ANNEX
Text of image
O1 - OIL REFINING
Reporting year 20XX
in thousand tonnes per year
Member State
Type of infrastructure
Annex point 1.1
Existing infrastructure
Art. 5 (3)
Infrastructure under construction
Art. 1(2) + 2(4) + 4 + 5 (1) a)
Planned infrastructure (FID)
Art. 1(2) + 2(3)+ 4 + 5 (1) a)
Additions to be commissioned (under construction + FID)
Art. 1(2) + 5 (1) c)
Infrastructure to be decommissioned
Art. 1(2) + 2(5) + 5 (2)
Position at 1/1/Y
Non-operational [> 3 Y]
Position at 31/3/Y
Position at 31/3/Y
Y + [0-2]
Y + [3-5]
Y + [0-2]
Y + [3-5]
Capacity
Capacity
Number
Capacity
Number
Capacity
Number
Capacity
Capacity
Number
Capacity
Capacity
Distillation (1 )
Astmospheric distillation
with CCS/CCS ready
Vacuum distillation
with CCS/CCS ready
Cracking (2 )
Craking (Thermal)
Visbreaking and/or thermal
Coking
Other
with CCS or capture ready
Cracking (catalytic)
Fluid catalytic cracking
Hydrocracking
Other
with CCS or capture ready
Reforming (2 )
(Naphta and isomerisation)
Text of image
in thousand tonnes per year
Member State
Type of infrastructure
Annex point 1.1
Existing infrastructure
Art. 5 (3)
Infrastructure under construction
Art. 1(2) + 2(4) + 4 + 5 (1) a)
Planned infrastructure (FID)
Art. 1(2) + 2(3) + 4 + 5 (1) a)
Additions to be commissioned (under construction + FID)
Art. 1(2) + 5 (1) c)
Infrastructure to be decommissioned
Art. 1(2) + 2(5) + 5 (2)
Position at 1/1/Y
Non-operational [> 3 Y]
Position at 31/3/Y
Position at 31/3/Y
Y + [0-2]
Y + [3-5]
Y + [0-2]
Y + [3-5]
Capacity
Capacity
Number
Capacity
Number
Capacity
Number
Capacity
Capacity
Number
Capacity
Capacity
with CCS or capture ready
Desulphurisation
(gasoil, HFO, other)
with CCS or capture ready
Alkylation Polymerisation Isomerisation (C4)
with CCS or capture ready
Etherification
(MTBE, TAME, ETBE)
Other
with CCS or capture ready
Supplementary Info
Art. 5 (3)
Indication of e.g. reasons for investment, delays, problems for new infrastructure
NB: under construction and FID (Final Investment Decision) include renovation.
(1 ) Installations of a capacity ≥ 1 Mio tonnes/y.
(2 ) Installations with a minimum capacity of 500 t/day.
Text of image
O2 - OIL TRANSPORT
Reporting year 20XX
Member State
Type of infrastructure
Annex point 1.2
Existing infrastructure
Art. 5 (3)
Infrastructure under construction
Art. 1(2) + 2(4) + 4 + 5 (1) a)
Planned infrastructure (FID)
Art. 1(2) + 2(3) + 4 + 5 (1) a)
Additions to be commissioned (under construction + FID)
Art. 1(2) + 5 (1) c)
Installations to be decommissioned
Art. 1(2) + 2(5) + 5 (2)
Position at 1/1/Y
Position at 31/3/Y
Position at 31/3/Y
Y + [0-2]
Y + [3-5]
Y + [0-2]
Y + [3-5]
Length (km)
Number
Length (km)
Number
Length (km)
Number
Length (km)
Length (km)
Number
Length (km)
Length (km)
Crude oil transport pipelines (1 )
Petroleum product pipelines (2 )
Supplementary Info
Art. 5 (3)
Indication of e.g. reasons for investment, delays, problems for new infrastructure
NB: under construction and FID (Final Investment Decision) include renovation.
(1 ) With a capacity ≥ 3 Mio Metric tonnes/year for New pipelines + extension/lengthening ≥ 30 km.
(2 ) With a capacity ≥ 1,5 Mio Metric tonnes/year for New pipelines + extension/lengthening ≥ 30 km.
Text of image
O3 - OIL CROSS-BORDER TRANSPORT
Reporting year 20XX
Member State
Transport capacity
(Metric Tonnes per day)
Cross-border transmission projects and essential links in interconnecting national or international newtorks
Annex point 1.2
Existing infrastructure
Art. 5 (3)
Infrastructure under construction
Art. 1(2) + 2(4) + 4 + 5 (1) a)
Planned infrastructure (FID)
Art. 1(2) + 2(3) + 4 + 5 (1) a)
Additions to be commissioned (under construction + FID)
Art. 2(3) + 5 (1) c)
Infrastructure to be decommissioned (FID)
Art. 1(2) + 2(5) + 5 (2)
TEN-E projects
Supplementary info
Art. 5(3)
Position at 1/1/Y
Position at 31/3/Y
Position at 31/3/Y
Y + [0-2]
Y + [3-5]
Y + [0-2]
Y + [3-5]
Ref.
TO (1 )
FROM (2 )
TO (1 )
FROM (2 )
TO (1 )
FROM (2 )
TO (1 )
FROM (2 )
TO (1 )
FROM (2 )
TO (1 )
FROM (2 )
TO (1 )
FROM (2 )
Crude oil pipelines
Annex point 1.2
Cross - border/interconnecting point no 1
(location - indicate MS/Third countries)
Petroleum products pipelines
Annex point 1.2
Cross - border/interconnecting point no 1
(location - indicate MS/Third countries)
NB: under construction and FID (Final Investment Decision) include renovation.
(1 ) To the reporting MS.
(2 ) From the reporting MS.
Text of image
O4 - OIL STORAGE
Reporting year 20XX
Member State
Type of infrastrucutre
Annex point 1.3
Existing infrastructure
Art. 5 (3)
Infrastructure under construction
Art. 1(2) + 2(4) + 4 + 5 (1) a)
Planned infrastructure (FID) (1 )
Art. 1(2) + 2(3) + 4 + 5 (1) a)
Additions to be commissioned (Under construction + FID)
Art. 1(2) + 5 (1) c)
Infrastructure to be decommissioned (1 )
Art. 1(2) + 2(5) + 5 (2)
Position at 1/1/Y
Non-operational [> 3 Y]
Position at 31/3/Y
Position at 31/3/Y
Y + [0-2]
Y + [3-5]
Y + [0-2]
Y + [3-5]
Storage capacity (m3 )
Storage capacity (m3 )
Number
Storage capacity (m3 )
Number
Storage capacity (m3 )
Number
Storage capacity (m3 )
Storage capacity (m3 )
Number
Storage capacity (m3 )
Storage capacity (m3 )
Crude oil
Annex 1.3
Storage installations
Tanks
Petroleum products
Annex 1.3
Storage installations
Tanks
Supplementary info
Article 5(3)
Indication of e.g. reasons for the investment, problemns, delays for new infrastructure
NB: under construction and FID (Final Investment Decision) include renovation.
(1 ) Installations of a capacity ≥ 150 000 m3 and tanks with a capacity ≥ 100 000 m.
Text of image
G1 - GAS TRANSMISSION
Reporting year 20XX
Member State
Type of infrastructure (1 )
Annex point 2.1
Existing infrastructure
Art. 5(3)
Infrastructure under construction
Art. 1(2) + 2(4) + 4 + 5 (1) a)
Planned infrastructure (FID)
Art. 1(2) + 2(3) + 4 + 5 (1) a)
Additions to be commissioned (under construction + FID)
Art. 1(2) + 5 (1) c)
Iinfrastructure to be decommissioned
Art. 1(2) + 2(5) + 5 (2)
Position at 1/1/Y
Position at 31/3/Y
Position at 31/3/Y
Y + [0-2]
Y + [3-5]
Y + [0-2]
Y + [3-5]
Length (km)
Number
Length (km)
Number
Length (km)
Number
Length (km)
Length (km)
Number
Length (km)
Length (km)
Transmission pipelines
Annex 2.1
Total power (MW)
Number
Total power (MW)
Number
Total power (MW)
Number
Total power (MW)
Total power (MW)
Number
Total power (MW)
Total power (MW)
Compressor substations (2 )
Annex 2.1
Supplementary Info
Art. 5 (3)
Indication of general comments, including e.g. the case of existing installations non operational for a period of more than 3 years
NB: under construction and FID (Final Investment Decision) include renovation.
(1 ) See definition in Annex 2.1 of the Council regulation: Transport pipelines that form part of a network which mainly contains high-pressure pipelines excluding pipelines that form part of an upstream pipeline network and excluding the part of high pressure pipelines primarily used in the context of local distribution of natural gas.
(2 ) Connected to transmission pipelines.
Text of image
G2 - GAS CROSS-BORDER TRANSMISSION
Reporting year 20XX
Member State
Maximum Technical transmission capacity
(Nm3 /d)
Cross-border transmission infrastructure
Annex point 2.1
Existing infrastructure
Art. 5 (3)
Infrastructure Under Construction
Art. 1(2) + 2(4) + 4 + 5 (1) a)
Planned infrastructure (FID)
Art. 1(2) + 2(3) + 4 + 5 (1) a)
Additions to be commissioned (under construction + FID)
Art. 1(2) + 5 (1) c)
Infrastructure to be decommissioned
Art. 1(2) + 2(5) + 5 (2)
TEN-E projects
Annex 2.1
Supplementary info (1 )
Art. 5(3)
Position at 1/1/Y
Position at 31/3/Y
Position at 31/3/Y
Y + [0-2]
Y + [3-5]
Y + [0-2]
Y + [3-5]
Ref.
TO (2 )
FROM (3 )
TO
FROM
TO
FROM
TO
FROM
TO
FROM
TO
FROM
TO
FROM
Cross - border point no 1
(location - indicate MS/Third countries)
Cross - border point no 1
(location - indicate MS/Third countries)
NB: under construction and FID (Final Investment Decision) include renovation.
(1 ) Indication of e.g. of delays, problems for new infrastructure or of the reasons of the increase in technical transmission capacity at a cross-border point in the absence of investment projects in new pipelines.
(2 ) To the reporting MS.
(3 ) From the reporting MS.
Text of image
G3 - LNG TERMINALS
Reporting year 20XX
Member State
Type of infrastructure
Annex point 2.2
Existing infrastructure
Art. 5 (3)
Infrastructure under construction (1 )
Art. 1(2)+ 2(4) + 4+ 5 (1) a)
Planned infrastructure (1 ) (FID)
Art. 1(2)+ 2(3)+ 4+ 5 (1) a)
Additions to be commissioned (1 ) (under construction + FID)
Art. 1(2)+ 5 (1) c)
Infrastructure to be decommissioned (1 )
Art. 1(2)+ 2(5) + 5 (2)
TEN - E project
Annex 2.1
Position at 1/1/Y
Non-operational [>3 Y]
Position at 31/3/Y
Position at 31/3/Y
Y+ [0-2]
Y + [3-5]
Y + [0-2]
Y + [3-5]
Number
Art. 5(1) b)
Max. regasification capacity [bcm(N)/y]
- Art. 5(1) b)
Max storage capacity [cm]
Art. 5(1) b)
Supplementary Info
Art. 5 (3)
Indication of e.g. reasons for the investment, problems, delays for new infrastructure
NB: under construction and FID (Final Investment Decision) include renovation
(1 ) Terminals for the importation of liquefied natural gas, with a regasification capacity of 1 bcm per year or more (Annex 2.2)
Text of image
G4 - GAS STORAGE
Reporting year 20XX
Member State
Type of infrastructure
Annex point 2.3
Existing infrastructure
Art. 5(3)
Infrastructure under construction (1 )
Art. 1(2) + 2(4) + 4 + 5 (1) a)
Planned infrastructure (1 ) (FID)
Art. 1(2) + 2(3) + 4 + 5 (1) a)
Additions to be commissioned (1 ) (under construction + FID)
Art. 1(2) + 5 (1) c)
Iinfrastructure to be decommissioned
Art. 1(2) + 2(5) + 5 (2)
Position at 1/1/Y
Non-operational [> 3 Y]
Position at 31/3/Y
Position at 31/3/Y
Y + [0-2]
Y + [3-5]
Y + [0-2]
Y + [3-5]
Aquifer storage
Number
Total storage capacity [bcm]
Working gas Capacity [bcm]
Deliverability - Max. withdrawal capacity [mcm/d]
Injectability Max.injection capacity [mcm/d]
Salt cavity
Number
Total storage capacity [bcm]
Working gas Capacity [bcm]
Deliverability - Max. withdrawal capacity [mcm/d]
Injectability Max.injection capacity [mcm/d]
Depleted field
Number
Text of image
Member State
Type of infrastructure
Annex point 2.3
Existing infrastructure
Art. 5 (3)
Infrastructure under construction (1 )
Art. 1(2) + 2(4) + 4 + 5 (1) a) + Art. 4
Planned infrastructure (1 ) (FID)
Art. 1(2) + 2(3) + 4 + 5 (1) a)
Additions to be commissioned (1 ) (Under construction + FID)
Art. 1(2) + 5 (1) c)
Infrastructure to be decommissioned
Art. 1(2) + 2(5) + 5 (2)
Position at 1/1/Y
Non-operational [> 3 Y]
Position at 31/3/Y
Position at 31/3/Y
Y + [0-2]
Y + [3-5]
Y + [0-2]
Y + [3-5]
Total storage capacity [bcm]
Working gas Capacity [bcm]
Deliverability - Max. withdrawal capacity [mcm/d]
Injectability Max.injection capacity [mcm/d]
Aboveground storage (2 )
Number
Total storage capacity [bcm]
Working gas Capacity [bcm]
Deliverability - Max. withdrawal capacity [mcm/d]
Injectability Max.injection capacity [mcm/d]
Supplementary Info
Art. 5 (3)
Indication of e.g. reasons for the investment, problems, delays for new infrastructure
NB: under construction and FID (Final Investment Decision) include renovation.
(1 ) Installations connected to the transport pipelines.
(2 ) Does not include storage capacity of LNG terminals (see separate LNG tables).
Text of image
E1 - ELECTRICITY PRODUCTION
Reporting year 20XX
Member State
Type of infrastructure
Annex point 3.1
Existing infrastructure
Art. 5 (3)
Infrastructure under construction
Art. 1(2) + 2(4) + 4 + 5 (1) a)
Planned infrastructure (FID)
Art. 1(2) + 2(3) + 4 + 5 (1) a)
Additions to be commissioned (under construction + FID)
Art. 1(2) + 5 (1) c)
Infrastructure to be decommissioned
Art. 1(2) + 2(5) + 5 (2)
Position at 1/1/Y
Non-operational [> 3 Y]
Position at 31/3/Y
Position at 31/3/Y
Y + [0-2]
Y + [3-5]
Y + [0-2]
Y + [3-5]
Capacity (1 ) (MW)
Capacity (1 ) (MW)
Number
Capacity (1 ) (MW)
Number
Capacity (1 ) (MW)
Number
Capacity (1 ) (MW)
Capacity (1 ) (MW)
Number
Capacity (1 ) (MW)
Capacity (1 ) (MW)
Conventional thermal power stations (≥ 100 MW) capable of burning
Annex point 3.1 + Art. 5(1) d)
Coal and lignite
with CCS/CCS ready
Oil
with CCS/CCS ready
Gas
with CCS/CCS ready
Two or more energy sources (2 )
…/… (1 )
with CCS or capture ready
Others
Nuclear Power Stations (≥ 100 MW) of type
Annex point 3.1 + Art. 5(1) b)
Pressurized Water Reactor
Boiling Water Reactor
Graphit Gas Reactor
Fast Breeder Reactor
Others
Text of image
Member State
Type of infrastructure
Annex point 3.1
Existing infrastructure
Art. 5 (3)
Infrastructure under construction
Art. 1(2) + 2(4) + 4 + 5 (1) a)
Planned infrastructure (FID)
Art. 1(2) + 2(3) + 4 + 5 (1) a)
Additions to be commissioned (under construction + FID)
Art. 1(2) + 5 (1) c)
Infrastructure to be decommissioned
Art. 1(2) + 2(5) + 5 (2)
Position at 1/1/Y
Non-operational [> 3 Y]
Position at 31/3/Y
Position at 31/3/Y
Y + [0-2]
Y + [3-5]
Y + [0-2]
Y + [3-5]
Capacity (1 ) (MW)
Capacity (1 ) (MW)
Number
Capacity (1 ) (MW)
Number
Capacity (1 ) (MW)
Number
Capacity (1 ) (MW)
Capacity (1 ) (MW)
Number
Capacity (1 ) (MW)
Capacity (1 ) (MW)
Biomass/bioliquids/waste power generation installations (≥ 20 MW) capable of burning
Annex point 3.1 + Art. 5(1) d)
Biomass
Waste
Bioliquids
Power stations with cogeneration of electricity and useful heat (electrical capacity ≥ 20 MW) capable of burning
Coal and lignite
with CCS/CCS ready
Oil
with CCS/CCS ready
Gas
with CCS/CCS ready
Biomass
Waste
Two or more energy sources (2 )
…/…
with CCS/CCS ready
Hydro-electric power stations (≥ 30 MW) of the type
Annex point 3.1 + Art. 5(1) b)
Seasonal stockage (S)
Short-term stockage (ST)
Text of image
Member State
Type of infrastructure
Annex point 3.1
Existing infrastructure
Art. 5 (3)
Infrastructure under construction
Art. 1(2) + 2(4) + 4 + 5 (1) a)
Planned infrastructure (FID)
Art. 1(2) + 2(3) + 4 + 5 (1) a)
Additions to be commissioned (under construction + FID)
Art. 1(2) + 5 (1) c)
Infrastructure to be decommissioned
Art. 1(2) + 2(5) + 5 (2)
Position at 1/1/Y
Non-operational [> 3 Y]
Position at 31/3/Y
Position at 31/3/Y
Y + [0-2]
Y + [3-5]
Y + [0-2]
Y + [3-5]
Capacity (1 )
(MW)
Capacity (1 ) (MW)
Number
Capacity (1 ) (MW)
Number
Capacity (1 ) (MW)
Number
Capacity (1 ) (MW)
Capacity (1 ) (MW)
Number
Capacity (1 ) (MW)
Capacity (1 ) (MW)
Run-of River (R)
Pumped storage only (P)
Mixed pumped and others
Wind power farms (≥ 20 MW) of the type
Annex point 3.1 + Art. 5(1) b)
On-shore
Off-shore
Concentrated solar thermal and geothermal installations (≥ 20 MW)
Annex point 3.1
Concentrated solar thermal
Geothermal
Photovoltaic installations (≥ 10 MW)
Annex point 3.1
Supplementary Info
Art. 5 (3)
Indication of e.g. reasons for the investment, problems, delays for new infrastructure
NB: under construction and FID (Final Investment Decision) include renovation.
(1 ) Nominal capacity.
(2 ) For installations capable of burning more than one fuel, please indicate the power at total level and for each fuel separately.
Text of image
E2 - ELECTRICITY TRANSMISSION
Reporting year 20XX
Member State
Type of infrastructure
Annex point 3.2
Existing infrastructure
Art. 5 (3)
Infrastructure under Construction
Art. 1(2)+ 2(4) + 4 + 5 (1) a)
Planned infrastructure (FID)
Art. 1(2) + 2(3) + 4 + 5 (1) a)
Additions to be commissioned (Under construction + FID)
Art. 1(2) + 5 (1) c)
Infrastructure to be decommissioned
Art. 1(2) + 2(5) + 5 (2)
Position at 1/1/Y
Position at 31/3/Y
Position at 31/3/Y
Y+ [0-2]
Y + [3-5]
Y + [0-2]
Y + [3-5]
Length (km)
Number
Length (km)
Number
Length (km)
Number
Length (km)
Length (km)
Number
Length (km)
Length (km)
Overhead lines (≥220 kv minimum) designed for the voltage commonly used at national level for interconnections lines (select the range)
Annex 3.2
AC
[220-299 kV]
[300-359 kV]
[360-499 kV]
[x]*
DC
300-499 MW
500-699 MW
700-999 MW
1 000-1 199 MW
other
Underground lines (≥ 150 kV)
AC
[150-199 kV]
[220-299 kV]
[300-359 kV]
[360-499 kV]
other
Text of image
Member State
Type of infrastructure
Annex point 3.2
Existing infrastructure
Art. 5(3)
Infrastructure under Construction
Art. 1(2) + 2(4) + 4 + 5 (1) a)
Planned infrastructure (FID)
Art. 1(2) + 2(3) + 4 + 5 (1) a)
Additions to be commissioned (Under construction + FID)
Art. 1(2) + 5 (1) c)
Infrastructure to be decommissioned
Art. 1(2) + 2(5) + 5 (2)
Position at 1/1/Y
Position at 31/3/Y
Position at 31/3/Y
Y + [0-2]
Y + [3-5]
Y + [0-2]
Y + [3-5]
Length (km)
Number
Length (km)
Number
Length (km)
Number
Length (km)
Length (km)
Number
Length (km)
Length (km)
DC
300-499 MW
500-699 MW
700-999 MW
1 000-1 199 MW
other
Submarine lines (≥ 150 kV)
AC
[150-199 kV]
[220-299 kV]
[300-359 kV]
[380-499 kV]
other
DC
300-499 MW
500-699 MW
700-999 MW
1 000-1 199 MW
1 200-1 599 MW
other
Supplementary Info
Art. 5 (3)
Indication of e.g. the case of existing infrastructure non operational for a period of time exceeding 3 years
NB: under construction and FID ((Final Investment Decision) include renovation.
(1 ) Fill in in cases two voltage systems coexist within a single Member States.
Text of image
E3 - ELECTRICITY CROSS-BORDER TRANSMISSION
Reporting year 20XX
Member State
Type of infrastructure
Annex point 3.2
Existing infrastructure
Art. 5 (3)
Infrastructure under construction
Art. 1(2) + 2(4) + 4 + 5 (1) a)
Planned infrastructure (FID)
Art. 1(2) + 2(3) + 4 + 5 (1) a)
Additions to be commissioned
(under construction + FID)
Art. 1(2) + 5 (1) c)
Infrastructure to be decommissioned
Art. 1(2) + 2(5) + 5 (2)
TEN-E project
Annex 3.
Supplementary info
Art. 5(3)
Position at 1/1/Y
Position at 31/3/Y
Position at 31/3/Y
Y + [0-2]
Y + [3-5]
Y + [0-2]
Y + [3-5]
Characteristics of section in the reporting Member State (MS)
Voltage (kV)
Transmission capacities (MVA - AC MW - DC)
Length (km)
Voltage (kV)
Transmission capacities (MVA - AC MW - DC)
Length (km)
Voltage (kV)
Transmission capacities (MVA - AC MW - DC)
[Yes/No]
[Yes/No]
[Yes/No]
[Yes/No]
Ref.
Overhead lines
AC
Border (MS A - MS/Country B)
Substation 1 (A)-Substation 1 (B) no 1
DC
Border (MS A - MS/Country B)
Substation 1 (A)-Substation 1 (B) no 1
Underground lines
AC
Border (MS A - MS/Country B)
Substation 1 (A)-Substation 1 (B) no 1
DC
Text of image
Member State
Type of infrastructure
Annex point 3.2
Existing infrastructure
Art. 5 (3)
Infrastructure under construction
Art. 1(2) + 2(4) + 4 + 5 (1) a)
Planned infrastructure (FID)
Art. 1(2) + 2(3) + 4 + 5 (1) a)
Additions to be commissioned
(under construction + FID)
Art. 1(2) + 5 (1) c)
Infrastructure to be decommissioned
Art. 1(2) + 2(5) + 5 (2)
TEN-E project
Annex 3.
Supplementary info
Art. 5 (3)
Position at 1/1/Y
Position at 31/3/Y
Position at 31/3/Y
Y + [0-2]
Y + [3-5]
Y + [0-2]
Y + [3-5]
Characteristics of section in the reporting Member State (MS)
Voltage (kV)
Transmission capacities (MVA - AC MW - DC)
Length (km)
Voltage (kV)
Transmission capacities (MVA - AC MW - DC)
Length (km)
Voltage (kV)
Transmission capacities (MVA - AC MW - DC)
[Yes/No]
[Yes/No]
[Yes/No]
[Yes/No]
Ref.
Border (MS A - MS/Country B)
Substation 1 (A)-Substation 1 (B) no 1
Submarine lines
AC
Border (MS A - MS/Country B)
Substation 1 (A)-Substation 1 (B) no 1
DC
Border (MS A - MS/Country B)
Substation 1 (A)-Substation 1 (B) no 1
NB: Under construction and FID (Final Investment Decision) include renovation.
Text of image
B1 - BIOFUEL PRODUCTION
Reporting year 20XX
Member State
Type of infrastructure
Annex point 4
Existing infrastructure
Art. 5 (3)
Infrastructure under construction (1 )
Art. 1(2) + 2(4) + 4 + 5 (1) a)
Planned infrastructure (1 ) (FID)
Art. 1(2) + 2(3) + 4 + 5 (1) a)
Additions to be commissioned (1 ) (under construction + FID)
Art. 1(2) + 5 (1) c)
Infrastructure to be decommissioned (1 )
Art. 1(2) + 2(5) + 5 (2)
Position at 1/1/Y
Non-operational [> 3 Y]
Position at 31/3/Y
Position at 31/3/Y
Y + [0-2]
Y + [3-5]
Y + [0-2]
Y + [3-5]
Annual capacity (kt)
Annual capacity (kt)
Number
Annual capacity (kt)
Number
Annual capacity (kt)
Number
Annual capacity (kt)
Annual capacity (kt)
Number
Annual capacity (kt)
Annual capacity (kt)
Installations - Unprocessed refined oil
(Pure Plant Oil)
Installations - Biofuel from oil crops
FAME (Fatty Acid Methyl Ester) and FAEE (Fatty Acid Ethyl Ester)
Oils (Hydrotreated and Refinery Co-Processed Oils)
Other
Installations - Biofuel from sugar and starch crops
Ethanol
ETBE
Other
Installations - Biofuel from lignocellulosics
Ethanol
Synthetic Biofuel (2 )
Others
Methane installations from biogas
Supplementary Info
Art. 5 (3)
Indication of e.g. reasons for the investment, problems, delays for new infrastructure
NB: under construction and FID (Final Investment Decision) include renovation.
(1 ) Installations of a capacity ≥ 50 kt/year.
(2 ) Fischer-Tropsh, DME, ethanol, methanol, methane, pyrolysis oil etc.
Text of image
C1 - CO2 TRANSPORT
Reporting year 20XX
Member State
Type of infrastructure
Annex point 5.1
Existing infrastructure
Art. 5 (3)
Infrastructure under construction (1 )
Art.1(2) + 2(4) + 4 + 5 (1) a)
Planned infrastructure (FID) (1 )
Art. 1(2) + 2(3) + 4 + 5 (1) a)
Additions to be commissioned (under construction + FID) (1 )
Art. 1(2) + 5 (1) c)
Infrastructure to be decommissioned (1 )
Art. 1(2) + 2(5) + 5 (2)
Position at 1/1/Y
Position at 31/3/Y
Position at 31/3/Y
Y + [0-2]
Y + [3-5]
Y + [0-2]
Y + [3-5]
Length (km)
Number
Length (km)
Number
Length (km)
Number
Length (km)
Length (km)
Number
Length (km)
Length (km)
Dry CO2 transport pipeline
Liquid CO2 transport pipeline
Total power (MW)
Number
Total power (MW)
Number
Total power (MW)
Number
Total power (MW)
Total power (MW)
Number
Total power (MW)
Total power (MW)
Compressor stations
Supplementary Info
Art. 5 (3)
Indication of e.g. reasons for the investment, problems, delays for new infrastructure
NB: under construction and FID (Final Investment Decision) include renovation.
(1 ) Pipelines related to power generation plants and refining installations.
Text of image
C2 - CO2 STORAGE
Reporting year 20XX
Member State
Type of infrastructure
Annex point 5.2
Existing infrastructure
Art. 5(3)
Infrastructure under construction (1 )
Art. 1(2) + 2(4) + 4 + 5 (1) a)
Planned infrastructure (1 ) (FID)
Art. 1(2) + 2(3) + 4 + 5 (1) a)
Additions to be commissioned (Under construction + FID) (1 )
Art. 1(2) + 5 (1) c)
Infrastructure to be decommissioned (1 )
Art. 1(2) + 2(5) + 5 (2)
Position at 1/1/Y
Non-operational [> 3 Y]
Position at 31/3/Y
Position at 31/3/Y
Y + [0-2]
Y + [3-5]
Y + [0-2]
Y + [3-5]
Aquifer storage
Number
Total storage capacity [kt]
Injectability Max.injection capacity [t/d]
Depleted field
Number
Total storage capacity [kt]
Injectability Max.injection capacity [t/d]
Other
Supplementary Info
Art. 5 (3)
Indication of e.g. reasons for the investment, problems, delays for new infrastructure
NB: under construction and FID (Final Investment Decision) include renovation.
(1 ) Installations with a capacity ≥ 100 kt.