Commission Regulation (EU) No 1303/2014 of 18 November 2014 concerning the technical specification for interoperability relating to safety in railway tunnels of the rail system of the European Union (Text with EEA relevance)Text with EEA relevance
Consolidated text: Commission Regulation (EU) No 1303/2014 of 18 November 2014 concerning the technical specification for interoperability relating to safety in railway tunnels of the rail system of the European Union (Text with EEA relevance)Text with EEA relevance
Commission Regulation (EU) No 1303/2014 of 18 November 2014 concerning the technical specification for interoperability relating to safety in railway tunnels of the rail system of the European Union (Text with EEA relevance)Text with EEA relevance
02014R1303 — EN — 29.01.2024 — 003.001
This text is meant purely as a documentation tool and has no legal effect. The Union's institutions do not assume any liability for its contents. The authentic versions of the relevant acts, including their preambles, are those published in the Official Journal of the European Union and available in EUR-Lex. Those official texts are directly accessible through the links embedded in this document
COMMISSION REGULATION (EU) No 1303/2014 of 18 November 2014 concerning the technical specification for interoperability relating to ‘safety in railway tunnels’ of the rail system of the European Union (OJ L 356 12.12.2014, p. 394) |
Amended by:
|
|
Official Journal |
||
No |
page |
date |
||
L 153 |
28 |
10.6.2016 |
||
COMMISSION IMPLEMENTING REGULATION (EU) 2019/776 of 16 May 2019 |
L 139I |
108 |
27.5.2019 |
|
COMMISSION IMPLEMENTING REGULATION (EU) 2024/191 of 8 January 2024 |
L |
1 |
9.1.2024 |
COMMISSION REGULATION (EU) No 1303/2014
of 18 November 2014
concerning the technical specification for interoperability relating to ‘safety in railway tunnels’ of the rail system of the European Union
(Text with EEA relevance)
Article 1
The technical specification for interoperability (TSI) relating to the ‘safety in railway tunnels’ of the rail system of the entire European Union, as set out in the Annex, is hereby adopted.
Article 2
The TSI shall apply to the control-command and signalling, infrastructure, energy, operation, as well as rolling stock subsystems as described in ►M2 Annex II to Directive (EU) 2016/797 ( 1 ) ◄ .
The TSI shall apply to these subsystems in accordance with Section 7 of the Annex.
Article 3
The technical and geographical scope of this Regulation is set out in Sections 1.1 and 1.2 of the Annex.
Article 4
Within six months of the entry into force of this Regulation, each Member State shall notify the other Member States and the Commission of:
the national rules referred to in paragraph 1;
the conformity assessment and verification procedures to be carried out to apply the national rules referred to in paragraph 1;
the bodies designated to carry out the conformity assessment and verification procedures for the national rules relating to the specific cases set out in point 7.3 of the Annex.
Article 5
Member States shall notify to the Commission the following types of agreement within six months of the entry into force of this Regulation:
national agreements between the Member States and railway undertakings or infrastructure managers, agreed on either a permanent or a temporary basis and required by the very specific or local nature of the intended transport service;
bilateral or multilateral agreements between railway undertakings, infrastructure managers or safety authorities which deliver significant levels of local or regional interoperability;
international agreements between one or more Member States and at least one third country, or between railway undertakings or infrastructure managers of Member States and at least one railway undertaking or infrastructure manager of a third country, which deliver significant levels of local or regional interoperability.
Article 6
In accordance with Article 9(3) of Directive 2008/57/EC, each Member State shall communicate to the Commission within one year of the entry into force of this Regulation the list of projects being implemented within its territory and that are at an advanced stage of development.
▼M1 —————
Article 8
Article 9
Decision 2008/163/EC is repealed with effect from 1 January 2015.
It shall however continue to apply to:
subsystems authorised in accordance with that Decision;
projects for new, renewed or upgraded subsystems which, at the time of publication of this Regulation, are at an advanced stage of development or are the subject of a contract which is being carried out.
Article 10
This Regulation shall enter into force on the twentieth day following that of its publication in the Official Journal of the European Union.
It shall apply from 1 January 2015.
This Regulation shall be binding in its entirety and directly applicable in all Member States.
ANNEX
1. |
Introduction |
1.1. |
Technical scope |
1.1.1. |
Scope related to tunnels |
1.1.2. |
Scope related to rolling stock |
1.1.3. |
Scope related to operational aspects |
1.1.4. |
Risk scope |
1.2. |
Geographical scope |
2. |
Definition of aspect/scope |
2.1. |
General |
2.2. |
The risk scenarios |
2.2.1. |
‘Hot’ incidents: Fire, explosion followed by fire, emission of toxic smoke or gases. |
2.2.2. |
‘Cold’ incidents: collision, derailment |
2.2.3. |
Prolonged stop |
2.2.4. |
Exclusions |
2.3. |
The role of emergency response services |
2.4. |
Definitions |
3. |
Essential requirements |
3.1. |
Infrastructure and energy subsystems |
3.2. |
Rolling stock subsystem |
4. |
Characterisation of the subsystem |
4.1. |
Introduction |
4.2. |
Functional and technical specifications of the subsystems |
4.2.1. |
Subsystem Infrastructure |
4.2.2. |
Subsystem Energy |
4.2.3. |
Subsystem rolling stock |
4.3. |
Functional and technical specifications of the interfaces |
4.3.1. |
Interfaces with the Control-Command-Signalling subsystem |
4.3.2. |
Interfaces with the Traffic Management and Operation subsystem |
4.4. |
Operating rules |
4.4.1. |
Emergency rule |
4.4.2. |
Tunnel emergency plan |
4.4.3. |
Exercises |
4.4.4. |
Switching off and Earthing procedures |
4.4.5. |
Provision of on-train safety and emergency information to passengers |
4.4.6. |
Operational rules related to trains running in tunnels |
4.5. |
Maintenance rules |
4.5.1. |
Infrastructure |
4.5.2. |
Maintenance of rolling stock |
4.6. |
Professional qualifications |
4.6.1. |
Tunnel specific competence of the train crew and other staff |
4.7. |
Health and safety conditions |
4.7.1. |
Self-rescue device |
5. |
Interoperability constituents |
6. |
Assessment of conformity and/or suitability for use of the constituents and verification of the subsystem |
6.1. |
Interoperability constituents |
6.2. |
Subsystems |
6.2.1. |
EC verification (general) |
6.2.2. |
Procedures for EC verification of a subsystem (modules) |
6.2.3. |
Existing solutions |
6.2.4. |
Innovative solutions |
6.2.5. |
Assessment of maintenance |
6.2.6. |
Assessment of conformity to the Safety requirements applying to the Infrastructure and Energy subsystems |
6.2.7. |
Additional requirements for assessment of specifications concerning the IM |
6.2.8. |
Additional requirements for assessment of specifications concerning the RU |
7. |
Implementation |
7.1. |
Application of this TSI to new subsystems |
7.1.1. |
General |
7.1.2. |
New rolling stock |
7.1.3. |
New Infrastructure |
7.2. |
Application of this TSI to subsystems already in service |
7.2.1. |
Upgrade or renewal of rolling stock |
7.2.2. |
Upgrade and renewal measures for tunnels |
7.2.3. |
Operation subsystem |
7.2.4. |
Operation of new rolling stock in existing tunnels |
7.3. |
Specific cases |
7.3.1. |
General |
7.3.2. |
Operational rules related to trains running in tunnels (clause 4.4.6) |
Appendix A: |
Standards or Normative Documents Referred to in this TSI |
Appendix B: |
Assessment of the Subsystems |
1. INTRODUCTION
1.1. Technical scope
This TSI concerns the following subsystems as defined in ►M2 Directive (EU) 2016/797 ◄ : control-command and signalling (‘CCS’), infrastructure (‘INF’), energy (‘ENE’), operation (‘OPE’), and rolling stock (locomotives and passenger units ‘LOC&PAS’).
The purpose of this TSI is to define a coherent set of tunnel specific measures for the infrastructure, energy, rolling stock, control-command and signalling and operation subsystems, thus delivering an optimal level of safety in tunnels in the most cost-efficient way.
It shall permit free movement of vehicles which are in compliance with this TSI to run under harmonised safety conditions in railway tunnels.
Only measures, designed to reduce specific tunnel risks, are prescribed in the present TSI. Risks related to pure railway operation, such as derailment and collision with other trains, are addressed by general railway safety measures.
The existing safety level shall not be reduced in a country as stipulated in Directive 2004/49/EC Art 4.1. Member States can retain more stringent requirements, as long as these requirements do not prevent the operation of TSI compliant trains.
Member States can prescribe new and more stringent requirements for specific tunnels in accordance with Directive 2004/49/EC Art 8; such requirements shall be notified to the Commission before they are introduced. Such higher requirements must be based on a risk analysis and must be justified by a particular risk situation. They shall be the result of a consultation of the Infrastructure Manager and of the relevant authorities for emergency response, and they shall be subject to a cost-benefit assessment.
1.1.1. Scope related to tunnels
This TSI applies to new, renewed and upgraded tunnels which are located on the ►M2 network of the Union rail system ◄ , and which are in accordance with the definition in clause 2.4 of this TSI.
Stations that are in tunnels shall be in conformity with the national rules on fire safety. When they are used as safe areas, they shall comply only with the specifications for clauses 4.2.1.5.1, 4.2.1.5.2 and 4.2.1.5.3 of this TSI. When they are used as ►M2 evacuation and rescue points ◄ , they shall comply only with the specifications of clauses 4.2.1.7 (c) and 4.2.1.7 (e) of this TSI.
1.1.2. Scope related to rolling stock
This TSI applies to rolling stock which is in the scope of the LOC&PAS TSI.
Rolling stock categorised ‘A’ or ‘B’ according to the previous SRT TSI (Decision 2008/163/EC) shall retain its category in this TSI as defined in clause 4.2.3.
1.1.3. Scope related to operational aspects
This TSI applies to the operation of all units of rolling stock which are running in tunnels described in clause 1.1.1.
1.1.3.1. Operation of freight trains
When each vehicle of a freight train or dangerous goods train as defined in clause 2.4 complies with the structural TSIs which apply to it (LOC&PAS, SRT, NOI, CCS, WAG) and when the dangerous goods wagon(s) comply with Annex II of Directive 2008/68/EC, the freight train or dangerous goods train operated according to the requirements of the OPE TSI shall be allowed to circulate in all tunnels of the ►M2 network of the Union rail ◄ system.
1.1.4. Risk scope
1.1.4.1.
This TSI covers only specific risks to the safety of passengers and on-board staff in tunnels for the subsystems above.
Where a risk analysis comes to the conclusion that other tunnel incidents might be of relevance, specific measures to deal with these scenarios shall be defined.
1.1.4.2.
Risks not covered by this TSI are as follows:
Health and safety of staff involved in maintenance of the fixed installations in tunnels.
Financial loss due to damage to structures and trains, and consequently the losses resulting from non-availability of the tunnel for repairs.
Trespass into the tunnel through the tunnel portals.
Terrorism, as a deliberate and premeditated act, which is designed to cause wanton destruction, injury and loss of life.
Risks for people in the neighbourhood of a tunnel where collapse of the structure could have catastrophic consequences.
1.2 Geographical scope
The geographical scope of this TSI is the network of the Union rail system as described in Annex I of Directive (EU) 2016/797 with the exclusion of the cases referred to in Articles 1(3) and 1(4) of Directive (EU) 2016/797.
2. DEFINITION OF ASPECT/SCOPE
2.1. General
The line of defence for the promotion of safety in tunnels comprises four successive layers: Prevention, mitigation, evacuation and rescue.
The largest contribution is in the area of prevention followed by mitigation and so on.
The layers of safety combine to produce a low level of residual risk.
A major feature of railways is their inherent ability to prevent accidents through the traffic running on a guide-way and generally being controlled and regulated using a signalling system.
2.2. The risk scenarios
This TSI provides measures which could prevent or mitigate the difficulty of evacuation or rescue operations following a tunnel-specific railway incident.
Relevant measures have been identified, which will control or significantly reduce the risks arising from the tunnel-specific incident scenarios identified above.
They have been developed, in the categories prevention/mitigation/evacuation/rescue; however they do not appear under these headings in this TSI but under the headings of the concerned subsystems.
The measures prescribed can be considered as a response to the following three types of incident.
2.2.1. ‘Hot’ incidents: Fire, explosion followed by fire, emission of toxic smoke or gases.
The main danger is fire. Fire is understood as a combination of heat, flames and smoke.
The fire starts on a train.
The fire is detected, either by on-board fire detectors, or by persons on-board. The driver is notified of a problem, either that there is a fire by an automatic notification or that there is a problem in general by passengers using the passenger alarm.
The driver is instructed to act appropriately depending on the local circumstances.
Ventilation is shut down to prevent smoke distribution. For rolling stock of category B, the passengers in the affected area will move to a non-affected area of the train where they are protected from fire and fumes
Whenever possible the train leaves the tunnel. Passengers are evacuated, directed by the train crew, or by self-rescue, to a safe area in the open air.
If appropriate, the train may stop at a ►M2 evacuation and rescue point ◄ inside the tunnel. Passengers are evacuated, directed by the train crew, or by self-rescue, to a safe area.
If a fire extinguishing system can extinguish the fire, the incident will become a ‘cold’ incident.
The fire starts in the tunnel.
If fire starts in a tunnel or in a technical room, the driver is instructed to act appropriately depending on the local circumstances in compliance with the tunnel-specific incident scenarios, described in the Emergency Plan.
2.2.2. ‘Cold’ incidents: collision, derailment
The tunnel specific measures concentrate on access/egress facilities to support evacuation and the intervention of the emergency response services.
The difference compared to the hot incidents is that there is no time constraint due to the presence of a hostile environment created by a fire.
2.2.3. Prolonged stop
Prolonged stop (an unplanned stop in a tunnel, without the occurrence of a hot or cold incident, for longer than 10 minutes) is not by itself a threat to passengers and staff.
However it may lead to ►M2 panic and to ◄ spontaneous, uncontrolled evacuation that exposes people to dangers present in a tunnel environment.
2.2.4. Exclusions
The scenarios that have not been dealt with are listed in clause 1.1.4.
2.3. The role of emergency response services
The definition of the role of the emergency response services is a matter for the relevant national legislation.
The measures specified in this TSI for rescue are based on the assumption that the emergency response services intervening in a tunnel incident shall protect lives as a priority.
It is assumed that they are expected to:
In a ‘hot’ incident type
In a ‘cold’ incident type
No demands on time or performance requirements are included in this TSI.
Considering that incidents in railway tunnels involving multiple fatalities are rare, it is implicit that there might be events, with an extremely low probability, for which even well-equipped emergency response services would be restricted, such as a major fire involving a freight train.
If the expectations of the emergency response services expressed in emergency plans go beyond the assumptions described above, the need for additional measures or tunnel equipment can be considered.
2.4. Definitions
For the purpose of this TSI the following definitions are used:
Railway tunnel: A railway tunnel is an excavation or a construction around the track provided to allow the railway to pass for example higher land, buildings or water. The length of a tunnel is defined as the length of the fully enclosed section, measured at rail level. A tunnel in the context of this TSI is 0.1 km or longer. Where certain requirements apply only to longer tunnels, thresholds are mentioned in the relevant clauses.
Safe area: a safe area is a temporary survivable space, inside or outside the tunnel, for passengers and staff to find refuge after they have evacuated from a train.
Final place of safety: the final place of safety is the place where passengers and staff will no longer be impacted by the effects of the initial incident (e.g. smoke opacity and toxicity, temperature). It is the termination point of the evacuation.
Evacuation and rescue point: an evacuation and rescue point is a defined location, inside or outside the tunnel, where fire fighting equipment can be used by the emergency response services and where passengers and staff can evacuate from a train.
Technical rooms: Technical rooms are enclosed spaces with doors for access/egress inside or outside the tunnel with safety installations which are necessary for at least one of the following functions: self-rescue, evacuation, emergency communication, rescue and fire fighting, signalling and communication equipment, and traction power supply.
Freight train: A freight train is a train composed of one or more locomotive(s) and one or more wagon(s). A freight train including at least one wagon carrying dangerous goods is a dangerous goods train.
All definitions related to rolling stock are defined in the LOC&PAS TSI and the WAG TSI.
CSM on risk assessment: this term is used to designate the Annex I of the Commission Implementing Regulation (EU) No 402/2013 of 30 April 2013 on the common safety method for risk evaluation and assessment and repealing Regulation (EC) No 352/2009 (OJ L 121, 3.5.2013, p. 8).
3. ESSENTIAL REQUIREMENTS
The following table indicates basic parameters of this TSI and their correspondence to the essential requirements as set out and numbered in Annex III to Directive (EU) 2016/797.
For meeting the essential requirements, the corresponding parameters of sections 4.2.1, 4.2.2 and 4.2.3 shall apply.
3.1 Infrastructure and energy subsystems
In order to meet the essential requirement ‘Safety’ applying to the Infrastructure and Energy subsystems, the CSM on risk assessment may be applied as an alternative to the corresponding parameters of sections 4.2.1 and 4.2.2.
Accordingly, for the risks identified in point 1.1.4 and the scenarios listed in point 2.2, the risk can be assessed by:
a comparison with a reference system;
an explicit risk estimation and evaluation.
For meeting the essential requirements other than ‘Safety’, the corresponding parameters of sections 4.2.1 and 4.2.2 shall apply.
Element of the infrastructure sub-system |
Ref. Clause |
Safety |
Reliability Availability |
Health |
Environmental protection |
Technical compatibility |
Accessibility |
Prevent unauthorised access to emergency exits and technical rooms |
4.2.1.1. |
2.1.1 |
|
|
|
|
|
Fire resistance of tunnel structures |
4.2.1.2. |
1.1.4 2.1.1 |
|
|
|
|
|
Fire reaction of building material |
4.2.1.3. |
1.1.4 2.1.1 |
|
1.3.2 |
1.4.2 |
|
|
Fire detection |
4.2.1.4. |
1.1.4 2.1.1 |
|
|
|
|
|
Evacuation facilities |
4.2.1.5. |
1.1.5 2.1.1 |
|
|
|
|
|
Escape walkways |
4.2.1.6. |
2.1.1 |
|
|
|
|
|
Evacuation and rescue points |
4.2.1.7 except (b) |
2.1.1 |
|
|
|
|
|
Evacuation and rescue points |
4.2.1.7 (b) |
|
|
|
|
1.5 |
|
Emergency communication |
4.2.1.8. |
2.1.1 |
|
|
|
|
|
Electricity supply for emergency response services |
4.2.1.9 |
2.1.1 |
|
|
|
|
|
Reliability of electrical systems |
4.2.1.10 |
2.1.1 |
|
|
|
|
|
Sectioning of contact line |
4.2.2.1. |
2.2.1 |
|
|
|
|
|
Earthing of contact line |
4.2.2.2. |
2.2.1 |
|
|
|
|
|
3.2 Rolling stock subsystem
For meeting the essential requirements, the corresponding parameters of section 4.2.3 shall apply.
Element of the rolling stock sub-system |
Ref. Clause |
Safety |
Reliability Availability |
Health |
Environmental protection |
Technical compatibility |
Accessibility |
Measures to prevent fire |
4.2.3.1 |
1.1.4 2.4.1 |
|
1.3.2 |
1.4.2 |
|
|
Measures to detect and control fire |
4.2.3.2 |
1.1.4 2.4.1 |
|
|
|
|
|
Requirements related to emergencies |
4.2.3.3 |
2.4.1 |
2.4.2 |
|
|
1.5 2.4.3 |
|
Requirements related to evacuation |
4.2.3.4 |
2.4.1 |
|
|
|
|
|
4. CHARACTERISATION OF THE SUBSYSTEM
4.1. Introduction
This consistency has been checked in relation to the development of the specifications within this TSI, its interfaces with respect to the systems in which it is integrated and also the operating rules for the railway.
Taking account of all the applicable essential requirements, the basic parameters related to safety in railway tunnels are set out for the subsystems infrastructure, energy and rolling stock in section 4.2 of this TSI. The operational requirements and responsibilities are set out in the OPE TSI and in section 4.4 of this TSI.
4.2. Functional and technical specifications of the subsystems
In the light of the essential requirements in Chapter 3, the functional and technical specifications of those aspects specific to tunnel safety in the above-mentioned subsystems are as follows:
4.2.1. Subsystem Infrastructure
4.2.1.1. Prevent unauthorised access to emergency exits and technical rooms
This specification applies to all tunnels.
Unauthorised access to technical rooms shall be prevented.
Where emergency exits are locked for security purposes, it shall always be possible to open them from inside.
4.2.1.2. Fire resistance of tunnel structures
This specification applies to all tunnels.
In the event of fire, the integrity of the tunnel lining shall be maintained for a period of time that is sufficiently long to permit self-rescue, evacuation of passengers and staff and intervention of the emergency response services. That period of time shall be in accordance with the evacuation scenarios considered and reported in the emergency plan.
▼M2 —————
4.2.1.3
This specification applies to all tunnels.
This specification applies to construction products and building elements inside tunnels. These products shall fulfil the requirements of Commission Regulation (EU) 2016/364 ( 6 ):
Tunnel building material shall fulfil the requirements of classification A2.
Non-structural panels and other equipment shall fulfil the requirements of classification B.
Exposed cables shall have the characteristics of low flammability, low fire spread, low toxicity and low smoke density. These requirements are fulfilled when the cables fulfil at least the requirements of classification B2ca, s1a, a1.
If the classification is lower than B2ca, s1a, a1, the class of cables may be determined by the infrastructure manager after a risk assessment, taking into account the characteristics of the tunnel and the intended operational regime. For the avoidance of doubt, different classifications of cable may be used for different installations within the same tunnel provided that the requirements of this point are met.
Materials that would not contribute significantly to a fire load shall be listed. They are allowed to not comply with the above.
4.2.1.4.
This specification applies to all tunnels of more than 1 km in length.
Fire in technical rooms shall be detected in order to alert the infrastructure manager.
4.2.1.5. Evacuation facilities
4.2.1.5.1 Safe area
This specification applies to all tunnels of more than 1 km in length.
A safe area shall allow the evacuation of trains that use the tunnel. It shall have a capacity corresponding to the maximum capacity of the trains planned to be operated on the line where the tunnel is located.
The safe area shall maintain survivable conditions for passengers and staff during the time needed for the complete evacuation from the safe area to a final place of safety.
In case of underground/undersea safe areas, the provisions shall allow people to move from the safe area to the surface without having to re-enter the affected tunnel tube.
The lay-out of an underground safe area and its equipment shall take into account the control of smoke, in particular to protect people who use the self-evacuation facilities.
4.2.1.5.2 Access to the safe area
This specification applies to all tunnels of more than 1 km in length.
Safe areas shall be accessible for people who commence self-evacuation from the train as well as for the emergency response services.
One of the following solutions shall be selected for access points from a train to the safe area:
Lateral and/or vertical emergency exits to the surface. These exits shall be provided at least every 1 000 m.
Cross-passages between adjacent independent tunnel tubes, which enable the adjacent tunnel tube to be employed as a safe area. Cross-passages shall be provided at least every 500 m.
▼M2 —————
Doors giving access from the escape walkway to the safe area shall have a minimum clear opening of 1,4 m wide and 2,0 m high. Alternatively it is permitted to use multiple doors next to each other which are less wide as long as the flow capacity of people is demonstrated to be equivalent or higher.
After passing the doors, the clear width shall continue to be at least 1,5 m wide and 2,25 m high.
The way in which the emergency response services access the safe area shall be described in the emergency plan.
4.2.1.5.3 Communication means in safe areas
This specification applies to all tunnels of more than 1 km in length.
Communication shall be possible, either by mobile phone or by fixed connection from underground safe areas to the control centre of the Infrastructure Manager.
4.2.1.5.4 Emergency lighting ►M2 on escape routes ◄
This specification applies to all tunnels of more than 0,5 km in length.
Emergency lighting shall be provided to guide passengers and staff to a safe area in the event of an emergency.
Illumination shall comply with the following requirements:
Single-track tube: on the side of the walkway
Multiple-track tube: on both sides of the tube
Position of lights:
The maintained illuminance shall be at least 1 lux at a horizontal plane at walkway level.
Autonomy and reliability: an alternative electricity supply shall be available for an appropriate period of time after failure of the main supply. The time required shall be consistent with the evacuation scenarios and reported in the Emergency Plan.
If the emergency light is switched off under normal operating conditions, it shall be possible to switch it on by both of the following means:
manually from inside the tunnel at intervals of 250 m
by the tunnel operator using remote control
4.2.1.5.5 Escape signage
This specification applies to all tunnels.
The escape signage indicates the emergency exits, the distance and the direction to a safe area.
All signs shall be designed according to the requirements of Directive 92/58/EEC of 24 June 1992 concerning the provision of health and/or safety signs at work and to the specification referenced in appendix A, index 1.
Escape signs shall be installed on sidewalls along escape walkways.
The maximum distance between escape signs shall be 50 m.
Signs shall be provided in the tunnel to indicate the position of emergency equipment, where such equipment is present.
All doors leading to emergency exits or ►M2 cross-passages ◄ shall be marked.
4.2.1.6. Escape walkways
This specification applies to all tunnels of more than 0,5 km in length.
Walkways shall be constructed in a single track tunnel tube on at least one side of the track and in a multiple track tunnel tube on both sides of the tunnel tube. In tunnel tubes with more than two tracks, access to a walkway shall be possible from each track.
The width of the walkway shall be at least 0.8 m.
The minimum vertical clearance above the walkway shall be 2.25 m.
The height of the walkway shall be at ►M2 bottom ◄ -of-rail level or higher.
Local constrictions caused by obstacles in the escape area shall be avoided. The presence of obstacles shall not reduce the minimum width to less than 0,7 m, and the length of the obstacle shall not exceed 2 m.
Continuous handrails shall be installed between 0.8 m and 1.1 m above the walkway providing a route to a safe area.
Handrails shall be placed outside the required minimum clearance of the walkway.
Handrails shall be angled at 30° to 40° to the longitudinal axis of the tunnel at the entrance to and exit from an obstacle.
4.2.1.7. ►M2 Evacuation and rescue points ◄
This specification applies to all tunnels of more than 1 km in length.
For the purpose of this clause, two or more consecutive tunnels will be considered as a single tunnel unless both of the following conditions are met:
The separation between tunnels in open air is longer than the maximum ►M2 length of the passenger train ◄ intended to be operated on the line + 100 m and
►M2 Evacuation and rescue points ◄ shall be created
Outside both portals of every tunnel of > 1 km and
Inside the tunnel, according to the category of rolling stock that is planned to be operated, as summarized in the table below:
Rolling stock category according to paragraph 4.2.3 |
Maximum distance from the portals to an evacuation and rescue point and between evacuation and rescue points |
Category A |
5 km |
Category B |
20 km |
Requirements for all ►M2 evacuation and rescue points ◄ :
The ►M2 evacuation and rescue points ◄ shall be equipped with water supply (minimum 800 l/min during 2 hours) close to the intended stopping point of the train. The method of supplying the water shall be described in the emergency plan.
The intended stopping position of the affected train shall be indicated to the train driver. This shall not require specific on-board equipment (all TSI compliant trains must be able to use the tunnel)
It shall be possible to switch off and earth the contact line, either locally or remotely.
Requirements for ►M2 evacuation and rescue points ◄ outside the portals of the tunnel
In addition to the requirements in 4.2.1.7 (c), ►M2 evacuation and rescue points ◄ outside the portals of the tunnel shall comply with the following requirements:
The open air area around the ►M2 evacuation and rescue point ◄ shall offer a minimum surface of 500 m2.
Requirements for ►M2 evacuation and rescue points ◄ inside the tunnel
In addition to the requirements in 4.2.1.7 (c), ►M2 evacuation and rescue points ◄ inside the tunnel shall comply with the following requirements
A safe area shall be accessible from the stopping position of the train. Dimensions of the evacuation route to the safe area shall consider the evacuation time (as specified in clause 4.2.3.4.1) and the planned capacity of the trains (referred to in clause 4.2.1.5.1) intended to be operated in the tunnel. The adequacy of the sizing of the evacuation route shall be demonstrated.
The safe area that is paired with the ►M2 evacuation and rescue point ◄ shall offer a sufficient standing surface relative to the time passengers are expected to wait until they are evacuated to a final place of safety.
There shall be an access to the affected train for emergency response services without going through the occupied safe area.
The lay-out of the ►M2 evacuation and rescue point ◄ and its equipment shall take into account the control of smoke, in particular to protect people who use the self-evacuation facilities to access the safe area.
4.2.1.8. Emergency communication
This specification applies to all tunnels of more than 1 km in length.
Radio communication between the train and the infrastructure manager control centre shall be provided in each tunnel with GSM-R.
Radio continuity shall be provided for permitting the emergency response services to communicate with their on-site command facilities. The system shall allow the emergency response services to use their own communication equipment.
4.2.1.9.
This specification applies to all tunnels of more than 1 km length.
The electricity supply system in the tunnel shall be suitable for the emergency response services equipment in accordance with the emergency plan for the tunnel. Some national emergency response services groups may be self-sufficient in relation to electricity supply. In this case, the option of not providing electricity supply facilities for the use of such groups may be appropriate. Such a decision, however, must be described in the emergency plan.
4.2.1.10.
This specification applies to all tunnels of more than 1 km length.
Electrical systems identified by the Infrastructure Manager as vital to the safety of passengers in the tunnel shall be kept in use as long as necessary according to the evacuation scenarios considered in the emergency plan.
Autonomy and reliability: an alternative electricity supply shall be available for an appropriate period of time after failure of the main supply. The time required shall be consistent with the evacuation scenarios considered and included in the emergency plan.
4.2.1.11.
This specification applies to all tunnels of more than 1 km in length.
When the contact line is divided into sections that can be locally switched, a means of communication and lighting shall be provided at the switching location.
4.2.2. Subsystem Energy
This section applies to the infrastructure part of the subsystem Energy.
4.2.2.1.
This specification applies to all tunnels of more than 1 km length.
The traction power supply system in tunnels may be divided into sections.
In such case, it shall be possible to switch off each section of the contact line, either locally or remotely.
4.2.2.2. ►M2 Earthing of contact line ◄
This specification applies to all tunnels of more than 1 km length.
Earthing devices shall be provided at tunnel access points and, if the earthing procedures allow the earthing of a single section, close to the separation points between sections. These shall be either portable devices or manually or remotely controlled fixed installations.
Communication and lighting means necessary for earthing ►M2 operations ◄ shall be provided.
▼M2 —————
4.2.3. Subsystem rolling stock
In the context of this TSI the subsystem rolling stock is subdivided into the following categories.
Category A passenger rolling stock (including passenger locomotives) for operation on lines within the scope of this TSI, where the distance between ►M2 evacuation and rescue points ◄ or the length of tunnels does not exceed 5 km.
Category B passenger rolling stock (including passenger locomotives) for operation in all tunnels on lines within the scope of this TSI, irrespective of the length of the tunnels.
Freight locomotives and self-propelling units designed to carry payload other than passengers, such as mail and freight for example, for operation in all tunnels on lines within the scope of this TSI, irrespective of the length of the tunnels. Locomotives designed to haul freight trains as well as passenger trains fall under both categories and shall respect the requirements of both categories.
Self-powered on-track machines, when in transport mode, for operation in all tunnels on lines within the scope of this TSI, irrespective of the length of the tunnels.
The rolling stock category shall be recorded in the technical file and will remain valid regardless of future revisions of this TSI.
4.2.3.1. Measures to prevent fire
This section is applicable to all categories of rolling stock.
4.2.3.1.1 Material requirements
Requirements are set out in the LOC&PAS TSI clause 4.2.10.2.1. These requirements shall also apply to the on-board CCS equipment.
4.2.3.1.2 Specific measures for flammable liquids
Requirements are set out in the LOC&PAS TSI clause 4.2.10.2.2.
4.2.3.1.3 Hot axle box detection
Requirements are set out in the LOC&PAS TSI clause 4.2.10.2.3.
4.2.3.2. Measures to detect and control fire
4.2.3.2.1 Portable fire extinguishers
Requirements are set out in the LOC&PAS TSI clause 4.2.10.3.1.
4.2.3.2.2 Fire detection systems
Requirements are set out in the LOC&PAS TSI clause 4.2.10.3.2.
4.2.3.2.3 Automatic fire fighting system for freight diesel units
Requirements are set out in the LOC&PAS TSI clause 4.2.10.3.3.
4.2.3.2.4 Fire containment and control systems for passenger rolling stock
Requirements are set out in the LOC&PAS TSI clause 4.2.10.3.4.
4.2.3.2.5 Fire containment and control systems for freight locomotives and freight self-propelling units
Requirements are set out in the LOC&PAS TSI clause 4.2.10.3.5.
4.2.3.3. Requirements related to emergencies
4.2.3.3.1. Emergency lighting system in the train
Requirements are set out in the LOC&PAS TSI clause 4.2.10.4.1.
4.2.3.3.2 Smoke control
Requirements are set out in the LOC&PAS TSI clause 4.2.10.4.2.
4.2.3.3.3. Passenger alarm and communication means
Requirements are set out in the LOC&PAS TSI clause 4.2.10.4.3.
4.2.3.3.4 Running capability
Requirements are set out in the LOC&PAS TSI clause 4.2.10.4.4.
4.2.3.4. Requirements related to evacuation
4.2.3.4.1 Passenger emergency exits
Requirements are set out in the LOC&PAS TSI clause 4.2.10.5.1.
4.2.3.4.2 Driver's cab emergency exits
Requirements are set out in the LOC&PAS TSI clause 4.2.10.5.2.
4.3. Functional and technical specifications of the interfaces
4.3.1. Interfaces with the Control-Command-Signalling subsystem
Interface with the CCS subsystem |
|||
SRT TSI |
|
CCS TSI |
|
Parameter |
Clause |
Parameter |
Clause |
Radio communication |
4.2.1.8 (a) |
Mobile communication functions for railways GSM-R |
4.2.4 |
Material characteristics |
►M2 4.2.1.3 ◄ |
Essential requirements |
Chapter 3 |
Material characteristics |
4.2.3.1.1 |
Essential requirements |
Chapter 3 |
4.3.2. Interfaces with the Traffic Management and Operation subsystem
Interface with the OPE subsystem |
|||
SRT TSI |
|
OPE TSI |
|
Parameter |
Clause |
Parameter |
Clause |
Emergency rule |
4.4.1 |
Ensuring that the train is in running order |
4.2.2.7 |
Train departure |
4.2.3.3 |
||
Degraded Operation |
4.2.3.6 |
||
Tunnel emergency plan |
4.4.2 |
Managing an emergency situation |
4.2.3.7 |
Exercises |
4.4.3 |
||
Provision of on-train safety and emergency information to passengers |
4.4.5 |
||
Tunnel specific competence of the train crew and other staff |
4.6.1 |
Professional competency |
4.6.1 |
▼M2 ————— |
|||
4.4. Operating rules
Operating rules are developed within the procedures described in the Infrastructure Manager safety management system. These rules take into account the documentation related to operation which forms a part of the technical file as required in ►M2 Article 15(4) ◄ and set out in ►M2 Annex IV ◄ of ►M2 Directive (EU) 2016/797 ◄ .
The following operating rules do not form any part of the assessment of the structural subsystems.
4.4.1. Emergency rule
These rules apply to all tunnels.
In light of the essential requirements in Chapter 3, the operating rules specific to tunnel safety are:
The operational rule is to monitor the train condition before entering a tunnel in order to detect any defect detrimental to its running behaviour and to take appropriate action.
In the case of an incident outside the tunnel, the operational rule is to stop a train with a defect that could be detrimental to its running behaviour before entering a tunnel.
In the case of an incident inside the tunnel the operational rule is to drive the train out of a tunnel, or to the next ►M2 evacuation and rescue point ◄ .
4.4.2. Tunnel emergency plan
These rules apply to tunnels of more than 1 km in length
An emergency plan shall be developed under the direction of the Infrastructure Manager(s), in cooperation with the emergency response services and the relevant authorities for each tunnel. Station managers shall be equally involved if one or more stations are used as a safe area or an evacuation and rescue point. In case the emergency plan concerns an existing tunnel, Railway Undertakings already operating in the tunnel must be consulted. In case the emergency plan concerns a new tunnel, Railway Undertakings planning to operate in the tunnel may be consulted.
The emergency plan shall be consistent with the self-rescue, evacuation, fire-fighting and rescue facilities available.
Detailed tunnel-specific incident scenarios adapted to the local tunnel conditions shall be developed for the emergency plan.
Once developed, the emergency plan shall be communicated to Railway Undertakings intending to use the tunnel.
4.4.3. Exercises
These rules apply to tunnels of > 1 km.
Prior to the opening of a single tunnel or a series of tunnels, a full-scale exercise comprising evacuation and rescue procedures, involving all categories of personnel defined within the emergency plan, shall take place.
The emergency plan shall define how all organisations involved can be familiarised with the infrastructure and how often visits to the tunnel and table top or other exercises have to take place.
4.4.4. Switching off and Earthing procedures
These rules apply to all tunnels.
In the case it is required to switch off the traction power supply system the infrastructure manager shall make sure that relevant sections of the contact line have been switched off, and inform the emergency response services before they enter the tunnel or a section of the tunnel.
It is the responsibility of the infrastructure manager to switch off the traction power supply.
Procedures and responsibilities for earthing of the contact line shall be defined between the Infrastructure Manager and the emergency response services, and reported in the emergency plan. Provision shall be made for switching off the section in which the incident has taken place.
4.4.5. Provision of on-train safety and emergency information to passengers
Railway undertakings shall inform passengers of on board emergency and safety procedures related to tunnels.
When such information is in written or spoken form, it shall be presented in the language of the country the train is running in as a minimum, plus English.
An operating rule shall be in place describing how the train crew ensures the complete evacuation of the train when this is necessary, including those people with hearing impairments that may be in closed areas.
4.4.6. Operational rules related to trains running in tunnels
Vehicles in conformity with the TSI as defined in clause 4.2.3 shall be permitted to operate in tunnels in accordance with the following principles:
Category A passenger rolling stock shall be deemed to comply with the tunnel safety requirements for rolling stock on lines where the distance between ►M2 evacuation and rescue points ◄ , or the length of tunnels does not exceed 5 km.
Category B passenger rolling stock shall be deemed to comply with the tunnel safety requirements for rolling stock on all lines.
Freight locomotives shall be deemed to comply with the tunnel safety requirements for rolling stock on all lines. However, Infrastructure Managers of tunnels longer than 20 km are permitted to require locomotives with a running capability equivalent to that of category B passenger rolling stock for hauling freight trains in such tunnels. This requirement shall be clearly stated ►M2 in the Register of Infrastructure defined in clause 4.8.1 and ◄ in the Network Statement of the IM.
On-track machines shall be deemed to comply with the tunnel safety requirements for rolling stock on all lines.
Freight trains shall be admitted in all tunnels according to the conditions specified in clause 1.1.3.1. Operational rules may manage the safe operation of freight and passenger traffic, by separating these types of traffic for example.
Operation of Category A rolling stock is permitted on lines where the distance between ►M2 evacuation and rescue points ◄ , or the length of tunnels exceeds 5 km, in the case where there are no passengers on board.
Operational rules shall be put in place to avoid ►M2 panic and ◄ spontaneous, uncontrolled evacuation in the case of a prolonged stop of a train in a tunnel without the occurrence of a hot or cold incident.
4.5. Maintenance rules
4.5.1. Infrastructure
Before placing a tunnel into service a maintenance file shall be prepared setting out at least:
Identification of elements which are subject to wear, failure, ageing or other forms of deterioration or degradation,
Specification of the limits of use of the elements under (1) and a description of the measures to be taken to prevent these limits being exceeded,
Identification of those elements which are relevant to emergency situations and their management,
Necessary periodic checks and servicing activities to ensure the proper functioning of the parts and systems under (3).
4.5.2. Maintenance of rolling stock
The maintenance requirements for rolling stock are set out in the LOC&PAS TSI.
4.6. Professional qualifications
The professional qualifications of staff required for operations specific to tunnel safety within the subsystems covered by this TSI and in accordance with the operating rules in clause 4.4 of this TSI are as follows:
4.6.1. Tunnel specific competence of the train crew and other staff
All professional staff driving and accompanying a train, as well as staff that authorise train movements, shall have the knowledge and ability to apply that knowledge to manage degraded situations in the event of an incident.
For staff undertaking the tasks of accompanying trains, the general requirements are specified in the OPE TSI.
Train crew as defined in the OPE TSI shall have knowledge of the appropriate safety behaviour in tunnels and in particular be able to evacuate the people on board a train, when the train is stopped in a tunnel.
This involves in particular instructing the passengers to go to the next coach or to exit the train, and to lead them outside the train to a safe area.
Auxiliary train staff (e.g. catering, cleaning), who do not form part of the train crew as defined above shall, in addition to their basic instruction, be trained to support the actions of the train crew.
Professional training of engineers and managers responsible for maintaining and operating the subsystems shall include the subject of safety in railway tunnels.
4.7. Health and safety conditions
The health and safety conditions of staff required for operations specific to tunnel safety for the subsystems concerned by this TSI and for the implementation of the TSI are as follows:
4.7.1. Self-rescue device
Manned traction units of freight trains shall be equipped with a self-rescue device for the driver and other persons on board, satisfying the specifications of either the specification referenced in appendix A, index 2 or the specification referenced in appendix A, index 3. The RU shall choose one of the two solutions defined in these specifications.
▼M2 —————
5. INTEROPERABILITY CONSTITUENTS
There are no interoperability constituents defined in the SRT TSI.
6. ASSESSMENT OF CONFORMITY AND/OR SUITABILITY FOR USE OF THE CONSTITUENTS AND VERIFICATION OF THE SUBSYSTEM
6.1. Interoperability constituents
Not applicable, since no interoperability constituents have been defined in the SRT TSI.
6.2. Subsystems
6.2.1. EC verification (general)
The EC verification of a Subsystem shall be performed according to one or a combination of the following modules as defined in Decision 2010/713/EU: