Document 32010R0617

Council Regulation (EU, Euratom) No 617/2010 of 24 June 2010 concerning the notification to the Commission of investment projects in energy infrastructure within the European Union and repealing Regulation (EC) No 736/96

OJ L 180, 15.7.2010, p. 7–14 (BG, ES, CS, DA, DE, ET, EL, EN, FR, IT, LV, LT, HU, MT, NL, PL, PT, RO, SK, SL, FI, SV)
Special edition in Croatian: Chapter 12 Volume 003 P. 147 - 154

Legal status of the document No longer in force, Date of end of validity: 08/04/2014; Arna ionadú ag 32014R0256

ELI: http://data.europa.eu/eli/reg/2010/617/oj

15.7.2010   

EN

Official Journal of the European Union

L 180/7


COUNCIL REGULATION (EU, EURATOM) No 617/2010

of 24 June 2010

concerning the notification to the Commission of investment projects in energy infrastructure within the European Union and repealing Regulation (EC) No 736/96

THE COUNCIL OF THE EUROPEAN UNION,

Having regard to the Treaty on the Functioning of the European Union, and in particular Article 337 thereof,

Having regard to the Treaty establishing the European Atomic Energy Community, and in particular Article 187 thereof,

Having regard to the proposal from the European Commission,

Having regard to the opinion of the European Parliament,

Whereas:

(1)

Obtaining an overall picture of the development of investment in energy infrastructure in the Union is essential for the Commission to perform its tasks in the field of energy. The availability of regular and up-to-date data and information should enable the Commission to make the necessary comparisons, evaluations or to propose relevant measures based on appropriate figures and analysis, in particular concerning the future energy supply-demand balance.

(2)

The energy landscape within and outside the Union has changed significantly in recent years and makes investment in energy infrastructure a crucial issue for securing the Union’s energy supply, for the functioning of the internal market and for the transition towards a low-carbon energy system the Union has begun.

(3)

The new energy context requires significant investment in all kinds of infrastructure in all energy sectors as well as the development of new types of infrastructure and new technologies to be taken up by the market. The liberalisation of the energy sector and the further integration of the internal market give a more prominent role to economic operators for investment. At the same time, new policy requirements such as targets affecting the fuel mix will alter Member States’ policies towards new and/or modernised energy infrastructure.

(4)

In this context, greater attention should be paid to investment in energy infrastructure in the Union, in particular with a view to anticipating problems, promoting best practices and establishing greater transparency on the future development of the Union’s energy system.

(5)

The Commission and in particular its Market Observatory for Energy should therefore have at its disposal accurate data and information on investment projects, including decommissioning, in the most significant components of the energy system of the Union.

(6)

Data and information regarding foreseeable developments in production, transmission and storage capacities and projects in the various energy sectors are of interest to the Union and important to future investment. It is therefore necessary to ensure that the Commission is notified of investment projects on which construction or decommissioning work has started or on which a final investment decision has been taken.

(7)

Pursuant to Articles 41 and 42 of the Euratom Treaty, undertakings are under an obligation to notify their investment projects. It is necessary to supplement such information with, in particular, a regular reporting on the implementation of investment projects. Such additional reporting is without prejudice to Articles 41 to 44 of the Euratom Treaty.

(8)

In order for the Commission to have a consistent view of the future developments of the Union’s energy system as a whole, a harmonised reporting framework for investment projects based on updated categories for official data and information to be transmitted by the Member States is necessary.

(9)

Member States should, to this end, notify to the Commission, data and information on investment projects in energy infrastructure concerning production, storage and transport of oil, natural gas, electricity, including electricity from renewable sources, bio-fuels and the capture and storage of carbon dioxide planned or under construction in their territory, including interconnections with third countries. Undertakings concerned should be under an obligation to notify to the Member State the data and information in question.

(10)

Given the time horizon of investment projects in the energy sector, reporting every two years should be sufficient.

(11)

With a view to avoiding disproportionate administrative burdens and to minimise costs to Member States and undertakings in particular for small and medium enterprises, this Regulation should give the possibility to exempt Member States and undertakings from reporting obligations provided that equivalent information is supplied to the Commission pursuant to energy sector-specific legal acts, adopted by the institutions of the Union, aiming at achieving the objectives of competitive energy markets in the Union, of sustainability of the energy system of the Union and of the security of energy supply to the Union. Any duplication of reporting requirements specified in the third internal market package for electricity and natural gas should therefore be avoided.

(12)

To process data as well as to simplify and secure data notification, the Commission and in particular its Market Observatory for Energy should be able to take all appropriate measures to that effect, in particular the operation of integrated IT tools and procedures.

(13)

The protection of individuals with regard to the processing of personal data by the Member States is governed by Directive 95/46/EC of the European Parliament and of the Council (1), while the protection of individuals with regard to the processing of personal data by the Commission is governed by Regulation (EC) No 45/2001 of the European Parliament and of the Council (2). This Regulation leaves those provisions intact.

(14)

Member States, or their delegated entities, and the Commission should preserve the confidentiality of commercially sensitive data and information. Therefore, Member States or their delegated entities should, with the exception of data and information related to crossborder transmission projects, aggregate such data and information at national level before submitting it to the Commission. If required the Commission should further aggregate this data in such a way that no details concerning individual undertakings and installations are disclosed or can be inferred.

(15)

The Commission and in particular its Market Observatory for Energy should provide a regular and cross-sector analysis of the structural evolution and perspectives of the Union energy system and, where appropriate, more focused analysis on certain aspects of this energy system. This analysis should in particular contribute to identifying possible infrastructure and investment gaps in view of an energy supply and demand balance. The analysis should also form a contribution to a discussion at Union level about energy infrastructures and should therefore be forwarded to the European Parliament, the Council and the European Economic and Social Committee and made available to interested parties.

(16)

The Commission may be assisted by experts from Member States or any other competent experts, with a view to developing a common understanding of potential infrastructure gaps and associated risks and to fostering transparency regarding future developments.

(17)

Building as far as possible on the notification format used under Commission Regulation (EC) No 2386/96 (3) which is applying Council Regulation (EC) No 736/96 of 22 April 1996 on notifying the Commission of investment projects of interest to the Community in the petroleum, natural gas and electricity sectors (4), and after consultation of national experts, the technical measures necessary for the implementation of this Regulation should be adopted by the Commission.

(18)

Given the extent of amendments necessary to adapt it to today’s energy challenges and for the sake of clarity, Regulation (EC) No 736/96 should be repealed and replaced by a new Regulation,

HAS ADOPTED THIS REGULATION:

Article 1

Subject matter and scope

1.   This Regulation establishes a common framework for the notification to the Commission of data and information on investment projects in energy infrastructure in the oil, natural gas, electricity, including electricity from renewable sources, and bio-fuel sectors, and on investment projects related to the capture and storage of carbon dioxide produced by these sectors.

2.   This Regulation shall apply to investment projects of the types listed in the Annex on which construction or decommissioning work has started or on which a final investment decision has been taken.

Member States may furthermore submit any estimated data or preliminary information on investment projects of the types listed in the Annex on which construction work is scheduled to start within five years and to those which are scheduled to be decommissioned within three years, but for which a final investment decision has not been taken.

Article 2

Definitions

For the purpose of this Regulation, the following definitions shall apply:

1.

‘infrastructure’ means any type of installations or part of installations related to production, transmission and storage;

2.

‘investment projects’ means projects aiming at:

(i)

building new infrastructure;

(ii)

transforming, modernising, increasing or reducing capacities of existing infrastructure;

(iii)

partial or total decommissioning of existing infrastructure;

3.

‘final investment decision’ means the decision taken at the level of an undertaking to definitively earmark funds towards the investment phase of a project, the investment phase meaning the phase during which construction or decommissioning takes place and capital costs are incurred. The investment phase excludes the planning phase, during which project implementation is prepared and which includes, where appropriate, a feasibility assessment, preparatory and technical studies, obtaining licences and authorisations and incurring capital costs;

4.

‘investment projects under construction’ means investment projects for which construction has started and capital costs are incurred;

5.

‘decommissioning’ means the phase where an infrastructure is permanently taken out of operation;

6.

‘production’ means the generation of electricity and the processing of fuels, including bio-fuels;

7.

‘transmission’ means the transport of energy sources or products or carbon dioxide, through a network, in particular:

(i)

through pipelines, other than upstream pipeline network and other than the part of pipelines primarily used in the context of local distribution; or

(ii)

through extra high voltage and high-voltage interconnected systems and other than the systems primarily used in the context of local distribution;

8.

‘storage’ means the stocking on a permanent or temporary basis of energy or energy sources in above-ground or underground infrastructure or geological sites or containment of carbon dioxide in underground geological formations;

9.

‘undertaking’ means any natural or legal private or public person, deciding or implementing investment projects;

10.

‘energy sources’ means:

(i)

primary energy sources, such as oil, natural gas or coal;

(ii)

transformed energy sources, such as electricity;

(iii)

renewable energy sources including hydroelectricity, biomass, biogas, wind, solar, tidal, wave and geothermal energy; and

(iv)

energy products, such as refined oil products and bio-fuels;

11.

‘specific body’ means a body entrusted by any energy sector-specific legal act of the Union with the preparation and adoption of Union-wide multi-annual network development and investment plans in energy infrastructure, such as the European network of transmission system operators for electricity (‘ENTSO-E’) referred to in Article 4 of Regulation (EC) No 714/2009 of the European Parliament and of the Council of 13 July 2009 on conditions for access to the network for cross-border exchanges in electricity (5) and the European network for transmission system operators for gas (‘ENTSO-G’) referred to in Article 4 of Regulation (EC) No 715/2009 of the European Parliament and of the Council of 13 July 2009 on conditions for access to the natural gas transmission networks (6).

Article 3

Notification of data

1.   While keeping the collection and reporting burden proportionate, Member States or the entities to which they delegate this task to shall compile all data and information specified in this Regulation from 1 January 2011 and from then onwards every two years.

They shall notify the data and relevant project information specified in this Regulation to the Commission in 2011, that year being the first reporting year, and from then onwards every two years. This notification shall be made in aggregated form, except for data and relevant information relating to crossborder transmission projects.

Member States or their delegated entities shall notify aggregated data and relevant project information by 31 July of the reporting year concerned.

2.   Member States or their delegated entities are exempted from the obligations set out in paragraph 1, provided that, and to the extent that, pursuant to energy sector-specific Union law or the Euratom Treaty:

(a)

the concerned Member State or its delegated entity has already notified to the Commission data or information equivalent to the requirements of this Regulation and has indicated the date of the notification and the specific legal act concerned; or

(b)

a specific body is entrusted with the preparation of a multi-annual investment plan in energy infrastructure at Union level and compiles to this end data and information equivalent to the requirements of this Regulation. In this case and for the purposes of this Regulation, the specific body shall notify all the relevant data and information to the Commission.

Article 4

Data sources

The undertakings concerned shall notify the data or information referred to in Article 3 to the Member States, or their delegated entities, in whose territory they are planning to carry out investment projects before 1 June of each reporting year. The data or information notified shall reflect the situation of investment projects as of 31 March of the relevant reporting year.

The first paragraph shall not apply to undertakings where the Member State concerned decides to use other means of supplying the Commission with the data or information referred to in Article 3.

Article 5

Content of the notification

1.   With regard to investment projects of the types listed in the Annex, the notification provided for in Article 3 shall indicate, where appropriate:

(a)

the volume of the capacities planned or under construction;

(b)

the type and main characteristics of infrastructure or capacities planned or under construction, including the location of crossborder transmission projects, if applicable;

(c)

the probable year of commissioning;

(d)

the type of energy sources used;

(e)

the installations capable of responding to security of supply crises, such as equipment enabling reverse flows or fuel switching; and

(f)

the equipment of carbon capture systems or retrofitting mechanisms for carbon capture and storage.

2.   With regard to any proposed decommissioning of capacities, the notification provided for in Article 3 shall indicate:

(a)

the character and the capacity of the infrastructure concerned; and

(b)

the probable year of decommissioning.

3.   Any notification under Article 3 shall include where appropriate the total volume of installed production, transmission and storage capacities which are in place at the beginning of the reporting year concerned or whose operation is interrupted for a period exceeding three years.

Member States, their delegated entities or the specific body referred to in Article 3(2)(b) may add to their notifications relevant comments, such as comments on delays or obstacles to the implementation of investment projects.

Article 6

Quality and publicity of data

1.   Member States, their delegated entities or, where appropriate, the specific bodies shall aim to ensure the quality, relevance, accuracy, clarity, timeliness and coherence of data and information they notify to the Commission.

In case of specific bodies, the data and information notified may be accompanied by appropriate comments from Member States.

2.   The Commission may publish data and information forwarded pursuant to this Regulation, in particular in analyses referred to in Article 10(3), provided that the data and information are published in an aggregated form and that no details concerning individual undertakings and installations are disclosed or can be inferred.

3.   Member States, the Commission, or their delegated entities shall each preserve the confidentiality of commercially sensitive data or information in their possession.

Article 7

Implementing provisions

Within the limits laid down by this Regulation, the Commission shall adopt, by 31 October 2010, the provisions necessary for the implementation of this Regulation, concerning the form and other technical details of the notification of data and information referred to in Articles 3 and 5.

Article 8

Data processing

The Commission shall be responsible for developing, hosting, managing and maintaining the IT resources needed to receive, store and carry out any processing of the data or information on energy infrastructure notified to the Commission pursuant to this Regulation.

Article 9

Protection of individuals with regards to the processing of data

This Regulation is without prejudice to Union law and, in particular, does not alter Member States’ obligations with regard to the processing of personal data, as laid down by Directive 95/46/EC, or the obligations incumbent upon the Union’s institutions and bodies under Regulation (EC) No 45/2001 with regard to the processing of personal data by them in the course of their duties.

Article 10

Monitoring and reporting

1.   On the basis of data and information forwarded and, if appropriate, of any other data sources including data purchased by the Commission, and taking into account relevant analyses such as the multi-annual network development plans for gas and for electricity, the Commission shall forward to the European Parliament, to the Council and to the European Economic and Social Committee and shall publish every two years a cross-sector analysis of the structural evolution and perspectives of the energy system of the Union. This analysis shall aim in particular at:

(a)

identifying potential future gaps between energy demand and supply that are of significance from an energy policy perspective of the Union;

(b)

identifying investment obstacles and promoting best practices to address them; and

(c)

increasing transparency for market participants and potential market entrants.

On the basis of this data and information, the Commission may also provide any specific analysis deemed necessary or appropriate.

2.   In preparing the analyses referred to in paragraph 1, the Commission may be assisted by experts from Member States and/or any other experts, professional associations with specific competence in the area concerned.

The Commission shall provide all Member States with an opportunity to comment on the draft analyses.

3.   The Commission shall discuss the analyses with interested parties, such as ENTSO-E, ENTSO-G, the Gas Coordination Group and the Oil Supply Group.

Article 11

Review

‘By 23 July 2015, the Commission shall review the implementation of this Regulation, and present a report on the results of this review to the European Parliament and to the Council.’. In the review, the Commission shall, inter alia, examine the possible extension of the scope to include the extraction of gas, oil and coal.

Article 12

Repeal

Regulation (EC) No 736/96 shall be repealed.

Article 13

Entry into force

This Regulation shall enter into force on the 20th day following its publication in the Official Journal of the European Union.

This Regulation shall be binding in its entirety and directly applicable in all Member States.

Done at Luxembourg, 24 June 2010.

For the Council

The President

J. BLANCO LÓPEZ


(1)   OJ L 281, 23.11.1995, p. 31.

(2)   OJ L 8, 12.1.2001, p. 1.

(3)   OJ L 326, 17.12.1996, p. 13.

(4)   OJ L 102, 25.4.1996, p. 1.

(5)   OJ L 211, 14.8.2009, p. 15.

(6)   OJ L 211, 14.8.2009, p. 36.


ANNEX

INVESTMENT PROJECTS

1.   OIL

1.1.   Refining

Distillation plants with a capacity of not less than 1 million tonnes a year,

extension of distilling capacity beyond 1 million tonnes a year,

reforming/cracking plants with a minimum capacity of 500 tonnes a day,

desulphurisation plants for residual fuel oil/gas oil/feedstock/other petroleum products,

Chemical plants which do not produce fuel oil and/or motor fuels, or which produce them only as by-products, are excluded.

1.2.   Transport

Crude oil pipelines with a capacity of not less than 3 million metric tonnes a year, and extension or lengthening of these pipelines, which are not less than 30 kilometres long,

petroleum product pipelines with a capacity of not less than 1,5 million tonnes a year, and extension or lengthening of these pipelines, which are not less than 30 kilometres long,

pipelines which constitute essential links in national or international interconnecting networks and pipelines and projects of common interest identified in the guidelines established under Article 171 of the Treaty on the Functioning of the European Union (‘TFEU’) (1).

Pipelines for military purposes and those supplying plants outside the scope of point 1.1. are excluded.

1.3.   Storage

Storage installations for crude oil and petroleum products (installations with a capacity of 150 000 m3 or more or, in the case of tanks, with a capacity not less than 100 000 m3),

Tanks intended for military purposes and those supplying plants outside the scope of point 1.1. are excluded.

2.   GAS

2.1.   Transmission

Gas, including natural gas and biogas, transport pipelines that form part of a network which mainly contains high-pressure pipelines, excluding pipelines that form part of an upstream pipeline network and excluding the part of high-pressure pipelines primarily used in the context of local distribution of natural gas,

pipelines and projects of common interest identified in the guidelines established under Article 171 TFEU (2).

2.2.   LNG terminals

Terminals for the importation of liquefied natural gas, with a regasification capacity of 1 billion m3 per year or more.

2.3.   Storage

Storage installations connected to the transport pipelines referred to in point 2.1.

Gas pipelines, terminals and installations for military purposes and those supplying chemical plants which do not produce energy products, or which produce them only as by-products, are excluded.

3.   ELECTRICITY

3.1.   Production

Thermal and nuclear power stations (generators with a capacity of 100 MWe or more),

biomass/bioliquids/waste power generation installations (with a capacity of 20 MW or more),

power stations with cogeneration of electricity and useful heat (installations with an electrical capacity of 20 MW or more),

hydro-electric power stations (installations having a capacity of 30 MW or more),

wind power farms with a capacity of 20 MW or more,

concentrated solar thermal and geothermal installations (with a capacity of 20 MW or more),

photovoltaic installations (with a capacity of 10 MW or more).

3.2.   Transmission

Overhead transmission lines, if they have been designed for the voltage commonly used at the national level for the interconnection lines, and provided they have been designed for a voltage of 220 kV or more,

underground and submarine transmission cables, if they have been designed for a voltage of 150 kV or more,

projects of common interest identified in the guidelines established under Article 171 TFEU (3).

4.   BIOFUEL

4.1.   Production

Installations that are able to produce or refine bio-fuels (installations with a capacity of 50 000 tonnes/year or more).

5.   CARBON DIOXIDE

5.1.   Transport

CO2 pipelines related to production installations referred to in points 1.1. and 3.1.

5.2.   Storage

Storage installations (storage site or complex with a capacity of 100 kt or more),

Storage installations intended for research and technological development are excluded.


(1)  Decision No 1364/2006/EC of the European Parliament and of the Council of 6 September 2006 laying down guidelines for trans-European energy networks (OJ L 262, 22.9.2006, p. 1) was adopted under Article 155 of the Treaty establishing the European Community.

(2)  Decision No 1364/2006/EC was adopted under Article 155 of the EC Treaty.

(3)  Decision No 1364/2006/EC was adopted under Article 155 of the EC Treaty.