EUROPEAN COMMISSION
Brussels, 26.2.2019
SWD(2019) 74 final
COMMISSION STAFF WORKING DOCUMENT
First Flood Risk Management Plans - Member State: Slovenia
Accompanying the document
REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL
on the implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC)
Second River Basin Management Plans
First Flood Risk Management Plans
{COM(2019) 95 final} - {SWD(2019) 30 final} - {SWD(2019) 31 final} - {SWD(2019) 32 final} - {SWD(2019) 33 final} - {SWD(2019) 34 final} - {SWD(2019) 35 final} - {SWD(2019) 36 final} - {SWD(2019) 37 final} - {SWD(2019) 38 final} - {SWD(2019) 39 final} - {SWD(2019) 40 final} - {SWD(2019) 41 final} - {SWD(2019) 42 final} - {SWD(2019) 43 final} - {SWD(2019) 44 final} - {SWD(2019) 45 final} - {SWD(2019) 46 final} - {SWD(2019) 47 final} - {SWD(2019) 48 final} - {SWD(2019) 49 final} - {SWD(2019) 50 final} - {SWD(2019) 51 final} - {SWD(2019) 52 final} - {SWD(2019) 53 final} - {SWD(2019) 54 final} - {SWD(2019) 55 final} - {SWD(2019) 56 final} - {SWD(2019) 57 final} - {SWD(2019) 58 final} - {SWD(2019) 59 final} - {SWD(2019) 60 final} - {SWD(2019) 61 final} - {SWD(2019) 62 final} - {SWD(2019) 63 final} - {SWD(2019) 64 final} - {SWD(2019) 65 final} - {SWD(2019) 66 final} - {SWD(2019) 67 final} - {SWD(2019) 68 final} - {SWD(2019) 69 final} - {SWD(2019) 70 final} - {SWD(2019) 71 final} - {SWD(2019) 72 final} - {SWD(2019) 73 final} - {SWD(2019) 75 final} - {SWD(2019) 76 final} - {SWD(2019) 77 final} - {SWD(2019) 78 final} - {SWD(2019) 79 final} - {SWD(2019) 80 final} - {SWD(2019) 81 final} - {SWD(2019) 82 final} - {SWD(2019) 83 final} - {SWD(2019) 84 final}
Table of contents
Acronyms
Introduction
Overview
Overview of the assessment
Good Practices
Areas for further development
Recommendations
1.
Scope of the assessment and sources of information for the assessment
1.1
Reporting of the FRMPs
1.2
Assessment of the FRMPs
2.
Integration of previously reported information
2.1
Conclusions drawn from the preliminary flood risk assessment
2.2
Presentation of Flood Hazard and Risk Maps (FHRMs) in the FRMP
2.3
Changes to the APSFRs or other Flood Risk Areas
2.4
Areas for further development in the earlier assessment of the flood hazard and risk maps
2.5
Good practices and areas for further development regarding integration of previously reported information
3.
Setting of Objectives
3.1
Focus of objectives
3.2
Specific and measurable objectives
3.3
Objectives to reduce adverse consequences from floods
3.4
Objectives to address the reduction of the likelihood of flooding
3.5
Process for setting the objectives
3.6
Good practices and areas for further development regarding setting objectives
4. Planned measures for the achievement of objectives
4.1
Cost of measures
4.2
Funding of measures
4.3
Measurable and specific (including location) measures
4.4
Measures and objectives
4.5
Geographic coverage/scale of measures
4.6
Prioritisation of measures
4.7
Authorities responsible for implementation of measures
4.8
Progress of implementation of measures
4.9
Measures taken under other Community Acts
4.10
Specific groups of measures
4.11
Recovery from and resilience to flooding
4.12
Monitoring progress in implementing the FRMP
4.13
Coordination with the Water Framework Directive
4.14
Good practices and areas for further development with regard to measures
5. Consideration of climate change
5.1
Good practices and areas for further development concerning climate change
6. Cost-benefit analysis
6.1
Good practices and areas for further development
7.
Governance including administrative arrangements, public information and consultation
7.1
Competent authorities
7.2
Public information and consultation
7.3
Active involvement of Stakeholders
7.4
Effects of consultation
7.5
Strategic Environmental Assessment
7.6
Good practices and areas for further development regarding governance
Annex A: Supplementary tables and charts on measures
Background & method
Types of measures used in reporting
List of Annex A tables & figures
Measures overview
Measure details: cost
Measure details: name & location
Measure details: objectives
Measure details: authorities
Measure details: progress
Measure details: other
Annex B: Definitions of measure types
Catalogue of Natural Water Retention Measures
Acronyms
|
APSFR
|
Areas of Potential Significant Flood Risk
|
|
CBA
|
Cost-Benefit Analysis
|
|
EEA
|
European Environment Agency
|
|
FD
|
Floods Directive
|
|
FHRM
|
Flood Hazard and Risk Map
|
|
FRMP
|
Flood Risk Management Plan
|
|
NWRM
|
Natural Water Retention Measures
|
|
PFRA
|
Preliminary Flood Risk Assessments
|
|
PoM
|
Programme of Measures
|
|
RBD
|
River Basin District
|
|
RBMP
|
River Basin Management Plan
|
|
SEA
|
Strategic Environmental Assessment
|
|
UoM
|
Unit of Management
|
|
WFD
|
Water Framework Directive
|
|
WISE
|
Water Information System for Europe
|
Introduction
The Floods Directive (FD) (2007/60/EC) requires each Member State to assess its territory for significant risk from flooding, to map the flood extent, identify the potential adverse consequences of future floods for human health, the environment, cultural heritage and economic activity in these areas, and to take adequate and coordinated measures to reduce this flood risk. By the end of 2011, Member States were to prepare Preliminary Flood Risk Assessments (PFRAs) to identify the river basins and coastal areas at risk of flooding (Areas of Potential Significant Flood Risk – APSFRs). By the end of 2013, Flood Hazard & Risk Maps (FHRMs) were to be drawn up for such areas. On this basis, Member States were to prepare Flood Risk Management Plans (FRMPs) by the end of 2015.
This report assesses the FRMPs for Slovenia. Its structure follows a common assessment template used for all Member States. The report draws on two main sources:
·Member State reporting to the European Commission on the FRMPs as per Articles 7 and 15 of the FD: this reporting provides an overview of the plans and details on their measures.
·The national FRMP – Slovenia prepared one FRMP, which contains general sections and (in separate sections) 17 sub-basin flood plans across the two Units of Management (UoM) in the country.
Overview
Slovenia is divided into two UoMs, which correspond to the River Basin Districts (RBDs) under the Water Framework Directive (WFD): these UoMs are the Danube (SI_RBD_1) and the Adriatic (SI_RBD_2). Slovenia prepared one FRMP that covers both UoMs; the FRMP incorporates 17 sub-basin flood plans – 14 in the Danube UoM and three in the Adriatic UoM. Each sub-basin flood plan includes at least one APSFR.
The management of the two main UoMs/RBDs in Slovenia is performed at the state level. The UoMs/RBDs are further divided into 17 sub-basin units (14 in the Danube UoM and three in the Adriatic UoM).
The FRMP was approved by a government decision (No. 35500-5/2017/8) on 27 July 2017.
The table below gives an overview of both UoMs in Slovenia, including the UoM code, the name, and the number of APSFRs reported. It also shows if the UoM reported all documents required to European Environment Agency’s (EEA) WISE
– the FRMP as a PDF and the reporting sheet as an XML. Slovenia delivered 13 PDF documents at national level and 2 XML documents at UoM level. The PDF documents include one national FRMP and supplementary documents such as PFRA and APSFR reports and methodology, the Strategic Environmental Assessment (SEA) report, the catalogue of measures and relevant governmental decisions.
Table 1
Overview of UoMs in Slovenia
|
UoM
|
Name
|
Number of APSFRs
|
XML reported
|
PDF Reported
|
|
SI_RBD_1
|
DANUBE
|
51
|
Yes
|
Yes (at national level)
|
|
SI_RBD_2
|
ADRIATIC
|
10
|
Yes
|
Yes (at national level)
|
|
TOTAL
|
|
61
|
|
|
Slovenia’s FRMP can be downloaded from the following web page:
·
http://www.mop.gov.si/si/delovna_podrocja/voda/zmanjsevanje_poplavne_ogrozenosti/
Overview of the assessment
The table below gives an overview of the evidence found during the assessment of the FRMPs. The following categorisation was used for the column concerning evidence:
·Evidence to the contrary: An explicit statement was found stating that the criterion was not met;
·No evidence: No information found to indicate that the criterion was met;
·Some evidence: Reference to the criterion is brief and vague, without a clear indication of the approach used for the criterion. Depending on the comment in the adjacent column, “some evidence” could also be construed as “weak evidence;
·Strong evidence: Clear information provided, describing an approach followed in the FRMP to address the criterion.
Table 2Overview of the evidence found during the assessment of the FRMPs
|
Criterion
|
Evidence
|
Comments
|
|
FRM objectives have been established
|
Strong evidence
|
The FRMP includes a list of four, clearly defined general objectives that are described in Slovenia’s reporting sheets and in the sub-plans provided with the FRMP.
|
|
FRM objectives relate to...
|
|
...the reduction of potential adverse consequences
|
Strong evidence
|
This aspect is specified in the definition of objectives in the FRMP and Slovenia’s reporting sheets. The four national Flood Risk Management (FRM) objectives are: (1) preventing new risks from floods, (2) reducing existing flood risks, (3) decreasing current flood dangers during and after floods and (4) enhancing awareness about flood endangerment.
|
|
...to the reduction of the likelihood of flooding
|
Strong evidence
|
The second objective seeks to reduce flood risks, a term which includes the likelihood of flooding, and is linked to prevention measures.
|
|
...to non-structural initiatives
|
Strong evidence
|
The fourth objective focuses on strengthening public awareness.
|
|
FRM objectives consider relevant potential adverse consequences to...
|
|
...human health
|
Some evidence
|
Although it is not specified in the objectives set out in the FRMP, Slovenia’s reporting sheets state that the objectives address potential adverse consequences to human health, economic activity, environment and cultural heritage.
|
|
...economic activity
|
Some evidence
|
See above under human health.
|
|
...environment
|
Some evidence
|
See above under human health.
|
|
...cultural heritage
|
Some evidence
|
See above under human health.
|
|
Measures have been...
|
|
...identified
|
Strong evidence
|
Slovenia’s FRMP defines 20 measure groups that are implemented via projects in each UoM and sub-basin. In its reporting sheets, Slovenia reported 40 measures to WISE: these correspond to the 20 measure groups across its two UoMs.
|
|
...prioritised
|
Strong evidence
|
Measures have been prioritised on national and sub-basin levels. A simple ranking of the measures was prepared by an expert group at national level. The methodology is explained in the FRMP.
|
|
Relevant aspects of Article 7 have been taken into account such as...
|
|
...costs & benefits
|
Some evidence
|
In the Slovene FRMP, aspects of costs and benefits are analysed. Costs of measures were estimated, and quantitative information on elements at risk and assessed potential flood damage (which are used as an indication of benefits of flood protection measures) was presented.
Cost-benefit assessment was not used for the prioritisation and planning of the measures in the FRMP, but the Plan indicates that a cost-benefit method will be used at sub-basin level for flood prevention construction projects (Slovenian measure group U7).
|
|
...flood extent
|
Strong evidence
|
The flood extent is presented for each APSFR in a corresponding fiche. According to the information reported, flood extent has been used to define the measures.
|
|
...flood conveyance
|
Some evidence
|
No reference to conveyance routes is included in the FRMP. However, conveyance routes were identified in the preparation of the PFRA, and thus were considered via this preparatory stage.
|
|
...water retention
|
Strong evidence
|
Natural water retention measures (NWRM) have been planned, in particular for the protection of flood plains through their designation as “natural flood-plains” (which provides formal protection of the most important flood-plains): land-use in these flood-plains should maintain their water retention capacity (e.g. via prohibition of urbanisation).
|
|
...environmental objectives of the WFD
|
Strong evidence
|
The 20 measure groups set out in the FRMP have been assessed and designated into three categories in regard to their role vis-à-vis the WFD objectives: (1) synergetic influence, (2) potential conflict, and (3) irrelevant for implementation of the WFD. This was carried out based on expert judgment. All the measures that raise potential conflicts with the WFD goals have to be further examined at project level and harmonised with the WFD’s objectives.
|
|
...spatial planning/land use
|
Strong evidence
|
The FRMP includes a clearly defined measure group on land use.
|
|
...nature conservation
|
Some evidence
|
In 2015, a special study for designating natural flood areas considered the contribution of this type of measure to nature conservation.
|
|
...navigation/ port infrastructure
|
No evidence
|
Navigation and port infrastructure are not explicitly mentioned.
|
|
...likely impact of climate change
|
Some evidence
|
The reporting sheets and the FRMP indicate that the contribution of each measure to adaptation to climate change was checked.
|
|
Coordination with other countries ensured in the RBD/UoM
|
Strong evidence
|
The FRMP indicates that coordination with neighbouring Member States (AT, HR, HU and IT) occurred via the international Danube and Sava river processes as well as via bilateral relations.
|
|
Coordination ensured with WFD
|
Strong evidence
|
Slovenia held a joint consultation of its draft FRMP/sub-basin flood plans and its RBMPs. The authorities developing both documents (led by different teams within the same authority) coordinated their work. The objectives of the Floods Directive are incorporated in Slovenia’s RBMP.
|
|
Active involvement of interested parties
|
Strong evidence
|
The FRMP reports that during the drafting process there were several internal and expert consultations as well as consultations for the interested public. Each sub-basin plan has a chapter devoted to public consultation.
|
Good Practices
The assessment identified the following good practices in the Slovenian FRMPs assessed.
Table 3
Good practices in the Slovenian FRMPs
|
Topic area
|
Good practices identified
|
|
Integration of previous reported information
|
Slovenia coordinated the PFRA and FHRM stages with neighbouring countries, both bilaterally and via international river basin processes.
For each project or spatial plan in flood areas, flood hazard and risk mapping is obligatory. These detailed flood hazard and flood risk maps are included in the graphic viewer “Atlas voda” (Water management Atlas), which is updated with information from new studies twice a year.
|
|
Planning/implementing of measures and their prioritization for the achievement of objectives.
|
The FRMP provides clear information on costs, funding sources and expected funding levels (and is forthright in identifying a funding gap).
The FRMP sets out measure groups for spatial planning, NWRM and nature conservation actions.
There are strong links with the WFD. For example, measure groups were assessed for their compatibility with the WFD. All the measure groups that have potential conflict with the WFD goals are to be further examined on a project level and harmonised with all the WFD objectives.
Monitoring will be carried out every two years and will include a public consultation process.
|
|
Consideration of climate change
|
The contribution of measure groups to climate adaptation was assessed.
|
|
Cost-benefit analysis (CBA)
|
The FRMP sets out a comprehensive approach for CBA at the project or sub-basin level.
|
|
Public participation.
|
After the FRMP was completed, workshops were organised on a sub-basin level to raise awareness of its objectives, assessments and provisions.
|
Areas for further development
The assessment identified the following areas for further development in the Slovenian FRMPs assessed.
Table 4
Areas for further development in the Slovenian FRMPs
|
Topic area
|
Areas identified for further development
|
|
Integration of previously reported information in the FRMPs.
|
Although mapping is carried out on a project level, there is limited information in the FRMP on how the FHRMs were used to prioritise measures.
Despite the existence of an online viewer, the “Atlas voda”, for some of the APSFRs, no internet links for maps (FHRM) are provided in the FRMP document. The links that are provided do not work. Furthermore, a map or a link to a digital map of UoMs with delineation of the APSFRs is not included in the FRMP.
|
|
Setting of objectives for the management of flood risk.
|
The objectives are not specific or measurable.
|
|
Planning/implementation of measures and their prioritization for the achievement of objectives.
|
Although the FRMP links objectives and measures, it is not clear by how much the measures will contribute to the objectives, nor whether the objectives will be achieved within a specific time horizon (due in part to the fact that objectives are not specific or measurable).
While the FRMP describes how monitoring of measures will be carried out and presented in a report every two years, a baseline for monitoring progress is not clearly defined in the FRMP.
|
|
Consideration of climate change
|
The FRMP contains little information about climate change impacts on flooding, and it does not appear that climate change was considered in the design of measures.
The national climate change adaptation strategy was under development when the FRMP was drafted, but there is no evidence of early coordination.
|
|
Use of CBA
|
CBA will be performed in the process of implementation of the FRMP at the project level, but was not used to identify, prioritise or plan its measures.
It is not clear if transboundary effects of measures were assessed under the CBA methodology.
|
|
Public participation
|
Although a report on public participation was published separately from the FRMP, there is little information in the FRMP about the types of stakeholders actively involved in its preparation and the extent of their involvement. There is also little information about the results of the consultation and the FRMP does not refer to the separate report on participation.
|
Recommendations
Based on the reported information and the FRMP, the following recommendations are made to enhance flood risk management (not listed in any particular order):
·The process for the development of objectives should be better explained in the FRMP. To be able to assess progress, the objectives should be specific and measurable to the extent possible, so their achievement can be ascertained.
·The FRMP should present and explain the baseline for implementation of the measures for monitoring progress.
·The impacts of climate change should be considered better in the development of the next FRMP and its measures. The FRMP and the national climate change adaptation strategy (once adopted) should be coordinated.
·CBA should not be used exclusively at the project level; where possible it could also be employed as a tool in the planning process to identify and prioritise measures and to assess alternatives of possible measures at an early stage of programme development (also at the transboundary level).
·The results of the active involvement of stakeholders in the preparation of the FRMP and of public consultation should be reflected better in the FRMP.
·It will be important to ensure that FRMPs, APSFRs, and FHRMs refer to each other as appropriate and that they are continuously available to all concerned and the public in an accessible format, including digitally.
1. Scope of the assessment and sources of information for the assessment
1.1Reporting of the FRMPs
Slovenia prepared one FRMP that covers both of its UoMs and consists of 17 sub-basin flood plans, 14 in the Danube UoM (SI_RBD_1) and three in the Adriatic UoM (SI_RBD_2).
Slovenia did not make use of Article 13.3 of the Floods Directive, which allowed Member States to make use of previous flood risk management plans (provided their content is equivalent to the requirements set out in the Directive).
1.2Assessment of the FRMPs
The assessment covers the FRMP submitted by Slovenia and any relevant supplementary documents provided with the FRMP. The following UoMs were assessed:
Table 5
UoMs assessed in Slovenia
|
UoM
|
Name
|
|
SI_RBD_1
|
DANUBE
|
|
SI_RBD_2
|
ADRIATIC
|
Slovenia’s FRMP can be downloaded from the following web page:
·
http://www.mop.gov.si/si/delovna_podrocja/voda/zmanjsevanje_poplavne_ogrozenosti/
2. Integration of previously reported information
2.1Conclusions drawn from the preliminary flood risk assessment
The conclusions of the PFRA are presented in the FRMP and within all sub-basin flood plans within the FRMP as textual description. There are also short textual descriptions of the APSFRs but no summary map showing the APSFRs covered by the FRMP or by the sub-basin flood plans. However, all PFRA reports and a map showing the APSFRs covered by the FRMP are included in the documentation that Slovenia submitted as part of its reporting to WISE. Each APSFR is presented with a number of internet links to maps but the links to these maps are not working. However, functional links to the maps are provided in a separate spreadsheet file that outlines the process of implementing the Floods Directive, a link to which is provided in all 17 sub-basin plans. All the maps related to the FHRM phase are also publicly available through an on-line application “Atlas voda” (Water Management Atlas).
Links to maps showing APSFRs have been provided in the FRMP; however, these links do not work. As mentioned above, the 17 sub-basin flood plans contain a link to a spreadsheet that presents the process of implementing the Floods Directive. This spreadsheet also provides working links to maps, which present the following information for each of the APSFRs: flood hazard and flood risk maps for 10, 100 and 500 years return period. It appears that maps for eight of the APSFRs are missing (i.e. for ASPFRs Zagorje ob Savi, Celje, Kostanjevica na Krki, Rogaška slatina – steklarna, Ptuj, Odranci, Miren, and Nova Gorica.) .
Conveyance routes have been taken into account in the PFRA: They were included in the preparation of the PFRA in accordance with national rules that define the methodology for their preparation.
2.1.1
Coordination with neighbouring Member States on shared RBDs/UoMs
It is reported in the FRMP (p.19-20) that the identification of flood risk areas and the FRMPs themselves have been coordinated with neighbouring Member States in cases where RBDs/UoMs are shared. There was also exchange and harmonisation of data and methods. The FRMP says that harmonisation of FRMPs with Italy was confirmed via a bilateral meeting in December 2015, with Austria via a meeting in September 2015, and with Hungary in November 2015. There was also an attempt to harmonise the FRMPs with Croatia in October 2015, but the unsolved border question halted progress.
Coordination with international FRMPs was assured via international river basin commissions, in particular the preparation of the FRMPs for the Sava river basin and for the Danube river basin.
2.1.2
Information how the PFRA was used in the development of the FHR maps
According to the FRMP, the preparation of the flood hazard and risk maps confirmed the findings of the PFRA in all 17 sub-basin flood plans included in the FRMP.
2.2Presentation of Flood Hazard and Risk Maps (FHRMs) in the FRMP
FHRMs are provided in all 17 sub-basin flood plans included in the FRMP of Slovenia. There is no specific distinction made between the sources of flooding and all maps present the combined effects of more than one source of flooding: The FHRMs cover fluvial, pluvial and seawater floods, floods from artificial water bearing structures and floods from not specified sources. The FHRMs have not been reproduced in the main part of the FRMP, but the plan provides weblinks to the maps: these links, however, do not work, potentially due to a problem with the PDF format of the plan. Working links are provided in the separate document noted above, a spreadsheet that presents the process of implementing the Floods Directive as well as in the on-line application “Atlas voda” (Water Management Atlas).
Examples of the links to the FHRMs provided in the spreadsheet are provided below (see the footnotes):
·Seawater FHRMs for the coastal city of Piran (Adriatic RBD, SI_RBD_2)
·Fluvial flood FHRMs for Ljubljana (Danube RBD, SI_RBD_1)
2.2.1
Maps for shared flood risk areas
FHRMs have been prepared for flood risk areas shared with the other Member States in transboundary river basins/UoMs. There are links provided in the FRMP that lead to the minutes of the meetings of bilateral water management commissions (with Italy, Austria, Hungary and Croatia), which discussed also the preparation of FHRMs. Mapping in shared flood risk areas has been coordinated with the neighbouring Member States in all bordering river basins, which is evident from the minutes.
2.2.2
Conclusions drawn from the flood hazard and flood risk maps
The FHRMs have been used as a tool in the public participation process. However, the FRMP do not indicate clearly how the FHRMs were used to prepare the content of the plan, in particular, its priorities, objectives, and measures .
The FRMPs explain that flood hazard mapping is used and further developed in the process of preparing construction projects and spatial plans. The FRMP moreover states that maps are updated whenever flood protection projects and spatial plans are prepared: This work is carried out by the Slovenian Water Agency under SI measure U1 (Determination and consideration of flood plain areas, see section 4). The preparation of flood hazard maps is obligatory for any new structural flood risk reduction project. In addition, in the preparation of state or municipal spatial planning instruments affecting flood risk areas as well as projects requiring building permits in these areas, the Slovenian Water Agency actively also carries out FRMP measure U1: in this process, for each project or spatial act planned in flood areas, flood hazard and risk mapping is obligatory. The validated data from such studies are then integrated into the detailed flood hazard database, which is publicly available via the online viewer, “Atlas voda” (Water Management Atlas), which is updated with information from new, detailed studies twice a year.
2.3Changes to the APSFRs or other Flood Risk Areas
The FRMP assessment looked for information on changes in the identification of APSFRs since December 2011, or in the FHRMs since 2013, indicated in the FRMP. The APSRFs identified in the process of preliminary flood risk assessment were adopted legally via a resolution of the government of Slovenia in February 2013. The FRMP does not indicate that any changes have been made in the list of APSFRs. Slovenia did not present flood water depth or level in the preliminary flood risk assessment, but instead a combination of water depth and velocity. This has changed and the FHRMs present also flood water depth.
In addition, the FRMP does not indicate any changes in the FHRMs since December 2013. The methodology for their preparation, defined in the ‘Rules on a methodology to define flood risk areas and erosion areas connected to floods and classification of plots into risk classes’, has not changed.
2.4Areas for further development in the earlier assessment of the flood hazard and risk maps
The FHRM assessment identified the following areas for further development for Slovenia:
·Climate change had not been included in the analysis.
·No potential adverse consequences on the environment were shown in the maps.
Information on amendments to address these areas for further development has not been found in the FRMP. A review of the FHRMs indicates that climate change has not been explicitly addressed in the maps; The online water atlas map viewer now shows a range of protected areas, including Natura 2000 sites and water protection areas.
2.5Good practices and areas for further development regarding integration of previously reported information
The following good practice was identified:
·Flood hazard mapping is obligatory as part of the process for new structural flood risk reduction projects and for state and municipal spatial instruments. Validated data from such studies are then integrated twice a year into Slovenia’s detailed flood hazard database, which is publicly available online via the “Atlas voda” viewer.
The following areas for further development were identified:
·Although mapping is used on a project level, there is limited information in the FRMP on how the FHRMs have been used to prioritise measures on the FRMP level.
·For some of the APSFRs, no internet links to FHRMs are provided in the FRMP document. The links that are provided do not work. Furthermore, a link to a digital map of UoMs with delineation of the APSFRs is not included in the FRMP .
3. Setting of Objectives
3.1Focus of objectives
Slovenia has set four main objectives at the national level, valid for both UoMs/RBDs and for all sub-basin flood plans. They are:
1.prevention of new risks from floods (consideration of flood plains in land use and spatial planning);
2.reduction of the existing flood threat (construction, management of flood protection water infrastructure);
3.decreasing the existing flood threat during and after floods (increasing the quality of flood forecasts, intervention protocols, and damage estimates to speed up restoration) and
4.enhancement of awareness about flood threats.
Consequently, it can be concluded that in Slovenia:
·The objectives aim to reduce the adverse consequences of floods;
·The objectives aim to reduce the likelihood of flooding;
·The objectives refer to non-structural measures.
3.2Specific and measurable objectives
In Slovenia, the objectives are neither specific nor measurable.
However, there is a clear link between the objectives and the 20 measure groups that are defined in the Slovenian catalogue of flood prevention measures, and then with the projects in each sub-basin flood plan. All sub-basin plans set out the same four main objectives.
3.3Objectives to reduce adverse consequences from floods
The first three objectives set out to reduce adverse consequences from floods. Moreover, Slovenia’s reporting sheets state that the objectives seek to address adverse consequences to human health, economic activity, environment and cultural heritage.
3.4Objectives to address the reduction of the likelihood of flooding
The objectives address flood risk, which is understood to include likelihood of flooding. The second objective, ‘reducing the existing flood threat’, specifically seeks to reduce the likelihood of flooding; moreover, it is linked to measure groups to prevent flooding. The first objective, by promoting floodplains, also seeks to reduce the likelihood of flooding.
3.5Process for setting the objectives
The FRMP indicates that the objectives were coordinated at the national level and discussed with stakeholders before their establishment at river basin/river sub-basin level. Further details, however, are not provided.
3.6Good practices and areas for further development regarding setting objectives
The following good practices were identified:
·The focus of the main objectives was discussed with stakeholders prior to their establishment. The focus of the objectives was further emphasised with a common methodology developed for defining flood risk and dealing with FRM. This kind of practice provides comparable results throughout the country.
·The FRMP links the objectives with the 20 measure groups that are defined in the Slovenian catalogue of flood measures and also with the individual projects identified for each sub-basin flood plan.
The following area for further development was identified:
·Objectives are not specific or measurable.
4. Planned measures for the achievement of objectives
In the reporting sheets, Slovenia has reported 40 aggregated measures and no individual measures. Of the 40 measures, 20 are reported for each of the two UoMs. The measures reported by Slovenia cover all four measure aspects: prevention (20 measures), protection (18 measures), preparedness (10 measures) and recovery and review (four measures). As some measures cover more than one measure aspect or type, when looking across there are a total of 52 measures (this implies double-counting). (See Tables A1 and A2 and Figures A1 and A2 of Annex A for further information.)
Slovenia’s FRMP, however, presents the number of measures differently: Slovenia's catalogue of flood risk reduction measures includes 20 groups of measures. These 20 groups of measures are used in each UoM and in all 17 sub-basins. For each measure group, there are regular activities performed by state and other agencies, and there can be a series of specific projects (these include both construction and non-construction projects; the number of projects per sub-basin ranges from 22 to 63).
The 40 aggregated measures set out in Slovenia’s reporting sheets correspond to the 20 measure groups: all 20 measure groups are reported once for each of the two UoMs.
4.1Cost of measures
Table 6
Estimated overall budget for the measures in the assessed FRMPs
|
|
Estimated overall budget of planned measures in the FRMP
(2017-2021) in EUR in constant prices
|
|
Both UoMs
|
540 000 000
|
Source: Reporting sheet and FRMPs
The FRMP provides an estimated overall budget for the implementation of structural and non-structural measures in the FRMP planned in both UoMs: EUR 540 m in constant prices (approximately EUR 110 m per year in constant prices), for the period 2017-2021.
The costs of the groups of measures that are already being implemented were estimated based on the expenditure for their implementation in past years (e.g. costs of flood forecasting). Costs of new measures or new parts of measures were estimated based on the planned activities, selected tariffs, data from adopted programmes and assessments of experts. Costs of structural measures were estimated based on the preliminary assessments and data from investment documentation gathered from the Slovenian Water Agency and municipalities.
The FRMP provides details on the costs of construction projects in each sub-basin plan: Appendix C to the FRMP presents 207 construction projects in Slovenia that are listed together with estimates of their costs, while Appendix F lists all international and bilateral projects and their estimated budgets. Costs of non-structural as well as structural measures are included in the estimated overall budget for implementation of the FRMP.
The FRMP states, however, that in the period of 2017-2021, only approximately EUR 400 m (or EUR 80 m per year) is likely to be available from financing sources. The FRMP nonetheless also presents an optimistic scenario, by which almost EUR 530 m can be ensured.
In addition to the budget for projects, the FRMP includes an overview of bilateral and transnational projects (ongoing and in preparation), which lists 11 projects and provides their estimated costs (in total EUR 25.9 m, of which EUR 10 m is planned for the Ministry of the Environment and Spatial Planning and for bodies under the Ministry). The FRMP states that these costs are included in the estimated total budget.
4.2Funding of measures
The FRMP lists the following sources of funding for the measures: the national Water Fund, the national Climate Fund, national and local public budgets, EU Cohesion funds and various INTERREG programs.
Table 7
Funding of measures
|
|
All UoMs
|
|
Distribution of costs among those groups affected by flooding
|
|
|
Use of public budget (national level)
|
✔
|
|
Use of public budget (regional level)
|
|
|
Use of public budget (local level)
|
✔
|
|
National Water Fund
|
✔
|
|
National Climate Fund
|
✔
|
|
Private investment
|
|
|
EU funds (generic)
|
|
|
EU Structural funds
|
✔
|
|
EU Solidarity Fund
|
✔
|
|
EU Cohesion funds
|
✔
|
|
EU CAP funds
|
|
|
International funds
|
|
Source: Reporting sheet and FRMPs
4.3Measurable and specific (including location) measures
The measure groups are general, while the projects are much more concrete.
In its reporting sheets, Slovenia has indicated the location of all measures (i.e. measure groups) as the basins of specific rivers. In the FRMP, the locations given for specific projects are much more detailed providing location, short description of the project and possible financial resources.
Nonetheless, the FRMP does not provide targets or measures for the expected results of the measures or the projects. Even though the FRMP provides the most detailed information for construction projects (measure group U7), this still does not indicate the contribution to overall flood risk reduction each project or group of projects would make.
The following table lists all the locations indicated for Slovenia’s projects:
Table 8
Location of measures
|
|
All UoMs
|
|
International
|
✔
|
|
National
|
✔
|
|
RBD/UoM
|
✔
|
|
Sub-basin
|
✔
|
|
APSFR or other specific risk area
|
✔
|
|
Water body level
|
✔
|
|
More detailed than water body
|
|
4.4Measures and objectives
The FRMP indicates which measure groups contribute to the achievement of which objectives; however, it is not clear by how much the measures will contribute nor whether the objectives will be achieved once all projects are implemented, .
4.5Geographic coverage/scale of measures
As noted above, the FRMP provides information about the location of specific projects corresponding to each measure group. The location is provided in three different ways: (1) types of areas to which the project is aimed (whole state, flooded area, or river basin), (2) short descriptions of relevant projects with the names of locations (name of a river or town etc.), and in some cases also (3) potential sources of financing, which indicate that some projects will be international (supported by bilateral or regional programmes) while others are local (financed by a municipality).
Specific construction projects are prepared at river sub-basin level, APSFR or water body level, and their expected effects would take place at this level.
In its reporting sheets, as noted above, Slovenia reported on the geographic level of groups of measures; however, Slovenia did not provide, in addition, information on the geographic coverage of the expected effects of the groups of measures.
4.6Prioritisation of measures
In its reporting sheets, Slovenia provided the priority of all measures (i.e. the measure groups set out in the FRMP). The majority of the measures are of ‘very high’ priority (38 measures, or around 73 % of all measures), followed by measures of ‘critical’ priority (10 measures, or about 19 % of the total). Only four measures were reported as ‘low’ priority and no measures were reported as ‘high’ or ‘moderate’ priority. The distribution of the priority of the measures across the two UoMs is even (for details see Tables A3 and A4 in Annex A).
According to the information in the FRMP, three categories for prioritisation are used: high, moderate and low. The FRMP further explains that the following five measure groups for Slovenia were identified as having the highest priority for implementation (on a scale of 1 up to 5, with 5 representing the highest priority):
·Planning and implementation of flood prevention construction measures (Slovenian measure group U7) received 3.95 points;
·Regular maintenance of watercourses, water objects as well as water and littoral areas (Slovenian measure group U10) received 2.85 points;
·Ensuring financial resources for civil service of water management (Slovenian measure group U13) received 2.20 points;
·Forecasting of floods received 1.31 points (Slovenian measure group U15J)
·Execution of individual (self-protection) flood protection measures (Slovenian measure group U8) received 1.24 points;
Other measure groups received lower scores.
The FRMP explains that prioritisation was carried out by expert judgement: a survey among water professionals was carried out at national level to determine the priorities of the 20 measure groups. Each water professional gave priorities to the five most important measure groups (giving them 5, 4, 3, 2 or 1 point while the rest of the measures received 0.2 points). Then the average number of points per measure group was calculated. This input was used in prioritisation. CBA was not used for prioritising the measures (see also section 6) .
Slovenia did not provide information on the timetable of measures in its reporting sheets. The FRMP indicates that the general timeframe for implementation of the specific projects is 2017-2021; further details, however, are not provided. All measure groups are composed of different specific projects; some are ongoing and some are continuous activities. For some ongoing and planned EU projects in the indicative list of EU projects (Appendix F), the FRMP provides more specific timeframes for implementation of the projects, which range from 2016-2018 for earlier projects to 2018-2020 for later projects .
4.7Authorities responsible for implementation of measures
Slovenia did not report information to WISE about the level of responsibility of the assigned responsible authorities; however, it reported the authorities responsible for each measure (i.e. measure groups).
Overall, all responsible authorities are at the national level and constitute two types of authorities: ministries of the government (e.g. Ministry of the Environment and Spatial Planning, Ministry of Agriculture, Forestry and Food, Ministry of Finance) or agencies (e.g. Slovenian Environment Agency, Slovenian Water Authority, Administration for Protection and Rescue.). Around a quarter of the measures were assigned only one responsible authority but most measures were assigned multiple responsible authorities.
While the FRMP itself does not provide a summary of authorities responsible for measures, the sub-basin plans provide this information. The authorities listed are:
(1) National administrative bodies: The Ministry for Environment and Spatial Planning, and the Slovenian Water Agency with its eight regional offices, a body of the Ministry;
(2) Executive bodies: Companies holding concessions for water management, specifically for construction projects;
(3) For organisation of civil protection in case of interventions due to floods: The national Administration for Civil Protection and Disaster Relief with 13 regional offices, a body of the Ministry of Defence.
While most of the responsibility (according to the national Slovenian water management legislation) in fact lies on the state/national level and state agencies, some of the tasks were assigned to local communities, as seen in the sub-basin lists of projects. Some of the projects were assigned to private sector actors as well.
4.8Progress of implementation of measures
According to the reporting sheets, nearly all measures in Slovenia are ongoing (50 measures) and two measures have not started. No measures were reported as ‘completed’ or ‘ongoing construction’ (for details see Tables A5 and A6 in Annex A).
Concerning construction measures, the FRMP contains a list of planned projects with information on the stage of implementation of each, including necessary technical and administrative steps. The implementation is monitored through seven steps (see below under monitoring).
4.9Measures taken under other Community Acts
Member States have been asked to report on other Community Acts under which each measure has been implemented: the reporting sheet does not provide any information, however. The FRMP itself does not mention measures under the WFD, or the Seveso Directive (though information is provided on Seveso installations located in the APSFRs).
4.10Specific groups of measures
The following measure group addresses spatial planning and land use: adaptation
of
land-
use
in
river basins
(Slovenian measure group U3). In addition, measure groups for flood plains also include land use elements
.
Slovenia’s framework for spatial planning has evolved since 2000. The first important step of halting or controlling buildings/development in floodplains occurred in 2002 under the Water Law passed that year: its Article 86 prohibits any kind of construction that would increase flood risk. Whenever further urbanisation is allowed, protection and compensation measures are required.
NWRM have been planned in Slovenia. There are two such measures: Slovenian measure U1 - Determination and consideration of flood plain areas (that partially corresponds to NWRM measures F05, F14, N02, and N03 from Annex B), and measure U2 - Identification, establishment, and protection of important natural high-water flood plain areas (that corresponds to NWRM measures F05, F14, N02, and N03).
Measures that specifically consider nature conservation. One measure specifically considers nature conservation (Identification, establishment, and protection of natural flood areas of high waters, Slovenian measure group U2). In 2015, a special study for designating natural flood areas was completed (it includes a proposal for formal protection of the most important flood-plains in the sense of protecting their water retention capacity). This measure is important because its results can have many synergetic effects for the implementation of the goals of the WFD and other sectoral policies (such as biodiversity, climate adaptation and green infrastructure).
The measures in the Slovenian FRMP do not specifically consider navigation and port infrastructure or dredging to increase the river channel capacity and its ability to convey water for flood alleviation purposes.
4.11Recovery from and resilience to flooding
The role of insurance policies is discussed in the Slovenian FRMP, with regard to the recovery from flooding, preparedness/resilience to flood or other issues. A general description of a measure group ‘U18 - assessment of damages and execution of reconstruction after floods’ emphasises that it is necessary to provide:
·regular training and education of members of the commission for assessment of flood damage;
·equal treatment of victims;
·participation of insurance companies; and
·ensuring a quick and professional treatment of victims.
Besides that, the list of specific projects includes two projects for each sub-basin under measure U20 (Systemic, normative, financial and other measures) that are related to insurance policies: both deal with establishing a scheme of subsidising of insurance premiums.
There is no specific information in the FRMP on what type of insurance is currently available.
4.12Monitoring progress in implementing the FRMP
Progress in the implementation of planned measure groups and projects will be monitored via a report to the Government of Slovenia every two years, where it will be shown how and if the listed/planned measures/projects are being developed or being implemented and how they relate to objectives in each of the 17 sub-basins. A draft of the report will go through ‘public unfolding’, a basic level of public consultation that usually includes a public presentation on the Internet, public debate and other forms of public consultation. After it is confirmed by the government, it will be published.
There is no specific information on what is monitored with the exception of the construction measure group and projects: Seven steps of implementation for each construction project are envisioned and progress will be monitored through these steps . Many measure groups are also ongoing activities, and there are no clear targets and/or indicators for assessing whether other non-construction measures have been implemented, and no dates were specified for the completion of each measure.
The FRMP does not indicate a specific baseline against which progress will be monitored and assessed.
4.13Coordination with the Water Framework Directive
The table below shows how the development of the FRMP has been coordinated with the development of the second River Basin Management Plan (RBMP) of the WFD.
Table 9
Coordination of the development of the FRMPs with the development of the second River Basin Management Plans of the WFD
|
|
All UoMs
|
|
Integration of FRMP and RBMP into a single plan
|
|
|
Joint consultation of draft FRMP and RBMP
|
✔
|
|
Coordination between authorities responsible for developing FRMP and RBMP
|
✔
|
|
Coordination with the environmental objectives in Art. 4 of the WFD
|
✔
|
|
The objectives of the Floods Directive were considered in the preparation of the RBMPs a
|
✔
|
|
Planning of win-win and no-regret measures in the FRMP
|
✔
|
|
The RBMP PoM includes win-win measures in terms of achieving the objectives of the WFD and Floods Directive, drought management and NWRM a
|
✔
|
|
Permitting or consenting of flood risk activities (e.g. dredging, flood defence maintenance or construction) requires prior consideration of WFD objectives and RBMPs
|
✔
|
|
Natural water retention and green infrastructure measures have been included
|
✔
|
|
Consistent and compliant application of WFD Article 4(7) and designation of heavily modified water bodies with measures taken under the FD e.g. flood defence infrastructure
|
✔
|
|
The design of new and existing structural measures, such as flood defences, storage dams and tidal barriers, have been adapted to take into account WFD Environmental Objectives a
|
✔
|
|
The use of sustainable drainage systems, such as the construction of wetland and porous pavements, have been considered to reduce urban flooding and also to contribute to the achievement of WFD Environmental Objectives
|
|
Notes: a based on reporting under the WFD
The development of the FRMP has been coordinated with the development of the second RBMP of the WFD. There were joint consultations of the draft FRMP/sub-basin flood plans and RBMPs and coordination between authorities responsible for developing both documents (the same authority, different teams).
In the FRMP, all flood risk management measure groups have been sorted into three categories depending on their influence on achieving of the WFD goals: (1) synergetic influence, (2) potential conflict with the WFD goals, and (3) irrelevant for implementation of the WFD. All the measure groups that have potential conflict with the WFD goals are to be further examined on a project level and harmonised with all the WFD objectives.
In the second RBMP, there is a measure called "U1a – protection from adverse effects of floods", which is actually the implementation of the FRMP, as explained in the text describing the measure.
4.14Good practices and areas for further development with regard to measures
The following good practices were identified:
·The FRMP provides clear information on costs, funding sources and expected funding levels (and is forthright in identifying a funding gap).
·The FRMP sets out measure groups for spatial planning, NWRM and nature conservation actions.
·There are strong links with the WFD. For example, measure groups were assessed for their compatibility with the WFD. All the measure groups that have potential conflict with the WFD goals are to be further examined on a project level and harmonised with all the WFD objectives.
·Monitoring will be carried out every two years and will include a public consultation process.
The following areas for further development were identified:
·Although the FRMP links objectives and measures, it is not clear by how much the measures will contribute to the objectives and whether the objectives will be achieved with their implementation (also as objectives are not specific or measurable).
·Whereas the FRMP describes how monitoring of measures will be carried out and presented in a report every two years, a baseline for monitoring progress is not clearly defined in the FRMP.
5. Consideration of climate change
Slovenia’s FRMP indicates that the contribution of each of measure group to adaptation to climate change was checked by expert judgement. (Moreover, for projects that contribute to adaptation, the national Climate Fund is a potential source of financing, as noted in section 4). However, it does not appear that any measure groups or projects were specifically developed to address climate change, nor that climate was considered in their design.
The FRMP does not contain a reference to the national Strategic Framework for Climate Change Adaptation (which was released after the FRMP, in December 2016). The FRMP does not indicate whether climate change scenarios were considered in its development; nor does it discuss possible shifts in the occurrence of extreme events, or changes in numerical recurrence times, or main sources of flooding under long term climate change scenarios.
5.1Good practices and areas for further development concerning climate change
The following good practice was identified:
·The contribution of measure groups to climate change adaptation was assessed.
The following area for further development was identified:
·The FRMP contains little information about climate impacts on flooding, and it does not appear that climate change was considered in the design of measures.
·No reference to a coordination between the FRMP and the national climate change adaptation strategy when both documents where still under parallel development.
·
6. Cost-benefit analysis
In the FRMP, costs of measures were estimated (see section 4) and quantitative information on elements at risk and on potential flood damage (which provides an indication on benefits of flood protection) were taken into account. In the FRMP, the methodology for the estimates of the costs of measures is described.
A CBA has not been used in the prioritisation and planning of the measures in the FRMP, but a methodology is set out to use CBA at the project or the sub-basin level.
The FRMP states that CBA will be performed in the process of preparing investment documentation, according to the national decree. The CBA will be performed at the project level for measures that fall into Slovenian measure type U7, “Planning and implementation of structural flood protection measures”. According to the national methodology (Article 5), this requires comparing costs and benefits of various alternatives, but it also allows comparison of just two alternatives: with or without intervention. The recommended structure of costs, as well as one of the possible methods for assessing the benefits, are presented in Annex B of the FRMP: this includes costs of new investments, operating, maintenance, administrative and other direct costs of planned flood protection measures, and benefits in terms of reduction of damage to human health, the environment, cultural heritage and economic activity of the affected areas.
The environment, ecosystem services, possible sources of greater pollution, as well as water services such as water supply and waste water collection and treatment are included in the assessment of reduced flood damage due to the implementation of flood protection measures. The method includes also proposed monetary values (per unit of endangered element) for both, estimated costs and benefits (resulting from the decrease in damage due to application of measures). The recommended structure of costs and method for assessing the benefits are applicable to all types of flood protection measures. Assessing of transboundary effects is not explicitly mentioned. It appears that CBA will be applied mainly on a project basis in the last phase of planning, when a CBA is required for investments from public funds according to the national decree.
6.1Good practices and areas for further development
The following good practice was identified:
·The FRMP sets out a comprehensive approach for CBA at the project and sub-basin level.
The following area for further development was identified:
·The application of CBA for measures with potentially transboundary effect is unclear.
·CBA will be performed in the implementation of the FRMP at the project level, but was not used to select and prioritise the Plan’s measures.
7. Governance including administrative arrangements, public information and consultation
7.1Competent authorities
In 2010, in accordance with the Water Law, the ministry responsible for water was tasked, as the competent authority, to prepare the FRMP: the Ministry of Agriculture and Environment of the Republic of Slovenia used to be the competent authority for both UoMs. Following a reorganisation, the Ministry of the Environment and Spatial Planning of the Republic of Slovenia is currently the competent authority for both UoMs . The most recent documents reported to the European Commission are dated 2014.
7.2Public information and consultation
The table below shows how the public and interested parties were informed, according to the FRMP concerning the draft FRMPs. Information how the consultation was actually carried out and which stakeholders participated is presented in the rest of the section:
Table 10
Methods used to inform the public and interested parties of the FRMPs
|
|
All UoMs
|
|
Media (papers, TV, radio)
|
✔
|
|
Internet
|
✔
|
|
Digital social networking
|
|
|
Printed material
|
|
|
Direct mailing
|
|
|
Invitations to stakeholders
|
✔
|
|
Local Authorities
|
✔
|
|
Meetings
|
✔
|
Source: FRMPs
In Slovenia, the public and stakeholders were informed about the preparation of the FRMP through the internet: all the documents (including the FRMP and background studies) were (and in early 2018, still are) available on government web sites. In addition, the public and stakeholders were informed through invitations, meetings, and workshops, through local water authorities that exhibited the draft plans as well as through press conferences.
The table below shows how the actual consultation was carried out:
Table 11
Methods used for the actual consultation
|
|
All UoMs
|
|
Via Internet
|
✔
|
|
Digital social networking
|
|
|
Direct invitation
|
✔
|
|
Exhibitions
|
✔
|
|
Workshops, seminars or conferences
|
✔
|
|
Telephone surveys
|
|
|
Direct involvement in drafting FRMP
|
|
Source: FRMPs
The actual consultation was carried out first of all via the internet. People were able to submit their comments online. The FRMP states that there were more than 50 comments on the draft FRMP collected in this way from various stakeholders (associations, local communities and other groups).
As indicated above, public presentations were organised across the country in cooperation with local authorities.
After the publication of the final FRMP, Slovenia organised workshops with local inhabitants in flood-risk areas and with local water professionals. In December 2015, there were four workshops for the basins of Savinja river (at Ljubno ob Savinji), Mura and Drava rivers (at Murska Sobota), Sava river (at Ljubljana) and Soča and Adriatic rivers (at Nova Gorica) that explained the FRMP. In 2017, a public discussion and exhibition was held, covering both UoMs.
The table below shows how the documents for the consultation were provided:
Table 12
Methods used to provide the documents for the consultation
|
|
All UoMs
|
|
Downloadable
|
✔
|
|
Direct mailing (e-mail)
|
|
|
Direct mailing (post)
|
|
|
Paper copies distributed at exhibitions
|
|
|
Paper copies available in municipal buildings (town hall, library etc.)
|
✔
|
Source: FRMPs
The documents for the consultation were available for downloading from the internet. They were also available at local offices of water authorities where they were publicly displayed.
7.3Active involvement of Stakeholders
There is no information in the FRMP on which groups of stakeholders were actively involved in the development of flood risk management plans. The reporting sheets indicate that after the draft FRMP was publicly presented (and available for downloading from the internet), there were several internal presentations of the FRMP to government bodies under the Ministry of the Environment and Spatial Planning, including flood warning and defence bodies.
7.4Effects of consultation
The FRMP reports that comments were collected at all public presentations but does not provide information on how these or written comments were used to amend the draft FRMP. The FRMP does note, however, that information about relevant construction projects planned at municipal level were collected and included in an informative list of construction projects to be considered.
7.5Strategic Environmental Assessment
The FRMP underwent an SEA procedure. The FRMP has an Appendix G with "General protection guidelines and mitigation measures”, taken from the SEA Report. The reporting sheets clarify that the draft FRMP and its draft SEA report were publicly presented together at public discussions and exhibitions.
7.6Good practices and areas for further development regarding governance
The following good practice was identified:
·Workshops were held to present and raise awareness of the completed FRMP on a sub-basin level.
The following areas for further development were identified:
·Although a report on public participation was published separately, the FRMP contains almost no information about the types of stakeholders actively involved in the preparation of the FRMP, nor the extent of their involvement. The FRMP does not contain a reference to the separate report.
·There is little information in the FRMP about the results of the consultation.
·
Annex A: Supplementary tables and charts on measures
This Annex gives an overview of the data on measures reported by Slovenia in its reporting sheets. These tables and charts were used for the preparation of section 4 on measures. As noted in section 4, the FRMP presents a different structure for measures. This Annex, however, is only based on Slovenia’s reporting sheets.
Background & method
This document was produced as part of the assessment of the Flood Risk Management Plans (FRMPs). The below tables and charts below are a summary of the data reported on measures by the Member States, and were used by the Member State assessor to complete the questions on the Flood measures. The data are extracted from the XMLs (reporting sheets) reported by Member States for each FRMP, and are split into the following sections:
·Measures overview – Tabulates the number of measures for each UoM;
·Measure details: cost – Cost & Cost explanation;
·Measures details: name & location – Location & geographic coverage;
·Measure details: authorities – Name of responsible authority & level of responsibility;
·Measure details: objectives – Objectives, Category of priority & Timetable;
·Measure details: progress – Progress of implementation & Progress description;
·Measure details: other – Other Community Acts.
On the basis of the Reporting Guidance (which in turn is based on the Floods Directive), not all fields are mandatory, and, as such, not all Member States reported information for all fields.
Some of the fields in the XMLs could be filled in using standardised answers – for example, progress is measured via the categories set out in the Reporting Guidance. This means that producing comprehensive tables and charts required little effort. For many fields, however, a free data format was used. For some Member States, this resulted in thousands of different answers, or answers given in the national language.
In such situations, tables and charts were developed using the following steps:
·A first filter is applied to identify how many different answers were given. If a high number of different answers are given, Member States assessors were asked to refer to the raw data when conducting the assessment, and this Annex does not reflect these observations.
·If a manageable number of answers are given, obvious categories are identified, and raw data sorted.
·Measures missing information may be assigned categories based on other fields (for example, if the level of Responsibility Authority is missing, the information may be obvious from the field “name of Responsible Authority”).
·Measures where obvious categories cannot be defined based on other available information (as in the example above on the name of the Responsible Authority), are categorised as “no information”.
Types of measures used in reporting
The following table
is used in the reporting on the types of measures. Each type of measures is coded as an M-number. Measures are grouped in an ‘aspect’.
|
NO ACTION
M11: No Action
|
PREPAREDNESS
M41: Flood Forecasting & Warning
M42: Emergency response planning
M43: Public Awareness
M44: Other preparedness
|
|
PREVENTION
M21: Avoidance
M22: Removal or relocation
M23: Reduction
M24: Other prevention
|
RECOVERY & REVIEW
M51: Clean-up, restoration & personal recovery
M52: Environmental recovery
M53: Other recovery
|
|
PROTECTION
M31: Natural flood management
M32: Flow regulation
M33: Coastal and floodplain works
M34: Surface Water Management
M35: other protection
|
OTHER MEASURES
M61: Other measures
|
List of Annex A tables & figures
Figure A1: Number of total measures (individual and aggregated) by measure aspect
Figure A2: Share of total measures (aggregated and individual) by measure aspect
Figure A3: Visualisation of Table A3: Category of priority by measure aspect
Figure A4: Visualisation of Table A4: Category of priority by UoM
Figure A5: Visualisation of Table A5: Progress of implementation by measure aspect
Figure A6: Visualisation of Table A6: Progress of implementation by UoM
Table A1 - Total number of measures
Table A2: Total number of measures (aggregated and individual), per measure aspect and UoM, including duplicates
Table A3: Category of priority by measure aspect
Table A4: Category of priority by UoM
Table A5: Progress of implementation by measure aspect
Table A6: Progress of implementation by UoM
Measures overview
Table A1 - Total number of measures
|
Number of individual measures
|
0
|
|
Number of aggregated measures
|
40
|
|
Number of aggregated measures including measures which have been allocated to more than one measure type
|
52
|
|
Total number of measures
|
40
|
|
Total number of measures including measures which have been allocated to more than one measure type
|
52
|
|
Range of number of measures between UoMs, including measures which have been allocated to more than one measure type (Min-Max)
|
equally distributed
|
|
Average number of measures across UoMs including measures which have been allocated to more than one measure type
|
26
|
Notes: As described in section 4, Slovenia’s FRMP contains a different structure: it presents 20 “measure groups”, with specific projects under each measure group in the two UoMs. The 40 measures presented here correspond to the 20 measure groups across the two UoMs.
Table A2: Total number of measures (aggregated and individual), per measure aspect and UoM, including duplicates
|
|
Prevention
|
Total
|
Protection
|
Total
|
Preparedness
|
Total
|
Recovery & review
|
Total
|
Other
|
Grand Total
|
|
|
M21
|
M22
|
M23
|
M24
|
|
M31
|
M32
|
M33
|
M35
|
|
M41
|
M42
|
M43
|
M44
|
|
M51
|
M53
|
|
|
|
|
SIRBD1
|
3
|
1
|
1
|
5
|
10
|
1
|
1
|
1
|
6
|
9
|
2
|
1
|
1
|
1
|
5
|
1
|
1
|
2
|
|
26
|
|
SIRBD2
|
3
|
1
|
1
|
5
|
10
|
1
|
1
|
1
|
6
|
9
|
2
|
1
|
1
|
1
|
5
|
1
|
1
|
2
|
|
26
|
|
Grand Total
|
6
|
2
|
2
|
10
|
20
|
2
|
2
|
2
|
12
|
18
|
4
|
2
|
2
|
2
|
10
|
2
|
2
|
4
|
0
|
52
|
|
Average per UoM
|
3
|
1
|
1
|
5
|
10
|
1
|
1
|
1
|
6
|
9
|
2
|
1
|
1
|
1
|
5
|
1
|
1
|
2
|
0
|
26
|
Notes: The total includes measures assigned to more than one measure type. All measures are aggregated as Slovenia did not report any individual measure.
The information in Table A2 is visualised in Figures A1 and A2 below:
Figure A1: Number of total measures (individual and aggregated) by measure aspect
Notes: The total includes measures assigned to more than one measure type. All measures are aggregated as Slovenia did not report any individual measures.
Figure A2: Share of total measures (aggregated and individual) by measure aspect
Notes: The total includes measures assigned to more than one measure type. All measures are aggregated as Slovenia did not report any individual measures.
Measure details: cost
Member States were requested to report information on:
·Cost (optional field);
·Cost explanation (optional field).
Slovenia did not report any information about the cost or cost explanations for any of the measures in the reporting sheets. (As noted in section 4 above, the FRMP contains information on the costs of structural and non-structural measures, in Chapter 4.1 and in Appendix B).
Measure details: name & location
Member States were requested to report on the following:
·Location of implementation of measures (mandatory field);
·Geographic coverage of the impact of measures (optional field).
Location of measures
In the reporting sheets, Slovenia provided information about the location of all measures. Overall, all measures in UoM SIRBD1 will be implemented in the river basins of the rivers Sava, Ljubljanska Sava, Ljublanica, Gradascica, Kaminska Bistrica, Litija Sava, Savinja, Krka, Sotla, Drava, Slovenske Mure and Ledava. The location for all measures in UoM SIRBD2 is reported as the river basins of the rivers Idrijca and Vipava.
Geographic coverage
Slovenia did not provide any information about the geographic coverage of the effects of any of the measures in the reporting sheets. (As noted in section 4 above, the FRMP contains information on the geographic coverage of structural and non-structural measures in Chapters 2 and 3).
Measure details: objectives
Member States were requested to report on:
·Objectives linked to measures (optional field, complementary to the summary provided in the textual part of the XML);
·Category of priority (Conditional, reporting on either ‘category of priority’ or ‘timetable’ is required);
·Timetable (Conditional, reporting on either ‘category of priority’ or ‘timetable’ is required).
Objectives
Slovenia reported objectives for all measures in the reporting sheets. A range of different objectives were reported for the UoMs. Consequently, it was not possible to aggregate the information.
Category of priority
Slovenia provided information for the priority of all measures. The following categories are used in the reporting sheet:
·Critical;
·Very high;
·High;
·Moderate;
·Low.
Table A3: Category of priority by measure aspect
|
|
Critical
|
Very high
|
Low
|
Grand Total
|
|
Prevention
|
2
|
16
|
2
|
20
|
|
Protection
|
4
|
12
|
2
|
18
|
|
Preparedness
|
2
|
8
|
|
10
|
|
Recovery & review
|
2
|
2
|
|
4
|
|
Grand Total
|
10
|
38
|
4
|
52
|
Notes: The total includes measures assigned to more than one measure type. No measures were categorised as ‘high’ or ‘moderate’ priority.
Figure A3: Visualisation of Table A3: Category of priority by measure aspect
Notes: The total includes measures assigned to more than one measure type. No measures were categorised as ‘high’ or ‘moderate’ priority.
Table A4: Category of priority by UoM
|
|
Critical
|
Very high
|
Low
|
Grand Total
|
|
SIRBD1
|
5
|
19
|
2
|
26
|
|
SIRBD2
|
5
|
19
|
2
|
26
|
|
Grand Total
|
10
|
38
|
4
|
52
|
|
Average per UoM
|
5
|
19
|
2
|
26
|
Notes: The total includes measures assigned to more than one measure type. No measures were categorised as ‘high’ or ‘moderate’ priority.
Figure A4: Visualisation of Table A4: Category of priority by UoM
Notes: The total includes measures assigned to more than one measure type. No measures were categorised as ‘high’ or ‘moderate’ priority.
Timetable
Slovenia did not provide any information about the timetable of the measures in the reporting sheets.
Measure details: authorities
Member States were requested to report on:
·Name of the responsible authority (optional if ‘level of responsibility’ is reported);
·Level of responsibility (optional if ‘name of the responsible authority’ is reported).
Slovenia did not provide information about the level of responsibility of the assigned responsible authorities in the reporting sheets, however, after examining the reported authorities for each measure it appears that all responsible authorities operate at the national level. Overall, Slovenia assigned two types of authorities as responsible for the measures: ministries of the government (e.g. Ministry of the Environment and Spatial Planning, Ministry of Agriculture, Forestry and Food, Ministry of Finance etc.) or agencies (e.g. Slovenian Environment Agency, Slovenian Water Authority, Administration for Protection and Rescue etc.). Around a quarter of the measures were assigned only one responsible authority but most measures were assigned multiple responsible authorities. (As noted in section 4 above, the FRMP contains information on the responsible authorities to perform specific structural or non-structural measures in Chapters 2 and 3).
Measure details: progress
Member States were requested to report on:
·Progress of implementation of measures (mandatory field) – this is a closed question whose responses are analysed below;
·Progress description of the implementation of measures (optional field) – this is an open text question for which not all Member States reported and whose answers are not analysed here.
Slovenia reported information about the progress of implementation of the measures. The Progress of implementation was reported as
:
·COM (completed);
·OGC (ongoing construction);
·POG (progress ongoing);
·NS (not started).
A full definition of these terms can be found at the end of this section.
Table A5: Progress of implementation by measure aspect
|
|
Progress ongoing
|
Not started
|
Grand Total
|
|
Prevention
|
18
|
2
|
20
|
|
Protection
|
18
|
|
18
|
|
Preparedness
|
10
|
|
10
|
|
Recovery & review
|
4
|
|
4
|
|
Grand Total
|
50
|
2
|
52
|
Notes: The total includes measures assigned to more than one measure type. No measures were reported as ‘completed’ or ‘ongoing construction’.
Figure A5: Visualisation of Table A5: Progress of implementation by measure aspect
Notes: The total includes measures assigned to more than one measure type. No measures were reported as ‘completed’ or ‘ongoing construction’.
Table A6: Progress of implementation by UoM
|
|
Progress ongoing
|
Not started
|
Grand Total
|
|
SIRBD1
|
25
|
1
|
26
|
|
SIRBD2
|
25
|
1
|
26
|
|
Grand Total
|
50
|
2
|
52
|
|
Average per UoM
|
25
|
1
|
26
|
Notes: The total includes measures assigned to more than one measure type. No measures were reported as ‘completed’ or ‘ongoing construction’.
Figure A6: Visualisation of Table A6: Progress of implementation by UoM
Notes: The total includes measures assigned to more than one measure type. No measures were reported as ‘completed’ or ‘ongoing construction’.
The categories describing the progress of measures are defined in the EU Reporting Guidance Document on the Floods Directive:
|
For measures involving construction or building works (e.g. a waste water treatment plant, a fish pass, a river restoration project, etc.):
·Not started (NS) means the technical and/or administrative procedures necessary for starting the construction or building works have not started.
·Progress on-going (POG) means that administrative procedures necessary for starting the construction or building works have started but are not finalised. The simple inclusion in the RBMPs is not considered planning in this context.
·On-going construction (OGC) means the construction or building works have started but are not finalized.
·Completed (COM) means the works have been finalised and the facilities are operational (maybe only in testing period in case e.g. a waste water treatment plant).
For measures involving advisory services (e.g. training for farmers):
·Not started (NS) means the advisory services are not yet operational and have not provided any advisory session yet.
·Progress on-going (POG) means the advisory services are operational and are being used. This is expected to be the situation for all multi- annual long/mid-term advisory services that are expected to be operational during the whole or most of RBMP cycle.
·On-going construction (OGC): Not applicable
·Completed (COM) means an advisory service that has been implemented and has been finalised, i.e. is no longer operational. This is expected only for advisory services that are relatively short term or one-off, and which duration is time limited in relation to the whole RBMP cycle.
For measures involving research, investigation or studies:
·Not started (NS) means the research, investigation or study has not started, i.e. contract has not been signed or there has not been any progress.
·Progress on-going (POG) means the research, investigation or study has been contracted or started and is being developed at the moment.
·On-going construction (OGC): Not applicable
·Completed (COM) means the research, investigation or study has been finalised and has been delivered, i.e. the results or deliverables are available (report, model, etc.).
For measures involving administrative acts (e.g. licenses, permits, regulations, instructions, etc.):
·Not started (NS) means the administrative file has not been opened and there has not been any administrative action as regards the measure.
·Progress on-going (POG) means an administrative file has been opened and at least a first administrative action has been taken (e.g. requirement to an operator to provide information to renew the licensing, request of a permit by an operator, internal consultation of draft regulations, etc.). If the measure involves more than one file, the opening of one would mean already “ongoing”.
·On-going construction (OGC): Not applicable
·Completed (COM) means the administrative act has been concluded (e.g. the license or permit has been issued; the regulation has been adopted, etc.). If the measure involves more than one administrative act, “completed” is achieved only when all of them have been concluded.
|
Measure details: other
Member States were requested to report on:
·Other Community Act associated to the measures reported (optional field);
·Any other information reported (optional field).
Slovenia did not provide information about other Community Acts that might be relevant or any other additional information for the measures in the reporting sheets.
Annex B: Definitions of measure types
Table B1
Types of flood risk management measures
|
|
No Action
|
|
M11
|
No Action, No measure is proposed to reduce the flood risk in the APSFR or other defined area,
|
|
|
Prevention
|
|
M21
|
Prevention, Avoidance, Measure to prevent the location of new or additional receptors in flood prone areas, such as land use planning policies or regulation
|
|
M22
|
Prevention, Removal or relocation, Measure to remove receptors from flood prone areas, or to relocate receptors to areas of lower probability of flooding and/or of lower hazard
|
|
M23
|
Prevention, Reduction, Measure to adapt receptors to reduce the adverse consequences in the event of a flood actions on buildings, public networks, etc...
|
|
M24
|
Prevention, Other prevention, Other measure to enhance flood risk prevention (may include, flood risk modelling and assessment, flood vulnerability assessment, maintenance programmes or policies etc...)
|
|
|
Protection
|
|
M31
|
Protection Natural flood management / runoff and catchment management, Measures to reduce the flow into natural or artificial drainage systems, such as overland flow interceptors and / or storage, enhancement of infiltration, etc and including in-channel, floodplain works and the reforestation of banks, that restore natural systems to help slow flow and store water.
|
|
M32
|
Protection, Water flow regulation, Measures involving physical interventions to regulate flows, such as the construction, modification or removal of water retaining structures (e.g., dams or other on-line storage areas or development of existing flow regulation rules), and which have a significant impact on the hydrological regime.
|
|
M33
|
Protection, Channel, Coastal and Floodplain Works, Measures involving physical interventions in freshwater channels, mountain streams, estuaries, coastal waters and flood-prone areas of land, such as the construction, modification or removal of structures or the alteration of channels, sediment dynamics management, dykes, etc.
|
|
M34
|
Protection, Surface Water Management, Measures involving physical interventions to reduce surface water flooding, typically, but not exclusively, in an urban environment, such as enhancing artificial drainage capacities or though sustainable drainage systems (SuDS).
|
|
M35
|
Protection, Other Protection, Other measure to enhance protection against flooding, which may include flood defence asset maintenance programmes or policies
|
|
|
Preparedness
|
|
M41
|
Preparedness, Flood Forecasting and Warning, Measure to establish or enhance a flood forecasting or warning system
|
|
M42
|
Preparedness, Emergency Event Response Planning / Contingency planning, Measure to establish or enhance flood event institutional emergency response planning
|
|
M43
|
Preparedness, Public Awareness and Preparedness, Measure to establish or enhance the public awareness or preparedness for flood events
|
|
M44
|
Preparedness, Other preparedness, Other measure to establish or enhance preparedness for flood events to reduce adverse consequences
|
|
|
Recovery & Review
|
|
M51
|
Recovery and Review (Planning for the recovery and review phase is in principle part of preparedness), Individual and societal recovery, Clean-up and restoration activities (buildings, infrastructure, etc), Health and mental health supporting actions, incl. managing stress Disaster financial assistance (grants, tax), incl. disaster legal assistance, disaster unemployment assistance, Temporary or permanent relocation, Other
|
|
M52
|
Recovery and Review, Environmental recovery, Clean-up and restoration activities (with several sub-topics as mould protection, well-water safety and securing hazardous materials containers)
|
|
M53
|
Recovery and Review, Other, Other recovery and review Lessons learnt from flood events Insurance policies
|
|
|
Other
|
|
M61
|
Other
|
Catalogue of Natural Water Retention Measures
NWRM cover a wide range of actions and land use types. Many different measures can act as NWRM, by encouraging the retention of water within a catchment and, through that, enhancing the natural functioning of the catchment. The catalogue developed in the NWRM project represents a comprehensive but non prescriptive wide range of measures; other measures, or similar measures called by a different name, could also be classified as NWRM.
To ease access to measures, the catalogue of measures hereunder is sorted by the primary land use in which it was implemented: Agriculture; Forest; Hydromorphology; Urban. Most of the measures however can be applied to more than one land use type.
Table B2
List of NWRM
|
Agriculture
|
Forest
|
Hydro Morphology
|
Urban
|
|
A01 Meadows and pastures
|
F01 Forest riparian buffers
|
N01 Basins and ponds
|
U01 Green Roofs
|
|
A02 Buffer strips and hedges
|
F02 Maintenance of forest cover in headwater areas
|
N02 Wetland restoration and management
|
U02 Rainwater Harvesting
|
|
A03 Crop rotation
|
F03 Afforestation of reservoir catchments
|
N03 Floodplain restoration and management
|
U03 Permeable surfaces
|
|
A04 Strip cropping along contours
|
F04 Targeted planting for 'catching' precipitation
|
N04 Re-meandering
|
U04 Swales
|
|
A05 Intercropping
|
F05 Land use conversion
|
N05 Stream bed re-naturalization
|
U05 Channels and rills
|
|
A06 No till agriculture
|
F06 Continuous cover forestry
|
N06 Restoration and reconnection of seasonal streams
|
U06 Filter Strips
|
|
A07 Low till agriculture
|
F07 'Water sensitive' driving
|
N07 Reconnection of oxbow lakes and similar features
|
U07 Soakaways
|
|
A08 Green cover
|
F08 Appropriate design of roads and stream crossings
|
N08 Riverbed material renaturalisation
|
U08 Infiltration Trenches
|
|
A09 Early sowing
|
F09 Sediment capture ponds
|
N09 Removal of dams and other longitudinal barriers
|
U09 Rain Gardens
|
|
A10 Traditional terracing
|
F10 Coarse woody debris
|
N10 Natural bank stabilisation
|
U10 Detention Basins
|
|
A11 Controlled traffic farming
|
F11 Urban forest parks
|
N11 Elimination of riverbank protection
|
U11 Retention Ponds
|
|
A12 Reduced stocking density
|
F12 Trees in Urban areas
|
N12 Lake restoration
|
U12 Infiltration basins
|
|
A13 Mulching
|
F13 Peak flow control structures
|
N13 Restoration of natural infiltration to groundwater
|
|
|
|
F14 Overland flow areas in peatland forests
|
N14 Re-naturalisation of polder areas
|
|
Source:
www.nwrm.eu