Council Regulation (EU) 2022/2577 of 22 December 2022 laying down a framework to accelerate the deployment of renewable energy
Consolidated text: Council Regulation (EU) 2022/2577 of 22 December 2022 laying down a framework to accelerate the deployment of renewable energy
Council Regulation (EU) 2022/2577 of 22 December 2022 laying down a framework to accelerate the deployment of renewable energy
02022R2577 — EN — 01.07.2024 — 002.001
This text is meant purely as a documentation tool and has no legal effect. The Union's institutions do not assume any liability for its contents. The authentic versions of the relevant acts, including their preambles, are those published in the Official Journal of the European Union and available in EUR-Lex. Those official texts are directly accessible through the links embedded in this document
COUNCIL REGULATION (EU) 2022/2577 of 22 December 2022 laying down a framework to accelerate the deployment of renewable energy (OJ L 335 29.12.2022, p. 36) |
Amended by:
|
|
Official Journal |
||
No |
page |
date |
||
L 223 |
1 |
10.1.2024 |
COUNCIL REGULATION (EU) 2022/2577
of 22 December 2022
laying down a framework to accelerate the deployment of renewable energy
Article 1
Subject matter and scope
This Regulation establishes temporary rules of an emergency nature to accelerate the permit-granting process applicable to the production of energy from renewable energy sources, with a particular focus on specific renewable energy technologies or types of projects which are capable of achieving a short term acceleration of the pace of deployment of renewables in the Union.
This Regulation applies to all permit-granting processes that have a starting date within the period of its application and is without prejudice to national provisions establishing shorter deadlines than those laid down in Article 5(1).
Member States may also apply this Regulation to ongoing permit granting processes which have not resulted in a final decision before 30 December 2022, provided that this shortens the permit granting process and that pre-existing third party legal rights are preserved.
Article 2
Definitions
For the purposes of this Regulation, the definitions set out in Article 2 of Directive (EU) 2018/2001 of the European Parliament and of the Council ( 1 ) shall apply. In addition, the following definitions shall apply:
‘permit-granting process’ means the process:
comprising all relevant administrative permits issued to build, repower and operate plants for the production of energy from renewable sources including heat pumps, co-located energy storage facilities, and assets necessary for their connection to the grid, including grid connection permits and environmental impact assessments where those are required; and
comprising all administrative stages starting from the acknowledgment of the reception of the complete application by the relevant authority and ending with the notification of the final decision on the outcome of the process by the relevant authority;
‘solar energy equipment’ means equipment that converts energy from the sun into thermal or electrical energy, including solar thermal and solar photovoltaic equipment.
Article 3
Overriding public interest
Concerning species protection, the first subparagraph shall only apply if and to the extent that appropriate species conservation measures contributing to the maintenance or restoration of the populations of the species at a favourable conservation status are undertaken and sufficient financial resources as well as areas are made available for that purpose.
Article 3a
Absence of alternative or satisfactory solutions
Article 4
Accelerating the permit-granting process for the installation of solar energy equipment
Article 5
Repowering of renewable energy power plants
Article 6
Acceleration of the permit-granting process of renewable energy projects and for related grid infrastructure which is necessary to integrate renewables into the system
Member States may exempt renewable energy projects, as well as energy storage projects and electricity grid projects which are necessary to integrate renewable energy into the electricity system, from the environmental impact assessment under Article 2(1) of Directive 2011/92/EU and from the species protection assessments under Article 12(1) of Directive 92/43/EEC and under Article 5 of Directive 2009/147/EC, provided that the project is located in a dedicated renewable or grid area for a related grid infrastructure which is necessary to integrate renewable energy into the electricity system, if Member States have set any renewable or grid area, and that the area has been subjected to a strategic environmental assessment in accordance with Directive 2001/42/EC of the European Parliament and of the Council ( 5 ). The competent authority shall ensure that, on the basis of existing data, appropriate and proportionate mitigation measures are applied in order to ensure compliance with Article 12(1) of Directive 92/43/EEC and Article 5 of Directive 2009/147/EC. Where those measures are not available, the competent authority shall ensure that the operator pays a monetary compensation for species protection programmes in order to secure or improve the conservation status of the species affected.
Article 7
Acceleration of the deployment of heat pumps
Unless there are justified safety concerns, further works are needed for grid connections or there is technical incompatibility of the system components, connections to the transmission or distribution grid shall be permitted following notification to the relevant entity for:
heat pumps of up to 12 kW electrical capacity; and
heat pumps installed by a renewables self-consumer of up to 50 kW electrical capacity, provided the capacity of the renewables self-consumer’s renewable electricity generation installation amounts to at least 60% of the capacity of the heat pump.
Article 8
Timelines for the permit-granting process for the repowering of renewable energy power plants in dedicated renewable or grid areas referred to in Article 6
When applying the deadlines referred to in Article 5(1), the following time shall not be counted as falling within those deadlines except where it coincides with other administrative stages of the permit-granting process:
the time during which the plants, their grid connections and, with a view to ensuring grid stability, grid reliability and grid safety, the related necessary grid infrastructure are being built or repowered; and
the time spent on the administrative stages necessary for significant upgrades to the grid required in order to ensure grid stability, grid reliability and grid safety.
Article 9
Review
By 31 December 2023 at the latest, the Commission shall carry out a review of this Regulation in view of the development of the security of supply and energy prices and the need to further accelerate the deployment of renewable energy. It shall present a report on the main findings of that review to the Council. The Commission may, based on that report, propose to prolong the validity of this Regulation.
Article 10
Entry into force and application
This Regulation shall enter into force on the day following that of its publication in the Official Journal of the European Union.
It shall apply for a period of 18 months from its entry into force.
However, Article 1, Article 2, point (1), Article 3(2), Article 3a, Article 5(1), Article 6 and Article 8 shall apply until 30 June 2025.
This Regulation shall be binding in its entirety and directly applicable in all Member States.
( 1 ) Directive (EU) 2018/2001 of the European Parliament and of the Council of 11 December 2018 on the promotion of the use of energy from renewable sources (OJ L 328, 21.12.2018, p. 82).
( 2 ) Council Directive 92/43/EEC of 21 May 1992 on the conservation of natural habitats and of wild fauna and flora (OJ L 206, 22.7.1992, p. 7).
( 3 ) Directive 2000/60/EC of the European Parliament and of the Council of 23 October 2000 establishing a framework for Community action in the field of water policy (OJ L 327, 22.12.2000, p. 1).
( 4 ) Directive 2009/147/EC of the European Parliament and of the Council of 30 November 2009 on the conservation of wild birds (OJ L 20, 26.1.2010, p. 7).
( 5 ) Directive 2001/42/EC of the European Parliament and of the Council of 27 June 2001 on the assessment of the effects of certain plans and programmes on the environment (OJ L 197, 21.7.2001, p. 30).