EUR-Lex Access to European Union law

Back to EUR-Lex homepage

This document is an excerpt from the EUR-Lex website

Document 52012SA0018

Special Report No 18/2012 ‘European Union assistance to Kosovo related to the rule of law’

52012SA0018

Special Report No 18/2012 ‘European Union assistance to Kosovo related to the rule of law’


ABBREVIATIONS

CONOPS : Concept of Operations

CPCC : Civilian Planning and Conduct Capability

CSDP : Common security and defence policy

EEAS : European External Action Service

EULEX : European Union Rule of Law Mission in Kosovo

EUO : European Union Office in Kosovo

EU SR : European Union Special Representative

ICO : International Civilian Office

IfS : Instrument for Stability

IPA : Instrument for Pre-Accession Assistance

JRCB : Joint Rule of Law Coordination Board

KFOR : Kosovo Force

MIPD : Multi-annual Indicative Planning Document

MMA : Monitoring, Mentoring and Advising

NATO : The North Atlantic Treaty Organisation

OECD : The Organisation for Economic Cooperation and Development

OPDAT : Office of Overseas Prosecutorial Development, Assistance and Training

OPLAN : Operation Plan

PPO : Public Prosecutors Office

PSC : Political and Security Committee of the Council

UNMIK : United Nations Interim Administration Mission in Kosovo

EXECUTIVE SUMMARY

I. The European Union (EU) is providing major assistance to the rule of law in Kosovo [1]. In particular it has deployed since 2008 its largest ever Common Security and Defence Policy (CSDP) mission in the form of the European Union Rule of Law Mission ("EULEX"). EULEX has had approximately 2500 staff working on capacity building and carrying out some executive functions. In addition, the European Commission has been managing rule of law projects, also mainly focused on capacity building, funded from the Instrument for Pre-Accession Assistance (IPA). From 2007 to 2011, the period covered by the audit, the EU budget funded 680 million euro in support to the rule of law.

II. The audit addressed the question of whether EU assistance to Kosovo in the field of the rule of law is effective. To do this the Court assessed whether assistance is achieving its intended results and what has been its impact on overall progress in the different areas of the rule of law (police, justice, customs, anti-corruption). It also examined the management of the assistance, particularly with regard to coordination and the management of EULEX. The audit included a sample of 17 EU interventions in Kosovo.

III. The audit found that EU assistance to Kosovo in the field of the rule of law has not been sufficiently effective. Some of the objectives of individual interventions have been achieved, albeit frequently with delays and doubts about the sustainability of the results. However, overall progress in improving the rule of law is slow, particularly with regard to the fight against organised crime and corruption, above all in the north of Kosovo.

IV. In the first place, the limited effectiveness of EU assistance can be explained by the specific circumstances of Kosovo. Nevertheless, the audit found there were significant areas where better management by the EEAS and Commission could have made EU assistance more effective.

V. The effectiveness of EU assistance has been hindered by objectives not being sufficiently clearly defined as well as major coordination challenges for Commission and EULEX operations. Moreover, EULEX has suffered from staffing constraints. While Commission projects were generally adequately managed, the EEAS and Commission could have made more use of policy dialogue and conditionality to strengthen the rule of law.

VI. The Court recommends:

- The Council and Commission should ensure rule of law objectives for Kosovo are linked to concrete benchmarks against which progress can be assessed and take into account EU internal secur- ity objectives.

- The EEAS and Commission to improve their coordination should review Commission programming and procurement procedures to ensure they are responsive to EULEX’s operational needs, and prepare an exit strategy for EULEX which would entail the Commission taking over EULEX’s capacity building functions.

- The EEAS should work with the Member States to ensure that future CSDP missions operate with the full authorised number of staff and that they are deployed for the necessary time period and have the appropriate skills to be effective.

- The Council and Commission should ensure that future CSDP missions have a legal personality.

- The EEAS and Commission should ensure that the allocation of staff in the EU Office in Pristina to managing rule of law support reflects the high priority given by the EU to this area.

- The Council, the EEAS and the Commission should ensure that their policy dialogues with Kosovo focus particularly on strengthening the rule of law and are linked to incentives and priority conditions.

INTRODUCTION

BACKGROUND

1. Within the former Yugoslavia, Kosovo was an autonomous province in the Republic of Serbia, one of the six republics originally making up the country [2]. It had an ethnic Albanian majority but with a significant Serb minority. Following a constitutional reform in 1974, Kosovo was granted increased autonomy, allowing it to have its own administration, assembly, and judiciary. During the 1980s ethnic tensions mounted and in 1989 Kosovo’s autonomy was revoked by the nationalistic Serbian government led by Slobodan Milošević.

2. The 1990s witnessed the disintegration of Yugoslavia and in Kosovo increasing repression by the Serbian government resulted in the outbreak of guerilla war led by the Kosovo Liberation Army and a total breakdown in the rule of law. Between 1997 and June 1999 an estimated 10000 Kosovo Albanians were killed. In response to the rapidly deteriorating situation the North Atlantic Treaty Organisation (NATO) bombed Serbia and Serbian armed forces in Kosovo to drive the latter out of Kosovo.

3. In June 1999, the United Nations (UN) Security Council adopted Resolution 1244/99 which set up a United Nations Interim Administration Mission in Kosovo (UNMIK) in place of the Government of Serbia. It mandated UNMIK to carry out all aspects of civil administration, establish democratic institutions and create the basis for eventually resolving Kosovo’s status [3]. The immediate task of UNMIK in conjunction with the NATO-led Kosovo Force (KFOR) was to establish law and order by ending the violence and repression and allowing for a safe return of all refugees.

4. From 2003, under a constitutional framework established by UNMIK, the structures of the so-called "Provisional Institutions of Self-Government" slowly began evolving. While UNMIK retained ultimate authority, a gradual transfer of power from UNMIK to Kosovo institutions took place.

5. Following negotiations over the period 2005–07, the UN Special Envoy, Martti Ahtisaari, proposed a "supervised independence" for Kosovo. While this proposal was not endorsed by the UN Security Council, two key parts of the Ahtisaari proposal were nevertheless subsequently implemented:

(a) The EU Council of Ministers established a Common Security and Defence Policy (CSDP) mission, the "European Union Rule of Law Mission in Kosovo" (EULEX), to monitor, mentor and advise on all areas related to the rule of law and carry out certain executive functions.

(b) A group of states supporting Kosovo’s independence, the International Steering Group, established an International Civilian Office (ICO) to monitor the implementation of the proposal. The Head of the ICO has the authority to annul decisions or laws adopted by Kosovo authorities and sanction or remove public officials.

6. Kosovo unilaterally declared independence from Serbia in February 2008 but this step was not followed by universal recognition of Kosovo [4]. Five EU Member States have not recognised Kosovo’s independence [5] which has led the EU to adopt what is termed a "status neutral" position [6]. All Member States have nevertheless agreed that the European Union should provide substantial funding to Kosovo with a view to ensuring the stability of Kosovo, the wider western Balkans region and Europe as a whole [7].

7. Kosovo benefits from financial assistance from the Instrument for Pre-Accession Assistance (IPA) and is treated by the Commission as a potential candidate for the purpose of receiving this assistance [8]. Since 2010 it has taken part in the same "Stabilisation and Association Process" (SAP) dialogue mechanism with the Commission as candidate countries and other potential candidates in the western Balkans region.

8. Serbia rejected Kosovo’s independence and many ethnic Serbs in the north of Kosovo wish to remain part of Serbia [9]. The EU is facilitating direct dialogue between Kosovo and Serbia to improve relations between them (the so-called "Pristina–Belgrade Dialogue"). In March 2012 the European Council granted Serbia the status of candidate country for joining the EU and the Commission has subsequently proposed an amendment of the IPA Regulation to transfer Serbia from the list of potential candidate countries to the list of candidate countries.

9. The desire for independence and subsequent international recognition have dominated the overall agenda of the Kosovo authorities. But Kosovo faces other major challenges, notably poverty and crime. Its GDP per capita of just 2383 euro is the lowest in Europe [10]. The collapse of the rule of law in the 1990s created a vacuum which has been exploited by organised crime both from within and outside Kosovo. At the same time, the clientelism prevalent throughout Kosovo society and the traditional recourse to a clan-based customary law hinder building up the rule of law.

10. Strengthening the rule of law in Kosovo is generally considered a pre-requisite for economic development. Given the international nature of organised crime, the strengthening of the rule of law in Kosovo is also important for the internal security of the EU.

11. In January 2012 the Kosovo authorities announced their desire to end the supervised independence by the end of the year. On 10 September the Kosovo Assembly adopted constitutional amendments to that effect ending the supervisory role exercised by the ICO. At the same time, the Kosovo authorities have renewed their invitation to EULEX to carry out its executive functions until the end of its current mandate in June 2014.

EU FINANCIAL ASSISTANCE

12. Over the last decade the international community has invested major resources in peace-keeping, reconstruction, institution building, economic development and rule of law assistance to Kosovo. During the period 1999–2007 Kosovo received 3,5 billion euro in donor assistance, two thirds of which came from the European Commission and EU Member States. A 2008 Donor Conference pledged an additional 1,2 billion euro for the period 2009–11, including 508 million euro from the Commission. Overall, Kosovo is ’the biggest recipient per capita of EU assistance in the whole world’ [11].

13. In the period 2007–11 more than half of EU assistance was allocated to the rule of law in Kosovo, principally through the CSDP mission [12] but also through IPA (see Table 1).

14. EULEX is the largest crisis management operation ever launched by the EU. Its central aim is to help the Kosovo authorities to strengthen the rule of law, specifically in the police, judiciary and customs areas (see also paragraph 68). It is financed from the EU’s Common Foreign and Security Policy (CFSP) budget, with funding being implemented through a contract between the European Commission and the EULEX Head of Mission, who is personally responsible for the EULEX budget. Up to June 2012, the EU had committed 614 million euro from the EU General Budget to support EULEX [13]. At the end of 2011 EULEX had 2539 staff including 1087 staff who had been seconded, mainly from Member States. In a strategic review of EULEX the European External Action Service (EEAS) proposed to maintain some executive functions and extend its mandate until June 2014, and this has been agreed by the Council [14].

15. IPA has funded projects in the areas of police, justice and customs as well as specific anti-corruption projects for a total of 92,47 million euro during the period 2007–11.

TABLE 1

EU ASSISTANCE TO THE RULE OF LAW 2007-11 (COMMITMENTS IN MILLION EURO [1111])

Source: European Commission (analysed by the European Court of Auditors).

Instrument | 2007 | 2008 | 2009 | 2010 | 2011 | Total |

EULEX (including Planning Team) (current budget line: 19.03.01.02) | 76,50 | 120,00 | 121,22 | 120,75 | 144,00 | 582,47 |

IPA wider rule of law [2222] (22.02.02 and 22.02.04.01) | 9,30 | 44,52 | 12,05 | 14,20 | 12,40 | 92,47 |

Instrument for Stability (IfS) (19.06.01.01) | 0,00 | 5,00 | 0,00 | 0,00 | 0,00 | 5,00 |

Total EU assistance to the wider rule of law | 85,80 | 169,52 | 133,27 | 134,95 | 156,40 | 679,94 |

Total EU assistance to Kosovo | 231,70 | 331,10 | 238,22 | 198,95 | 212,70 | 1212,67 |

Total rule of law as % of total EU assistance | 37 % | 51 % | 56 % | 68 % | 74 % | 56 % |

16. The Commission service primarily responsible for dealing with Kosovo is the Directorate-General for Enlargement. It is responsible for the management of IPA which is the main source of funding for assistance projects in Kosovo. EULEX is managed by the Civilian Operations commander, who is the Director of the Civilian Planning and Conduct Capability (CPCC), which is based in Brussels and forms part of the EEAS. He is under the political control and strategic direction of the Political and Security Committee of the Council (PSC). The European Union Office (EUO) manages the implementation of IPA assistance and since February 2012 its Head also serves as the European Union Special Representative (EU SR) in Kosovo (see paragraph 78).

AUDIT SCOPE AND APPROACH

17. The report addresses the overall question:

"Is EU assistance to Kosovo in the field of rule of law effective?"

The first part of the report focuses on whether EU assistance has achieved its intended results and what has been its impact on overall progress in different areas of the rule of law (police, justice, customs, anti-corruption). The second part of the report identifies areas where improvements in the management of EU assistance could lead to greater effectiveness of assistance, in particular:

(a) clarity of objectives;

(b) co-ordination between the EU institutions, and with other donors and the Kosovo authorities;

(c) the management of EULEX;

(d) the management of assistance projects;

(e) policy dialogue and conditionality.

18. The audit involved documentary review, interviews and three on-the-spot audit visits to Kosovo in 2011 and 2012. The Court examined a sample of eight IPA projects selected from the 20 IPA rule of law projects to which the EU committed funding between 2007–10 and which were implemented over the period 2008–11. It also examined one project funded from the Instrument for Stability. The projects audited totalled 21 million euro out of a total of 85 million euro spent on rule of law projects. In addition, the Court examined a sample of eight Monitoring, Mentoring and Advising (MMA) actions carried out by EULEX out of the 45 initially launched MMA actions [15]. Details of the audit sample are given in Annex II and the detailed audit criteria are presented in Annex III.

19. In order to assess the impact of EU assistance at sector level, the Court used other audit evidence including documentation from other rule of law Commission-funded projects in Kosovo and EULEX-led MMA actions. It also reviewed reports from the Kosovo authorities and other donors and stakeholders present in Kosovo as well as conducting a literature review (see Bibliography in Annex V). In addition, the Court interviewed relevant Kosovo authorities as well as representatives of the international community and civil society in Kosovo.

20. The Court used an advisory panel of international experts to gain background information about the situation in Kosovo and to test the rele- vance of the audit questions.

OBSERVATIONS

DESPITE SIGNIFICANT EU ASSISTANCE, PROGRESS IN IMPROVING THE RULE OF LAW IS LIMITED AND LEVELS OF ORGANISED CRIME AND CORRUPTION REMAIN HIGH

21. This section sets out the results of the sample of IPA projects and EULEX MMA actions audited by the Court. It also seeks to assess the impact of EU assistance on overall progress in the rule of law in relation to police, judiciary, customs and anti-corruption, including in the north of Kosovo. In addition, it assesses whether progress is likely to be sustained.

KOSOVO POLICE: EU INTERVENTIONS AUDITED BY THE COURT HAD MODEST SUCCESS BUT MAJOR CHALLENGES REMAIN, IN PARTICULAR IN THE FIGHT AGAINST ORGANISED CRIME

EU ASSISTANCE

22. The Commission and EULEX have assisted the Kosovo Police in many ways since 2007 (16 IPA projects totalling 33 million euro and 36 MMA actions). The Court audited two IPA projects [16] and four MMA actions [17].

23. Both IPA projects audited aimed to develop the capacity of the Kosovo Police to carry out the new task of monitoring Kosovo’s borders and boundaries [18]. The Commission’s support for a separate Border and Boundary Police intelligence system was in contradiction with EULEX’s objective of creating a single intelligence system within the Kosovo Police due to insufficient coordination during the design of this project. The implementation of both projects was significantly delayed, particularly the supply of the equipment which was over a year late.

24. A major part of the project was to replace the existing border management system, funded by the USA [19], with a new system fully compliant with EU standards. The fact that a non-EU comptatible system was orig- inally installed points to a lack of coordination between the Commission and the USA (see also paragraph 86). Implementation of the new system was difficult because of the Kosovo authorities’ preference to continue with the existing system.

25. The twinning project, implemented from May 2009 until November 2010, also contributed to developing border and boundary policing in Kosovo through technical advice and training. However, its 18 month duration was not long enough to ensure that new practices introduced by the project were fully taken over by the Kosovo Police.

26. The MMA "Border Police — Enhanced Planning" was successful in increasing the planning capacity of the Border Police and complemented the IPA-funded projects for this part of the Kosovo Police.

27. The MMA "Intelligence-led Policing" was seriously hindered by the Kos- ovo authorities’ lack of necessary financial and staffing resources. The EULEX MMA "Rationalise Kosovo Police Structure" contributed to a new police structure which centralised the previously dispersed intelligence-gathering functions. Despite the contributions of these two MMA actions, the overall capacity of Kosovo Police in strategic planning and intelligence-led policing remains weak.

28. The MMA "Team Approach — Criminal Investigations" focused on police-prosecutor cooperation, but had to be suspended as prosecutors decided to prioritise the investigation of ongoing cases which limited the resources available for capacity building actions (see paragraph 95).

29. Despite some modest successes, notably in the transfer of responsibilities for border and boundary control from KFOR to Kosovo authorities, EU assistance to the police audited by the Court did not lead to significant improvements.

THE FIGHT AGAINST ORGANISED CRIME

30. Despite assistance from the EU and other donors, Kosovo has made little progress in the fight against organised crime. Indeed, the 2010 Stra- tegic Threat Assessment "Organised Crime in Kosovo" by the EU Office for Criminal Intelligence (EUOCI) concluded that "the situation regarding organised crime in Kosovo has not changed considerably since the arrival of the international community in the summer of 1999" [20]. The investigation of serious crimes is still ineffective due to limited experience and political interference. The Kosovo authorities also lack the capacity to tackle financial and economic crime and money laundering.

31. A major shortcoming affecting the cooperation between police and prosecutors is their lack of a joint database which makes it impossible to track and coordinate their investigation of criminal cases. This has led to situations where prosecutors are unaware of police investigations and vice versa, which seriously hinder the fight against organised crime. The fact that the police and prosecutors have not implemented simple steps, such as common case reference numbers points to insufficient political will to ensure cooperation.

32. Europol is the European law enforcement agency which aims at improving the effectiveness and cooperation of countries in preventing and combating organised crime. The non-recognition of Kosovo by some EU Member States prevents Europol from entering into operational and/or strategic agreements [21] with the Kosovo authorities. Kosovo accordingly does not appear on a Council-approved list of third countries with which Europol is able to enter into such agreements [22]. In addition, Euro- pol is also unable to enter into a direct cooperation agreement with EULEX since it has, like all CSDP missions, no legal personality (see paragraph 93). To circumvent this difficulty, Europol has put in place an ad-hoc specific mechanism to exchange relevant information with EULEX. This mechanism though relies on the readiness of Member States to cooperate. At present, three Member States participate in this mechanism [23].

33. Limited capacity to protect key witnesses in high profile cases by Kosovo authorities and the difficulties relocating witnesses abroad are important shortcomings as "instances of witness intimidation continue to hamper the proper functioning of the justice system" [24]. Although EU assistance is provided through a regional IPA project for the western Balkans [25], its impact in Kosovo is likely to be limited due to the weak financial and legal framework of Kosovo’s Witness Protection Unit.

KOSOVO JUDICIARY: EU INTERVENTIONS AUDITED HELPED BUILD CAPACITY BUT THE JUDICIAL SYSTEM CONTINUES TO SUFFER FROM FUNDAMENTAL WEAKNESSES

EU ASSISTANCE

34. The Commission and EULEX have financed 15 IPA projects and one Instrument for Stability (IfS) project for a total amount of 58 million euro as well as six MMA actions. The Court audited two projects: "Support to the Vetting and Reappointment Process" (5,9 million euro funded by the IfS and IPA) and "Legal Education System Reform" (3,6 million euro). It also audited two MMA actions ("Judges in the Criminal and Civil Fields" and "Prosecutors").

35. The vetting and reappointment process aimed to identify and recommend suitable candidates for judicial posts [26]. This process was an important step in building confidence in Kosovo’s judiciary. However, at the end of the project, 28 % of the vacant posts remained unfilled (127 out of 461). This was partly because 31 candidates recommended by the international commissioners [27] have not been subsequently appointed by the Kosovo authorities [28]. Only 33 % of the positions reserved for minor- ities were filled. Overall, the number of judges and prosecutors in Kosovo remains very low [29].

36. The IPA project "Legal Education System Reform" suffered from significant delays in its implementation, partly due to problems in obtaining co-financing from the Kosovo authorities. While most project objectives were eventually achieved, the sustainability of results is in doubt. The project could not be implemented in the north of Kosovo (see paragraph 56).

37. EULEX judges and prosecutors perform executive functions as an integral part of Kosovo’s judiciary. This has limited the time they can devote to capacity building. While some MMA actions are close to completion, others require further substantial efforts, particularly those involving prosecutors. Both MMA actions audited in detail contributed to developing the capacity of local judges and prosecutors. However, the local judiciary is still not able to deal with certain types of serious cases (organised crime, economic crimes and corruption, as well as war crimes) due to insufficient expertise as well as threats and intimidation.

THE FUNCTIONING OF THE JUDICIAL SYSTEM

38. Although overall the EU projects audited have helped to build the capacity of the judiciary, fundamental weaknesses remain. Political interference with the judiciary remains a major problem in Kosovo, notwithstanding the presence of EULEX judges and prosecutors. The Organisation for Security and Cooperation in Europe (OSCE) has reported, quoting a jurist, that "judges are not fully willing to render their judgments on the basis of the law only, but tend to act in anticipatory obedience to external influences" [30]. In August 2011 the Kosovo authorities initiated legislation to reduce EULEX’s executive powers through the reform of the Special Chamber which ends EULEX judges’ majority at the First Instance level of the Special Chamber of the Supreme Court [31].

39. The efficiency of judges and prosecutors remains a key issue. The huge backlog of cases (211588 as of 31 July 2011) limits confidence in and recourse to justice. A new strategy launched in November 2010 had led to a 46 % reduction in the pre-2008 backlog [32] but the Commission and EULEX are not in a position to indicate whether due process has been always respected in achieving this. The Commission and other donors have also funded complementary projects aiming to reduce the recourse to courts, such as the Alternative Dispute Resolutions project or the introduction of the notary profession in Kosovo, but it is still too early to assess their impact on the workload of the courts.

40. There is insufficient transparency in the allocation of cases among judges and prosecutors, allocations not always being based on pre-determined objective criteria and procedural safeguards. This is a major shortcoming as it provides opportunities for political interference through the selection of the responsible judge or prosecutor. An EU-funded "Court Management Information System" project launched in 2004 to address this issue is not yet operational.

41. While there has been some progress in legal reform (see paragraph 62), the actual implementation and enforcement of laws remains a major problem. The Commission estimated in 2011 that only 40 % of Court rulings in Kosovo were enforced [33].

KOSOVO CUSTOMS: EU INTERVENTIONS HAVE BEEN LARGELY SUCCESSFUL IN BUILDING THE CAPACITY OF KOSOVO CUSTOMS

42. The Commission and EULEX have provided assistance to the Kosovo Customs through two IPA projects for an amount of 2,7 million euro and four MMA actions. The audit reviewed the two IPA projects, "Preparation of Fiscal and Customs Blueprint" and "Support to Customs and Taxation Administrations", and two MMA actions, "Enhanced internal communication and data sharing" and "Implementation of the Integrated Border Management (IBM) Action Plan".

43. Though there were occasional problems [34], the assistance provided by the Commission and EULEX has largely achieved its objective of building the capacity of Kosovo Customs.

44. More generally, progress in the area of customs has been made. Kos- ovo Customs increased revenue collection from 527 million euro in 2007 to 700 million euro in 2010. It has also actively participated in the fight against money laundering even if checks need to be made more systematic. A new customs regulation, broadly compatible with EU legislation, has been introduced although there are still some gaps in the implementation of the existing customs regulation.

45. Despite the overall improvements, coordination between the Kosovo Customs and the Public Prosecutors Office (PPO) remains poor which hinders the effectiveness of the investigation and prosecution of cases of serious crime. In addition, Kosovo Customs itself is still perceived by Kosovo citizens as one of the most corrupt government services [35], although few corruption cases are brought to court.

ANTI-CORRUPTION: EU INTERVENTIONS HAVE HAD LIMITED RESULTS IN TACKLING CORRUPTION WHICH REMAINS A MAJOR CONCERN

EU ASSISTANCE

46. The Commission funded seven IPA projects related to the fight against corruption. These projects amount to 8,5 million euro. EULEX did not undertake any specific MMA action since it proposed to treat corruption as a cross-cutting issue relevant to all its activities. The Court audited two IPA projects: "Support to Public Procurement Reform" (2 million euro) and "Support to the Anti-Corruption Agency" (1 million euro).

47. The implementation of the project "Support to Public Procurement Reform" was affected by disagreement between the Commission and the Kosovo authorities over whether a recently passed Public Procurement Law was compliant with EU law and procedures. As a result, the Commission focused the project on assisting the drafting of a new Public Procurement Law that was fully compliant. This was the third Public Procurement Law in less than three years. The priority given to this meant that much needed work on secondary legislation and training to implement the new law could not be pursued.

48. The technical assistance project "Support to the Anti-corruption Agency" reviewed relevant legislative proposals on anti-corruption. It resulted in 35 recommendations. However, the Kosovo authorities accepted only 14 of these recommendations (40 %) [36]. The design of this project included the realisation of an organisational review of the Agency, but this was replaced by a new information exchange mechanism between Kosovo law enforcement bodies which is not yet operational. The project aimed to improve the capacity of the Agency yet the drafting of the new anti-corruption strategy for the period 2012–16 was undertaken entirely by an outside expert. It also aimed to increase the number of cases sent to the prosecution, but the number of cases sent decreased from 68 in 2009 to 29 in 2010 (see paragraph 55).

49. While EULEX judges and prosecutors have prioritised corruption cases, actual results are below the high expectations of the Kosovo population [37]. This is notably due to the difficulties in closing complex investigations.

50. Overall, the Commission’s assistance and EULEX executive activities have not achieved the expected results although they have contributed to some progress in the fight against corruption.

THE FIGHT AGAINST CORRUPTION

51. Corruption continues to prevail in many areas and is a major concern of the Kosovo population [38]. Kosovo’s Transparency International 2011 Corruption Perception Index (CPI) indicator is 2.9, which is classified as a level of "rampant" corruption. The Organisation for Economic Co-operation and Development (OECD) has also reported that "Kosovo remains very permissive to corruption at all levels, meaning that the risk of becoming (or even of actually already being) a "captured state" is high" [39].

52. In spite of limited financial and human resources, the Kosovo authorities have opted for a complex institutional framework to fight corruption. Three bodies have been set up with weak powers and overlapping responsibilities [40]. Moreover, the Kosovo Anti-Corruption Agency cannot investigate criminal activities and is powerless to prosecute cases of alleged corruption.

53. The supervision of public procurement is similarly complex with three central bodies directly involved [41]. Moreover, there are more than 150 contracting authorities in Kosovo. Given the size of Kosovo (population 1,7 million) this complexity and fragmentation increases the risk of corruption [42]. EU assistance has not addressed this issue nor has the EU policy dialogue focused on it at a political level (see also paragraph 97).

54. The Kosovo Assembly has recently adopted new laws to foster transparency and accountability in public administration [43]. The legislation is, however, marred by shortcomings (see Annex IV) and poor implementation [44] while non-compliance is not sanctioned [45].

55. In general, the Kosovo authorities have given a low priority to anti-corruption activities. The Kosovo authorities have not yet evaluated the results and impact of the two previous anti-corruption strategies (2004–07 and 2009–11) despite having already approved a new strategy for 2012–16 (see paragraph 48). The European Partnership Action Plan 2012 contains five anti-corruption actions but with a total funding of only 17000 euro. By way of comparison, the promotion of eco-driving in Kosovo receives funding of 25000 euro from Kosovo’s budget.

THE NORTH OF KOSOVO: EU INTERVENTIONS HAVE BEEN VERY LIMITED AND THERE HAS BEEN ALMOST NO PROGRESS IN ESTABLISHING THE RULE OF LAW

56. EU assistance, implemented through IPA rule of law projects and MMA actions, has not specifically targeted the north of Kosovo. IPA projects and MMA actions which were intended to cover all of Kosovo have generally had a negligible impact in the north. For example, the "Support to Public Procurement Reform" project contributed to training and certifying procurement officers, but no officer from the Serbian-majority northern municipalities benefited from the project. Similarly, the "Legal Education System Reform" project contributed to improving the law curriculum at the University of Pristina but its activities did not cover the Serbian-controlled University of Pristina-Kosovska Mitrovica (see paragraph 36).

57. This situation is mainly due to the lack of control over the north by the Pristina-based Kosovo authorities. It has the reputation for being a "safe haven" for organised crime [46] due to the lack of both a strong police force and a functioning judicial system.

58. EULEX police have made significant efforts to continue their activities in the north. EULEX has advocated the establishment of a multi-ethnic crowd and riot control unit there but with little success to date. Police stations in the north, predominantly staffed with Kosovo Serbs, are in principle integrated in the Kosovo Police chain of command, but in reality their communication with Headquarters in Pristina is limited. Kosovo’s specialised crowd and riot police units are mostly staffed by Kosovo Albanians, which is a source of tension when they are deployed in the north.

59. Kosovo Customs, a service where minorities are under-represented, also has difficulties working in the north. For example, its staff cannot reach two crossing points located on the boundary between Serbia and Kosovo [47], and has to be airlifted in. EULEX Customs and Kosovo Customs officers at these crossing points collect information about commercial transit but do not collect customs duties.

60. Since 2008 no local judges or prosecutors have been able to work in the north. Similarly, road blocks have restricted the mobility of EULEX judges and prosecutors who were not able to administer law in the Mitrovicë/Mitrovica Court from July 2011 until February 2012. Parallel courts apply Serbian law but the legality of their decisions is contested by the Kosovo authorities.

61. Since 2011 EULEX has been aiming to establish a larger "footprint" in the north and has increased its staff living there to 40. It also set up a special "Task Force Mitrovica" to develop criminal investigations in cooperation with the EU Office of Criminal Intelligence, drawing on resources from the Kosovo Police, the Kosovo Customs, EULEX Police and EULEX Customs. However, difficulties in the north have resulted in the task force’s officers residing in the north having to be relocated south of the river Ibar.

QUESTIONABLE LOCAL POLITICAL WILL, WEAK FINANCIAL CAPACITY AND THE LIMITED INFLUENCE OF CIVIL SOCIETY IMPAIR THE PROSPECTS FOR SUSTAINABILITY OF EU INTERVENTIONS

62. Political support from the Kosovo authorities for strengthening the rule of law sector is a key condition for the sustainability of the results of the EU assistance. However, the national authorities’ commitment to new laws is open to question. For example, four fundamental laws [48] were drafted with minimal local participation.

63. The Kosovo authorities’ financial capacity to continue project activities after the end of EU funding, and more generally to finance the rule of law sector, is in doubt. Since 2008 increased government expenditure has led to rising deficits. A stand-by arrangement with the International Monetary Fund agreed in July 2010 went off track a few months after signature due to large public sector wage rises.

64. The impact of this weak financial capacity is particularly significant in the judicial sector as implementation of the new laws will require additional funds. For example, the Joint Rule of Law Coordination Board (JRCB) (see paragraph 76) has expressed concerns over the high budgetary costs of the new Law on Witness protection. The Court’s review of individual IPA projects also indicated that the Kosovo government’s budget would be insufficient for the operation of the high security prison and juvenile justice reform.

65. The frequent changes in the senior management of the Kosovo Police, partly linked to political interference, risk undermining efforts to build up management capacity on a sustainable basis [49]. It also undermines trust in the rule of law. Political interference in the judiciary equally undermines the rule of law and trust in democratic institutions (see paragraphs 35, 37, 38 and 40). The European Commission has expressed concern about the extensive use of presidential pardons without appropriate justification [50].

66. Civil society, including the media, also has an important role in ensuring that improvements in the rule of law are sustained through its monitoring and lobbying the Kosovo authorities. However, civil society remains fragile and also faces political pressure.

DESPITE ONGOING IMPROVEMENTS, SIGNIFICANT SCOPE REMAINS FOR ENHANCING THE EFFICIENCY AND EFFECTIVENESS OF EU ASSISTANCE

67. As emphasised in the "Introduction" section, Kosovo has had a very difficult recent history with limited experience of self-administration. In these circumstances, it is clear that strengthening the rule of law to EU standards is a medium to long term process. Nevertheless, the audit identified areas where the efficiency and effectiveness of the management of EU support to the rule of law could be improved. This section highlights these areas.

OBJECTIVES HAVE NOT BEEN SUFFICIENTLY CLEARLY DEFINED AND COORDINATED

CAPACITY BUILDING OBJECTIVES AND ROLES ARE NOT CLEARLY DEFINED

68. EULEX’s overall mission is defined as to:

"assist the Kosovo institutions, judicial authorities and law enforcement agencies in their progress towards sustainability and accountability and in further developing and strengthening an independent multi-ethnic justice system and multi-ethnic police and customs service, ensuring that these institutions are free from political interference and adhering to internationally recognised standards and European best practices" [51].

However, the EULEX Concept of Operations (CONOPS) and Operation Plan (OPLAN) [52], the basic planning documents for implementing the mission, do not contain clear benchmarks and objectively verifiable indicators to assess progress in meeting these objectives.

69. EULEX pursues its mission both through the exercise of certain executive powers, for which UNMIK was previously responsible, and also through capacity building activities based on MMA actions. The relative priority to be given to these two areas is not clearly defined.

70. The European Commission has provided capacity building support to Kosovo in the field of the rule of law since 2000. When the Council gave EULEX tasks in the same field, neither its comparative advantages nor opportunities for synergies with Commission projects were identified (see paragraph 91).

EU INTERNAL SECURITY OBJECTIVES ARE NOT ADEQUATELY INTEGRATED INTO THE EU’S EXTERNAL OBJECTIVES FOR KOSOVO AND THE WESTERN BALKANS

71. Organised crime and corruption in the western Balkans is a matter of serious concern for the EU. The Council has accordingly repeatedly called for a coherent and coordinated approach which makes internal security a central priority in EU external objectives and actions. Despite this the EU’s programming of assistance to Kosovo has not adequately taken the EU’s internal security priorities into account.

72. For example, the rise in the number of victims of trafficking in human beings from the western Balkans [53] has not prompted policy changes by the Commission or EULEX. Neither the Council Joint Action establishing EULEX, nor the various Commission IPA Multi-annual Indicative Planning Documents (MIPD) for Kosovo, explicitly refer to the priorities included in the EU’s various strategies for the external dimension of Justice and Home Affairs.

73. EU internal security objectives tend to be broad-ranging and action plans have largely focused on activities and outputs rather than on quantified results and impact. This lack of specific and clear objectives makes it more difficult for EULEX and EUO to design interventions to address priorities identified by the Council (see paragraph 96). For example, Euro- pol’s Organised Crime Threat Assessments have repeatedly stated the threat to the EU posed by crime hubs in the western Balkans region, including Albanian-speaking organised crime groups, and the trafficking of heroin and human beings.

74. The Council and the Commission have recognised the need to better integrate external and internal objectives. Two relevant recent initiatives which may address the issue are the establishment of an "EU Policy Cycle" [54] and the development of a roadmap for strengthening ties between CSDP and Freedom, Security and Justice (FSJ) [55]. However, it is too early to assess their impact.

COORDINATION BETWEEN EU INSTITUTIONS AND THEIR COORDINATION WITH THE KOSOVO AUTHORITIES AND THE INTERNATIONAL COMMUNITY IS STILL INSUFFICIENT IN SOME AREAS

COORDINATION BETWEEN EU INSTITUTIONS HAS STEADILY IMPROVED BUT SOME ISSUES REMAIN, NOTABLY IN MAKING COMMISSION PROCEDURES MORE RESPONSIVE TO CSDP MISSION NEEDS

COORDINATION MECHANISMS

75. The existence of both a large Commission-managed financial assistance programme in Kosovo and the largest ever CSDP mission requires effective coordination mechanisms. The Council Decision establishing EULEX stipulated that "the necessary coordination arrangements shall be put in place in the EULEX Kosovo area, as appropriate, as well as in Brussels" [56].

76. In 2008 EULEX established a Joint Rule of Law Coordination Board (JRCB) with the Kosovo authorities, co-chaired by the EULEX Head of Mission and the Deputy Prime Minister of Kosovo [57]. EUO was also represented but by technical staff and its inputs were relatively limited. However, EUO has been able to play a more influential role since the Head of EUO became a third co-chair from the beginning of 2011. This has led to the JRCB being more focused on making progress in the broader Stabilisation and Association Process.

77. The Council established the position of EU SR in Kosovo in order to try to ensure intra-EU political coordination and guidance [58]. Yet, until recently, the EU SR has not made a substantial contribution to strengthening coordination between EUO and EULEX and did not participate in the JRCB meetings although they took place at a high political level and he had a mandate to provide political advice to EULEX. Similarly, he was not represented in the monthly meetings organised by EUO with Member States and other donors (known as "Member States Plus meetings") despite the need to ensure links between political priorities and financial assistance.

78. The combining in 2012 of the roles of EU SR and Head of EUO is likely to significantly improve coordination. Nevertheless scope remains for better integrating the EU SR’s role with EULEX [59].

COORDINATION OF PROJECT PROGRAMMING AND IMPLEMENTATION

79. IPA projects can be used to support EULEX MMA activities by financing equipment and infrastructure. However, the lead time required for an IPA project to be approved and then for procurement to be completed is often too long to meet EULEX’s operational needs. This is because IPA project proposals generally have to be finalised well before the year in which they will be funded.

80. Although EULEX may itself procure equipment for its operations, it has to follow the procurement procedures laid down in the Financial Regulation. These are not designed for CSDP missions such as EULEX where fast and flexible responses are sometimes necessary.

81. EULEX’s CONOPS and OPLAN do not include an exit strategy although EULEX’s mandates are limited to only two years at a time, albeit with the possibility of extensions. The Commission’s involvement in contrast is open-ended. Although the Council has recognised in principle that after the end of a CSDP mission its objectives can continue to be pursued through Commission-led projects [60], the Commission and the EEAS have not yet agreed when and how to do this in the specific case of Kosovo.

THE KOSOVO AUTHORITIES HAVE LIMITED CAPACITY TO ENSURE COORDINATION AND CHALLENGES REMAIN IN COORDINATING WITH OTHER INTERNATIONAL DONORS

82. By the end of 2011 the Kosovo authorities had still not established effective coordination mechanisms in the field of rule of law despite the Commission and other donors emphasising the importance of this [61]. By this time only one Rule of Law Sector Working Group meeting had taken place and the three planned sub-sector working groups (Judiciary; Anti-Corruption and Organised Crime; Visa, Asylum, Border Management, Customs and Police) had not yet become operational.

83. EULEX and the Kosovo authorities have restricted participation in the JRCB meetings (see paragraph 76) to a few key stakeholders which prevents the potential use of this forum for coordinating rule of law assistance [62]. In addition, the JRCB focuses on high level policy issues rather than technical matters. While the Board has discussed setting up working groups to improve coordination at a technical level, these have not yet been established.

84. EUO has used regular monthly "Member States Plus" meetings (see paragraph 77) to share information on the programming of its IPA assistance. In contrast, Member States shared relatively limited information on their programmes although detailed information exchange could be a first step towards joint programming of assistance.

85. A key partner for EULEX is the NATO-led KFOR [63]. EULEX and KFOR generally work closely together at an operational and tactical level, despite the absence of a formal agreement between the EU and NATO. However, EULEX faces difficulties fulfilling its obligations vis-à-vis KFOR following a unilateral 50 % reduction in crowd control police assigned to EULEX by Member States (see paragraph 90). As a result EULEX was unable to play its role effectively during the major disturbances in the north of Kosovo in summer 2011 and had to rely instead on KFOR. This situation and events on the ground have prevented KFOR from going ahead with its next phase of troop reductions and have required it to deploy its Operational Reserve Force over the past year.

86. The EU Institutions have made significant efforts to coordinate with the USA which is the largest bilateral donor in Kosovo. Nonetheless it remains difficult to achieve full co-ordination given the wide range of US actors involved in Kosovo in the rule of law field [64]. Co-ordination is particularly challenging in the drafting of legislation, where the USA is very active despite Kosovo’s interest in adopting the EU acquis communautaire and the fact that Kosovo’s legal framework is based on European Continental law. For example, the new law on courts required around 50 drafts starting from 2004 and was only adopted by the Assembly in August 2010, the government blaming the significant delay on disagreement between EUO and USAID.

EULEX’S EFFICIENCY AND EFFECTIVENESS HAVE SUFFERED FROM RESOURCE CONSTRAINTS

87. At the time of the audit EULEX was only able to operate at approximately 75 % of its authorised strength due to difficulties recruiting staff, in particular seconded staff from Member States [65] which is the Council’s preferred way of recruitment. Member States pledged fewer staff than was authorised and subsequently seconded fewer than originally pledged [66] (see Table 2). In six Calls for Contributions held in 2010 and 2011 Member States submitted fewer applicants for seconded positions than there were vacancies. As a result only 47 % of the vacancies were filled with new seconded staff [67]. It was particularly difficult to recruit for specialised positions such as magistrates.

88. A further handicap for EULEX operations is the short duration of secondments. The typical timeframe of one year is insufficient for key positions such as senior advisers, magistrates or organised crime investigators. In some cases staff can only become fully operational after 12 months. This frequent turnover of key advisers is not conducive to the effective transfer of knowledge to the Kosovo authorities and undermines the effectiveness of the MMA actions.

TABLE 2

EULEX INTERNATIONAL STAFFING VERSUS INDICATIVE PLEDGES

Source: CPCC and EULEX Operation Plan (OPLAN).

Origin of staff | International Positions according to OPLAN [3333] | Initial pledges | Average staffing (2010) | Modified pledges (2011) | Average staffing (2011) | 31.12.2011 |

Seconded by Member States | Total 2042 | 1405 | 1203 | 1145 | 1137 | 939 |

Seconded by other contributors | 142 | 166 | 183 | 184 | 148 |

Subtotal seconded | 1547 | 1369 | 1328 | 1321 | 1087 |

International Contracted staff | 310 | 330 | 360 | 327 | 302 |

Total International staff | 1857 | 1699 | 1688 | 1648 | 1389 |

89. The quality of staff deployed to EULEX is also a concern. The Court found that 11 Member States submitted unqualified candidates to at least one of the 10 selections procedures it reviewed. In addition, whilst EULEX staff need project management expertise and soft-skills [68] to carry out their MMA responsibilities, Member States generally neither assess candidates in these areas during the screening nor provide sufficient training in them prior to deployment.

90. EULEX’s Head of Mission cannot reallocate the staff according to changing needs. Instead this requires prior approval by the PSC or even by Member States [69]. As a consequence, there have been significant imbalances in staff resources both between and within components. While EULEX lacks staff in the Justice component, it currently has more than necessary in the Customs component and, overall, in the Police component. On the other hand, parts of the Police component have suffered from significant understaffing, notably the crowd and riot control police units following unilateral withdrawals by some Member States (see paragraph 85).

91. EULEX does not have an adequate system to monitor and analyse the amount of time staff spend on individual MMA actions and on executive functions. In addition, the EEAS does not collect information about the payments made by Member States’ administrations to EULEX’s seconded staff and therefore cannot establish the total cost of EULEX to the EU including Member States. It is therefore not possible to assess how cost-effective EULEX is compared with other forms of EU capacity building assistance.

92. EULEX, like all CSDP missions, does not have a legal personality. This has been a significant handicap since it means the running of the whole organisation, consisting of 2500 personnel, therefore depends on the mandate received by a single person. This means that the Head of Mission himself is exposed to judicial actions as EULEX has no standing before jurisdictions.

93. In addition, EULEX cannot sign agreements committing the mission as any agreement signed by the Head of Mission only commits himself and not EULEX as an entity. This constraint has, for example, hindered the implementation of a permanent data exchange agreement with Europol [70] (see paragraph 32).

94. In June 2012 the Commission issued a communication on the financial management of the CSDP missions. This included a request to the Council to grant them legal personality, to clearly establish their status as entities created by a Council act, and for them to be responsible to the Commission for the funds entrusted to them [71].

DESPITE LIMITED STAFF IN THE EUO IN KOSOVO IPA PROJECTS WERE GENERALLY ADEQUATELY MANAGED

95. The strategic importance to the EU of the rule of law in Kosovo is not reflected in the staff allocated to managing financial assistance for this area in the EUO. Thus the operations team consists of only five staff. This prevents the specialisation of task managers in different areas such as police or justice matters. It also means there is limited capacity in key areas such as information technology applications relating to the field of rule of law. Staffing constraints have also led the EUO to make considerable use of external consultants in order to monitor projects.

96. Despite the staffing constraints faced, IPA rule of law projects were generally adequately managed by the Commission using well established procedures. The main shortcomings noted during the audit were:

(a) Projects audited focused on further reforms and new primary legislation rather than on ensuring secondary legislation was put in place and enforced and new systems made to work (see paragraph 47).

(b) Projects were not targeted effectively to address the EU’s internal security objectives (see paragraph 73).

(c) Most projects did not include SMART objectives [72], baseline data and objectively verifiable indicators to assess the progress made.

(d) IPA project preparation documents did not include an adequate risk assessment, including the formulation of risk mitigation strat- egies [73]. In particular the risks of corruption and political interference in the areas of police, judiciary and customs were not sufficiently addressed.

THE COMMISSION AND EEAS HAVE NOT MADE SUFFICIENT USE OF POLICY DIALOGUE AND CONDITIONALITY TO STRENGTHEN THE RULE OF LAW

97. The formal framework for policy dialogue between the EU and Kosovo is the Stabilisation and Association Process (SAP). However, there is only one meeting per year at technical level [74]. The Commission has recently recognised this problem with the launch of a so-called "Structured Rule of Law Dialogue" in May 2012 which is at a political level. It involves two additional EU–Kosovo rule of law meetings a year, focused on corruption, organised crime and the judiciary.

98. The incentives and conditionality used by the Commission and EEAS have so far also proven of limited use in promoting progress on rule of law issues in Kosovo.

99. In contrast to the rest of the western Balkans, in the case of Kosovo the incentive of potential EU accession is jeopardised by the absence of a common EU position on its independence (see paragraph 6). In the shorter term the possibility of visa liberalisation may act as an incentive as the visa liberalisation roadmap includes conditions linked to the rule of law. However, there are 95 requirements to be met for visa liberalisation, which risks undermining the incentive effect [75].

100. The EU assistance to Kosovo is in principle conditional on progress in meeting priorities set out in the European Partnership [76]. However, the Partnership contains as many as 79 priorities on the rule of law alone. Moreover, the Partnership has not been updated since 2008. While specific conditions are included in the IPA annual programmes, they are generally of a technical nature and not linked to broader policy concerns.

101. The only condition formally established by EULEX in its OPLAN is that its presence in Kosovo "will be based on continued cooperation and support from the Kosovo authorities". However, the Kosovo authorities are increasingly looking to end "supervised independence" (see paragraphs 5 and 11). EULEX does not use conditionality for individual MMAs.

CONCLUSIONS AND RECOMMENDATIONS

CONCLUSIONS

102. The audit found that EU assistance to Kosovo in the field of the rule of law has not been sufficiently effective. Assistance has made only a modest contribution to building the capacity of the Kosovo police and little progress has been made in the fight against organised crime. In the judicial sector assistance has been useful but the judiciary continues to suffer from political interference, inefficiency and a lack of transparency and enforcement. EU interventions have had only limited results in tackling corruption which continues to prevail in many areas. Most progress was made in the area of customs. There has been almost no progress in establishing the rule of law in the north of Kosovo. Overall, the sustainability of results which have been achieved by the assistance is threatened by a lack of political will, weak financial capacity and the limited influence of civil society.

103. In the first place, the limited effectiveness of EU assistance can be explained by the specific circumstances of Kosovo: the low starting point at independence for building up the rule of law and the insufficient priority accorded by the new Kosovo authorities to the rule of law agenda. In addition, the absence of a common EU position over the recognition of Kosovo has jeopardised the incentive of EU accession.

104. Nevertheless, the audit found there were significant areas where better management by the EEAS and Commission could have made EU assistance more effective. This is notwithstanding the improvements which they have introduced during the period audited.

105. The respective objectives and roles of Commission and EULEX capacity building activities were not adequately assessed and benchmarked during the planning stage of the EULEX mission. EU internal security objectives relating to Kosovo have not been sufficiently coordinated with EU external policy objectives for Kosovo.

106. Coordination between the Commission and CSDP operations has been a major challenge. Programming and procurement procedures remain an obstacle to effective cooperation. The EU has not established an exit strategy which would entail the Commission taking over EULEX’s capacity building functions. Since 2012 the EU SR is playing a greater role in ensuring coordination but could still be better integrated into the management of the CSDP operations. Overall donor coordination in Kosovo has been hindered by the limited capacity of the Kosovo authorities to assume leadership. EU and US bodies in Kosovo should strengthen their coordination where possible.

107. Although EULEX is by far the largest CSDP mission ever, its effectiveness in strengthening the rule of law has been reduced by human resource constraints. Member States have not seconded sufficient staff to EULEX. Moreover, staff are often seconded for too short periods and without the necessary capacity building skills. EULEX has also been handicapped by not having a legal personality.

108. The number of EUO staff allocated to supervising Commission support to the rule of law does not reflect the importance of this area. Despite this, IPA projects were generally adequately managed.

109. The EEAS and Commission have made insufficient use of policy dialogue and conditions, alongside the assistance provided, to help achieve EU rule of law objectives in Kosovo. The recent introduction of a political level "Structured Rule of Law Dialogue" and a visa liberalisation roadmap could be significant steps forward in this respect.

RECOMMENDATIONS

RECOMMENDATION 1

The Council and Commission should ensure rule of law objectives for Kosovo are linked to concrete benchmarks against which progress can be assessed and take into account EU internal security objectives.

RECOMMENDATION 2

The EEAS and Commission to improve their coordination should review Commission programming and procurement procedures to ensure they are responsive to EULEX’s operational needs, and prepare an exit strategy for EULEX which would entail the Commission taking over EULEX’s capacity building functions.

RECOMMENDATION 3

The EEAS should work with the Member States to ensure that future CSDP missions operate with the full authorised number of staff and that they are deployed for the necessary time period and have the appropriate skills to be effective.

RECOMMENDATION 4

The Council and Commission should ensure that future CSDP missions have a legal personality.

RECOMMENDATION 5

The EEAS and Commission should ensure that the allocation of staff in the EU Office in Pristina to managing rule of law support reflects the high priority given by the EU to this area.

RECOMMENDATION 6

The Council, the EEAS and the Commission should ensure that their policy dialogues with Kosovo focus particularly on strengthening the rule of law and are linked to incentives and priority conditions.

This Report was adopted by Chamber III, headed by Mr Karel PINXTEN, Member of the Court of Auditors, in Luxembourg at its meeting of 16 October 2012.

For the Court of Auditors

+++++ TIFF +++++

Vítor Manuel da Silva Caldeira

President

[1] This designation is without prejudice to positions on status, and is in line with UN Security Council Resolution 1244 and the ICJ opinion on the Kosovo declaration of independence.

[2] The other constituent republics of former Yugoslavia were Bosnia and Herzegovina, Croatia, Macedonia, Montenegro, and Slovenia. There was one other autonomous province, Vojvodina, also in the Republic of Serbia.

[3] This designation is without prejudice to positions on status, and is in line with UN Security Council Resolution 1244 and the ICJ opinion on the Kosovo declaration of independence.

[4] As of 8 June 2012, 91 countries have recognised Kosovo.

[5] Cyprus, Greece, Romania, Slovakia and Spain.

[6] "Status neutral" means that the European Union neither supports nor opposes Kosovo’s independence.

[7] The Council has stated the EU’s willingness "to assist the economic and political development of Kosovo through a clear European perspective of the region" (2011 Council conclusions on enlargement and stabilisation and association process, 18195/11, 5.12.2011).

[8] Annexes I and II of Council Regulation (EC) No 1085/2006 of 17 July 2006 establishing an Instrument for Pre-Accession Assistance (IPA) (OJ L 210, 31.7.2006, p. 82).

[9] According to a 2011 census, an estimated 5 % of Kosovo’s population of 1,7 million are Serbs. They live mainly in the north of Kosovo.

[10] Kosovo Agency of Statistics, GDP 2010.

[11] Statement by President Barroso following his meeting with Hashim Thaçi, Prime Minister of Kosovo, Pristina, 20 May 2011. According to Commission data, Kosovo has received more assistance from the EU per capita than any other recipient since 1999. See Annex I for the amounts of 2011 EU assistance per capita granted for relevant countries in the western Balkans region.

[12] The Common Security Defence Policy — CSDP (formerly known as European Security and Defence Policy — ESDP) was launched at the Cologne European Council of June 1999 as an integral part of the Union’s Common Foreign and Security Policy (CFSP).

[13] See Council Decision 2012/291/CFSP of 5 June 2012 amending and extending Joint Action 2008/124/CFSP on the European Union Rule of Law Mission in Kosovo, EULEX KOSOVO (OJ L 146, 6.6.2012, p. 46).

[14] Council Decision 2012/291/CFSP.

[1111] The EU general budget only provides detail of the EULEX figures since 2011. The Court has used in this table the figures provided in the 2011 EU budget for the years 2009, 2010 and 2011 and figures obtained from the Commission’s internal accounting system (ABAC) for previous years.

[2222] IPA "wider rule of law" projects include in addition to police and judicial projects, projects related to anti-corruption, customs and public financial management reform.

[15] EULEX originally implemented 36 MMA actions in the Police Component, 5 in the Justice Component and 4 in the Customs Component.

[16] "Border and Boundary Police Equipment" (several supply contracts worth 3 million euro) and "Border and Boundary Police" (a twinning project with Member State experts for 2,6 million euro).

[17] "Border Police — Enhanced Planning"; "Intelligence-led Policing"; "Rationalise Kosovo Police Structure"; "Team Approach — Criminal Investigations".

[18] The term "boundary" refers to where Kosovo adjoins Serbia whereas the term "border" refers to where Kosovo adjoins Albania, the Former Yugoslavia Republic of Macedonia, and Montenegro. The references to "border" in this report are without prejudice to Member States’ position on status.

[19] The "Personal Identification, Secure Comparison, and Evaluation System" or "PISCES", funded by the US State Department.

[20] Strategic Threat Assessment — Organised Crime in Kosovo November 2010 by the EU Office for Criminal Intelligence (EUOCI).

[21] Agreements that allow for the exchange of information (strategic), including personal data (operational).

[22] Council Decision 2009/934/JHA of 30 November 2009 adopting the implementing rules governing Europol’s relations with partners, including the exchange of personal data and classified information (OJ L 325, 11.12.2009, p. 6).

[23] The European Pact to combat international drug trafficking also notes that information exchanges between Europol and EULEX should be improved as Kosovo is one of the main traffic routes for drugs to western Europe.

[24] Report of the Secretary General on the United Nations Interim Administration Mission in Kosovo, 31 January 2012, p. 7.

[25] IPA 2009 project "Cooperation in Criminal Justice: Witness Protection in the Fight against Serious Crime and Terrorism (WINPRO)", 4 million euro.

[26] The reappointment process was a one-time, comprehensive review of the suitability of all applicants for permanent appointments as judges and public prosecutors in Kosovo funded by international donors. It was included in the Ahtisaari proposal (Article 3, Annex IV).

[27] The Independent Judicial and Prosecutorial Council.

[28] This is in contrast to a similar exercise in Bosnia and Herzegovina, where the High Judicial and Prosecutorial Council (HJPC), which vetted judges and prosecutors for integrity and professional competence, was also responsible for their appointment to ensure full independence of the re-appointment procedure.

[29] Kosovo has 14 judges per 100000 citizens, whereas the ratio for other countries is: Montenegro 51, Croatia 41, Hungary 27. The ratio for prosecutors is even lower: 3,7 for Kosovo, compared to 13,4 in Montenegro, 7,3 in Bosnia and Herzegovina and 17,3 in Hungary. See EULEX Programme report 2011, p. 34.

[30] OSCE: Independence of the Judiciary in Kosovo, Institutional and Functional Dimensions, January 2012, p. 7.

[31] The Secretary General of the United Nations has stated his serious concern that this legislation will not only curtail EULEX involvement in the judicial oversight of privatisation, but also severely weakens the safeguards over the use of proceeds from privatisation (see Paragraph 31 of Report of the Secretary-General on the UNMIK, 31 October 2011).

[32] This strategy addresses the reduction of the 161273 cases initiated before 31 December 2008 and still pending at year-end 2010. As of April 2012 87914 of these cases remain pending. Kosovo Judicial Council. Progress on the work achieved by Kosovo Judiciary in implementation of the National Backlog Reduction Strategy, 25 April 2012.

[33] 2nd Plenary of the SAP Dialogue, 1 July 2011.

[34] The exception was the MMA on the "IBM Action Plan", where the objective of reaching EU levels was not realistic in the limited timeframe. While this MMA did contribute to improving cooperation between Kosovo Customs and Kosovo Police, it is not yet of the standard necessary for effective integrated border management.

[35] United Nations Development Programme (UNDP) Public Pulse Poll report: Fast Facts III, 11 December 2011, p. 6.

[36] The Commission and EULEX considered all recommendations pertinent. The Kosovo authorities did not provide an explanation why most were not accepted.

[37] The Kosovo population expected that the arrival of EULEX would lead to an increased focus on fighting corruption and organised crime. This view was encouraged by some public declarations by EULEX staff.

[38] A survey conducted by the United Nations Office of Drugs and Crime (UNODC) in 2010 states that corruption remains a major concern of ordinary citizens in Kosovo. The survey also noted that 11 % of the population reported having bribed a public official in the previous year. UNODC Report: "Corruption in the western Balkans, bribery as experienced by the population", 2010.

[39] SIGMA Assessment Report Kosovo 2011, OECD, 2011, p. 15.

[40] The Kosovo Anticorruption Agency, the Anti-corruption Council and the Office of Good Governance.

[41] The Public Procurement Agency, the Public Procurement Regulatory Commission and the Procurement Review Body.

[42] During 2011, 158 contracting authorities in Kosovo managed a public procurement market of less than 800 million euro. Excluding one unusual contract of 236 million, the average contracted amount was less than 45000 euro. See 2011 Annual Report of the Public Procurement Regulatory Commission, p. 31.

[43] These include the law for declaration of assets, the law on preventing conflict of interest in exercising public function and the law on access to public documents.

[44] The OECD has also reported that: "Kosovo is adopting a remarkable set of laws aimed at preventing and fighting corruption and organised crime. At the same time, the institutional set-up is also being established. However, the absence of clear results in this field raises concerns about the capacity for absorbing the legislation, the real commitment in implementing it, and the capability of institutions and staff." SIGMA Assessment Report Kosovo 2011, p. 14.

[45] EU anti-corruption requirements: measuring progress in Albania, Kosovo, FYR Macedonia and Turkey, Transparency International, p. 6.

[46] Council of the European Union, Regional report on western Balkans 11791/11, 20 June 2011, p. 29.

[47] The two crossing points at Gate 1 (Jarinje) and Gate 31 (Brnjak).

[48] The four laws were on courts, prosecution and Kosovo Judicial and Prosecutorial Councils. These laws were enacted in 2010.

[49] In 2010 and 2011 there were four different Director Generals.

[50] The Acting President (partially) pardoned 103 prisoners in 2011. Many of them were serving sentences for serious crimes. SEC(2011) 1207 final — Kosovo 2011 Progress Report, p. 13.

[51] Article 2 of Council Joint Action 2008/124/CFSP of 4 February 2008 on the European Union Rule of Law Mission in Kosovo (EULEX KOSOVO) (OJ L 42, 16.2.2008, p. 92).

[52] These documents are classified and therefore not readily available.

[53] Council Document 11678/11 of 4 July 2011 "Fourth Implementation Report of the "Strategy for the External Dimension of JHA: Global Freedom, Security and Justice" by the Council Secretariat (JAIEX working party) — Period of Reference: January 2010–June 2011".

[54] The recently established "EU Policy Cycle" may lead to greater coherence between internal and external security policies through its cascading system of threat assessments (by Europol), priorities, strategic goals, Operational Action Plans (OAPs) and performance indicators (3043rd Justice and Home Affairs Council meeting, Brussels, 8 and 9 November 2010).

[55] Council Document 18173/11 of 5 December 2011 "Strengthening Ties between CSDP and FSJ — Draft Road Map".

[56] See Article 17 of Council Joint Action 2008/124/CFSP.

[57] In addition, the Ministers of Justice, Interior, and Finance and Economy attend these meetings.

[58] Council Joint Action 2008/123/CFSP of 4 February 2008 appointing a European Union Special Representative in Kosovo (OJ L 42, 16.2.2008, p. 88).

[59] The European Union Planning Team (EUPT), established to prepare the EULEX mission, proposed in its assessment report of September 2006 a "Tentative Structure" in which the CSDP (EULEX) Head of Mission would report to the EU SR. The Council approved a CONOPS and OPLAN which did not follow this proposal.

[60] Council’s "Concept paper on procedures for the termination, extension and refocusing of an EU civilian crisis management operation" of 9 January 2006.

[61] Following Kosovo’s declaration of independence in February 2008, the Commission organised a donor conference for Kosovo in July 2008. The follow up to the donor conference confirmed that, in line with the principles of the 2005 Paris Declaration on Aid Effectiveness, Kosovo should take the leading role in developing its policies and coordinating donor assistance.

[62] The JRCB meetings were attended by the USA but not by other stakeholders such as EU Member States or international organisations involved in supporting the Rule of Law.

[63] KFOR is mandated under UN SCR to permit freedom of movement and provide a safe and secure environment in Kosovo.

[64] These include the US Embassy, US Agency for International Development (USAID), the International Criminal Investigative Training Assistance Programme (ICITAP) and the Office of Overseas Prosecutorial Development, Assistance and Training (OPDAT). Existing coordination fora are not effective to co-ordinate with the USA as they generally accept only one representative per donor.

[65] At the end of 2011, approximately 78 % of EULEX’s international staff were seconded, mainly from Member States (94 %). Canada, Croatia, Norway, Switzerland, Turkey and the United States have also seconded staff to EULEX.

[66] Member States notify the CPCC through so-called "pledges" of how many staff they will second to the mission. If there are insufficient seconded applicants, posts may be filled with contracted staff but this is more expensive because then EULEX pays their salaries.

[67] The Calls contained 2396 vacancies for seconded staff. 47 % were filled with new seconded staff and 5 % with new contracted staff. 13 % were filled by existing EULEX staff which meant their previous post became vacant.

[3333] EULEX’s authorised strength was 2042 international staff until October 2010 when it was reduced to 1950 international staff.

[68] Examples of relevant soft skills for MMA advisers include communication, negotiation, facilitation, influence, teamwork, mentoring and resilience skills.

[69] Changes in job descriptions are approved by the PSC. Member States need to agree to a reallocation of seconded staff.

[70] The Council has been informed that the lack of legal personality of CSDP missions hinders information exchange (Council document 5620/11 of 25 January 2011 "Tightening links between the external and internal aspects of EU security").

[71] C(2012) 4052 final of 26 June 2012.

[72] SMART is an acronym of: Specific, Measurable, Achievable, Realistic and. Time-bound.

[73] Termed project fiches by the Commission.

[74] The meeting is co-chaired by the EUO and attended by representatives of DG Enlargement, DG Justice, DG Home Affairs, EULEX, EU SR and EUO. In 2010 and 2011 the meetings were co-chaired by a Commission’s desk officer.

[75] In June 2012 the Commission provided the Kosovo authorities with the "Roadmap" of reforms Kosovo needed to complete to obtain visa liberalisation including rule of law reforms (Reference: Meeting doc 012-12 Rev 3 Origin CION).

[76] Annex 1 Article 5 of the European Partnership states that: "Assistance to the western Balkan countries is conditional on progress on satisfying the Copenhagen criteria and on meeting the specific priorities of this European Partnership. Failure to respect these conditions could lead the Council to take appropriate measure".

--------------------------------------------------

ANNEX I

EU FINANCIAL ASSISTANCE PER CAPITA (WESTERN BALKANS)

Source: Court’s analysis of Commission’s data.

Recipient | 2011 Assistance granted IPA (euro) | 2011 Assistance granted CSDP [1111] (euro) | Population [2222] | EU assistance per capita (euro) |

Albania | 94428286 | | 3069275 | 31 |

Bosnia and Herzegov- ina | 107428286 | 17600000 | 3843998 | 33 |

Croatia | 156528286 | | 4290612 | 36 |

Former Yugoslav Republic of Macedonia | 98028286 | | 2048619 | 48 |

Kosovo | 68700000 | 132566667 | 1733872 | 116 |

Montenegro | 34153943 | | 625266 | 55 |

Serbia | 201879600 | | 7120666 | 28 |

[1111] The CSDP expenditure for Kosovo (EULEX) and Bosnia and Herzegovina (EUPM) has been calculated based on the expenditure approved by Council Joint Actions distributed on a pro rata basis (for EULEX 165 million euro to cover expenditure from 15 October 2010 until 14 December 2011, and 72,8 million euro from 15 December 2011 until 14 June 2012).

[2222] Population data obtained from the Census 2011 results, except for Bosnia and Herzegovina and FYROM for which 2009 estimates provided by DG Enlargement.

--------------------------------------------------

ANNEX II

AUDIT SAMPLE

Instrument for Pre-accession Assistance (IPA) Projects |

Contract (CRIS Ref.) | Title of the project | Budget (euro) |

2009/209-712 | Border and Boundary Police, Twinning | 2000000 |

2008/172-158 | Border and Boundary Police Equipment | 412506 |

2008/172-282 | 635210 |

2010/250-987 | 480238 |

2010/248-943 | 1967353 |

2010/253-575 | 372948 |

2009/215-030 | Legal Education System Reform | 3600000 |

2010/241-467 | Completion of reappointment of Judges and Prosecutors (IPA/IfS) | 876460 |

2008/169-890 | Support to Public Procurement Reform | 1912373 |

2008/169-230 | Support to Anti-Corruption Institutions in Kosovo | 997260 |

2009/202-640 | Preparation of Fiscal and Customs Blueprint exercise in Tax and Customs Administrations of Kosovo (UNSCR 1244) | 102876 |

2009/211-402 | Support to Customs and Taxation Administrations | 2639500 |

Instrument for Stability Projects |

Contract (CRIS Ref.) | Title of the project | Value (euro) |

2008/154-134 | Reappointment of Judges and Prosecutors in Kosovo | 5000000 |

Monitoring, Mentoring and Advising (MMA) actions |

Component | EULEX Ref. | MMA Title |

Police | PSD05/2009 | Team Approach — Criminal Investigations |

Police | PSD10/2009 | Intelligence-led policing |

Police | PSD19/2009 | Border Police: Enhanced Planning |

Police | PSD24/2009 | Rationalise Kosovo Police Structure |

Justice | - | Judges in the criminal and civil field |

Justice | - | Prosecutors |

Customs | CC/06/2009 | Enhanced internal communications and data sharing, specifically intelligence communication and dissemination |

Customs | CC/09/2009 | Implementation of the IBM Action Plan, specifically including upgrading of infrastructure and equipment at Customs stations |

--------------------------------------------------

ANNEX III

DETAILED AUDIT QUESTIONS AND AUDIT CRITERIA

The Court has answered the audit question by splitting it into sub questions addressing the effectiveness and impact of the interventions as well as management issues. Each topic was reviewed by answering the detailed question which is presented in this annex together with the related audit criteria used by the Court.

Has the EU assistance been effective? Has overall EU assistance to the rule of law sector achieved the intended results?

In assessing this question the following criteria were taken into account:

(a) EU Progress Reports have reported satisfactory progress;

(b) Priorities set out in the European Partnership have been met;

(c) Objectives set out in the Multiannual Indicative Programming Documents and Council Joint Action for EULEX have been met;

(d) The project activities are implemented in a timely manner in accordance with plans and bene-ficiaries take ownership and are involved in projects/actions implementation;

(e) Objectives set out in project/MMA Action fiches have been met.

Are the Kosovo authorities able to manage the rule of law sector in a sustainable way without donor intervention?

In assessing this question the following criteria were taken into account:

(a) The Commission and the EEAS/EULEX assess the prospects for the Kosovo authorities to be able to manage the rule of law sector without donor intervention;

(b) The Kosovo authorities have ownership of the reform process in the rule of law sector and have technical and financial capacity to manage the rule of law sector in a sustainable way.

Is there a well-defined overall EU strategy for the rule of law in Kosovo and are the specific objectives of the different bodies clearly set out?

In assessing this question the following criteria were taken into account:

(a) The EU strategy for rule of law in Kosovo is set within a clear overall strategy for Kosovo;

(b) The EU strategy for rule of law in Kosovo is integrated with related EU rule of law policies;

(c) EU bodies responsible for implementing the strategy have clear mandates and their objectives do not overlap;

(d) Objectives are reasonably limited in number, prioritised and SMART ("Specific, Measurable, Achievable, Realistic and Time-bound").

Is EU assistance to Kosovo related to the rule of law well co-ordinated between the EU bodies?

In assessing this question the following criteria were used:

(a) General coordination through communication and reporting between EU bodies is timely and coherent;

(b) Programming and Implementation by different EU bodies is co-ordinated;

(c) Specific communication and reporting between EU bodies is timely and coherent.

Has EU assistance been well co-ordinated with other stakeholders?

In assessing this question the following criteria were used:

(a) There is a comprehensive assessment of Kosovo needs in the field of rule of law and an analysis of the required resources;

(b) There is an in-country division of labour with lead donor arrangements in the field of rule of law;

(c) EU assistance has been programmed in coordination with other donors and mechanisms exist and have ensured the coordinated implementation of assistance.

Has the EU appropriately assessed and mitigated the risks to which the funding is exposed?

In assessing this question the following criteria were taken into account:

(a) Risks to spending EU funds have been identified and assessed;

(b) Adequate risk mitigation and risk management strategies are developed and implemented.

Have the EU financial and human resources committed to the rule of law in Kosovo been allocated according to the priorities for EU assistance in the field and within a clear implementation timeframe?

In assessing this question the following criteria were taken into account:

(a) There are clear milestones for the implementation of the EU Strategy (from inception to exit) and there is an assessment of the resources needed at each stage;

(b) Financial resources committed to the interventions are allocated in accordance with EU priorities;

(c) The staff working on the interventions have the necessary expertise and are available on a timely basis.

Has effective use been made of other inputs (dialogue, conditionality and monitoring) to help achieve the objectives of its assistance?

In assessing this question the following criteria were taken into account:

(a) The EU policy dialogue addresses the main weaknesses/reform needs of the rule of law sector and makes appropriate proposals;

(b) The EU supported the achievement of its rule of law sector objectives by the use of appropriate conditionality;

(c) The EU has an adequate system for monitoring its rule of law assistance.

--------------------------------------------------

ANNEX IV

ANALYSIS OF IMPLEMENTATION GAPS IN RELEVANT LAWS IN THE FIGHT AGAINST CORRUPTION

Source: European Court of Auditors.

Legal text | Assessment and shortcoming | Impact |

Law on anticorruption and existing provisions of the Criminal Code (CCK) on corruption. | Kosovo Anti-Corruption Agency’s mandate is limited to investigate non-criminal activities and it cannot initiate the prosecution. The anticorruption law and the provisional penal code define corruption differently. | The Agency’s mandate excludes the investigation and the prosecution of any kind of criminal corruption. |

Existing provisions of the Criminal Code (CCK) and the Criminal Proced- ure Code (CPCK) on the confiscation of material benefits acquired through criminal activities. | Very few assets have been confiscated, and there seems to be a lack of will to use the applicable law provisions in cases involving highly complex corruption behaviours involving senior officials. | Convicted criminals maintain the property of the benefits of their illegal activities. |

Law on declaration of the origin of the property and gifts of senior public officials (Law for declaration of assets). | Weak sanctioning framework including that false declarations are not considered as criminal offences. | Declarations of assets continue to show discrepancies between the assets declared and actual revenue. |

Law on preventing Conflict of interest in Exercising Public Function. | The Law on conflicts of interest lacks relevant reporting obligations and it only foresees that the Kosovo Anti-Corruption Agency should urge the official to avoid the conflict. | Conflicts of interest persist. |

The Law on access to public documents. | This law foresees penalties for infringement but it remains unclear whether they should be paid by the institution or the responsible civil servant. | Insufficient transparency leads to less oversight of public activities and more opportunities for corruption. |

The law on financing of political parties. | The law neither prohibits nor strictly regulates donations from legal entities which provide goods or services to public administration. | Political parties’ financing practices are not transparent. |

--------------------------------------------------

ANNEX V

BIBLIOGRAPHY

"Adapting the EU’s approach to today’s security challenges — the Review of the 2003 European Security Strategy", European Union Committee/House of Lords, London, 2008.

"Assessment Kosovo (under UNSCR 1244/99)", SIGMA Support for Improvement in Governance and Management, OECD, 2010, 2011.

Ball, N., Promoting security sector reform in fragile states, USAID, 2005.

Blockmans, S., Wouters, J., Ruys, T., The European Union and Peacebuilding, Policy and Legal Aspects, ISBN: 9789067043298, 2010.

Briscoe, I., Price, M., Kosovo’s new map of power: governance and crime in the wake of independence, Netherlands Institute of International Relations "Clingendael", 2011.

Chivvis, Ch.-S., EU Civilian Crisis Management: the record so far, RAND Corporation, 2010.

"Communicate, Coordinate and Cooperate. A series of papers on the A-Z of cohering EU Crisis Management in the post-Lisbon Era", ISIS Europe, 2011.

"Corruption Cases Report Kosovo", Advocacy and Legal Advice Centre, Transparency International, 2009.

"Corruption in Kosovo, implications for USAID", USAID, 2006.

"Corruption in the western Balkans: bribery as experienced by the population", UNODC Statistics and Surveys Section (SASS), UN OFFICE ON DRUGS AND CRIME, 2011.

Dari, E., Price, M., Van der Wal, J., Gottwald, M., Koenig, N., CSDP Missions and Operations: Lessons learned Processes, European Parliament, Directorate-General for External Policies, 2012.

Derks, M., More, S., The European Union and Internal Challenges for Effectively Supporting Security Sector Reform — An Overview of the EU’s set-up for SSR support anno spring 2009, Netherlands Institute of International Relations "Clingendael", 2009.

Derks, M., Price, M., The EU and Rule of Law Reform in Kosovo, Netherlands Institute of International Relations "Clingendael", 2010.

"EU Anti-Corruption requirements: Measuring progress in Albania, Kosovo, FYR Macedonia and Turkey" Transparency International, CIMAP, ISBN: 9783935711777, 2011.

"EULEX — The first ten years (1999–2009) — The rule-of-law mission in Kosovo", European Union Institute for Security Studies, Paris, 2009.

"EULEX: Still in search of Identity", IPOL — Balkan Policy Institute, Pristina, 2010.

"European Security and Defence Policy: the first ten years (1999–2009)", Institute for Security Studies (EUISS), 2009.

"Fighting corruption in security sector reform", Peacebrief no 32, United States Institute of Peace, 2010.

Hobbing, P., CEPS — Customs cooperation in the Area of Freedom, Security and Justice: the Role of Customs in the Management of the EU’s external border, 2011.

"Indicators of the spread of corruption in Kosovo’s Judicial System", Kosovo Democratic Institute, Transparency International, Pristina, 2009.

Jones, S.-G., Wilson, J.-M., Rathmell, A., Riley, K.-J., Establishing Law and Order after conflict, RAND Corporation, 2005.

King, I., Mason, W., Peace at any Price. How the world failed Kosovo, ISBN 9780801445392, 2006.

Korski, D., and Gowan, R., Can the EU Rebuild Failing States? A Review of Europe’s Civilian Capacities, European Council on Foreign Relations, 2009.

"Kosovo and Serbia: A little goodwill could go a long way", International Crisis Group, Pristina, Belgrade, Brussels, 2012.

"Kosovo Justice Support Programme QR, October–December 2009", USAID.

"Kosovo: Time for EULEX to prioritise War Crimes", Amnesty International, 2012.

Lehne, S., Kosovo and Serbia: Toward a normal relationship, Carnegie Endowment for International Peace, 2012.

Malešič, M., Crisis Management in the EU: International Coordination and Civil–Military Cooperation, Faculty of Social Sciences, University of Ljubljana.

"Mission in Kosovo — 6 years onwards: putting the Helsinki Final Act into action", OSCE, 2005.

"Mission in Kosovo: Independence of the Judiciary in Kosovo, Institutional and Functional Dimensions", OSCE, 2012.

Montanaro, L., The Kosovo Statebuilding Conundrum: Addressing Fragility in a Contested State, FRIDE, 2009.

"Nato presence in Kosovo, Implications of KFOR troop reduction and essential political processes", NATO, Open Society Foundations, Friedrich Ebert Stiftung, Foreign Policy Club, Pristina, 2011.

"North Kosovo: Dual Sovereignty in Practice", Europe Report No 211, International Crisis Group, Pristina, Mitrovica, Brussels, 2011.

Philips, D.-L., Realizing Kosovo’s Independence, National Committee on American Foreign Policy, 2010.

Poston, M., UK assessment and proposed support in the RoL sector in Kosovo, Department for International Development (DFID), 2008.

"Public perceptions of safety and security in Kosovo: Time to act", Safer world, London, 2011.

Qosaj-Mustafa, A., Strengthening Rule of Law in Kosovo: the Fight against corruption and organised crime, Kosovar Institute for Policy Research and Development (KIPRED), Policy Paper 2010/8, Pristina, 2010.

Rathmell, A., Oliker, O., Kelly T.-K., Brannan, D., Crane, K., Developing Iraq’s security sector, RAND Corporation, 2005.

Rehrl, J., Weisserth, H.-B., Handbook on CSDP — The Common Security and Defence Policy of the European Union,European Security and Defence College, Vienne, 2010.

"Rule of Law tools for post-conflict states: monitoring legal systems", United Nations Rule of Law, 2006.

Sadiku, L., Civil Society against Corruption: Report Kosovo, Hertie School of Governance, 2010.

"Securing peace and development: the role of the UN in supporting security sector reform", Report of the SG, UN — General Assembly, 2008.

"Security Reform and Governance", DAC reference document, OECD, 2005.

Simonen, K., The state versus the Individual, the Unresolved Dilemma of Humanitarian Intervention, ISBN13: 9789004202917, 2011.

"Situation in Kosovo. Information note from Mr. Von Sydow", Parliamentary Assembly CoE, 2010.

"Special Report: The EU’s experience with Security Sector Governance", United States Insitute of Peace, 2011.

Summers, J., Kosovo: A precedent? The declaration of Independence, the Advisory Opinion and Implications for Statehood, Self-Determination and Minority Rights, ISBN13: 9789004175990, 2011.

"The Rule of Law in Independent Kosovo", Europe Report No 204, International Crisis Group, Pristina, Brussels, 2010.

"The Corruption Monitor: Monitoring Report on Institutional Activities in the Fight Against Corruption September–October 2011", FOL, 2011.

"The Fragile Triangle — Police, judges and prosecutors coordination during criminal proceedings response in Kosovo", Kosovar Institute for Policy Research and Development (KIPRED), Pristina, 2010.

"The UK approach to stabilisation", Department for International Development (DFID), 2008.

"Trust Me, I’m an International: on the Relationship between Civil Society and the International Community in Kosovo", FOL discussion paper.

"US Army — Security Sector Reform: a case study approach to transition and capacity building", Strategic Studies Institute, 2010.

Weiler, Q., The EU and Security Sector Reform in Africa: a leader in theory, a laggard in reality? UN University/College of Europe, 2009.

Youngs, R., The European Union and the Promotion of Democracy, ISBN13: 9780199249794, 2002.

Zogiani, A., Pula, B., Bërxulli, D., Mulaj, I., USAID — Early Warning Report Kosovo, January–June 2006, Evalu- ation Report, ABA-Roli Activities in Kosovo, USAID, Kosovo, 2010.

--------------------------------------------------

Top