where the Council decides that a Member State does not comply with the macro-economic adjustment programme referred to in Article 7 of Regulation (EU) No 472/2013, or with the measures requested by a Council decision adopted in accordance with Article 136(1) TFEU.
In making its proposal, the Commission shall respect the provisions of paragraph 11 and shall take account of all relevant information in that regard, and it shall give due consideration to any elements arising from and opinions expressed through the structured dialogue under paragraph 15.
Priority shall be given to the suspension of commitments: payments shall be suspended only when immediate action is sought and in the case of significant non-compliance. ►C1 The suspension of payments shall apply to payment applications submitted for the programmes concerned after the date of the decision to suspend. ◄
The Council shall adopt a decision, by means of an implementing act, on a proposal by the Commission referred to in paragraph 9 in relation to the suspension of payments.
Detailed provisions for determining the scope and level of suspensions are set out in Annex III.
The suspension of commitments shall be subject to the lower of the following ceilings:
A maximum of 50 % of the commitments relating to the next financial year for the ESI Funds in the first case of non-compliance with an excessive deficit procedure as referred to in point (a) of the first subparagraph of paragraph 9 and a maximum 25 % of the commitments relating to the next financial year for the ESI Funds in the first case of non-compliance relating to a corrective action plan under an excessive imbalances procedure as referred to in point (b) of the first subparagraph of paragraph 9 or non-compliance with the recommended corrective action pursuant to an excessive imbalances procedure as referred to in point (c) of the first subparagraph of paragraph 9.
The level of the suspension shall increase gradually up to a maximum of 100 % of the commitments relating to the next financial year for the ESI Funds in the case of an excessive deficit procedure and up to 50 % of the commitments relating to the next financial year for the ESI Funds in the case of an excessive imbalance procedure, in line with the seriousness of the non-compliance;
a maximum of 0,5 % of nominal GDP applying in the first case of non-compliance with an excessive deficit procedure as referred to in point (a) of the first subparagraph of paragraph 9 and a maximum of 0,25 % of nominal GDP applying in the first case of non-compliance relating to a corrective action plan under an excessive imbalances procedure as referred to in point (b) of the first subparagraph of paragraph 9 or non-compliance with recommended corrective action under an excessive imbalances procedure as referred to in point (c) of the first subparagraph of paragraph 9.
If non-compliance relating to corrective actions referred to in points (a), (b) and (c) of the first subparagraph of paragraph 9 persists, the percentage of that GDP cap shall be gradually increased up to:
a maximum of 50 % of the commitments relating to the next financial year for the ESI Funds or a maximum of 0,5 % of nominal GDP in the first case of non-compliance as referred to in points (d) and (e) of the first subparagraph of paragraph 9.
In determining the level of the suspension and whether to suspend commitments or payments, the stage of the programme cycle shall be taken into account having regard in particular to the period remaining for using the funds following the re-budgeting of suspended commitments.
Without prejudice to de-commitment rules set out in Articles 86 to 88 the Commission shall lift the suspension of commitments, without delay, in the following cases:
where the excessive deficit procedure is held in abeyance in accordance with Article 9 of Council Regulation (EC) No 1467/97 ( 18 ) or the Council has decided in accordance with Article 126(12) TFEU to abrogate the decision on the existence of an excessive deficit;
where the Council has endorsed the corrective action plan submitted by the Member State concerned in accordance with Article 8(2) of Regulation (EU) No 1176/2011 or the excessive imbalance procedure is placed in a position of abeyance in accordance with Article 10(5) of that Regulation or the Council has closed the excessive imbalance procedure in accordance with Article 11 of that Regulation;
where the Commission has concluded that the Member State concerned has taken adequate measures to implement the adjustment programme referred to in Article 7 of Regulation (EU) No 472/2013 or the measures requested by a decision of the Council in accordance with Article 136(1) TFEU.
When lifting the suspension of commitments, the Commission shall re-budget the suspended commitments in accordance with Article 8 of Council Regulation (EU, Euratom) No 1311/2013.
A decision concerning the lifting of the suspension of payments shall be taken by the Council on a proposal from the Commission where the applicable conditions set out in points (a), (b) and (c) of the first subparagraph are fulfilled.
The European Parliament may invite the Commission for a structured dialogue on the application of this Article, having regard in particular to the transmission of the information referred to in the first sub-paragraph.
The Commission shall transmit the proposal for suspension of commitments or payments or the proposal to lift such a suspension to the European Parliament and the Council immediately after its adoption. The European Parliament may invite the Commission to explain the reasons for its proposal.
Article 24
Increase in payments for Member State with temporary budgetary difficulties
If a Member State meets one of the following conditions after 21 December 2013, the increased rate, which may not exceed 100 %, shall apply to its payment applications for the period until 30 June 2016:
where the Member State concerned receives a loan from the Union under Regulation (EU) No 407/2010;
where the Member State concerned receives medium-term financial assistance in accordance with Regulation (EC) No 332/2002 conditional on the implementation of a macroeconomic adjustment programme;
where financial assistance is made available to the Member State concerned conditional on the implementation of a macroeconomic adjustment programme as specified in Regulation (EU) No 472/2013.
If a Member State meets one of the conditions set out in the second subparagraph after 30 June 2016, the increased rate shall apply to its payment applications for the period until 30 June of the year following the calendar year in which the related financial assistance comes to an end.
This paragraph shall not apply to programmes under the ETC Regulation.
Notwithstanding paragraph 1, Union support through interim payments and payments of the final balance shall not be higher than:
the public expenditure; or
the maximum amount of support from the ESI Funds for each priority for the ERDF, ESF and the Cohesion Fund, or for each measure for the EAFRD and the EMFF, as laid down in the decision of the Commission approving the programme,
whichever is lower.
Article 25
Management of technical assistance for Member States
Where a Member States meets the conditions set out in Article 24(1) on 1 January 2014, it may transmit the request for that year at the same time as the submission of its Partnership Agreement, which shall set out the amount to be transferred to technical assistance at the initiative of the Commission.
CHAPTER V
Exceptional measures for the use of the ESI Funds in response to the COVID-19 outbreak
Article 25a
Exceptional measures for the use of the ESI Funds in response to the COVID-19 outbreak
Requests for modification of the co-financing rate shall be submitted in accordance with the procedure for the amendment of programmes set out in Article 30 and shall be accompanied by a revised programme or programmes. The co-financing rate of 100 % shall apply only if the relevant amendment of the operational programme is approved by the Commission before the submission of the final application for an interim payment in accordance with Article 135(2).
Before submitting the first payment application for the accounting year starting 1 July 2021, Member States shall notify the table referred to in point (d)(ii) of Article 96(2) confirming the co-financing rate which was applicable during the accounting year ending 30 June 2020 for the priorities concerned by the temporary increase to 100 %.
For the purpose of those transfers, the requirements laid down in Article 92(4) shall not apply.
Transfers shall not affect resources allocated to the YEI in accordance with Article 92(5) or to the aid for the most deprived under the Investment for growth and jobs goal in accordance with Article 92(7).
Resources transferred between the ERDF, the ESF and the Cohesion Fund under this paragraph shall be implemented in accordance with the rules of the Fund to which the resources are transferred.
By way of derogation from Articles 26(1), 27(1), 30(1) and 30(2), as from 24 April 2020 the consistency of programmes and of their implementation with the Partnership Agreement shall not be verified.
By way of derogation from point (b) of Article 125(3), such operations may be selected for support by the ERDF or the ESF prior to the approval of the amended programme.
By way of derogation from Regulation (EU) No 1305/2013, such support may also be provided by the EAFRD under measures referred to in Regulation (EU) No 1305/2013 and relevant to the implementation of financial instruments. Such eligible expenditure shall not exceed EUR 200 000 .
TITLE III
PROGRAMMING
CHAPTER I
General provisions on the ESI Funds
Article 26
Preparation of programmes
Article 27
Content of programmes
Each programme shall include arrangements to ensure effective, efficient and coordinated implementation of the ESI Funds and actions to achieve a reduction of the administrative burden on beneficiaries.
Each priority shall set out indicators and corresponding targets expressed in qualitative or quantitative terms, in accordance with the Fund-specific rules, in order to assess progress in programme implementation aimed at achievement of objectives as the basis for monitoring, evaluation and review of performance. Those indicators shall include:
financial indicators relating to expenditure allocated;
output indicators relating to the operations supported;
result indicators relating to the priority concerned.
For each ESI Fund, the Fund-specific rules shall set out common indicators and may set out provisions related to programme-specific indicators.
Article 28
Specific provisions on the content of programmes dedicated to joint instruments for uncapped guarantees and securitisation providing capital relief implemented by the EIB
By way of derogation from Article 27, the dedicated programmes referred to in point (b) of the first subparagraph of Article 39(4) shall include:
the elements set out under the first subparagraph of Article 27(1), and under paragraphs 2, 3 and 4 of that Article as regards the principles set out under Article 5;
an identification of the bodies referred to under Articles 125, 126 and 127 of this Regulation and Article 65(2) of the EAFRD Regulation as relevant for the Fund concerned;
for each ex ante conditionality, established in accordance with Article 19 and Annex XI, which is applicable to the programme, an assessment of whether the ex ante conditionality is fulfilled at the date of submission of the Partnership Agreement and programme, and where ex ante conditionalities are not fulfilled, a description of the actions to fulfil the ex ante conditionality, the bodies responsible and a timetable for such actions in accordance with the summary submitted in the Partnership Agreement.
Article 29
Procedure for the adoption of programmes
By way of derogation from the requirement referred to in the first subparagraph, programmes under the European territorial cooperation goal may be approved by the Commission before the adoption of the decision approving the Partnership Agreement and dedicated operational programmes for the YEI referred to in point (a) of the second paragraph of Article 18 of the ESF Regulation and dedicated programmes referred to in point (b) of the first subparagraph of Article 39(4) of this Regulation may be approved by the Commission before the submission of the Partnership Agreement.
Article 30
Amendment of programmes
Where the amendment of a programme affects the information provided in the Partnership Agreement, the procedure set out in Article 16(4a) shall apply.
Such transfers shall not affect previous years. They shall be considered to be not substantial and shall not require a decision of the Commission amending the programme. They shall however comply with all regulatory requirements and shall be approved by the monitoring committee in advance. The Member State shall notify the revised financial tables to the Commission.
Article 31
Participation of the EIB
CHAPTER II
Community-led local development
Article 32
Community-led local development
Community-led local development shall be:
focused on specific subregional areas;
led by local action groups composed of representatives of public and private local socio-economic interests, in which, at the decision-making level neither public authorities, as defined in accordance with national rules, nor any single interest group represents more than 49 % of the voting rights;
carried out through integrated and multi-sectoral area-based local development strategies;
designed taking into consideration local needs and potential, and shall include innovative features in the local context, networking and, where appropriate, cooperation.
Article 33
Community-led local development strategies
A community-led local development strategy shall contain at least the following elements:
the definition of the area and population covered by the strategy;
an analysis of the development needs and potential of the area, including an analysis of strengths, weaknesses, opportunities and threats;
a description of the strategy and its objectives, a description of the integrated and innovative features of the strategy and a hierarchy of objectives, including measurable targets for outputs or results. In relation to results, targets may be expressed in quantitative or qualitative terms. The strategy shall be consistent with the relevant programmes of all the ESI Funds concerned that are involved;
a description of the community involvement process in the development of the strategy;
an action plan demonstrating how objectives are translated into actions;
a description of the management and monitoring arrangements of the strategy, demonstrating the capacity of the local action group to implement the strategy and a description of specific arrangements for evaluation;
the financial plan for the strategy, including the planned allocation from each of the ESI Funds concerned.
Article 34
Local action groups
Member States shall define the respective roles of the local action group and the authorities responsible for the implementation of the relevant programmes, concerning all implementation tasks relating to the community-led local development strategy.
The tasks of local action groups shall include the following:
building the capacity of local actors, including potential beneficiaries, to develop and implement operations including by fostering their capacity to prepare and manage their projects;
drawing up a non-discriminatory and transparent selection procedure which avoids conflicts of interests, ensures that at least 50 % of the votes in selection decisions are cast by partners which are not public authorities, and allows selection by written procedure;
drawing up and approving non-discriminatory objective criteria for the selection of operations that ensure coherence with the community-led local development strategy by prioritising those operations according to their contribution to meeting that strategy’s objectives and targets;
preparing and publishing calls for proposals or an ongoing project submission procedure;
receiving and assessing applications for support;
selecting operations and fixing the amount of support and, where relevant, presenting the proposals to the body responsible for final verification of eligibility before approval;
monitoring the implementation of the community-led local development strategy and the operations supported and carrying out specific evaluation activities linked to that strategy.
Where local action groups carry out tasks not covered by points (a) to (g) of the first subparagraph that fall under the responsibility of the managing or certifying authority or of the paying agency, those local action groups shall be designated as intermediate bodies in accordance with the Fund-specific rules.
Article 35
Support from the ESI Funds for community-led local development
Support from the ESI Funds concerned for community-led local development shall cover:
the costs of preparatory support consisting of capacitybuilding, training and networking with a view to preparing and implementing a community-led local development strategy.
Such costs may include one or more of the following elements:
training actions for local stakeholders;
studies of the area concerned;
costs related to the design of the community-led local development strategy, including consultancy costs and costs for actions related to consultations of stakeholders for the purposes of preparing the strategy;
administrative costs (operating and personnel costs) of an organisation that applies for preparatory support during the preparation phase;
support for small pilot projects.
Such preparatory support shall be eligible regardless of whether the community-led local development strategy designed by the local action group benefitting from the support is selected for funding by the selection committee set up under Article 33(3).
implementation of operations under the community-led local development strategy;
preparation and implementation of the local action group's cooperation activities;
running costs linked to the management of the implementation of the community-led local development strategy consisting of operating costs, personnel costs, training cost, costs linked to public relations, financial costs as well as the costs linked to monitoring and evaluation of that strategy as referred to in point (g) of Article 34(3);
animation of the community-led local development strategy in order to facilitate exchange between stakeholders to provide information and to promote the strategy and to support potential beneficiaries with a view to developing operations and preparing applications.
CHAPTER ΙΙΙ
Territorial development
Article 36
Integrated territorial investment
Actions carried out as an ITI may be complemented with financial support from the EAFRD or the EMFF.
Where an ITI is complemented with financial support from the EAFRD or the EMFF, the indicative financial allocation and the measures covered shall be set out in the relevant programme or programmes in accordance with the Fund-specific rules.
TITLE IV
FINANCIAL INSTRUMENTS
Article 37
Financial instruments
Financial instruments shall be implemented to support investments which are expected to be financially viable and do not give rise to sufficient funding from market sources. When applying this Title, the managing authorities, the bodies implementing funds of funds, and the bodies implementing financial instruments shall comply with applicable law, in particular on State aid and public procurement.
Support of financial instruments shall be based on an ex ante assessment which has established evidence of market failures or suboptimal investment situations, and the estimated level and scope of public investment needs, including types of financial instruments to be supported. Such ex ante assessment shall include:
an analysis of market failures, suboptimal investment situations, and investment needs for policy areas and thematic objectives or investment priorities to be addressed with a view to contributing to the achievement of specific objectives set out under a priority and to be supported through financial instruments. That analysis shall be based on available good practices methodology;
an assessment of the added value of the financial instruments that are being considered for support from the ESI Funds, consistency with other forms of public intervention addressing the same market, possible State aid implications, the proportionality of the envisaged intervention and measures to minimise market distortion;
an estimate of additional public and private resources to be potentially raised by the financial instrument down to the level of the final recipient (expected leverage effect), including as appropriate an assessment of the need for, and the extent of, differentiated treatment as referred to in Article 43a to attract counterpart resources from investors operating under the market economy principle and/or a description of the mechanisms which will be used to establish the need for, and extent of, such differentiated treatment, such as a competitive or appropriately independent assessment process;
an assessment of lessons learnt from similar instruments and ex ante assessments carried out by the Member State in the past, and how such lessons will be applied in the future;
the proposed investment strategy, including an examination of options for implementation arrangements within the meaning of Article 38, financial products to be offered, final recipients targeted and envisaged combination with grant support as appropriate;
a specification of the expected results and how the financial instrument concerned is expected to contribute to the achievement of the specific objectives set out under the relevant priority including indicators for that contribution;
provisions allowing for the ex ante assessment to be reviewed and updated as required during the implementation of any financial instrument which has been implemented based upon such assessment, where during the implementation phase, the managing authority considers that the ex ante assessment may no longer accurately represent the market conditions existing at the time of implementation.
The summary findings and conclusions of ex ante assessments in relation to financial instruments shall be published within three months of their date of finalisation.
The ex ante assessment shall be submitted to the monitoring committee for information purposes in accordance with the Fund-specific rules.
Financial instruments may also provide support in the form of working capital to SMEs, if necessary as a temporary measure, to provide an effective response to a public health crisis.
Article 38
Implementation of financial instruments
In implementing Article 37, managing authorities may provide a financial contribution to the following financial instruments:
financial instruments set up at Union level, managed directly or indirectly by the Commission;
financial instruments set up at national, regional, transnational or cross-border level, managed by or under the responsibility of the managing authority;
financial instruments combining such contribution with EIB financial products under the EFSI in accordance with Article 39a.
Contributions to the financial instruments referred to in the first subparagraph shall be subject to this Regulation unless exceptions are expressly provided for.
The second subparagraph is without prejudice to the rules governing the set up and functioning of the financial instruments under the Financial Regulation, unless those rules conflict with the rules of this Regulation, in which case this Regulation prevails.
For financial instruments under point (b) of paragraph 1, the managing authority may provide a financial contribution to the following financial instruments:
financial instruments complying with the standard terms and conditions laid down by the Commission, in accordance with the second subparagraph of this paragraph;
already existing or newly created financial instruments which are specifically designed to achieve the specific objectives set out under the relevant priority.
The Commission shall adopt implementing acts concerning the standard terms and conditions with which the financial instruments under point (a) of the first subparagraph shall comply. Those implementing acts shall be adopted in accordance with the examination procedure referred to in Article 150(3).
When supporting financial instruments referred to in point (b) of paragraph 1 the managing authority may:
invest in the capital of existing or newly created legal entities, including those financed from other ESI Funds, dedicated to implementing financial instruments consistent with the objectives of the respective ESI Funds, which will undertake implementation tasks; the support to such entities shall be limited to the amounts necessary to implement new investments in accordance with Article 37 and in a manner that is consistent with the objectives of this Regulation;
entrust implementation tasks, through the direct award of a contract, to:
the EIB;
an international financial institution in which a Member State is a shareholder;
a publicly-owned bank or institution, established as a legal entity carrying out financial activities on a professional basis, which fulfils all of the following conditions:
entrust implementation tasks to another body governed by public or private law; or
undertake implementation tasks directly, in the case of financial instruments consisting solely of loans or guarantees. In that case the managing authority shall be considered to be the beneficiary within the meaning of point (10) of Article 2.
When implementing the financial instrument, the bodies referred to in points (a) to (d) of the first subparagraph of this paragraph shall ensure compliance with applicable law and with the requirements laid down in Article 155(2) and (3) of the Financial Regulation.
The Commission shall be empowered to adopt delegated acts in accordance with Article 149 laying down additional specific rules on the role, liabilities and responsibility of bodies implementing financial instruments, related selection criteria and products that may be delivered through financial instruments in accordance with Article 37. The Commission shall notify those delegated acts simultaneously to the European Parliament and the Council by 22 april 2014.
Where a financial instrument is implemented under points (a), (b) and (c) of the first subparagraph of paragraph 4, subject to the implementation structure of the financial instrument, the terms and conditions for contributions from programmes to financial instruments shall be set out in funding agreements in accordance with Annex IV at the following levels:
where applicable, between the duly mandated representatives of the managing authority and the body that implements the fund of funds; and
between the duly mandated representatives of the managing authority, or where applicable, the body that implements the fund of funds, and the body that implements the financial instrument.
Article 39
Contribution of ERDF and EAFRD to joint uncapped guarantee and securitisation financial instruments in favour of SMEs, implemented by the EIB
Member States may use the ERDF and EAFRD during the eligibility period set out in Article 65(2) of this Regulation to provide a financial contribution to financial instruments referred to in point (a) of Article 38(1) of this Regulation, implemented indirectly by the Commission with the EIB pursuant to point (c)(iii) of the first subparagraph of Article 62(1) of the Financial Regulation and Article 208(4) of the Financial Regulation, in respect of the following activities:
uncapped guarantees providing capital relief to financial intermediaries for new portfolios of debt finance to eligible SMEs in accordance with Article 37(4) of this Regulation;
securitisation, as defined in point (61) of Article 4 (1) of Regulation (EU) 575/2013 of the European Parliament and of the Council ( 22 ), of any of the following:
existing portfolios of debt finance to SMEs and other enterprises with less than 500 employees;
new portfolios of debt finance to SMEs.
The financial contribution referred to in points (a) and (b) of the first subparagraph of this paragraph shall contribute to junior and/or mezzanine tranches of portfolios mentioned therein provided that the relevant financial intermediary retains a sufficient part of the risk of the portfolios at least equal to the risk retention requirement set out in Directive 2013/36/EU of the European Parliament and of the Council ( 23 ) and in Regulation (EU) No 575/2013 to ensure adequate alignment of interest. In the case of securitisation under point (b) of the first subparagraph of this paragraph, the financial intermediary is obliged to originate new debt finance to eligible SMEs in accordance with Article 37(4) of this Regulation.
Each Member State intending to participate in such financial instruments shall contribute an amount which is in line with SMEs' debt financing needs in that Member State and the estimated demand for such SME debt finance, taking into account the ex ante assessment referred to in point (a) of the first subparagraph of paragraph 4 and in any case which is not higher than 7 % of the allocation from the ERDF and EAFRD to the Member State. The aggregate ERDF and EAFRD contribution by all participating Member States shall be subject to a global ceiling of EUR 8 500 000 000 (in 2011 prices).
Where it is considered by the Commission in consultation with the EIB that the aggregate minimum contribution to the instrument representing the sum of the contributions of all participating Member States is insufficient taking due account of the minimum critical mass defined in the ex ante assessment referred to in point (a) of the first subparagraph of paragraph 4, implementation of the financial instrument shall be discontinued and the contributions returned to the Member States.
Where the Member State and the EIB are not able to agree the conditions of the funding agreement referred to in point (c) of the first subparagraph of paragraph 4 the Member State shall submit a request for amendment of the programme referred to in point (b) of the first subparagraph of paragraph 4 and reallocate the contribution to other programmes and priorities in accordance with requirements for thematic concentration.
Where the conditions for the termination of the Member State's contribution to the instrument established in the funding agreement between the Member State concerned and the EIB referred to in point (c) of the first subparagraph of paragraph 4 have been satisfied, the Member State shall submit a request for amendment of the programme referred to in point (b) of the first subparagraph of paragraph 4 and reallocate the remaining contribution to other programmes and priorities in accordance with requirements for thematic concentration.
Where the participation of a Member State is discontinued, that Member State shall submit a request for amendment of the programme. Where unused appropriations are decommitted, the decommitted appropriations shall be made available again to the Member State concerned, in order to be re-programmed for other programmes and priorities in accordance with the requirements for thematic concentration.
The financial contribution referred to in paragraph 2 shall comply with the following conditions:
by way of derogation from Article 37(2), it shall be based on an ex ante assessment at Union level carried out by the EIB and the Commission or, where more recent data are available, on an ex ante assessment at Union, national or regional level.
On the basis of available data sources on bank debt finance and SMEs, the ex ante assessment shall cover, inter alia, an analysis of the SME financing needs at the relevant level, SME financing conditions and needs as well as an indication of the SME financing gap, a profile of the economic and financial situation of the SME sector at the relevant level, minimum critical mass of aggregate contributions, a range of estimated total loan volume generated by such contributions, and the added value;
it shall be provided by each participating Member State as part of a separate priority axis within a programme in the case of ERDF contribution, or a single dedicated national programme per financial contribution by ERDF and EAFRD, supporting the thematic objective set out in point (3) of the first paragraph of Article 9;
it shall be subject to the conditions set out in a funding agreement concluded between each participating Member State and the EIB including, inter alia:
tasks and obligations of the EIB including remuneration;
minimum leverage to be achieved at clearly defined milestones within the eligibility period indicated in Article 65(2);
conditions for the new debt finance;
provisions relating to non-eligible activities and exclusion criteria;
schedule of payments;
penalties in the event of non-performance by financial intermediaries;
selection of financial intermediaries;
monitoring, reporting and auditing;
visibility;
the conditions for termination of the agreement.
For the purposes of implementation of the instrument, the EIB will enter into contractual arrangements with selected financial intermediaries;
in the event that the funding agreement referred to in point (c) is not concluded within six months of the adoption of the programme referred to in point (b), the Member State shall have the right to reallocate such contribution to other programmes and priorities in accordance with requirements for thematic concentration.
The Commission shall, in order to ensure uniform conditions for the implementation of this Article, adopt an implementing act laying down the model of the funding agreement referred to in point (c) of the first subparagraph. That implementing act shall be adopted in accordance with the examination procedure referred to in Article 150(3).
In the event that the financial intermediary does not achieve the minimum leverage set out in the funding agreement referred to in point (c) of the first subparagraph of paragraph 4 it shall be contractually bound to pay penalties for the benefit of the participating Member State, in accordance with the terms and conditions set out in the funding agreement.
Neither the guarantees issued nor the relevant securitisation transactions shall be affected by a failure by the financial intermediary to reach the minimum leverage set out in the funding agreement.
At closure of the programme, the eligible expenditure as referred to in points (a) and (b) of the first subparagraph of Article 42(1) shall be the total amount of programme contributions paid to the financial instrument, corresponding:
for the activities referred to in point (a) of the first subparagraph of paragraph 2 of this Article, to the resources referred to in point (b) of the first subparagraph of Article 42(1);
for the activities referred to in point (b) of the first subparagraph of paragraph 2 of this Article, to the aggregate amount of new debt finance resulting from the securitisation transactions, paid to or to the benefit of eligible SMEs within the eligibility period set out in Article 65(2).
The report referred to in Article 46(1) shall include the following additional elements:
the total amount of ERDF and EAFRD support paid to the financial instrument in relation to uncapped guarantees or securitisation transactions, by programme and priority or measure;
progress in creating the new debt finance in accordance with Article 37(4), for eligible SMEs.
Article 39a
Contribution of ESI Funds to financial instruments combining such contribution with EIB financial products under the European Fund for Strategic Investments
When contributing to financial instruments referred to in point (c) of Article 38(1) the managing authority may do any of the following:
invest in the capital of an existing or newly created legal entity dedicated to implement investments in final recipients consistent with the objectives of the respective ESI Funds which will undertake implementation tasks;
entrust implementation tasks in accordance with points (b) and (c) of the first subparagraph of Article 38(4).
The body entrusted with implementation tasks as referred to in point (b) of the first subparagraph of this paragraph shall either open a fiduciary account in its name and on behalf of the managing authority or set up a separate block of finance within the institution for programme contribution. In the case of a separate block of finance, an accounting distinction shall be made between programme resources invested in the financial instrument and the other resources available in the institution. The assets held on fiduciary accounts and such separate blocks of finance shall be managed in accordance with the principle of sound financial management following appropriate prudential rules and shall have appropriate liquidity.
For the purposes of this Article, a financial instrument may also take the form or be part of an investment platform in line with Article 2(4) of Regulation (EU) 2015/1017, provided that the investment platform takes the form of a special purpose vehicle or a managed account.
The terms and conditions for contributions pursuant to point (c) of Article 38(1) shall be set out in funding agreements in accordance with Annex IV at the following levels:
where applicable, between the duly mandated representatives of the managing authority and the body that implements the fund of funds;
between the duly mandated representatives of the managing authority, or where applicable, between the body that implements the fund of funds, and the body that implements the financial instrument.
Article 40
Management and control of financial instruments
However, the designated authorities shall carry out verifications in accordance with Article 125(5) of this Regulation and checks in accordance with Article 59(1) of Regulation (EU) No 1306/2013 at the level of other bodies implementing the financial instruments in the jurisdiction of their respective Member State.
The EIB and other international financial institutions in which a Member State is a shareholder shall provide to the designated authorities a control report with each application for payment. They shall also provide to the Commission and to the designated authorities an annual audit report drawn up by their external auditors. Those reporting obligations are without prejudice to the reporting obligations, including as regards the performance of the financial instruments, as set out in Article 46(1) and (2) of this Regulation.
The Commission shall be empowered to adopt an implementing act concerning the models for the control reports and the annual audit reports referred to in the third subparagraph of this paragraph.
That implementing act shall be adopted in accordance with the advisory procedure referred to in Article 150(2).
The bodies responsible for the audit of the programmes shall carry out audits of operations and of management and control systems at the level of other bodies implementing the financial instruments in their respective Member States and at the level of the final recipients provided that the conditions set out in paragraph 3 are fulfilled.
The Commission may carry out audits at the level of the bodies referred to in paragraph 1, where it concludes that this is necessary to obtain reasonable assurance given the risks identified.
The bodies responsible for the audit of programmes may conduct audits at the level of final recipients only when one or more of the following situations occur:
supporting documents, providing evidence of the support from the financial instrument to final recipients and of its use for the intended purposes in line with applicable law, are not available at the level of the managing authority or at the level of the bodies that implement financial instruments;
there is evidence that the documents available at the level of the managing authority or at the level of the bodies that implement financial instruments do not represent a true and accurate record of the support provided.
By way of derogation from Article 143(4) of this Regulation and from the second paragraph of Article 56 of Regulation (EU) No 1306/2013, in operations comprising financial instruments, a contribution cancelled in accordance with Article 143(2) of this Regulation or in accordance with the first paragraph of Article 56 of Regulation (EU) No 1306/2013, as a result of an individual irregularity, may be reused within the same operation under the following conditions:
where the irregularity that gives rise to the cancellation of the contribution is detected at the level of the final recipient, the contribution cancelled may be reused only for other final recipients within the same financial instrument;
where the irregularity that gives rise to the cancellation of the contribution is detected at the level of the financial intermediary within a fund of funds, the contribution cancelled may be reused only for other financial intermediaries.
Where the irregularity that gives rise to the cancellation of the contribution is detected at the level of the body implementing funds of funds, or at the level of the body implementing financial instruments where a financial instrument is implemented through a structure without a fund of funds, the contribution cancelled may not be reused within the same operation.
Where a financial correction is made for a systemic irregularity, the contribution cancelled may not be reused for any operation affected by the systemic irregularity.
Article 41
Payment applications including expenditure for financial instruments
As regards financial instruments referred to in points (a) and (c) of Article 38(1), and as regards financial instruments referred to in point (b) of Article 38(1) implemented in accordance with points (a), (b) and (c) of the first subparagraph of Article 38(4), phased applications for interim payment shall be made for programme contributions paid to the financial instrument during the eligibility period laid down in Article 65(2) (the ‘eligibility period’) in accordance with the following conditions:
the amount of the programme contribution paid to the financial instrument included in each application for interim payment submitted during the eligibility period shall not exceed 25 % of the total amount of programme contributions committed to the financial instrument under the relevant funding agreement, corresponding to expenditure within the meaning of points (a), (b) and (d) of Article 42(1) expected to be paid during the eligibility period. Applications for interim payment submitted after the eligibility period shall include the total amount of eligible expenditure within the meaning of Article 42;
each application for interim payment referred to in point (a) of this paragraph may include up to 25 % of the total amount of the national co-financing as referred to in Article 38(9) expected to be paid to the financial instrument, or at the level of final recipients for expenditure in the meaning of points (a), (b) and (d) of Article 42(1), within the eligibility period;
subsequent applications for interim payment submitted during the eligibility period shall only be made:
for the second application for interim payment, when at least 60 % of the amount included in the first application for interim payment has been spent as eligible expenditure ◄ within the meaning of points (a), (b) and (d) of Article 42(1);
for the third and subsequent applications for interim payment, when at least 85 % of the amounts included in the previous applications for interim payment have been spent as eligible expenditure ◄ within the meaning of points (a), (b) and (d) of Article 42(1);
each application for interim payment, which includes expenditure related to financial instruments, shall separately disclose the total amount of programme contributions paid to the financial instruments and the amounts paid as eligible expenditure ◄ within the meaning of points (a), (b) and (d) of Article 42(1).
At closure of a programme, the application for payment of the final balance shall include the total amount of eligible expenditure as referred to in Article 42.
Article 42
Eligible expenditure at closure
At closure of a programme, the eligible expenditure of the financial instrument shall be the total amount of programme contributions effectively paid or, in the case of guarantees, committed by the financial instrument within the eligibility period, corresponding to:
payments to final recipients, and in the cases referred to in Article 37(7) payments to the benefit of final recipients;
resources committed for guarantee contracts, whether outstanding or already come to maturity, in order to honour possible guarantee calls for losses, calculated on the basis of a prudent ex ante risk assessment, covering a multiple amount of underlying new loans or other risk-bearing instruments for new investments in final recipients;
capitalised interest rate subsidies or guarantee fee subsidies, due to be paid for a period not exceeding 10 years after the eligibility period, used in combination with financial instruments, paid into an escrow account specifically set up for that purpose, for effective disbursement after the eligibility period, but in respect of loans or other risk-bearing instruments disbursed for investments in final recipients within the eligibility period;
reimbursement of management costs incurred or payment of management fees of the financial instrument.
The Commission shall be empowered to adopt delegated acts in accordance with Article 149 laying down the specific rules concerning the establishment of a system of capitalisation of annual instalments for interest rate subsidies and guarantee fee subsidies referred to in point (c) of the first subparagraph.
The amount paid into the escrow account:
shall be used solely for follow-on investments in final recipients having received initial equity investments from the financial instrument within the eligibility period, which are still wholly or partially outstanding;
shall be used solely for follow-on investments to be made in accordance with market standards and market standard contractual arrangements and limited to the minimum necessary to stimulate private sector co-investment, while ensuring continuity of financing for the target enterprises so that both public and private investors can benefit from investments;
shall not exceed 20 % of the eligible expenditure of the equity-based instrument referred to in point (a) of the first subparagraph of paragraph 1 from which ceiling capital resources and gains returned to that equity-based instrument during the eligibility period shall be deducted.
Any amounts paid into the escrow account which are not used for investments in final recipients paid in the period referred to in the first subparagraph shall be used in accordance with Article 45.
The eligible expenditure disclosed in accordance with paragraphs 1, 2 and 3 shall not exceed ◄ the sum of the:
total amount of the support from the ESI Funds paid for the purposes of paragraphs 1, 2 and 3 ◄ ; and
corresponding national co-financing.
Management costs and fees may comprise arrangement fees. Where arrangement fees, or any part thereof, are charged to final recipients, they shall not be declared as eligible expenditure.
Management costs and fees, including those incurred for preparatory work in relation to the financial instrument before the signature of the relevant funding agreement, shall be eligible as from the date of signature of the relevant funding agreement.
Article 43
Interest and other gains generated by support from the ESI Funds to financial instruments
Article 43a
Differentiated treatment of investors
Article 44
Re-use of resources attributable to the support from the ESI Funds until the end of the eligibility period
Without prejudice to Article 43a, resources paid back to financial instruments from investments or from the release of resources committed for guarantee contracts, including capital repayments and gains and other earnings or yields, such as interest, guarantee fees, dividends, capital gains or any other income generated by investments, which are attributable to the support from the ESI Funds, shall be re-used for the following purposes, up to the amounts necessary and in the order agreed in the relevant funding agreements:
further investments through the same or other financial instruments, in accordance with the specific objectives set out under a priority;
where applicable, to cover the losses in the nominal amount of the ESI Funds contribution to the financial instrument resulting from negative interest, if such losses occur despite active treasury management by the bodies implementing financial instruments;
where applicable, reimbursement of management costs incurred and payment of management fees of the financial instrument.
Article 45
►C1 Re-use of resources after the end of the eligibility period
Member States shall adopt the necessary measures to ensure that resources paid back to financial instruments, including capital repayments and gains and other earnings or yields generated during a period of at least eight years after the end of the eligibility period, which are attributable to the support from the ESI Funds to financial instruments pursuant to Article 37, are re-used in accordance with the aims of the programme or programmes ◄ , either within the same financial instrument or, following the exit of those resources from the financial instrument, in other financial instruments provided that, in both cases, an assessment of market conditions demonstrates a continuing need for such investment, or in other forms of support.
Article 46
Report on implementation of financial instruments
The specific report referred to in paragraph 1 shall include, for each financial instrument, the following information:
identification of the programme and of the priority or measure from which support from the ESI Funds is provided;
description of the financial instrument and implementation arrangements;
identification of the bodies implementing financial instruments, and the bodies implementing funds of funds where applicable, as referred to under points (a), (b) and (c) of Article 38(1);
total amount of programme contributions by priority or measure paid to the financial instrument;
total amount of support paid to the final recipients or to the benefit of final recipients, or committed in guarantee contracts by the financial instrument for investments in final recipients, as well as management costs incurred or management fees paid, by programme and priority or measure;
the performance of the financial instrument including progress in its set-up and in selection of bodies implementing the financial instrument, including the body implementing a fund of funds;
interest and other gains generated by support from the ESI Funds to the financial instrument and programme resources paid back to financial instruments from investments as referred to in Articles 43 and 44 and amounts used for differentiated treatment as referred to in Article 43a;
progress in achieving the expected leverage effect of investments made by the financial instrument;
the value of equity investments, with respect to previous years;
contribution of the financial instrument to the achievement of the indicators of the priority or measure concerned.
The information in points (h) and (j) of the first subparagraph may be included only in the annex to the annual implementation reports submitted in 2017 and 2019 as well as in the final implementation report. The reporting obligations set out in points (a) to (j) of the first subparagraph shall not be applied at the level of final recipients.
TITLE V
MONITORING AND EVALUATION
CHAPTER I
Monitoring
Article 47
Monitoring committee
A Member State may set up a single monitoring committee to cover more than one programme co-financed by the ESI Funds.
Article 48
Composition of the monitoring committee
The composition of the monitoring committee of a programme under the European territorial goal shall be agreed by the Member States participating in the programme and by third countries in the event that they have accepted the invitation to participate in the cooperation programme. The monitoring committee shall include relevant representatives of those Member States and third countries. The monitoring committee may include representatives of the EGTC carrying out activities related to the programme within the programme area.
Article 49
Functions of the monitoring committee
Article 50
Implementation reports
The Commission shall inform the Member State within 15 working days of the date of receipt of the annual implementation report if it is not admissible, failing which it shall be deemed admissible.
Article 51
Annual review meeting
Article 52
Progress report
The progress report shall set out information on and assess:
changes in the development needs in the Member State since the adoption of the Partnership Agreement;
progress made towards achievement of the Union strategy for smart, sustainable and inclusive growth, as well as of the Fund-specific missions referred to in Article 4(1), through the contribution of the ESI Funds to the thematic objectives selected, and in particular with regard to the milestones set out in the performance framework for each programme, and to the support used for climate change objectives;
whether the actions taken to fulfil the applicable ex ante conditionalities set out in the Partnership Agreement not fulfilled at the date of adoption of the Partnership Agreement have been implemented in accordance with the timetable established. This point shall only apply to the progress report to be submitted in 2017;
implementation of mechanisms to ensure coordination between the ESI Funds and other Union and national funding instruments and with the EIB;
implementation of the integrated approach to territorial development, or a summary of the implementation of the integrated approaches that are based on the programmes, including progress towards achievement of priority areas established for cooperation;
where appropriate, actions taken to reinforce the capacity of the Member State authorities and beneficiaries to administer and use the ESI Funds;
actions taken, and progress made, with regard to reducing the administrative burden on beneficiaries;
the role of the partners referred to in Article 5 in the implementation of the Partnership Agreement;
a summary of the actions taken in relation to the application of the horizontal principles referred to in Articles 5, 7 and 8 and policy objectives for the implementation of the ESI Funds.
Article 53
Reporting by the Commission and debate on the ESI Funds
CHAPTER II
Evaluation
Article 54
General Provisions
Article 55
Ex ante evaluation
Ex ante evaluations shall appraise:
the contribution to the Union strategy for smart, sustainable and inclusive growth, having regard to the selected thematic objectives and priorities, taking into account national and regional needs and potential for development as well as lessons drawn from previous programming periods;
the internal coherence of the proposed programme or activity and its relationship with other relevant instruments;
the consistency of the allocation of budgetary resources with the objectives of the programme;
the consistency of the selected thematic objectives, the priorities and corresponding objectives of the programmes with the CSF, the Partnership Agreement and the relevant country specific recommendations adopted in accordance with Article 121(2) TFEU and where appropriate at national level, the National Reform Programme;
the relevance and clarity of the proposed programme indicators;
how the expected outputs will contribute to results;
whether the quantified target values for indicators are realistic, having regard to the support envisaged from the ESI Funds;
the rationale for the form of support proposed;
the adequacy of human resources and administrative capacity for management of the programme;
the suitability of the procedures for monitoring the programme and for collecting the data necessary to carry out evaluations;
the suitability of the milestones selected for the performance framework;
the adequacy of planned measures to promote equal opportunities between men and women and to prevent any discrimination, in particular as regards accessibility for persons with disabilities;
the adequacy of planned measures to promote sustainable development;
measures planned to reduce the administrative burden on beneficiaries.
Article 56
Evaluation during the programming period
▼M6 —————
Article 57
Ex post evaluation
TITLE VI
TECHNICAL ASSISTANCE
Article 58
Technical assistance at the initiative of the Commission
The measures referred to in the first subparagraph may be implemented either directly by the Commission or indirectly, by entities and persons other than Member States in accordance with ►M6 Article 154 of the Financial Regulation ◄ .
The measures referred to in the first subparagraph may include in particular:
assistance for project preparation and appraisal, including with the EIB;
support for institutional strengthening and administrative capacity-building for the effective management of the ESI Funds;
studies linked to the Commission's reporting on the ESI Funds and the cohesion report;
measures related to the analysis, management, monitoring, information exchange and implementation of the ESI Funds, as well as measures relating to the implementation of control systems and technical and administrative assistance;
evaluations, expert reports, statistics and studies, including those of a general nature, concerning the current and future operation of the ESI Funds, which may be carried out where appropriate by the EIB;
actions to disseminate information, support networking, carry out communication activities with particular attention to the results and added value of support from the ESI Funds, raise awareness and promote cooperation and exchange of experience, including with third countries;
the installation, operation and interconnection of computerised systems for management, monitoring, audit, control and evaluation;
actions to improve evaluation methods and the exchange of information on evaluation practices;
actions related to auditing;
the strengthening of national and regional capacity regarding investment planning, needs assessment, preparation, design and implementation of financial instruments, joint action plans and major projects, including joint initiatives with the EIB;
the dissemination of good practices in order to assist Member States to strengthen the capacity of the relevant partners referred to in Article 5 and their umbrella organisations;
actions financed under Regulation (EU) 2017/825 in order to contribute to delivering the Union strategy for smart, sustainable and inclusive growth.
The Commission shall dedicate at least 15 % of the resources referred to in this Article to bring about greater efficiency in communication to the public and stronger synergies between the communication activities undertaken at the initiative of the Commission, by extending the knowledge base on results, in particular through more effective data collection and dissemination, evaluations and reporting, and especially by highlighting the contribution of the ESI Funds to improving people’s lives, and by increasing the visibility of support from the ESI Funds as well as by raising awareness about the results and the added value of such support. Information, communication and visibility measures on results and added value of support from the ESI Funds, with particular focus on operations, shall be continued after the closure of the programmes, where appropriate. Such measures shall also contribute to the corporate communication of the political priorities of the Union as far as they are related to the general objectives of this Regulation.
Depending on their purpose, the measures referred to in this Article can be financed either as operational or administrative expenditure.
Article 59
Technical assistance at the initiative of the Member States
Without prejudice to paragraph 2, Member States may implement actions referred to in paragraph 1 through the direct award of a contract to:
the EIB;
an international financial institution in which a Member State is a shareholder;
a publicly-owned bank or institution, as referred to in point (b)(iii) of the first subparagraph of Article 38(4).
TITLE VII
FINANCIAL SUPPORT FROM THE ESI FUNDS
CHAPTER I
Support from the ESI Funds
Article 60
Determination of co-financing rates
Article 61
Operations generating net revenue after completion
Where not all the investment cost is eligible for co-financing, the net revenue shall be allocated pro rata to the eligible and non-eligible parts of the investment cost.
The potential net revenue of the operation shall be determined in advance by one of the following methods chosen by the managing authority for a sector, subsector or type of operation:
application of a flat rate net revenue percentage for the sector or subsector applicable to the operation as defined in Annex V or in any of the delegated acts referred to in the second, third and fourth subparagraphs;
application of a flat rate net revenue percentage established by a Member State for a sector or subsector not covered by point (a). Before the application of the flat rate the responsible audit authority shall verify that the flat rate has been established according to a fair, equitable and verifiable method based on historical data or objective criteria;
calculation of the discounted net revenue of the operation, taking into account the reference period appropriate to the sector or subsector applicable to the operation, the profitability normally expected of the category of investment concerned, the application of the polluter-pays principle and, if appropriate, considerations of equity linked to the relative prosperity of the Member State or region concerned.
The Commission shall be empowered to adopt delegated acts in accordance with Article 149 in duly justified cases to amend Annex V by adjusting the flat rates established therein taking into account historical data, the potential for cost recovery and the polluter-pays principle where applicable.
The Commission shall be empowered to adopt delegated acts in accordance with Article 149 establishing flat rates for sectors or subsectors within the fields of ICT, RDI and energy efficiency. The Commission shall notify the delegated acts to the European Parliament and the Council not later than 30 June 2015.
In addition, the Commission shall be empowered to adopt delegated acts in accordance with Article 149 in duly justified cases with regard to adding sectors or subsectors, including subsectors for sectors in Annex V, falling under the thematic objectives defined in the first paragraph of Article 9 and supported by the ESI Funds.
Where the method referred to in point (a) of the first subparagraph is applied, all the net revenue generated during implementation and after completion of the operation shall be considered to be taken into account by the application of the flat rate and shall therefore not be deducted subsequently from the eligible expenditure of the operation.
When a flat rate for a new sector or subsector has been established by the adoption of a delegated act in accordance with the third and fourth subparagraphs, a managing authority may choose to apply the method set out in point (a) of the first subparagraph for new operations in relation to the sector or subsector concerned.
The Commission shall be empowered to adopt delegated acts, in accordance with Article 149, laying down the method referred to in point (b) of the first subparagraph. Where that method is applied, the net revenue generated during implementation of the operation, resulting from sources of revenue not taken into account in determining the potential net revenue of the operation, shall be deducted from the eligible expenditure of the operation, no later than in the final payment claim submitted by the beneficiary.
Paragraphs 1 to 6 shall not apply to:
operations or parts of operations supported solely by the ESF;
operations whose total eligible cost before application of paragraphs 1 to 6 does not exceed EUR 1 000 000 ;
repayable assistance subject to an obligation for full repayment and prizes;
technical assistance;
support to or from financial instruments;
operations for which public support takes the form of lump sums or standard scale unit costs;
operations implemented under a joint action plan;
operations for which amounts or rates of support are defined in Annex II to the EAFRD Regulation or in the EMFF Regulation.
Notwithstanding point (b) of the first subparagraph of this paragraph, where a Member State applies paragraph 5, it may include in the relevant priority or measure operations whose total eligible cost before application of paragraphs 1 to 6 does not exceed EUR 1 000 000 .
CHAPTER II
Special rules on support from the ESI Funds to PPPs
Article 62
PPPs
The ESI Funds may be used to support PPP operations. Such PPP operations shall comply with applicable law, in particular concerning State aid and public procurement.
Article 63
Beneficiary under PPP operations
In relation to a PPP operation, and by way of derogation from point (10) of Article 2, a beneficiary may be either:
the public law body initiating the operation; or
a body governed by private law of a Member State (the "private partner") selected or to be selected for the implementation of the operation.
Article 64
Support for PPP operations
In the case of a PPP operation where the beneficiary is a public law body, expenditure under a PPP operation which has been incurred and paid by the private partner may, by way of derogation from Article 65(2), be considered as incurred and paid by a beneficiary and included in a payment application to the Commission ◄ provided that the following conditions are met:
the beneficiary has entered into a PPP agreement with a private partner;
the managing authority has verified that the expenditure declared by the beneficiary has been paid by the private partner and that the operation complies with applicable Union and national law, the programme and the conditions for support of the operation.
CHAPTER III
Eligibility of expenditure and durability
Article 65
Eligibility
The eligible expenditure of the operation to be co-financed from the ESI Funds shall be reduced by the net revenue not taken into account at the time of approval of the operation directly generated only during its implementation, not later than at the final payment claim submitted by the beneficiary. Where not all the costs are eligible for co-financing, the net revenue shall be allocated pro rata to the eligible and non-eligible parts of the cost.
This paragraph shall not apply to:
technical assistance;
financial instruments;
repayable assistance subject to an obligation for full repayment;
prizes;
operations subject to the State aid rules;
operations for which public support takes the form of lump sums or standard scale unit costs provided that the net revenue has been taken into account ex ante;
operations implemented under a joint action plan provided that the net revenue has been taken into account ex ante;
operations for which amounts or rates of support are defined in Annex II to the EAFRD Regulation or in the EMFF Regulation with the exception of those operations for which reference is made to this paragraph in the EMFF Regulation; or
operations for which the total eligible cost does not exceed EUR 100 000 .
For the purposes of this Article and Article 61, any payment received by the beneficiary arising from contractual penalties as a result of a breach of contract between the beneficiary and a third party or third parties or that has occurred as a result of the withdrawal of an offer by a third party chosen under public procurement rules (the 'deposit') shall not be considered as revenue and shall not be deducted from the eligible expenditure of the operation.
The Fund-specific rules for the EMFF may derogate from the first subparagraph.
By way of derogation from paragraph 9, expenditure for operations for fostering crisis response capacities in the context of the COVID-19 outbreak shall be eligible as of 1 February 2020.
Article 66
Forms of support
The ESI Funds shall be used to provide support in the form of grants, prizes, repayable assistance and financial instruments, or a combination thereof.
In the case of repayable assistance, the support repaid to the body that provided it, or to another competent authority of the Member State, shall be kept in a separate account or separated with accounting codes and reused for the same purpose or in accordance with the objectives of the programme.
Article 67
Forms of grants and repayable assistance
Grants and repayable assistance may take any of the following forms:
reimbursement of eligible costs actually incurred and paid, together with, where applicable, contributions in kind and depreciation;
standard scales of unit costs;
lump sums;
flat-rate financing, determined by the application of a percentage to one or more defined categories of costs;
financing which is not linked to costs of the relevant operations but is based on the fulfilment of conditions related to the realisation of progress in implementation or the achievement of objectives of programmes as set out in the delegated act adopted in accordance with paragraph 5a.
Fund-specific rules may limit the forms of grants or repayable assistance applicable to certain operations.
For the form of financing referred to in point (e) of the first subparagraph, the audit shall exclusively aim at verifying that the conditions for reimbursement have been fulfilled.
Where flat-rate financing is used, the categories of costs to which the flat rate is applied may be reimbursed in accordance with point (a) of the first subparagraph of paragraph 1.
For operations supported by the EAFRD, ERDF or the ESF, where the flat rate referred to in Article 68b(1) is used, the allowances and the salaries paid to participants may be reimbursed in accordance with point (a) of the first subparagraph of paragraph 1 of this Article.
This paragraph shall be subject to the transitional provisions set out in Article 152(7).
The amounts referred to in points (b), (c) and (d) of the first subparagraph of paragraph 1 shall be established in one of the following ways:
a fair, equitable and verifiable calculation method based on any of the following:
statistical data, other objective information or an expert judgement;
the verified historical data of individual beneficiaries;
the application of the usual cost accounting practices of individual beneficiaries;
a draft budget established on a case-by-case basis and agreed ex ante by the managing authority, or in the case of EAFRD the authority responsible for the selection of operations, where the public support does not exceed EUR 100 000 ;
in accordance with the rules for application of corresponding scales of unit costs, lump sums and flat rates applicable in Union policies for a similar type of operation and beneficiary;
in accordance with the rules for application of corresponding scales of unit costs, lump sums and flat rates applied under schemes for grants funded entirely by the Member State for a similar type of operation and beneficiary;
rates established by this Regulation or the Fund-specific rules;
specific methods for determining amounts established in accordance with the Fund-specific rules.
Article 68
Flat-rate financing for indirect costs concerning grants and repayable assistance
Where the implementation of an operation gives rise to indirect costs, they may be calculated at a flat rate in one of the following ways:
a flat rate of up to 25 % of eligible direct costs, provided that the rate is calculated on the basis of a fair, equitable and verifiable calculation method or a method applied under schemes for grants funded entirely by the Member State for a similar type of operation and beneficiary;
a flat rate of up to 15 % of eligible direct staff costs without there being a requirement for the Member State to perform a calculation to determine the applicable rate;
a flat rate applied to eligible direct costs based on existing methods and corresponding rates, applicable in Union policies for a similar type of operation and beneficiary.
The Commission is empowered to adopt delegated acts in accordance with Article 149 to supplement the provisions on the flat rate and the related methods referred to in point (c) of the first subparagraph of this paragraph.
Article 68a
Staff costs concerning grants and repayable assistance
The first subparagraph shall not apply to programmes under the European territorial cooperation goal for staff costs related to individuals who work on a part-time assignment on the operation.
Article 68b
Flat-rate financing for costs other than staff costs
For operations supported by the ESF, the ERDF or the EAFRD, salaries and allowances paid to participants shall be considered additional eligible costs not included in the flat rate.
Article 69
Specific eligibility rules for grants and repayable assistance
Contributions in kind in the form of provision of works, goods, services, land and real estate for which no cash payment supported by invoices, or documents of equivalent probative value, has been made, may be eligible on condition that the eligibility rules of the ESI Funds and the programme so provide and that all the following criteria are fulfilled:
the public support paid to the operation which includes contributions in kind does not exceed the total eligible expenditure, excluding contributions in kind, at the end of the operation;
the value attributed to contributions in kind does not exceed the costs generally accepted on the market in question;
the value and the delivery of the contribution can be independently assessed and verified;
in the case of provision of land or real estate, a cash payment, for the purposes of a lease agreement of a nominal amount per annum not exceeding a single unit of the currency of the Member State, may be made;
in the case of contributions in kind in the form of unpaid work, the value of that work is determined by taking into account the verified time spent and the rate of remuneration for equivalent work.
The value of the land or real estate referred to in point (d) of the first subparagraph of this paragraph shall be certified by an independent qualified expert or duly authorised official body and shall not exceed the limit laid down in point (b) of paragraph 3.
Depreciation costs may be considered as eligible where the following conditions are fulfilled:
the eligibility rules of the programme allow for it;
the amount of the expenditure is duly justified by supporting documents having equivalent probative value to invoices for eligible costs where reimbursed in the form referred to in point (a) of the first subparagraph of Article 67(1);
the costs relate exclusively to the period of support for the operation;
public grants have not contributed towards the acquisition of the depreciated assets.
The following costs shall not be eligible for a contribution from the ESI Funds and from the amount of support transferred from the Cohesion Fund to the CEF as referred to in Article 92(6):
interest on debt, except in relation to grants given in the form of an interest rate subsidy or guarantee fee subsidy;
the purchase of land not built on and land built on in the amount exceeding 10 % of the total eligible expenditure for the operation concerned. For derelict sites and for those formerly in industrial use which comprise buildings, that limit shall be increased to 15 %. In exceptional and duly justified cases, the limit may be raised above the respective aforementioned percentages for operations concerning environmental conservation;
value added tax except where it is non-recoverable under national VAT legislation.
Article 70
Eligibility of operations depending on location
Operations concerning the provision of services to citizens or businesses which cover the whole territory of a Member State shall be considered as being located in all programme areas within a Member State. In such cases, expenditure shall be allocated to the concerned programme areas on a pro-rata basis, based on objective criteria.
The second subparagraph of this paragraph does not apply to the national programme referred to in Article 6(2) of Regulation (EU) No 1305/2013 or to the specific programme for the establishment and the operation of the national rural network referred to in Article 54(1) of that Regulation.
The managing authority may accept that an operation is implemented outside the programme area but within the Union, provided that all the following conditions are satisfied:
the operation is for the benefit of the programme area;
the total amount from the ERDF, Cohesion Fund, EAFRD or EMFF allocated under the programme to operations located outside the programme area does not exceed 15 % of the support from the ERDF, Cohesion Fund, EAFRD or EMFF at the level of the priority at the time of adoption of the programme;
the monitoring committee has given its agreement to the operation or types of operations concerned;
the obligations of the authorities for the programme in relation to management, control and audit concerning the operation are fulfilled by the authorities responsible for the programme under which that operation is supported or they enter into agreements with authorities in the area in which the operation is implemented.
Where operations financed from the Funds and the EMFF are implemented outside the programme area in accordance with this paragraph and have benefits both outside and within the programme area, such expenditure shall be allocated to those areas on a pro rata basis based on objective criteria.
Where operations concern the thematic objective referred to in point (1) of the first paragraph of Article 9 and are implemented outside the Member State but within the Union, only points (b) and (d) of the first subparagraph of this paragraph shall apply.
Article 71
Durability of operations
An operation comprising investment in infrastructure or productive investment shall repay the contribution from the ESI Funds if within five years of the final payment to the beneficiary or within the period of time set out in State aid rules, where applicable, it is subject to any of the following:
a cessation or relocation of a productive activity outside the programme area;
a change in ownership of an item of infrastructure which gives to a firm or a public body an undue advantage;
a substantial change affecting its nature, objectives or implementation conditions which would result in undermining its original objectives.
Sums unduly paid in respect of the operation shall be recovered by the Member State in proportion to the period for which the requirements have not been fulfilled.
Member States may reduce the time limit set out in the first subparagraph to three years in cases concerning the maintenance of investments or jobs created by SMEs.
TITLE VIII
MANAGEMENT AND CONTROL
CHAPTER I
Management and control systems
Article 72
General principles of management and control systems
Management and control systems shall, in accordance with Article 4(8), provide for:
a description of the functions of each body involved in management and control, and the allocation of functions within each body;
compliance with the principle of separation of functions between and within such bodies;
procedures for ensuring the correctness and regularity of expenditure declared;
computerised systems for accounting, for the storage and transmission of financial data and data on indicators, for monitoring and for reporting;
systems for reporting and monitoring where the body responsible entrusts execution of tasks to another body;
arrangements for auditing the functioning of the management and control systems;
systems and procedures to ensure an adequate audit trail;
the prevention, detection and correction of irregularities, including fraud, and the recovery of amounts unduly paid, together with any interest on late payments.
Article 73
Responsibilities under shared management
In accordance with the principle of shared management, Member States and the Commission shall be responsible for the management and control of programmes in accordance with their respective responsibilities laid down in this Regulation and in the Fund-specific rules.
Article 74
Responsibilities of Member States
CHAPTER II
Commission powers and responsibilities
Article 75
Commission powers and responsibilities
Commission officials or authorised Commission representatives, duly empowered to carry out on-the-spot audits or checks, shall have access to all necessary records, documents and metadata, irrespective of the medium in which they are stored, relating to operations supported by the ESI Funds or to management and control systems. Member States shall provide copies of such records, documents and metadata to the Commission upon request.
The powers set out in this paragraph shall not affect the application of national provisions which reserve certain acts for agents specifically designated by national legislation. Commission officials and authorised representatives shall not take part, inter alia, in home visits or the formal questioning of persons within the framework of national legislation. However, such officials and representatives shall have access to the information thus obtained without prejudice to the competences of national courts and in full respect of the fundamental rights of the legal subjects concerned.
The Commission shall provide the competent national authority with:
the draft audit report from the on-the-spot audit or check within three months of the end of that audit or check;
the final audit report within three months of the receipt of a complete reply from the competent national authority to the draft audit report from the on-the-spot audit or check concerned.
The reports referred to in points (a) and (b) of the first subparagraph shall be made available within the time limits set out in those points in at least one of the official languages of the institutions of the Union.
The time limit set out in point (a) of the first subparagraph shall not include the period which starts on the date following the date on which the Commission sends its request for additional information to the Member State and lasts until the Member State responds to that request.
This paragraph shall not be applicable to the EAFRD.
TITLE IX
FINANCIAL MANAGEMENT, EXAMINATION AND ACCEPTANCE OF ACCOUNTS AND FINANCIAL CORRECTIONS, DECOMMITMENT
CHAPTER I
Financial management
Article 76
Budget commitments
The budget commitments of the Union in respect of each programme shall be made in annual instalments for each Fund during the period between 1 January 2014 and 31 December 2020. The budget commitments relating to the performance reserve in each programme shall be made separately from the remaining allocation to the programme.
►C1 The decision of the Commission adopting a programme shall constitute a financing decision within the meaning of ►M6 Article 110(1) of the Financial Regulation ◄ ◄ and once notified to the Member State concerned, a legal commitment within the meaning of that Regulation.
For each programme, the budget commitments for the first instalment shall follow the adoption of the programme by the Commission.
The budget commitments for subsequent instalments shall be made by the Commission before 1 May of each year, on the basis of the decision referred to in the second paragraph of this Article, except where Article 16 of the Financial Regulation applies.
Following application of the performance framework in accordance with Article 22, where priorities have not achieved their milestones, the Commission shall where necessary decommit the corresponding appropriations committed to the programmes concerned as part of the performance reserve and shall make them available again for the programmes for which the allocation is increased as a result of an amendment approved by the Commission in accordance with Article 22(5).
Article 77
Common rules for payments
Article 78
Common rules for calculating interim payments, and payment of the final balance
The Fund-specific rules shall lay down rules for the calculation of the amount reimbursed as interim payments, and of the final balance. That amount shall be a function of the specific co-financing rate applicable to the eligible expenditure.
Article 79
Payment applications
Article 80
Use of the euro
Amounts set out in programmes submitted by Member States, ►C1 forecasts of expenditure, payment applications, accounts and expenditure mentioned in the annual and final implementation reports shall be denominated in euro. ◄
Article 81
Payment of initial pre-financing
Article 82
Clearance of initial pre-financing
The amount paid as initial pre-financing shall be totally cleared from the Commission accounts not later than when the programme is closed.
Article 83
Interruption of the payment deadline
The payment deadline for an interim payment claim may be interrupted by the authorising officer by delegation within the meaning of the Financial Regulation for a maximum period of six months if:
following information provided by a national or Union audit body, there is clear evidence to suggest a significant deficiency in the functioning of the management and control system;
the authorising officer by delegation has to carry out additional verifications following information that has come to that officer's attention alerting him or her that expenditure in a payment application is linked to an irregularity having serious financial consequences;
there is a failure to submit one of the documents required under ►M6 Article 63(5), (6) and (7) of the Financial Regulation ◄ .
The Member State may agree to an extension of the interruption period for another three months.
The Fund-specific rules for the EMFF may lay down specific bases for interruption of payments linked to non-compliance with rules applicable under the Common Fisheries Policy, which shall be proportionate, having regard to the nature, gravity, duration and recurrence of the non-compliance.
CHAPTER II
Examination and acceptance of accounts
Article 84
Deadline for the examination and acceptance of accounts by the Commission
By 31 May of the year following the end of the accounting period, the Commission shall, in accordance with ►M6 Article 63(8) of the Financial Regulation ◄ , apply procedures for the examination and acceptance of the accounts and inform the Member State as to whether it accepts that the accounts are complete, accurate and true in accordance with Fund-specific rules.
CHAPTER III
Financial corrections
Article 85
Financial corrections by the Commission
A breach of applicable law shall lead to a financial correction only in relation to expenditure which has been declared to the Commission and where one of the following conditions is met:
the breach has affected the selection of an operation by the body responsible for support from the ESI Funds or in cases where, due to the nature of the breach, it is not possible to establish that impact but there is a substantiated risk that the breach has had such an effect;
the breach has affected the amount of expenditure declared for reimbursement by the budget of the Union or in cases where, due to the nature of the breach, it is not possible to quantify its financial impact but there is a substantiated risk that the breach has had such an effect.
CHAPTER IV
Decommitment
Article 86
Principles
Article 87
Exception to the decommitment
The amount concerned by decommitment shall be reduced by the amounts equivalent to that part of the budget commitment for which:
the operations are suspended by a legal proceeding or by an administrative appeal having suspensory effect; or
it has not been possible to make a payment application ◄ for reasons of force majeure seriously affecting implementation of all or part of the programme.
The national authorities claiming force majeure under point (b) of the first subparagraph shall demonstrate the direct consequences of the force majeure on the implementation of all or part of the programme.
For the purpose of points (a) and (b) of the first subparagraph, the reduction may be requested once, if the suspension or force majeure lasted no longer than one year, or a number of times that corresponds to the duration of the force majeure or the number of years between the date of the legal or administrative decision suspending the implementation of the operation and the date of the final legal or administrative decision.
Article 88
Procedure
PART THREE
GENERAL PROVISIONS APPLICABLE TO THE ERDF, THE ESF AND THE COHESION FUND
TITLE I
OBJECTIVES AND FINANCIAL FRAMEWORK
CHAPTER I
Mission, goals and geographical coverage of support
Article 89
Mission and goals
The actions supported by the Funds shall also contribute to the delivery of the Union strategy for smart, sustainable and inclusive growth.
For the purpose of the mission referred to in paragraph 1, the following goals shall be pursued:
Investment for growth and jobs in Member States and regions, to be supported by the Funds; and
European territorial cooperation, to be supported by the ERDF.
Article 90
Investment for growth and jobs goal
Resources for the Investment for growth and jobs goal shall be allocated among the following three categories of NUTS level 2 regions:
less developed regions, whose GDP per capita is less than 75 % of the average GDP of the EU-27;
transition regions, whose GDP per capita is between 75 % and 90 % of the average GDP of the EU-27;
more developed regions, whose GDP per capita is above 90 % of the average GDP of the EU-27.
The classification of regions under one of the three categories of regions shall be determined on the basis of how the GDP per capita of each region, measured in purchasing power parities (PPS) and calculated on the basis of Union figures for the period 2007 - 2009, relates to the average GDP of the EU-27 for the same reference period.
The Member States eligible for funding from the Cohesion Fund in 2013, but whose nominal GNI per capita exceeds 90 % of the average GNI per capita of the EU-27 as calculated under the first subparagraph shall receive support from the Cohesion Fund on a transitional and specific basis.
CHAPTER II
Financial framework
Article 91
Resources for economic, social and territorial cohesion
Article 92
Resources for the Investment for growth and jobs goal and for the European territorial cooperation goal
Resources for the Investment for growth and jobs goal shall amount to 96,09 % of the global resources (i.e., a total of EUR 317 073 545 392 ) and shall be allocated as follows:
51,52 % (i.e., a total of EUR 163 359 380 738 ) for less developed regions;
10,82 % (i.e., a total of EUR 34 319 221 039 ) for transition regions;
16,33 % (i.e., a total of EUR 51 773 321 432 ) for more developed regions;
20,89 % (i.e., a total of EUR 66 236 030 665 ) for Member States supported by the Cohesion Fund;
0,44 % (i.e., a total of EUR 1 385 591 518 ) as additional funding for the outermost regions identified in Article 349 TFEU and the NUTS level 2 regions fulfilling the criteria laid down in Article 2 of Protocol No 6 to the 1994 Act of Accession.
Member States that benefit from the additional resources for the specific allocation for the YEI may request the transfer of up to 50 % of these additional resources to the ESF in order to constitute the corresponding ESF targeted investment as required by Article 22(1) of the ESF Regulation. Such a transfer shall be made to the respective categories of region corresponding to the categorisation of the regions eligible for the increase of the specific allocation for the YEI. Member States shall request the transfer in the request for amendment of the programme in accordance with Article 30(1) of this Regulation. Resources allocated to past years may not be transferred.
The second subparagraph of this paragraph shall apply to any additional resources for specific allocation for the YEI allocated in 2019 and 2020.
The Commission shall adopt a decision, by means of an implementing act, setting out the amount to be transferred from each Member State's Cohesion Fund allocation to the CEF, which amount shall be determined on a pro rata basis for the whole period. The Cohesion Fund allocation of each Member State shall be reduced accordingly.
The annual appropriations corresponding to the support from the Cohesion Fund referred to in the first subparagraph shall be entered in the relevant budget lines of the CEF as of the 2014 budgetary exercise.
The amount transferred from the Cohesion Fund to the CEF, referred to in the first subparagraph, shall be implemented by launching specific calls for projects implementing the core networks or for projects and horizontal activities identified in Part I of Annex I to Regulation (EU) No 1316/2013.
Rules applicable for the transport sector under Regulation (EU) No 1316/2013 shall apply to the specific calls referred to in the fourth subparagraph. Until 31 December 2016, the selection of projects eligible for financing shall respect the national allocations under the Cohesion Fund. As of 1 January 2017, resources transferred to the CEF which have not been committed to a transport infrastructure project shall be made available to all Member States eligible for funding from the Cohesion Fund to finance transport infrastructure projects in accordance with Regulation (EU) No 1316/2013.
In order to support Member States eligible for funding from the Cohesion Fund, which may experience difficulties in designing projects that are of a sufficient maturity, quality, or both, and which have sufficient added value for the Union, particular attention shall be given to programme support actions aimed at strengthening institutional capacity and the efficiency of public administrations and public services in relation to the development and implementation of projects listed in Part I of Annex I to the Regulation (EU) No 1316/2013. To ensure the highest possible absorption of the transferred funds in all Member States eligible for funding from the Cohesion fund, the Commission may organise additional calls.
The Commission shall adopt a decision, by means of an implementing act, setting out the amount to be transferred from each Member State's Structural Funds allocation to aid for the most deprived for the whole period. The Structural Funds allocation of each Member State shall be reduced accordingly, on the basis of a pro-rata reduction by category of region.
The annual appropriations corresponding to the support from the Structural Funds referred to in the first subparagraph shall be entered in the relevant budget lines of the aid for the most deprived instrument with the 2014 budgetary exercise.
Article 92a
REACT-EU resources
The measures referred to in Article 1(2) of Council Regulation (EU) 2020/2094 ( 25 ) shall be implemented under the Structural Funds with an amount of up to EUR 47 500 000 000 in 2018 prices as referred to in point (a)(i) of Article 2(2) of that Regulation, subject to its Article 3(3), (4), (7) and (9).
These additional resources for 2021 and 2022, stemming from the European Union Recovery Instrument, shall provide assistance for fostering crisis repair in the context of the COVID-19 pandemic and its social consequences and for preparing a green, digital and resilient recovery of the economy (‘REACT-EU resources’).
As provided for in Article 3(1) of Regulation (EU) 2020/2094, the REACT-EU resources shall constitute external assigned revenues for the purpose of Article 21(5) of the Financial Regulation.
Article 92b
Implementing arrangements for the REACT-EU resources
By way of derogation from Article 94, Member States shall also jointly allocate part of their REACT-EU resources to cross-border co-operation programmes under the European territorial cooperation goal in which they participate, if they agree that such allocations reflect their respective national priorities.
The REACT-EU resources shall be used to implement technical assistance pursuant to paragraph 6 of this Article and the operations implementing the thematic objective referred to in the first subparagraph of paragraph 9 of this Article.
The REACT-EU resources shall be made available for budgetary commitment for the years 2021 and 2022, in addition to the global resources set out in Article 91, as follows:
The REACT-EU resources shall also support administrative expenditure up to EUR 18 000 000 in 2018 prices.
Operations to be supported by the REACT-EU resources may be selected for support up to the end of 2023. The phasing provisions set out in a Regulation laying down common provisions on the European Regional Development Fund, the European Social Fund Plus, the Cohesion Fund, the Just Transition Fund and the European Maritime and Fisheries Fund and financial rules for those and for the Asylum and Migration Fund, the Internal Security Fund and the Border Management and Visa Instrument are applicable to operations supported by the REACT-EU resources.
The legal commitment referred to in the second paragraph of Article 76 for the years 2021 and 2022 shall enter into force on or after the date referred to in Article 3(3) of Regulation (EU) 2020/2094.
The third and fourth paragraphs of Article 76 shall not apply in respect of the REACT-EU resources.
By way of derogation from Article 14(3) of the Financial Regulation, the de-commitment rules set out in Chapter IV of Title IX of Part II and in Article 136 of this Regulation shall apply to the budgetary commitments based on the REACT-EU resources. By way of derogation from point (c) of Article 12(4) of the Financial Regulation, the REACT-EU resources shall not be used for a succeeding programme or action.
By way of derogation from Articles 86(2) and 136(1) of this Regulation, the commitments for the REACT-EU resources shall be decommitted in accordance with the rules to be followed for the closure of the programmes.
Each Member State shall allocate the REACT-EU resources available for programming under the ERDF and the ESF to operational programmes or to cross-border cooperation programmes, involving local and regional authorities, as well as relevant bodies representing civil society and social partners, in accordance with the partnership principle.
By way of derogation from Article 92(7), a part of the REACT-EU resources shall also be proposed to be used, if the Member State concerned considers it appropriate, to increase the support for the Fund for European Aid to the Most Deprived (‘FEAD’), in order to address the situation of those who have been hit to an unprecedented degree by the COVID-19 crisis. A part of the REACT-EU resources may also be used to increase the support for the YEI. In both cases, the increase may be proposed before or at the same time as the allocation to the ERDF and the ESF.
Following their initial allocation, the REACT-EU resources may, at the request of a Member State for amendment of an operational programme pursuant to Article 30(1), be transferred between the ERDF and the ESF, irrespective of the percentages referred to in points (a), (b) and (c) of Article 92(1), keeping the overall operational strength of the ESF at Union level. This subparagraph shall not apply to ERDF resources allocated to cross-border cooperation programmes under the European territorial cooperation goal.
Article 30(5) shall not apply to the REACT-EU resources. Those resources shall be excluded from the basis of calculation for the purposes of the ceilings established in that paragraph.
For the purposes of the application of point (f) of Article 30(1) of the Financial Regulation, the condition that appropriations are to be for the same objective shall not apply in respect of such transfers. Such transfers may only apply to the ongoing year or to future years in the financial plan.
The requirements laid down in Article 92(4) of this Regulation shall not apply to the initial allocation or the subsequent transfers of the REACT-EU resources.
The REACT-EU resources shall be implemented in accordance with the rules of the Fund to which they are allocated or transferred.
Up to 6 % of the additional ERDF resources allocated to a cross-border cooperation programme under the European territorial cooperation goal pursuant to the second subparagraph of paragraph 1 may be allocated to technical assistance.
For the purpose of applying Article 134(2) to the annual pre-financing in the years 2021, 2022 and 2023, the amount of the support from the Funds for the whole programming period to the operational programme shall include the REACT-EU resources.
The amount paid as additional initial pre-financing referred to in the first subparagraph shall be totally cleared from the Commission accounts not later than when the operational programme is closed.
Member States may allocate the REACT-EU resources either to one or more separate priority axes within an existing operational programme or programmes under the Investment for growth and jobs goal or within an existing cross-border cooperation programme or programmes under the European territorial cooperation goal, or to a new operational programme or programmes referred to in paragraph 10 of this Article under the Investment for growth and jobs goal. By way of derogation from Article 26(1), the programme shall cover the period until 31 December 2022, subject to paragraph 4 of this Article.
For the ERDF, the REACT-EU resources shall be used primarily to support investments in products and services for health services or in social infrastructure, to provide support in the form of working capital or investment support to SMEs’ investments in sectors with a high job creation potential, to support investments contributing to the transition towards a digital and green economy, to support investments in infrastructure providing basic services to citizens, and to support economic support measures in the regions which are most dependent on sectors most affected by the COVID-19 crisis.
For the ESF, the REACT-EU resources shall be used primarily to support access to the labour market by maintaining jobs of employees and of the self-employed, including through short-time work schemes even when that support is not combined with active labour market measures, unless those measures are imposed by national law. The REACT-EU resources shall support job creation and quality employment, in particular for people in vulnerable situations, and extend youth employment measures in line with the reinforced Youth Guarantee. Investments in education, training and skills development shall be directed to address the twin green and digital transitions.
The REACT-EU resources shall also support social systems contributing to social inclusion, anti-discrimination and poverty eradication measures, with a particular focus on child poverty and enhance equal access to social services of general interest, including for children, the elderly, persons with disabilities, ethnic minorities and the homeless.
The thematic objective referred to in the first subparagraph of this paragraph shall be available exclusively for the programming of the REACT-EU resources. By way of derogation from points (b), (c) and (d) of Article 96(1) of this Regulation and from Article 8(1) of Regulation (EU) No 1299/2013, it shall not be combined with other investment priorities.
The thematic objective referred to in the first subparagraph of this paragraph shall also constitute the single investment priority for the programming and implementation of the REACT-EU resources from the ERDF and the ESF.
Where one or more separate priority axes are established corresponding to the thematic objective referred to in the first subparagraph of this paragraph within an existing operational programme, the elements listed in points (b)(v) and (vii) of Article 96(2) of this Regulation and in points (b)(v) and (vi) of Article 8(2) of Regulation (EU) No 1299/2013 shall not be required for the description of the priority axis in the revised operational programme.
The revised financing plan set out in point (d) of Article 96(2) of this Regulation and in point (d) of Article 8(2) of Regulation (EU) No 1299/2013 shall set out the allocation of the REACT-EU resources for the year 2021 and, where applicable, for 2022 without identifying amounts for the performance reserve and with no breakdown per category of regions.
By way of derogation from Article 30(1) of this Regulation, requests for the amendment of a programme submitted by a Member State shall be duly justified and shall in particular set out the expected impact of the changes to the programme on fostering crisis repair in the context of the COVID-19 pandemic and its social consequences and on preparing a green, digital and resilient recovery of the economy. Those requests shall be accompanied by the revised programme.
By way of derogation from point (a) of Article 96(2), where such a new operational programme is established, the justification shall set out the expected impact of the operational programme on fostering crisis repair in the context of the COVID-19 pandemic and its social consequences and on preparing a green, digital and resilient recovery of the economy.
Where such a new operational programme is established, only authorities already designated under ongoing operational programmes supported by the ERDF, the ESF and the Cohesion Fund may be identified by the Member States for the purposes of point (a) of Article 96(5).
The elements set out in points (b)(v) and (vii) of the first subparagraph of paragraph 2, in paragraph 4, in points (b) and (c) of paragraph 6 and in paragraph 7 of Article 96 shall not be required for such new operational programme. The elements set out in Article 96(3) shall only be required where corresponding support is provided.
By way of derogation from Article 29(3) and (4) and Article 30(2), the Commission shall do its utmost to approve any new dedicated operational programme or any amendment to an existing programme within 15 working days of its submission by a Member State.
By way of derogation from Articles 56(3) and 114(2), the Member States shall ensure that by 31 December 2024 at least one evaluation on the use of the REACT-EU resources is carried out to assess their effectiveness, efficiency, impact and, where applicable, inclusiveness and non-discrimination, including from a gender perspective, and how they contributed to the thematic objective referred to in the first subparagraph of paragraph 9 of this Article.
The following provisions shall not apply to the REACT-EU resources:
thematic concentration requirements including thresholds established for sustainable urban development as set out in this Regulation or the Fund-specific rules, by way of derogation from Article 18;
ex ante conditionalities, by way of derogation from Article 19 and the Fund-specific rules;
requirements on the performance reserve and application of the performance framework, by way of derogation from Articles 20 and 22, respectively;
Article 65(6) for operations that started from 1 February 2020 and that foster crisis repair in the context of the COVID-19 pandemic and its social consequences and prepare a green, digital and resilient recovery of the economy supported under the thematic objective referred to in the first subparagraph of paragraph 9 of this Article;
requirements to prepare a communication strategy, by way of derogation from Article 116 and point (a) of Article 115(1).
By way of derogation from the requirements set out in Article 12(4) of Regulation (EU) No 1299/2013 for operations supported by the REACT-EU resources under the European territorial cooperation goal, cooperation of beneficiaries in at least two fields shall be sufficient.
The Member States and managing authorities shall make clear to citizens that the operation in question is funded as part of the Union’s response to the COVID-19 pandemic and shall ensure full transparency, using, where appropriate, social media.
The references to the ‘Fund’, ‘Funds’ or ‘ESI Funds’ in Section 2.2 of Annex XII shall be complemented by a reference to ‘funded as part of the Union’s response to the COVID-19 pandemic’, where financial support is provided to operations from the REACT-EU resources.
Article 93
Non-transferability of resources between categories of regions
Article 94
Non-transferability of resources between goals
Article 95
Additionality
For the purposes of this Article and Annex X, the following definitions apply:
'gross fixed capital formation' means all the resident producers' acquisitions, less disposals, of fixed assets during a given period and certain additions to the value of non-produced assets realised by the productive activity of producer or institutional units, as defined in Council Regulation (EC) No 2223/96 ( 26 );
'fixed assets' means all tangible or intangible assets produced as outputs from processes of production that are themselves used repeatedly, or continuously, in processes of production for more than one year;
'general government' means the totality of institutional units which, in addition to fulfilling their political responsibilities and their role of economic regulation, produce principally non-market services (possibly goods) for individual or collective consumption and redistribute income and wealth;
'public or equivalent structural expenditure' means the gross fixed capital formation of the general government.
In setting the reference level referred to in the first subparagraph, the Commission and the Member States shall take into account the general macroeconomic conditions and specific or exceptional circumstances, such as privatisations, an exceptional level of public or equivalent structural expenditure by a Member State in the 2007-2013 programming period and the evolution of other public investment indicators. They shall also take into account changes in the national allocations from the Funds as compared to the years 2007-2013.
In those Member States in which less developed regions cover at least 65 % of the total population, the verification shall take place at national level.
In those Member States in which less developed regions cover more than 15 % and less than 65 % of the total population, the verification shall take place at regional level. For that purpose, those Member States shall provide to the Commission information about the expenditure in the less developed regions at each stage of the verification process.
The detailed rules relating to the verification of additionality are set out in point 2 of Annex X.
TITLE II
PROGRAMMING
CHAPTER I
General provisions on the Funds
Article 96
Content, adoption and amendment of operational programmes under the Investment for growth and jobs goal
An operational programme shall consist of priority axes. A priority axis shall concern one Fund and one category of region, except in the case of the Cohesion Fund, and shall correspond, without prejudice to Article 59, to a thematic objective and comprise one or more of the investment priorities of that thematic objective, in accordance with the Fund-specific rules. Where appropriate and in order to increase its impact and effectiveness through a thematically coherent integrated approach, a priority axis may:
concern more than one category of region;
combine one or more complementary investment priorities from the ERDF, the Cohesion Fund and the ESF under one thematic objective;
in duly justified cases combine one or more complementary investment priorities from different thematic objectives in order to achieve the maximum contribution to that priority axis;
for the ESF, combine investment priorities from different thematic objectives set out in points (8), (9), (10) and (11) of the first paragraph of Article 9 in order to facilitate their contribution to other priority axes and in order to implement social innovation and transnational cooperation.
Member States may combine two or more of the options in points (a) to (d).
An operational programme shall contribute to the Union strategy for smart, sustainable and inclusive growth and to the achievement of economic, social and territorial cohesion and shall set out:
a justification for the choice of thematic objectives, corresponding investment priorities and financial allocations having regard to the Partnership Agreement, based on an identification of regional and, where appropriate, national needs including the need to address the challenges identified in relevant country-specific recommendations adopted in accordance with Article 121(2) TFEU and the relevant Council recommendations adopted in accordance with Article 148(4) TFEU, taking into account the ex ante evaluation in accordance with Article 55;
for each priority axis other than technical assistance:
the investment priorities and corresponding specific objectives;
in order to strengthen the result-orientation of the programming, the expected results for the specific objectives, and the corresponding result indicators, with a baseline value and a target value, where appropriate quantified in accordance with the Fund-specific rules;
a description of the type and examples of actions to be supported under each investment priority and their expected contribution to the specific objectives referred to in point (i) including the guiding principles for the selection of operations and where appropriate, the identification of main target groups, specific territories targeted, types of beneficiaries, the planned use of financial instruments and major projects;
the output indicators, including the quantified target value, which are expected to contribute to the results, in accordance with the Fund-specific rules, for each investment priority;
identification of implementation steps and financial and output indicators, and where appropriate, result indicators, to be used as milestones and targets for the performance framework in accordance with Article 21(1) and Annex II;
the corresponding categories of intervention based on a nomenclature adopted by the Commission, and an indicative breakdown of the programmed resources;
where appropriate, a summary of the planned use of technical assistance including, where necessary, actions to reinforce the administrative capacity of authorities involved in the management and control of the programmes and beneficiaries;
for each priority axis concerning technical assistance:
specific objectives;
the expected results for each specific objective, and, where objectively justified given the content of the actions, the corresponding result indicators, with a baseline value and a target value, in accordance with the Fund-specific rules;
a description of actions to be supported and their expected contribution to the specific objectives referred to in point (i);
the output indicators which are expected to contribute to the results;
the corresponding categories of intervention based on a nomenclature adopted by the Commission, and an indicative breakdown of the programmed resources.
Point (ii) shall not apply where the Union contribution to the priority axis or axes concerning technical assistance in an operational programme does not exceed EUR 15 000 000 .
a financing plan containing the following tables:
tables specifying for each year, in accordance with Articles 60, 120 and 121, the amount of the total financial appropriation envisaged for the support from each of the Funds, identifying the amounts related to the performance reserve;
tables specifying, for the whole programming period, for the operational programme and for each priority axis, the amount of the total financial appropriation of the support from each of the Funds and the national co-financing, identifying the amounts related to the performance reserve. For priority axes, which concern several categories of region, the tables shall specify the amount of total financial appropriation from the Funds and the national co-financing for each category of region.
For priority axes, which combine investment priorities from different thematic objectives, the table shall specify the amount of total financial appropriation from each of the Funds and the national co-financing for each of the corresponding thematic objectives.
Where the national co-financing is made up of public and private co-financing, the table shall give the indicative breakdown between the public and the private components. It shall show, for information purposes, the envisaged participation from the EIB;
a list of major projects for which the implementation is planned during the programming period.
The Commission shall adopt implementing acts concerning the nomenclature referred to in points (b)(vi) and (c)(v)of the first subparagraph. Those implementing acts shall be adopted in accordance with the examination procedure referred to in Article 150(3).
Taking into account its content and objectives, an operational programme shall describe the integrated approach to territorial development, having regard to the Partnership Agreement, and showing how that operational programme contributes to the accomplishment of its objectives and expected results, specifying, where appropriate, the following:
the approach to the use of community-led local development instruments and the principles for identifying the areas where it will be implemented;
the indicative amount of the ERDF support for integrated actions for sustainable urban development, to be implemented in accordance with Article 7(4) of the ERDF Regulation ◄ and the indicative allocation of ESF support for integrated actions;
the approach to the use of the ITI instrument other than in cases covered by point (b), and their indicative financial allocation from each priority axis;
the arrangements for interregional and transnational actions, within the operational programmes, with beneficiaries located in at least one other Member State;
where Member States and regions participate in macro-regional strategies and sea-basin strategies, subject to the needs of the programme area as identified by the Member State, the contribution of the planned interventions under the programme to such strategies.
In addition, the operational programme shall specify the following:
where appropriate, the identification of whether and how it addresses the specific needs of geographical areas most affected by poverty or target groups at highest risk of discrimination or social exclusion, with special regard to marginalised communities, and persons with disabilities, and where relevant the contribution to the integrated approach set out in the Partnership Agreement;
where appropriate, the identification of whether and how it addresses the demographic challenges of regions or specific needs of areas which suffer from severe and permanent natural or demographic handicaps, as referred to in Article 174 TFEU and the contribution to the integrated approach set out in the Partnership Agreement to this end.
The operational programme shall identify:
the managing authority, the certifying authority, where applicable, and the audit authority;
the body to which payments are to be made by the Commission;
the actions taken to involve the relevant partners referred to in Article 5 in the preparation of the operational programme, and the role of those partners in the implementation, monitoring and evaluation of the operational programme.
The operational programme shall also set out the following, having regard to the content of the Partnership Agreement and taking into account the institutional and legal framework of the Member States:
mechanisms to ensure coordination between the Funds, the EAFRD, the EMFF and other Union and national funding instruments, and with the EIB taking into account the relevant provisions laid down in the CSF;
for each ex ante conditionality, established in accordance with Article 19 and Annex XI, which is applicable to the operational programme, an assessment of whether the ex ante conditionality is fulfilled at the date of submission of the Partnership Agreement and operational programme, and where ex ante conditionalities are not fulfilled, a description of the actions to fulfil the ex ante conditionality, the bodies responsible and a timetable for such actions in accordance with the summary submitted in the Partnership Agreement;
a summary of the assessment of the administrative burden on beneficiaries and, where necessary, the actions planned, accompanied by an indicative timeframe, to reduce the administrative burden.
Each operational programme, except those where technical assistance is undertaken under a specific operational programme, shall, subject to the Member State's duly justified assessment of their relevance to the content and objectives of the operational programmes, include a description of:
the specific actions to take into account environmental protection requirements, resource efficiency, climate change mitigation and adaptation, disaster resilience and risk prevention and management, in the selection of operations;
the specific actions to promote equal opportunities and prevent discrimination based on sex, racial or ethnic origin, religion or belief, disability, age or sexual orientation during the preparation, design and implementation of the operational programme and in particular in relation to access to funding, taking account of the needs of the various target groups at risk of such discrimination and in particular the requirements to ensure accessibility for persons with disabilities;
the contribution of the operational programme to the promotion of equality between men and women and, where appropriate, the arrangements to ensure the integration of gender perspective at operational programme and operation level.
Member States may submit an opinion from the national equality bodies on the measures set out in points (b) and (c) of the first subparagraph with the proposal for an operational programme under the Investment for growth and jobs goal.
Article 97
Specific provisions on the programming of support for the joint instruments for uncapped guarantees and securitisation under the Investment for growth and jobs goal
In accordance with Article 28, operational programmes referred to in point (b) of the first subparagraph of Article 39(4) shall include only the elements referred to in point (b)(i), (ii) and (iv) and point (d) of the first subparagraph of Article 96(2), Article 96(5) and point (b) of Article 96(6).
Article 98
Joint support from the Funds under the Investment for growth and jobs goal
Article 99
Geographical scope of operational programmes under the Investment for growth and jobs goal
Unless otherwise agreed between the Commission and the Member State, operational programmes for the ERDF and the ESF shall be drawn up at the appropriate geographical level and at least at NUTS level 2, in accordance with the institutional and legal framework of the Member State.
Operational programmes with support from the Cohesion Fund shall be drawn up at national level.
CHAPTER II
Major projects
Article 100
Content
As part of an operational programme or operational programmes, which have been subject to a Commission decision under Article 96(10) of this Regulation or under Article 8(12) of the ETC Regulation, the ERDF and the Cohesion Fund may support an operation comprising a series of works, activities or services intended in itself to accomplish an indivisible task of a precise economic or technical nature which has clearly identified goals and for which the total eligible cost exceeds EUR 50 000 000 and in the case of operations contributing to the thematic objective under point (7) of the first paragraph of Article 9 where the total eligible cost exceeds EUR 75 000 000 (the 'major project'). Financial instruments shall not be considered to be major projects.
Article 101
Information necessary for the approval of a major project
Before a major project is approved, the managing authority shall ensure that the following information is available:
details concerning the body to be responsible for implementation of the major project, and its capacity;
a description of the investment and its location;
the total cost and total eligible cost, taking account of the requirements set out in Article 61;
feasibility studies carried out, including the options analysis, and the results;
a cost-benefit analysis, including an economic and a financial analysis, and a risk assessment;
an analysis of the environmental impact, taking into account climate change adaptation and mitigation needs, and disaster resilience;
an explanation as to how the major project is consistent with the relevant priority axes of the operational programme or operational programmes concerned, and its expected contribution to achieving the specific objectives of those priority axes and the expected contribution to socio-economic development;
the financing plan showing the total planned financial resources and the planned support from the Funds, the EIB, and all other sources of financing, together with physical and financial indicators for monitoring progress, taking account of the identified risks;
the timetable for implementing the major project and, where the implementation period is expected to be longer than the programming period, the phases for which support from the Funds is requested during the programming period.
The Commission shall adopt implementing acts establishing the methodology to be used based on recognised best practices, in carrying out the cost-benefit analysis referred to in point (e) of the first paragraph. Those implementing acts shall be adopted in accordance with the advisory procedure referred to in Article 150(2).
At the initiative of a Member State, the information in points (a) to (i) of the first paragraph may be assessed by independent experts supported by technical assistance of the Commission or, in agreement with the Commission, by other independent experts ("quality review"). In other cases, the Member State shall submit to the Commission the information set out in points (a) to (i) of the first paragraph as soon as it is available.
The Commission shall be empowered to adopt delegated acts, in accordance with Article 149, laying down the methodology to be used in carrying out the quality review of a major project.
The Commission shall adopt implementing acts establishing the format for submission of the information set out in points (a) to (i) of the first paragraph. Those implementing acts shall be adopted in accordance with the advisory procedure referred to in Article 150(2).
Article 102
Decision on a major project
Where a major project has been appraised positively by a quality review by independent experts, on the basis of their assessment of the information referred to in the first paragraph of Article 101, the managing authority may proceed with the selection of the major project in accordance with Article 125(3). The managing authority shall notify the Commission of the selected major project. That notification shall consist of the following elements:
the document referred to in point (c) of Article 125(3) setting out:
the body to be responsible for implementation of the major project;
a description of the investment, its location, timetable and expected contribution of the major project to the specific objectives of the relevant priority axis or axes;
the total cost and total eligible cost, taking account of the requirements set out in Article 61;
the financing plan, and the physical and financial indicators for monitoring progress, taking account of the identified risks;
the quality review of the independent experts, providing clear statements on the investment's feasibility and the economic viability of the major project.
The financial contribution to the major project selected by the Member State shall be deemed to be approved by the Commission in the absence of a decision, by means of an implementing act, refusing the financial contribution within three months of the date of the notification referred to in the first subparagraph. The Commission shall refuse the financial contribution only on the grounds that it has established a significant weakness in the independent quality review.
The Commission shall adopt implementing acts establishing the format for the notification referred to in the first subparagraph. Those implementing acts shall be adopted in accordance with the examination procedure referred to in Article 150(3).
An independent quality review shall be delivered within six months of the submission of that information to the independent experts.
The corresponding expenditure shall be withdrawn and the declaration of expenditure shall be rectified accordingly in the following cases:
where the independent quality review has not been notified to the Commission within three months of the expiry of the deadline referred to in the second subparagraph;
where the submission of the information is withdrawn by the Member State; or
where the relevant appraisal is negative.
Article 103
Decision on a major project subject to phased implementation
By way of derogation from the third paragraph of Article 101 and Article 102(1) and (2), the procedures set out in paragraphs 2, 3 and 4 of this Article shall apply to an operation which satisfies the following conditions:
the operation consists of the second or subsequent phase of a major project under the previous programming period for which the preceding phase or phases are approved by the Commission not later than 31 December 2015 pursuant to Regulation (EC) No 1083/2006; or in the case of Member States which acceded to the Union after 1 January 2013, no later than 31 December 2016;
the sum of the total eligible costs of all phases of the major project exceeds the respective levels set out in Article 100;
the major project application and assessment by the Commission under the previous programming period covered all the planned phases;
there are no substantial changes in the information referred to in the first paragraph of Article 101 of this Regulation for the major project compared to the information provided for the major project application submitted under Regulation (EC) No 1083/2006, in particular as regards the total eligible cost;
the phase of the major project to be implemented under the previous programming period is or will be ready to be used for its intended purpose as specified in the Commission decision by the deadline of the submission of the closure documents for the relevant operational programme or programmes.
CHAPTER III
Joint action plan
Article 104
Scope
Article 105
Preparation of joint action plans
Article 106
Content of joint action plans
A joint action plan shall contain:
a description of the objectives of the joint action plan and how it contributes to the objectives of the programme or to the relevant country-specific recommendations and the broad guidelines of the economic policies of the Member States and of the Union under Article 121(2) TFEU and the relevant Council recommendations which the Member States are to take into account in their employment policies under Article 148(4) TFEU;
▼M6 —————
a description of the projects or types of projects envisaged, together with the milestones, where relevant, and the targets for outputs and results linked to the common indicators by priority axis, where relevant;
information on its geographic coverage and target groups;
its expected implementation period;
confirmation that it will contribute to the approach to promoting equality between men and women, as set out in the relevant programme or Partnership Agreement;
confirmation that it will contribute to the approach on sustainable development, as set out in the relevant programme or Partnership Agreement;
its implementing provisions, including the following:
information on the selection of the joint action plan by the managing authority in accordance with Article 125(3);
the arrangements for steering the joint action plan, in accordance with Article 108;
the arrangements for monitoring and evaluating the joint action plan including arrangements ensuring the quality, collection and storage of data on the achievement of milestones, outputs and results;
its financial arrangements, including the following:
the costs of achieving milestones, and targets for outputs and results, based, in the case of standard scales of unit costs and lump sums, on the methods set out in Article 67(5) of this Regulation and in Article 14 of the ESF Regulation;
▼M6 —————
the financing plan by operational programme and priority axis, including the total eligible amount and the amount of public expenditure.
The Commission shall, in order to ensure uniform conditions for the implementation of this Article, adopt implementing acts laying down the format of the model for the joint action plan. Those implementing acts shall be adopted in accordance with the advisory procedure referred to in Article 150(2).
Article 107
Decision on the joint action plan
Where the Commission, within two months following the submission of a joint action plan proposal, considers that it does not meet the appraisal requirements referred to in Article 104, it shall make observations to the Member State. The Member State shall provide to the Commission all necessary additional information requested and, where appropriate, revise the joint action plan accordingly.
Article 108
Steering committee and amendment of the joint action plan
The composition of the steering committee shall be decided by the Member State in agreement with the relevant managing authority, respecting the principle of partnership.
The Commission may participate in the work of the steering committee in an advisory capacity.
The steering committee shall carry out the following activities:
review progress towards achieving the milestones, outputs and results of the joint action plan;
consider and approve any proposal to amend the joint action plan in order to take account of any issues affecting its performance.
Article 109
Financial management and control of the joint action plan
TITLE III
MONITORING, EVALUATION, INFORMATION AND COMMUNICATION
CHAPTER I
Monitoring and evaluation
Article 110
Functions of the monitoring committee
The monitoring committee shall examine in particular:
any issues that affect the performance of the operational programme;
progress made in implementation of the evaluation plan and the follow-up given to findings of evaluations;
implementation of the communication strategy, including information and communication measures, and of measures to enhance the visibility of the Funds;
implementation of major projects;
implementation of joint action plans;
actions to promote equality between men and women, equal opportunities, and non-discrimination, including accessibility for persons with disabilities;
actions to promote sustainable development;
where applicable ex ante conditionalities are not fulfilled at the date of the submission of the Partnership Agreement and operational programme, progress on actions to fulfil the applicable ex ante conditionalities;
financial instruments.
By way of derogation from Article 49(3), the monitoring committee shall examine and approve:
the methodology and criteria used for selection of operations, except where those criteria are approved by local action groups in accordance with point (c) of Article 34(3);
the annual and final implementation reports;
the evaluation plan for the operational programme and any amendment of the evaluation plan, including where either is part of a common evaluation plan pursuant to Article 114(1);
the communication strategy for the operational programme and any amendment of the strategy;
any proposal by the managing authority for any amendment to the operational programme.
Article 111
Implementation reports for the Investment for growth and jobs goal
Annual implementation reports shall set out information on:
implementation of the operational programme in accordance with Article 50(2);
progress in preparation and implementation of major projects and joint action plans.
The annual implementation reports submitted in 2017 and 2019 shall set out and assess the information required under Article 50(4) and (5) respectively and the information set out in paragraph 3 of this Article together with the following information:
progress in the implementation of the evaluation plan and the follow-up given to the findings of evaluations;
the results of the information and publicity measures of the Funds carried out under the communication strategy;
the involvement of the partners in the implementation, monitoring and evaluation of the operational programme.
The annual implementation reports submitted in 2017 and 2019 may, depending on the content and objectives of operational programmes, set out information and assess the following:
progress in the implementation of the integrated approach to territorial development, including development of regions facing demographic challenges and permanent or natural handicaps, sustainable urban development, and community-led local development under the operational programme;
progress in the implementation of actions to reinforce the capacity of Member State authorities and beneficiaries to administer and use the Funds;
progress in the implementation of any interregional and transnational actions;
where appropriate, the contribution to macro-regional and sea basin strategies;
the specific actions taken to promote equality between men and women and to prevent discrimination, in particular accessibility for persons with disabilities, and the arrangements implemented to ensure the integration of the gender perspective in the operational programme and operations;
actions taken to promote sustainable development in accordance with Article 8;
progress in the implementation of actions in the field of social innovation, where appropriate;
progress in the implementation of measures to address the specific needs of geographical areas most affected by poverty or of target groups at highest risk of poverty, discrimination or social exclusion, with special regard to marginalised communities and persons with disabilities, long term unemployed and young people not in employment, including, where appropriate, the financial resources used.
By way of derogation from the first and second subparagraphs, and in order to ensure consistency between the Partnership Agreement and the progress report, ►C1 Member States with no more than one operational programme per Fund may include the information relating to ex ante conditionalities referred to in Article 50(4), the information required by Article 50(5) ◄ and the information referred to in points (a), (b), (c) and (h) of the second subparagraph of this paragraph in the progress report instead of the annual implementation reports submitted in 2017 and 2019 respectively and the final implementation report, without prejudice to point (b) of Article 110(2).
Article 112
Transmission of financial data
By 31 January, 31 July and 31 October, the Member State shall transmit electronically to the Commission for monitoring purposes, for each operational programme and by priority axis:
the total and public eligible cost of the operations and the number of operations selected for support;
the total eligible expenditure declared by beneficiaries to the managing authority.
Article 113
Cohesion Report
The report of the Commission referred to in Article 175 TFEU shall include:
a record of progress made towards achieving economic, social and territorial cohesion, including the socio-economic situation and development of the regions, as well as the integration of the Union's priorities;
a record of the role of the Funds, EIB funding and the other instruments in, as well as the effect of other Union and national policies on, the progress made;
where appropriate an indication of future Union measures and policies necessary to strengthen economic, social and territorial cohesion, as well as to deliver the Union's priorities.
Article 114
Evaluation
▼M6 —————
CHAPTER II
Information, communication and visibility
Article 115
Information, communication and visibility
Member States and managing authorities shall be responsible for:
drawing up communication strategies;
ensuring the establishment of a single website or a single website portal providing information on, and access to, all operational programmes in that Member State, including information about the timing of implementation of programming and any related public consultation processes;
informing potential beneficiaries about funding opportunities under operational programmes;
publicising to Union citizens the role and achievements of cohesion policy and of the Funds through measures to enhance the visibility of the results and impact of Partnership Agreements, operational programmes and operations.
In order to encourage the use of the list of operations subsequently by the private sector, civil society or national public administration, the website may clearly indicate the applicable licensing rules under which data are published.
The list of operations shall be updated at least every six months.
The minimum information to be set out in the list of operations is laid down in Annex XII.
Article 116
Communication strategy
The communication strategy shall include the elements set out in Annex XII.
Where a common communication strategy is drawn up for several operational programmes and concerns several monitoring committees, the Member State may designate one monitoring committee to be responsible, in consultation with the other relevant monitoring committees, for the approval of the common communication strategy and for the approval of any subsequent amendments of that strategy.
Where necessary, the Member State or managing authorities may amend the communication strategy during the programming period. The amended communication strategy shall be submitted by the managing authority to the monitoring committee for approval in accordance with point (d) of Article 110(2).
Article 117
Information and communication officers and their networks
TITLE IV
TECHNICAL ASSISTANCE
Article 118
Technical assistance at the initiative of the Commission
The Funds, taking into account the deductions made in accordance with Article 91(3), may support technical assistance up to a ceiling of 0,35 % of their respective annual allocation.
Article 119
Technical assistance of the Member States
The specific allocation for YEI may be taken into account by a Member State in the calculation of the limit to the total amount of the Funds allocated to the technical assistance of the Member State.
TITLE V
FINANCIAL SUPPORT FROM THE FUNDS
Article 120
Determination of co-financing rates
For each priority axis, the Commission decision shall set out whether the co-financing rate for the priority axis is to be applied to:
total eligible expenditure, including public and private expenditure; or
eligible public expenditure.
The co-financing rate at the level of each priority axis and, where relevant, by category of region and Fund, of operational programmes under the Investment for growth and jobs goal shall be no higher than:
85 % for the Cohesion Fund;
85 % for the less developed regions of Member States whose average GDP per capita for the period 2007 - 2009 was below 85 % of the EU-27 average during the same period and for the outermost regions including the additional allocation for outermost regions in accordance with point (e) of Article 92(1) and Article 4(2) of the ETC Regulation;
80 % for the less developed regions of Member States other than those referred to in point (b), and for all regions whose GDP per capita used as an eligibility criterion for the 2007-2013 programming period was less than 75 % of the average of the EU-25 but whose GDP per capita is above 75 % of the GDP average of the EU-27, as well as for regions defined in Article 8(1) of Regulation (EU) 1083/2006 receiving transitional support for the 2007-2013 programming period;
60 % for the transition regions other than those referred to in point (c);
50 % for the more developed regions other than those referred to in point (c).
For the period from 1 January 2014 until closure of the operational programme the co-financing rate at the level of each priority axis for all operational programmes in Cyprus shall not be higher than 85 %.
The Commission shall carry out a review to assess the justification for maintaining the co-financing rate, referred to in the second subparagraph, after 30 June 2017 and shall if necessary make a legislative proposal before 30 June 2016.
The co-financing rate at the level of each priority axis of operational programmes under the European territorial cooperation goal shall be no higher than 85 %.
The maximum co-financing rate under points (b), (c), (d) and (e) of the first subparagraph shall be increased for each priority axis implementing the YEI and where a priority axis is dedicated to social innovation or to transnational cooperation, or a combination of both. That increase shall be determined in accordance with the Fund-specific rules.
A separate priority axis with a co-financing rate of up to 95 % may be established within an operational programme to support operations which fulfil all of the following conditions:
the operations are selected by managing authorities in response to major or regional natural disasters as defined in Article 2(2) and (3) of Council Regulation (EC) No 2012/2002 ( 27 );
the operations are aimed at reconstruction in response to the natural disaster; and
the operations are supported under an ERDF investment priority.
The amount allocated to the operations referred to in the first subparagraph shall not exceed 5 % of the total ERDF allocation in a Member State for the 2014-2020 programming period.
By way of derogation from Article 65(9), expenditure for operations under this priority axis shall be eligible from the date when the natural disaster occurred.
Where expenditure in relation to operations referred to in the first subparagraph has been included in a payment application submitted to the Commission before the establishment of the separate priority axis, the Member State shall make the necessary adjustments to the next payment application and, where appropriate, to the next accounts submitted following the adoption of the amendment to the programme.
Article 121
Modulation of the co-financing rates
The co-financing rate from the Funds to a priority axis may be modulated to take account of:
the importance of the priority axis for the delivery of the Union strategy for smart, sustainable and inclusive growth, having regard to the specific gaps to be addressed;
the protection and improvement of the environment, principally through the application of the precautionary principle, the principle of preventive action and the polluter pays principle;
the rate of mobilisation of private financing;
the coverage of areas with severe and permanent natural or demographic handicaps defined as follows:
island Member States eligible under the Cohesion Fund, and other islands except those on which the capital of a Member State is situated or which have a fixed link to the mainland;
mountainous areas as defined by the national legislation of the Member State;
sparsely (i.e. less than 50 inhabitants per square kilometre) and very sparsely (less than 8 inhabitants per square kilometre) populated areas;
the inclusion of the outermost regions as referred to in Article 349 TFEU.
PART FOUR
GENERAL PROVISIONS APPLICABLE TO THE FUNDS AND THE EMFF
TITLE I
MANAGEMENT AND CONTROL
CHAPTER I
Management and control systems
Article 122
Responsibilities of Member States
The Member States shall not notify the Commission of irregularities in relation to the following:
cases where the irregularity consists solely of the failure to execute, in whole or in part, an operation included in the co-financed operational programme owing to the bankruptcy of the beneficiary;
cases brought to the attention of the managing authority or certifying authority by the beneficiary voluntarily and before detection by either authority, whether before or after the payment of the public contribution;
cases which are detected and corrected by the managing authority or certifying authority before inclusion of the expenditure concerned in a payment application submitted to the Commission.
In all other cases, in particular those preceding a bankruptcy or in cases of suspected fraud, the detected irregularities and the associated preventive and corrective measures shall be reported to the Commission.
When amounts unduly paid to a beneficiary for an operation cannot be recovered and this is as a result of fault or negligence on the part of a Member State, that Member State shall be responsible for reimbursing the amounts concerned to the budget of the Union. Member States may decide not to recover an amount unduly paid if the amount to be recovered from the beneficiary, not including interest, does not exceed EUR 250 in contribution from the Funds to an operation in an accounting year.
The Commission shall be empowered to adopt delegated acts in accordance with Article 149 laying down additional detailed rules on the criteria for determining the cases of irregularity to be reported, the data to be provided and on the conditions and procedures to be applied to determine whether amounts which are irrecoverable shall be reimbursed by Member States.
The Commission shall adopt implementing acts setting out the frequency of the reporting of irregularities and the reporting format to be used. Those implementing acts shall be adopted in accordance with the advisory procedure referred to in Article 150(2).
The systems referred to in the first subparagraph shall facilitate interoperability with national and Union frameworks and allow for the beneficiaries to submit all information referred to in the first subparagraph only once.
The Commission shall adopt implementing acts laying down detailed rules concerning the exchanges of information under this paragraph. Those implementing acts shall be adopted in accordance with the examination procedure referred to in Article 150(3).
CHAPTER II
Management and control authorities
Article 123
Designation of authorities
Where the total amount of support from the Funds to an operational programme exceeds EUR 250 000 000 or from the EMFF exceeds EUR 100 000 000 , the audit authority may be part of the same public authority or body as the managing authority either if, pursuant to the applicable provisions for the previous programming period, the Commission has informed the Member State prior to the date of adoption of the operational programme concerned of its conclusion that it can rely principally on its audit opinion, or if the Commission is satisfied on the basis of the experience of the previous programming period that the institutional organisation and accountability of the audit authority provide adequate guarantees of its functional independence and reliability.
Article 124
Procedure for the designation of the managing authority and the certifying authority
The Commission may make observations within two months of receipt of the documents referred to in the first subparagraph. Without prejudice to Article 83, the examination of those documents shall not interrupt the treatment of applications for interim payments.
Where the designated authority fails to implement the required remedial action within the period of probation determined by the Member State, the Member State, at an appropriate level, shall end its designation.
The Member State shall notify the Commission without delay when a designated authority is put under probation, providing information on the respective period of probation, when, following implementation of remedial actions, the probation is ended, as well as when the designation of an authority is ended. The notification that a designated body is put on probation by the Member State, without prejudice to the application of Article 83, shall not interrupt the treatment of applications for interim payments.
Article 125
Functions of the managing authority
As regards the management of the operational programme, the managing authority shall:
support the work of the monitoring committee referred to in Article 47 and provide it with the information it requires to carry out its tasks, in particular data relating to the progress of the operational programme in achieving its objectives, financial data and data relating to indicators and milestones;
draw up and, after approval by the monitoring committee, submit to the Commission annual and final implementation reports referred to in Article 50;
make available to intermediate bodies and beneficiaries information that is relevant to the execution of their tasks and the implementation of operations respectively;
establish a system to record and store in computerised form data on each operation necessary for monitoring, evaluation, financial management, verification and audit, including data on individual participants in operations, where applicable;
ensure that the data referred to in point (d) is collected, entered and stored in the system referred to in point (d), and that data on indicators is broken down by gender where required by Annexes I and II of the ESF Regulation.
As regards the selection of operations, the managing authority shall:
draw up and, once approved, apply appropriate selection procedures and criteria that:
ensure the contribution of operations to the achievement of the specific objectives and results of the relevant priority;
are non-discriminatory and transparent;
take into account the general principles set out in Articles 7 and 8;
ensure that a selected operation falls within the scope of the EMFF, the Fund or Funds concerned and can be attributed to a category of intervention or, in the case of the EMFF, a measure identified in the priority or priorities of the operational programme;
ensure that the beneficiary is provided with a document setting out the conditions for support for each operation including the specific requirements concerning the products or services to be delivered under the operation, the financing plan, the time limit for execution, as well as the requirements regarding information, communication and visibility;
satisfy itself that the beneficiary has the administrative, financial and operational capacity to fulfil the conditions referred to in point (c) before approval of the operation;
satisfy itself that, where the operation has started before the submission of an application for funding to the managing authority, applicable law relevant for the operation has been complied with;
ensure that operations selected for support from the Funds or the EMFF do not include activities which were part of an operation which has been or should have been subject to a procedure of recovery in accordance with Article 71 following the relocation of a productive activity outside the programme area;
determine the categories of intervention or, in the case of the EMFF, the measures to which the expenditure of an operation shall be attributed.
As regards the financial management and control of the operational programme, the managing authority shall:
verify that the co-financed products and services have been delivered, that the operation complies with applicable law, the operational programme and the conditions for support of the operation and:
where costs are to be reimbursed pursuant to point (a) of the first subparagraph of Article 67(1), that the amount of expenditure declared by the beneficiaries in relation to those costs has been paid;
in the case of costs reimbursed pursuant to points (b) to (e) of the first subparagraph of Article 67(1), that the conditions for reimbursement of expenditure to the beneficiary have been met;
ensure that beneficiaries involved in the implementation of operations reimbursed on the basis of eligible costs actually incurred maintain either a separate accounting system or an adequate accounting code for all transactions relating to an operation;
put in place effective and proportionate anti-fraud measures taking into account the risks identified;
set up procedures to ensure that all documents regarding expenditure and audits required to ensure an adequate audit trail are held in accordance with the requirements of point (g) of Article 72;
draw up the management declaration and annual summary referred to in ►M6 points (a) and (b) of Article 63(5) and Article 63(6) and (7) of the Financial Regulation ◄ .
By way of derogation from point (a) of the first subparagraph, the ETC Regulation may establish specific rules on verification applicable to cooperation programmes.
Verifications pursuant to point (a) of the first subparagraph of paragraph 4 shall include the following procedures:
administrative verifications in respect of each application for reimbursement by beneficiaries;
on-the-spot verifications of operations.
The frequency and coverage of the on-the-spot verifications shall be proportionate to the amount of public support to an operation and to the level of risk identified by such verifications and audits by the audit authority for the management and control system as a whole.
The Commission shall adopt implementing acts laying down the technical specifications of the system established under point (d) of paragraph 2 of this Article. Those implementing acts shall be adopted in accordance with the examination procedure referred to in Article 150(3).
Article 126
Functions of the certifying authority
The certifying authority of an operational programme shall be responsible in particular for:
drawing up and submitting payment applications to the Commission, and certifying that they result from reliable accounting systems, are based on verifiable supporting documents and have been subject to verifications by the managing authority;
drawing up the accounts referred to in ►M6 point (a) of Article 63(5) and Article 63(6) of the Financial Regulation ◄ ;
certifying the completeness, accuracy and veracity of the accounts and that the expenditure entered in the accounts complies with applicable law and has been incurred in respect of operations selected for funding in accordance with the criteria applicable to the operational programme and complying with applicable law;
ensuring that there is a system which records and stores, in computerised form, accounting records for each operation, and which supports all the data required for drawing up payment applications and accounts, including records of amounts recoverable, amounts recovered and amounts withdrawn following cancellation of all or part of the contribution for an operation or operational programme;
ensuring, for the purposes of drawing up and submitting payment applications, that it has received adequate information from the managing authority on the procedures and verifications carried out in relation to expenditure;
taking account when drawing up and submitting payment applications of the results of all audits carried out by, or under the responsibility of, the audit authority;
maintaining, in a computerised form, accounting records of expenditure declared to the Commission and of the corresponding public contribution paid to beneficiaries;
keeping an account of amounts recoverable and of amounts withdrawn following cancellation of all or part of the contribution for an operation. ►C1 Amounts recovered shall be repaid to the budget of the Union prior to the closure of the operational programme by deducting them from the subsequent payment application. ◄
Article 127
Functions of the audit authority
A non- statistical sampling method may be used on the professional judgement of the audit authority, in duly justified cases, in accordance with internationally accepted audit standards and in any case where the number of operations for an accounting year is insufficient to allow the use of a statistical method.
In such cases, the size of the sample shall be sufficient to enable the audit authority to draw up a valid audit opinion in accordance with ►M6 Article 63(7) of the Financial Regulation ◄ .
The non-statistical sample method shall cover a minimum of 5 % of operations for which expenditure has been declared to the Commission during an accounting year and 10 % of the expenditure which has been declared to the Commission during an accounting year.
The audit authority shall draw up:
an audit opinion in accordance with ►M6 Article 63(7) of the Financial Regulation ◄ ;
a control report setting out the main findings of the audits carried out in accordance with paragraph 1, including findings with regard to deficiencies found in the management and control systems, and the proposed and implemented corrective actions.
Where a common management and control system applies to more than one operational programme, the information required under point (b) of the first subparagraph may be grouped in a single report.
CHAPTER III
Cooperation with audit authorities
Article 128
Cooperation with audit authorities
TITLE II
FINANCIAL MANAGEMENT, PREPARATION, EXAMINATION AND ACCEPTANCE OF ACCOUNTS AND FINANCIAL CORRECTIONS
CHAPTER I
Financial management
Article 129
Common rules for payments
The Member State shall ensure that by the closure of the operational programme, ►C1 the amount of public expenditure paid to beneficiaries is at least equal to the contribution from the Funds and the EMFF paid by the Commission to the Member State. ◄
Article 130
Common rules for calculating interim payments and payment of the final balance
The contribution from the Funds or the EMFF to a priority through the interim payments and payment of the final balance shall not be higher than:
the eligible public expenditure indicated in the payment applications for the priority; or
the contribution from the Funds or the EMFF for the priority laid down in the decision of the Commission approving the operational programme,
whichever is the lower.
The contribution from the Funds or the EMFF through payments of the final balance in the final accounting year shall not exceed the eligible public expenditure declared or the contribution from each Fund and category of regions to each operational programme as laid down in the decision of the Commission approving the operational programme, whichever is the lower.
Article 131
Payment applications
Payment applications shall include, for each priority:
the total amount of eligible expenditure incurred by beneficiaries and paid in implementing operations, as entered in the accounting system of the certifying authority;
the total amount of public expenditure incurred in implementing operations, as entered in the accounting system of the certifying authority.
With regard to the amounts to be included in payment applications for the form of support referred to in point (e) of the first subparagraph of Article 67(1), the payment applications shall include the elements set out in the delegated acts adopted in accordance with Article 67(5a) and shall use the model for payment applications set out in the implementing acts adopted in accordance with paragraph 6 of this Article.
By way of derogation from paragraph 1 of this Article, in the case of State aid, the payment application may include advances paid to the beneficiary by the body granting the aid or, where Member States have decided that the beneficiary is the body granting the aid pursuant to point (10)(a) of Article 2, paid by the beneficiary to the body receiving the aid, under the following cumulative conditions:
those advances are subject to a guarantee provided by a bank or other financial institution established in the Member State or are covered by a facility provided as a guarantee by a public entity or by the Member State;
those advances do not exceed 40 % of the total amount of the aid to be granted to a beneficiary for a given operation or, where Member States have decided that the beneficiary is the body granting the aid pursuant to point (10)(a) of Article 2, of the total amount of the aid to be granted to the body receiving the aid as part of a given operation;
those advances are covered by expenditure paid by the beneficiary or, where Member States have decided that the beneficiary is the body granting the aid pursuant to point (10)(a) of Article 2, expenditure paid by the body receiving the aid in implementing the operation, and supported by receipted invoices or accounting documents of equivalent probative value within three years of the year of the payment of the advance or on 31 December 2023, whichever is earlier.
Where the conditions set out in point (c) of the first subparagraph are not met, the next payment application shall be corrected accordingly.
Each payment application which includes advances of the type referred to in paragraph 4 of this Article shall separately disclose:
the total amount paid from the operational programme as advances;
the amount which, within three years of the payment of the advance in accordance with point (c) of the first subparagraph of paragraph 4, has been covered by expenditure paid by the beneficiary or, where Member States have decided that the beneficiary is the body granting the aid pursuant to point (10)(a) of Article 2, by the body receiving the aid; and
the amount which has not been covered by expenditure paid by the beneficiary or, where Member States have decided that the beneficiary is the body granting the aid pursuant to point (10)(a) of Article 2, by the body receiving the aid, and for which the three year period has not yet elapsed.
Article 132
Payment to beneficiaries
No amount shall be deducted or withheld and no specific charge or other charge with equivalent effect shall be levied that would reduce amounts due to beneficiaries.
The payment deadline referred to in paragraph 1 may be interrupted by the managing authority in either of the following duly justified cases:
the amount of the payment claim is not due or the appropriate supporting documents, including the documents necessary for management verifications under point (a) of the first subparagraph of Article 125(4), have not been provided;
an investigation has been initiated in relation to a possible irregularity affecting the expenditure concerned.
The beneficiary concerned shall be informed in writing of the interruption and the reasons for it.
Article 133
Use of the euro
Article 134
Payment of pre-financing
The initial pre-financing amount shall be paid in instalments as follows:
in 2014: 1 % of the amount of support from the Funds and the EMFF for the entire programming period to the operational programme or 1,5 % of the amount of support from the Funds and the EMFF for the entire programming period to the operational programme when a Member State has been receiving financial assistance since 2010, in accordance with Articles 122 and 143 TFEU, or from the European Financial Stability Facility (EFSF), or is receiving financial assistance on 31 December 2013 in accordance with Articles 136 and 143 TFEU;
in 2015: 1 % of the amount of support from the Funds and the EMFF for the entire programming period to the operational programme or 1,5 % of the amount of support from the Funds and the EMFF for the entire programming period to the operational programme when a Member State has been receiving financial assistance since 2010, in accordance with Articles 122 and 143 TFEU, or from the EFSF, or is receiving financial assistance on 31 December 2014 in accordance with Articles 136 and 143 TFEU;
in 2016: 1 % of the amount of support from the Funds and the EMFF for the entire programming period to the operational programme.
If an operational programme is adopted in 2015 or later, the earlier instalments shall be paid in the year of adoption.
The additional initial pre-financing shall not apply to programmes under the European territorial cooperation goal nor to the specific allocation for the Youth Employment Initiative.
If, by 31 December 2016, the total amount of the additional initial pre-financing paid on the basis of this paragraph in 2015 and 2016 to an operational programme by Fund, where applicable, is not covered by payment applications submitted by the certifying authority for that programme, Greece shall repay to the Commission the total amount of the additional initial pre-financing for that Fund paid to that programme. Those repayments shall not constitute a financial correction and shall not reduce support from the Funds or the EMFF to the operational programmes. The amounts repaid shall constitute internal assigned revenue in accordance with point (c) of Article 21(3) of the Financial Regulation.
An annual pre-financing amount shall be paid before 1 July in the years 2016 to 2023. It shall be a percentage of the amount of the support from the Funds and the EMFF for the whole programming period to the operational programme as follows:
When calculating the amount of annual pre-financing referred to in paragraph 2 up to and including 2020, the amount of support for the entire programming period shall exclude the amounts from the performance reserve which were initially allocated to the operational programme.
Article 135
Deadlines for presentation of interim payment applications and for their payment
Article 136
Decommitment
CHAPTER II
Preparation, examination and acceptance of accounts and closure of operational programmes and suspension of payments
Article 137
Preparation of the accounts
The accounts referred to in ►M6 point (a) of Article 63(5) and Article 63(6) of the Financial Regulation ◄ shall be submitted to the Commission for each operational programme. The accounts shall cover the accounting year and shall include at the level of each priority and, where applicable, fund and category of regions:
the total amount of eligible expenditure entered into the accounting systems of the certifying authority which has been included in payment applications submitted to the Commission in accordance with Article 131 and Article 135(2) by 31 July following the end of the accounting year, the total amount of the corresponding public expenditure incurred in implementing operations, and the total amount of corresponding payments made to beneficiaries under Article 132(1);
the amounts withdrawn and recovered during the accounting year, the amounts to be recovered as at the end of the accounting year, the recoveries effected pursuant to Article 71, and the irrecoverable amounts;
the amounts of programme contributions paid to financial instruments under Article 41(1) and advances of State aid under Article 131(4);
for each priority, a reconciliation between the expenditure stated pursuant to point (a) and the expenditure declared in respect of the same accounting year in payment applications, accompanied by an explanation of any differences.
Article 138
Submission of information
For each year from 2016 until and including 2025, Member States shall submit, by the deadline set out in ►M6 Article 63(5), and the second subparagraph of Article 63(7), of the Financial Regulation ◄ , the documents referred to in that Article namely:
the accounts, referred to in Article 137(1) of this Regulation, for the preceding accounting year;
the management declaration and the annual summary referred to in point (e) of the first subparagraph of Article 125(4) of this Regulation, for the preceding accounting year;
the audit opinion and the control report referred to in points (a) and (b) of the first subparagraph of Article 127(5) of this Regulation, for the preceding accounting year.
Article 139
Examination and acceptance of accounts
On the basis of the accepted accounts, the Commission shall calculate the amount chargeable to the Funds and to the EMFF for the accounting year and the consequent adjustments in relation to the payments to the Member State. The Commission shall take into account:
the amounts in the accounts referred to in point (a) of Article 137(1) and to which the co-financing rate for each priority is to be applied;
the total amount of payments made by the Commission during that accounting year, consisting of:
the amount of interim payments paid by the Commission in accordance with Article 130(1) and Article 24; and
the amount of the annual pre-financing paid under Article 134(2).
By way of derogation from the first subparagraph, the Commission shall not issue a recovery order for amounts recoverable from the Member State for the accounts submitted in 2020. Amounts not recovered shall be used to accelerate investments related to the COVID-19 outbreak and eligible under this Regulation and Fund-specific rules.
The amounts not recovered shall be cleared or recovered at closure.
Article 140
Availability of documents
In the case of operations other than those referred to in the first subparagraph, all supporting documents shall be made available for a two year period from 31 December following the submission of the accounts in which the final expenditure of the completed operation is included.
A managing authority may decide to apply to operations for which the total eligible expenditure is less than EUR 1 000 000 the rule referred to in the second subparagraph.
The time period referred to in the first or second subparagraph shall be interrupted either in the case of legal proceedings or by a duly justified request of the Commission.
Article 141
Submission of closure documents and payment of the final balance
Article 142
Suspension of payments
All or part of the interim payments at the level of priorities or operational programmes may be suspended by the Commission if one or more of the following conditions are met:
there is a serious deficiency in the effective functioning of the management and control system of the operational programme, which has put at risk the Union contribution to the operational programme and for which corrective measures have not been taken;
expenditure in a payment application is linked to an irregularity having serious financial consequences which has not been corrected;
the Member State has failed to take the necessary action to remedy the situation giving rise to an interruption under Article 83;
there is a serious deficiency in the quality and reliability of the monitoring system or of the data on common and specific indicators;
there is a failure to complete actions to fulfil an ex ante conditionality subject to the conditions set out in Article 19;
there is evidence resulting from the performance review for a priority that there has been a serious failure in achieving that priority's milestones relating to financial and output indicators and key implementation steps set out in the performance framework subject to the conditions set out in Article 22.
The Fund-specific rules for the EMFF may lay down specific bases for suspension of payments linked to non-compliance with rules applicable under the Common Fisheries Policy, which shall be proportionate, having regard to the nature, gravity, duration and recurrence of the non-compliance.
CHAPTER III
Financial corrections
Article 143
Financial corrections by Member States
Article 144
Criteria for financial corrections
The Commission shall make financial corrections, by means of implementing acts, by cancelling all or part of the Union contribution to an operational programme in accordance with Article 85, where, after carrying out the necessary examination, it concludes that:
there is a serious deficiency in the effective functioning of the management and control system of the operational programme which has put at risk the Union contribution already paid to the operational programme;
the Member State has not complied with its obligations under Article 143 prior to the opening of the correction procedure under this paragraph;
expenditure contained in a payment application is irregular and has not been corrected by the Member State prior to the opening of the correction procedure under this paragraph.
The Commission shall base its financial corrections on individual cases of identified irregularity and shall take account of whether an irregularity is systemic. Where it is not possible to quantify precisely the amount of irregular expenditure charged to the Funds or the EMFF, the Commission shall apply a flat rate or extrapolated financial correction.
Article 145
Procedure
The first subparagraph shall not apply in the case of a serious deficiency in the effective functioning of a management and control system which, prior to the date of detection by the Commission or the European Court of Auditors:
had been identified in the management declaration, annual control report or the audit opinion submitted to the Commission in accordance with ►M6 Article 63(5), (6) and (7) of the Financial Regulation ◄ , or in other audit reports of the audit authority submitted to the Commission and appropriate measures taken; or
had been the subject of appropriate remedial measures by the Member State.
The assessment of serious deficiencies in the effective functioning of management and control systems shall be based on the applicable law when the relevant management declarations, annual control reports and audit opinions were submitted.
When deciding on a financial correction the Commission shall:
respect the principle of proportionality by taking account of the nature and gravity of the serious deficiency in the effective functioning of a management and control system and its financial implications for the budget of the Union;
for the purpose of applying a flat rate or extrapolated correction, exclude irregular expenditure previously detected by the Member State which has been the subject of an adjustment in the accounts in accordance with Article 139(10), and expenditure subject to an ongoing assessment of its legality and regularity under Article 137(2);
take into account flat rate or extrapolated corrections applied to the expenditure by the Member State for other serious deficiencies detected by the Member State when determining the residual risk for the budget of the Union.
Article 146
Obligations of Member States
A financial correction by the Commission shall not prejudice the Member State's obligation to pursue recoveries under Article 143(2) of this Regulation and to recover State aid within the meaning of Article 107(1) TFEU and under Article 14 of Council Regulation (EC) No 659/1999 ( 29 ).
Article 147
Repayment
TITLE III
PROPORTIONAL CONTROL OF OPERATIONAL PROGRAMMES
Article 148
Proportional control of operational programmes
By derogation from the first subparagraph, operations for which the total eligible expenditure is between EUR 200 000 and EUR 400 000 for the ERDF and the Cohesion Fund, between EUR 150 000 and EUR 300 000 for the ESF and between EUR 100 000 and EUR 200 000 for the EMFF may be subject to more than one audit, if the audit authority concludes, based on its professional judgment, that it is not possible to issue or draw up an audit opinion on the basis of statistical or non-statistical sampling methods referred to in Article 127(1) without carrying out more than one audit of the respective operation.
PART FIVE
DELEGATIONS OF POWER, IMPLEMENTING, TRANSITIONAL AND FINAL PROVISIONS
CHAPTER I
Delegations of power and implementing provisions
Article 149
Exercise of the delegation
Article 150
Committee Procedure
Where the committee delivers no opinion, the Commission shall not adopt the draft implementing act in respect of the implementing powers referred to in the third paragraph of Article 8, the fifth subparagraph of Article 22(7), the second subparagraph of Article 38(3), Article 38(10), the second subparagraph of Article 39(4), Article 46(3), the second subparagraph of Article 96(2), Article 115(4) and the second subparagraph of Article 125(8), and the third subparagraph of Article 5(4) of Regulation (EU) No 182/2011 shall apply.
CHAPTER II
Transitional and final provisions
Article 151
Review
The European Parliament and the Council shall review this Regulation by 31 December 2020 in accordance with Article 177 TFEU.
Article 152
Transitional provisions
Greece shall submit a report to the Commission on the implementation of paragraphs 4 and 5 of this Article by the end of 2016 and shall further report in the final implementation report to be submitted pursuant to point (a) of Article 89(1) of Regulation (EC) No 1083/2006.
Where the managing authority, or the monitoring committee for the programmes under the European territorial cooperation goal, considers that Article 67(2a) creates a disproportionate administrative burden, it may decide to extend the transitional period referred to in the first subparagraph of this paragraph for a period it considers appropriate. It shall notify the Commission of such decision before the expiration of the initial transitional period.
The first and second subparagraphs do not apply to grants and repayable assistance supported by the ESF for which the public support does not exceed EUR 50 000 .
Article 153
Repeal
Article 154
Entry into force
This Regulation shall enter into force on the day following that of its publication in the Official Journal of the European Union.
Articles 20 to 24, Article 29(3), point (a) of Article 38(1), Articles 58, 60, 76 to 92, 118, 120, 121 and Articles 129 to 147 shall apply with effect from 1 January 2014.
The second sentence of the seventh subparagraph of Article 39(2) and the fifth paragraph of Article 76 shall apply with effect from the date on which the amendment to the Financial Regulation relating to the decommitment of appropriations has entered into force.
Articles 92a and 92b shall not apply to or in the United Kingdom. References to Member States in those provisions shall be understood as not including the United Kingdom.
This Regulation shall be binding in its entirety and directly applicable in all Member States.
ANNEX I
COMMON STRATEGIC FRAMEWORK
1. INTRODUCTION
In order to promote the harmonious, balanced and sustainable development of the Union and to maximise the contribution of the ESI Funds to the Union strategy for smart, sustainable and inclusive growth as well as the Fund-specific missions of the ESI Funds, including economic, social and territorial cohesion, it is necessary to ensure that policy commitments made in the context of the Union strategy for smart, sustainable and inclusive growth are underpinned by investment through the ESI Funds and other Union instruments. The Common Strategic Framework (CSF) shall therefore, in accordance with Article 10, and in compliance with the priorities and objectives laid down in the Fund-specific Regulations, provide strategic guiding principles in order to achieve an integrated development approach using the ESI Funds coordinated with other Union instruments and policies, in line with the policy objectives and headline targets of the Union strategy for smart, sustainable and inclusive growth and, where appropriate, the flagship initiatives, while taking into account the key territorial challenges and specific national, regional and local contexts.
2. CONTRIBUTION OF ESI FUNDS TO THE UNION STRATEGY FOR SMART, SUSTAINABLE AND INCLUSIVE GROWTH AND COHERENCE WITH THE UNION'S ECONOMIC GOVERNANCE
1. To support effective targeting of smart, sustainable and inclusive growth in the Partnership Agreements and programmes this Regulation identifies eleven thematic objectives, set out in the first paragraph of Article 9, corresponding to the priorities of the Union strategy for smart, sustainable and inclusive growth which shall receive support from the ESI Funds.
2. In line with the thematic objectives set out in the first paragraph of Article 9, Member States shall, in order to ensure critical mass necessary to deliver growth and jobs, concentrate support in accordance with Article 18 of this Regulation and with the Fund-specific rules on thematic concentration, and shall ensure the effectiveness of spending. Member States shall give particular attention to prioritising growth-friendly expenditure, including spending on education, research, innovation and energy efficiency and expenditure to facilitate the access of SMEs to finance, and to ensure environmental sustainability, and the management of natural resources and climate action as well as to modernise public administration. They shall also take account of maintaining or reinforcing the coverage and effectiveness of employment services and active labour market policies in order to combat unemployment, with a focus on youth and tackle the social consequences of the crisis, and promote social inclusion.
3. To ensure consistency with priorities established in the context of the European Semester, in preparing their Partnership Agreements, Member States shall plan the use of the ESI Funds taking into account the National Reform Programmes, where appropriate, and the most recent relevant country-specific recommendations adopted in accordance with Article 121(2) TFEU and relevant Council recommendations adopted in accordance with Article 148(4) TFEU in accordance with their respective roles and obligations. Member States, where necessary, shall also take into account relevant Council recommendations based on the Stability and Growth Pact and the economic adjustment programmes.
4. In order to determine the way in which the ESI Funds can most effectively contribute to the Union strategy for smart, sustainable and inclusive growth, and to take account of the Treaty objectives, including economic, social and territorial cohesion, Member States shall select the thematic objectives for the planned use of the ESI Funds within the appropriate national, regional and local contexts.
3. INTEGRATED APPROACH TO AND ARRANGEMENTS FOR THE USE OF THE ESI FUNDS
3.1 Introduction
1. In accordance with point (a) of Article 15(2) the Partnership Agreement shall indicate an integrated approach to territorial development. Member States shall ensure that the selection of thematic objectives and investment and Union priorities addresses development needs and territorial challenges in an integrated manner in line with the analysis set out in section 6.4. Member States shall seek to make maximum use of the possibilities for ensuring coordinated and integrated delivery of the ESI funds.
2. Member States and, where appropriate in accordance with Article 4(4), regions shall ensure that the interventions supported through the ESI Funds are complementary and are implemented in a coordinated manner with a view to creating synergies, in order to reduce the administrative cost and burden for managing bodies and beneficiaries in accordance with Articles 4, 15 and 27.
3.2 Coordination and complementarity
1. Member States and managing authorities responsible for the implementation of the ESI Funds shall work closely together in the preparation, implementation, monitoring and evaluation of the Partnership Agreement and programmes. In particular, they shall ensure that the following actions are carried out:
identify areas of intervention where the ESI Funds can be combined in a complementary manner to achieve the thematic objectives set out in this Regulation;
ensure in accordance with Article 4(6), the existence of arrangements for the effective coordination of the ESI Funds in order to increase the impact and effectiveness of the Funds including, where appropriate, through the use of multi-fund programmes for the Funds;
promote the involvement of managing authorities responsible for other ESI Funds and relevant ministries in the development of support schemes to ensure coordination and synergies and to avoid overlaps;
establish, where appropriate, joint monitoring committees for programmes implementing the ESI Funds, and the development of other joint management and control arrangements to facilitate coordination between authorities responsible for the implementation of the ESI Funds;
make use of available joint eGovernance solutions, which may assist applicants and beneficiaries, and make the widest possible use of "one-stop shops", including for advice on the opportunities of support available through each of the ESI Funds;
establish mechanisms to coordinate cooperation activities financed by the ERDF and the ESF with investments supported by the programmes under the Investment for growth and jobs goal;
promote common approaches between ESI Funds with regard to guidance for the development of operations, calls for proposals and selection processes or other mechanisms to facilitate access to Funds for integrated projects;
encourage cooperation between managing authorities of different ESI Funds in the areas of monitoring, evaluation, management and control, and audit.
3.3 Encouraging integrated approaches
1. Member States shall, where appropriate, combine the ESI Funds into integrated packages at local, regional or national level, which are tailor-made to address specific territorial challenges in order to support the achievement of the objectives set out in the Partnership Agreement and programmes. This can be done using ITIs, Integrated operations, Joint Action Plans and community-led local development.
2. In accordance with Article 36 to achieve integrated use of thematic objectives, funding from different priority axes or operational programmes supported by the ESF, ERDF and Cohesion Fund may be combined under an ITI. Actions carried out under an ITI may be complemented with financial support from the programmes under the EAFRD or the EMFF respectively.
3. In accordance with the relevant provisions of the Fund-specific rules, to increase impact and effectiveness in a thematically coherent integrated approach a priority axis may concern more than one category of region, combine one or more complementary investment priorities from the ERDF, Cohesion Fund and ESF under one thematic objective and, in duly justified cases combine one or more complementary investment priorities from different thematic objectives in order to achieve the maximum contribution to that priority axis.
4. Member States shall promote, in accordance with their institutional and legal framework and with Article 32 the development of local and sub-regional approaches. Community-led local development shall be implemented in the context of a strategic approach to ensure that the 'bottom-up' definition of local needs takes account of priorities set at a higher level. Member States shall therefore define the approach to community-led local development in the EAFRD and, where appropriate, in the ERDF, the ESF or the EMFF in accordance with Article 15(2) and shall indicate in the Partnership Agreement the main challenges to be tackled in this way, the main objectives and priorities for community-led local development, the types of territories to be covered, the specific role to be attributed to local action groups in the delivery of strategies and the role envisaged for the EAFRD and where appropriate for the ERDF, the ESF or the EMFF in implementing community-led local development strategies in different types of territories such as rural, urban and coastal areas and the corresponding co-ordination mechanisms.