ISSN 1977-1045

Uradni list

Evropske unije

C 284

European flag  

Slovenska izdaja

Informacije in objave

Letnik 62
22. avgust 2019


Vsebina

Stran

 

II   Sporočila

 

SPOROČILA INSTITUCIJ, ORGANOV, URADOV IN AGENCIJ EVROPSKE UNIJE

 

Evropska komisija

2019/C 284/01

Nenasprotovanje priglašeni koncentraciji (Zadeva M.9419 – PSP/Welltower/SRG/Senior Housing Property) ( 1 )

1

2019/C 284/02

Nenasprotovanje priglašeni koncentraciji (Zadeva M.9381 – Carlyle/Mubadala/CEPSA) ( 1 )

1


 

IV   Informacije

 

INFORMACIJE INSTITUCIJ, ORGANOV, URADOV IN AGENCIJ EVROPSKE UNIJE

 

Evropska komisija

2019/C 284/03

Menjalni tečaji eura

2

 

INFORMACIJE V ZVEZI Z EVROPSKIM GOSPODARSKIM PROSTOROM

 

Nadzorni organ Efte

2019/C 284/04

Sklep št. 052/19/COL z dne 10. julija 2019 o začetku formalne preiskave v zadevi Farsund Vekst (zadeva 83835) – Poziv k predložitvi pripomb v skladu s členom 1(2) dela I Protokola 3 k Sporazumu med državami Efte o ustanovitvi nadzornega organa in sodišča o vprašanjih državne pomoči

3

2019/C 284/05

Sporočilo Nadzornega organa Efte – Imenovanje pooblaščencev za zaslišanje in prenehanje funkcije

16


 

V   Objave

 

SODNI POSTOPKI

 

Sodišče Efte

2019/C 284/06

Zahtevek za svetovalno mnenje Sodišča Efte, ki ga je 29. marca 2019 vložilo sodišče Fürstliches Landgericht v zadevi Gable Insurance AG in Konkurs (Zadeva E-3/19)

17

 

POSTOPKI V ZVEZI Z IZVAJANJEM POLITIKE KONKURENCE

 

Evropska komisija

2019/C 284/07

Predhodna priglasitev koncentracije (Zadeva M.9514 – Bain Capital Investors/Kantar) – Zadeva, primerna za obravnavo po poenostavljenem postopku ( 1 )

18


 


 

(1)   Besedilo velja za EGP.

SL

 


II Sporočila

SPOROČILA INSTITUCIJ, ORGANOV, URADOV IN AGENCIJ EVROPSKE UNIJE

Evropska komisija

22.8.2019   

SL

Uradni list Evropske unije

C 284/1


Nenasprotovanje priglašeni koncentraciji

(Zadeva M.9419 – PSP/Welltower/SRG/Senior Housing Property)

(Besedilo velja za EGP)

(2019/C 284/01)

Komisija se je 24. julija 2019 odločila, da ne bo nasprotovala zgoraj navedeni priglašeni koncentraciji in jo bo razglasila za združljivo z notranjim trgom. Ta odločitev je sprejeta v skladu s členom 6(1)(b) Uredbe Sveta (ES) št. 139/2004 (1). Celotno besedilo odločitve je na voljo samo v angleščini in bo objavljeno po tem, ko bodo iz besedila odstranjene morebitne poslovne skrivnosti. Na voljo bo:

v razdelku o združitvah na spletišču Komisije o konkurenci (http://ec.europa.eu/competition/mergers/cases/). Spletišče vsebuje različne pripomočke za iskanje posameznih odločitev o združitvah, vključno z nazivi podjetij, številkami zadev, datumi ter indeksi področij,

v elektronski obliki na spletišču EUR-Lex (http://eur-lex.europa.eu/homepage.html?locale=sl) pod dokumentarno številko 32019M9419. EUR-Lex zagotavlja spletni dostop do evropskega prava.


(1)  UL L 24, 29.1.2004, str. 1.


22.8.2019   

SL

Uradni list Evropske unije

C 284/1


Nenasprotovanje priglašeni koncentraciji

(Zadeva M.9381 – Carlyle/Mubadala/CEPSA)

(Besedilo velja za EGP)

(2019/C 284/02)

Komisija se je 25. julija 2019 odločila, da ne bo nasprotovala zgoraj navedeni priglašeni koncentraciji in jo bo razglasila za združljivo z notranjim trgom. Ta odločitev je sprejeta v skladu s členom 6(1)(b) Uredbe Sveta (ES) št. 139/2004 (1). Celotno besedilo odločitve je na voljo samo v angleščini in bo objavljeno po tem, ko bodo iz besedila odstranjene morebitne poslovne skrivnosti. Na voljo bo:

v razdelku o združitvah na spletišču Komisije o konkurenci (http://ec.europa.eu/competition/mergers/cases/). Spletišče vsebuje različne pripomočke za iskanje posameznih odločitev o združitvah, vključno z nazivi podjetij, številkami zadev, datumi ter indeksi področij,

v elektronski obliki na spletišču EUR-Lex (http://eur-lex.europa.eu/homepage.html?locale=sl) pod dokumentarno številko 32019M9381. EUR-Lex zagotavlja spletni dostop do evropskega prava.


(1)  UL L 24, 29.1.2004, str. 1.


IV Informacije

INFORMACIJE INSTITUCIJ, ORGANOV, URADOV IN AGENCIJ EVROPSKE UNIJE

Evropska komisija

22.8.2019   

SL

Uradni list Evropske unije

C 284/2


Menjalni tečaji eura (1)

21. avgusta 2019

(2019/C 284/03)

1 euro =


 

Valuta

Menjalni tečaj

USD

ameriški dolar

1,1104

JPY

japonski jen

118,24

DKK

danska krona

7,4564

GBP

funt šterling

0,91545

SEK

švedska krona

10,6983

CHF

švicarski frank

1,0875

ISK

islandska krona

138,10

NOK

norveška krona

9,9263

BGN

lev

1,9558

CZK

češka krona

25,794

HUF

madžarski forint

327,31

PLN

poljski zlot

4,3529

RON

romunski leu

4,7280

TRY

turška lira

6,3462

AUD

avstralski dolar

1,6337

CAD

kanadski dolar

1,4761

HKD

hongkonški dolar

8,7072

NZD

novozelandski dolar

1,7308

SGD

singapurski dolar

1,5354

KRW

južnokorejski won

1 335,79

ZAR

južnoafriški rand

16,8573

CNY

kitajski juan

7,8438

HRK

hrvaška kuna

7,3830

IDR

indonezijska rupija

15 808,76

MYR

malezijski ringit

4,6387

PHP

filipinski peso

57,941

RUB

ruski rubelj

73,1897

THB

tajski bat

34,173

BRL

brazilski real

4,4621

MXN

mehiški peso

21,8446

INR

indijska rupija

79,4655


(1)  Vir: referenčni menjalni tečaj, ki ga objavlja ECB.


INFORMACIJE V ZVEZI Z EVROPSKIM GOSPODARSKIM PROSTOROM

Nadzorni organ Efte

22.8.2019   

SL

Uradni list Evropske unije

C 284/3


Sklep št. 052/19/COL z dne 10. julija 2019 o začetku formalne preiskave v zadevi Farsund Vekst (zadeva 83835)

Poziv k predložitvi pripomb v skladu s členom 1(2) dela I Protokola 3 k Sporazumu med državami Efte o ustanovitvi nadzornega organa in sodišča o vprašanjih državne pomoči

(2019/C 284/04)

Z zgoraj navedeno odločbo, objavljeno v verodostojnem jeziku na straneh, ki sledijo temu povzetku, je Nadzorni organ Efte norveške organe obvestil o svoji odločitvi, da bo začel postopek v skladu s členom 1(2) dela I Protokola 3 k Sporazumu med državami Efte o ustanovitvi nadzornega organa in sodišča v zvezi z zgoraj navedenim ukrepom.

Zainteresirane strani lahko predložijo svoje pripombe o zadevnem ukrepu v enem mesecu od datuma objave na naslednji naslov:

EFTA Surveillance Authority

Registry

Rue Belliard/Belliardstraat 35

1040 Bruxelles/Brussel

BELGIQUE/BELGIË

Pripombe se posredujejo norveškim organom. Zainteresirana stran, ki predloži pripombe, lahko pisno zaprosi za zaupno obravnavo svoje identitete in navede razloge za to.

Povzetek

Postopek

1.

Nadzorni organ je 16. aprila 2018 prejel pritožbo.

2.

Na podlagi zahtev je nato od norveških organov prejel informacije, in sicer z dopisi z dne 21. junija 2018, 6. decembra 2018 in 6. marca 2019 ter po videokonferenci z dne 10. januarja 2019.

Opis ukrepa/ukrepov

3.

Domnevni upravičenec do pomoči je Glastad Farsund AS (v nadaljnjem besedilu: Glastad), ki deluje prek podjetja Farsund Vekst AS in drugih hčerinskih družb v popolni lasti.

4.

Občina Farsund (v nadaljnjem besedilu: občina) in Glastad sta leta 2010 načrtovala razvoj stanovanjskih in poslovnih nepremičnin v Farsundu na Norveškem. Občina in Glastad sta se odločila, da bosta razvijala nekatera območja v občini Farsund; (i) Nordkapp gnr. 1 bnr. 199 m. fl (v nadaljnjem besedilu: območje Nordkapp) in (ii) Farøy gnr. 3, bnr. 80 & 49 ter del gnr. 3 bnr. 23 (v nadaljnjem besedilu: območje Farøy).

5.

Leta 2011 je bil sklenjen delničarski sporazum med občino in podjetjem Glastad, s čimer je bilo ustanovljeno podjetje Farsund Vekst AS. Vsaka od obeh strank je imela v lasti 50 % delnic podjetja Farsund Vekst AS. Istega dne je občina podjetju Farsund Vekst AS dodelila opcijski pogodbi za območje Nordkapp in območje Farøy. Cene v opcijah za nakup območij Nordkapp in Farøy so bile določene v skladu z vrednotenjem iz leta 2010.

6.

Opcijska pogodba za območje Nordkapp je podjetju Farsund Vekst AS zagotovila izključno pravico, da takoj začne gradnjo nakupovalnega središča na območju Nordkapp in nato pozneje kupi zemljišče za 25 milijonov NOK. V začetku leta 2015 je bilo jasno, da si podjetje Farsund Vekst AS ne more privoščiti, da bi lahko takoj plačalo celotno opcijo Nordkapp po skupni ceni 25 milijonov NOK. Podjetje Farsund Vekst AS je takrat že začelo graditi nakupovalno središče. Občina se je zato strinjala, da podjetju Farsund Vekst AS dovoli neuradno koriščenje opcije Nordkapp, tako da je podjetje plačalo 8,5 milijona NOK za območje, kjer se je že nahajalo nakupovalno središče. Oktobra 2015 je bila opcija Nordkapp uradno razdeljena na 3 dele, cena vsakega dela pa je temeljila na vrednotenju za celotno območje Nordkapp iz leta 2010. Podjetje Farsund Vekst AS ni izkoristilo preostalih 2 delov opcije Nordkapp.

7.

Opcija Farøy zagotavlja podjetju Farsund Vekst AS izključno pravico do del v zvezi z razvojem in spremembo namembnosti območja Farøy ter do nakupa tega območja za 10,5 milijona NOK v 18 mesecih od dneva, ko je bila spremenjena namembnost območja. Občina se je leta 2015 strinjala, da spremeni opcijo Farøy in doda 500m2 zemljišča za razvoj rekreativnega parka za javnost ter podjetju Farsund Vekst AS zagotovi pravico, da zahteva znižano ceno, če bo uporabljena površina, manjša od 2 400 m2. Za občino pa ni ustrezne pravice, da bi lahko zahtevala višjo ceno za večjo uporabljeno površino. Občina je septembra 2018 sprejela nov prostorski načrt, zoper katerega je bila vložena pritožba pri guvernerju okrožja Agder, ki zadevo še vedno obravnava. Podjetje Farsund Vekst AS še ni uveljavilo opcije Farøy. Na podlagi informacij, ki so na voljo Nadzornemu organu, ni jasno, ali ima pritožba kakršne koli posledice za datum prenehanja veljavnosti opcije.

8.

Občina se je leta 2015 odločila, da proda vse svoje delnice (50 %) v podjetju Farsund Vekst AS podjetju Glastad. Cena je bila določena na 21 milijonov NOK, in sicer na podlagi skupnega lastniškega kapitala podjetja Farsund Vekst AS. Podjetje Glastad ni nikoli preneslo sredstev na občino. Stranki sta se namesto tega dogovorili, da bi bilo treba občini prodati pravice za gradnjo tretjega in četrtega nadstropja nad streho nakupovalnega središča (pravica podjetja Farsund Vekst AS, ki ga je občina v tem času prodajala podjetju Glastad). Občina in podjetje Glastad sta se strinjala z nakupno ceno 23,5 milijona NOK. Zato se je občina strinjala, da bo podjetju Glastad plačala razliko v višini 2,5 milijona NOK (23,5 milijona NOK minus 21 milijonov NOK, kar znaša 2,5 milijona NOK).

Ocena ukrepa

9.

Nadzorni organ dvomi, da so navedeni ukrepi v skladu z načelom udeleženca v tržnem gospodarstvu. Sklenitev opcijskih pogodb se lahko šteje za državno pomoč, če je morebitna prodaja zadevne nepremičnine nižja od tržne cene. Nadzorni organ ugotavlja, da opcije omogočajo podjetju Farsund Vekst AS, da spremlja gibanje cen nepremičnin skozi leta. Dogovorjene cene temeljijo na vrednotenju površin iz leta 2010. Tudi če cene predstavljajo tržno ceno iz leta 2011, se Nadzorni organ sprašuje, ali tržna vrednost ustreza le vrednosti zadevnih nepremičnin. Po mnenju Nadzornega organa to pomeni, da je podjetje Farsund Vekst AS pridobilo opcije brezplačno.

10.

Po predhodnem mnenju Nadzornega organa sta imeli opcijski pogodbi leta 2011, ko sta se sklenili, vrednost, ne glede na to, ali sta se izvajali ali ne. Iz dokumentacije in pojasnil, ki jih je Nadzorni organ prejel do zdaj, ni informacij, da je podjetje Farsund Vekst AS plačalo za opcije.

11.

V obdobju od marca do oktobra 2015 je bila opravljena prodaja delnic v podjetju Farsund Vekst AS, prodaja dela 1 območja Nordkapp, vrednotenje strehe nakupovalnega središča in podaljšanje opcijskih pogodb. Med drugimi dejavniki to kratko obdobje kaže, da so transakcije vse med seboj povezane in skupaj tvorijo izstop občine iz celotnega projekta. Vendar kljub temu, da je prodaja delnic v podjetju Farsund Vekst AS vključevala obveznost občine, da pozneje kupi površino na strehi za 23,5 milijona NOK (ki je bila predmet novega vrednotenja ob približno istem času), ni bila pridobljena neodvisna ocena vrednosti delnic v podjetju Farsund Vekst AS. Dogovorjena nakupna cena je v času prodaje odražala samo polovico lastniškega kapitala podjetja Farsund Vekst AS, pri tem pa ni bila upoštevana vrednost opcijskih pogodb, na pol končanega nakupovalnega središča in površine na strehi. Zato Nadzorni organ dvomi, da bi udeleženec v tržnem gospodarstvu sklenil tako pogodbo pod podobnimi pogoji kot občina.

12.

Nazadnje se zdi, da je trg za razvoj nepremičnin načeloma in v praksi odprt za trgovino znotraj EGP. Nakupovalno središče na območju Nordkapp je že pritegnilo mednarodne gospodarske subjekte, kot so Intersport, Cubus, Clas Ohlson in Burger King. Na podlagi tega Nadzorni organ ne more izključiti možnosti, da bi ukrepi lahko izkrivljali konkurenco in vplivali na trgovino znotraj EGP.

13.

Če ukrepi pomenijo državno pomoč, obveznost iz člena 1(3) dela I Protokola 3 k Sporazumu med državami Efte o ustanovitvi nadzornega organa in sodišča, ki zahteva, da se pomoč pred izvršitvijo priglasi Nadzornemu organu, ni bila spoštovana. Taka državna pomoč bi bila torej nezakonita.

14.

Norveški organi niso predložili argumentov, ki bi utemeljili, da bi se lahko ukrepi, kolikor pomenijo državno pomoč, šteli za združljive z delovanjem Sporazuma EGP. Nadzorni organ ima pomisleke glede združljivosti ukrepov.

Decision No 052/19/COL of 10 July 2019 to open a formal investigation into Farsund Vekst

1.   Summary

(1)

The EFTA Surveillance Authority (“the Authority”) wishes to inform the Norwegian authorities that it has concerns that measures related to the development of the Nordkapp and Farøy areas in Farsund municipality in Vest-Agder county might entail state aid pursuant to Article 61(1) of the EEA Agreement, and has doubts as to the compatibility of the measures with the EEA Agreement. Therefore, the Authority is required to open a formal investigation procedure (1).

(2)

The Authority has based its decision on the following considerations.

2.   Procedure

(3)

By letter dated 16 April 2018 (2), the Authority received a complaint alleging that Farsund Municipality (“the Municipality”) in Norway has granted unlawful state aid to Glastad Farsund AS and its wholly owned subsidiaries Farsund Vekst AS and Nordkapp Utvikling AS.

(4)

By letter dated 18 April 2018 (3), the Authority forwarded the complaint to the Norwegian authorities and invited them to comment on it. By letter dated 21 June 2018 (4), the Norwegian authorities responded.

(5)

By letter dated 10 October 2018 (5), the Authority requested information from the Norwegian authorities. By letter dated 6 December 2018 (6), the Norwegian authorities responded.

(6)

By letter dated 26 November 2018 (7), the Norwegian authorities forwarded supplementary information from the complainant to the Authority (8). By letter dated 13 December 2018, the Authority invited the Norwegian authorities to comment on the supplementary information and requested a meeting to discuss the case. On 10 January 2019, a videoconference was held between the Authority and the Norwegian authorities. By letter dated 6 March 2019 (9), the Norwegian authorities provided their comments on the supplementary information from the complainant (10).

(7)

By email dated 21 May 2019, the complainant submitted further information on the market value of a plot of land in the Farøy area (11).

3.   Description of the measures

3.1.    Background

(8)

In 2010, the Municipality and Glastad Farsund AS (“Glastad”) planned the development of housing and commercial real estate in Farsund, Norway. The Municipality and Glastad decided to develop certain areas in Farsund Municipality; (i) Nordkapp, located in gnr. (12) 1 bnr. (13) 199 m.fl. (14) (“the Nordkapp area”) and (ii) Farøy, located in gnr. 3, bnr. 80 & 49 and part of gnr. 3 bnr. 23 (“the Farøy area”).

(9)

On 21 December 2010, a valuation of the areas was made by a real estate agency located in Kristiansand, Næringsmegleren Sædberg & Hodne AS (15). The Nordkapp area was valued at NOK 25 million and the Farøy area at NOK 10,5 million. The valuation took into account estimated preparation costs and future use of the areas. The valuation was based on the assumption that the areas would be rezoned in the near future and that they would be ready for construction. The valuation of the Nordkapp area estimated that the reclamation of land needed to complete the plot would cost around NOK 12 million.

(10)

Regarding the preparation costs, the Municipality engaged one of Norway’s largest consulting engineering and architectural firms, Asplan Viak, to assess how much it would cost to fill out the property at Nordkapp. Asplan Viak estimated that the cost of filling out the property would be NOK 12 million excluding VAT, and this cost estimate was used in the assessment from Næringsmegleren. Asplan Viak assumed that inexpensive mass from the nearby area Røssevika could be used. However, it turned out that the expected quantity of masses from Røssevika was not available when the municipality needed it. The municipality acknowledges having spent approximately NOK 15,8 million including VAT on landfills in the Nordkapp area (16).

(11)

On 27 May 2011, a shareholders' agreement was entered into between the Municipality and Glastad, establishing Farsund Vekst AS. The two parties each owned 50 % of the shares of Farsund Vekst AS (17). On the same day, the Municipality concluded option agreements with Farsund Vekst AS for the Nordkapp area (“the Nordkapp option”) and the Farøy area (“the 2011 Farøy option”).The prices in the options for acquiring the areas were set according to the valuation from 2010.

3.2.    The Nordkapp option

(12)

The Nordkapp option (18) provided Farsund Vekst AS with the exclusive right to start immediately the construction of a shopping mall in the Nordkapp area and then buy the land for NOK 25 million within a period of 18 months. The Nordkapp area is about 16 300 m2 and zoned for housing and commercial real estate. The area was not measured and the agreement states that a deviation of +/- 10 % should not result in a change in the agreed option price. According to the agreement, deviations beyond this provide a basis for revising the agreed price according to the price per square meter.

(13)

According to the Nordkapp option, Farsund Vekst AS must develop 200 parking spaces for public use free of charge to replace the parking spaces already located in the Nordkapp area.

(14)

On 22 November 2012, five days before it was set to expire, Farsund Vekst AS let the Municipality know that it intended to make use of the option (19). However, no actual payment took place at that time, since Farsund Vekst AS could not afford to buy all of the Nordkapp area.

(15)

Early 2015, it was clear that Farsund Vekst AS could not afford to make use of the entire Nordkapp option at a total price of NOK 25 million all at once. At that time, Farsund Vekst AS had already started to build the shopping centre. On 10 March 2015, the Municipality agreed to allow Farsund Vekst AS to informally exercise the Nordkapp option by paying NOK 8,5 million for the area already covered by the shopping centre (20). On 14 October 2015, the Nordkapp option was formally divided into 3 parts (“Nordkapp part 1/2/3”) (21). The price for each part was based on the 2010 valuation for the whole Nordkapp area.

(16)

Nordkapp part 1 was valued at NOK 8,5 million. The option provided Farsund Vekst AS with the exclusive right to buy the land under the shopping centre in the Nordkapp area. As previously stated, on 10 March 2015, Farsund Vekst AS, through its wholly owned subsidiary Nordkapp Utvikling AS, exercised Nordkapp part 1 for NOK 8,5 million (22).

(17)

Nordkapp part 2 was valued at NOK 9 million. The option provides Farsund Vekst AS with the exclusive right to buy the remaining land already reclaimed in the Nordkapp area. The option covers just over 1/3 of the whole Nordkapp area. Even before exercising the option, Farsund Vekst AS is allowed to make use of the parking spaces in the area, but the 200 parking spaces they must develop shall be available before the Municipality completes its construction on the rooftop of the shopping centre (see paragraph (25) below). The option is not time limited, but must be exercised before the Municipality starts construction on the rooftop of the shopping centre. Nordkapp part 2 has not been exercised yet.

(18)

Nordkapp part 3 is valued at NOK 7,5 million. The option provides Farsund Vekst AS with the exclusive right to buy the west end of the Nordkapp area (the area that has not been reclaimed). The option covers approximately 1/3 of the whole Nordkapp area and shall be reclaimed in accordance with the original Nordkapp option. Nordkapp part 3 is not limited in time and has not been exercised yet.

3.3.    The 2011 Farøy option

(19)

The 2011 Farøy option (23) provided Farsund Vekst AS with the exclusive right to work on the development and rezoning of the Farøy area and to buy it for NOK 10,5 million. The option had to be used within a period of 18 months, starting on the day the area would be rezoned.

(20)

The Farøy area allowed for approximately 1 900 m2 of industrial real estate, the area was not measured and the agreement states that a deviation of +/- 10 % should not result in a change in the agreed option price. The agreement further states that deviations beyond +/- 10 % provided basis for revising the agreed price according to the price per square meter.

(21)

Farsund Vekst AS did not exercise the 2011 Farøy option before it was amended in 2015.

3.4.    The 2015 Farøy option

(22)

On 14 October 2015, the Municipality agreed to amend the 2011 Farøy option (24). The amended 2011 Farøy option (“the 2015 Farøy option”) is different as it concerns a larger area than the 2011 Farøy option and a price adjustment mechanism was introduced. The 2015 Farøy option provides Farsund Vekst AS with the exclusive right to buy the Farøy area for NOK 10,5 million, based on the assumption that a new zoning plan will allow for a minimum utilisation of 2 400 m2. According to the Norwegian authorities, the additional area (500 m2 (1 900 m2 vs 2 400 m2)) is supposed to be developed as a recreational park for public use.

(23)

Farsund Vekst AS has a right to require a reduced price if utilisation will be below 2 400 m2. There is no corresponding right for the Municipality to require a higher price for a higher utilisation.

(24)

The 2015 Farøy option has the same time limit as the 2011 Farøy option (18 months starting on the day the area would be rezoned). A new zoning plan was adopted by the Municipality in September 2018, but has been appealed to the County Governor of Agder, who still considers the case. Farsund Vekst AS has not yet exercised the 2015 Farøy option. Based on the information available to the Authority, it is not clear whether the appeal has any implications for the date of expiry of the option.

3.5.    The sale of shares in Farsund Vekst AS

(25)

On 17 September 2015, the Municipality decided to sell all its shares (50 %) in Farsund Vekst AS (25). At that time, the first and second floor of the shopping centre was commenced, but not completed. On 14 October 2015, it was decided that Glastad would buy the shares (26). The price was set to NOK 21 million, based on the total equity capital of Farsund Vekst AS (27). Glastad never transferred the funds to the Municipality. Instead, the parties agreed that the rights to build a third and a fourth floor on the rooftop of the shopping centre (a right held by Farsund Vekst AS, the company that the Municipality was in the process of selling to Glastad) should be sold to the Municipality. On 7 August 2015, Næringsmegleren Sædberg & Hodne AS valued the right to develop the rooftop at NOK 8 million (if developed solely as a commercial property) or NOK 42,5 million (with a maximum capacity of apartments) (28).The Municipality and Glastad agreed to a purchase price of NOK 23,5 million. Hence, the Municipality agreed to pay the difference of NOK 2.5 million (NOK 23,5 million minus NOK 21 million equals NOK 2,5 million) to Glastad.

(26)

Today, almost four years later, the Municipality has not made use of the acquired right to construct.

4.   The complaint

4.1.    The alleged aid measures

(27)

The complainant alleges that the Municipality has granted unlawful state aid to Glastad and its wholly owned subsidiaries Farsund Vekst AS and Nordkapp Utvikling AS through the following measures connected to the development of the Nordkapp and Farøy areas.

a.

By providing option agreements for the Nordkapp and Farøy areas that have no price adjustment mechanism in case of future price increases and where the Municipality is not compensated for the options.

b.

By selling Nordkapp part 1 at a price below market price.

c.

By selling the Municipality owned shares in Farsund Vekst AS at a price below market price.

4.2.    The value of the Nordkapp area

(28)

The complainant argues that the 2010 valuation from Næringsmegleren Sædberg & Hodne AS of the Nordkapp area that provides an estimation of NOK 12 million in preparation costs and a total price of NOK 25 million is not representative of the market price. The complainant notes that a better indication of the value of the Nordkapp area can be found in the court ruling of Lister District Court from 19 November 2011 (29) (the “Lister District Court ruling”) (30). The Lister District Court ruling sets the redemption cost for land No 1, unit No 787 and 789, which were absorbed by the larger property covered by the Nordkapp option. According to the complainant, the ruling indicates that the value of the Nordkapp area is approximately NOK 69 million. Further, the ruling, as well as the memos and meeting minutes from the Municipality show that the Municipality’s costs of preparing the Nordkapp area have been upwards of NOK 42,5 million (NOK 19 million in property purchases and NOK 23,5 million in preparations costs (31)).

4.3.    The value of the land covered by Nordkapp part 1

(29)

The complainant states that the sale of Nordkapp part 1 constitutes state aid as the relevant area accounts for more than 1/3 of the whole Nordkapp area, while the purchase price was based on a third of the valuation from 2010 without adjustment to market developments. Furthermore, the current use of the land covered by Nordkapp part 2 is now a roundabout outside the shopping centre, providing access to the centre’s parking lot.

4.4.    The value of the land covered by the 2011 Farøy option

(30)

The complainant notes that the Farøy area is a west-facing property, on the seafront in Farsund inner harbour. It is within walking distance of the old city centre and the new shopping centre at Nordkapp. The island of Farøy has traditionally been one of the most exclusive residential areas in the municipality. A rough calculation based on the principles used in the Lister District Court ruling, and applying an increase of 20 % to account for the more valuable location, provides a price per square meter of NOK 10 200 per m2. Based on this calculation, the stipulated Farøy area of 1 900 m2 in 2011 should have been valued at NOK 19,4 million.

4.5.    The value of the land covered by the 2015 Farøy option

(31)

The complainant notes that the 2015 Farøy option increased the size of the Farøy area, but the purchase price was still based on the valuation from 2010 without adjustment to market rates. The price set in the 2015 Farøy option, NOK 10,5 million, is based on a minimum utilisation of 2 400 m2 housing. This gives a square meter price of NOK 4 375 per m2. The complainant argues that this deviates from market terms since it gives the beneficiary a right to a reduced price if utilisation is below 2 400 m2, without a corresponding right for the Municipality to require a higher price for higher utilisation.

(32)

The complainant notes that the current zoning proposal provides an utilisation of around 3 000 m2, which means that Glastad will receive the extra square meters for free if the zoning plan is confirmed and the option is exercised.

(33)

Furthermore, the complainant notes that the current zoning proposal includes two outriggers for moorings for small boats. These outriggers can provide space for at least 36 boats in total. Such berths are usually sold separately from residential units and there is no mechanism in the 2015 Farøy option to compensate for it. As an indication of value, berths further from the city centre have a current price of NOK 130 000 each (32). Assuming construction costs of around NOK 500 000 for two outriggers and necessary anchoring, etc., this indicates a profit on berths alone of at least NOK (36 x 130 000 – 500 000 =) 4 180 000.

4.6.    The value of the shares in Farsund Vekst AS

(34)

The complainant argues that the sale of the municipally owned shares in Farsund Vekst AS constitutes state aid. The complainant notes that the Municipality did not look for any other buyers, the purchase price for the shares was not based on a neutral assessment as it seems to be based solely on equity capital (not taking into account the value of options and properties held in the company, development potential etc.). The complainant further notes that the price that the Municipality paid for the rooftop (NOK 23,5 million) is higher than 50 % of the total company value (NOK 21 million). This indicates that either the shares in Farsund Vekst AS were sold far below market value, or the rooftop was severely overpriced. Either way, the difference means that the private party received a significant and uncompetitive advantage.

5.   Comments from the Norwegian authorities

5.1.    The position of the Norwegian authorities

(35)

According to the Norwegian authorities, none of the above-mentioned measures involves state aid, since the Municipality acted in line with the market economy operator (“MEO”) principle and all the prices reflect market value.

5.2.    General comments on the option agreements

(36)

In terms of compensating for the value of the options, the Norwegian authorities note that it is not common that a municipality is compensated for options. The Norwegian authorities stress that an option holder is a high-risk taker and must pay large sums to develop the area.

(37)

The Norwegian authorities are also of the opinion that it is uncommon to include a price adjustment mechanism in contracts like the ones in question. When the options were granted it was deemed difficult to determine a mechanism that would be reasonable. The parties therefore did not include such a clause in the option agreements.

(38)

Furthermore, the Norwegian authorities note that according to the Nordkapp option, Farsund Vekst AS is obligated to develop 200 parking lots for free public use. This is an expense Farsund Vekst AS must pay alone, which consequently can be considered compensation to the Municipality in addition to the purchase price itself.

5.3.    General comments on the amendments to the option agreements in 2015

(39)

The Norwegian authorities note that the amendments to the option agreements in 2015 were only to formalize what was previously decided regarding the partition of the Nordkapp area into three options and the development of a recreational park in the Farøy area, not to change the main terms of the original agreement, price included.

(40)

The Norwegian authorities confirm that the 2015 Farøy option includes a larger area than the 2011 Farøy option, without a corresponding increase in price. The reason for this is that the additional area will be a recreational park for the public and will not be rezoned in the future. The Norwegian authorities are of the opinion that this area has no financial value for Farsund Vekst AS. On the contrary, this entails significant commitments for Farsund Vekst AS, since it is obligated to invest a significant amount to upgrade the area, in order to offer its use to all residents and visitors in the Municipality.

(41)

The Norwegian authorities add that the parties discussed whether there should be a corresponding right for the Municipality to require a higher price for higher utilisation. This proposal was rejected for mainly two reasons. First, if the Municipality were given this right, it would have been an incentive for it to regulate as much as possible for its own gain. It was not desirable to incentivise the Municipality's administrative authority in this way. Second, the Norwegian authorities stress that private undertakings must be allowed to make good deals with public authorities without this constituting state aid. That is a part of the negotiations and the conclusion of an agreement. The Norwegian authorities are therefore of the opinion that this is not in itself a deviation from market terms which leads to state aid.

5.4.    The value of the Nordkapp area

(42)

The Norwegian authorities are of the opinion that the valuation of the Nordkapp area carried out in 2010 gives a qualified, independent and best estimate of the value of the property at that time, and that there has been no price increase in the following years.

(43)

The Norwegian authorities state that the Nordkapp area was valued at NOK 25 million in 2010. The valuation was conducted based on generally accepted market indicators and valuation standards. This valuation formed the basis for the option agreement. In other words, the Municipality acted as any other commercial player in the market would have.

(44)

In 2006, the Municipality obtained a valuation of the Nordkapp area from the assessor Jan P. Svendsen, who assessed the value of the area to be NOK 700 per m2 (33). The valuation from Næringsmegleren in 2010 concluded with a value of approximately NOK 1 050 per m2, which is 33 % higher than the estimated value by Jan P. Svendsen five years earlier. This is a significantly higher increase than the general price increase in these five years, and a solid indication that Næringsmegleren's assessment was not too low.

(45)

The complainant has referred to a valuation of the properties No 787 and 789, which were expropriated by the Municipality in 2011. The Norwegian authorities are of the opinion that a comparison with these properties cannot be made just because they are in the same area as Nordkapp. First, the Municipality has obtained a separate valuation for the Nordkapp area, which is a more specific assessment than the valuation of the other two properties. Second, the private parties obtained the valuations submitted in the Lister District Court ruling for these properties. It must be assumed that these parties wanted the highest possible price for the properties. Furthermore, the Lister District Court ruling was not published until one year after the valuation of Nordkapp and was thus in any case not available at the time of the valuation of Nordkapp.

(46)

In conclusion, the Norwegian authorities state that the Municipality obtained a price estimate from a professional consultancy firm and based its decision on the best available estimate. There is always a risk of additional costs, and this cannot be used as an indication of illegal state aid. A private company would, under the same circumstances, have had to accept a similar risk in a project of this nature.

5.5.    The division of the Nordkapp option and the exercise of Nordkapp part 1

(47)

The Norwegian authorities note that the price for Nordkapp part 1 is not only related to the size, but also to the permitted use of the area. Nordkapp part 1 makes up a larger area than the two other options, but the risk of building there is much higher than for the other areas. Building the two first floors of a commercial building is high risk, expensive and difficult. It is much cheaper and involves less risk building the two next floors with mainly apartments on top of the existing building. Therefore, despite the fact that Nordkapp part 2 constitutes a smaller area; it has a higher value than Nordkapp part 1.

(48)

The Municipality was, and still is, of the opinion that this solution benefitted the Municipality and furthered a responsible and rational development of the Nordkapp area. It was important for the Municipality to make sure that progress of the development was viable and appropriate considering its importance for Farsund as a whole.

5.6.    The value of the Farøy area

(49)

The Norwegian authorities agree that Farøy is a good location, but state that Næringsmegleren considered this in the price assessment. With regard to the valuation as such, Castelar Holding AS, which has the same owners as Glastad, bought three properties (land No 3, units No 23, 65 and 84) only a few hundred meters from the actual property at Farøy in 2009. Selvaaggruppen, which, according to the Norwegian authorities, has been an active nationwide property developer and investor for more than 60 years, sold the properties. The properties bought by Castelar Holding AS included a fully zoned housing project, where approximately 40 apartments, with associated berths and parking garages, could be built. The total usable floor area was about 6 300 m2 (34). The total cost for these properties were NOK 8,25 million, i.e. a cost of NOK 206 250 per planned unit, and NOK 1 310 per usable floor area of apartments (35).

(50)

The current zoning plan for the Farøy area allows for 26 units in sizes varying from 60 to 200 m2, and totalling 2 770 m2 of usable floor area. Based on the option price of NOK 10,5 million this implies a cost of NOK 403 846 per unit, and NOK 3 790 per usable floor area of apartments. The valuation performed by Næringsmegleren and the option price is consequently significantly higher than the market price paid by Glastad for comparable properties a few years earlier.

(51)

In addition, all the zoning risks lie with the option holder and the option holder pays for all costs of getting the property zoned. Glastad has so far spent NOK 1,9 million on zoning work. As of today, the Municipality owns the land with existing buildings, and the Municipality receives the rent from the buildings.

(52)

The Norwegian authorities state that the above supports the Municipality's view that the agreed price for the Farøy area, as assessed by Næringsmegleren, is at least at market value.

5.7.    The sale of shares in Farsund Vekst AS

(53)

According to the Norwegian authorities, the price reflects that there was, in their view, only one potential buyer of the shares – the other shareholder. There were no other known prospective buyers at that time willing to purchase a 50 % stake of the company – with a half-finished shopping centre with uncertain prospects and major guarantee commitments. On the other hand, the Municipality had an overall desire not to lose large amounts by selling the shares, and did not want to sell it for less than paid-in capital.

(54)

The Municipality and Glastad made an overall assessment of the project and its value, with special emphasis on the fact that the object for sale was shares and not a property. The Municipality was, and still is, of the opinion that it was unrealistic to expect that any other private investors would have taken upon itself these obligations and responsibility at a higher price than Glastad was willing to do, at that time.

(55)

The Norwegian authorities explain that the rooftop is a regulated area ready for construction. The rooftop could be used for apartments, which are of higher value than the commercial area on the first and second floor of the centre. In other words, the Municipality’s potential related to the rooftop, implies a small risk compared to owning shares in Farsund Vekst AS.

6.   Presence of state aid

(56)

Article 61(1) of the EEA Agreement reads as follows:

“Save as otherwise provided in this Agreement, any aid granted by EC Member States, EFTA States or through State resources in any form whatsoever which distorts or threatens to distort competition by favouring certain undertakings or the production of certain goods shall, in so far as it affects trade between Contracting Parties be incompatible with the functioning of this Agreement.”

(57)

The qualification of a measure as aid within the meaning of this provision therefore requires the following cumulative conditions to be met: (i) the measure must be granted by the state or through state resources; (ii) it must confer an advantage on an undertaking; (iii) favour certain undertakings (selectivity); and (iv) be liable to distort competition and affect trade.

6.1.    Presence of state resources

(58)

For a measure to constitute aid, it must be granted by the state or through state resources. State resources include all resources of the public sector, including resources of intra-state entities (decentralised, federal, regional, municipal or other), see the Authority’s Guidelines on the notion of state aid (“NoA”) (36).

(59)

The transfer of State resources may take many forms, such as direct grants, loans, guarantees, direct investment in the capital of companies and benefits in kind. A positive transfer of funds does not have to occur; waiving revenue that would otherwise have been paid to the state constitutes a transfer of state resources (37).

(60)

If the Municipality sells the land and/or the shares below its market price, it will forego income. In such circumstances, the beneficiaries should have paid more and therefore there is a transfer of resources from the Municipality.

(61)

For these reasons, the Authority considers that if the transactions did not take place in accordance with market conditions, state resources within the meaning of Article 61(1) of the EEA Agreement would be involved.

6.2.    Advantage

6.2.1.   Introduction

(62)

The qualification of a measure as state aid requires that it confers an advantage on the recipient. An advantage, within the meaning of Article 61(1) of the EEA Agreement, is any economic benefit that an undertaking could not have obtained under normal market conditions (38).

(63)

The measure confers an advantage not only if it confers positive economic benefits, but also in situations where it mitigates charges normally borne by the budget of the undertaking. This covers all situations in which economic operators are relieved of the inherent costs of their economic activities (39).

(64)

Economic transactions carried out by public bodies are considered not to confer an advantage on the counterpart of the agreement, and therefore not to constitute aid, if they are carried out in line with normal market conditions. This is assessed pursuant to the market economy operator principle (“MEOP”) (40).

(65)

The conclusion of option agreements can qualify as state aid if the eventual sale of the underlying property is below market price. If the option agreements, as such, cannot be said to comply with the MEOP, the Authority will assess whether the property was transferred at market value when the sale takes place (41).

6.2.2.   The Nordkapp and the 2011 Farøy options

(66)

The Nordkapp and the 2011 Farøy options both provide Farsund Vekst AS with the exclusive right to buy the areas and fixe the price for a later transfer.

(67)

The original Nordkapp option was limited to 18 months and expired on 27 November 2012. However, the Nordkapp option in fact has no clear time limit. On 22 November 2012, Farsund Vekst AS sent an email to the Municipality saying that they will make use of the option (42). But no actual sale took place at that time, since Farsund Vekst AS could not afford to buy the entire Nordkapp area. On 10 March 2015, Farsund Vekst AS bought Nordkapp part 1 (43). On 14 October 2015, the Nordkapp option was formally divided into three parts. According to the Norwegian authorities (44), Farsund Vekst AS has the exclusive right to buy Nordkapp part 2 until the Municipality decides to start building on the roof area of the shopping centre (“the rooftop”), and there is no time limit on their right to buy Nordkapp part 3.

(68)

This enables Farsund Vekst AS to observe the development of property prices over the years, before deciding whether to buy.

(69)

The agreed price in the Nordkapp and the 2011 Farøy options is based on a valuation of the areas made in 2010. Even if the prices represent the market price in 2011, the Authority questions whether the market value only corresponds to the value of the underlying properties. In the Authority’s view, that would entail that Farsund Vekst AS got the Nordkapp and the 2011 Farøy options for free.

(70)

The Authority notes that the Nordkapp area was used as a public parking space before the Nordkapp option was concluded. The fact that Glastad has to provide 200 parking spaces for public use therefore cannot be considered as a payment for the option since the construction of a shopping mall must include parking spots for its customers.

(71)

The Nordkapp and the 2011 Farøy options prevent the Municipality from selling the areas to other buyers, and thus ties up capital for which the Municipality could have found alternative uses or received interest. Furthermore, it enables Farsund Vekst AS to actively approach the Municipality, in order to reregulate the areas for purposes that would increase the market value. Moreover, the Municipality would not receive any payment in case of no subsequent sale

(72)

In the Authority’s preliminary view, the Nordkapp- and the 2011 Farøy options themselves, independently of whether they were exercised or not, had a value in 2011, when the agreements were concluded. From the documentation and explanations the Authority has received so far, there is no information that Farsund Vekst AS paid for the options.

(73)

For these reasons, the Authority has doubts that a market economy operator would have entered into such option agreements, on similar conditions as the Municipality, without requiring remuneration for the option and the favourable conditions as such. By simply requiring a remuneration corresponding to the value of the property in 2011, the Municipality runs the risk of granting state aid later if property prices should increase (45).

6.2.3.   The 2015 Farøy option

(74)

The agreed price in the 2015 Farøy option is based on a valuation of the Farøy area made in 2010. Even if the price represented the market price in 2010, the Authority questions whether the market value of the 2015 Farøy option only corresponds to the value of the underlying property in 2010. In the Authority’s preliminary view, that would entail that Farsund Vekst AS got the 2015 Farøy option for free. When the 2011 Farøy option was amended, five years had passed from the valuation of the area, current zoning proposals included higher utilization and a new shopping mall was about to open close by.

(75)

The Norwegian authorities explain that the additional land area will not be rezoned in the future. It is not clear to the Authority how the Norwegian authorities can assert that so clearly.

(76)

The Authority further notes that the additional area for a recreational park provided in the 2015 Farøy option is located in front of a plot that is owned by a shareholder of Glastad. The area could therefore have a higher value for him than anyone else.

(77)

The 2015 Farøy option provides Farsund Vekst AS with the right to a reduced price if utilisation will be below 2 400 m2 of housing, without a corresponding right for the Municipality to require a higher price for higher utilisation.

(78)

For these reasons, at this stage the Authority has doubts as to whether a private market economy operator would have entered into such an agreement.

6.2.4.   The sale of Nordkapp part 1

(79)

On 10 March 2015, Farsund Vekst AS bought Nordkapp part 1, through its subsidiary Nordkapp Utvikling AS, for NOK 8,5 million (46). The price was based on approximately one third of the valuation for the whole Nordkapp area made in 2010.

(80)

On the basis of the Nordkapp option, Farsund Vekst AS had already started building the shopping mall in the Nordkapp area before making use of the option. Because Farsund Vekst AS could not afford to buy the entire Nordkapp area, the Municipality decided to allow Farsund Vekst AS to buy only the part that was already covered by the shopping mall.

(81)

At that time, five years had passed from the valuation and Nordkapp part 1 comprised more than a third of the entire Nordkapp area. Furthermore, the Norwegian authorities pointed out that the valuation from Næringsmegleren in 2010 estimated a value of approximately NOK 1 050 per m2, which is 33 % higher than the estimated value by Jan P. Svendsen five years earlier. This is an indication of price increases for the area and the Norwegian authorities have not provided clear reasoning why the property prices did not increase between 2010 and 2015.

(82)

For these reasons, at this stage the Authority doubts that a market economy operator would have entered into such an agreement on similar conditions as the Municipality, without requesting a new valuation for each part of the Nordkapp area.

6.2.5.   The sale of shares in Farsund Vekst AS

(83)

When applying the MEO test, it is useful to distinguish between situations in which the transaction's compliance with market conditions can be directly established through transaction-specific market data and situations in which, due to the absence of such data, the transaction's compliance with market conditions must be assessed on the basis of other available methods (47).

(84)

A transaction's compliance with market conditions can be directly established through transaction-specific market information in the following situations (48):

(a)

where the transaction is carried out pari passu by public entities and private operators; or

(b)

where it concerns the sale and purchase of assets, goods and services (or other comparable transactions) carried out through a competitive, transparent non-discriminatory and unconditional tender procedure.

(85)

If a transaction has not been realised through a tender, or if the intervention of the public bodies is not pari passu with that of private operators, this does not automatically mean that the transaction does not comply with market conditions. In such cases compliance with market conditions can still be assessed through (i) benchmarking or (ii) other assessment methods (49).

(86)

When the Municipality sold its shares in Farsund Vekst AS in October 2015, there was no tender procedure and no effort was made to find any other buyer than Glastad.

(87)

The sale of the shares in Farsund Vekst AS, the sale of Nordkapp part 1, the valuation of the roof area of the shopping mall and the renewal of the option agreements were all done in March to October 2015. Among other factors, this closeness in time indicates that the transactions are all inter-connected and together form the Municipality’s exit from the whole project. However, even though the sale of the shares in Farsund Vekst AS involved an obligation for the Municipality to later buy the roof area for NOK 23,5 million (which was subject to a new valuation around the same time), no independent valuation of the shares in Farsund Vekst AS was obtained. The agreed purchase price reflected half of Farsund Vekst AS’ equity at the time of the sale, but no value was placed on the option agreements, the half-finished shopping mall or the roof area.

(88)

For these reasons, at this stage the Authority doubts that a market economy operator would have entered into such an agreement on similar conditions as the Municipality, without requesting an independent valuation of their share in Farsund Vekst AS.

6.3.    Selectivity

(89)

To be characterised as state aid within the meaning of Article 61(1) of the EEA Agreement, the measure must be selective in that it favours “certain undertakings or the production of certain goods”. Not all measures that favour economic operators fall under the notion of aid, but only those that grant an advantage in a selective way to certain undertakings, categories of undertakings or to certain economic sectors.

(90)

There is only one possible beneficiary undertaking for the measures under assessment, i.e. Glastad and its wholly owned subsidiaries Farsund Vekst AS and Nordkapp Utvikling AS. The measures are thus selective.

6.4.    Effect on trade and distortion of competition

(91)

In order to constitute state aid within the meaning of Article 61(1) of the EEA Agreement, the measures must be liable to distort competition and affect trade between EEA States.

(92)

Measures granted by the state are considered liable to distort competition when they are liable to improve the competitive position of the recipient compared to other undertakings with which it competes. A distortion of competition within the meaning of Article 61(1) of the EEA Agreement is generally found to exist when the state grants a financial advantage to an undertaking in a liberalised sector where there is, or could be, competition (50).

(93)

Public support is liable to distort competition even if it does not help the recipient undertaking to expand or gain market share. It is enough that the aid allows it to maintain a stronger competitive position than it would have had if the aid had not been provided (51).

(94)

The Authority notes that the owner of Glastad is an active investor in Scandinavia, the UK and in the US (52). The shopping centre in the Nordkapp area attracts international operators like Intersport, Cubus, Clas Ohlson and Burger King (53). Furthermore, other developers of shopping centres like Olav Thon Group (54) and Klepierre (55) are examples of real estate developers that have shopping centres in their portfolio and are active in EEA trade. The Authority therefore cannot exclude that such real estate developers could have been interested in this project.

(95)

To the extent that the transactions have not been carried out in line with normal market conditions, they have conferred an advantage on the beneficiaries, which may have strengthened their position compared to their competitors’ active in the real estate- and property development market. The business of developing real estate is in principle and in practice open to intra-EEA trade (56). Where state aid strengthens the position of an undertaking as compared with other undertakings competing in intra-EEA trade, the latter must be regarded as affected by the aid (57).

(96)

On this basis, the Authority cannot exclude that the measures are liable to distort competition and have an effect on intra-EEA trade.

6.5.    Conclusion

(97)

For the above-mentioned reasons, at this stage the Authority has doubts as to whether or not the transactions concerning the Nordkapp and Farøy areas and involving Farsund Vekst AS, Glastad and Nordkapp Utvikling AS entail the grant of state aid.

7.   Procedural requirements

(98)

Pursuant to Article 1(3) of Part I of Protocol 3 to the Agreement between the EFTA States on the Establishment of a Surveillance Authority and a Court of Justice (“Protocol 3”): “The EFTA Surveillance Authority shall be informed, in sufficient time to enable it to submit its comments, of any plans to grant or alter aid. …. The State concerned shall not put its proposed measures into effect until the procedure has resulted in a final decision.”

(99)

The Norwegian authorities did not notify the measures to the Authority. The Authority therefore concludes that, if the measures constitute state aid, the Norwegian authorities have not respected their obligations pursuant to Article 1(3) of Part I of Protocol 3.

8.   Compatibility of the aid measures

(100)

The Norwegian authorities have not provided any arguments substantiating why the measures, if they were to constitute state aid, should be considered compatible with the functioning of the EEA Agreement. The Authority also has not identified any clear grounds for compatibility.

(101)

If the measures constitute state aid, the Authority has doubts as to their compatibility with the functioning of the EEA Agreement.

9.   Conclusion

(102)

As set out above, the Authority has doubts as to whether the measures constitute state aid within the meaning of Article 61(1) of the EEA Agreement.

(103)

The Authority also has doubts as to whether the measures are compatible with the functioning of the EEA Agreement.

(104)

Consequently, and in accordance Article 4(4) of Part II of Protocol 3, the Authority hereby opens the formal investigation procedure provided for in Article 1(2) of Part I of Protocol 3. The decision to open a formal investigation procedure is without prejudice to the final decision of the Authority, which may conclude that the measures do not constitute state aid or that they are compatible with the functioning of the EEA Agreement.

(105)

The Authority, acting under the procedure laid down in Article 1(2) of Part I of Protocol 3, invites the Norwegian authorities to submit, by 12 August 2019 their comments and to provide all documents, information and data needed for the assessment of the measures in light of the state aid rules.

(106)

The Norwegian authorities are requested to immediately forward a copy of this decision to the potential aid recipients.

(107)

The Authority informs the Norwegian authorities that it will publish a meaningful summary of this decision in the Official Journal of the European Union. All interested parties will be invited to submit their comments within one month of the date of such publication. The comments will be communicated to the Norwegian authorities.

For the EFTA Surveillance Authority

Bente ANGELL-HANSEN

President

Responsible College Member

Frank J. BÜCHEL

College Member

Högni KRISTJÁNSSON

College Member


(1)  Reference is made to Article 4(4) of Part II of Protocol 3 to the Agreement between the EFTA States on the Establishment of a Surveillance Authority and a Court of Justice.

(2)  Document No 909653.

(3)  Document No 909644.

(4)  Document No 1045487.

(5)  Document No 932210.

(6)  Document No 1042409.

(7)  Document No 1040145.

(8)  Document No 1040147.

(9)  Document No 1057576.

(10)  Document No 1057574.

(11)  Document No 1070527.

(12)  Gnr. is an abbreviation for Gårdsnummer (English translation: Cadastral unit number)

(13)  Bnr. is an abbreviation for Bruksnummer (English translation: Property unit number)

(14)  M.fl. is an abbreviation for Med flere (English translation: With others)

(15)  Document No 1045487 (attachment 1).

(16)  Document No 1057574 (attachment 23).

(17)  Document No 1045487 (attachment 2).

(18)  Document No 909656.

(19)  Document No 1042409 (attachments 6–7).

(20)  Document No 1057574 (attachment 14).

(21)  Documents No 909658 &1042409.

(22)  Document No 1057574 (attachment 14).

(23)  Document No 1042409 (attachment 4).

(24)  Document No 909657.

(25)  Documents No 909661 and 1042409 (attachments 1 and 2).

(26)  Document No 909659.

(27)  Document No 1045487 (attachments 4–7).

(28)  Document No 909660.

(29)  Lister District Court ruling No 11-061831SKJ-LIST [2011].

(30)  Document No 1040143 (attachment 3).

(31)  Document No 1040143 (attachments 4–5).

(32)  https://www.finn.no/boat/dock/available/ad.html?finnkode=142829167.

(33)  Document No 1057574 (attachment 6).

(34)  The Norwegian term used in the supporting documents for usable floor area is bruksareal (BRA).

(35)  Document No 1057574 (attachments 25–26).

(36)  OJ L 342, 21.12.2017, p. 35 and EEA Supplement No 82, 21.12.2017, p. 1, para. 48.

(37)  NoA, para. 51.

(38)  NoA, para. 66.

(39)  NoA, para. 68.

(40)  NoA, para. 76.

(41)  Case E-12/11 Asker Brygge [2012] EFTA Ct. Rep. 536, para. 64.

(42)  Document No 1042409 (attachments 6–7).

(43)  Document No 1057574 (attachment 14).

(44)  Document No 1042409.

(45)  Asker Brygge, paras. 12, 50 and 59.

(46)  Document No 1057574 (attachment 14).

(47)  NoA, para. 83.

(48)  NoA, para. 84.

(49)  NoA, para. 97.

(50)  NoA, para. 187.

(51)  NoA, para. 189.

(52)  See Glastad’s investment portfolio: https://www.glastad.no/investment-portfolio/.

(53)  See stores located in the shopping centre: https://amfi.no/kjopesentre/amfi-farsund/butikker/.

(54)  See further information about the Olav Thon Group here: http://www.olavthon.no/English/.

(55)  See further information about Klepierre here: http://www.klepierre.com/en/portfolio/scandinavia/norway/.

(56)  See section 1.4 of the Authority’s Decision No 232/11/COL on the notification of the sale of land at Nesøyveien 8, gnr. 32 bnr. 17 in the municipality of Asker (OJ L 323, 22.11.2012, p. 32, and EEA Supplement No 65, 22.11.2012, p. 56).

(57)  Judgment in Eventech, C-518/13, EU:C:2015:9, para. 66.


22.8.2019   

SL

Uradni list Evropske unije

C 284/16


Sporočilo Nadzornega organa Efte – Imenovanje pooblaščencev za zaslišanje in prenehanje funkcije

(2019/C 284/05)

Nadzorni organ Efte je z učinkom od 15. julija 2019 imenoval Michaela Sáncheza Rydelskega, uradnika Nadzornega organa Efte, za pooblaščenca za zaslišanje za namene Odločbe Nadzornega organa Efte št. 442/12/COL z dne 29. novembra 2012 o funkciji in mandatu pooblaščencev za zaslišanje v nekaterih postopkih o konkurenci (1).

Imenovanje Casparja Ebrechta na podlagi Odločbe št. 497/15/COL z dne 16. decembra 2015 o imenovanju novih pooblaščencev za zaslišanje v nekaterih postopkih o konkurenci preneha.

Craig Simpson ostaja na položaju pooblaščenca za zaslišanje pri Nadzornem organu Efte.


(1)  UL L 190, 11.7.2013, str. 93, in Dopolnilo EGP št. 40, 11.7.2013, str. 3.


V Objave

SODNI POSTOPKI

Sodišče Efte

22.8.2019   

SL

Uradni list Evropske unije

C 284/17


Zahtevek za svetovalno mnenje Sodišča Efte, ki ga je 29. marca 2019 vložilo sodišče Fürstliches Landgericht v zadevi Gable Insurance AG in Konkurs

(Zadeva E-3/19)

(2019/C 284/06)

Pri Sodišču Efte je bil z dopisom z dne 29. marca 2019, ki ga je poslalo sodišče Fürstliches Landgericht (deželno knežje sodišče) in ga je tajništvo Sodišča Efte prejelo 29. marca 2019, vložen zahtevek za svetovalno mnenje v zadevi Gable Insurance AG in Konkurs glede naslednjih vprašanj:

1.

Prvo vprašanje se nanaša na razlago pojma „zavarovalni zahtevek“ iz člena 268(1)(g) Direktive 2009/138/ES.

(a)

Katera merila je treba uporabiti pri ugotavljanju, ali nekateri elementi dolga še niso poznani?

(b)

Ali mora zahtevek, da bi se obravnaval kot zavarovalni zahtevek, vsaj načeloma nastati, biti sprejet in/ali vložen pred začetkom postopka zaradi insolventnosti (oziroma, alternativno, pred preklicem zavarovalnih pogodb zaradi začetka postopka prenehanja)? Če je odgovor negativen, se pojavi naslednje vprašanje:

(c)

Ali Direktiva 2009/138/ES določa kakšen rok za možnost nastanka zavarovalnih zahtevkov po začetku postopka zaradi insolventnosti, da se prepreči stalno odlaganje priprave končnega računa in razdelitve upnikom zaradi stalnega vlaganja novih zahtevkov, ali, alternativno, kako Direktiva 2009/138/ES obravnava nedoločene dolgove te vrste?

(d)

Ali izraz „[…] ali preklicala […]“ pomeni, da se le tiste premije, ki jih [zavarovalnica] dolguje zaradi preklica pogodbe pred začetkom postopka prenehanja, štejejo kot zavarovalni zahtevki ali pa pomeni zavarovalne zahtevke tudi to, da zavarovalnica dolguje premijo zaradi preklica pogodbe po začetku postopka prenehanja?

2.

Drugo vprašanje se nanaša na razlago pojma „postopek prenehanja“ iz člena 268(1)(d) Direktive 2009/138/ES.

Ali je treba to določbo razlagati tako, da je možna sodna poravnava glede (posameznih) zavarovalnih zahtevkov tudi neodvisno od nacionalnih postopkovnih pravil, ki urejajo postopke prenehanja, ali v nasprotju z njimi, in če je odgovor pritrdilen, katere posebne zahteve direktive je treba izpolnjevati, da se lahko doseže poravnava?

3.

Tretje vprašanje se nanaša na razmerje med členom 275(1)(a) in členom 274(2)(g) Direktive 2009/138/ES.

Ali člen 275(1)(a) nasprotuje nacionalni ureditvi za izvajanje člena 274(2)(g), povedano drugače, o vlaganju, preverjanju in sprejemu zahtevkov, katere posledica je neenaka obravnava zavarovalnih upnikov?


POSTOPKI V ZVEZI Z IZVAJANJEM POLITIKE KONKURENCE

Evropska komisija

22.8.2019   

SL

Uradni list Evropske unije

C 284/18


Predhodna priglasitev koncentracije

(Zadeva M.9514 – Bain Capital Investors/Kantar)

Zadeva, primerna za obravnavo po poenostavljenem postopku

(Besedilo velja za EGP)

(2019/C 284/07)

1.   

Komisija je 16. avgusta 2019 prejela priglasitev predlagane koncentracije v skladu s členom 4 Uredbe Sveta (ES) št. 139/2004 (1).

Ta priglasitev zadeva naslednji podjetji:

Bain Capital Investors LLC („Bain Capital Investors“, Združene države Amerike),

Kantar Group („Kantar“, Združeno kraljestvo), ki ga nadzoruje podjetje WPP plc („WPP“, Združeno kraljestvo).

Podjetje Bain Capital Investors pridobi v smislu člena 3(1)(b) uredbe o združitvah nadzor nad celotnim podjetjem Kantar.

Koncentracija se izvede z nakupom delnic.

2.   

Poslovne dejavnosti zadevnih podjetij so:

—   za Bain Capital Investors: globalna družba za naložbe zasebnega kapitala, ki vlaga v številne sektorje, vključno v informacijsko tehnologijo, zdravstvo, maloprodajo in potrošniške izdelke, komunikacije ter finančne storitve in proizvodnjo,

—   za Kantar: globalni podatki, raziskave, storitve svetovanja in analiz, vključno z zagotavljanjem storitev tržnih raziskav, storitev merjenja medijev ter storitve trženja in komunikacijske storitve.

3.   

Po predhodnem pregledu Komisija ugotavlja, da bi se za priglašeno koncentracijo lahko uporabljala uredba o združitvah. Vendar končna odločitev o tem še ni sprejeta.

V skladu z Obvestilom Komisije o poenostavljenem postopku obravnave določenih koncentracij na podlagi Uredbe Sveta (ES) št. 139/2004 (2) je treba opozoriti, da je ta zadeva primerna za obravnavo po postopku iz Obvestila.

4.   

Komisija zainteresirane tretje osebe poziva, naj ji predložijo morebitne pripombe glede predlagane transakcije.

Komisija mora pripombe prejeti najpozneje v 10 dneh po datumu te objave. Pri tem vedno navedite sklicno številko:

M.9514 – Bain Capital Investors/Kantar

Pripombe se lahko Komisiji pošljejo po elektronski pošti, po telefaksu ali po pošti. Pri tem uporabite spodnje kontaktne podatke:

E-naslov: COMP-MERGER-REGISTRY@ec.europa.eu

Faks +32 22964301

Poštni naslov:

European Commission

Directorate-General for Competition

Merger Registry

1049 Bruxelles/Brussel

BELGIQUE/BELGIË


(1)  UL L 24, 29.1.2004, str. 1 (uredba o združitvah).