SECTION 1: REFORMS AND INVESTMENTS UNDER THE RECOVERY AND RESILIENCE PLAN
Description of Reforms and Investments
A. COMPONENT 1.1: Decarbonisation using renewable hydrogen in particular
The component of the German recovery and resilience plan addresses the challenge of climate change mitigation by aiming to reduce greenhouse gas (GHG) emissions in the economy. The objectives of the component are to support the use of hydrogen produced with energy from renewable sources and to contribute as a primary goal to GHG emission reduction as defined in the German NECP, with a focus on industry. The component also seeks to make a contribution in terms of industrial innovation and employment policy.
The component supports addressing the Country Specific Recommendation on investment in the green transition and constitutes one building block in the design of a clean, efficient and integrated energy system (Country Specific Recommendation 2 in 2019 and Country Specific Recommendation 1 in 2020).
It is expected that no measure in this component does significant harm to environmental objectives within the meaning of Article 17 of Regulation (EU) 2020/852, taking into account the description of the measures and the mitigating steps set out in the recovery and resilience plan in accordance with the DNSH Technical Guidance (2021/C58/01).
A.1.
Description of the reforms and investments for non-repayable financial support
1.1.1 Investment: Hydrogen projects within the framework of IPCEIs
The objective of the planned hydrogen Important Projects of Common European Interest (IPCEIs) is to accelerate the necessary market uptake of hydrogen and its derivatives to decarbonise emission-intensive processes and develop new areas of application in Germany and in Europe.
The measure consists of financial support that shall be given to integrated projects along the entire value chain through planned IPCEIs on hydrogen. As regards production, the planned IPCEIs shall focus on building large electrolysis capability to produce renewable hydrogen in locations where sufficient renewable electricity is available. Within this framework, up to 500 MW of electrolysis capability is aimed to be built. As regards infrastructure, they are aimed to contribute to building German and European hydrogen transport and storage infrastructure.
The implementation of the investment shall be completed by 31 August 2026.
1.1.2 Investment: Funding programme for decarbonisation in industry
The objective of the measure is to help industry shift from highly emission-intensive production processes to low GHG processes. More precisely, it seeks to help businesses address the challenges of the transition, which lie in particular in the high costs and economic risk of developing climate-neutral technologies.
Support shall be given to research and development, testing in experimental or pilot plants and investments in installations for the application and implementation of measures on an industrial scale. The support shall be granted in the form of a partial investment grant. The measure targets companies in energy-intensive industries with GHG emissions emanating from the production process covered by the EU emissions trading scheme (in particular steel, cement, lime, chemicals, non-ferrous metals, glass and ceramics). Only projects resulting in emissions substantially below the EU Emissions Trading System benchmarks shall be eligible for support under the measure.
The implementation of the measure shall be completed by 31 August 2026. In addition, Germany is planning to prolong the measure beyond 2026 with funding under its national budget.
1.1.3 Investment: Pilot scheme for climate action contracts based on the principle of Carbon Contracts for Difference
The objective of the measure is, as for measure 1.1.2, the introduction of new, cleaner production technologies for energy-intensive industries. The specific objective of the measure is to provide businesses with financial certainty when they make significant investments in climate-neutral technologies and to reduce on a permanent basis process-related GHG emissions which are difficult to avoid under the current state of the art of technologies.
Climate action contracts shall be signed between the state and energy-intensive industries to cushion the higher operating costs of innovative technologies. These contracts shall guarantee a fixed CO2 price over a fixed duration for companies investing in CO2 reduction technologies. The programme is aimed primarily at companies in the steel, chemical and building materials industries where process emissions are particularly difficult to avoid. Only projects resulting in emissions substantially below the ETS benchmarks shall be eligible for support under the measure.
The implementation of the investment is expected to start by 31 December 2021 and shall be completed by 31 August 2026. In addition, Germany is planning to prolong the measure beyond 2026 with funding under its national budget.
1.1.4 Investment: Project-related climate protection research
Like other measures from this component, the aim of this measure is to contribute to the general goal of decarbonising the economy in line with the 2050 targets but with a stronger focus on SMEs and basic industries.
Collaborative projects shall be supported in the three areas: (i) climate protection in the industry, (ii) SME innovation and (iii) climate resilience. The first area shall focus on climate protection in the basic materials industry with the aim of promoting industrial research and development of new processes that prevent GHG emissions. The second area of focus shall consist in SME innovation support measures contributing to climate change mitigation and energy efficiency. Lastly, the third area shall focus on support measures for climate resilience projects by municipalities and local businesses associated with research partners (universities and non-university research institutes).
The implementation of the investment shall be completed by 31 December 2025.
1.1.5 Investment: Flagship projects for research and innovation in the context of the National Hydrogen Strategy
This measure contributes to the general objective of decarbonising the economy and shall focus specifically on addressing key issues related to the provision of green hydrogen in the future energy system.
On the research side, a first flagship initiative shall address the challenges of serial production of water electrolysers. A second flagship initiative shall focus on the integrated direct offshore production of hydrogen and its derivatives at sea using offshore wind energy. A third flagship initiative shall explore and assess the potential of hydrogen transport technologies.
The implementation of the measure shall be completed by 31 August 2026.
1.1.6 Investment: Federal support for efficient heat networks
The measure consists of financial support to investment projects to decarbonise existing district heating systems, as well as investment projects for the construction of new district heating networks, expanding the share of heat from renewable sources and waste heat.
New district heating networks shall be supported by at least 75% of renewable energy and waste heat. No fossil fuels shall be financed. Support under the scheme shall be granted only to heat generation from renewable energy sources, including sustainable biomass, and waste heat.
The implementation of the measure shall be completed by 31 August 2026.
A.2.
Milestones, targets, indicators and timetable for monitoring and implementation for non-repayable financial support
Sequential Number
|
Related Measure (Reform or Investment)
|
Milestone / Target
|
Name
|
Qualitative indicators
(for milestones)
|
Quantitative indicators
(for targets)
|
Indicative timeline for completion
|
Description of each milestone and target
|
|
|
|
|
|
Unit of measure
|
Baseline
|
Goal
|
Quarter
|
Year
|
|
1
|
1.1.1 Hydrogen projects within the framework of IPCEIs
|
Milestone
|
Completion of expression of interest procedure
|
Companies have submitted project sketches
|
-
|
-
|
-
|
Q2
|
2021
|
The expression of interest procedure has been completed. Potential projects and project participants in Germany have been identified.
|
2
|
1.1.1 Hydrogen projects within the framework of IPCEIs
|
Milestone
|
Issuance of first grant decisions
|
Grant decisions issued
|
-
|
-
|
-
|
Q1
|
2022
|
Grant award decisions have been issued to recipients/applicants by the Federal Ministry for Economic Affairs and Climate Action (BMWK) and the Federal Ministry for Digital and Transport (BMDV) enabling the start of the implementation of the selected projects.
|
3
|
1.1.1 Hydrogen projects within the framework of IPCEIs
|
Target
|
Commitment of at least EUR 500 000 000
|
-
|
EUR million
|
0
|
500
|
Q2
|
2024
|
At least EUR 500 000 000 have been committed to hydrogen projects in line with grant decisions issued.
|
4
|
1.1.1 Hydrogen projects within the framework of IPCEIs
|
Milestone
|
Evaluation of the support programme
|
First evaluation report (interim report) published
|
-
|
-
|
-
|
Q4
|
2025
|
The evaluators have provided a first evaluation report, which shall contain an initial assessment of the direct and indirect effects of the aid and an assessment of the appropriateness and proportionality of the support measure. The evaluation report shall notably assess the success towards the development of electrolytic capabilities, their systemic integration into the energy system (avoidance of network bottlenecks), the development of demand-driven infrastructure, implementation of hydrogen decarbonisation technologies. The evaluators shall also assess the success of the hydrogen technology market uptake and to what extent it is relevant to the energy system and needs. The evaluation shall be contracted out to external and independent evaluators.
|
5
|
1.1.1 Hydrogen projects within the framework of IPCEIs
|
Target
|
Commitment of EUR 1 500 000 000
|
-
|
EUR million
|
0
|
1 500
|
Q3
|
2026
|
At least EUR 1 500 000 000 have been committed to hydrogen projects in line with grant decisions issued.
|
6
|
1.1.1 Hydrogen projects within the framework of IPCEIs
|
Target
|
Creation of at least 300 MW of electrolysis capacity
|
|
Megawatt
|
0
|
300
|
Q3
|
2026
|
At least 300 MW of electrolysis capabilities shall be created.
|
7
|
1.1.2 Support programme for decarbonisation in industry
|
Milestone
|
Entry into force of funding guideline (Förderrichtlinie) for decarbonisation in industry
|
Entry into force of funding guideline
|
-
|
-
|
-
|
Q1
|
2021
|
The guideline has entered into force, enabling companies to submit applications.
|
8
|
1.1.2 Support programme for decarbonisation in industry
|
Target
|
Issuance of grant decisions
|
-
|
Number
|
0
|
20
|
Q4
|
2024
|
Grant decisions have been issued to recipients/applicants, enabling the start of the implementation of the selected projects.
|
9
|
1.1.2 Support programme for decarbonisation in industry
|
Target
|
Disbursement to the supported projects
|
-
|
EUR million
|
0
|
426.823
|
Q3
|
2026
|
Of the EUR 449 288 000 allocated to the measure, at least EUR 426 823 000 of funds committed to the selected projects have been disbursed to the recipients.
|
10
|
1.1.2 Support programme for decarbonisation in industry
|
Target
|
Reduction of greenhouse gas emissions in industry
|
-
|
Million tonnes of CO2 equivalent (annual avoidance)
|
0
|
1
|
Q3
|
2026
|
The measure has led to the avoidance of at least 1 million tonnes of CO2 equivalent in 12 consecutive months in 2025/2026, as evidenced by the interim/final reports sent by recipients to the project promoter. The reports shall indicate how many greenhouse gas emissions (GHG) have been avoided by the implemented projects, compared to the GHG emissions that would have occurred without the intervention. The overall GHG emissions reduction achieved by the measure shall be summarised in a separate report.
|
11
|
1.1.3 Pilot scheme for climate action contracts based on the principle of Carbon Contracts for Difference
|
Milestone
|
Completion of expression of interest procedure for climate change contracts
|
Companies submit expressions of interest for climate change contracts to the Federal Ministry for Economic Affaires and Climate Action (BMWK)
|
-
|
-
|
-
|
Q4
|
2021
|
The expression of interest procedure has been completed, with companies having expressed their interest in receiving support for their projects through climate change contracts and projects having been selected.
|
12
|
1.1.3 Pilot scheme for climate action contracts based on the principle of Carbon Contracts for Difference
|
Milestone
|
Funding guideline (Förderrichtlinie) for a pilot programme on climate change contracts based on the principle of Carbon Contracts for Difference
|
Entry into force of funding guideline
|
-
|
-
|
-
|
Q3
|
2022
|
The guideline for a pilot programme on climate change contracts based on the principle of Carbon Contracts for Difference has entered into force, enabling companies to submit applications.
|
13
|
1.1.3 Pilot scheme for climate action contracts based on the principle of Carbon Contracts for Difference
|
Target
|
Disbursement to the supported projects
|
-
|
EUR million
|
0
|
522, 5
|
Q3
|
2026
|
Of the EUR 550 000 000 allocated to the measure, at least EUR 522 500 000 of funds committed to the selected projects have been disbursed to the recipients.
|
14
|
1.1.4 Project-related climate protection research
|
Target
|
Approval of applications for support of climate-related research projects
|
-
|
Number of applications approved
|
0
|
45
|
Q4
|
2021
|
The climate-related research projects selected under the call for tender have been approved for funding.
|
15
|
1.1.4 Project-related climate protection research
|
Target
|
Disbursement to the supported projects
|
-
|
EUR million
|
0
|
57
|
Q4
|
2025
|
Of the EUR 60 000 000 allocated to the measure, at least EUR 57 000 000 of funds committed to the selected projects have been disbursed to the recipients.
|
16
|
1.1.4 Project-related climate protection research
|
Target
|
Completion of supported climate-related research projects
|
-
|
Number
|
0
|
45
|
Q4
|
2025
|
Projects have been completed, as evidenced by the submission of the final report.
|
17
|
1.1.5 Flagship projects for research and innovation in the context of the National Hydrogen Strategy
|
Milestone
|
Publication of the competition “Idea Competition ‘Hydrogen Republic Germany’” (Förderaufruf zum Ideenwettbewerb „Wasserstoffrepublik Deutschland“)
|
Publication of the competition on the Federal Ministry of Education and Research‘s homepage
|
-
|
-
|
-
|
Q2
|
2020
|
The competition, including the eligibility conditions, has been published on the homepage of the Federal Ministry of Education and Research and opened for applications.
|
18
|
1.1.5 Flagship projects for research and innovation in the context of the National Hydrogen Strategy
|
Target
|
Issuance of grant decisions
|
-
|
Number of grant decisions issued
|
0
|
150
|
Q2
|
2022
|
Grant decisions have been issued to recipients/applicants, enabling the start of the implementation of the selected projects.
|
19
|
1.1.5 Flagship projects for research and innovation in the context of the National Hydrogen Strategy
|
Target
|
Completion of the supported projects
|
-
|
Number
|
0
|
150
|
Q3
|
2026
|
The projects have been completed, as evidenced by the availability of the official final report. These reports shall describe in detail the results achieved and compare them with the objectives set.
|
20
|
1.1.5 Flagship projects for research and innovation in the context of the National Hydrogen Strategy
|
Target
|
Disbursement to the supported projects
|
-
|
EUR million
|
0
|
560
|
Q3
|
2026
|
Of the EUR 700 000 000 allocated to the flagship projects, at least EUR 560 000 000 have been disbursed to recipients. Calculation based on actual payments made.
|
21
|
1.1.5 Flagship projects for research and innovation in the context of the National Hydrogen Strategy
|
Target
|
Commitment for flagship research and innovation projects
|
-
|
EUR million
|
0
|
665
|
Q3
|
2026
|
Of the EUR 700 000 000 allocated to the flagship projects, at least EUR 665 000 000 have been committed.
|
21A
|
1.1.6 Federal support for efficient heat networks
|
Target
|
Signing of grant decisions
|
-
|
Grant decisions
|
0
|
200
|
Q4
|
2023
|
The implementing authority, BAFA (Bundesamt für Wirtschaft und Ausfuhrkontrolle), has signed 200 grant decisions for projects in line with the measure description.
|
21B
|
1.1.6 Federal support for efficient heat networks
|
Target
|
Completion of feasibility studies and/or transformation plans
|
-
|
Feasibility studies and/or transformation plans
|
0
|
50
|
Q4
|
2024
|
At least 50 feasibility studies and/or transformation plans have been completed in accordance with the funding guidelines for efficient district heating from 1 August 2022 and submitted to the implementing authority, (Bundesamt für Wirtschaft und Ausfuhrkontrolle) BAFA.
|
21C
|
1.1.6 Federal support for efficient heat networks
|
Target
|
Disbursement to the supported projects
|
-
|
Million EUR disbursed
|
0
|
541.5
|
Q2
|
2026
|
Of the EUR 570 000 000 allocated to the measure, at least EUR 541 500 000 have been disbursed for the supported projects in line with the measure description.
|
B. COMPONENT 1.2: Climate-friendly mobility
The component of the German recovery and resilience plan addresses the challenge of climate change mitigation with a focus on the transport sector.
The objective of the component is to contribute to substantially reducing CO2 emissions in the transport sector. It specifically aims to establish alternative technologies in the transport sector in a sustainable way, to make them more energy-efficient, climate- and environmentally friendly, thereby further promoting the energy transition in transport.
Support for the market development of electro-mobility and the complementary investment in sustainable mobility technologies are also intended to support the transition towards a climate-neutral automotive and supply industry and to help Germany strengthen its economy in the medium and long term.
The component supports addressing the Country Specific Recommendation to “focus investment on the green and digital transition, in particular on sustainable transport, (…) research and innovation” (Country Specific Recommendation 1 in 2020).
It is expected that no measure in this component does significant harm to environmental objectives within the meaning of Article 17 of Regulation (EU) 2020/852, taking into account the description of the measures and the mitigating steps set out in the recovery and resilience plan in accordance with the DNSH Technical Guidance (2021/C58/01).
B.1.
Description of the reforms and investments for non-repayable financial support
1.2.1 Investment: Support for the construction of charging infrastructure
The general challenge addressed by the measure is the need to develop clean mobility solutions to decarbonise the transport sector. Specifically, this measure tackles the need to develop a ubiquitous network of charging infrastructure for e-vehicles. This is one of the key conditions for the success of electro-mobility as the current lack of charging infrastructure holds back the purchase of e-vehicles.
The measure consists of aid for building recharging points, including the necessary grid connection of the recharging site and the installation of the recharging point itself. Support shall take the form of project funding for a grant scheme to be operated by the Federal Ministry for Digital and Transport (BMDV). It shall apply to both publicly accessible and non-publicly accessible charging infrastructure.
The implementation of the measure shall be completed by 31 December 2025.
1.2.2 Investment: Funding for the development of electro-mobility
The general challenge addressed by this measure is also the need to develop clean mobility solutions to decarbonise the transport sector. In particular, it targets the further market development of electro-mobility and, in particular, the development of municipal and commercial vehicle fleets.
The measure consists of financial support given for the purchase of electric vehicles in municipal and commercial fleets and necessary charging infrastructure for the operation of these vehicles. In addition, application-oriented research and development projects, the development of electric mobility projects (municipal and commercial) and electro-mobility concepts shall be supported. The support shall take the form of funding a grant scheme to be operated by the Federal Ministry for Digital and Transport.
The implementation of the measure shall be completed by 30 June 2024.
1.2.3 Investment: Support for the replacement of the private vehicle fleet
The general challenge addressed by this measure is the same as for measure 1.2.2. The promotion of electro-mobility is an essential part of achieving the Paris climate goals in the transport sector. The measure focuses on the challenge represented by the very low share of pure e-cars in the total vehicle fleet (1,2% in 2020), especially compared to the 7 million to10 million electric vehicles envisaged in the 2030 Climate Change Programme.
The measure shall reduce the purchase prices of electric vehicles, which is usually higher compared to those with internal combustion engines, thereby stimulating the market. Support shall be provided exclusively for the promotion of zero-emission vehicles and plug-in hybrids emitting less than 50g CO2/km.
The implementation of the measure shall be completed by 31 March 2025.
1.2.4 Reform: Extension of the initial registration period for granting the ten-year tax exemption for purely electric vehicles
The general challenge addressed by this measure is the same as for measure 1.2.2. The promotion of electro-mobility is an essential part of achieving the Paris climate goals in the transport sector.
The measure consists of a ten-year tax exemption starting from the registration of an electric vehicle. It shall be limited to purely electric vehicles. The exemption shall apply to all natural and legal persons.
The implementation of the reform shall be completed by 31 March 2026.
1.2.5 Investment: Support for purchases of buses with alternative propulsion
The general challenge addressed by this measure is the same as for measure 1.2.2. The aim of the measure is to support the market circulation of alternatively fuelled buses in passenger transport. Currently, diesel buses are still almost exclusively used in bus transport. The shift to low-emission buses shall contribute to a lower climate impact and less air pollution.
The measure consists of grants attributed on the basis of calls for tenders. Funds shall mainly be used for battery-powered electric buses, battery trolley buses, fuel cell buses and 100% biomethane-powered buses. Operationally necessary infrastructure, as well as feasibility studies on alternative drives in public transport, may also be supported. It is expected that the financing of buses to be fuelled with biomethane will remain limited (the share of gas buses in Germany has steadily decreased in recent years and is currently around 2% of all city buses in use).
The implementation of the measure is expected to start in the third quarter of 2021 and shall be completed by 30 September 2026.
1.2.6 Investment: Support to promote alternative rail propulsion
The challenge addressed by this measure is also the decarbonisation of the transport sector, but it focuses on rail. Around 3 200 diesel locomotives are currently used in rail freight transport; 60% may be classified as very old vehicles with high CO2 emissions. This measure aims to replace these particularly old vehicles to achieve a significant reduction in CO2 emissions and air pollutants (such as nitrogen oxides and black carbon).
The measure consists of financial support for the procurement of innovative rail vehicles (in terms of powertrain) or the conversion to alternative engines with significant CO2 savings on non-electrified lines compared to conventional diesel vehicles. Applications shall be prioritised on the basis of environmental benefits.
The implementation of the measure shall be completed by 31 December 2024.
1.2.7 Investment: Promotion of the industries involved in hydrogen and fuel cell applications in transport
This measure seeks to contribute to the decarbonisation of the transport sector in link with component 1.1 Decarbonisation using renewable hydrogen in particular. The objective is to support a competitive supply industry for hydrogen and fuel cell technology. This includes enabling the production of fuel cell components and serial testing of hydrogen components and vehicles in Germany.
A new Hydrogen Technology and Innovation Centre shall focus on the hydrogen and fuel cell technology value chain for mobility applications. It shall also provide a development, certification and standardisation facility, which is not able to be carried out without public support due to the early stage of the market and the high costs involved. The measure shall also provide additional funding opportunities for the vehicle and supply industry through the existing funding guidelines in the National Innovation Programme for Hydrogen and Fuel Cell Technology.
The implementation of the measure shall be completed by 31 August 2026.
B.2.
Milestones, targets, indicators, and timetable for monitoring and implementation for non-repayable financial support
Sequential Number
|
Related Measure (Reform or Investment)
|
Milestone/ Target
|
Name
|
Qualitative indicators
(for milestones)
|
Quantitative indicators
(for targets)
|
Indicative timeline for completion
|
Description of each milestone and target
|
|
|
|
|
|
Unit of measure
|
Baseline
|
Goal
|
Quarter
|
Year
|
|
22
|
1.2.1 Support for the construction of charging infrastructure
|
Milestone
|
Entry into force of funding guidelines
|
Two funding guidelines published in the Federal Gazette (Bundesanzeiger)
|
-
|
-
|
-
|
Q4
|
2021
|
The two funding guidelines are published in the Federal Gazette (Bundesanzeiger), enabling eligible organisations / households to submit applications to: (1) ‘charging infrastructure for residential buildings’ and (2) ‘publicly accessible charging infrastructure for electric vehicles’.
|
23
|
1.2.1 Support for the construction of charging infrastructure
|
Target
|
Expansion of the public recharging network for electric vehicles
|
-
|
Number of publicly accessible recharging points
|
0
|
50 000
|
Q4
|
2025
|
At least 50 000 publicly accessible recharging points have been funded with support from the grant scheme operated by the Federal Ministry for Digital and Transport (BMDV).
|
24
|
1.2.1 Support for the construction of charging infrastructure
|
Target
|
Expansion of recharging points in residential buildings
|
-
|
Thousand recharging points in residential buildings
|
0
|
689
|
Q4
|
2023
|
At least 689 000 recharging points have been funded through the disbursement of financial support from the grant scheme operated by the Federal Ministry for Digital and Transport (BMDV).
|
25
|
1.2.2 Funding for the development of electro-mobility
|
Milestone
|
Entry into force of the funding guidelines
|
Entry into force of funding guidelines published in the Federal Gazette (Bundesanzeiger)
|
-
|
-
|
-
|
Q4
|
2020
|
The funding guidelines covering the development of municipal and commercial e-vehicle fleets and charging infrastructure, as well as related applied R&D (e-mobility concepts/designs) and e-mobility concepts have been published in the Federal Gazette (Bundesanzeiger), enabling eligible organisations / households to submit applications.
|
26
|
1.2.2 Funding for the development of electro-mobility
|
Target
|
Commitment of funds
|
-
|
EUR million
|
0
|
71.25
|
Q4
|
2022
|
Of the EUR 75 000 000 allocated to the measure, at least EUR 71 250 000 have been committed.
|
27
|
1.2.2 Funding for the development of electro-mobility
|
Target
|
Expansion of municipal and commercial e-mobility fleets
|
-
|
Number of e-vehicles
|
0
|
4 000
|
Q2
|
2024
|
Municipalities, companies and other eligible organisations have received funding commitments for at least 4 000 e-vehicles with support of the grant scheme.
|
28
|
1.2.2 Funding for the development of electro-mobility
|
Target
|
Completion of electro-mobility preliminary designs
|
-
|
Number of completed electro-mobility preliminary designs
|
0
|
80
|
Q2
|
2024
|
At least 80 electro-mobility preliminary designs have been completed for municipalities, companies or other eligible organisations.
|
29
|
1.2.3 Support for the replacement of the private vehicle fleet
|
Target
|
Support for the purchase of 240 000 electric vehicles
|
-
|
Number of e-vehicles purchased
|
0
|
240 000
|
Q1
|
2021
|
Recipients have received grant support for the purchase of a total of 240 000 electric vehicles on the basis of the amended funding guidelines that entered into force on 8 July 2020.
|
30
|
1.2.3 Support for the replacement of the private vehicle fleet
|
Target
|
Support for the purchase of another 320 000 electric vehicles
|
-
|
Number of e-vehicles purchased
|
240 000
|
560 000
|
Q4
|
2022
|
Recipients have received grant support for the purchase of a (cumulative) total of 560 000 electric vehicles on the basis of the amended funding guidelines that entered into force on 8 July 2020.
|
30A
|
1.2.3 Support for the replacement of the private vehicle fleet
|
Target
|
Support for the purchase of 399 450 electric vehicles
|
-
|
Number of e-vehicles purchased
|
0
|
399 450
|
Q1
|
2025
|
Additionally to the purchases supported under targets 29 and 30, grant support has been disbursed to recipients for the purchase of 399 450 electric vehicles, (PHEV, BEV and FCEV) on the basis of the funding guidelines (BAnz 07.07.2020 B2) that entered into force on 8 July 2020 as well as any subsequent guidelines and amendments to those guidelines.
|
31
|
1.2.4 Extension of the initial registration period for granting the ten-year tax exemption for purely electric vehicles
|
Milestone
|
Entry into force of the Seventh Motor Vehicle Tax Amendment Act
|
Provision in the law indicating the entry into force of the Seventh Motor Vehicle Tax Amendment Act
|
-
|
-
|
-
|
Q4
|
2020
|
The amendment to the Motor Vehicle Tax Act to extend the initial registration period for e-vehicles to obtain the ten-year tax exemption has entered into force.
|
32
|
1.2.4 Extension of the initial registration period for granting the ten-year tax exemption for purely electric vehicles
|
Milestone
|
Evaluation of the measure
|
The measure shall be evaluated five years after its entry into force, within the framework provided for in the Seventh Motor Vehicle Tax Amendment Act.
|
-
|
-
|
-
|
Q1
|
2026
|
The evaluation shall examine whether the vehicle tax bases is expected to continue to provide incentives for environmentally and climate-friendly mobility in the future. In particular, the data from the customs administration and the Federal Motor Transport Authority shall be used for this purpose (cf. BT-Drs.19/20978 p. 16). The evaluation shall be published.
|
33
|
1.2.5 Support for purchases of buses with alternative propulsion
|
Milestone
|
Publication of funding guidelines
|
Publication in the Federal Gazette (Bundesanzeiger)
|
-
|
-
|
-
|
Q3
|
2021
|
The funding guidelines on the support scheme for the purchase of buses and coaches for passenger transport with alternative propulsion have been published in the Federal Gazette (Bundesanzeiger).
|
34
|
1.2.5 Support for purchases of buses with alternative propulsion
|
Target
|
Approval of applications
|
-
|
EUR million
|
0
|
1 031
|
Q3
|
2025
|
Of the EUR 1 085 000 000 allocated to the measure, at least EUR 1 031 000 000 of bus purchase projects have been approved, enabling the orders of the corresponding buses.
|
35
|
1.2.5 Support for purchases of buses with alternative propulsion
|
Target
|
Orders of buses with alternative propulsion
|
-
|
Number of buses ordered
|
0
|
2 800
|
Q3
|
2026
|
At least 2 800 buses with alternative propulsion have been ordered with support from the scheme.
|
36
|
1.2.6 Support to promote alternative rail propulsion
|
Milestone
|
Entry into force of the funding guidelines
|
Entry into force
|
-
|
-
|
-
|
Q1
|
2021
|
The funding guidelines for the grant scheme to promote alternative rail propulsion have entered into force enabling eligible organisations to submit applications.
|
37
|
1.2.6 Support to promote alternative rail propulsion
|
Target
|
Approval of applications
|
-
|
EUR million
|
0
|
215.65
|
Q3
|
2024
|
Of the EUR 227 000 000 allocated to the measure, at least EUR 215 650 000 of rail purchase projects have been approved, enabling the orders of the corresponding rail vehicles.
|
38
|
1.2.6 Support to promote alternative rail propulsion
|
Target
|
Order of rail vehicles with alternative propulsion
|
-
|
Number of rail vehicles ordered
|
0
|
280
|
Q4
|
2024
|
At least 280 rail vehicles (locomotives) with alternative (to conventional diesel) propulsion have been ordered, with support from the scheme, as evidenced by binding awards by the beneficiary of contracts for the delivery of the vehicles with manufacturers.
|
39
|
1.2.7 Promotion of the industries involved in hydrogen and fuel cell applications in transport
|
Milestone
|
Entry into force of amendment extending existing supporting guidelines (Förderrichtlinien) of the National Hydrogen and Fuel Cell Technology Innovation Programme (NIP) (or if not sufficiently covered by existing supporting guidelines, entry into force of new supporting guidelines).
|
Publication in Federal Gazette (Bundesanzeiger)
|
-
|
-
|
-
|
Q4
|
2021
|
The relevant funding guidelines in the National Hydrogen and Fuel Cell Technology Innovation Programme (NIP), currently limited to 30 June 2021, has been extended in time and this extension has entered into force. If planned projects under the measure are not sufficiently covered by existing supporting guidelines, separate supporting guidelines shall be adopted.
|
40
|
1.2.7 Promotion of the industries involved in hydrogen and fuel cell applications in transport
|
Target
|
Approval of projects for the vehicle and supplier industry for hydrogen and fuel cell applications in transport
|
-
|
Number of approved projects
|
0
|
170
|
Q4
|
2025
|
At least 170 R&D and market activation projects for hydrogen and fuel cell applications in transport have been approved, enabling the start of the implementation of the funded projects.
|
41
|
1.2.7 Promotion of the industries involved in hydrogen and fuel cell applications in transport
|
Milestone
|
Establishment of a Technology and Innovation Centre for Hydrogen Technology
|
At least partial start of operations of the centre
|
-
|
-
|
-
|
Q3
|
2026
|
The Technology and Innovation Centre shall be at least partially operational, while, for example, construction works may not have been completed. Partial operation of the centre guarantees that the actual support services to businesses and stakeholders may be provided.
|
C. COMPONENT 1.3: Climate-friendly renovation and construction
The component of the German recovery and resilience plan addresses the challenge of climate change mitigation and energy transition with a focus on energy-efficient renovation.
In the building sector, Germany aims to reduce CO2 emissions by around 40% by 2030 compared to current levels (120 million tonnes of CO2 equivalent in 2020). By 2050, Germany aims to achieve net-zero GHG emissions, including for the building stock in Germany. At the same time, it must be ensured that construction and housing remain affordable.
The climate-friendly construction and renovation component aims at contributing to the achievement of these objectives by increasing energy efficiency and the share of renewable energy in final energy consumption for heating and cooling in buildings. Accompanying measures for the timber construction sector towards digitalisation, circularity and climate-friendly practices shall also be undertaken as timber is identified as having the potential to constitute a climate friendly and resource-efficient building material, as well as leading to cost-effective and time-efficient construction and renovation methods.
The component supports addressing the Country Specific Recommendations related to the green transition, in particular clean, efficient and integrated energy systems and, indirectly, to making housing more affordable (Country Specific Recommendation 1 in 2019 and Country Specific Recommendation 2 in 2020).
It is expected that no measure in this component does significant harm to environmental objectives within the meaning of Article 17 of Regulation (EU) 2020/852, taking into account the description of the measures and the mitigating steps set out in the recovery and resilience plan in accordance with the DNSH Technical Guidance (2021/C58/01).
C.1.
Description of the reforms and investments for non-repayable financial support
1.3.1 Investment: Support programme for the development of a climate-friendly timber construction
The objective of this investment is to accelerate the development, deployment and diffusion of innovative technologies, processes, products and services (digital transformation) to increase the use of timber as a climate-friendly building material. The measure is also intended to help overcome structural disadvantages and obstacles in order to be able to establish construction with timber on an equal footing in large-scale, multi-storey construction. To overcome the challenge of transfer of knowledge, innovation and technology between research and practice, the measure further aims to improve the networking between businesses, academia and research institutions related to climate-friendly construction with timber.
To that end, the measure shall focus support on advisory services (analysis, evaluations and recommendations) directed towards increasing the use of timber (coniferous/deciduous) and related to digitalisation, service and business innovation, business optimisation, and recyclability of construction products. The measure shall also focus on the development of innovation clusters related to innovation and development of climate-friendly timber construction. Given the structure of the sector, SMEs are aimed to be the main beneficiaries of the support.
The implementation of the measure shall be completed by 31 December 2021. This corresponds to the period during which project owners may apply for support.
1.3.2 Investment: Municipal living labs for the energy transition
Municipal living labs for the energy transition explore and demonstrate innovative solutions for the efficient and sustainable energy supply of urban neighbourhoods. Technological and non-technical innovations are tested in a real-world environment, thereby contributing to technology development and market penetration, whilst serving as a blueprint for the subsequent large-scale roll-out of integrated solutions.
Living laboratories (including this measure) are one of the sector coupling measures of the German National Energy and Climate Plan (NECP).
At least four joint living labs projects shall be implemented, covering at least 10 urban neighbourhoods.
The implementation of the measure shall be completed by 31 March 2026.
1.3.3 Investment: Building renovation: federal funding for energy-efficient buildings
This investment measure focuses on support to the energy-efficient renovation of residential buildings. It consists of two strands focused on i) full renovation programmes and ii) individual measures.
The first strand of the measure shall achieve, on average, at least a medium-depth level renovation as defined in Commission Recommendation (EU) 2019/786 on Building Renovation. More specifically, given the current state of housing stock and the minimum requirement to obtain support under the measure (the renovated building must achieve at minimum Energy class 100) it aims to achieve on average a minimum of 45% of primary energy demand savings and potentially significantly more (70% savings) through bonuses for renewable energy and better classes of energy efficiency.
The second strand shall support individual measures. This strand shall focus on support to the energy-efficient renovation of residential buildings for the following individual measures: building envelope, systems technology (without heating), solar collectors, biomass heating systems, electric heat pumps and combination of these categories. Moreover, support shall extend to a 10% funding bonus for exchanging functioning oil/coal-based heating and gas boilers that are older than 20 years for above-mentioned heating items. Interventions not supported under the measure shall be the replacement of coal/oil-based heating with hybrid gas or gas-condensing boilers, and the connection to district heating networks.
The implementation of the measure under the German recovery and resilience plan is expected to start by 1 January 2021 and shall be completed by 31 August 2026. In addition, Germany is planning to prolong the measure beyond 2026 with funding under its national budget.
C.2.
Milestones, targets, indicators, and timetable for monitoring and implementation for non-repayable financial support
Sequential Number
|
Related Measure (Reform or Investment)
|
Milestone / Target
|
Name
|
Qualitative indicators
(for milestones)
|
Quantitative indicators
(for targets)
|
Indicative timeline for completion
|
Description of each milestone and target
|
|
|
|
|
|
Unit of measure
|
Baseline
|
Goal
|
Quarter
|
Year
|
|
42
|
1.3.1 Support programme for the development of a climate-friendly timber construction sector
|
Milestone
|
Funding guidelines on the promotion of climate-friendly timber construction
|
Publication in the Federal Gazette (Bundesanzeiger) and entry into force of the funding guidelines
|
-
|
-
|
-
|
Q1
|
2021
|
The guidelines have been published in the Federal Gazette (Bundesanzeiger), enabling companies and eligible organisations to apply for funding.
|
43
|
1.3.1 Support programme for the development of a climate-friendly timber construction sector
|
Target
|
Approval of projects related to the development of climate-friendly timber construction
|
-
|
Number of approved projects
|
0
|
17
|
Q2
|
2022
|
At least 17 projects have been approved, enabling the recipients to start their implementation.
|
44
|
1.3.2 Municipal living labs for the energy transition
|
Target
|
Approval of ‘living labs’ projects
|
-
|
Number of approved projects
|
0
|
4
|
Q4
|
2023
|
At least four joint living labs projects have been approved through a grant decision, enabling the start of their implementation.
|
45
|
1.3.2 Municipal living labs for the energy transition
|
Target
|
Completion of urban neighbourhood projects
|
-
|
Number
|
0
|
10
|
Q1
|
2026
|
Innovative installations for efficient and sustainable energy supply have been tested and are operational in 10 urban neighbourhoods. The 10 implemented neighbourhood projects demonstrably achieve a reduction in primary energy demand compared to conventional energy supply for buildings, thus contributing to decarbonisation in the building sector.
|
46
|
1.3.3 Building renovation: federal funding for energy-efficient buildings
|
Milestone
|
Funding guidelines for the support of energy-efficient renovation of buildings
|
Publication of funding guidelines in the Federal Gazette (Bundesanzeiger)
|
-
|
-
|
-
|
Q3
|
2021
|
The guidelines have been published, enabling households and eligible organisations to apply for funding.
|
47
|
1.3.3 Building renovation: federal funding for energy-efficient buildings
|
Target
|
Completion of energy-efficient renovations of 10 000 housing units.
|
-
|
Number of housing units renovated
|
0
|
10 000
|
Q4
|
2024
|
At least 10 000 housing units have been renovated under the support scheme; the corresponding works have been fully carried out and the corresponding grants have been disbursed.
|
48
|
1.3.3 Building renovation: federal funding for energy-efficient buildings
|
Target
|
Completion of energy-efficient renovations of a further 30 000 housing units
|
-
|
Number
|
10 000
|
40 000
|
Q2
|
2026
|
At least 40 000 housing units have been renovated under the support scheme; the corresponding works have been fully carried out and the corresponding grants have been disbursed.
|
48 A
|
1.3.3 Building renovation: federal funding for energy-efficient buildings
|
Target
|
Interim target for completed individual renovation measures for energy-efficient buildings
|
|
Completed individual renovation measures
|
0
|
55 000
|
Q4
|
2024
|
At least 55 000 individual renovation measures have been completed.
|
48 B
|
1.3.3 Building renovation: federal funding for energy-efficient buildings
|
Target
|
Final target for completed individual renovation measures for energy-efficient buildings
|
|
Completed individual renovation measures
|
55 000
|
145 000
|
Q2
|
2026
|
At least 145 000 individual renovation measures have been completed in total.
|
D. COMPONENT 2.1: Data as the raw material of the future
The objectives of this component of the German recovery and resilience plan are to support the transition towards a secure and dynamic data economy through the promotion of data-driven innovation in the context of the data strategy adopted by the German federal government on 27 January 2021, as well as through investments in research, development, innovation and first industrial deployments in strategic technological areas linked to the processing of data (microelectronics and next generation cloud infrastructures and services) in the context of large multi-country initiatives.
The component supports addressing the Country Specific Recommendations on investment in the digital transition (Country Specific Recommendation 1 in 2019 and Country Specific Recommendation 2 in 2020).
It is expected that no measure in this component does significant harm to environmental objectives within the meaning of Article 17 of Regulation (EU) 2020/852, taking into account the description of the measures and the mitigating steps set out in the recovery and resilience plan in accordance with the DNSH Technical Guidance (2021/C58/01).
D.1.
Description of the reforms and investments for non-repayable financial support
2.1.1 Reform: Innovative data policy for Germany
The objectives of the measure are to foster the sharing and innovative use of data. It notably aims at addressing the lack of infrastructures, data literacy, incentives to share data and incentives to invest in the data economy.
The investment consists of supporting projects, selected mainly through calls for proposals, covering the following activities:
-networks and research and development of software for high-performance computing;
-pilot projects/use cases/real laboratories (‘regulatory data sandboxes’) for the testing and scientific monitoring of data diffusion models;
-a research network of six living labs investigating depersonalisation of data in certain application domains such as healthcare, automotive, retail and manufacturing;
-research projects on technologies to anonymise data;
-actions aiming at developing data literacy in different fields of science (including those that are less data-intensive);
-data science laboratories linked to the national research data infrastructure;
-support to young researchers in data science;
-support to universities in the re-use, sharing and management of research data;
-monitoring of data skills of the German population;
-data literacy courses for students and other learners;
-research and innovation on architectures, institutions and spaces for the data society;
-development of a freely available toolbox for increased data literacy; and
-a pilot project on data cooperation in the food value chain.
A specific set of actions aiming at improving data literacy and data use in the federal administration shall also be supported. These shall include:
-the stock-taking and analysis of measures already taken to increase data literacy;
-the mapping of data competence across public administration services;
-the creation of Chief Data Scientists or similar roles in federal ministries;
-the establishment and strengthening of internal data laboratories and data competence centres in federal ministries and agencies, including notably the Foreign Office, the Federal Ministry of Education and Research, the Federal Environment Agency, the Federal Ministry of Defence, the Federal Ministry for Economic Cooperation and Development, the Federal Institute for Occupational Safety and Health, the German Corporation for International Cooperation; and
-the creation of a digital academy in the Federal Academy for Public Administration, bringing together all training opportunities to support digitalisation.
The implementation of the reform shall be completed by 31 December 2025.
2.1.2 Investment: IPCEI Microelectronics and Communication Technologies
The objective of the measure is to contribute to a cross-border initiative aiming at endowing the European Union with capabilities in electronics design and deployment of the next generation of low power trusted processors and other electronic components.
The initiative shall be implemented through a planned Important Project of Common European Interest (IPCEI).
The investment consists of providing support to German participants in projects to be implemented as part of the planned IPCEI.
The implementation of the investment shall be completed by 31 August 2026.
2.1.3 Investment: IPCEI Next Generation Cloud Infrastructure and Services (IPCEI CIS)
The objective of the measure is to contribute to a large-scale cross-border initiative aiming at fostering the development and first industrial deployment of smart cloud and edge solutions that are highly innovative, fully interoperable, highly secure, energy efficient and fully compliant with data protection.
The initiative shall be implemented through a planned IPCEI.
The investment consists of providing financial support to German participants in projects to be implemented as part of the planned IPCEI.
The selection criteria shall ensure that more than 50% of these projects address energy-efficiency as one of their key priorities and comply with the European Code of Conduct on Data Centre Energy Efficiency.
The implementation of the investment shall be completed by 31 August 2026.
D.2.
Milestones, targets, indicators, and timetable for monitoring and implementation for non-repayable financial support
Sequential Number
|
Related Measure (Reform or Investment)
|
Milestone / Target
|
Name
|
Qualitative indicators
(for milestones)
|
Quantitative indicators
(for targets)
|
Indicative timeline for completion
|
Description of each milestone and target
|
|
|
|
|
|
Unit of measure
|
Baseline
|
Goal
|
Quarter
|
Year
|
|
49
|
2.1.1 Innovative data policy for Germany
|
Milestone
|
Start of projects
|
Start of all projects
|
-
|
-
|
-
|
Q4
|
2022
|
All projects and activities of the measure have started. Wherever relevant, selection procedures have been completed and selected projects have started.
|
50
|
2.1.1 Innovative data policy for Germany
|
Target
|
Development of human resources and capabilities in federal ministries
|
-
|
Percentage of federal ministries with data units and internal data laboratories
|
0
|
95
|
Q3
|
2026
|
At least 95% of federal ministries have established a Chief Data Scientist unit or equivalent and an internal data laboratory
|
51
|
2.1.1 Innovative data policy for Germany
|
Target
|
Budget execution – disbursement of at least EUR 464 400 000 to the supported projects
|
-
|
EUR million
|
0
|
464.4
|
Q3
|
2026
|
Of the EUR 516 000 000 allocated to the measure, at least EUR 464 400 000 have been disbursed to envisaged projects and activities.
|
52
|
2.1.2 IPCEI Microelectronics and Connectivity
|
Milestone
|
Content design of the planned IPCEI
|
Completion of national call for expression of interest process to identify projects in Germany
|
-
|
-
|
-
|
Q2
|
2021
|
The expression of interest procedure has been completed. Potential projects and project participants in Germany have been identified.
|
53
|
2.1.2 IPCEI Microelectronics and Connectivity
|
Target
|
Launch of first projects
|
-
|
Number of projects
|
0
|
10
|
Q4
|
2022
|
Ten grant decisions have been signed.
|
54
|
2.1.2 IPCEI Microelectronics and Connectivity
|
Target
|
Budget execution – disbursement of at least EUR 1 275 000 000 to the supported projects
|
-
|
EUR million
|
0
|
1 275
|
Q3
|
2026
|
Of the EUR 1 500 000 000 allocated to the measure, at least EUR 1 425 000 000 have been committed (through signatures of grant decisions) and at least EUR 1 275 000 000 have been disbursed to projects.
|
55
|
2.1.3 IPCEI Next Generation Cloud Infrastructure and Services (IPCEI CIS)
|
Milestone
|
Launch of R&D&I projects
|
Signature of grant decisions for R&D&I projects
|
-
|
-
|
-
|
Q4
|
2022
|
The grant decisions have been signed for all R&D&I projects covered by the IPCEI State aid decision. The selection criteria have ensured that more than 50% of these projects address energy-efficiency as one of their key priorities and comply with the European Code of Conduct on Data Centre Energy Efficiency.
|
56
|
2.1.3 IPCEI Next Generation Cloud Infrastructure and Services (IPCEI CIS)
|
Milestone
|
Launch of pilot phase of use cases
|
Publication of a report on the state of play of the projects
|
-
|
-
|
-
|
Q4
|
2024
|
A report on the state of play of the initiative has been published.
|
57
|
2.1.3 IPCEI Next Generation Cloud Infrastructure and Services (IPCEI CIS)
|
Target
|
First industrial deployment of solutions developed under the measure.
|
-
|
Number of use cases addressed in large-scale pilots which are eventually addressed in first industrial deployments
|
0
|
1
|
Q3
|
2026
|
At least one of the use cases addressed in the large-scale piloting phase shall have been subject to a first industrial deployment.
|
58
|
2.1.3 IPCEI Next Generation Cloud Infrastructure and Services (IPCEI CIS)
|
Target
|
Budget execution – disbursement of at least EUR 637 500 000 to the supported projects
|
-
|
EUR million
|
0
|
637.5
|
Q3
|
2026
|
Of the EUR 750 000 000 allocated to the measure, at least EUR 712 500 000 have been committed (through signatures of grant decisions) and at least EUR 637 500 000 have been disbursed to projects. More than 50% of the funded projects addressed energy-efficiency as one of their key priorities and complied with the European Code of Conduct on Data Centre Energy Efficiency.
|
E. COMPONENT 2.2: Digitalisation of the Economy
The objectives of the component of the German recovery and resilience plan are to support the digital transition of the German economy and the challenges resulting from it. The component addresses essential aspects such as research and innovation on digital technologies, and skills. It also aims at providing specific support to the automotive and rail sectors.
The component supports addressing the Country Specific Recommendations on investment in the digital transition (Country Specific Recommendation 1 in 2019 and Country Specific Recommendation 2 in 2020).
It is expected that no measure in this component does significant harm to environmental objectives within the meaning of Article 17 of Regulation (EU) 2020/852, taking into account the description of the measures and the mitigating steps set out in the recovery and resilience plan in accordance with the DNSH Technical Guidance (2021/C58/01).
E.1.
Description of the reforms and investments for non-repayable financial support
2.2.1 Investment: Vehicle manufacturer/supply industry investment programme
The objective of the measure is to provide support to the digital and ecological transition of the automotive industry, in the context of a programme aiming at supporting future-oriented investments by the vehicle manufacturers and supply industry.
The investment consists of funding projects to be selected through four calls for proposals corresponding to three modules and addressing:
-module (a):
oinvestments in the vehicle sector, supporting in particular future-oriented investment projects by small and medium-sized enterprises in the vehicle industry, with the aim of making production processes more energy efficient and digital; and
osupport to research and development projects in the field of digitalisation of production processes and industry 4.0 in the vehicle industry.
-module (b):
osupport to research and development projects in the field of automated driving, innovative powertrains and light building in vehicle technologies.
-module (c):
osupport to regional innovation clusters for the transformation of the vehicle industry, addressing in particular the supply industry and focusing on technology transfer between enterprises from regions particularly affected by structural change, transition to climate-neutral propulsion and digitalisation and modernisation of industry production processes.
Only future investments that make a significant contribution to the digitalisation and climate objectives of the programme launched by Germany to support future-oriented investments by the vehicle manufacturers and supply industry shall be supported. Therefore, no targeted support for fossil combustion engine technologies in the vehicle sector shall be provided under the measure.
The implementation of the investment shall be completed by 31 August 2026.
2.2.2 Reform: Federal programme ‘Building continuing education and training networks (CET networks)’
The objective of the measure is to support so-called ‘CET networks’, which promote the organisation of training activities, for employees of SMEs in particular. More specifically, the aim is to support the establishment or development of professional development networks, in order to enable companies, among other things, to benefit from the experience of other companies and of educational and advisory centres and institutions, and thereby to develop their own strategic staff development and training planning. These ‘skills alliances’ shall also enable participating training providers to adapt their offer.
The investment consists of supporting around 40 pilot projects, selected through one of the calls for proposals organised under the federal programmes ‘Building CET networks’.
The implementation of the reform shall be completed by 31 December 2024.
2.2.3 Investment: Digitalisation and Technology Research Centre of the Bundeswehr (dtec.bw)
The objective of the measure is to support research and innovation activities on strategic technological areas for the future, in order to contribute to strengthen German and European digital and technological sovereignty.
The investment consists of supporting research, development and innovation activities led by the Digitalisation and Technology Research Centre of the Bundeswehr (dtec.bw).
The corresponding research projects shall focus on digital fields and key technologies for the future, in line with the federal government’s high-tech strategy priorities (‘Sustainability’, ‘Climate Protection and Energy’, ‘Mobility’, ‘Security’ and ‘Economics and Work 4.0’):
-Space research, aerospace engineering and space communications;
-Sensor technology and integrated sensor systems;
-Innovative, connected mobility;
-Cybersecurity, including quantum communications;
-Research on risk, critical infrastructures, security and conflict;
-Technologies, methods and impacts of digitalisation (e.g. additive manufacturing);
-Digitalisation of the energy and production sectors, sustainable infrastructure development;
-Artificial Intelligence, robotics and intelligent physical systems; and
-Skills for the digital world of work and leadership models of the future.
The implementation of the investment shall be completed by 31 August 2026.
2.2.4 Investment: Promoting the digitalisation of rail by replacing conventional interlocking/fast-track programmes to speed up the roll-out of the ‘Digital Rail Germany’ (SLP)
The objective of the measure is to support the digitalisation of railway in the context of the ‘Digital Rail Germany’ initiative and the ‘fast track’ programme aiming at accelerating it. This initiative gathers public and private stakeholders (including the Federal Railway Authority (EBA), research and technical organisations and industry, amongst others) in order to develop standardised, interoperable and modular components for the digitalisation of railway operations.
The investment consists of funding seven pilot projects of the programme, aiming at developing solutions to replace old signal boxes and level crossing protection systems by security systems of the latest digital generation.
Four of these projects shall enable established firms to certify new solutions in an operational context, while the other three shall enable additional providers to validate their solutions in laboratory tests. The new solutions developed by these projects shall be compatible with the technical specifications of the ‘Digital Rail Germany’ programme. They are also aimed to be upgradeable and compatible with a subsequent ETCS (European Train Control System) upgrade by means of uniform system interfaces.
The implementation of the investment shall be completed by 31 March 2023.
E.2.
Milestones, targets, indicators, and timetable for monitoring and implementation for non-repayable financial support
Sequential Number
|
Related Measure (Reform or Investment)
|
Milestone / Target
|
Name
|
Qualitative indicators
(for milestones)
|
Quantitative indicators
(for targets)
|
Indicative timeline for completion
|
Description of each milestone and target
|
|
|
|
|
|
Unit of measure
|
Baseline
|
Goal
|
Quarter
|
Year
|
|
59
|
2.2.1 Vehicle manufacturers/suppliers investment programme
|
Milestone
|
Publication of all funding guidelines
|
Publication of the funding guidelines in the Federal Gazette (Bundesanzeiger)
|
-
|
-
|
-
|
Q1
|
2021
|
All the funding guidelines for the four types of support measures under the programme have been published in the Federal Gazette (Bundesanzeiger) and have become legally binding.
|
60
|
2.2.1 Vehicle manufacturers/suppliers investment programme
|
Target
|
Approval of projects
|
-
|
Number of projects approved
|
0
|
401
|
Q1
|
2023
|
At least 401 funding projects (for the three modules) have been approved and have received a support decision for implementation.
|
61
|
2.2.1 Vehicle manufacturers/suppliers investment programme
|
Target
|
Successful completion of projects
|
-
|
Number of projects successfully completed
|
0
|
531
|
Q3
|
2026
|
At least 531 funding projects approved between 2021 and 2026 have been successfully completed.
|
62
|
2.2.2 Federal programme ‘Building further CET networks’
|
Milestone
|
Publication of the funding guidelines
|
Publication of the funding guidelines in the Federal Gazette (Bundesanzeiger)
|
-
|
-
|
-
|
Q2
|
2020
|
The funding guidelines have been published in the Federal Gazette (Bundesanzeiger) and have become legally binding.
|
63
|
2.2.2 Federal programme ‘Building further CET networks’
|
Target
|
Active participation of additional enterprises in CET networks
|
-
|
Number of additional enterprises participating in CET networks
|
0
|
200
|
Q4
|
2022
|
At least 200 additional enterprises participate in CET networks. These companies participate in the collection of training needs, the design of new training measures or modules and the use of proposed training measures or modules together with other companies (use of information and participation in events only shall not be considered as active participation). Only companies that have not already been designated as cooperation partners at the start of the respective skills alliance shall be taken into account for this target.
|
64
|
2.2.2 Federal programme ‘Building further CET networks’
|
Target
|
Revision or redesign of training measures or sub-modules as a result of the work of the CET networks
|
-
|
Number of revised or redesigned training measures
|
0
|
60
|
Q4
|
2024
|
At least 60 training measures or sub-modules have been redesigned or revised, taking into account digital skills, which have been initiated or encouraged by CET networks or which take into account the results of the needs assessments carried out by the coordinating bodies of CET networks.
|
65
|
2.2.3 Digitalisation and Technology Research Centre of the Bundeswehr
|
Target
|
Launch of research projects
|
-
|
Number of projects
|
0
|
68
|
Q1
|
2021
|
At least 68 funding grants have been signed and the corresponding 68 projects have received funding and may start their research activity.
|
66
|
2.2.3 Digitalisation and Technology Research Centre of the Bundeswehr
|
Milestone
|
Report on research and transfer outputs
|
Publication of a report to the Federal Ministry of Defence confirming successful progress of projects
|
-
|
-
|
-
|
Q4
|
2023
|
A report to the Federal Ministry of Defence has been published, confirming the progress of the funded projects in terms of research outputs, cooperation, knowledge transfer and technology transfer with at least (overall):
-200 publications;
-70 collaborations initiated with other research institutes;
-30 collaborations initiated with industrial companies and startups;
-15 collaborations initiated with agencies of the Federal Armed Forces and the public administration;
-10 prototypes of mature technologies; and
-10 patent applications.
Additionally, an external evaluation of the measure by the German Science Council has also been published.
|
67
|
2.2.3 Digitalisation and Technology Research Centre of the Bundeswehr
|
Target
|
Continuation of projects
|
-
|
Number of projects assessed as progressing satisfactorily
|
0
|
40
|
Q2
|
2024
|
On the basis of an interim evaluation, at least 40 projects are considered as progressing satisfactorily and may continue their activities.
|
68
|
2.2.3 Digitalisation and Technology Research Centre of the Bundeswehr
|
Target
|
Budget execution – disbursement of EUR 700 000 000 to the supported
|
-
|
Funds paid to projects
|
0
|
700
|
Q3
|
2026
|
At least EUR 700 000 000 has been disbursed to projects supported through the measure.
|
69
|
2.2.3 Digitalisation and Technology Research Centre of the Bundeswehr
|
Milestone
|
Report on research and transfer outputs
|
Publication of a report to the Federal Ministry of Defence confirming successful progress of projects
|
-
|
-
|
-
|
Q3
|
2026
|
A report to the Federal Ministry of Defence has been published, confirming the overall success of the funded projects in terms of research outputs, cooperation, knowledge transfer and technology transfer with at least (overall):
-400 publications;
-60 doctorates completed;
-100 collaborations initiated with other research institutes;
-70 collaborations initiated with industrial companies and startups;
-30 collaborations initiated with agencies of the Federal Armed Forces and the public administration;
-20 prototypes of mature technologies;
-20 patent applications; and
-10 start-up projects.
|
70
|
2.2.4 Promoting the digitalisation of railways by replacing conventional interlocking/fast-track programmes to speed up the roll-out of the ‘Digital Rail Germany’
|
Milestone
|
Signature of the financing agreement for the ‘fast track’ programme between the Federal Government and Deutsche Bahn AG
|
Signed financing agreement between the Federal Government and Deutsche Bahn AG
|
-
|
-
|
-
|
Q4
|
2020
|
The financing agreement between the Federal Government and Deutsche Bahn AG has been signed.
|
71
|
2.2.4 Promoting the digitalisation of railways by replacing conventional interlocking/fast-track programmes to speed up the roll-out of the ‘Digital Rail Germany’
|
Milestone
|
Interim report on implementation
|
Interim report submitted by DB Netz AG to the Federal Ministry for Digital and Transport (BMDV) and the Federal Railway Authority (EBA) on the implementation of the programme.
|
-
|
-
|
-
|
Q2
|
2021
|
DB Netz AG has submitted a report to the Federal Ministry for Digital and Transport (BMDV) and the Federal Railway Authority (EBA) on the implementation of the programme.
|
72
|
2.2.4 Promoting the digitalisation of railways by replacing conventional interlocking/fast-track programmes to speed up the roll-out of the ‘Digital Rail Germany’
|
Target
|
Successful completion of pilot projects
|
-
|
Number of pilot projects completed
|
0
|
6
|
Q4
|
2021
|
Six pilot projects of the programme, aiming at developing solutions to replace old signal boxes and level crossing protection systems by security systems of the latest digital generation have been completed successfully, with validation in operational conditions for at least three of them, and validation in laboratory conditions for the others.
|
72A
|
2.2.4 Promoting the digitalisation of railways by replacing conventional interlocking/fast-track programmes to speed up the roll-out of the ‘Digital Rail Germany’
|
Target
|
Successful completion of the final pilot project
|
-
|
Number of pilot projects completed
|
6
|
7
|
Q1
|
2023
|
The final pilot project of the programme has been completed successfully with validation in operational conditions.
|
F. COMPONENT 3.1: Digitalisation of Education
The component of the German recovery and resilience plan focuses on providing financial support for investments in the digital transition in education. The overall aim is to allow for more and better digital teaching and learning throughout the different education and training systems in Germany.
The component addresses the challenge of digital education in Germany. The long identified challenge has been exacerbated by the COVID-19 pandemic as the related lockdown caused closure of education sites such as schools, training institutions and universities. With the shift to online education, suboptimal infrastructure and basic digital skills are putting a break on the learning processes.
The component supports addressing the Country Specific Recommendation on focusing the investment on digital transition, in particular on education (Country Specific Recommendation 2 in 2020 and 1 in 2019) and improving educational outcomes and skills levels of disadvantaged groups (Country Specific Recommendation 2 in 2019).
It is expected that no measure in this component does significant harm to environmental objectives within the meaning of Article 17 of Regulation (EU) 2020/852, taking into account the description of the measures and the mitigating steps set out in the recovery and resilience plan in accordance with the DNSH Technical Guidance (2021/C58/01).
F.1.
Description of the reforms and investments for non-repayable financial support
3.1.1: Investment: Investment programme for teacher devices
The objective of this investment is to ensure the feasibility of digital teaching and learning across all schools in Germany. It consists of equipping teachers with mobile digital devices on a lending basis. The measure shall be part of a bigger framework supporting digital education that is only partially supported by the German recovery and resilience plan. The provision of digital devices shall be ensured by schools.
The implementation of the investment shall be completed by 31 December 2021.
3.1.2 Reform: Education platform
The objective of this measure is to develop and establish the first national education platform for an encompassing education area that, with digital means, supports the development of competences by learners throughout their individual learning pathways. The platform shall connect existing and new learning offers and learning materials and allow for a broad and open access.
The implementation of the measure is expected to start by 31 March 2022 and shall be completed by 31 December 2025.
3.1.3 Reform: Educational centres of excellence
The objective of this measure is to improve and institutionalise digital education as part of the established teacher education and further education framework. The measure shall support by providing scientific content the development and set-up of competence centres for digital education based on a system of collaboration between teacher education and in-service training institutions, universities, and research institutes.
The implementation of the measure shall be completed by 31 August 2026.
3.1.4 Investment: Modernisation of the Federal Armed Forces’ educational and training facilities
This investment seeks to equip up to 60 different education institutions of the Federal Armed Forces (Bundeswehr) with up-to-date information technology. The measure shall include a thorough analysis of the state of play and upgrade needs in the different institutions and a subsequent roll out of the necessary equipment and systems.
The implementation of the investment shall be completed by 31 March 2026.
F.2.
Milestones, targets, indicators, and timetable for monitoring and implementation for non-repayable financial support
Sequential Number
|
Related Measure (Reform or Investment)
|
Milestone / Target
|
Name
|
Qualitative indicators
(for milestones)
|
Quantitative indicators
(for targets)
|
Indicative timeline for completion
|
Description of each milestone and target
|
|
|
|
|
|
Unit of measure
|
Baseline
|
Goal
|
Quarter
|
Year
|
|
73
|
3.1.1 Investment programme for teacher devices
|
Milestone
|
Administrative agreement
|
Conclusion of the administrative agreement between the Federal Government of Germany and the governing bodies at Länder level
|
-
|
-
|
-
|
Q1
|
2021
|
Publication in the Federal Gazette (Bundesanzeiger) of the administrative agreement between the Federal Government of Germany and the governing bodies at Länder level to implement this investment.
|
74
|
3.1.1 Investment programme for teacher devices
|
Target
|
Disbursement of at least EUR 475 000 000 to the supported projects
|
-
|
EUR million
|
0
|
475
|
Q1
|
2022
|
Of the EUR 500 000 000 allocated to the measure, at least EUR 475 000 000 have been disbursed for the provision of digital equipment for teachers.
|
75
|
3.1.1 Investment programme for teacher devices
|
Milestone
|
Evaluation of changes in digital infrastructure and use of digital media in schools
|
Final evaluation report
|
-
|
-
|
-
|
Q4
|
2025
|
The evaluation report of the programme confirms that teachers have observed an improvement in the digital infrastructure available and the use of digital media in school.
|
76
|
3.1.2 Education platform
|
Milestone
|
Entry into force of the funding guidelines for education platform prototypes and procurement launched
|
Publication of the funding guidelines and call for tenders in the Federal Gazette (Bundesanzeiger)
|
-
|
-
|
-
|
Q1
|
2022
|
Funding guidelines have entered into force for the development of three separate prototypes of the meta-platform on education, as well as for cross-compatible research projects, accessible by learners and teachers. Depending on the result of these projects, the key dimensions of the project specifications are clarified and the procurement procedure shall be launched.
|
77
|
3.1.2 Education platform
|
Milestone
|
Launch of the beta-version of the education platform
|
Launch of beta version of the platform on the website of the Federal Ministry of Education and Research (BMBF)
|
-
|
-
|
-
|
Q3
|
2023
|
A beta version of the education platform shall be online, with all services and functions that have been identified in the functional description as high priority by the Federal Ministry of Education and Research (BMBF). These functions include access for information, user profile, collaboration, identity and access management, workflows, inbox. The launch shall be accompanied by additional security and data protection audits and successful load tests.
|
78
|
3.1.2 Education platform
|
Milestone
|
Final evaluation report with a decision on the future of the education platform
|
Publication of the final evaluation report in the Federal Gazette (Bundesanzeiger)
|
-
|
-
|
-
|
Q3
|
2024
|
The final evaluation report of the education platform has been published, with an assessment confirming that the project was successful according to the project monitoring criteria. The project shall be successful if the continuation of the education platform is recommended or if it is established that services and functions of the prototypes shall be taken over and continued by other stakeholders on the basis of the results of the project.
|
79
|
3.1.3 Educational centres of excellence
|
Milestone
|
Entry into force of the first funding guidelines and call for tenders for a project-executing agency for the overall programme
|
Publication of the first funding guidelines in the Federal Gazette (Bundesanzeiger) and publication of a call for tenders on an award platform.
|
-
|
-
|
-
|
Q4
|
2021
|
Under the lead of the Federal Ministry of Education and Research (BMBF), the first funding guidelines have entered into force and have been published. A project-executing agency has been chosen based on applications received via a public call for tenders on an award platform.
|
80
|
3.1.3 Educational centres of excellence
|
Target
|
Approval of at least 45 research projects
|
-
|
Number of research projects approved and in progress
|
0
|
45
|
Q3
|
2022
|
At least 45 research projects have been approved by the project-executing agency and are in progress. Results have been published via the Federal catalogue of funds (Förderkatalog) and the BMBF website.
|
81
|
3.1.3 Educational centres of excellence
|
Milestone
|
Entry into force of three additional funding guidelines
|
Publication of the additional funding guidelines in the Federal Gazette (Bundesanzeiger)
|
-
|
-
|
-
|
Q3
|
2022
|
Under the lead of the Federal Ministry of Education and Research (BMBF), three additional funding guidelines, each of them with a specific thematic orientation, have entered into force and been published.
|
82
|
3.1.3 Educational centres of excellence
|
Target
|
Completion of research projects
|
-
|
Number of completed research projects
|
0
|
45
|
Q3
|
2026
|
At least 45 research projects have been completed, as evidenced by a final evaluation report that shall present the results of the supported research projects and demonstrate the added value for teacher training in digital and digitally supported teaching in each of the Länder. Results have been presented at a closing event and on the BMBF website.
|
83
|
3.1.4 Modernisation of the Federal Armed Forces’ educational and training facilities
|
Milestone
|
Project contract signed
|
Project contract signed with the IT service provider
|
-
|
-
|
-
|
Q1
|
2021
|
The project contract for the initial phase for assessing the IT systems of the educational and training facilities of the Federal Armed Forces (Bundeswehr) has been signed between the Federal Office of Federal Armed Forces’ Equipment, Information Technology and In-Service Support (BBAAINBw), a civilian higher federal authority directly subordinate to the Federal Ministry of Defense (BMVg) and the IT provider, stipulating key steps in the future assessment work.
|
84
|
3.1.4 Modernisation of the Federal Armed Forces’ educational and training facilities
|
Target
|
Analysis of educational institutions and identification of their IT needs
|
-
|
Number of educational institutions fully analysed
|
0
|
60
|
Q1
|
2022
|
An assessment report has been adopted by the Federal Ministry of Defence (BMVg). This report shall demonstrate that the IT environments and needs of the 60 initially designated educational institutions have been analysed, and the needs and implementation possibilities have been identified.
|
85
|
3.1.4 Modernisation of the Federal Armed Forces’ educational and training facilities
|
Target
|
Completion of the modernisation of the 60 educational institutions
|
-
|
Number of educational institutions for which modernisation has been completed
|
0
|
60
|
Q1
|
2026
|
A final assessment report has been adopted by the Federal Ministry of Defence (BMVg). This report shall confirm that on the basis of the results of the analyses carried out on the 60 institutions, necessary implementing measures have been completed within the time and budgets available. The result of the process, the progress already achieved regarding training and education shall be demonstrated and the way forward for the following years shall be mapped out.
|
G. COMPONENT 4.1: Strengthening of social inclusion
This component of the German recovery and resilience plan mobilises resources to improve different aspects of social inclusion: (i) labour market inclusion of women and parents in general, (ii) improving educational outcomes and skills for students with a learning backlog, often from disadvantaged backgrounds, (iii) safeguarding apprenticeships, thereby supporting the labour market entry for young people, (iv) protecting take-home pay and jobs by avoiding an increase in the tax wedge, and (v) improving transparency throughout all three pillars of the pension system and thereby access to social protection.
The component supports addressing the Country Specific Recommendation on focusing investment-related economic policy on education and on shifting away taxes from labour (Country Specific Recommendation 1 in 2019), on reducing disincentives to work more hours, on taking measures to safeguard the long-term sustainability of the pension system while maintaining adequacy of the pension level at the same time and on improving educational outcomes and skills levels of disadvantaged groups (Country Specific Recommendation 2 in 2019) and on focusing investment on education (Country Specific Recommendation 1 in 2019 and 2 in 2020).
It is expected that no measure in this component does significant harm to environmental objectives within the meaning of Article 17 of Regulation (EU) 2020/852, taking into account the description of the measures and the mitigating steps set out in the recovery and resilience plan in accordance with the DNSH Technical Guidance (2021/C58/01).
G.1.
Description of the reforms and investments for non-repayable financial support
4.1.1 Investment: Investment programme ‘Childcare-financing’ 2020/21: special fund ‘Child Day-care Expansion’
The objective of the measure is to promote the creation of new childcare facilities and the refurbishment of existing facilities, which shall create 90 000 additional places.
For this purpose, the federal government provides support to Länder and local authorities so that these invest in new buildings, extensions, conversions, refurbishments, renovations and equipment.
The implementation of the measure shall be completed by 31 December 2022.
4.1.2 Reform: Social Guarantee 2021
The objective of the measure is to avoid that the financial impact of COVID-19 triggers extensive social security contribution rises, denting take-home pay and increasing labour costs.
For this purpose, the Federal Government shall provide fiscal transfers for the social security funds to fill their financing gap, and with this avoid that the contribution rate of social security contributions exceeds 40% in 2021.
The implementation of the reform shall be completed by 31 December 2021.
4.1.3 Investment: Apprenticeship support
The objective of the measure is to counteract the COVID-19-related reduction in the number of apprenticeships.
For this purpose, the government shall provide financial support to SMEs that take on apprentices and that maintain their current level of training, create additional apprenticeships, avoid short-time working (Kurzarbeit) for apprentices, or take on apprentices from companies that have become insolvent.
The implementation of the measure shall be completed by 31 December 2022.
4.1.4 Reform: Educational support for students with a learning backlog
The objective of the measure is to avoid that a temporary learning backlog due to COVID-19-related disruption becomes entrenched.
For this purpose, the Federal Government shall provide financial support to the Länder so that these provide additional courses and mentoring to pupils, with a focus on core subjects and core competences, for example German language, mathematics and science.
The implementation of the measure shall be completed by 30 September 2022.
4.1.5 Reform: Digital Pension Overview
The objective of this measure is to create a Digital Pension Overview, a portal to provide citizens information about their individual pension provision from all three pension pillars (statutory, company and private pensions).
For this purpose, the German Pension Fund (Deutsche Rentenversicherung Bund) shall establish a pension information portal, involving the various stakeholders to ensure that it aggregates relevant pension information, and, through testing and development, it ensures that the portal is user friendly.
The implementation of the measure shall be completed by 31 August 2026.
G.2.
Milestones, targets, indicators, and timetable for monitoring and implementation for non-repayable financial support
Sequential Number
|
Related Measure (Reform or Investment)
|
Milestone / Target
|
Name
|
Qualitative indicators
(for milestones)
|
Quantitative indicators
(for targets)
|
Indicative timeline for completion
|
Description of each milestone and target
|
|
|
|
|
|
Unit of measure
|
Baseline
|
Goal
|
Quarter
|
Year
|
|
86
|
4.1.1 Investment programme ‘Childcare-financing’ 2020/21: special fund ‘Child Day-care Expansion’
|
Milestone
|
Entry into force of the Childcare Financing Act and the Federal Financial Assistance Act and of the implementing regulations at Länder level
|
Provision in the law indicating the entry into force of the Childcare Financing Act and the Federal Financial Assistance Act as well as the Länder-specific implementing regulations
|
-
|
-
|
-
|
Q4
|
2020
|
Amendments to the Childcare Financing Act and the Federal Financial Assistance Act (KitaFinHG) for the extension of day-care for children have entered into force. The Länder have adopted the federal rules and made them more specific in their Länder regulations.
|
87
|
4.1.1 Investment programme ‘Childcare-financing’ 2020/21: special fund ‘Child Day-care Expansion’
|
Milestone
|
Publication of interim report in compliance with KitaFinHG
|
Publication of interim reports containing amount of funding, number of childcare places, type and respective number of investments for equipment in accordance with the legal provisions and the relevant coordination discussions between the federal government and the Länder.
|
-
|
-
|
-
|
Q4
|
2023
|
An interim report on approved and created childcare places and investments in equipment (§ 30 (2) and (3) KitaFinHG) has been published. The relevant Länder have reported to the federal government on the state of implementation, including on funding, number of childcare places, type and respective number of investments for equipment, in accordance with the monitoring and guidance obligations.
|
88
|
4.1.1 Investment programme ‘Childcare-financing’ 2020/21: special fund ‘Child Day-care Expansion’
|
Target
|
Final report on the total number of newly funded childcare places in compliance with the KitaFinHG
|
-
|
Additional childcare places for children
|
0
|
90 000
|
Q4
|
2025
|
The Länder have submitted their final report on implementation after completion of the checks on the use of funds. The report confirms that 90 000 newly funded childcare places for children prior to school entry have been created in child day-care facilities (Kindertageseinrichtungen) and child day-care services (Kindertagespflege) throughout Germany.
|
89
|
4.1.2 Social Guarantee 2021
|
Milestone
|
Verification of the average social security contribution rate for year 2021
|
Total social security contribution rate calculated and it is established not having exceeded 40%
|
-
|
-
|
-
|
Q4
|
2021
|
The total social security contribution rate shall be calculated for year 2021 and it is established that this has not increased above 40%. The total social security contribution rate shall be calculated as the sum of the contribution rates for pensions, unemployment, long-term care ( without childless supplement) and healthcare insurance including the average additional contribution rate under § 242a Social Code V (SGB V).
|
90
|
4.1.3 Apprenticeship support
|
Milestone
|
Entry into force of the revised funding guidelines for the federal programme Ausbildungsplätze sichern
|
Publication of revised funding guidelines
|
-
|
-
|
-
|
Q2
|
2021
|
The revised funding guidelines covering the whole federal programme Ausbildungsplätze sichern have been published in the Federal Gazette (Bundesanzeiger), reflecting the cabinet decision taken on 17 March 2021.
|
91
|
4.1.3 Apprenticeship support
|
Target
|
Outflow of support for the federal programme Ausbildungsplätze sichern
|
-
|
EUR million
|
0
|
282
|
Q4
|
2022
|
At least EUR 282 000 000 have been disbursed to recipients under the programme.
|
92
|
4.1.3 Apprenticeship support
|
Target
|
Award decisions on applications for the federal programme Ausbildungsplätze sichern
|
-
|
Number of eligible applications having been awarded funding
|
0
|
70 000
|
Q4
|
2022
|
At least 70 000 eligible applications have been awarded funding under the programme.
|
93
|
4.1.4 Educational support for students with a learning backlog
|
Milestone
|
Agreement between the Federal Government and the Länder to provide learning support for learners with pandemic learning backlogs.
|
Länder and the Federal Government adopt the funding agreement
|
-
|
-
|
-
|
Q2
|
2021
|
The Federal Government and Länder have adopted the funding agreement setting out the conditions of funding learning support.
|
94
|
4.1.4 Educational support for students with a learning backlog
|
Target
|
1 000 000 students have received learning support
|
-
|
Number of pupils receiving support under the programme
|
0
|
1 000 000
|
Q3
|
2022
|
At least 1 000 000 pupils have received learning support as part of the programme, as proved by the monitoring report.
|
95
|
4.1.5 Digital Pension Overview
|
Milestone
|
Entry into force of the Digital Pension Overview Act
|
Provision in the law indicating the entry into force of the law on the Digital Pension Overview.
|
-
|
-
|
-
|
Q1
|
2021
|
The law on the Digital Pension Overview (RentÜG) has been published in the Federal Gazette (Bundesanzeiger) and has entered into force.
|
96
|
4.1.5 Digital Pension Overview
|
Milestone
|
Completion of the development and first operational phase.
|
The portal is available and has been tested in a first operational phase. The evaluation report on the first operational phase has been submitted by ZfDR to the steering committee for further discussion.
|
-
|
-
|
-
|
Q4
|
2023
|
The coordination body responsible for the digital pension overview (ZfDR, Zentrale Stelle für die Digitale Rentenübersicht) has provided an evaluation report according to § 6 (3) RentÜG of the first operational phase, assessing the achieved level of usability and implementability for pension providers. The report shall clearly identify possible actions for improvements and new functionalities to be further discussed in the steering committee.
|
97
|
4.1.5 Digital Pension Overview
|
Milestone
|
Completion of the implementation of improvements deduced from practical experience during the first operational phase.
|
Improvements and where appropriate new functionalities have been implemented following the evaluation report and consultation with the steering committee. The Digital Pension Overview covers a majority of existing pension entitlements regarding those pension providers that are generally obligated to participate by law.
|
-
|
-
|
-
|
Q1
|
2026
|
Following the submission of the evaluation report, concrete targets shall be established on the frequency of use and on the coverage of pension entitlements. The target on the frequency of use and the target on coverage on pension entitlements is either met by Q1 2026 or further action to improve user acceptance is taken, for example by adopting a regulation to set the reference date for the obligation for pension providers to participate in the Digital Pension Overview, covering pension providers who are required to provide annual benefit statements to their customers.
|
H. COMPONENT 5.1: Strengthening of a Pandemic-resilient Healthcare System
This component of the German recovery and resilience plan aims to increase the resilience of the healthcare sector, including to shocks induced by pandemics. The specific objectives of the measures under this component are the digitalisation of the public health offices, which play an important role in pandemic management in Germany, the digitalisation of hospitals to increase their efficiency and resilience, and research and development of vaccines against SARS-CoV-2.
The component supports addressing the Country Specific Recommendation to mobilise adequate resources and strengthen the resilience of the healthcare system, including by deploying e-health services (Country Specific Recommendation 1 in 2020).
It is expected that no measure in this component does significant harm to environmental objectives within the meaning of Article 17 of Regulation (EU) 2020/852, taking into account the description of the measures and the mitigating steps set out in the recovery and resilience plan in accordance with the DNSH Technical Guidance (2021/C58/01).
H.1.
Description of the reforms and investments for non-repayable financial support
5.1.1 Reform: Strengthening of the digital and technical resources of the public health service
The objective of the measure is to modernise the public health offices, in particular through increasing the level of their digitalisation and interoperability of IT systems to connect public health offices with other actors in the public healthcare system. The measure consists of a nationwide rollout of an IT system to track pandemic developments, and increasing the overall level of digital maturity in the public health offices over the next years.
The implementation of the measure shall be completed by 31 August 2026.
5.1.2 Investment: Programme to future-proof hospitals
The objective of the measure is to enable hospitals to invest within a short timeframe in their modernisation, including through digitalisation. The measure consists of establishing a fund, from which hospitals may receive financial support for a number of modernisation projects, for instance to improve their digital infrastructure, emergency capacities, tele-medicine, robotics, or IT and cyber security.
The implementation of the measure shall be completed by 31 August 2026.
5.1.3 Investment: Special programme to accelerate research and development of urgently needed vaccines against SARS-CoV-2
The objectives of the measure are to support the research and development of vaccines against SARS-CoV-2 in order to reduce the severity and duration of the pandemic. The investment consists of financial support to German vaccine producers to increase their development and production capacity, and to increase patient numbers for clinical trial phases. This aims to strengthen the pharmaceutical/biotech sector in Germany in the long term and provide a broader base and flexibility to respond to the current and future pandemics.
The implementation of the measure shall be completed by 31 December 2022.
H.2.
Milestones, targets, indicators, and timetable for monitoring and implementation for non-repayable financial support
Sequential Number
|
Related Measure (Reform or Investment)
|
Milestone / Target
|
Name
|
Qualitative indicators
(for milestones)
|
Quantitative indicators
(for targets)
|
Indicative timeline for completion
|
Description of each milestone and target
|
|
|
|
|
|
Unit of measure
|
Baseline
|
Goal
|
Quarter
|
Year
|
|
98
|
5.1.1 Strengthening of the digital and technical resources of the public health service
|
Target
|
Comprehensive nationwide use of the German Electronic Reporting and Information System for Infection Protection (Deutsches Elektronisches Melde- und Informationssystem für den Infektionsschutz, DEMIS)
|
-
|
Percentage of public health offices using DEMIS
|
0
|
100
|
Q1
|
2021
|
The competent authorities of the Länder are using DEMIS to register persons in the context of SARS-CoV-2 and to discharge the reporting requirements under § 8 (1) (2) of the Infection Protection Law.
|
99
|
5.1.1 Strengthening of the digital and technical resources of the public health service
|
Target
|
Progress of public health offices towards digital maturity
|
-
|
Percentage
|
0
|
35
|
Q1
|
2024
|
At least 35% of public health offices have improved their digital maturity by at least two levels by the end of Q4 2023 in at least two categories in the employed digital maturity system, as compared to their digital maturity level of 2021.
|
100
|
5.1.1 Strengthening of the digital and technical resources of the public health service
|
Target
|
Progress of public health offices towards digital maturity
|
-
|
Percentage
|
35
|
70
|
Q3
|
2026
|
At least 70% of public health offices have improved their digital maturity by at least two levels by Q3 2026 in at least three categories in the employed digital maturity system, as compared to their digital maturity level of 2021.
|
101
|
5.1.2 Programme to future-proof hospitals
|
Target
|
Applications submitted to the Federal Office for Social Security for at least EUR 2 700 000 000
|
-
|
Volume of funding (in million euro) for applications submitted to the Federal Office for Social Security
|
0
|
2 700
|
Q2
|
2022
|
Of the EUR 3 000 000 000 allocated to the measure, applications of at least EUR 2 700 000 000 in volume have been submitted to the Federal Office for Social Security for hospitals’ projects under the Programme to future-proof hospitals by the deadline for the applications of 31 December 2021. By 31 March 2022, the Federal Office for Social Security shall publish the requested volume of funding.
|
102
|
5.1.2 Programme to future-proof hospitals
|
Target
|
Increase in the digital maturity of at least 35% of hospitals
|
-
|
Percentage of hospitals with increased digital maturity
|
0
|
35
|
Q3
|
2025
|
At least 35% of the hospitals whose application for funding under the Programme to future-proof hospitals was approved have increased their digital maturity in at least two categories related to the Programme to future-proof hospitals by at least two digital maturity levels in the employed digital maturity system compared with the evaluation from 30 June 2021.
|
103
|
5.1.2 Programme to future-proof hospitals
|
Target
|
Implementation of at least 75% of the relevant digitalisation projects
|
-
|
Percentage of completed digitalisation projects
|
0
|
75
|
Q3
|
2026
|
At least 75% of the digitalisation projects which have received funding under the Programme to future-proof hospitals and which, if not fully implemented by 31 December 2024, would lead to financial reductions established under the Hospital Future Act (Krankenhauszukunftsgesetz), have been fully implemented by 31 August 2026.
|
104
|
5.1.3 Special programme to accelerate research and development of urgently needed vaccines against SARS-CoV-2
|
Milestone
|
Approval of a first vaccine against SARS-CoV-2 by the regulatory authority
|
Recommendation for authorisation by the European Medicines Agency of a vaccine against SARS-CoV-2 developed by one of the three companies supported
|
-
|
-
|
-
|
Q4
|
2020
|
Approval recommended by the European Medicines Agency for a vaccine against SARS-CoV-2 developed by one of the three companies supported through measure 5.1.3.
|
106
|
5.1.3 Special programme to accelerate research and development of urgently needed vaccines against SARS-CoV-2
|
Target
|
Disbursement of at least
EUR 561 450 000 to vaccine research supported by this special programme
|
-
|
EUR million
|
0
|
561.45
|
Q3
|
2022
|
Of the EUR 591 000 000allocated to the measure, at least EUR 561 450 000 (95% of the total funding) have been disbursed to the recipients for vaccine research.
|
107
|
5.1.3 Special programme to accelerate research and development of urgently needed vaccines against SARS-CoV-2
|
Milestone
|
End of programme
|
Completion and conclusive audit of the utilisation reports and of all final reports
|
-
|
-
|
-
|
Q4
|
2022
|
All final reports on the utilisation of funds have been submitted and audited.
|
I. COMPONENT 6.1: Modern Public Administration
The component of the German recovery and resilience plan addresses the challenges of modernising Germany’s public administration. The objective of the component is to advance the digitalisation of the public administration decisively and reduce the administrative burden for companies and citizens when interacting with the government.
The component supports addressing the Country Specific Recommendation on improving digital public services across all levels (Country Specific Recommendation 2 in 2020).
It is expected that no measure in this component does significant harm to environmental objectives within the meaning of Article 17 of Regulation (EU) 2020/852, taking into account the description of the measures and the mitigating steps set out in the recovery and resilience plan in accordance with the DNSH Technical Guidance (2021/C58/01).
I.1.
Description of the reforms and investments for non-repayable financial support
6.1.1 Reform: European identity ecosystem
The objective of the measure is to create a digital, open and secure ecosystem that establishes and verifies identities and personal documents online, without reliance on major private platforms, this includes personal IDs and documents such as diplomas. Additionally, the objective of the measure is to create a system with the aim to also be open to other types of applications as well as verifying the identity of companies and devices within the Internet of things. Lastly, the objective of the measure is to have the ecosystem be open for use by the administrations and the private sector in the EU and beyond.
The measure consists of developing technical components and standards, supporting interoperability efforts to other initiatives, providing a sovereign ID and catalysing the ecosystem by developing initial use cases. The first applications to be developed are subsidised and steered by the government, but as the ecosystem progresses, the aim is that the private sector shall develop applications independently.
The implementation of the measure shall be completed by 31 August 2026. The ecosystem is expected to continue to be implemented after this point.
6.1.2 Reform: Digitalisation of the administration – implementation of the Online Access Act
The objective of the measure is to make public services digitally available by 2022, in line with the Online Access Act. Given Germany’s federal system, public services are offered by both the federal level and the State governments and local authorities, which increases the level of required coordination substantially.
The measure consists of digitalising 100 service bundles that fall within the implementing competency of the Länder, and 115 service bundles within the competency of the Federal Government.
The implementation of the measure shall be completed by 30 June 2025.
6.1.3 Reform: Digitalisation of the administration –modernisation of registers
The objective of the measure is to enable a simple, secure and digital exchange of data stored in various German registers. This shall allow citizens and companies to submit their data only once, instead of having to submit the same data to different authorities multiple times.
The measure consists of the development of the necessary technical architecture and connecting at least 6 of the most important registers and another 12 registers, belonging to the most important registers, are ready to be connected to the single infrastructure via the implementation of the National Once-Only Technical System (NOOTS). To reach these objectives and steer the project, a register modernisation authority (Registermodernisierungsbehörde) shall be established.
The implementation of the measure shall be completed by 30 June 2026.
I.2.
Milestones, targets, indicators, and timetable for monitoring and implementation for non-repayable financial support
Sequential Number
|
Related Measure (Reform or Investment)
|
Milestone / Target
|
Name
|
Qualitative indicators
(for milestones)
|
Quantitative indicators
(for targets)
|
Indicative timeline for completion
|
Description of each milestone and target
|
|
|
|
|
|
Unit of measure
|
Baseline
|
Goal
|
Quarter
|
Year
|
|
108
|
6.1.1 European identity ecosystem
|
Target
|
Launch of one pilot project for digital hotel check-in
|
-
|
Number of hotels with digital check-in
|
0
|
100
|
Q3
|
2021
|
A pilot project has been put into operation, allowing employees of four large German companies to check-in digitally to three large German hotel chains, with at least 100 hotels participating. The pilot provides first technical components as well as insights for the further development of the ecosystem.
|
109
|
6.1.1 European identity ecosystem
|
Target
|
Completion of additional government-supported application cases in addition to the pilot hotel check-in.
|
-
|
Number of application cases
|
1
|
5
|
Q4
|
2024
|
Following the first pilot application case, the implementation of at least four additional application cases (for example opening of bank accounts online, access management, online conclusion of telephone contracts or opening of customer accounts in e-commerce) has been completed, each with at least 10 000 users. The eID function for identification and authentication has been integrated into application casesand, where necessary, new interfaces have been implemented.
|
110
|
6.1.1 European identity ecosystem
|
Target
|
Provision of additional application cases beyond the pilots with little or no government support for their implementation
|
-
|
Number of application cases
|
5
|
10
|
Q4
|
2025
|
The system has been further scaled up through the implementation of increasingly less government-supported application cases, and at least ten application cases exist with at least 10 000 users each. At least two initiatives or proprietary decentralised identity solutions (for example proof of vaccination) are interoperable with the system.
|
111
|
6.1.2 Digitalisation of the administration —Implementation of the Online Access Act (OZG)
|
Target
|
Completion of individual agreements between the lead department and the lead Land
|
-
|
Number of individual agreements
|
0
|
14
|
Q3
|
2021
|
At least 14 individual agreements to implement the Online Access Act have been concluded between the lead department and the lead federal state, in which the operational arrangements are defined. The implementation shall be in accordance with the one-for-all principle. The individual agreements provide the legal basis for cooperation and work-based implementation.
|
112
|
6.1.2 Digitalisation of the administration— Implementation of the Online Access Act (OZG)
|
Target
|
Go-Lives of online access act service bundles (Onlinezugangsgesetz-Leistungen)
|
-
|
Number ofservice bundles going live
|
0
|
70
|
Q4
|
2021
|
At least 70 public service bundles are live (available online to the general public).
|
113
|
6.1.2 Digitalisation of the administration— Implementation of the Online Access Act (OZG)
|
Target
|
Widespread digitalisation of administrative services
|
-
|
Number of service bundles implemented
|
0
|
215
|
Q4
|
2022
|
At least 100 of the most important administrative services of the Länder are implemented as one-for-all services, as well as an additional 115 Federal Government services.
|
113A
|
6.1.2 Digitalisation of the administration— Implementation of the Online Access Act (OZG)
|
Target
|
Roll-out of the services of the Länder to nationwide coverage
|
|
Number of service bundles available nationwide
|
0
|
100
|
Q2
|
2025
|
At least 100 of the most important administrative services of the Länder are implemented nationwide (in at least 50% of the Länder) as one-for-all services.
|
114
|
6.1.3 Digitalisation of the administration—modernisation of registers
|
Milestone
|
Completion of pilot projects to test pilot registers
|
End of pilot and assessment document compiled
|
-
|
-
|
-
|
Q4
|
2023
|
Completion of a pilot project to test pilot registers, in accordance with the implementation of the Identification Number Act (Identifikationsnummerngesetz) and the Register Modernisation Act (Registermodernisierungsgesetz).
|
115
|
6.1.3 Digitalisation of the administration —modernisation of registers
|
Milestone
|
Completion of the implementation of the uniform architecture for the advancement of the only-once principle
|
Central architectural components are ready to be connected to proprietary registers
|
-
|
-
|
-
|
Q4
|
2025
|
The standardised technical architecture is ready to be connected with priority registers for the implementation of the once-only principle. The legal bases for connecting priority registers shall be in place. Governance (multi-project management) to control the connection across registers shall be in place.
|
116
|
6.1.3 Digitalisation of the administration —modernisation of registers
|
Target
|
Priority connection of user-based registers to the once-only target architecture
|
-
|
Number of priority registers
|
0
|
18
|
Q2
|
2026
|
At least 6 of the prioritised registers are connected to a single infrastructure (NOOTs) to implement the once-only principle and another 12 priority registers are ready to be connected to the established single infrastructure, each capable of storing and processing the identification number.
|
J. COMPONENT 6.2: Reduction of barriers to investment
This component of the German recovery and resilience plan addresses barriers to investment, which have been slowing public and private investment in Germany. Reducing barriers to investment enables the timely spending of funds and facilitates investment in the green and digital transition. Furthermore, it increases Germany’s resilience to economic shocks and contributes to stimulating domestic demand, with potential to narrow the current account surplus, which has been repeatedly identified as a macroeconomic imbalance for Germany.
The component supports addressing the Country Specific Recommendations on achieving a sustained upward trend in private and public investment, and to enhance investment (Country Specific Recommendation 1 in 2019 and Country Specific Recommendation 1 in 2020).
It is expected that no measure in this component does significant harm to environmental objectives within the meaning of Article 17 of Regulation (EU) 2020/852, taking into account the description of the measures and the mitigating steps set out in the recovery and resilience plan in accordance with the DNSH Technical Guidance (2021/C58/01).
J.1.
Description of the reforms and investments for non-repayable financial support
6.2.1 Reform: Joint programme of the Federal Government and the Länder for an efficient administration that benefits citizens and businesses
The objectives of the measure are to make the administration more efficient, future-oriented and innovation-inducing. It aims, among other things, to accelerate planning and approval procedures, to further standardise the requirements faced by lower levels of government for requesting financial subsidies in order to ensure a faster outflow of funds, to accelerate housing construction, and to increase the number of successful transfers of business ownership to the next generation.
The measure consists of establishing a working group comprised of the federal level and the Länder, which shall develop proposals to improve the efficiency of public administration in 11 areas (as detailed in the milestones) that shall be implemented by 2025.
The implementation of the measure shall be completed by 31 March 2025.
6.2.2 Reform: Expansion of consulting services of PD - Berater der öffentlichen Hand GmbH
The objective of the measure is to increase public investment activity, especially on the municipal level, by enabling municipalities and other public entities to better integrate public funding programmes into their investment projects, as well as by improving the implementation of IT investments in schools.
The measure consists of two submeasures, to be executed by PD - Berater der öffentlichen Hand GmbH (PD), a public-sector consulting firm owned mostly by the federal state and the Länder. The first submeasure aims to support municipalities and other public entities in navigating the funding programme landscape, as well as to improve the calibration of public funding programmes to the needs of municipalities and other public entities. The second submeasure concerns the digitalisation of schools, for which PD shall develop consulting concepts and advise school authorities.
The implementation of the measure shall be completed by 31 August 2026.
6.2.3 Reform: Acceleration of planning and approval procedures in the transport sector
The objective of the measure is to substantially accelerate the planning and approval procedures in the transport sector. This aims to increase the capacity of transport routes, as well as facilitating the expansion of climate-friendly modes of transport in order to reach Germany’s climate goals.
The measure consists of implementing and evaluating three laws, the investment acceleration act (Investitionsbeschleunigungsgesetz), the most recent planning acceleration act, (Planungsbeschleunigungsgesetz III) and the measure-act-preparatory-act (Maßnahmengesetzvorbereitungsgesetz).
The implementation of the measure shall be completed by 31 August 2026.
J.2.
Milestones, targets, indicators, and timetable for monitoring and implementation for non-repayable financial support
Sequential Number
|
Related Measure (Reform or Investment)
|
Milestone / Target
|
Name
|
Qualitative indicators
(for milestones)
|
Quantitative indicators
(for targets)
|
Indicative timeline for completion
|
Description of each milestone and target
|
|
|
|
|
|
Unit of measure
|
Baseline
|
Goal
|
Quarter
|
Year
|
|
117
|
6.2.1
Joint programme of the Federal Government and the Länder for an efficient administration that benefits citizens and businesses
|
Milestone
|
First progress report for the Conference of Minister-Presidents (MPK)
|
First progress report published
|
-
|
-
|
-
|
Q2
|
2021
|
The first report to the heads of government of the Federal Government and the Länder has been published and shall encompass a list of those measures from the Federal/Länder programme of measures which shall be further examined and processed. The starting point of the report are the following eleven areas of action:
—Accelerating the outflow of grants;
—Identifying obstacles to the outflow of grants and reporting them to the Federal Ministry of Finance;
—Improving the financial support of municipalities;
—Streamlining and making grants from the Federal Government to the Länder and municipalities as uniform as possible;
—Improving transfer of business ownership through a dedicated task force;
—Revising the model building code (Musterbauordnung);
—Strengthening planning and approval authorities;
—Improving recruitment of skilled staff and ensuring an improved staffing situation;
—Accelerating planning, in particular rail, local public and private transport;
— Streamlining the consultation process and public participation procedures and simplifying participation through digitalisation;
—Further accelerating planning and approval processes.
|
118
|
6.2.1 Joint programme of the Federal Government and the Länder for an efficient administration that benefits citizens and businesses
|
Milestone
|
Second progress report for the Conference of Minister-Presidents
|
Second progress report published
|
-
|
-
|
-
|
Q2
|
2022
|
The published progress report shall identify the measures that shall be implemented under the leadership of the Federal Government and/or the Länder. The progress report shall contain the following elements: The name of the measure; status (started, completed, not yet started); next milestone; expected end date.
|
119
|
6.2.1 Joint programme of the Federal Government and the Länder for an efficient administration that benefits citizens and businesses
|
Target
|
Completion of measures in the progress report
|
-
|
Percentage of measures completed
|
0
|
80
|
Q1
|
2025
|
Completion of the implementation of at least 80% of the measures identified in the second progress report.
|
120
|
6.2.2.1 Expansion of consulting services of PD: Effective Funding Support Management
|
Milestone
|
Start of PD consulting services for selected funding programmes
|
Agreement with the federal ministries on selection of funding programmes
|
-
|
-
|
-
|
Q4
|
2022
|
Suitable funding programmes have been identified by PD jointly with the relevant federal ministries, and the consulting project to improve the calibration of these funding programmes to the needs of the recipients has started.
|
121
|
6.2.2.1 Expansion of consulting services of PD: Effective Funding Support Management
|
Target
|
Consultations carried out
|
-
|
Number of consultations carried out
|
0
|
100
|
Q3
|
2024
|
100 consultations with funding programme beneficiaries, which may also be part of a more encompassing investment advisory service, have been completed or are in the process of being carried out.
|
122
|
6.2.2.1 Expansion of consulting services of PD: Effective Funding Support Management
|
Target
|
Concepts for revision of funding programmes developed
|
-
|
Number of revision concepts
|
0
|
4
|
Q3
|
2024
|
Revision concepts have been developed for four funding programmes which also contain insight to inform the design of other programmes.
|
123
|
6.2.2.1 Expansion of consulting services of PD: Effective Funding Support Management
|
Milestone
|
Information dissemination on lessons learned
|
Funding Guide of the Federal Ministry of Finance published
|
-
|
-
|
-
|
Q3
|
2026
|
Publication of a Federal Ministry of Finance Funding Guide on how to design public funding programmes for public infrastructure measures, to enable an improved outflow of funds.
|
124
|
6.2.2.1 Expansion of consulting services of PD: Effective Funding Support Management
|
Target
|
Consultations carried out
|
-
|
Number of consultations carried out
|
100
|
400
|
Q3
|
2026
|
At least 400 consultations with funding programme beneficiaries, which may also be part of a more encompassing investment consulting project, have been completed or are in the process of being carried out (target includes consultations completed as set out in target 121).
|
125
|
6.2.2.2 Expansion of consulting services of PD: School IT consultancy
|
Target
|
Roll-out and pilot consulting projects on school IT
|
-
|
Number of consulting projects carried out
|
0
|
5
|
Q4
|
2022
|
At least five consulting projects for school authorities on school IT have started.
|
126
|
6.2.2.2 Expansion of consulting services of PD: School IT consultancy
|
Milestone
|
Development of model concepts
|
Model IT concept
|
-
|
-
|
-
|
Q3
|
2024
|
A model IT concept and implementation programme have been developed as evidenced by corresponding PD project deliverables.
|
127
|
6.2.2.2 Expansion of consulting services of PD: School IT consultancy
|
Target
|
School IT consulting projects
|
-
|
Number of consulting projects carried out
|
5
|
50
|
Q3
|
2024
|
A total of 50 school authorities’ consultations on school IT, which may be part of a more encompassing investment consulting project, have been completed or are in the process of being carried out (target includes the previous target).
|
128
|
6.2.3.1 Acceleration of planning and approval procedures in the transport sector
|
Milestone
|
Entry into force of the Investment Acceleration Act, the Planning Acceleration Act III, and the measure-act-preparatory-act
|
Provision in the law indicating the entry into force of the Investment Acceleration Act, the Planning Acceleration Act III, and the measure-act-preparatory-act.
|
-
|
-
|
-
|
Q4
|
2020
|
The Investment Acceleration Act, the Planning Acceleration Act III, and the measure-act-preparatory-act (Investitionsbeschleunigungsgesetz,
Planungsbeschleunigungsgesetz III,
Maßnahmengesetzvorbereitungsgesetz) have entered into force.
|
129
|
6.2.3.1 Acceleration of planning and approval procedures in the transport sector
|
Milestone
|
Evaluation of legislative changes
|
Evaluation of the three laws
|
-
|
-
|
-
|
Q3
|
2026
|
An extensive evaluation of the adopted legislative measures (see milestone 128) has been initiated, based on an evaluation concept that has been developed, and data collection has started. The evaluation shall, among other evaluation dimensions, include a comparison of the length of planning and approval procedures in the transport sector before and after the adoption of the measures and consider other qualitative and quantitative indicators.
|
K. COMPONENT 7.1: REPowerEU
The objective of the REPowerEU component of the German recovery and resilience plan is to support the energy transition by integrating security of supply, affordability, resource conservation and environmental compatibility with innovative and intelligent climate protection. The component aims to address the contribution of the heating and cooling sector to greenhouse gas emissions by promoting the decarbonization of buildings through energy effiency measures. . The component also aims to promote climate-friendly freight transport, targeting a substantial reduction in emissions by incentivising the adoption of electrically powered vehicles and supporting the necessary infrastructure development. In addition, facilitating planned hydrogen infrastructure projects is identified as crucial for meeting decarbonization goals. The expansion of wind energy, both offshore and on land, is further introduced to reduce dependency on fossil fuel imports and accelerate progress towards climate neutrality. Legislative reforms are proposed to streamline permitting procedures, ensuring sustainable and responsible use of renewable energy resources.
The REPowerEU component contributes to addressing Country-Specific Recommendations, in particular CSR 2022.4 and CSR 2023.4.
Several measures are expected to have an indirect cross-border impact, including the scale-up of the federal funding for energy-efficient buidlings, which aims to reduce reduce the reliance on fossil fuels. Additionally, a digital platform to accelerate application and approval procedures could eventually facilitate the access of other EU companies to the German market by simplifying administrative processes and therefore reduce the reliance on fossil fuels, as the platform is intended to speed up the establishment of a core hydrogen grid. Direct cross-border impacts are also anticipated with the reform of the Wind Energy on Land Act and the Offshore Wind Energy Act, as the additional electricity obtained from wind energy can have an impact on the demand-supply balance in Germany and across several countries and affect cross-border flows.
It is expected that no measure in this component does significant harm to environmental objectives within the meaning of Article 17 of Regulation (EU) 2020/852, taking into account the description of the measures and the mitigating steps set out in the recovery and resilience plan in accordance with the ‘do no significant harm’ Technical Guidance (2021/C58/01).
K.1.
Description of the reforms and investments for non-repayable financial support
7.1.1 Scaled-up investment: Building renovation: federal funding for energy-efficient buildings
The objective of this measure is to scale up investment 1.3.3 ‘Building renovation: federal funding for energy-efficient buildings’ under Component 1.3. The scaled-up part of the measure shall support 190 000 individual renovation measures, in addition to those financed from the non-repayable support as part of the investment 1.3.3.
The implementation of the measure shall be completed by 30 August 2026.
7.1.2 Investment: Support programme for light- and heavy-duty zero-emission transport
The objective of this measure is to speed up the penetration of zero-emission road transport. The measure shall consist in the support for the purchase of zero-emission commercial vehicles of the EC vehicle classes N1, N2 and N3 with electric drives according to Section 2 Numbers 2 and 4 of the Electric Mobility Act (Elektromobilitätsgesetz , 'EmoG') , i.e. battery and fuel-cell electric vehicles only. Hybrid electric vehicles (‘plug-ins’) shall not be supported under the measure. The measure shall also support the refueling and charging infrastructure necessary for the operation of the category of supported vehicles, for a maximum of 80 % of the eligible costs.
The implementation of the measure shall be completed by 30 August 2026.
7.1.3 Investment: Digital end-to-end platform to accelerate planning and approval
The objective of this measure is to accelerate the planning and approval of energy infrastructural projects through a digital end-to-end platform. In particular, the measure's obejective is to speed up building Germany’s core hydrogen grid through the use of this platform, as for the first time, it enables companies to submit applications for authorisations for the hydrogen core network digitally. The platform shall centralise, standardise and speed up the process for applicants and the approval authority. Moreover, the measure shall address back-office bottlenecks through a workflow system to process applications.
The implementation of the measure shall be completed by 31 December 2025.
7.1.4 Reform: Wind Energy on Land Act
The objective of this measure is to accelerate the deployment of onshore wind energy power plants.
The act shall define each federal state (Land)’s land-use target for wind energy. The act shall also contain provisions to change the Construction Code to enable federal states (Länder) to designate additional areas as suitable for onshore wind generation. The implementation of the reform shall be monitored by a joint committee of the federal level and federal states (Länder) (EEG-Bund-Länder Kooperationsausschuss).
The implementation of the measure shall be completed by 31 March 2023.
7.1.5 Reform: Offshore Wind Energy Act
The objective of this measure is to accelerate the deployment of offshore wind energy power plants.
The reform shall increase the expansion targets for offshore wind energy in Germany from 20 GW to at least 30 GW by 2030, and to reach 40 GW by 2035 and 70 GW by 2045 (previously: 40 GW by 2040). It shall also contain provisions to streamline planning and approval procedures and bundle the review of applications.
The implementation of the measure shall be completed by 31 March 2023.
K.2.
Milestones, targets, indicators, and timetable for monitoring and implementation for non-repayable financial support
Sequential Number
|
Related Measure (Reform or Investment)
|
Milestone / Target
|
Name
|
Qualitative indicators
(for milestones)
|
Quantitative indicators
(for targets)
|
Indicative timeline for completion
|
Description of each milestone and target
|
|
|
|
|
|
Unit of measure
|
Baseline
|
Goal
|
Quarter
|
Year
|
|
130
|
Investment 7.1.1 (scale-up): Building renovation: federal funding for energy-efficient buildings
|
Target
|
Scaled-up final target for completed individual renovation measures for energy-efficient buildings
|
|
Completed individual renovation measures
|
145 000
|
335 000
|
Q2
|
2026
|
At least 335 000 individual renovation measures have been completed in total.
|
131
|
Investment 7.1.2: Support programme for light- and heavy-duty zero-emission transport
|
Target
|
Interim target for for registrationof zero-emission vehicles
|
|
Zero-emission commercial vehicles
|
0
|
670
|
Q4
|
2024
|
670 zero-emission commercial vehicles, including at least 190 vehicles of class N3, have been registered.
|
132
|
Investment 7.1.2: Support programme for light- and heavy-duty zero-emission transport
|
Target
|
Final target for registered zero-emission vehicles
|
|
Zero-emission commercial vehicles
|
670
|
1100
|
Q2
|
2026
|
1 100 zero-emission vehicles, including at least 490 vehicles of class N3, have been registered.
|
133
|
Investment 7.1.2: Support programme for light- and heavy-duty zero-emission transport
|
Target
|
Entry into operation of recharging and refueling stations
|
|
Recharging and refuelling stations
|
0
|
1357
|
Q2
|
2026
|
1 352 electric charging stations and 5 hydrogen refuelling stations have been put into operation.
|
134
|
Investment 7.1.3: Digital end-to-end platform to accelerate planning and approval
|
Milestone
|
Signature of contracts
|
Commitment of funds through signature of project contracts
|
|
|
|
Q3
|
2025
|
Contracts for developing the platform have been signed and entered into force, committing at least 95% of the total envelope for this measure (EUR 94 500 000) including 95 % of the costs designated for AI developments
(EUR 38 285 000).
|
135
|
Investment 7.1.3: Digital end-to-end platform to accelerate planning and approval
|
Milestone
|
Launch of once-only permitting platform
|
Launch of website containing a workflow system and operating at once-only standard
|
|
|
|
Q4
|
2025
|
The platform enables companies to submit applications for authorisations for the hydrogen core network digitally. For this service, the platform fulfils the once-only standard (national maturity level 4 according to Decision 2020/20 of the IT Planning Council). Moreover, a workflow system is in place to process applications, and automated completeness checks of applications and draft justifications for the approval decision are in place using (a) large language model(s).
|
136
|
Reform 7.1.4: Wind Energy on Land Act
|
Milestone
|
Entry into force of the Wind Energy on Land Act (Wind-an-Land -Gesetz)
|
Provision in the legal act indicating the entry into force of the legal act
|
|
|
|
Q1
|
2023
|
The Wind Energy on Land Act (Wind-an-Land -Gesetz) has entered into force.
|
137
|
Reform 7.1.5: Offshore Wind Energy Act
|
Milestone
|
Entry into force of the Offshore Wind Energy Act (Wind-auf-See-Gesetz)
|
Provision in the legal act indicating the entry into force of the legal act
|
|
|
|
Q1
|
2023
|
The Offshore Wind Energy Act (Wind-auf-See-Gesetz) has entered into force.
|
Estimated total cost of the recovery and resilience plan
The estimated total cost of the recovery and resilience plan of Germany, including the REPowerEU chapter, is EUR 32 344 275 666 . The estimated total costs of the REPowerEU chapter of Germany is EUR 2 444 838 075.
SECTION 2: FINANCIAL SUPPORT
1.Financial contribution
The instalments referred to in Article 2(2) shall be organised in the following manner:
1.1First instalment (non-repayable support):
Sequential Number
|
Related Measure
(Reform or Investment)
|
Milestone / Target
|
Name
|
1
|
1.1.1 Hydrogen projects within the framework of IPCEIs
|
Milestone
|
Completion of expression of interest procedure
|
7
|
1.1.2 Support programme for decarbonisation in industry
|
Milestone
|
Entry into force of funding guideline (Förderrichtlinie) for decarbonisation in industry
|
11
|
1.1.3 Pilot scheme for climate action contracts based on the principle of Carbon Contracts for Difference
|
Milestone
|
Completion of expression of interest procedure for climate change contracts
|
14
|
1.1.4 Project-related climate protection research
|
Target
|
Approval of applications for support of climate-related research projects
|
17
|
1.1.5 Flagship projects for research and innovation in the context of the National Hydrogen Strategy
|
Milestone
|
Publication of the competition “Idea Competition ‘Hydrogen Republic Germany’” (Förderaufruf zum Ideenwettbewerb „Wasserstoffrepublik Deutschland“)
|
22
|
1.2.1 Support for the construction of charging infrastructure
|
Milestone
|
Entry into force of funding guidelines
|
25
|
1.2.2 Funding for the development of electro-mobility
|
Milestone
|
Entry into force of the funding guidelines
|
29
|
1.2.3 Support for the replacement of the private vehicle fleet
|
Target
|
Support for the purchase of 240 000 electric vehicles
|
31
|
1.2.4 Extension of the initial registration period for granting the ten-year tax exemption for purely electric vehicles
|
Milestone
|
Entry into force of the Seventh Motor Vehicle Tax Amendment Act
|
33
|
1.2.5 Support for purchases of buses with alternative propulsion
|
Milestone
|
Publication of funding guidelines
|
36
|
1.2.6 Support to promote alternative rail propulsion
|
Milestone
|
Entry into force of the funding guidelines
|
39
|
1.2.7 Promotion of the industries involved in hydrogen and fuel cell applications in transport
|
Milestone
|
Entry into force of amendment extending existing supporting guidelines (Förderrichtlinien) of the National Hydrogen and Fuel Cell Technology Innovation Programme (NIP) (or if not sufficiently covered by existing supporting guidelines, entry into force of new supporting guidelines).
|
42
|
1.3.1 Support programme for the development of a climate-friendly timber construction sector
|
Milestone
|
Funding guidelines on the promotion of climate-friendly timber construction
|
46
|
1.3.3 Building renovation: federal funding for energy-efficient buildings
|
Milestone
|
Funding guidelines for the support of energy-efficient renovation of buildings
|
52
|
2.1.2 IPCEI Microelectronics and Connectivity
|
Milestone
|
Content design of the planned IPCEI
|
59
|
2.2.1 Vehicle manufacturers/suppliers investment programme
|
Milestone
|
Publication of all funding guidelines
|
62
|
2.2.2 Federal programme ‘Building further CET networks’
|
Milestone
|
Publication of the funding guidelines
|
65
|
2.2.3 Digitalisation and Technology Research Centre of the Bundeswehr
|
Target
|
Launch of research projects
|
70
|
2.2.4 Promoting the digitalisation of railways by replacing conventional interlocking/fast-track programmes to speed up the roll-out of ‘Digital Rail Germany’
|
Milestone
|
Signature of the financing agreement for the ‘fast track’ programme between the Federal Government and Deutsche Bahn
|
71
|
2.2.4 Promoting the digitalisation of railways by replacing conventional interlocking/fast-track programmes to speed up the roll-out of ‘Digital Rail Germany’
|
Milestone
|
Interim report on implementation
|
72
|
2.2.4 Promoting the digitalisation of railways by replacing conventional interlocking/fast-track programmes to speed up the roll-out of ‘Digital Rail Germany’
|
Target
|
Successful completion of pilot projects
|
73
|
3.1.1 Investment programme for teacher devices
|
Milestone
|
Administrative agreement
|
79
|
3.1.3 Educational centres of excellence
|
Milestone
|
Entry into force of the first funding guidelines and call for tenders for a project-executing agency for the overall programme
|
83
|
3.1.4 Modernisation of the Federal Armed Forces’ educational and training facilities
|
Milestone
|
Project contract signed
|
86
|
4.1.1 Investment programme ‘Childcare-financing’ 2020/21: special fund ‘Child Day-care Expansion’
|
Milestone
|
Entry into force of the Childcare Financing Act and the Federal Financial Assistance Act and of the implementing regulations at Länder level
|
89
|
4.1.2 Social Guarantee 2021
|
Milestone
|
Verification of the average social security contribution rate for year 2021
|
90
|
4.1.3 Apprenticeship support
|
Milestone
|
Entry into force of the revised funding guidelines for the federal programme Ausbildungsplätze sichern
|
93
|
4.1.4 Educational support for students with a learning backlog
|
Milestone
|
Agreement between the federal government and the Länder to provide learning support for learners with pandemic learning backlogs.
|
95
|
4.1.5 Digital Pension Overview
|
Milestone
|
Entry into force of the Digital Pension Overview Act
|
98
|
5.1.1 Strengthening of the digital and technical resources of the public health service
|
Target
|
Comprehensive nationwide use of the German Electronic Reporting and Information System for Infection Protection (Deutsches Elektronisches Melde- und Informationssystem für den Infektionsschutz, DEMIS)
|
104
|
5.1.3 Special programme to accelerate research and development of urgently needed vaccines against SARS-CoV-2
|
Milestone
|
Approval of a first vaccine against SARS-CoV-2 by the regulatory authority
|
108
|
6.1.1 European identity ecosystem
|
Target
|
Launch of one pilot project for digital hotel check-in
|
111
|
6.1.2 Digitalisation of the administration —Implementation of the Online Access Act (OZG)
|
Target
|
Completion of individual agreements between the lead department and the lead federal state (Bundesland)
|
112
|
6.1.2 Digitalisation of the administration— Implementation of the Online Access Act (OZG)
|
Target
|
Go-Lives of online access act service bundles (Onlinezugangsgesetz-Leistungen)
|
117
|
6.2.1 Joint programme of the federal government and the Länder for an efficient administration that benefits citizens and businesses
|
Milestone
|
First progress report for the Conference of Minister-Presidents (MPK)
|
128
|
6.2.3.1 Acceleration of planning and approval procedures in the transport sector
|
Milestone
|
Entry into force of the Investment Acceleration Act, the Planning Acceleration Act III, and the measure-act-preparatory-act
|
Instalment amount
|
EUR 4 344 763 676
|
1.2Second instalment (non-repayable support):
Sequential Number
|
Related Measure
(Reform or Investment)
|
Milestone / Target
|
Name
|
2
|
1.1.1 Hydrogen projects within the framework of IPCEIs
|
Milestone
|
Issuance of first grant decisions
|
12
|
1.1.3 Pilot scheme for climate action contracts based on the principle of Carbon Contracts for Difference
|
Milestone
|
Funding guideline (Förderrichtlinie) for a pilot programme on climate change contracts based on the principle of Carbon Contracts for Difference
|
18
|
1.1.5 Flagship projects for research and innovation in the context of the National Hydrogen Strategy
|
Target
|
Issuance of grant decisions
|
26
|
1.2.2 Funding for the development of electro-mobility
|
Target
|
Commitment of funds
|
30
|
1.2.3 Support for the replacement of the private vehicle fleet
|
Target
|
Support for the purchase of another 320 000 electric vehicles
|
43
|
1.3.1 Support programme for the development of a climate-friendly timber construction sector
|
Target
|
Approval of projects related to the development of climate-friendly timber construction
|
49
|
2.1.1 Innovative data policy for Germany
|
Milestone
|
Start of projects
|
53
|
2.1.2 IPCEI Microelectronics and Connectivity
|
Target
|
Launch of first projects
|
55
|
2.1.3 IPCEI Next Generation Cloud Infrastructure and Services (IPCEI CIS)
|
Milestone
|
Launch of R & D & I projects
|
63
|
2.2.2 Federal programme ‘Building further CET networks’
|
Target
|
Active participation of additional enterprises in CET networks
|
72A
|
2.2.4 Promoting the digitalisation of railways by replacing conventional interlocking/fast-track programmes to speed up the roll-out of ‘Digital Rail Germany’
|
Target
|
Successful completion of final project
|
74
|
3.1.1 Investment programme for teacher devices
|
Target
|
Disbursement of at least EUR 475 000 000 to the supported projects
|
76
|
3.1.2 Education platform
|
Milestone
|
Entry into force of the funding guidelines for education platform prototypes and procurement launched
|
80
|
3.1.3 Educational centres of excellence
|
Target
|
Approval of at least 45 research projects
|
81
|
3.1.3 Educational centres of excellence
|
Milestone
|
Entry into force of three additional funding guidelines
|
84
|
3.1.4 Modernisation of the Federal Armed Forces’ educational and training facilities
|
Target
|
Analysis of educational institutions and identification of their IT needs
|
91
|
4.1.3 Apprenticeship support
|
Target
|
Outflow of support for the federal programme Ausbildungsplätze sichern
|
92
|
4.1.3 Apprenticeship support
|
Target
|
Award decisions on applications for the federal programme Ausbildungsplätze sichern
|
94
|
4.1.4 Educational support for students with a learning backlog
|
Target
|
1 000 000 students have received learning support
|
101
|
5.1.2 Programme to future-proof hospitals
|
Target
|
Applications submitted to the Federal Office for Social Security for at least EUR 2 700 000 000
|
106
|
5.1.3 Special programme to accelerate research and development of urgently needed vaccines against SARS-CoV-2
|
Target
|
Disbursement of at least EUR 561 450 000 to vaccine research supported by this special programme
|
107
|
5.1.3 Special programme to accelerate research and development of urgently needed vaccines against SARS-CoV-2
|
Milestone
|
End of programme
|
113
|
6.1.2 Digitalisation of the administration— Implementation of the Online Access Act (OZG)
|
Target
|
Widespread digitalisation of administrative services
|
118
|
6.2.1 Joint programme of the federal government and the Länder for an efficient administration that benefits citizens and businesses
|
Milestone
|
Second progress report for the Conference of Minister-Presidents
|
120
|
6.2.2.1 Expansion of consulting services of PD: Effective Funding Support Management
|
Milestone
|
Start of PD consulting services for selected funding programmes
|
125
|
6.2.2.2 Expansion of consulting services of PD: School IT consultancy
|
Target
|
Roll-out and pilot consulting projects on school IT
|
Instalment amount
|
EUR 7 522 077 413
|
1.3Third instalment (non-repayable support):
Sequential Number
|
Related Measure
(Reform or Investment)
|
Milestone / Target
|
Name
|
3
|
1.1.1 Hydrogen projects within the framework of IPCEIs
|
Target
|
Commitment of at least EUR 500 000 000
|
21A
|
1.1.6 Federal support for efficient heat networks
|
Target
|
Signing of grant decisions
|
24
|
1.2.1 Support for the construction of charging infrastructure
|
Target
|
Expansion of recharging points in residential buildings
|
27
|
1.2.2 Funding for the development of electro-mobility
|
Target
|
Expansion of municipal and commercial e-mobility fleets
|
28
|
1.2.2 Funding for the development of electro-mobility
|
Target
|
Completion of electro-mobility preliminary designs
|
44
|
1.3.2 Municipal living labs for the energy transition
|
Target
|
Approval of ‘living labs’ projects
|
60
|
2.2.1 Vehicle manufacturers/suppliers investment programme
|
Target
|
Approval of projects
|
66
|
2.2.3 Digitalisation and Technology Research Centre of the Bundeswehr
|
Milestone
|
Report on research and transfer outputs
|
67
|
2.2.3 Digitalisation and Technology Research Centre of the Bundeswehr
|
Target
|
Continuation of projects
|
77
|
3.1.2 Education platform
|
Milestone
|
Launch of the beta-version of the education platform
|
87
|
4.1.1 Investment programme ‘Childcare-financing’ 2020/21: special fund ‘Child Day-care Expansion’
|
Milestone
|
Publication of interim report in compliance with KitaFinHG
|
96
|
4.1.5 Digital Pension Overview
|
Milestone
|
Completion of the development and first operational phase.
|
99
|
5.1.1 Strengthening of the digital and technical resources of the public health service
|
Target
|
Progress of public health offices towards digital maturity
|
114
|
6.1.3 Digitalisation of the administration—modernisation of registers
|
Milestone
|
Completion of pilot projects to test pilot registers
|
136
|
7.1.4: Wind Energy on Land Act
|
Milestone
|
Entry into force of the Wind Energy on Land Act.
|
137
|
7.1.5: Offshore Wind Energy Act
|
Milestone
|
Entry into force of the Offshore Wind Energy Act.
|
Instalment amount
|
EUR 7 059 109 790
|
1.4Fourth instalment (non-repayable support):
Sequential Number
|
Related Measure
(Reform or Investment)
|
Milestone / Target
|
Name
|
8
|
1.1.2 Support programme for decarbonisation in industry
|
Target
|
Issuance of grant decisions
|
21B
|
1.1.6 Federal support for efficient heat networks
|
Target
|
Completion of feasibility studies and transformation plans
|
30A
|
1.2.3 Support for the replacement of the private vehicle fleet
|
Target
|
Support for the purchase of 399 450 electric vehicles
|
37
|
1.2.6 Support to promote alternative rail propulsion
|
Target
|
Approval of applications
|
38
|
1.2.6 Support to promote alternative rail propulsion
|
Target
|
Order of rail vehicles with alternative propulsion
|
47
|
1.3.3 Building renovation: federal funding for energy-efficient buildings
|
Target
|
Completion of energy-efficient renovations of 10 000 housing units.
|
48A
|
1.3.3 Building renovation: federal funding for energy-efficient buildings
|
Target
|
Interim target for completed individual renovation measures
|
56
|
2.1.3 IPCEI Next Generation Cloud Infrastructure and Services (IPCEI CIS)
|
Milestone
|
Completion of R&D&I projects and launch of large-scale piloting of use cases
|
64
|
2.2.2 Federal Programme ‘Building further CET networks’
|
Target
|
Revision or redesign of training measures or sub-modules as a result of the work of the CET networks
|
78
|
3.1.2 Education platform
|
Milestone
|
Final evaluation report with a decision on the future of the education platform
|
109
|
6.1.1 European identity ecosystem
|
Target
|
Completion of additional government-supported application cases in addition to the pilot hotel check-in.
|
113A
|
6.1.2 Digitalisation of the administration— Implementation of the Online Access Act (OZG)
|
Target
|
Roll-out of the services of the Länder to nationwide coverage
|
119
|
6.2.1 Joint programme of the federal government and the Länder for an efficient administration that benefits citizens and businesses
|
Target
|
Completion of measures in the progress report
|
121
|
6.2.2.1 Expansion of consulting services of PD: Effective Funding Support Management
|
Target
|
Consultations carried out
|
122
|
6.2.2.1 Expansion of consulting services of PD: Effective Funding Support Management
|
Target
|
Concepts for revision of funding programmes developed
|
126
|
6.2.2.2 Expansion of consulting services of PD: School IT consultancy
|
Milestone
|
Development of model concepts
|
127
|
6.2.2.2 Expansion of consulting services of PD: School IT consultancy
|
Target
|
School IT consulting projects
|
131
|
7.1.2: Support programme for light- and heavy-duty zero-emission transport
|
Target
|
Interim target for for registration of zero-emission vehicles
|
Instalment amount
|
EUR 4 953 033 425
|
1.5Fifth instalment (non-repayable support):
Sequential Number
|
Related Measure
(Reform or Investment)
|
Milestone / Target
|
Name
|
4
|
1.1.1 Hydrogen projects within the framework of IPCEIs
|
Milestone
|
Evaluation of the support programme
|
5
|
1.1.1 Hydrogen projects within the framework of IPCEIs
|
Target
|
Commitment of EUR 1 500 000 000
|
6
|
1.1.1 Hydrogen projects within the framework of IPCEIs
|
Target
|
Creation of at least 300 MW of electrolysis capacity
|
9
|
1.1.2 Support programme for decarbonisation in industry
|
Target
|
Disbursement to the supported projects
|
10
|
1.1.2 Support programme for decarbonisation in industry
|
Target
|
Reduction of greenhouse gas emissions in industry
|
13
|
1.1.3 Pilot scheme for climate action contracts based on the principle of Carbon Contracts for Difference
|
Target
|
Disbursement to the supported projects
|
15
|
1.1.4 Project-related climate protection research
|
Target
|
Disbursement to the supported projects
|
16
|
1.1.4 Project-related climate protection research
|
Target
|
Completion of supported climate-related research projects
|
19
|
1.1.5 Flagship projects for research and innovation in the context of the National Hydrogen Strategy
|
Target
|
Completion of the supported projects
|
20
|
1.1.5 Flagship projects for research and innovation in the context of the National Hydrogen Strategy
|
Target
|
Disbursement to the supported projects
|
21
|
1.1.5 Flagship projects for research and innovation in the context of the National Hydrogen Strategy
|
Target
|
Commitment for flagship research and innovation projects
|
21C
|
1.1.6 Federal support for efficient heat networks
|
Target
|
Disbursement to the supported projects
|
23
|
1.2.1 Support for the construction of charging infrastructure
|
Target
|
Expansion of the public recharging network for electric vehicles
|
32
|
1.2.4 Extension of the initial registration period for granting the ten-year tax exemption for purely electric vehicles
|
Milestone
|
Evaluation of the measure
|
34
|
1.2.5 Support for purchases of buses with alternative propulsion
|
Target
|
Approval of applications
|
35
|
1.2.5 Support for purchases of buses with alternative propulsion
|
Target
|
Orders of buses with alternative propulsion
|
40
|
1.2.7 Promotion of the industries involved in hydrogen and fuel cell applications in transport
|
Target
|
Approval of projects for the vehicle and supplier industry for hydrogen and fuel cell applications in transport
|
41
|
1.2.7 Promotion of the industries involved in hydrogen and fuel cell applications in transport
|
Milestone
|
Establishment of a Technology and Innovation Centre for Hydrogen Technology
|
45
|
1.3.2 Municipal living labs for the energy transition
|
Target
|
Completion of urban neighbourhood projects
|
48
|
1.3.3 Building renovation: federal funding for energy-efficient buildings
|
Target
|
Completion of energy-efficient renovations of a further 30 000 housing units
|
48B
|
1.3.3 Building renovation: federal funding for energy-efficient buildings
|
Target
|
Final target for completed individual renovation measures
|
50
|
2.1.1 Innovative data policy for Germany
|
Target
|
Development of human resources and capabilities in federal ministries
|
51
|
2.1.1 Innovative data policy for Germany
|
Target
|
Budget execution – disbursement of at least EUR 464 400 000 to the supported projects
|
54
|
2.1.2 IPCEI Microelectronics and Connectivity
|
Target
|
Budget execution – disbursement of at least EUR 1 275 000 000 to the supported projects
|
57
|
2.1.3 IPCEI Next Generation Cloud Infrastructure and Services (IPCEI CIS)
|
Target
|
First industrial deployment of solutions developed under the measure.
|
58
|
2.1.3 IPCEI Next Generation Cloud Infrastructure and Services (IPCEI CIS)
|
Target
|
Budget execution – disbursement of at least EUR 637 500 000 to the supported projects
|
61
|
2.2.1 Vehicle manufacturers/suppliers investment programme
|
Target
|
Successful completion of projects
|
68
|
2.2.3 Digitalisation and Technology Research Centre of the Bundeswehr
|
Target
|
Budget execution – disbursement of EUR 700 000 000 to the supported
|
69
|
2.2.3 Digitalisation and Technology Research Centre of the Bundeswehr
|
Milestone
|
Report on research and transfer outputs
|
75
|
3.1.1 Investment programme for teacher devices
|
Milestone
|
Evaluation of changes in digital infrastructure and use of digital media in schools
|
82
|
3.1.3 Educational centres of excellence
|
Target
|
Completion of research projects
|
85
|
3.1.4 Modernisation of the Federal Armed Forces’ educational and training facilities
|
Target
|
Completion of the modernisation of the 60 educational institutions
|
88
|
4.1.1 Investment programme ‘Childcare-financing’ 2020/21: special fund ‘Child Day-care Expansion’
|
Target
|
Completion of all measures
|
97
|
4.1.5 Digital Pension Overview
|
Milestone
|
Completion of the implementation of improvements deduced from practical experience during the first operational phase.
|
100
|
5.1.1 Strengthening of the digital and technical resources of the public health service
|
Target
|
Progress of public health offices towards digital maturity
|
102
|
5.1.2 Programme to future-proof hospitals
|
Target
|
Increase in the digital maturity of at least 35% of hospitals
|
103
|
5.1.2 Programme to future-proof hospitals
|
Target
|
Implementation of at least 75% of the relevant digitalisation projects
|
110
|
6.1.1 European identity ecosystem
|
Target
|
Provision of additional application cases beyond the pilots with little or no government support for their implementation
|
115
|
6.1.3 Digitalisation of the administration — modernisation of registers
|
Milestone
|
Completion of the implementation of the uniform architecture for the advancement of the only-once principle
|
116
|
6.1.3 Digitalisation of the administration —modernisation of registers
|
Target
|
Priority connection of user-based registers to the once-only target architecture
|
123
|
6.2.2.1 Expansion of consulting services of PD: Effective Funding Support Management
|
Milestone
|
Information dissemination on lessons learned
|
124
|
6.2.2.1 Expansion of consulting services of PD: Effective Funding Support Management
|
Target
|
Consultations carried out
|
129
|
6.2.3.1 Acceleration of planning and approval procedures in the transport sector
|
Milestone
|
Evaluation of legislative changes
|
130
|
7.1.1 (scale-up): Building renovation: federal funding for energy-efficient buildings
|
Target
|
Scaled up final target for completed individual renovation measures
|
132
|
7.1.2: Support programme for light- and heavy-duty zero-emission transport
|
Target
|
Final target for registration of zero-emission vehicles
|
133
|
7.1.2: Support programme for light- and heavy-duty zero-emission transport
|
Target
|
Entry into operation of recharging and refueling stations
|
134
|
7.1.3: Digital end-to-end platform to accelerate planning and approval
|
Milestone
|
Launch of project
|
135
|
7.1.3: Digital end-to-end platform to accelerate planning and approval
|
Milestone
|
Launch of once-only permitting platform
|
Instalment amount
|
EUR 6 445 680 778
|
SECTION 3: ADDITIONAL ARRANGEMENTS
1.Arrangements for monitoring and implementation of the recovery and resilience plan
The monitoring and implementation of the recovery and resilience plan of Germany shall take place in accordance with the following arrangements:
-A coordination unit in the Federal Ministry of Finance shall monitor the implementation of Germany’s recovery and resilience plan. The unit shall coordinate the monitoring and reporting of progress on milestones and targets and on relevant indicators, perform qualitative controls on all financial data and submit payment requests. The coordination unit shall be further responsible for identifying and correcting early on any potential undesirable developments. It shall serve as a coordinating body also for the monitoring and implementation of the audit and control measures.
-The coordinating function of the unit is based on established national mechanisms and regulations. The relevant national legal provisions and national mechanism for monitoring and control shall be applied, including the corresponding reporting obligations. The disbursement of funds for the measures in the recovery and resilience plan to the final recipients shall be carried out in compliance with the legal basis of the general funding guidelines (Förderrichtlinie) for the respective measure in accordance with the General Administrative Regulations, and on the basis of individual funding decisions (administrative acts) in favour of the final recipients.
-The coordination unit consists of a team of economists and budgetary and controlling experts with the relevant experience and specialist knowledge. Specialist expertise from other units of the Federal Ministry of Finance or other line Ministries shall be called in as needed. The mandate of the coordinating unit is set out in the distribution-of-business plan of the Federal Ministry of Finance.
2.Arrangements for providing full access by the Commission to the underlying data
The Federal Ministry of Finance, as the central coordinating body for Germany’s recovery and resilience plan and its implementation, is responsible for overall coordination and monitoring of the plan. In particular, it acts as a coordinating body for monitoring progress on milestones and targets, for monitoring and, where appropriate, implementing control and audit activities, and for providing reporting and requests for payments. It coordinates the reporting of milestones and targets, relevant indicators, but also qualitative financial information and other data, such as on final recipients. The data encoding is taking place in decentralised IT systems throughout different ministries, which are obliged to report the required data to the Federal Ministry of Finance.
In accordance with Article 24(2) of Regulation (EU) 2021/241, upon completion of the relevant agreed milestones and targets in Section 2.1 of this Annex, Germany shall submit to the Commission a duly justified request for payment of the financial contribution. Germany shall ensure that, upon request, the Commission has full access to the underlying relevant data that supports the due justification of the request for payment, both for the assessment of the request for payment in accordance with Article 24(3) of Regulation (EU) 2021/241 and for audit and control purposes.