This document is an excerpt from the EUR-Lex website
Document 52012DC0334
REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL PROGRESS REPORT ON THE DEVELOPMENT OF THE SECOND GENERATION SCHENGEN INFORMATION SYSTEM (SIS II) July 2011 - December 2011
REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL PROGRESS REPORT ON THE DEVELOPMENT OF THE SECOND GENERATION SCHENGEN INFORMATION SYSTEM (SIS II) July 2011 - December 2011
REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL PROGRESS REPORT ON THE DEVELOPMENT OF THE SECOND GENERATION SCHENGEN INFORMATION SYSTEM (SIS II) July 2011 - December 2011
/* COM/2012/0334 final */
REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL PROGRESS REPORT ON THE DEVELOPMENT OF THE SECOND GENERATION SCHENGEN INFORMATION SYSTEM (SIS II) July 2011 - December 2011 /* COM/2012/0334 final */
TABLE OF CONTENTS 1........... Introduction.................................................................................................................... 3 2........... Project Status................................................................................................................. 3 2.1........ Overview of progress during the
period under review...................................................... 3 2.2........ Technical framework for
finalising the project.................................................................. 4 2.3........ Preparations for the second
Milestone Test..................................................................... 5 2.4........ Preparations for the
Comprehensive Test........................................................................ 5 2.5........ Preparations for migration............................................................................................... 6 2.6........ SIS II network............................................................................................................... 6 2.7........ Operational management................................................................................................. 6 2.8........ Security.......................................................................................................................... 6 3........... Management................................................................................................................... 6 3.1........ Financial aspects............................................................................................................. 6 3.2.1..... Global Programme Management Board
(GPMB)............................................................ 6 3.2.2..... SIS-VIS Committee (SIS II).......................................................................................... 6 3.2.3..... National planning and coordination.................................................................................. 6 3.2.4..... Council........................................................................................................................... 6 3.2.5..... European Parliament....................................................................................................... 6 4........... Priorities for the next
reporting period.............................................................................. 6 5........... Conclusions.................................................................................................................. 11 1. Introduction This progress report describes the work
carried out in the second semester of 2011, concerning the development of the
second generation Schengen Information System (SIS II) and preparations for
migration from SIS 1+ to SIS II. It is presented to the Council and the
European Parliament in accordance with Article 18 of Council Regulation (EC) No
1104/2008 of 24 October 2008[1]
and of Council Decision 2008/839/JHA of 24 October 2008[2] on migration from the Schengen
Information System (SIS 1+) to the SIS II. 2. Project Status 2.1. Overview of
progress during the period under review The end of 2010 and the first half of 2011
witnessed considerable activity at both Central SIS II and Member State levels with
the implementation of the final technical specifications that govern the
interaction of the central system and the national systems. This was a
pre-requisite for finalising the technical development of the project. The
second semester of 2011 saw steady progress on the intensive testing of the coherence
between the central and the national systems. As in any other IT project of similar
nature, such intensive testing identified a number of issues both at central
and national levels. The sources of the issues related to three key areas: (i) at national level, several Member
States experienced issues or delays during the performance of their Compliance
Tests Extended (CTE). In order to accommodate additional testing time or late
starts in carrying out CTE, the schedule for these tests had to be extended; (ii) at central level, the performance of
the Central System Qualification Tests (CSQT) without Member States took longer
that initially planned. The impact on the Global Schedule was however absorbed
shortly after; (iii) the unavailability of sufficient resources
for the SIS II project at the French Data Centre in Strasbourg (C.SIS)
triggered lengthy discussions on the timely preparation and validation of the
SIS 1+ test tools which had been described in the Council Conclusions of 4 June
2009, in relation to the performance of the second Milestone Test. This matter
caused concern as it could result in either a delay in the overall schedule
that could not be mitigated or the need for renouncing the SIS 1+ tools. In order to address these issues, the
Commission worked together with experts from the Member States within both the Global
Programme Management Board (GPMB) and SIS-VIS Committee to identify the
mitigation solution that would allow, inter alia, the project stakeholders to maintain
the go-live date in the first quarter of 2013. A wide majority of Member States
supported this mitigation solution. 2.2. Technical
framework for finalising the project Tests By this reporting period, the SIS II
project reached a stage where a series of thorough testing campaigns could be
carried out to prove the stability, proper functioning and performance of both
the national and central systems. The approach consists of testing the national
and central systems' components first separately (during this reporting period),
and then together (starting in the following reporting period). Following the implementation of the
necessary technical updates at national level, Member States began verifying
the compliance of the national systems with the SIS II specifications during
the CTE phase. As the performance of this test phase was slower than envisaged
in the Global Schedule, further national testing will be carried out in 2012. Moreover,
contractual and technical problems at national level prevented two Member
States from starting their tests in 2011. In order to address these delays, the
Commission initiated dynamic management of testing slots, by allocating testing
environments to Member States as soon as they became available. Whilst, by the
end of 2011 the delay in CTE testing was not considered to be on the critical path
for project delivery, all Member States must finalise their CTE campaigns by 24
May 2012 so as to allow the Comprehensive Test to start in accordance with the
timeframe provided in the Global Schedule. During the same
period, qualification tests (CSQT without MS) were scheduled to take place at central
level. This test campaign was due by the end of September but was re-scheduled and
finished by 14 December 2011. The delay was caused by a problem with the link
between the Central Unit (CU) and the Back-up Central Unit (BCU), which was
slowing down the synchronisation and exchange of data between the two units and
caused deterioration in performance. Technical adaptations were necessary in
order to overcome this difficulty. The adaptations guaranteed that the BCU
contained the same data as the CU, in case of a failure in the CU. The nature
of these adaptations did not change any of the system's technical requirements,
including those related to availability, resilience and performance of the
system and did not have any impact on national systems. The subsequent
phase consists of carrying out further central system qualification tests with
the participation of a number of Member States (CSQT with Member States), this
being planned to commence on 16 January 2012 and to run throughout the first
quarter of 2012. All eight participating Member States made good progress in
their compliance tests (a pre-requisite to enter the subsequent testing phase) to
the degree that there were no concerns regarding the possibility of starting the
CSQT with Member States on time. The impact of
the delays at both Member States and central levels, as described above, was
already absorbed within the project schedule. The Commission, together with the
Presidency and the GPMB, identified ways to mitigate, absorb or compensate for
these delays so as to ensure that the go-live date for SIS II would remain
unchanged. 2.3. Preparations
for the second Milestone Test Substantial preparatory activity for the
second Milestone Test took place in several work-streams. In particular, the target
date for the reference document detailing the relevant test cases was set for
early 2012. With regard to the validation of test results, and pursuant to the
June 2009 Council Conclusions, in May 2011, the relevant Council Working Party mandated
the SIS 1+ contractors and the French authorities to undertake the necessary
work towards ensuring the validation and availability of the C.SIS measurement
tools for the test. In the course of September 2011, France
(C.SIS) and the SIS 1+ contractors announced in the Working Party that they
would not be able to validate or operate the tools for the second Milestone Test
within the scope and timeline set out in the Global Schedule. The Presidency
and the Commission organised several technical meetings with C.SIS and SIS 1+
contractors to work out concrete solutions and the matter was further discussed
at Council Working Party level. Faced with the unavailability of the SIS 1+
tools, Commission and Member States' experts analysed all possible solutions. A
vast majority converged towards the option based on the use of the available SIS
II tools (i.e. the two testing tools that were developed for the SIS II project
by the Commission's main development contractor and quality assurance
contractor). It should be stressed that these SIS II tools were also explicitly mentioned in the June 2009 Council Conclusions, alongside
the SIS 1+ tools, and were already used during the successful first Milestone Test. Moreover, this solution also foresaw that upcoming testing phases
and activities would be rearranged so as to allow the completion of national
testing by May 2012 and the start of the second Milestone Test in April 2012. This was the solution that would best
preserve the shared objectives of the project: undertaking credible testing
campaigns, maintaining the go-live date in the first quarter of 2013 and avoiding
a negative impact on SIS 1+ by easing the pressure on resources within C.SIS. It
received the support of a large majority of delegations in the SIS-VIS
Committee of 7 November 2011. However, taking into consideration the
concerns that continued to be expressed by some Member States, at the JHA
Council on 13 December 2011, the Commission aimed to reinforce the common
interest in a credible second Milestone Test by inviting any Member State still
having doubts on the specifications and reliability of the SIS II tools to
participate in their validation. Notwithstanding this, the test tools
developed by France for SIS 1+ can be retained for later testing if they become
available. 2.4. Preparations
for the Comprehensive Test The migration legal instruments describe
the Comprehensive Test[3]
as confirming, in particular, the completion by the Commission and the Member
States participating in SIS 1+ of the necessary technical arrangements to
process SIS II data and the demonstration that the level of performance of SIS
II is at least equivalent to that achieved with SIS 1+. Accordingly, the reporting period saw considerable
discussion on the matter and marked the beginning of the preparation of the
plan for the Comprehensive Test. This will be thoroughly reviewed and refined
in the first semester of 2012, with a view to the Comprehensive Test taking
place in the second semester of 2012, prior to the activities dedicated to
migration. 2.5.
Preparations for migration Testing the
converter In order to
successfully perform the migration from SIS 1+ to SIS II an interim migration
architecture will be put in place. This will include a converter designed to convert
data in two directions between the current C.SIS and central SIS II and keep
both systems synchronised for the period of time required for Member States to
move from one system to the other[4].
Such a key component of the migration
architecture requires significant testing. In order for this to take place a
SIS 1+ test environment was required. Given C.SIS inability to provide such an
environment, as initially foreseen, a new environment had to be purchased by
the Commission and a number of tests had to be completed and validated. With regards to the converter itself, it
passed Factory Acceptance Tests in October 2011. After this acceptance, the
converter was deployed to Strasbourg and tested against SIS II (System Solution
Testing – SIS II) in anticipation of further testing with SIS 1+. Additionally
the Commission installed and tested the necessary SIS 1+ communication
components in the converter itself, a required step prior to linking the
converter to SIS 1+. Preparations were made to connect the converter to the
test environment for the start of 2012. In the first half of 2012, the converter will
be tested against SIS 1+ (Qualification Tests), with a view to testing the
converter against both systems at the same time in the summer of 2012. This work
is the precursor to carrying out rehearsals with the Member States. Following
rehearsals, the next step will be live data migration from SIS 1 to SIS II early
in 2013. Planning the migration On 23 February 2011, the SIS-VIS Committee
delivered a favourable opinion on three important documents paving the way for
the migration activities, namely the SIS II Migration Plan, Test Strategy and
Test Plan. Of these, the Migration Plan is designed to
meet the technical needs of Member States by reflecting their favoured
technical approach. This approach was not fully in line with the migration legal
instruments. The Commission intends to propose, in early 2012, an amendment to
the legal framework, with a view to aligning the legal provisions with this
technical approach. There is still a heavy responsibility on
the Member States to ensure that attention is given to the issue of data
quality. Indeed, only data meeting the data quality rules of SIS 1+ can be
migrated to SIS II. Data which are not compliant with SIS 1+ data quality rules
must be "cleansed" prior to the switchover to SIS II as they cannot
be transferred in a non-compliant format. The Polish Presidency made data
cleansing a priority for the second half of 2011. A dedicated meeting
demonstrated the approaches that several Member States had taken to this
important activity. The Commission is working closely with the
Member States in writing the Migration Manual, a document setting out in detail
the steps which had been outlined in the Migration Plan. The Manual will define
roles and responsibilities throughout the process and describe the detailed
schedule for the migration of real SIS data. This task, which commenced in
December 2011, must be finalised by the end of 2012. At Working Party meetings, Member States
raised the issue of SIRENE migration. This is the change from the Member
States' existing SIS 1+ SIRENE Bureaux systems to their new SIS II SIRENE
systems. The migration legal instruments provide that the Member States
participating in SIS 1+ shall conduct a test on supplementary information (functional
SIRENE tests)[5].
The Commission supported Member States in their preparations to review the
technical specifications of data exchange between the SIRENE Bureaux, an
activity to take place in the first half of 2012. 2.6. SIS II
network The SIS II project includes the provision
of a wide area communications network, meeting the requirements of
availability, security, geographical coverage and level of service, to enable
the central and national systems to communicate. For
operational purposes Member States have both main and back-up interfaces with
the network. During the reporting period, a number of Member States' back-up
interfaces were reactivated in order to prepare for tests involving switching
between main and back-up sites. This reactivation process is to continue into
2012. The SIS II basic legal instruments describe
the communication infrastructure dedicated to SIS II data and the exchange of
data between SIRENE Bureaux[6].
Following the Member States confirmation of the technical specifications of the
SIS II SIRENE mail relay, the Commission finalised the procurement procedures.
The mail relay will be installed in the first half of 2012, in anticipation of
the Member States' test on supplementary information. 2.7.
Operational management Following joint
statements of the Council and the European Parliament when adopting the SIS II
and VIS legal instruments, in June 2009 the Commission proposed to set up an
Agency for the operational management of large-scale IT systems in the area of
freedom, security and justice. The Regulation establishing the Agency was
adopted on 25 October 2011[7].
The Agency will take up its
responsibilities as regards the operational management of VIS and EURODAC on 1
December 2012, whilst, with regard to the operational management of SIS II, it
will do so once this system is brought into operation. In future, the Agency
could also be entrusted with other large-scale IT systems in the area of
freedom, security and justice if so provided by the relevant legislative
instruments. 2.8. Security The study on
additional network security for SIS II was presented to the SIS-VIS Committee in
the previous reporting period. A technical solution, complying with all
requirements, was identified and a pilot project subsequently commenced. The
necessary equipment was purchased and a first phase was run between October and
December 2011 in a controlled environment. All technical options for the deployment
of a solution were validated. The next step of the pilot project will be to
perform a further test, for which the participation of three volunteer Member
States will be needed. Germany and Austria have already put themselves forward
to participate and a further volunteer is sought. The goal is success during
the security audit of the system, due to take place in the summer of 2012. 3. Management 3.1. Financial
aspects SIS II budget By the end of the reporting period, the
total budgetary commitments made by the Commission on the SIS II project since
2002, amounted to EUR 148 283 233. The corresponding contracts include
feasibility studies, the development of the Central SIS II itself, support and
quality assurance, the SIS II network, preparation for operational management
in Strasbourg, security, biometrics preparations, communication and experts'
mission expenses. Of this
amount, EUR 95 414 354 had actually been paid between 2002 and the end of December
2011. The main expenditure items were development (EUR 52 336 641), the
network (EUR 24 983 117), support and quality assurance (EUR 9 492
497) and preparation for operational management in Strasbourg and Sankt Johann
im Pongau (EUR 7 077 303). Budget execution || From 2002 to December 2011 || From July to December 2011 (EUR) Commitments || Payments || Commitments || Payments Development (HP/Stéria) || 80 593 047 || 51 072 141 || 134 184 || 16 204 913 Development (Atos) || 3 535 041 || 1 264 500 || 3 535 041 || 1 264 500 Support & quality assurance || 13 092 269 || 9 492 497 || 2 129 015 || 900 319 Network || 38 526 008 || 24 983 117 || 6 150 053 || 3 462 496 Operational management preparation || 8 965 894 || 7 077 303 || 1 290 179 || 841 246 Security || 1 358 310 || 217 712 || 4 027 || 0 Studies / Consultancy || 961 131 || 942 261 || 0 || 0 Information Campaign || 33 373 || 33 373 || 0 || 0 Experts Mission Expenses || 1 203 286 || 316 577 || 0 || 79 711 Others || 14 874 || 14 874 || 0 || 0 TOTAL: || 148 283 233 || 95 414 354 || 13 242 499 || 22 753 185 Additional financing for Member States'
national development The October 2010 Council urged the
Commission to make the necessary arrangements to make the European External
Borders Fund (EBF) available to the Member States to support the completion of national
system developments. Accordingly, a significant reallocation of
resources towards SIS II national projects was undertaken within the framework
of the 2011 programming for the EBF. In most cases, it was possible to
accommodate the extra financial needs related to SIS II in the annual
programmes for 2011. However, this was not possible for eight Member States
either because of the limited size of their EBF allocations and/or by the need
to cover other pressing, and equally strategic, priorities in their annual
programmes. It was therefore decided to meet these needs from the Community
Actions part of the EBF. By the end of 2011, all grant agreements had
been signed by the Commission and the Member States concerned and an advance
payment of 75% of each grant had been made to the respective Member State. 3.2. Project management 3.2.1. Global Programme Management Board (GPMB) The amendments
to the migration legal instruments adopted on 3 June 2010 formalised the GPMB
as an advisory body for assistance to the central SIS II project to facilitate
consistency between central and national SIS II projects[8]. The GPMB has neither
decision-making power nor any mandate to represent the Commission or Member
States. The GPMB met 20 times during the period
covered by this report. 3.2.2. SIS-VIS Committee (SIS II) The Commission is assisted in the
development of SIS II by the SIS-VIS Committee. There were five meetings of the
SIS-VIS Committee on SIS II technical matters in the period July – December
2011. Several key approvals were achieved on migration and testing. In addition to regular SIS-VIS Committee
meetings, working groups of the Committee and workshops, involving Member
States' experts, are organised to discuss detailed technical issues. These
meetings generally focus on issues arising from specific project deliverables: · The Test Advisory Group (TAG), provides the SIS-VIS Committee with
an opinion on issues related to the organisation, implementation and
interpretation of tests. This group held 23 meetings in the reporting period. · The Change Management Board (CMB), provides advice on
classification, qualification and the potential impact of correction of
reported issues. Due to the amount of effort expended on agreeing the updated
technical specifications of the central system in 2010-11 and the subsequent
stabilisation of requirements, this working group, which also reports to the
SIS-VIS Committee, was not formally convened during the reporting period; neither
were any SIS II Migration Workshops/meetings held during this period. 3.2.3. National planning and coordination A working group composed of the Member
States' national project managers (NPM) is organised to advise the Commission project
team. The purpose of the NPM meetings is to deal with detailed planning issues,
risks and activities both at the central and national project levels. During
this reporting period four NPM meetings took place. 3.2.4. Council Overall a positive
and cooperative atmosphere characterised the meetings in the Council. Given the
very technical nature of the project, the Commission paid particular attention
to transparency, for example through the provision of a detailed letter to the
Presidency in November 2011. On subjects where Member States sought additional
clarification, the Commission held bilateral meetings in order to ensure that a
common base of understanding is achieved. This is also pursued through the
Council's SIS II Task Force, of which the Commission is a member, which
provides an overview of preparations at Member State level to the Council.
Additionally, the Member States recognised the need to review a key technical
document on data exchange between SIRENE Bureaux and to establish a structure to
plan and manage the SIRENE functional tests. Ad hoc groups were established
accordingly, with the Commission being invited to both. As expressed in Council Conclusions and in
line with the wishes of all parties in the project to maintain complete transparency,
the Commission keeps the Council informed, regularly, on the implementation of
the Global Schedule for SIS II and expenditure on the central project. The Commission takes part in the meetings
of the preparatory bodies of the Council responsible for the Schengen
Information System and of each Council of Ministers session where SIS II is
included on the agenda. The Commission has presented reports on the state of
play of the SIS II project and the next steps envisaged. The Commission circulates a weekly flash
report, summarising technical developments, to colleagues engaged in the
project at national level. 3.2.5. European Parliament At the end of 2011,
the European Parliament decided to put into the reserve part of the
appropriations for the SIS II project in the EU General Budget. The Commission
keeps the European Parliament informed on the state of play of SIS II. In
addition to fulfilling the reporting obligations provided by the SIS II legal
instruments[9],
the Commission provided the European Parliament with further information on
financial, contractual and scheduling matters and the status of the project in
the context of the discussions on the release of SIS II appropriations for 2011
from the reserve. Finally, the Commission responded to seven parliamentary
questions on SIS related matters. 4. Priorities
for the next reporting period During the next
reporting period, January to end-June 2012, there will be seven principal areas
of activity: · the finalisation of CTE testing at national level; · the finalisation of CSQT with Member States; · the preparation for and the carrying out of the Provisional System Acceptance
Tests (PSAT); · the preparation for and the carrying out of the second Milestone Test; · the preparation for the Comprehensive Test; · the pilot project on security and preparation for the subsequent
test and audit; · the installation of the SIS II SIRENE mail relay in anticipation of
the Member States' test on supplementary information. 5. Conclusions As is to be
expected during a period of intensive testing, issues were found which had to
be resolved in relation to both the central and national systems. However,
through a cooperative and pragmatic working style, these issues were addressed
and solved and the SIS II project remains on track. These actions provided the
foundations for a series of critical tests to be carried out throughout 2012,
namely the PSAT, the second Milestone Test and the Comprehensive Test. At national
level, Member States will, during the first semester of 2012, continue to ensure
that they can make use of the installation of the new SIRENE mail relay for the
test on the exchange of supplementary information between Member States. The Commission
and Member States will continue to work together to ensure that SIS II complies
with the requirements of the security audit, due in the summer of 2012. Finally, on the
basis of tests on the converter which have already been carried out, preparation
for migration between SIS 1+ and SIS II will continue. Annex I SIS-VIS
Committee (SIS II) and Working Group Meetings Meetings held during the reporting
period JULY 2011 12, 19, 25 || SIS II Global Programme Management Board 18 || SIS II Migration Workshop 26 || SIS II National Project Managers' Meeting 26 || SIS-VIS Committee (SIS II Technical Formation Meeting) 11 || SIS II Test Strategy Workshop 4, 18, 25 || SIS II TAG meeting (Test Advisory Group) AUGUST 2011 2, 9, 22 || SIS II Global Programme Management Board 23 || SIS II National Project Managers' Meeting 23 || SIS-VIS Committee (SIS II Technical Formation Meeting) 1, 15, 22 || SIS II TAG meeting (Test Advisory Group) SEPTEMBER 2011 2, 9, 16, 22, 30 || SIS II Global Programme Management Board 23 || SIS-VIS Committee (SIS II Technical Formation Meeting) 23 || SIS II National Project Managers' Meeting 29 || SIS II TAG meeting (Test Advisory Group) 22 || SIS II Workshop on Compliance Test (Extended) TDDs 24 || SIS II Migration Workshop OCTOBER 2011 6, 13, 27 || SIS II Global Programme Management Board 5, 12, 19, 26 || SIS II TAG meeting (Test Advisory Group) NOVEMBER 2011 10, 18, 24 || SIS II Global Programme Management Board 25 || SIS-VIS Committee (SIS II Technical Formation Meeting) 25 || SIS II National Project Managers' Meeting 17 || SIS II Migration meeting 12, 17, 24, 31 || SIS II TAG meeting (Test Advisory Group) DECEMBER 2011 1, 8, 15, 28 || SIS II Global Programme Management Board 23 || SIS II CTE Workshop 29 || SIS-VIS Committee (SIS II Technical Formation Meeting) 29 || SIS II National Project Managers' Meeting 7, 14, 21 || SIS II TAG meeting (Test Advisory Group) SIS-VIS
Committee (SIS II) and Working Group Meetings b)
Meetings provisionally scheduled during the forthcoming reporting period JANUARY 2012 6, 12, 19, 27 || SIS II Global Programme Management Board 20 || SIS-VIS Committee (SIS II Technical Formation Meeting) 20 || SIS II National Project Managers' Meeting 5, 12, 19, 26 || SIS II TAG meeting (Test Advisory Group) 14 || SIS II M2 Test Preparation Meeting FEBRUARY 2012 10, 23 || SIS II Global Programme Management Board 2 , 9 , 16 , 23 , 30 || SIS II TAG meeting (Test Advisory Group) MARCH 2012 7 , 14 , 21 , 28 || SIS II Global Programme Management Board 21 || SIS-VIS Committee (SIS II Technical Formation Meeting)) 21 || SIS II National Project Managers' Meeting 6 , 13 , 20 , 27 || SIS II TAG meeting (Test Advisory Group) APRIL 2012 5 , 19 , 26 || SIS II Global Programme Management Board 24 || SIS-VIS Committee (SIS II Technical Formation Meeting)) 24 || SIS II National Project Managers' Meeting 4 , 11 , 18 , 25 || SIS II TAG meeting (Test Advisory Group) MAY 2012 9 , 16 , 23 , || SIS II Global Programme Management Board 23 || SIS-VIS Committee (SIS II Technical Formation Meeting)) 23 || SIS II National Project Managers' Meeting 8 , 15 , 22 , 29 || SIS II TAG meeting (Test Advisory Group) JUNE 2012 7 , 14 , 21 || SIS II Global Programme Management Board 21 || SIS-VIS Committee (SIS II Technical Formation Meeting)) 21 || SIS II National Project Managers' Meeting 6 , 13 , 20 || SIS II TAG meeting (Test Advisory Group) [1] Council Regulation (EC) No 1104/2008 of 24 October
2008 on migration from the Schengen Information System (SIS 1+) to the second
generation Schengen Information System (SIS II) (OJ L 299, 8.11.2008, p. 1). [2] Council Decision 2008/839/JHA of 24 October 2008 on
migration from the Schengen Information System (SIS 1+) to the second
generation Schengen Information System (SIS II) (OJ L 299, 8.11.2008, p. 43). [3] Common Article 8 of Council Regulation (EC) No
1104/2008 and of Council Decision 2008/839/JHA. [4] Common Article 10 (3) of Council Regulation (EC) No
1104/2008 of 24.10.2008 and of Council Decision 2008/839/JHA of 24.10.2008. [5] Common Article 9 (1) of Council Regulation (EC) No
1104/2008 and of Council Decision 2008/839/JHA. [6] Common Article 4 of Regulation (EC) No 1987/2006 of
the European Parliament and of the Council of 20 December 2006 on the
establishment, operation and use of the second generation Schengen Information
System (SIS II) (OJ L 381, 28.12.2006, p. 4) and of Council Decision
2007/533/JHA of 12 June 2007 on the establishment, operation and use of the
second generation Schengen Information System (SIS II) (OJ L 205, 7.8.2007, p.
63). [7] Regulation (EU) No 1077/2011 of the European
Parliament and of the Council of 25 October 2011 establishing a European Agency
for the operational management of large-scale IT systems in the area of
freedom, security and justice (OJ L 286, 1.11.2011, p.1) [8] Council Regulation (EU) No 541/2010 of 3 June 2010
amending Regulation (EC) No 1104/2008 on migration from the Schengen
Information System (SIS 1+) to the second generation Schengen Information
System (SIS II) (OJ L 155, 22.6.2010, p. 19) and Council Regulation (EU) No
542/2010 of 3 June 2010 amending Decision 2008/839/JHA on migration from the
Schengen Information System (SIS 1+) to the second generation Schengen
Information System (SIS II) (OJ L 155, 22.6.2010, p. 23) introducing an Article
17a into the migration legal instruments. [9] Common Article 18 of Council Regulation (EC) No
1104/2008 and of Council Decision 2008/839/JHA.