EUR-Lex Access to European Union law

Back to EUR-Lex homepage

This document is an excerpt from the EUR-Lex website

Document 52011PC0189

Proposal for a DIRECTIVE OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL on the assessment of the effects of certain public and private projects on the environment

/* COM/2011/0189 final - COD 2011/0080 */

52011PC0189

/* COM/2011/0189 final - COD 2011/0080 */ Proposal for a DIRECTIVE OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL on the assessment of the effects of certain public and private projects on the environment


[pic] | EUROPEAN COMMISSION |

Brussels, 12.4.2011

COM(2011) 189 final

2011/0080 (COD)

Proposal for a

DIRECTIVE OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

on the assessment of the effects of certain public and private projects on the environment

(Codification)

EXPLANATORY MEMORANDUM

1. In the context of a people’s Europe, the Commission attaches great importance to simplifying and clarifying the law of the Union so as to make it clearer and more accessible to citizens, thus giving them new opportunities and the chance to make use of the specific rights it gives them.

This aim cannot be achieved so long as numerous provisions that have been amended several times, often quite substantially, remain scattered, so that they must be sought partly in the original instrument and partly in later amending ones. Considerable research work, comparing many different instruments, is thus needed to identify the current rules.

For this reason a codification of rules that have frequently been amended is also essential if the law is to be clear and transparent.

2. On 1 April 1987 the Commission decided[1] to instruct its staff that all acts should be codified after no more than ten amendments, stressing that this is a minimum requirement and that departments should endeavour to codify at even shorter intervals the texts for which they are responsible, to ensure that their provisions are clear and readily understandable.

3. The Conclusions of the Presidency of the Edinburgh European Council (December 1992) confirmed this[2], stressing the importance of codification as it offers certainty as to the law applicable to a given matter at a given time.

Codification must be undertaken in full compliance with the normal procedure for the adoption of acts of the Union.

Given that no changes of substance may be made to the instruments affected by codification , the European Parliament, the Council and the Commission have agreed, by an interinstitutional agreement dated 20 December 1994, that an accelerated procedure may be used for the fast-track adoption of codification instruments.

4. The purpose of this proposal is to undertake a codification of Council Directive 85/337/EEC of 27 June 1985 on the assessment of the effects of certain public and private projects on the environment[3] . The new Directive will supersede the various acts incorporated in it[4]; this proposal fully preserves the content of the acts being codified and hence does no more than bring them together with only such formal amendments as are required by the codification exercise itself.

5. The codification proposal was drawn up on the basis of a preliminary consolidation , in 22 official languages, of Directive 85/337/EEC and the instruments amending it, carried out by the Publications Office of the European Union, by means of a data-processing system . Where the Articles have been given new numbers, the correlation between the old and the new numbers is shown in a table contained in Annex VI to the codified Directive.

ê 85/337/EEC (adapted)

2011/0080 (COD)

Proposal for a

DIRECTIVE OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

on the assessment of the effects of certain public and private projects on the environment

(Codification)

(Text with EEA relevance)

THE EUROPEAN PARLIAMENT AND THE COUNCIL OF THE EUROPEAN UNION,

Having regard to the Treaty Ö on the Functioning of the European Union Õ, and in particular Article Ö 192(1) Õ thereof,

Having regard to the proposal from the European Commission,

After transmission of the draft legislative act to the national Parliaments,

Having regard to the opinion of the European Economic and Social Committee[5],

Having regard to the opinion of the Committee of the Regions[6],

Acting in accordance with the ordinary legislative procedure[7],

Whereas:

ê

1. Council Directive 85/337/EEC of 27 June 1985 on the assessment of the effects of certain public and private projects on the environment[8] has been substantially amended several times[9]. In the interests of clarity and rationality the said Directive should be codified.

ê 97/11/EC recital 2 (adapted)

è1 85/337/EEC recital 1, 2nd sentence (adapted)

2. Pursuant to Article Ö 191 Õ of the Treaty Ö on the Functioning of the European Union Õ, Ö Union Õ policy on the environment is based on the precautionary principle and on the principle that preventive action should be taken, that environmental damage should as a priority be rectified at source and that the polluter should pay. è1 Effects on the environment Ö should be taken Õ into account at the earliest possible stage in all the technical planning and decision-making processes. ç

ê 85/337/EEC recital 7 (adapted)

è1 97/11/EC recital 3 (adapted)

3. The principles of the assessment of environmental effects should be harmonised, in particular with reference to the projects which should be subject to assessment, the main obligations of the developers and the content of the assessment. è1 The Member States may lay down stricter rules to protect the environment. ç

ê 85/337/EEC recital 3 (adapted)

4. In addition, it is necessary to achieve one of the objectives Ö of the Union Õ in the sphere of the protection of the environment and the quality of life.

ê 2003/35/EC recital 2 (adapted)

5. Environmental legislation Ö of the Union Õ includes provisions for public authorities and other bodies to take decisions which may have a significant effect on the environment as well as on personal health and well-being.

ê 85/337/EEC recital 5 (adapted)

6. General principles for the assessment of environmental effects should be Ö laid down Õ with a view to supplementing and coordinating development consent procedures governing public and private projects likely to have a major effect on the environment.

ê 85/337/EEC recital 6 (adapted)

7. Development consent for public and private projects which are likely to have significant effects on the environment should be granted only after a prior assessment of the likely significant environmental effects of those projects has been carried out. Ö That Õ assessment Ö should Õ be conducted on the basis of the appropriate information supplied by the developer, which may be supplemented by the authorities and by the Ö public likely to Õ be concerned by the project in question.

ê 85/337/EEC recital 8 (adapted)

8. Projects belonging to certain types have significant effects on the environment and Ö those Õ projects Ö should Õ as a rule be subject to a systematic assessment.

ê 85/337/EEC recital 9 (adapted)

è1 97/11/EC recital 7 (adapted)

9. Projects of other types may not have significant effects on the environment in every case and Ö those Õ projects should be assessed where the Member States consider that è1 they are likely to have significant effects on the environment ç.

ê 97/11/EC recital 8

10. Member States may set thresholds or criteria for the purpose of determining which such projects should be subject to assessment on the basis of the significance of their environmental effects. Member States should not be required to examine projects below those thresholds or outside those criteria on a case-by-case basis.

ê 97/11/EC recital 9 (adapted)

11. When setting such thresholds or criteria or examining projects on a case-by-case basis for the purpose of determining which projects should be subject to assessment on the basis of their significant environmental effects, Member States should take account of the relevant selection criteria set out in this Directive. In accordance with the subsidiarity principle, the Member States are in the best position to apply Ö those Õ criteria in specific instances.

ê 85/337/EEC recital 10 (adapted)

12. For projects which are subject to assessment, a certain minimal amount of information Ö should Õ be supplied, concerning the project and its effects.

ê 97/11/EC recital 11 (adapted)

13. It is appropriate to Ö lay down Õ a procedure in order to enable the developer to obtain an opinion from the competent authorities on the content and extent of the information to be elaborated and supplied for the assessment. Member States, in the framework of this procedure, may require the developer to provide, inter alia , alternatives for the projects for which it intends to submit an application.

ê 85/337/EEC recital 11 (adapted)

14. The effects of a project on the environment Ö should Õ be assessed in order to take account of concerns to protect human health, to contribute by means of a better environment to the quality of life, to ensure maintenance of the diversity of species and to maintain the reproductive capacity of the ecosystem as a basic resource for life.

ê 97/11/EC recital 12 (adapted)

è1 97/11/EC recital 13

15. It is desirable to Ö lay down strengthened Õ provisions concerning environmental impact assessment in a transboundary context to take account of developments at international level. è1 The Community signed the Convention on Environmental Impact Assessment in a Transboundary Context on 25 February 1991, Ö and ratified it on 24 June 1997. Õ ç

ê 2003/35/EC recital 3

16. Effective public participation in the taking of decisions enables the public to express, and the decision-maker to take account of, opinions and concerns which may be relevant to those decisions, thereby increasing the accountability and transparency of the decision-making process and contributing to public awareness of environmental issues and support for the decisions taken.

ê 2003/35/EC recital 4

17. Participation, including participation by associations, organisations and groups, in particular non-governmental organisations promoting environmental protection, should accordingly be fostered, including inter alia by promoting environmental education of the public.

ê 2003/35/EC recital 5 (adapted)

18. The Community signed the UN/ECE Convention on Access to Information, Public Participation in Decision-Making and Access to Justice in Environmental Matters (the Århus Convention) on 25 June 1998 Ö and ratified it on 17 February 2005 Õ.

ê 2003/35/EC recital 6

19. Among the objectives of the Århus Convention is the desire to guarantee rights of public participation in decision-making in environmental matters in order to contribute to the protection of the right to live in an environment which is adequate for personal health and well-being.

ê 2003/35/EC recital 7

20. Article 6 of the Århus Convention provides for public participation in decisions on the specific activities listed in Annex I thereto and on activities not so listed which may have a significant effect on the environment.

ê 2003/35/EC recital 9

21. Article 9(2) and (4) of the Århus Convention provides for access to judicial or other procedures for challenging the substantive or procedural legality of decisions, acts or omissions subject to the public participation provisions of Article 6 of the Convention.

ê 85/337/EEC recital 12 (adapted)

22. However, this Directive should not be applied to projects the details of which are adopted by a specific act of national legislation, since the objectives of this Directive are achieved through the legislative process.

ê 85/337/EEC recital 13 (adapted)

23. Furthermore, it may be appropriate in exceptional cases to exempt a specific project from the assessment procedures laid down by this Directive, subject to appropriate information being supplied to the Commission Ö and to the public Õ.

ê 2003/35/EC recital 12 (adapted)

24. Since the Ö objectives Õ of the proposed action cannot be sufficiently achieved by the Member States and can therefore, by reason of the scale and effects of the action, be better achieved at Ö Union Õ level, the Ö Union Õ may adopt measures in accordance with the principle of subsidiarity as set out in Article 5 of the Treaty Ö on European Union Õ. In accordance with the principle of proportionality, as set out in that Article, this Directive does not go beyond what is necessary in order to achieve Ö those objectives Õ.

ê

25. This Directive should be without prejudice to the obligations of the Member States relating to the time-limits for transposition into national law of the Directives set out in Annex V, Part B,

ê 85/337/EEC (adapted)

HAVE ADOPTED THIS DIRECTIVE:

Article 1

1. This Directive shall apply to the assessment of the environmental effects of those public and private projects which are likely to have significant effects on the environment.

2. For the purposes of this Directive Ö , the following definitions shall apply Õ:

(a) ‘project’ means:

26. the execution of construction works or of other installations or schemes,

27. other interventions in the natural surroundings and landscape including those involving the extraction of mineral resources;

(b) ‘developer’ means the applicant for authorisation for a private project or the public authority which initiates a project;

(c) ‘development consent’ means the decision of the competent authority or authorities which entitles the developer to proceed with the project;

ê 2003/35/EC Art. 3 pt. 1

(d) ‘public’ means one or more natural or legal persons and, in accordance with national legislation or practice, their associations, organisations or groups;

(e) ‘public concerned’ means the public affected or likely to be affected by, or having an interest in, the environmental decision-making procedures referred to in Article 2(2); for the purposes of this definition, non-governmental organisations promoting environmental protection and meeting any requirements under national law shall be deemed to have an interest;

ê 85/337/EEC (adapted)

(f) ‘competent authority or authorities’ Ö means Õ that authority or those authorities which the Member States designate as responsible for performing the duties arising from this Directive.

ê 2003/35/EC Art. 3 pt. 2

3. Member States may decide, on a case-by-case basis if so provided under national law, not to apply this Directive to projects serving national defence purposes, if they deem that such application would have an adverse effect on these purposes.

ê 85/337/EEC (adapted)

4. This Directive shall not apply to projects the details of which are adopted by a specific act of national legislation, since the objectives of this Directive are achieved through the legislative process.[Article 2

ê 97/11/EC Art. 1 pt. 1

1. Member States shall adopt all measures necessary to ensure that, before consent is given, projects likely to have significant effects on the environment by virtue, inter alia , of their nature, size or location are made subject to a requirement for development consent and an assessment with regard to their effects. These projects are defined in Article 4.

ê 85/337/EEC

2. The environmental impact assessment may be integrated into the existing procedures for consent to projects in the Member States, or, failing this, into other procedures or into procedures to be established to comply with the aims of this Directive.

ê 97/11/EC Art. 1 pt. 2 (adapted)

3. Member States may provide for a single procedure in order to fulfil the requirements of this Directive and the requirements of Directive Ö [2008/1/EC] of the European Parliament and of the Council Õ[10].

ê 97/11/EC Art. 1 pt. 3

4. Without prejudice to Article 7, Member States may, in exceptional cases, exempt a specific project in whole or in part from the provisions laid down in this Directive.

ê 85/337/EEC

In that event, the Member States shall:

ê 2003/35/EC Art. 3 pt. 3

(a) consider whether another form of assessment would be appropriate;

(b) make available to the public concerned the information obtained under other forms of assessment referred to in point (a), the information relating to the exemption decision and the reasons for granting it;

ê 85/337/EEC (adapted)

è1 97/11/EC Art. 1 pt. 4

(c) inform the Commission, prior to granting consent, of the reasons justifying the exemption granted, and provide it with the information made available, è1 where applicable ç, to their own nationals.

The Commission shall immediately forward the documents received to the other Member States.

The Commission shall report annually to Ö the European Parliament and to Õ the Council on the application of this paragraph.

ê 97/11/EC Art. 1 pt. 5

Article 3

The environmental impact assessment shall identify, describe and assess in an appropriate manner, in the light of each individual case and in accordance with Articles 4 to 12, the direct and indirect effects of a project on the following factors:

(a) human beings, fauna and flora;

(b) soil, water, air, climate and the landscape;

(c) material assets and the cultural heritage;

(d) the interaction between the factors referred to in points (a), (b) and (c).

ê 97/11/EC Art. 1 pt. 6 (adapted)

Article 4

1. Subject to Article 2 (4), projects listed in Annex I shall be made subject to an assessment in accordance with Articles 5 to 10.

2. Subject to Article 2 (4), for projects listed in Annex II, the Member States shall determine whether the project shall be made subject to an assessment in accordance with Articles 5 to 10. Ö Member States shall make that determination Õ through:

(a) a case-by-case examination,

or

(b) thresholds or criteria set by the Member State.

Member States may decide to apply both procedures referred to in points (a) and (b).

3. When a case-by-case examination is carried out or thresholds or criteria are set for the purpose of paragraph 2, the relevant selection criteria set out in Annex III shall be taken into account.

4. Member States shall ensure that the determination made by the competent authorities under paragraph 2 is made available to the public.

ê 97/11/EC Art. 1 pt. 7

Article 5

1. In the case of projects which, pursuant to Article 4, must be made subject to an environmental impact assessment in accordance with Articles 5 to 10, Member States shall adopt the necessary measures to ensure that the developer supplies in an appropriate form the information specified in Annex IV inasmuch as:

(a) the Member States consider that the information is relevant to a given stage of the consent procedure and to the specific characteristics of a particular project or type of project and of the environmental features likely to be affected;

(b) the Member States consider that a developer may reasonably be required to compile this information having regard inter alia to current knowledge and methods of assessment.

2. Member States shall take the necessary measures to ensure that, if the developer so requests before submitting an application for development consent, the competent authority shall give an opinion on the information to be supplied by the developer in accordance with paragraph 1. The competent authority shall consult the developer and authorities referred to in Article 6(1) before it gives its opinion. The fact that the authority has given an opinion under this paragraph shall not preclude it from subsequently requiring the developer to submit further information.

Member States may require the competent authorities to give such an opinion, irrespective of whether the developer so requests.

3. The information to be provided by the developer in accordance with paragraph 1 shall include at least:

(a) a description of the project comprising information on the site, design and size of the project;

(b) a description of the measures envisaged in order to avoid, reduce and, if possible, remedy significant adverse effects;

(c) the data required to identify and assess the main effects which the project is likely to have on the environment;

(d) an outline of the main alternatives studied by the developer and an indication of the main reasons for his choice, taking into account the environmental effects;

(e) a non-technical summary of the information referred to in points (a) to (d).

4. Member States shall, if necessary, ensure that any authorities holding relevant information, with particular reference to Article 3, shall make this information available to the developer.

ê 85/337/EEC

Article 6

ê 97/11/EC Art. 1 pt. 8

1. Member States shall take the measures necessary to ensure that the authorities likely to be concerned by the project by reason of their specific environmental responsibilities are given an opportunity to express their opinion on the information supplied by the developer and on the request for development consent. To this end, Member States shall designate the authorities to be consulted, either in general terms or on a case-by-case basis. The information gathered pursuant to Article 5 shall be forwarded to those authorities. Detailed arrangements for consultation shall be laid down by the Member States.

ê 2003/35/EC Art. 3 pt. 4

2. The public shall be informed, whether by public notices or other appropriate means such as electronic media where available, of the following matters early in the environmental decision-making procedures referred to in Article 2(2) and, at the latest, as soon as information can reasonably be provided:

(a) the request for development consent;

(b) the fact that the project is subject to an environmental impact assessment procedure and, where relevant, the fact that Article 7 applies;

(c) details of the competent authorities responsible for taking the decision, those from which relevant information can be obtained, those to which comments or questions can be submitted, and details of the time schedule for transmitting comments or questions;

(d) the nature of possible decisions or, where there is one, the draft decision;

(e) an indication of the availability of the information gathered pursuant to Article 5;

(f) an indication of the times and places where and means by which the relevant information will be made available;

(g) details of the arrangements for public participation made pursuant to paragraph 5 of this Article.

3. Member States shall ensure that, within reasonable time-frames, the following is made available to the public concerned:

(a) any information gathered pursuant to Article 5;

(b) in accordance with national legislation, the main reports and advice issued to the competent authority or authorities at the time when the public concerned is informed in accordance with paragraph 2 of this Article;

ê 2003/35/EC Art. 3 pt. 4 (adapted)

(c) in accordance with the provisions of Directive 2003/4/EC of the European Parliament and of the Council[11], information other than that referred to in paragraph 2 of this Article which is relevant for the decision in accordance with Article 8 Ö of this Directive Õ and which only becomes available after the time the public concerned was informed in accordance with paragraph 2 of this Article.

ê 2003/35/EC Art. 3 pt. 4

4. The public concerned shall be given early and effective opportunities to participate in the environmental decision-making procedures referred to in Article 2(2) and shall, for that purpose, be entitled to express comments and opinions when all options are open to the competent authority or authorities before the decision on the request for development consent is taken.

5. The detailed arrangements for informing the public (for example by bill posting within a certain radius or publication in local newspapers) and for consulting the public concerned (for example by written submissions or by way of a public inquiry) shall be determined by the Member States.

6. Reasonable time-frames for the different phases shall be provided, allowing sufficient time for informing the public and for the public concerned to prepare and participate effectively in environmental decision-making subject to the provisions of this Article.

ê 97/11/EC Art. 1 pt. 9

Article 7

ê 2003/35/EC Art. 3 pt. 5(a) (adapted)

1. Where a Member State is aware that a project is likely to have significant effects on the environment in another Member State or where a Member State likely to be significantly affected so requests, the Member State in whose territory the project is intended to be carried out shall send to the affected Member State as soon as possible and no later than when informing its own public, inter alia :

(a) a description of the project, together with any available information on its possible transboundary impact;

(b) information on the nature of the decision which may be taken.

Ö The Member State in whose territory the project is intended to be carried out Õ shall give the other Member State a reasonable time in which to indicate whether it wishes to participate in the environmental decision-making procedures referred to in Article 2(2), and may include the information referred to in paragraph 2 of this Article.

2. If a Member State which receives information pursuant to paragraph 1 indicates that it intends to participate in the environmental decision-making procedures referred to in Article 2(2), the Member State in whose territory the project is intended to be carried out shall, if it has not already done so, send to the affected Member State the information required to be given pursuant to Article 6(2) and made available pursuant to Article 6(3)(a) and (b).

ê 97/11/EC Art. 1 pt. 9 (adapted)

3. The Member States concerned, each insofar as it is concerned, shall also:

(a) arrange for the information referred to in paragraphs 1 and 2 to be made available, within a reasonable time, to the authorities referred to in Article 6 (1) and the public concerned in the territory of the Member State likely to be significantly affected; and

(b) ensure that Ö the Õ authorities Ö referred to in Article 6(1) Õ and the public concerned are given an opportunity, before development consent for the project is granted, to forward their opinion within a reasonable time on the information supplied to the competent authority in the Member State in whose territory the project is intended to be carried out.

4. The Member States concerned shall enter into consultations regarding, inter alia , the potential transboundary effects of the project and the measures envisaged to reduce or eliminate such effects and shall agree on a reasonable time frame for the duration of the consultation period.

ê 2003/35/EC Art. 3 pt. 5(b)

5. The detailed arrangements for implementing this Article may be determined by the Member States concerned and shall be such as to enable the public concerned in the territory of the affected Member State to participate effectively in the environmental decision-making procedures referred to in Article 2(2) for the project.

ê 97/11/EC Art. 1 pt. 10 (adapted)

Article 8

The results of consultations and the information gathered pursuant to Articles 5, 6 and 7 Ö shall Õ be taken into consideration in the development consent procedure.

ê 97/11/EC Art. 1 pt. 11

Article 9

ê 2003/35/EC Art. 3 pt. 6(a)

1. When a decision to grant or refuse development consent has been taken, the competent authority or authorities shall inform the public thereof in accordance with the appropriate procedures and shall make available to the public the following information:

(a) the content of the decision and any conditions attached thereto;

(b) having examined the concerns and opinions expressed by the public concerned, the main reasons and considerations on which the decision is based, including information about the public participation process;

(c) a description, where necessary, of the main measures to avoid, reduce and, if possible, offset the major adverse effects.

ê 2003/35/EC Art. 3 pt. 6(b)

2. The competent authority or authorities shall inform any Member State which has been consulted pursuant to Article 7, forwarding to it the information referred to in paragraph 1 of this Article.

The consulted Member States shall ensure that that information is made available in an appropriate manner to the public concerned in their own territory.

ê 97/11/EC Art. 1 pt. 12 (adapted)

Article 10

The provisions of this Directive shall not affect the obligation on the competent authorities to respect the limitations imposed by national Ö laws, Õ regulations and administrative provisions and accepted legal practices with regard to commercial and industrial confidentiality, including intellectual property, and the safeguarding of the public interest.

Where Article 7 applies, the transmission of information to another Member State and the receipt of information by another Member State shall be subject to the limitations in force in the Member State in which the project is proposed.

ê 2003/35/EC Art. 3 pt. 7

Article 11

1. Member States shall ensure that, in accordance with the relevant national legal system, members of the public concerned:

(a) having a sufficient interest, or alternatively,

(b) maintaining the impairment of a right, where administrative procedural law of a Member State requires this as a precondition,

have access to a review procedure before a court of law or another independent and impartial body established by law to challenge the substantive or procedural legality of decisions, acts or omissions subject to the public participation provisions of this Directive.

2. Member States shall determine at what stage the decisions, acts or omissions may be challenged.

3. What constitutes a sufficient interest and impairment of a right shall be determined by the Member States, consistently with the objective of giving the public concerned wide access to justice. To this end, the interest of any non-governmental organisation meeting the requirements referred to in Article 1(2), shall be deemed sufficient for the purpose of point (a) of paragraph 1 of this Article. Such organisations shall also be deemed to have rights capable of being impaired for the purpose of point (b) of paragraph 1 of this Article.

4. The provisions of this Article shall not exclude the possibility of a preliminary review procedure before an administrative authority and shall not affect the requirement of exhaustion of administrative review procedures prior to recourse to judicial review procedures, where such a requirement exists under national law.

Any such procedure shall be fair, equitable, timely and not prohibitively expensive.

5. In order to further the effectiveness of the provisions of this Article, Member States shall ensure that practical information is made available to the public on access to administrative and judicial review procedures.

ê 85/337/EEC

Article 12

1. The Member States and the Commission shall exchange information on the experience gained in applying this Directive.

ê 97/11/EC Art. 1 pt. 13

2. In particular, Member States shall inform the Commission of any criteria and/or thresholds adopted for the selection of the projects in question, in accordance with Article 4 (2).

ê 85/337/EEC (adapted)

3. On the basis of this exchange of information, the Commission shall Ö if necessary Õ submit additional proposals Ö to the European Parliament and to the Council Õ, with a view to Ö ensuring that Õ this Directive Ö is Õ applied in a sufficiently coordinated manner.

Article 13

Member States shall communicate to the Commission the texts of the provisions of national law which they adopt in the field covered by this Directive.

ê

Article 14

Directive 85/337/EEC, as amended by the Directives listed in Annex V, Part A, is repealed, without prejudice to the obligations of the Member States relating to the time-limits for transposition into national law of the Directives set out in Annex V, Part B.

References to the repealed Directive shall be construed as references to this Directive and shall be read in accordance with the correlation table in Annex VI.

Article 15

This Directive shall enter into force on the twentieth day following that of its publication in the Official Journal of the European Union .

ê 85/337/EEC

Article 16

This Directive is addressed to the Member States.

Done at Brussels

For the European Parliament For the Council

The President The President

ê 97/11/EC Art. 1 pt. 15 and Annex (adapted)

ANNEX I

PROJECTS Ö REFERRED Õ TO Ö IN Õ ARTICLE 4(1)

1. Crude-oil refineries (excluding undertakings manufacturing only lubricants from crude oil) and installations for the gasification and liquefaction of 500 tonnes or more of coal or bituminous shale per day.

2. (a) Thermal power stations and other combustion installations with a heat output of 300 megawatts or more;

ê 97/11/EC Art. 1 pt. 15 and Annex

(b) Nuclear power stations and other nuclear reactors including the dismantling or decommissioning of such power stations or reactors[12] (except research installations for the production and conversion of fissionable and fertile materials, whose maximum power does not exceed 1 kilowatt continuous thermal load).

3. (a) Installations for the reprocessing of irradiated nuclear fuel;

(b) Installations designed:

(i) for the production or enrichment of nuclear fuel,

(ii) for the processing of irradiated nuclear fuel or high-level radioactive waste,

(iii) for the final disposal of irradiated nuclear fuel,

(iv) solely for the final disposal of radioactive waste,

(v) solely for the storage (planned for more than 10 years) of irradiated nuclear fuels or radioactive waste in a different site than the production site.

4. (a) Integrated works for the initial smelting of cast-iron and steel;

(b) Installations for the production of non-ferrous crude metals from ore, concentrates or secondary raw materials by metallurgical, chemical or electrolytic processes.

5. Installations for the extraction of asbestos and for the processing and transformation of asbestos and products containing asbestos: for asbestos-cement products, with an annual production of more than 20 000 tonnes of finished products, for friction material, with an annual production of more than 50 tonnes of finished products, and for other uses of asbestos, utilisation of more than 200 tonnes per year.

6. Integrated chemical installations, namely those installations for the manufacture on an industrial scale of substances using chemical conversion processes, in which several units are juxtaposed and are functionally linked to one another and which are:

(a) for the production of basic organic chemicals;

(b) for the production of basic inorganic chemicals;

(c) for the production of phosphorous-, nitrogen- or potassium-based fertilisers (simple or compound fertilisers);

(d) for the production of basic plant health products and of biocides;

(e) for the production of basic pharmaceutical products using a chemical or biological process;

(f) for the production of explosives.

7. (a) Construction of lines for long-distance railway traffic and of airports with a basic runway length of 2 100 m or more;

ê 97/11/EC Art. 1 pt. 15 and Annex (adapted)

For the purposes of this Directive, ‘airport’ means Ö an Õ airport which Ö complies Õ with the definition in the 1944 Chicago Convention setting up the International Civil Aviation Organization (Annex 14);

ê 97/11/EC Art. 1 pt. 15 and Annex

(b) Construction of motorways and express roads;

For the purposes of the Directive, ‘express road’ means a road which complies with the definition in the European Agreement on Main International Traffic Arteries of 15 November 1975;

(c) Construction of a new road of four or more lanes, or realignment and/or widening of an existing road of two lanes or less so as to provide four or more lanes, where such new road, or realigned and/or widened section of road would be 10 km or more in a continuous length.

8. (a) Inland waterways and ports for inland-waterway traffic which permit the passage of vessels of over 1 350 tonnes;

(b) Trading ports, piers for loading and unloading connected to land and outside ports (excluding ferry piers) which can take vessels of over 1 350 tonnes.

ê 97/11/EC Art. 1 pt. 15 and Annex (adapted)

9. Waste disposal installations for the incineration, chemical treatment as defined in Annex Ö I Õ to Directive Ö 2008/98/EC of the European Parliament and of the Council Õ[13] under heading D9, or landfill of hazardous waste Ö , as defined in point 2 of Article 3 of that Directive Õ.

10. Waste disposal installations for the incineration or chemical treatment as defined in Annex Ö I Õ to Directive Ö 2008/98/EC Õ under heading D9 of non-hazardous waste with a capacity exceeding 100 tonnes per day.

ê 97/11/EC Art. 1 pt. 15 and Annex

11. Groundwater abstraction or artificial groundwater recharge schemes where the annual volume of water abstracted or recharged is equivalent to or exceeds 10 million cubic metres.

12. (a) Works for the transfer of water resources between river basins where this transfer aims at preventing possible shortages of water and where the amount of water transferred exceeds 100 million cubic metres/year;

(b) In all other cases, works for the transfer of water resources between river basins where the multi-annual average flow of the basin of abstraction exceeds 2 000 million cubic metres/year and where the amount of water transferred exceeds 5 % of this flow.

In both cases transfers of piped drinking water are excluded.

13. Waste water treatment plants with a capacity exceeding 150 000 population equivalent as defined in point 6 of Article 2 of Council Directive 91/271/EEC[14].

14. Extraction of petroleum and natural gas for commercial purposes where the amount extracted exceeds 500 tonnes/day in the case of petroleum and 500 000 m3/day in the case of gas.

15. Dams and other installations designed for the holding back or permanent storage of water, where a new or additional amount of water held back or stored exceeds 10 million cubic metres.

ê 2009/31/EC Art. 31 pt. 1(a) (adapted)

16. Pipelines with a diameter of more than 800 mm and a length of more than 40 km:

(a) for the transport of gas, oil, chemicals;

(b) for the transport of carbon dioxide (CO2) streams for the purposes of geological storage, including associated booster stations.

ê 97/11/EC Art. 1 pt. 15 and Annex

17. Installations for the intensive rearing of poultry or pigs with more than:

(a) 85 000 places for broilers, 60 000 places for hens;

(b) 3 000 places for production pigs (over 30 kg); or

(c) 900 places for sows.

18. Industrial plants for the production of :

(a) pulp from timber or similar fibrous materials;

(b) paper and board with a production capacity exceeding 200 tonnes per day.

19. Quarries and open-cast mining where the surface of the site exceeds 25 hectares, or peat extraction, where the surface of the site exceeds 150 hectares.

20. Construction of overhead electrical power lines with a voltage of 220 kV or more and a length of more than 15 km.

21. Installations for storage of petroleum, petrochemical, or chemical products with a capacity of 200 000 tonnes or more.

ê 2009/31/EC Art. 31 pt. 1(b) (adapted)

22. Storage sites pursuant to Directive 2009/31/EC of the European Parliament and of the Council[15].

23. Installations for the capture of CO2 streams for the purposes of geological storage pursuant to Directive 2009/31/EC from installations covered by this Annex, or where the total yearly capture of CO2 is 1,5 megatonnes or more.

ê 2003/35/EC Art. 3 pt. 8

24. Any change to or extension of projects listed in this Annex where such a change or extension in itself meets the thresholds, if any, set out in this Annex.

_____________

ê 97/11/EC Art. 1 pt. 15 and Annex (adapted)

ANNEX II

PROJECTS Ö REFERRED Õ TO Ö IN Õ ARTICLE 4(2)

ê 97/11/EC Art. 1 pt. 15 and Annex

1. AGRICULTURE, SILVICULTURE AND AQUACULTURE

(a) Projects for the restructuring of rural land holdings;

(b) Projects for the use of uncultivated land or semi-natural areas for intensive agricultural purposes;

(c) Water management projects for agriculture, including irrigation and land drainage projects;

(d) Initial afforestation and deforestation for the purposes of conversion to another type of land use;

(e) Intensive livestock installations (projects not included in Annex I);

(f) Intensive fish farming;

(g) Reclamation of land from the sea.

2. EXTRACTIVE INDUSTRY

(a) Quarries, open-cast mining and peat extraction (projects not included in Annex I);

(b) Underground mining;

(c) Extraction of minerals by marine or fluvial dredging;

(d) Deep drillings, in particular:

(i) geothermal drilling,

(ii) drilling for the storage of nuclear waste material,

(iii) drilling for water supplies,

with the exception of drillings for investigating the stability of the soil;

(e) Surface industrial installations for the extraction of coal, petroleum, natural gas and ores, as well as bituminous shale.

3. ENERGY INDUSTRY

(a) Industrial installations for the production of electricity, steam and hot water (projects not included in Annex I);

(b) Industrial installations for carrying gas, steam and hot water; transmission of electrical energy by overhead cables (projects not included in Annex I);

(c) Surface storage of natural gas;

(d) Underground storage of combustible gases;

(e) Surface storage of fossil fuels;

(f) Industrial briquetting of coal and lignite;

(g) Installations for the processing and storage of radioactive waste (unless included in Annex I);

(h) Installations for hydroelectric energy production;

(i) Installations for the harnessing of wind power for energy production (wind farms);

ê 2009/31/EC Art. 31 pt. 2(a)

(j) Installations for the capture of CO2 streams for the purposes of geological storage pursuant to Directive 2009/31/EC from installations not covered by Annex I to this Directive.

ê 97/11/EC Art. 1 pt. 15 and Annex

4. PRODUCTION AND PROCESSING OF METALS

(a) Installations for the production of pig iron or steel (primary or secondary fusion) including continuous casting;

(b) Installations for the processing of ferrous metals:

(i) hot-rolling mills,

(ii) smitheries with hammers,

(iii) application of protective fused metal coats;

(c) Ferrous metal foundries;

(d) Installations for the smelting, including the alloyage, of non-ferrous metals, excluding precious metals, including recovered products (refining, foundry casting, etc.);

(e) Installations for surface treatment of metals and plastic materials using an electrolytic or chemical process;

(f) Manufacture and assembly of motor vehicles and manufacture of motor-vehicle engines;

(g) Shipyards;

(h) Installations for the construction and repair of aircraft;

(i) Manufacture of railway equipment;

(j) Swaging by explosives;

(k) Installations for the roasting and sintering of metallic ores.

5. MINERAL INDUSTRY

(a) Coke ovens (dry coal distillation);

(b) Installations for the manufacture of cement;

(c) Installations for the production of asbestos and the manufacture of asbestos-products (projects not included in Annex I);

(d) Installations for the manufacture of glass including glass fibre;

(e) Installations for smelting mineral substances including the production of mineral fibres;

(f) Manufacture of ceramic products by burning, in particular roofing tiles, bricks, refractory bricks, tiles, stoneware or porcelain.

6. CHEMICAL INDUSTRY (PROJECTS NOT INCLUDED IN ANNEX I)

(a) Treatment of intermediate products and production of chemicals;

(b) Production of pesticides and pharmaceutical products, paint and varnishes, elastomers and peroxides;

(c) Storage facilities for petroleum, petrochemical and chemical products.

7. FOOD INDUSTRY

(a) Manufacture of vegetable and animal oils and fats;

(b) Packing and canning of animal and vegetable products;

(c) Manufacture of dairy products;

(d) Brewing and malting;

(e) Confectionery and syrup manufacture;

(f) Installations for the slaughter of animals;

(g) Industrial starch manufacturing installations;

(h) Fish-meal and fish-oil factories;

(i) Sugar factories.

8. TEXTILE, LEATHER, WOOD AND PAPER INDUSTRIES

(a) Industrial plants for the production of paper and board (projects not included in Annex I);

(b) Plants for the pretreatment (operations such as washing, bleaching, mercerisation) or dyeing of fibres or textiles;

(c) Plants for the tanning of hides and skins;

(d) Cellulose-processing and production installations.

9. RUBBER INDUSTRY

Manufacture and treatment of elastomer-based products.

10. INFRASTRUCTURE PROJECTS

(a) Industrial estate development projects;

(b) Urban development projects, including the construction of shopping centres and car parks;

(c) Construction of railways and intermodal transshipment facilities, and of intermodal terminals (projects not included in Annex I);

(d) Construction of airfields (projects not included in Annex I);

(e) Construction of roads, harbours and port installations, including fishing harbours (projects not included in Annex I);

(f) Inland-waterway construction not included in Annex I, canalisation and flood-relief works;

(g) Dams and other installations designed to hold water or store it on a long-term basis (projects not included in Annex I);

(h) Tramways, elevated and underground railways, suspended lines or similar lines of a particular type, used exclusively or mainly for passenger transport;

ê 2009/31/EC Art. 31 pt. 2(b)

(i) Oil and gas pipeline installations and pipelines for the transport of CO2 streams for the purposes of geological storage (projects not included in Annex I);

ê 97/11/EC Art. 1 pt. 15 and Annex

(j) Installations of long-distance aqueducts;

(k) Coastal work to combat erosion and maritime works capable of altering the coast through the construction, for example, of dykes, moles, jetties and other sea defence works, excluding the maintenance and reconstruction of such works;

(l) Groundwater abstraction and artificial groundwater recharge schemes not included in Annex I;

(m) Works for the transfer of water resources between river basins not included in Annex I.

11. OTHER PROJECTS

(a) Permanent racing and test tracks for motorised vehicles;

(b) Installations for the disposal of waste (projects not included in Annex I);

(c) Waste-water treatment plants (projects not included in Annex I);

(d) Sludge-deposition sites;

(e) Storage of scrap iron, including scrap vehicles;

(f) Test benches for engines, turbines or reactors;

(g) Installations for the manufacture of artificial mineral fibres;

(h) Installations for the recovery or destruction of explosive substances;

(i) Knackers' yards.

12. TOURISM AND LEISURE

(a) Ski-runs, ski-lifts and cable-cars and associated developments;

(b) Marinas;

(c) Holiday villages and hotel complexes outside urban areas and associated developments;

(d) Permanent camp sites and caravan sites;

(e) Theme parks.

ê 97/11/EC Art. 1 pt. 15 and Annex (adapted)

è1 2003/35/EC Art. 3 pt. 9

13. (a) Any change or extension of projects listed in Annex I or Ö this Õ Annex, already authorised, executed or in the process of being executed, which may have significant adverse effects on the environment è1 (change or extension not included in Annex I) ç;

ê 97/11/EC Art. 1 pt. 15 and Annex

(b) Projects in Annex I, undertaken exclusively or mainly for the development and testing of new methods or products and not used for more than two years.

_____________

ANNEX III

SELECTION CRITERIA REFERRED TO IN ARTICLE 4(3)

1. CHARACTERISTICS OF PROJECTS

The characteristics of projects must be considered having regard, in particular, to:

(a) the size of the project;

(b) the cumulation with other projects;

(c) the use of natural resources;

(d) the production of waste;

(e) pollution and nuisances;

(f) the risk of accidents, having regard in particular to substances or technologies used.

2. LOCATION OF PROJECTS

The environmental sensitivity of geographical areas likely to be affected by projects must be considered, having regard, in particular, to:

(a) the existing land use;

(b) the relative abundance, quality and regenerative capacity of natural resources in the area;

(c) the absorption capacity of the natural environment, paying particular attention to the following areas:

(i) wetlands,

(ii) coastal zones,

(iii) mountain and forest areas,

(iv) nature reserves and parks,

ê 97/11/EC Art. 1 pt. 15 and Annex (adapted)

(v) areas classified or protected under Member States' legislation; special protection areas designated by Member States pursuant to Directive Ö 2009/147/EC of the European Parliament and of the Council[16] Õ and Ö to Council Directive Õ 92/43/EEC Ö [17] Õ,

(vi) areas in which the environmental quality standards laid down in Ö Union Õ legislation have already been exceeded,

ê 97/11/EC Art. 1 pt. 15 and Annex

(vii) densely populated areas,

(viii) landscapes of historical, cultural or archaeological significance.

3. CHARACTERISTICS OF THE POTENTIAL IMPACT

ê 97/11/EC Art. 1 pt. 15 and Annex (adapted)

The potential significant effects of projects must be considered in relation to criteria set out in points 1 and 2, and having regard in particular to:

ê 97/11/EC Art. 1 pt. 15 and Annex

(a) the extent of the impact (geographical area and size of the affected population);

(b) the transfrontier nature of the impact;

(c) the magnitude and complexity of the impact;

(d) the probability of the impact;

(e) the duration, frequency and reversibility of the impact.

_____________

ANNEX IV

INFORMATION REFERRED TO IN ARTICLE 5(1)

1. Description of the project, including in particular:

(a) a description of the physical characteristics of the whole project and the land-use requirements during the construction and operational phases;

(b) a description of the main characteristics of the production processes, for instance, the nature and quantity of the materials used;

(c) an estimate, by type and quantity, of expected residues and emissions (water, air and soil pollution, noise, vibration, light, heat, radiation, etc.) resulting from the operation of the proposed project.

2. An outline of the main alternatives studied by the developer and an indication of the main reasons for this choice, taking into account the environmental effects.

3. A description of the aspects of the environment likely to be significantly affected by the proposed project, including, in particular, population, fauna, flora, soil, water, air, climatic factors, material assets, including the architectural and archaeological heritage, landscape and the inter-relationship between the above factors.

4. A description of the likely significant effects of the proposed project on the environment resulting from:

(a) the existence of the project;

(b) the use of natural resources;

(c) the emission of pollutants, the creation of nuisances and the elimination of waste.

This description should cover the direct effects and any indirect, secondary, cumulative, short, medium and long-term, permanent and temporary, positive and negative effects of the project.

ê 97/11/EC Art. 1 pt. 15 and Annex (adapted)

5. The description by the developer of the forecasting methods used to assess the effects on the environment Ö referred to in point 4 Õ.

ê 97/11/EC Art. 1 pt. 15 and Annex

6. A description of the measures envisaged to prevent, reduce and where possible offset any significant adverse effects on the environment.

7. A non-technical summary of the information provided under headings 1 to 6.

8. An indication of any difficulties (technical deficiencies or lack of know-how) encountered by the developer in compiling the required information.

_____________

é

ANNEX V

Part A

Repealed Directive with list of its successive amendments(referred to in Article 14)

Council Directive 85/337/EEC (OJ L 175, 5.7.1985, p. 40) |

Council Directive 97/11/EC (OJ L 73, 14.3.1997, p. 5) |

Directive 2003/35/EC of the European Parliament and of the Council (OJ L 156, 25.6.2003, p. 17) | Article 3 only |

Directive 2009/31/EC of the European Parliament and of the Council (OJ L 140, 5.6.2009, p. 114) | Article 31 only |

Part B

List of time-limits for transposition into national law (referred to in Article 14)

Directive | Time-limit for transposition |

85/337/EEC | 3 July 1988 |

97/11/EC | 14 March 1999 |

2003/35/EC | 25 June 2005 |

2009/31/EC | 25 June 2011 |

_____________

ANNEX VI

Correlation Table

Directive 85/337/EEC | This Directive |

Article 1(1) | Article 1(1) |

Article 1(2), first subparagraph | Article 1(2), introductory words |

Article 1(2), second subparagraph, introductory words | Article 1(2)(a), introductory words |

Article 1(2), second subparagraph, first indent | Article 1(2)(a), first indent |

Article 1(2), second subparagraph, second indent | Article 1(2)(a), second indent |

Article 1(2), third subparagraph | Article 1(2)(b) |

Article 1(2), fourth subparagraph | Article 1(2)(c) |

Article 1(2), fifth subparagraph | Article 1(2)(d) |

Article 1(2), sixth subparagraph | Article 1(2)(e) |

Article 1(3) | Article 1(2)(f) |

Article 1(4) | Article 1(3) |

Article 1(5) | Article 1(4) |

Article 2(1) | Article 2(1) |

Article 2(2) | Article 2(2) |

Article 2(2a) | Article 2(3) |

Article 2(3) | Article 2(4) |

Article 3, introductory part | Article 3, introductory part |

Article 3, first indent | Article 3(a) |

Article 3, second indent | Article 3(b) |

Article 3, third indent | Article 3(c) |

Article 3, fourth indent | Article 3(d) |

Article 4 | Article 4 |

Article 5(1) | Article 5(1) |

Article 5(2) | Article 5(2) |

Article 5(3), introductory words | Article 5(3), introductory words |

Article 5(3), first indent | Article 5(3)(a) |

Article 5(3), second indent | Article 5(3)(b) |

Article 5(3), third indent | Article 5(3)(c) |

Article 5(3), fourth indent | Article 5(3)(d) |

Article 5(3), fifth indent | Article 5(3)(e) |

Article 5(4) | Article 5(4) |

Article 6 | Article 6 |

Article 7(1), introductory part | Article 7(1), first subparagraph, introductory part |

Article 7(1)(a) | Article 7(1), first subparagraph, point (a) |

Article 7(1)(b) | Article 7(1), first subparagraph, point (b) |

Article 7(1), final part | Article 7(1), second subparagraph |

Article 7(2)-7(5) | Article 7(2)-7(5) |

Article 8 | Article 8 |

Article 9(1), introductory part | Article 9, introductory part |

Article 9(1), first indent | Article 9(1)(a) |

Article 9(1), second indent | Article 9(1)(b) |

Article 9(1), third indent | Article 9(1)(c) |

Article 9(2) | Article 9(2) |

Article 10 | Article 10 |

Article 10a, first paragraph | Article 11(1) |

Article 10a, second paragraph | Article 11(2) |

Article 10a, third paragraph | Article 11(3) |

Article 10a, fourth and fifth paragraphs | Article 11(4), first and second subparagraphs |

Article 10a, sixth paragraph | Article 11(5) |

Article 11(1) | Article 12(1) |

Article 11(2) | Article 12(2) |

Article 11(3) | _____ |

Article 11(4) | Article 12(3) |

Article 12(1) | _____ |

Article 12(2) | Article 13 |

_____ | Article 14 |

_____ | Article 15 |

Article 14 | Article 16 |

Annex I, point 1 | Annex I, point 1 |

Annex I, point 2, first indent | Annex I, point 2(a) |

Annex I, point 2, second indent | Annex I, point 2(b) |

Annex I, point 3(a) | Annex I, point 3(a) |

Annex I, point 3(b), introductory words | Annex I, point 3(b), introductory words |

Annex I, point 3(b), first indent | Annex I, point 3(b)(i) |

Annex I, point 3(b), second indent | Annex I, point 3(b)(ii) |

Annex I, point 3(b), third indent | Annex I, point 3(b)(iii) |

Annex I, point 3(b), fourth indent | Annex I, point 3(b)(iv) |

Annex I, point 3(b), fifth indent | Annex I, point 3(b)(v) |

Annex I, point 4, first indent | Annex I, point 4(a) |

Annex I, point 4, second indent | Annex I, point 4(b) |

Annex I, point 5 | Annex I, point 5 |

Annex I, point 6, introductory part | Annex I, point 6, introductory part |

Annex I, point 6(i) | Annex I, point 6(a) |

Annex I, point 6(ii) | Annex I, point 6(b) |

Annex I, point 6(iii) | Annex I, point 6(c) |

Annex I, point 6(iv) | Annex I, point 6(d) |

Annex I, point 6(v) | Annex I, point 6(e) |

Annex I, point 6(vi) | Annex I, point 6(f) |

Annex I, point 7(a) | Annex I, point 7(a), first subparagraph |

Annex I, point 7(a), footnote | Annex I, point 7(a), second subparagraph |

Annex I, point 7(b) | Annex I, point 7(b), first subparagraph |

Annex I, point 7(b), footnote | Annex I, point 7(b), second subparagraph |

Annex I, point 7(c) | Annex I, point 7(c) |

Annex I, points 8-15 | Annex I, points 8-15 |

Annex I, point 16, introductory words | Annex I, point 16, introductory words |

Annex I, point 16, first indent | Annex I, point 16(a) |

Annex I, point 16, second indent | Annex I, point 16(b) |

Annex I, points 17-21 | Annex I, points 17-21 |

Annex I, point 22 | Annex I, point 24 |

Annex I, point 23 | Annex I, point 22 |

Annex I, point 24 | Annex I, point 23 |

Annex II, point 1 | Annex II, point 1 |

Annex II, point 2(a), (b) and (c) | Annex II, point 2(a), (b) and (c) |

Annex II, point 2(d), introductory words | Annex II, point 2(d), introductory words |

Annex II, point 2(d), first indent | Annex II, point 2(d)(i) |

Annex II, point 2(d), second indent | Annex II, point 2(d)(ii) |

Annex II, point 2(d), third indent | Annex II, point 2(d)(iii) |

Annex II, point 2(d), final words | Annex II, point 2(d), final words |

Annex II, point 2(e) | Annex II, point 2(e) |

Annex II, points 3-12 | Annex II, points 3-12 |

Annex II, point 13, first indent | Annex II, point 13(a) |

Annex II, point 13, second indent | Annex II, point 13(b) |

Annex III, point 1, introductory words | Annex III, point 1, introductory words |

Annex III, point 1, first indent | Annex III, point 1(a) |

Annex III, point 1, second indent | Annex III, point 1(b) |

Annex III, point 1, third indent | Annex III, point 1(c) |

Annex III, point 1, fourth indent | Annex III, point 1(d) |

Annex III, point 1, fifth indent | Annex III, point 1(e) |

Annex III, point 1, sixth indent | Annex III, point 1(f) |

Annex III, point 2, introductory words | Annex III, point 2, introductory words |

Annex III, point 2, first indent | Annex III, point 2(a) |

Annex III, point 2, second indent | Annex III, point 2(b) |

Annex III, point 2, third indent, introductory words | Annex III, point 2(c), introductory words |

Annex III, point 2, third indent, point (a) | Annex III, point 2(c)(i) |

Annex III, point 2, third indent, point (b) | Annex III, point 2(c)(ii) |

Annex III, point 2, third indent, point (c) | Annex III, point 2(c)(iii) |

Annex III, point 2, third indent, point (d) | Annex III, point 2(c)(iv) |

Annex III, point 2, third indent, point (e) | Annex III, point 2(c)(v) |

Annex III, point 2, third indent, point (f) | Annex III, point 2(c)(vi) |

Annex III, point 2, third indent, point (g) | Annex III, point 2(c)(vii) |

Annex III, point 2, third indent, point (h) | Annex III, point 2(c)(viii) |

Annex III, point 3, introductory words | Annex III, point 3, introductory words |

Annex III, point 3, first indent | Annex III, point 3(a) |

Annex III, point 3, second indent | Annex III, point 3(b) |

Annex III, point 3, third indent | Annex III, point 3(c) |

Annex III, point 3, fourth indent | Annex III, point 3(d) |

Annex III, point 3, fifth indent | Annex III, point 3(e) |

Annex IV, point 1, introductory words | Annex IV, point 1, introductory words |

Annex IV, point 1, first indent | Annex IV, point 1(a) |

Annex IV, point 1, second indent | Annex IV, point 1(b) |

Annex IV, point 1, third indent | Annex IV, point 1(c) |

Annex IV, points 2 and 3 | Annex IV, points 2 and 3 |

Annex IV, point 4, introductory words | Annex IV, point 4, first subparagraph, introductory words |

Annex IV, point 4, first indent | Annex IV, point 4, first subparagraph, point (a) |

Annex IV, point 4, second indent | Annex IV, point 4, first subparagraph, point (b) |

Annex IV, point 4, third indent | Annex IV, point 4, first subparagraph, point (c) |

Annex IV, footnote | Annex IV, point 4, second subparagraph |

Annex IV, point 4, final part | Annex IV, point 5 |

Annex IV, point 5 | Annex IV, point 6 |

Annex IV, point 6 | Annex IV, point 7 |

Annex IV, point 7 | Annex IV, point 8 |

_____ | Annex V |

_____ | Annex VI |

_____________

[1] COM(87) 868 PV.

[2] See Annex 3 to Part A of the Conclusions.

[3] Entered in the legislative programme for 2010.

[4] See Annex V, Part A of this proposal.

[5] OJ C […], […], p. […].

[6] OJ C […], […], p. […].

[7] OJ C […], […], p. […].

[8] OJ L 175, 5.7.1985, p. 40.

[9] See Annex VI, Part A.

[10] OJ L Ö 24, 29.1.2008, p. 8 Õ.

[11] OJ L 41, 14.2.2003, p. 26.

[12] Nuclear power stations and other nuclear reactors cease to be such an installation when all nuclear fuel and other radioactively contaminated elements have been removed permanently from the installation site.

[13] OJ L Ö 312, 22.11.2008, p. 3 Õ.

[14] OJ L 135, 30.5.1991, p. 40.

[15] OJ L 140, 5.6.2009, p. 114.

[16] OJ L 20, 26.1.2010, p. 7.

[17] OJ L 206, 22.7.1992, p. 7.

Top