Commission Decision (EU) 2023/178 of 14 December 2022 on the consistency of the performance targets contained in the revised draft performance plan submitted by Switzerland pursuant to Regulation (EC) No 549/2004 of the European Parliament and of the Council with the Union-wide performance targets for the third reference period (notified under document C(2022) 9236) (Only the English text is authentic) (Text with EEA relevance)
Commission Decision (EU) 2023/178 of 14 December 2022 on the consistency of the performance targets contained in the revised draft performance plan submitted by Switzerland pursuant to Regulation (EC) No 549/2004 of the European Parliament and of the Council with the Union-wide performance targets for the third reference period (notified under document C(2022) 9236) (Only the English text is authentic) (Text with EEA relevance)
Commission Decision (EU) 2023/178 of 14 December 2022 on the consistency of the performance targets contained in the revised draft performance plan submitted by Switzerland pursuant to Regulation (EC) No 549/2004 of the European Parliament and of the Council with the Union-wide performance targets for the third reference period (notified under document C(2022) 9236) (Only the English text is authentic) (Text with EEA relevance)
C/2022/9236
OJ L 25, 27.1.2023, p. 87–94
(BG, ES, CS, DA, DE, ET, EL, EN, FR, GA, HR, IT, LV, LT, HU, MT, NL, PL, PT, RO, SK, SL, FI, SV)
In force
27.1.2023 |
EN |
Official Journal of the European Union |
L 25/87 |
COMMISSION DECISION (EU) 2023/178
of 14 December 2022
on the consistency of the performance targets contained in the revised draft performance plan submitted by Switzerland pursuant to Regulation (EC) No 549/2004 of the European Parliament and of the Council with the Union-wide performance targets for the third reference period
(notified under document C(2022) 9236)
(Only the English text is authentic)
(Text with EEA relevance)
THE EUROPEAN COMMISSION,
Having regard to the Agreement between the European Community and the Swiss Confederation on Air Transport (1),
Having regard to Regulation (EC) No 549/2004 of the European Parliament and of the Council of 10 March 2004 laying down the framework for the creation of the single European sky (the framework Regulation) (2), and in particular Article 11(3), point (c) thereof,
Having regard to Commission Implementing Regulation (EU) 2019/317 of 11 February 2019 laying down a performance and charging scheme in the single European sky and repealing Implementing Regulations (EU) No 390/2013 and (EU) No 391/2013 (3), and in particular Article 15(2) thereof,
Whereas:
GENERAL CONSIDERATIONS
(1) |
Pursuant to Article 10 of Implementing Regulation (EU) 2019/317, Member States are to draw up performance plans, either at national level or at functional airspace blocks level (‘FAB’), which are to include binding performance targets for each reference period of the performance scheme for air navigation services and network functions. Those performance targets are to be consistent with the Union-wide targets adopted by the Commission for the reference period concerned. |
(2) |
Union-wide performance targets for the third reference period (‘RP3’) were originally set out in Commission Implementing Decision (EU) 2019/903 (4). Since those Union-wide performance targets and the draft RP3 performance plans subsequently submitted in October 2019 by Member States were drawn up before the outbreak of the COVID-19 pandemic in March 2020, they did not take account of the considerable reduction in air traffic due to the measures taken by the Member States and third countries to contain the pandemic. |
(3) |
In response to the impact of the COVID-19 pandemic on the provision of air navigation services, exceptional measures for RP3, which derogate from the provisions of Implementing Regulation (EU) 2019/317, were set out in Commission Implementing Regulation (EU) 2020/1627 (5). The Commission adopted, on 2 June 2021, Commission Implementing Decision (EU) 2021/891 (6) setting revised Union-wide performance targets for RP3. On that basis, in October 2021, Member States submitted to the Commission draft performance plans containing revised local performance targets for RP3. |
(4) |
Switzerland submitted to the Commission its draft performance plan at FAB level, in this case at the level of Functional Airspace Block Europe Central (‘FABEC’), together with Belgium, Germany, France, Luxembourg, and the Netherlands (‘Member States part of FABEC’). By its Implementing Decision (EU) 2022/780 (7), the Commission notified Switzerland that the cost-efficiency performance targets for the Belgium-Luxembourg en route charging zone contained in the draft FABEC performance plan were not consistent with the Union-wide performance targets. The Commission concluded in that Implementing Decision that the performance targets applicable to air navigation services provided in the airspace of Switzerland did not give rise to concerns in respect of their consistency with the corresponding Union-wide performance targets. |
(5) |
In response to Russia’s war of aggression against Ukraine, which started on 24 February 2022, the Union has imposed restrictive measures which prohibit Russian air carriers, any Russian-registered aircraft and any non-Russian-registered aircraft which is owned or chartered, or otherwise controlled by any Russian natural or legal person, entity or body, from landing in and taking off from, or overflying the territory of the Union. Those restrictive measures and the counter-measures adopted by Russia have led to changes in air traffic in European airspace. Certain Member States have been severely affected by a significant reduction in the number of overflights in the airspace under their responsibility. However, at Union-wide level, the observed impact on the number of flights has been limited in contrast with the sharp reduction of air traffic across Europe which resulted from the outbreak of the COVID-19 pandemic. |
(6) |
On 13 July 2022, Switzerland, jointly with Belgium, France, Germany, Luxembourg, and the Netherlands, submitted a revised draft FABEC performance plan for RP3 to the Commission. |
(7) |
On 24 October 2022, the Commission concluded that doubts remain as to the consistency of the revised cost-efficiency performance targets proposed for the Belgium-Luxembourg en route charging zone with the Union-wide performance targets and initiated the detailed examination set out in Article 15(3) of Implementing Regulation (EU) 2019/317 in respect of those performance targets contained in the revised draft FABEC performance plan. The Commission notified Switzerland thereof by its Decision (EU) 2022/2256 (8). |
(8) |
On 4 November 2022, Switzerland informed the Commission that it has withdrawn from the revised draft FABEC performance plan, and submitted to the Commission a revised draft performance plan for RP3 established at national level (the ‘revised draft national performance plan’). The revised draft national performance plan maintains the performance targets for air navigation services provided in the airspace of Switzerland at the level set in the revised draft FABEC performance plan submitted on 13 July 2022. There were effectively no additional performance benefits or synergies for Switzerland deriving from the revised draft FABEC performance plan. The revised draft national performance plan does not list any negative impact resulting from the discontinuation of the performance planning and target setting activities at FABEC level. |
(9) |
The performance review body, assisting the Commission in the implementation of the performance scheme pursuant to Article 11(2) of Regulation (EC) No 549/2004, has submitted to the Commission a report containing its assessment of the revised draft national performance plan. |
(10) |
In accordance with Article 15(1) of Implementing Regulation (EU) 2019/317, the Commission, taking account of local circumstances, has assessed the consistency of the local performance targets included in the revised draft national performance plan of Switzerland on the basis of the assessment criteria laid down in point 1 of Annex IV to that Implementing Regulation. In respect of each key performance area and the related performance targets, the Commission has complemented its assessment by reviewing the elements set out in point 2 of Annex IV to Implementing Regulation (EU) 2019/317. |
(11) |
The Eurocontrol’s Statistics and Forecast Service (STATFOR) base traffic forecast published in June 2022 takes account of the change in circumstances referred to in recital 5. On the basis of that forecast, the Commission notes that Switzerland is not expected to experience major changes in air traffic flows over RP3 as a result of Russia’s war in Ukraine. Therefore, those changes in circumstances do not directly impact the performance targets contained in the revised draft national performance plan or the assessment of those targets in respect of their consistency with the Union-wide performance targets. |
(12) |
Switzerland agrees that this Decision is adopted and notified in English. |
COMMISSION ASSESSMENT
Assessment of performance targets in the key performance area of safety
(13) |
Concerning the key performance area of safety, the Commission has assessed the consistency of the targets submitted by Switzerland regarding the effectiveness of safety management of air navigation service providers (‘ANSPs’) based on the criterion laid down in point 1.1 of Annex IV to Implementing Regulation (EU) 2019/317. |
(14) |
The local safety performance targets proposed by Switzerland in respect of the effectiveness of safety management, broken down per safety management objective and expressed as a level of implementation, are as follows:
|
(15) |
The safety performance targets proposed by Switzerland for the air navigation service provider, namely Skyguide, are consistent with the Union-wide performance targets. |
(16) |
The Commission notes that the revised draft national performance plan submitted by Switzerland sets out measures for Skyguide for the achievement of the local safety performance targets, such as the enhanced analysis of safety data, the integration of risk management with business continuity and crisis management, and the deployment of a centralised risk management information system. |
(17) |
Therefore, in the light of what has been said in recitals 14, 15 and 16, and considering that the Union-wide safety performance targets set in Implementing Decision (EU) 2021/891 are to be achieved by the final year of RP3, namely 2024, the targets in the key performance area of safety included in the revised draft national performance plan should be considered consistent with the Union-wide performance targets. |
Assessment of performance targets in the key performance area of environment
(18) |
Concerning the key performance area of environment, the consistency of the targets submitted by Switzerland regarding the average horizontal en route flight efficiency of the actual trajectory has been assessed based on the criterion laid down in point 1.2 of Annex IV to Implementing Regulation (EU) 2019/317. Accordingly, the targets included in the revised draft national performance plan have been compared with the relevant en route horizontal flight efficiency reference values set out in the European Route Network Improvement Plan (‘ERNIP’) available on 2 June 2021, the time of adopting the revised Union-wide performance targets for RP3. |
(19) |
In respect of the year 2020, the Union-wide performance target for RP3 in the key performance area of environment, which before the outbreak of the COVID-19 pandemic was initially set out in Implementing Decision (EU) 2019/903, was not revised by Implementing Decision (EU) 2021/891, in so far as the period for the application of that target had expired and its implementation had thus become definitive leaving no possibility for retroactive adjustments. Similarly, it is not possible to modify retroactively, in the revised draft performance plans, the local environment performance targets for the year 2021 set by Member States in the draft performance plans submitted in October 2021. Therefore, the consistency of the local environment performance targets with the corresponding Union-wide performance targets should be assessed with regard to the years 2022, 2023 and 2024. |
(20) |
The performance targets in the key performance area of environment proposed by Switzerland and the corresponding national reference values for RP3 from the ERNIP, expressed as the average horizontal en route flight efficiency of the actual trajectory, are as follows:
|
(21) |
The Commission observes that the environment targets proposed by Switzerland are equal to the corresponding national reference values for each of the years 2022, 2023 and 2024. |
(22) |
The Commission notes that Switzerland has presented, in the revised draft national performance plan, measures for the achievement of the local environment targets which include the implementation of free route airspace, the deployment of an optimisation tool to enable more efficient routes, the extended use of the arrival manager tool for en route airspace, and enhanced management of military airspace. The Commission further invites Switzerland to put in place all the recommended measures from the ERNIP to improve en route trajectories. |
(23) |
Therefore, in the light of what has been said in recitals 20, 21 and 22, the targets in the key performance area of environment included in the revised draft national performance plan should be considered consistent with the Union-wide performance targets. |
Assessment of performance targets in the key performance area of capacity
(24) |
Concerning the key performance area of capacity, the consistency of the targets submitted by Switzerland regarding the average en route air traffic flow management (‘ATFM’) delay per flight has been assessed based on the criterion laid down in point 1.3 of Annex IV to Implementing Regulation (EU) 2019/317. Accordingly, the targets included in the revised draft national performance plan have been compared with the relevant reference values set out in the Network Operations Plan available on 2 June 2021, the time of adopting the revised Union-wide performance targets for RP3. |
(25) |
In respect of the year 2020, the Union-wide performance target for RP3 in the key performance area of capacity, which before the outbreak of the COVID-19 pandemic was initially set out in Implementing Decision (EU) 2019/903, was not revised by Implementing Decision (EU) 2021/891 in so far as the period for the application of that target had expired and its implementation had thus become definitive leaving no possibility for retroactive adjustments. Similarly, it is not possible to modify retroactively, in the revised draft performance plans, the local capacity performance targets for the year 2021 set by Member States in the draft performance plans submitted in October 2021. Therefore, the consistency of the local capacity performance targets with the corresponding Union-wide performance targets should be assessed with regard to the years 2022, 2023 and 2024. |
(26) |
The en route capacity targets proposed by Switzerland for RP3, expressed in minutes of ATFM delay per flight, as well as the corresponding reference values from the Network Operations Plan, are as follows:
|
(27) |
The Commission observes that the capacity targets proposed by Switzerland are equal to the corresponding national reference values for each of the years 2022, 2023 and 2024. |
(28) |
The Commission notes that Switzerland has presented, in the revised draft national performance plan, measures for the achievement of the local en route capacity targets. Those measures include free route airspace, improved prediction and decision-making tools and procedures, as well as flexible rostering and recruitment, as needed, to maintained adequate levels of staff. |
(29) |
Therefore, in the light of what has been said in recitals 26, 27 and 28, the targets in the key performance area of capacity included in the revised draft national performance plan should be considered consistent with the Union-wide performance targets. |
Review of draft capacity targets for terminal air navigation services
(30) |
With regard to airports which fall within the scope of Implementing Regulation (EU) 2019/317 as set out in Article 1(3) and (4) of that Implementing Regulation, the Commission has complemented its assessment of en route capacity targets by reviewing the capacity targets for terminal air navigation services in accordance with point 2.1(b) of Annex IV to Implementing Regulation (EU) 2019/317. In respect of Switzerland, those targets were not found to raise concerns. |
Assessment of performance targets in the key performance area of cost-efficiency
(31) |
The Commission has assessed the consistency of the cost-efficiency targets proposed in the revised draft national performance plan based on the criteria laid down in points 1.4(a), (b) and (c) of Annex IV to Implementing Regulation (EU) 2019/317. |
(32) |
The en route cost-efficiency targets proposed by Switzerland for RP3 are as follows:
|
(33) |
As regards point 1.4(a) of Annex IV to Implementing Regulation (EU) 2019/317, the Commission observes that the en route determined unit cost (‘DUC’) trend at charging zone level of -0,5 % over RP3 outperforms the Union-wide trend of +1,0 % over the same period. |
(34) |
As regards point 1.4(b) of Annex IV to Implementing Regulation (EU) 2019/317, the Commission observes that the long-term en route DUC trend at charging zone level of -1,2 % over the second reference period (‘RP2’) and RP3 underperforms the long-term Union-wide trend of -1,3 % over the same period. |
(35) |
As regards point 1.4(c) of Annex IV to Implementing Regulation (EU) 2019/317, the Commission observes that the baseline value for the DUC of EUR 87,82 of Switzerland, expressed in 2017 prices (‘EUR2017’), is +22,0 % higher than the average baseline value of 72,01 in EUR2017 of the relevant comparator group. |
(36) |
It is clear that Switzerland outperforms the RP3 Union-wide DUC trend. Furthermore, the DUC of Switzerland in 2024 is lower than the 2014 and 2019 baseline values, which shows that effective cost-efficiency gains are achieved over the medium and long term. Therefore, the Commission considers that, in respect of Switzerland, the minor deviation from the Union-wide long-term DUC trend referred to in recital 34 and the difference between the baseline value and the comparator group average referred to in recital 35 do not preclude the cost-efficiency performance targets from being consistent with the Union-wide cost-efficiency performance targets. |
(37) |
Therefore, in the light of what has been said in recitals 32 to 36, the targets in the key performance area of cost-efficiency included in the revised draft national performance plan should be considered consistent with the Union-wide performance targets. |
Review of cost-efficiency targets for terminal air navigation services
(38) |
With regard to airports which fall within the scope of Implementing Regulation (EU) 2019/317 as set out in Articles 1(3) and (4) of that Implementing Regulation, the Commission has complemented its assessment of the en route cost-efficiency targets by reviewing the cost-efficiency targets for terminal air navigation services in accordance with point 2.1(c) of Annex IV to Implementing Regulation (EU) 2019/317. |
(39) |
In Implementing Decision (EU) 2022/780, the Commission raised concerns regarding the terminal cost-efficiency targets proposed by Switzerland in the draft FABEC performance plan submitted in 2021, and considered that Switzerland was to further justify those targets or revise them downwards. The Commission notes, however, that Switzerland has neither revised those targets nor provided further justification. |
(40) |
The Commission observes that the terminal RP3 DUC trend of +2,7 % remains higher than the en route RP3 DUC trend of -0,5 %, and remains higher than the actual terminal DUC trend of -3,4 % observed over RP2. Furthermore, the Commission observes that the terminal DUC for Geneva and Zurich Airports is estimated to remain above the median DUC of the relevant comparator group by a significant margin. |
(41) |
Therefore, in the light of what has been said in recitals 39 and 40, the Commission concludes that the terminal cost-efficiency performance targets of Switzerland continue to give rise to concerns. The Commission therefore reiterates its view that Switzerland should revise downwards those targets or provide adequate justifications for those targets. Switzerland should address those concerns in connection with the adoption of its final performance plan pursuant to Article 16, point (a), of Implementing Regulation (EU) 2019/317. |
Review of the incentive schemes referred to in Article 11 of Implementing Regulation (EU) 2019/317 complementing the Commission’s assessment of capacity targets
(42) |
In accordance with point 2.1(f) of Annex IV to Implementing Regulation (EU) 2019/317, the Commission has complemented its assessment of capacity targets by reviewing the incentive schemes referred to in Article 11 of that Implementing Regulation. In that respect, the Commission has examined whether the proposed incentive schemes fulfil the substantive requirements set out in Article 11(1) and (3) of Implementing Regulation (EU) 2019/317. |
(43) |
In Implementing Decision (EU) 2022/780, the Commission concluded that Switzerland is to revise its incentive schemes for achieving en route and terminal capacity targets in such a way that the maximum financial disadvantage stemming from those incentive schemes is set at a level having a material impact on the revenue at risk. The Commission notes that Switzerland has not made any changes to those incentive schemes in comparison with the draft FABEC performance plan submitted in 2021 and the revised draft FABEC performance plan submitted in July 2022. |
(44) |
Therefore, in the light of what has been said in recital 43, the Commission concludes that the incentive schemes set out in the revised draft national performance plan continue to give rise to concerns. The Commission therefore reiterates its view that Switzerland should revise its incentive schemes for achieving en route and terminal capacity targets, in connection with the adoption of its final performance plan in accordance with Article 16, point (a), of Implementing Regulation (EU) 2019/317, so that the maximum financial disadvantages stemming from those incentive schemes are set at a level having a material impact on the revenue at risk, as expressly required under Article 11(3), point (a), of that Implementing Regulation. In the Commission’s view that should lead to a maximum financial disadvantage equal to or higher than 1 % of determined costs. |
CONCLUSIONS
(45) |
In the light of all the foregoing, the Commission has found that the performance targets contained in the revised draft national performance plan submitted by Switzerland are consistent with the Union-wide performance targets, |
HAS ADOPTED THIS DECISION:
Article 1
The performance targets included in the revised draft performance plan submitted by Switzerland on 4 November 2022, pursuant to Regulation (EC) No 549/2004, and listed in the Annex to this Decision, are consistent with the Union-wide performance targets for the third reference period set out in Implementing Decision (EU) 2021/891.
Article 2
This Decision is addressed to the Swiss Confederation.
Done at Brussels, 14 December 2022.
For the Commission
Adina-Ioana VĂLEAN
Member of the Commission
(1) OJ L 114, 30.4.2002, p. 73.
(4) Commission Implementing Decision (EU) 2019/903 of 29 May 2019 setting the Union-wide performance targets for the air traffic management network for the third reference period starting on 1 January 2020 and ending on 31 December 2024 (OJ L 144, 3.6.2019, p. 49).
(5) Commission Implementing Regulation (EU) 2020/1627 of 3 November 2020 on exceptional measures for the third reference period (2020-2024) of the single European sky performance and charging scheme due to the COVID-19 pandemic (OJ L 366, 4.11.2020, p. 7).
(6) Commission Implementing Decision (EU) 2021/891 of 2 June 2021 setting revised Union-wide performance targets for the air traffic management network for the third reference period (2020-2024) and repealing Implementing Decision (EU) 2019/903 (OJ L 195, 3.6.2021, p. 3).
(7) Commission Implementing Decision (EU) 2022/780 of 13 April 2022 on the inconsistency of certain performance targets contained in the draft functional airspace block performance plan submitted by Switzerland pursuant to Regulation (EC) No 549/2004 of the European Parliament and of the Council with the Union-wide performance targets for the third reference period and setting out recommendations for the revision of those targets (OJ L 139, 18.5.2022, p. 218).
(8) Commission Decision (EU) 2022/2256 of 15 November 2022 on the initiation of the detailed examination of certain performance targets contained in the revised draft performance plan for the third reference period submitted at functional airspace block level by Switzerland pursuant to Regulation (EC) No 549/2004 of the European Parliament and of the Council (OJ L 297, 17.11.2022, p. 80).
ANNEX
Performance targets included in the revised draft performance plan submitted by Switzerland pursuant to Regulation (EC) No 549/2004, found to be consistent with the Union-wide performance targets for the third reference period
KEY PERFORMANCE AREA OF SAFETY
Effectiveness of safety management
Switzerland |
Targets on the effectiveness of safety management, expressed as a level of implementation, ranging from EASA level A to D |
|||
Air navigation service provider concerned |
Safety management objective |
2022 |
2023 |
2024 |
Skyguide |
Safety policy and objectives |
C |
C |
C |
Safety risk management |
C |
D |
D |
|
Safety assurance |
C |
C |
C |
|
Safety promotion |
C |
C |
C |
|
Safety culture |
C |
C |
C |
KEY PERFORMANCE AREA OF ENVIRONMENT
Average horizontal en route flight efficiency of the actual trajectory
Switzerland |
2022 |
2023 |
2024 |
Targets in the key performance area of environment, expressed as the average horizontal en route flight efficiency of the actual trajectory |
3,95 % |
3,95 % |
3,95 % |
KEY PERFORMANCE AREA OF CAPACITY
Average en route ATFM delay in minutes per flight
Switzerland |
2022 |
2023 |
2024 |
Targets in the key performance area of capacity, expressed in minutes of ATFM delay per flight |
0,19 |
0,19 |
0,19 |
KEY PERFORMANCE AREA OF COST-EFFICIENCY
Determined unit cost for en route air navigation services
En route charging zone of Switzerland |
2014 baseline value |
2019 baseline value |
2020 -2021 |
2022 |
2023 |
2024 |
En route cost-efficiency targets, expressed as determined en route unit cost (in 2017 prices) |
107,06 CHF |
97,59 CHF |
226,30 CHF |
114,58 CHF |
103,45 CHF |
95,61 CHF |
96,35 EUR |
87,82 EUR |
203,64 EUR |
103,11 EUR |
93,10 EUR |
86,04 EUR |