EUR-Lex Access to European Union law

Back to EUR-Lex homepage

This document is an excerpt from the EUR-Lex website

Document 32022D0767

Commission Decision (EU) 2022/767 of 13 April 2022 on the consistency of the performance targets contained in the draft performance plan submitted by Portugal pursuant to Regulation (EC) No 549/2004 of the European Parliament and of the Council with the Union-wide performance targets for the third reference period (notified under document C(2022) 2288) (Only the Portuguese text is authentic) (Text with EEA relevance)

C/2022/2288

OJ L 139, 18.5.2022, p. 97–106 (BG, ES, CS, DA, DE, ET, EL, EN, FR, GA, HR, IT, LV, LT, HU, MT, NL, PL, PT, RO, SK, SL, FI, SV)

Legal status of the document In force

ELI: http://data.europa.eu/eli/dec/2022/767/oj

18.5.2022   

EN

Official Journal of the European Union

L 139/97


COMMISSION DECISION (EU) 2022/767

of 13 April 2022

on the consistency of the performance targets contained in the draft performance plan submitted by Portugal pursuant to Regulation (EC) No 549/2004 of the European Parliament and of the Council with the Union-wide performance targets for the third reference period

(notified under document C(2022) 2288)

(Only the Portuguese text is authentic)

(Text with EEA relevance)

THE EUROPEAN COMMISSION,

Having regard to the Treaty on the Functioning of the European Union,

Having regard to Regulation (EC) No 549/2004 of the European Parliament and of the Council of 10 March 2004 laying down the framework for the creation of the single European sky (the framework Regulation) (1), and in particular Article 11(3) point (c), first paragraph, thereof,

Having regard to Commission Implementing Regulation (EU) 2019/317 of 11 February 2019 laying down a performance and charging scheme in the single European sky (2), and in particular Article 14(2) thereof,

Whereas:

GENERAL CONSIDERATIONS

(1)

Pursuant to Article 11 of Regulation (EC) No 549/2004, a performance scheme for air navigation services and network functions is to be set up. Furthermore, pursuant to Article 10 of Implementing Regulation (EU) 2019/317, Member States are to draw up, either at national level or at the level of functional airspace blocks (‘FABs’), binding performance targets for each reference period of the performance scheme for air navigation services and network functions. Those performance targets have to be consistent with the Union-wide targets adopted by the Commission for the reference period concerned. The Commission is responsible for assessing whether the proposed performance targets contained in the draft performance plans drawn up by the Member States are consistent with the Union-wide performance targets using the assessment criteria set out in Annex IV to Implementing Regulation (EU) 2019/317.

(2)

The outbreak of the COVID-19 pandemic has, since the first quarter of calendar year 2020, significantly impacted the air transport sector and has considerably reduced air traffic volumes as compared to pre-pandemic levels, due to the measures taken by the Member States and third countries to contain the pandemic.

(3)

Union-wide performance targets for the third reference period (‘RP3’) were originally set out in Commission Implementing Decision (EU) 2019/903 (3). As those Union-wide performance targets and the draft RP3 performance plans subsequently submitted by the Member States were drawn up before the outbreak of the COVID-19 pandemic, they could not take account of the resulting significantly changed circumstances for air transport.

(4)

In response to the impact of the COVID-19 pandemic on the provision of air navigation services, exceptional measures for RP3, which derogate from the provisions of Implementing Regulation (EU) 2019/317, were set out in Commission Implementing Regulation (EU) 2020/1627 (4). Pursuant to Article 2(1) of Implementing Regulation (EU) 2020/1627, the Commission adopted, on 2 June 2021, Implementing Decision (EU) 2021/891 (5) setting revised Union-wide performance targets for RP3.

(5)

The Commission notes that the October 2021 base traffic forecast of the Eurocontrol’s Statistics and Forecast Service (‘STATFOR’) projects that air traffic at Union-wide level will reach its pre-pandemic levels in the course of 2023 and will exceed those levels in 2024. However, the level of uncertainty regarding traffic development remains particularly high because of the risks related to the evolution of the COVID-19 epidemiological situation. The Commission also notes that the traffic recovery is expected to be uneven across Member States.

(6)

All Member States have developed and adopted draft performance plans containing revised local performance targets for RP3, which were submitted to the Commission for assessment by 1 October 2021. Following the verification of completeness of those draft performance plans, the Commission requested Member States to submit updated draft performance plans by 17 November 2021. The Commission’s assessment presented in this Decision is based on the updated draft performance plan submitted by Portugal.

(7)

The performance review body, assisting the Commission in the implementation of the performance scheme pursuant to Article 11(2) of Regulation (EC) No 549/2004, has submitted to the Commission a report containing its advice on the assessment of RP3 draft performance plans.

(8)

In accordance with Article 14(1) of Implementing Regulation (EU) 2019/317, the Commission has assessed the consistency of the local performance targets proposed by Portugal on the basis of the assessment criteria laid down in point 1 of Annex IV to that Implementing Regulation, and taking account of local circumstances. In respect of each key performance area and the related performance targets, the Commission has complemented the assessment by reviewing draft performance plans in respect of the elements set out in point 2 of Annex IV to that Implementing Regulation.

COMMISSION ASSESSMENT

Assessment of draft performance targets in the key performance area of safety

(9)

Concerning the key performance area of safety, the Commission has assessed the consistency of the targets submitted by Portugal regarding the effectiveness of safety management of air navigation service providers based on the criterion laid down in point 1.1 of Annex IV to Implementing Regulation (EU) 2019/317. That assessment was conducted taking account of local circumstances and was complemented by the review of measures planned for the achievement of the safety targets in respect of the elements set out in point 2.1.(a) of Annex IV to Implementing Regulation (EU) 2019/317.

(10)

The draft performance targets in the key performance area of safety proposed by Portugal in respect of the effectiveness of safety management, broken down per safety management objective and expressed as a level of implementation, are as follows:

Portugal

Targets on the effectiveness of safety management, expressed as a level of implementation, ranging from EASA level A to D

Air navigation service provider concerned

Safety management objective

2021

2022

2023

2024

NAV Portugal

Safety policy and objectives

C

C

C

C

Safety risk management

C

C

C

D

Safety assurance

C

C

C

C

Safety promotion

C

C

C

C

Safety culture

C

C

C

C

(11)

In respect of the draft safety targets proposed by Portugal for the air navigation service provider (NAV Portugal), the Commission has found that the level of the Union-wide performance target is planned to be achieved in 2024 with regard to the ‘safety risk management’ objective, whilst for the other ‘safety management objectives’ the local performance targets meet the level of the Union-wide performance target for each calendar year from 2021 to 2024.

(12)

The Commission notes that the draft performance plan submitted by Portugal sets out measures for NAV Portugal for the achievement of the local safety targets, such as the upgrade of existing tools, the improvement of the monitoring process of safety indicators and of reporting on safety culture, as well as the revision of the training structure regarding the safety management system.

(13)

On the basis of the findings set out in recitals 11 and 12, and considering that the Union-wide safety performance targets set in Implementing Decision (EU) 2021/891 must be achieved by the final year of RP3, namely 2024, the draft targets included in the draft performance plan of Portugal should be assessed as consistent with the Union-wide performance targets in the key performance area of safety.

Assessment of draft performance targets in the key performance area of environment

(14)

Concerning the key performance area of environment, the consistency of the targets submitted by Portugal regarding the average horizontal en route flight efficiency of the actual trajectory has been assessed based on the criterion laid down in point 1.2 of Annex IV to Implementing Regulation (EU) 2019/317. Accordingly, the proposed targets contained in the draft performance plan of Portugal have been compared to the relevant en route horizontal flight efficiency reference values set out in the European Route Network Improvement Plan (‘ERNIP’) available at the time of adopting the revised Union-wide performance targets for RP3, that is on 2 June 2021. That assessment was conducted taking account of local circumstances and was complemented by the review of measures planned for the achievement of the environment targets under point 2.1(a) of Annex IV to Implementing Regulation (EU) 2019/317.

(15)

In respect of the calendar year 2020, the Union-wide performance target for RP3 in the key performance area of environment, which was initially set out in Implementing Decision (EU) 2019/903, was not revised by Implementing Decision (EU) 2021/891, considering that the time period for the application of that target had expired and that its implementation had thus become definitive leaving no possibility for retroactive adjustments. Accordingly, Member States were not requested to revise, in the draft performance plans submitted by 1 October 2021, their local performance targets for calendar year 2020 in the key performance area of environment. Therefore, the consistency of the local environment performance targets with the corresponding Union-wide performance targets should be assessed with regard to calendar years 2021, 2022, 2023 and 2024.

(16)

The draft performance targets in the key performance area of environment proposed by Portugal and the corresponding national reference values for RP3 from the ERNIP, expressed as the average horizontal en route flight efficiency of the actual trajectory, are as follows:

 

2021

2022

2023

2024

Draft en route environment targets of Portugal, expressed as the average horizontal en route flight efficiency of the actual trajectory

1,80  %

1,80  %

1,80  %

1,80  %

Reference values for Portugal

1,80  %

1,80  %

1,80  %

1,80  %

(17)

The Commission observes that the draft environment targets proposed by Portugal are equal to the corresponding national reference values for each calendar year from 2021 to 2024.

(18)

In respect of point 2.1(a) of Annex IV to Implementing Regulation (EU) 2019/317, the Commission notes that Portugal has presented in the draft performance plan several measures for the achievement of the local environment targets which include the optimisation and extension of Madeira Terminal Manoeuvring Area (TMA), the implementation of a performance-based navigation (PBN) transition plan, new Standard Instrument Departures (SID) and Standard Instrument Arrivals (STAR) structures in Cascais, Lisbon TMA point merge system as well as several measures to increase cross-border collaboration with France, Spain and Morocco.

(19)

Furthermore, the Commission observes that Portugal has already implemented free route airspace (FRA) from flight level 245 in the Lisbon Flight Information Region (FIR) and plans to extend FRA to Santa Maria FIR in late 2024.

(20)

On the basis of the findings set out in recitals 17 to 19, the draft targets included in the draft performance plan of Portugal should be assessed as consistent with the Union-wide performance targets in the key performance area of environment.

Assessment of draft performance targets in the key performance area of capacity

(21)

Concerning the key performance area of capacity, the consistency of the targets submitted by Portugal regarding the average en route air traffic flow management (‘ATFM’) delay per flight has been assessed based on the criterion laid down in point 1.3 of Annex IV to Implementing Regulation (EU) 2019/317. Accordingly, the proposed targets contained in the draft performance plan of Portugal have been compared to the relevant reference values set out in the Network Operations Plan available at the time of adopting the revised Union-wide performance targets for RP3, that is on 2 June 2021. That assessment was conducted taking account of local circumstances and was complemented by the review of measures planned for the achievement of the capacity targets under point 2.1(a) of Annex IV to Implementing Regulation (EU) 2019/317.

(22)

In respect of the calendar year 2020, the Union-wide performance target for RP3 in the key performance area of capacity, which was initially set out in Implementing Decision (EU) 2019/903, was not revised by Implementing Decision (EU) 2021/891, considering that the time period for the application of that target had expired and that its implementation had thus become definitive leaving no possibility for retroactive adjustments. Accordingly, Member States were not requested to revise, in the draft performance plans submitted by 1 October 2021, their local performance targets for calendar year 2020 in the key performance area of capacity. Therefore, the consistency of the local capacity performance targets with the corresponding Union-wide performance targets should be assessed with regard to calendar years 2021, 2022, 2023 and 2024.

(23)

The draft en route capacity targets proposed by Portugal for RP3, expressed in minutes of ATFM delay per flight, as well as the corresponding reference values from the Network Operations Plan are as follows:

 

2021

2022

2023

2024

Draft en route capacity targets of Portugal, in minutes of ATFM delay per flight

0,09

0,13

0,13

0,13

Reference values for Portugal

0,09

0,13

0,13

0,13

(24)

The Commission observes that the draft capacity targets proposed by Portugal are equal to the corresponding national reference values for each calendar year from 2021 to 2024.

(25)

In respect of point 2.1(a) of Annex IV to Implementing Regulation (EU) 2019/317, the Commission notes that Portugal has presented in the draft performance plan a range of measures for the achievement of the local en route capacity targets. Those measures include the transition to a new Air Traffic Management (ATM) system and Operations (OPS) room, airspace changes including FRA cross-border initiatives, enhanced Air Traffic Flow and Capacity Management (ATFCM) procedures as well as the implementation of a recruitment plan to significantly increase air traffic controller FTEs (+ 25 % by 2024 compared to 2019 levels).

(26)

On the basis of the findings set out in recitals 24 and 25, the draft targets included in the draft performance plan of Portugal should be assessed as consistent with the Union-wide performance targets in the key performance area of capacity.

Review of draft capacity targets for terminal air navigation services

(27)

With regard to airports which fall within the scope of Implementing Regulation (EU) 2019/317 as set out in Articles 1(3) and (4) of that Regulation, the Commission has complemented its assessment of draft en route capacity targets by the review of the draft capacity targets for terminal air navigation services in accordance with point 2.1(b) of Annex IV to Implementing Regulation (EU) 2019/317. Those draft targets were found to raise concerns in respect of Portugal.

(28)

The Commission observes that when comparing at airport level the draft national targets on average arrival ATFM delay with the performance of similar airports during the second reference period (‘RP2’), the Commission has found that the airports of Lisbon and Porto are expected to experience higher ATFM delays than those forecasted for similar airports.

(29)

Therefore, the Commission considers that, in connection with the adoption of its final performance plan in accordance with Article 16, point (a) of Implementing Regulation (EU) 2019/317, Portugal should further justify the terminal capacity targets in light of the observations set out above, or should revise downwards the draft capacity targets for terminal air navigation services.

Assessment of draft performance targets in the key performance area of cost-efficiency

(30)

Concerning the key performance area of cost-efficiency, the consistency of the targets submitted by Portugal regarding the determined unit costs (‘DUC’) for en route air navigation services has been assessed based on the criteria laid down in points 1.4(a), (b) and (c) of Annex IV to Implementing Regulation (EU) 2019/317. Those criteria consist of the DUC trend over RP3, the long-term DUC trend over RP2 and RP3 (2015-2024), and the baseline value for the DUC at charging zone level compared with the average value of the charging zones where air navigation service providers have a similar operational and economic environment.

(31)

The assessment of en route cost efficiency targets was conducted taking account of local circumstances. It was complemented by the review of the key factors and parameters underpinning those targets as specified under point 2.1(d) of Annex IV to Implementing Regulation (EU) 2019/317.

(32)

The draft en route cost-efficiency targets proposed by Portugal for RP3 are as follows:

En route charging zone of Portugal Continental

2014 baseline value

2019 baseline value

2020 -2021

2022

2023

2024

Draft en route cost-efficiency targets, expressed as determined en route unit cost (in real terms at 2017 prices)

36,13 EUR

34,88 EUR

65,82 EUR

40,78 EUR

40,37 EUR

37,87 EUR

(33)

Concerning the criterion laid down in point 1.4(a) of Annex IV to Implementing Regulation (EU) 2019/317, the Commission observes that the en route DUC trend of Portugal at charging zone level of +2,1 % per year over RP3 underperforms the Union-wide trend of +1,0 % over the same period.

(34)

Concerning the criterion laid down in point 1.4(b) of Annex IV to Implementing Regulation (EU) 2019/317, the Commission observes that the long-term en route DUC trend of Portugal at charging zone level over RP2 and RP3 of +0,5 % per year underperforms the long-term Union-wide trend of -1,3 % over the same period.

(35)

It should be taken into account, however, when comparing the local and Union-wide DUC trends referred to in recitals 33 and 34, that the en route traffic growth forecasted by Eurocontrol STATFOR for Portugal over RP3 is foreseen to be significantly lower than the average traffic growth at Union-wide level. This renders it more challenging for Portugal to meet the said Union-wide DUC trends.

(36)

Concerning the criterion laid down in point 1.4(c) of Annex IV to Implementing Regulation (EU) 2019/317, the Commission observes that the baseline value for the DUC of EUR 34,88 of Portugal in real terms at 2017 prices (‘EUR2017’) is 12,2 % lower than the average baseline value of EUR 39,73 in EUR2017 of the relevant comparator group. The Commission notes that the determined en route unit cost of Portugal for 2024 will continue to be lower by 9,8 % than the average of the comparator group.

(37)

The Commission has further examined whether the deviations observed in recitals 33 and 34 could be deemed necessary and proportionate under point 1.4(d) of Annex IV to Implementing Regulation (EU) 2019/317, provided that the observed deviations from the Union-wide DUC trend or from the long-term Union-wide DUC trend are exclusively due to additional determined costs related to measures necessary to achieve the performance targets in the key performance area of capacity or to restructuring measures within the meaning of Article 2(18) of Implementing Regulation (EU) 2019/317.

(38)

In respect of the criterion specified under point 1.4(d)(i) of Annex IV to Implementing Regulation (EU) 2019/317, the Commission observes that Portugal has presented in its draft performance plan measures and investments to be implemented by the air navigation service provider, namely NAV Portugal, for the purpose of achieving the local capacity targets.

(39)

In particular, Portugal plans to put in service a new ATM system, as the system currently in use has reached the end of its lifecycle and has to be replaced. This action is indeed important in order to provide adequate capacity in the future, as the existing ATM system was responsible for a substantial part of the ATFM delays generated by NAV Portugal under RP2, in the pre-COVID circumstances. The new ATM system will reduce ATCO workload per aircraft and will enabling new functionalities, thus delivering operational gains.

(40)

Furthermore, Portugal plans to significantly increase, over RP3, the number of full-time equivalent ATCOs in operations. This development is essential in order to enable the opening of a higher number of sectors in the en route airspace of Portugal by the end of RP3, which will enhance the provided capacity.

(41)

Based on the detailed analysis by the performance review body, the Commission considers that the relevant measures outlined by Portugal in the draft performance plan are indeed necessary to achieve the local capacity targets. Furthermore, having regard to the evaluation made by the performance review body, it can be concluded that the additional costs of those measures are larger than the deviations from the Union-wide DUC trend and from the long-term Union-wide DUC trend referred to in recitals 33 and 34.

(42)

In light of the considerations in recitals 38 to 41, the Commission therefore finds that the criterion set out in point 1.4(d)(i) is fulfilled in respect of Portugal.

(43)

It follows from the foregoing observations that it is not necessary to further examine whether the criterion set out under point 1.4(d)(ii) would be fulfilled with regard to Portugal.

(44)

On the basis of the findings set out in recitals 33 to 43, the draft targets included in the draft performance plan of Portugal should be assessed as consistent with the Union-wide performance targets in the key performance area of cost-efficiency.

Review of draft cost-efficiency targets for terminal air navigation services

(45)

With regard to airports which fall within the scope of Implementing Regulation (EU) 2019/317 as set out in Articles 1(3) and (4) of that Regulation, the Commission has complemented its assessment of draft en route cost-efficiency targets with the review of the draft cost-efficiency targets for terminal air navigation services in accordance with point 2.1(c) of Annex IV to Implementing Regulation (EU) 2019/317. Those draft targets were not found to raise concerns in respect of Portugal.

Review of the incentive schemes referred to in Article 11 of Implementing Regulation (EU) 2019/317 complementing the Commission’s assessment of draft capacity targets

(46)

In accordance with point 2.1(f) of Annex IV to Implementing Regulation (EU) 2019/317, in relation to the assessment of draft capacity targets, the Commission has complemented its assessment by a review of the draft incentive schemes referred to in Article 11 of Implementing Regulation (EU) 2019/317. In this respect, the Commission has examined whether the draft incentive schemes fulfil the substantive requirements set out in in Article 11(1) and (3) of Implementing Regulation (EU) 2019/317. The draft incentive schemes contained in the draft performance plan of Portugal were found to raise concerns.

(47)

The Commission observes that both the en route capacity incentive scheme and the terminal capacity incentive scheme proposed in Portugal’s draft performance plan comprise a maximum financial disadvantage amounting to 0,5 % of determined costs and a maximum financial advantage amounting to 0,5 % of determined costs.

(48)

In respect of those incentive schemes, the Commission, on the basis of expert advice provided by the performance review body, has strong doubts whether the proposed maximum financial disadvantage, which amounts to 0,5 % of determined costs, would have any material impact on the revenue at risk, as required pursuant to point (a) of Article 11(3) of Implementing Regulation (EU) 2019/317.

(49)

Therefore, Portugal, in connection with the adoption of its final performance plan in accordance with Article 16, point (a) of Implementing Regulation (EU) 2019/317, should revise its incentive schemes for achieving en route and terminal capacity targets so that the maximum financial disadvantages stemming from those incentive schemes are set at a level having a material impact on the revenue at risk, as expressly required under Article 11(3), point (a) of Implementing Regulation (EU) 2019/317, which in the Commission’s view should lead to a maximum financial disadvantage equal to or higher than 1 % of determined costs.

CONCLUSIONS

(50)

On the basis of the assessment set out in recitals 9 to 49, the Commission has found that the performance targets contained in the draft performance plan submitted by Portugal are consistent with the Union-wide performance targets.

(51)

The Commission notes that some Member States have indicated their intention to include cost items relating to airport drone detection in their RP3 cost bases. It has not been possible to precisely establish, based on the elements contained in the draft performance plans, to what extent Member States have included such determined costs in their RP3 cost bases and, where such costs have been included, to what extent they are incurred in relation to the provision of air navigation services and could thus be deemed eligible under the performance and charging scheme. The Commission services have sent an ad hoc information request to all Member States in order to gather relevant information, and will further examine the reported airport drone detection costs in the context of unit rate compliance verification. This Decision is without prejudice to the findings and conclusions of the Commission on the topic of drone detection costs.

(52)

In response to Russia’s military aggression against Ukraine, which started on 24 February 2022, the Union has adopted restrictive measures prohibiting Russian air carriers, any Russian-registered aircraft and any non-Russian-registered aircraft which is owned or chartered, or otherwise controlled by any Russian natural or legal person, entity or body from landing in, taking off from, or overflying the territory of the Union. Those measures are leading to a reduced air traffic in the airspace over the territory of the Union. The impact at the Union-wide level should however not be comparable to the reduction of air traffic which resulted from the outbreak of the COVID-19 pandemic in March 2020. Therefore, it is appropriate to maintain the existing measures and processes for the implementation of the performance and charging scheme in RP3,

HAS ADOPTED THIS DECISION:

Article 1

The performance targets contained in the draft performance plan submitted by Portugal, pursuant to Regulation (EC) No 549/2004, and listed in the Annex to this Decision, are consistent with the Union-wide performance targets for the third reference period set out in Implementing Decision (EU) 2021/891.

Article 2

This Decision is addressed to the Portuguese Republic.

Done at Brussels, 13 April 2022.

For the Commission

Adina VĂLEAN

Member of the Commission


(1)   OJ L 96, 31.3.2004, p. 1.

(2)  Commission Implementing Regulation (EU) 2019/317 of 11 February 2019 laying down a performance and charging scheme in the single European sky and repealing Implementing Regulations (EU) No 390/2013 and (EU) No 391/2013 (OJ L 56, 25.2.2019, p. 1).

(3)  Commission Implementing Decision (EU) 2019/903 of 29 May 2019 setting the Union-wide performance targets for the air traffic management network for the third reference period starting on 1 January 2020 and ending on 31 December 2024 (OJ L 144, 3.6.2019, p. 49).

(4)  Commission Implementing Regulation (EU) 2020/1627 of 3 November 2020 on exceptional measures for the third reference period (2020-2024) of the single European sky performance and charging scheme due to COVID-19 pandemic (OJ L 366, 4.11.2020, p. 7).

(5)  Commission Implementing Decision (EU) 2021/891 of 2 June 2021 setting revised Union-wide performance targets for the air traffic management network for the third reference period (2020-2024) and repealing Implementing Decision (EU) 2019/903 (OJ L 195, 3.6.2021, p. 3).


ANNEX

Performance targets included in the draft performance plan submitted by Portugal pursuant to Regulation (EC) No 549/2004, found to be consistent with the Union-wide performance targets for the third reference period

KEY PERFORMANCE AREA OF SAFETY

Effectiveness of safety management

Portugal

Targets on the effectiveness of safety management, expressed as a level of implementation, ranging from EASA level A to D

Air navigation service provider concerned

Safety management objective

2021

2022

2023

2024

NAV Portugal

Safety policy and objectives

C

C

C

C

Safety risk management

C

C

C

D

Safety assurance

C

C

C

C

Safety promotion

C

C

C

C

Safety culture

C

C

C

C

KEY PERFORMANCE AREA OF ENVIRONMENT

Average horizontal en route flight efficiency of the actual trajectory

 

2021

2022

2023

2024

Draft en route environment targets of Portugal, expressed as the average horizontal en route flight efficiency of the actual trajectory

1,80  %

1,80  %

1,80  %

1,80  %

Reference values for Portugal

1,80  %

1,80  %

1,80  %

1,80  %

KEY PERFORMANCE AREA OF CAPACITY

Average en route ATFM delay in minutes per flight

 

2021

2022

2023

2024

Draft en route capacity targets of Portugal, in minutes of ATFM delay per flight

0,09

0,13

0,13

0,13

Reference values for Portugal

0,09

0,13

0,13

0,13

KEY PERFORMANCE AREA OF COST-EFFICIENCY

Determined unit cost for en route air navigation services

En route charging zone of Portugal Continental

2014 baseline value

2019 baseline value

2020 -2021

2022

2023

2024

Draft en route cost-efficiency targets, expressed as determined en route unit cost (in real terms at 2017 prices)

36,13 EUR

34,88 EUR

65,82 EUR

40,78 EUR

40,37 EUR

37,87 EUR


Top