This document is an excerpt from the EUR-Lex website
Document 32002D0731R(01)
Corrigendum to Commission Decision 2002/731/EC of 30 May 2002 concerning the technical specification for interoperability relating to the control-command and signalling subsystem of the trans-European high-speed rail system referred to in Article 6(1) of Council Directive 96/48/EC
Corrigendum to Commission Decision 2002/731/EC of 30 May 2002 concerning the technical specification for interoperability relating to the control-command and signalling subsystem of the trans-European high-speed rail system referred to in Article 6(1) of Council Directive 96/48/EC
Corrigendum to Commission Decision 2002/731/EC of 30 May 2002 concerning the technical specification for interoperability relating to the control-command and signalling subsystem of the trans-European high-speed rail system referred to in Article 6(1) of Council Directive 96/48/EC
OJ L 275, 11.10.2002, pp. 3–4
(ES, DA, DE, EL, EN, FR, IT, NL, PT, FI, SV)
ELI: http://data.europa.eu/eli/dec/2002/731/corrigendum/2002-10-11/oj
Corrigendum to Commission Decision 2002/731/EC of 30 May 2002 concerning the technical specification for interoperability relating to the control-command and signalling subsystem of the trans-European high-speed rail system referred to in Article 6(1) of Council Directive 96/48/EC
Official Journal L 275 , 11/10/2002 P. 0003 - 0004
Corrigendum to Commission Decision 2002/731/EC of 30 May 2002 concerning the technical specification for interoperability relating to the control-command and signalling subsystem of the trans-European high-speed rail system referred to in Article 6(1) of Council Directive 96/48/EC (Official Journal of the European Communities L 245 of 12 September 2002) On page 41, in the Annex, after the title "TECHNICAL SPECIFICATION FOR INTEROPERABILITY RELATING TO THE CONTROL-COMMAND AND SIGNALLING SUBSYSTEM" insert the following table of contents: "CONTENTS >TABLE>"