EUR-Lex Access to European Union law

Back to EUR-Lex homepage

This document is an excerpt from the EUR-Lex website

Document 32010D0670

2010/670/EU: Commission Decision of 3 November 2010 laying down criteria and measures for the financing of commercial demonstration projects that aim at the environmentally safe capture and geological storage of CO 2 as well as demonstration projects of innovative renewable energy technologies under the scheme for greenhouse gas emission allowance trading within the Community established by Directive 2003/87/EC of the European Parliament and of the Council (notified under document C(2010) 7499)

OJ L 290, 6.11.2010, p. 39–48 (BG, ES, CS, DA, DE, ET, EL, EN, FR, IT, LV, LT, HU, MT, NL, PL, PT, RO, SK, SL, FI, SV)

Legal status of the document In force

ELI: http://data.europa.eu/eli/dec/2010/670/oj

6.11.2010   

EN

Official Journal of the European Union

L 290/39


COMMISSION DECISION

of 3 November 2010

laying down criteria and measures for the financing of commercial demonstration projects that aim at the environmentally safe capture and geological storage of CO2 as well as demonstration projects of innovative renewable energy technologies under the scheme for greenhouse gas emission allowance trading within the Community established by Directive 2003/87/EC of the European Parliament and of the Council

(notified under document C(2010) 7499)

(2010/670/EU)

THE EUROPEAN COMMISSION,

Having regard to the Treaty on the Functioning of the European Union,

Having regard to Directive 2003/87/EC of the European Parliament and of the Council of 13 October 2003 establishing a scheme for greenhouse gas emission allowance trading within the Community and amending Council Directive 96/61/EC (1), and in particular the third subparagraph of Article 10a(8) thereof,

Whereas:

(1)

The European Council of June 2008 called on the Commission to bring forward as soon as possible a mechanism to incentivise Member State and private sector investments to ensure the construction and operation by 2015 of up to 12 carbon capture and storage (‘CCS’) demonstration plants.

(2)

Article 10a(8) of Directive 2003/87/EC establishes a mechanism for the financing of commercial demonstration projects that aim at the environmentally safe capture and geological storage of CO2 (hereinafter ‘CCS demonstration projects’) and demonstration projects of innovative renewable energy technologies (hereinafter ‘RES demonstration projects’). With a view to ensuring a smooth functioning of this mechanism, it is necessary to lay down both the rules and criteria for the selection and implementation of those projects and the basic principles for the monetisation of allowances and for the management of revenues.

(3)

The Commission adopted the Communication entitled ‘Investing in the Development of Low Carbon Technologies’ (2) on 7 October 2009, which emphasises the role of funding under this Decision in implementing the European Strategic Energy Technology Plan (SET-Plan) in respect of the needed demonstration projects.

(4)

Funding under this Decision should be conditional on clearance by the Commission of any State aid component of the overall financial contribution from public sources pursuant to Articles 107 and 108 of the Treaty with a view to ensuring that funding is limited to the extent necessary for implementation and operation of the project, taking into account potential negative effects on competition. Member States should therefore notify the Commission of any financing involving State aid pursuant to Article 108(3) of the Treaty to allow coordination of the selection procedure under this Decision with the State aid assessment.

(5)

The financing provided under this Decision is not part of the general budget of the European Union. It can therefore be combined with financing from other instruments, including the Structural and Cohesion Funds and the European Energy Programme for Recovery (EEPR). It can also be combined with loan financing provided under the Risk-Sharing Finance Facility (RSFF) set up by the Union and the European Investment Bank (EIB).

(6)

In order to avoid a subsidy competition between Member States, financing under this Decision should be fixed at 50 % of the relevant costs, unless the total amount of funding under this Decision would exceed the limit of 15 % of the total available allowances as referred to in Directive 2003/87/EC, in which case funding should be limited to 15 % of the total available allowances. The funding should also be complementary to substantial co-financing by the operator. In order not to give preferential treatment to projects funded under the EEPR, financing under this Decision should be reduced by the amount of financing received from the EEPR.

(7)

The establishment of an EU demonstration programme comprising the best possible projects of a wide range of technologies in geographically balanced locations within the territory of Member States, their exclusive economic zones and their continental shelves, cannot be sufficiently achieved if projects are selected on a national level. The selection should therefore take place at Union level. With a view to ensuring coherence with national selection and funding procedures, Member States should be responsible for collecting funding applications from the sponsors and for the evaluation of the projects on the basis of the eligibility criteria laid down in this Decision. Since projects financed under this Decision will in most cases be co-financed by Member States, Member States should have the possibility to decide which of the projects they wish to support, and whose applications they wish to submit to the Union selection process. Submission of these applications is not intended to replace a State aid notification for cases in which the funding contains a State aid component. The role of Member States should be further strengthened by reconsulting the relevant Member States to confirm, where appropriate, the value and structure of the total public funding contribution and by submitting the draft list of selected projects to the Climate Change Committee, including on the quality of projects, before the award decisions are taken.

(8)

In light of its expertise in project selection and financing, the Commission has sought to involve the EIB in the implementation of this Decision. The EIB has agreed that, acting on request of, on behalf of and for the account of the Commission, it should perform certain tasks in respect of the project selection, the monetisation of allowances and the management of the revenues. The specific terms and conditions of the cooperation, including remuneration of the EIB, should be laid down in an agreement between the Commission and the EIB, subject to the approval of the decision-making bodies of the EIB. The EIB should be reimbursed for the performance of those tasks from income generated from its management of the revenues.

(9)

The available revenues from the 300 million allowances should be awarded through two rounds of calls for proposals to allow, on the one hand, for mature projects to receive financing already in the first round, and on the other hand, to provide for the possibility to adjust any technical or geographical imbalance in the second round. Where there is insufficient competition in a particular subcategory of projects in the first round, award decisions in that subcategory should be postponed to the second round with a view to maximising the use of funds under this Decision.

(10)

The financing under this Decision should be reserved for projects which make use of technologies which are innovative in relation to the state-of-the-art in the key substreams for each technology. Those technologies should not yet be commercially available, but sufficiently mature to be ready for demonstration at pre-commercial scale. They should have reasonable prospects of successful demonstration, taking into account that technological risks are inevitable, and the proposed scale of demonstration should be such that no significant additional problems are to be expected from further scaling up. They should also have a high replicability potential, and therefore offer significant prospects for cost-effective CO2 reduction both in the Union and globally. Therefore, only projects which fall into specific categories of projects and which comply with specific requirements set out in this Decision should be eligible for funding.

(11)

With a view to ensuring technological diversity, eight CCS demonstration projects should be funded (with at least one and, at most, three projects in each project category, at least three with hydrocarbon reservoir storage, and at least three with saline aquifer storage) in the first round of calls for proposals, and one project should be funded in each of the RES project subcategories in the first round of calls for proposals. If there are sufficient resources, it should be possible to finance more projects while maintaining the balance between CCS and RES demonstration projects. Further, with a view to ensuring geographical balance, at least one and no more than three projects should be funded within any one Member State. The projects which are intended to take place on the territory of several Member States should not be, due to their nature, limited by that criteria.

(12)

In principle, projects which satisfy the requirements on project numbers per category in the most cost-effective way should be selected.

(13)

With a view to ensuring that the selected projects begin operation as planned and that funds are efficiently used, award decisions should be conditional on the issuing of all relevant national permits in accordance with relevant requirements under Union law and final investment decisions being reached by the sponsors, within a specified period of time upon adoption of the award decisions.

(14)

Member States should disburse the revenues to projects on the basis of legally binding instruments. As required by Directive 2003/87/EC, disbursement should take place annually, on the basis of the amount of CO2 stored for CCS demonstration projects as reported, monitored and verified under Directive 2003/87/EC, and on the basis of the amount of energy produced for RES projects. However, where Member States guarantee that any excess funding will be returned, it should be possible to disburse part or all of the funding for a project prior to its entry into operation. In light of the particular importance of knowledge-sharing in the context of a demonstration programme, funds should only be disbursed if knowledge-sharing requirements are met.

(15)

The measures provided for in this Decision are in accordance with the opinion of the Climate Change Committee,

HAS ADOPTED THIS DECISION:

Article 1

Subject matter

This Decision lays down rules and criteria for the following:

(1)

the selection of commercial demonstration projects that aim at the environmentally safe capture and geological storage of CO2 (‘CCS demonstration projects’) and demonstration projects of innovative renewable energy technologies (‘RES demonstration projects’) referred to in Directive 2003/87/EC;

(2)

the monetisation of the allowances referred to in Directive 2003/87/EC for the support of CCS and RES demonstration projects, and the management of the related revenues;

(3)

the disbursement of revenues and the implementation of CCS and RES demonstration projects.

This Decision, including the provisions in relation to the monetisation of allowances, shall be without prejudice to other implementing acts adopted pursuant to Directive 2003/87/EC.

Article 2

Principles

1.   The number of allowances in the new entrants’ reserve referred to in Article 10a(8) of Directive 2003/87/EC shall be 300 million.

2.   Selection of CCS and RES demonstration projects for funding under this Decision shall take place through two rounds of calls for proposals organised by the Commission and addressed to Member States, covering the equivalent of 200 million allowances for the first round of call for proposals, and the equivalent of 100 million allowances and the remaining allowances from the first round of calls for proposals for the second round of calls for proposals.

3.   Subject to the fourth sentence in the fourth subparagraph of Article 10a(8) of Directive 2003/87/EC, financing under this Decision shall be 50 % of the relevant costs. Where the total request for public funding is less than 50 % of the relevant costs, the total request for public funding shall be financed under this Decision.

However, where financing under this Decision is combined with financing from the European Energy Programme for Recovery (EEPR), the financing under this Decision shall be reduced by the amount of financing received from the EEPR.

Article 3

Relevant costs

1.   For the purposes of Article 2(3), the rules in paragraphs 2 to 5 of this Article shall apply.

2.   The relevant costs of CCS demonstration projects shall be those investment costs which are borne by the project due to the application of CCS net of the net present value of the best estimate of operating benefits and costs arising due to the application of CCS during the first 10 years of operation.

3.   Relevant costs of RES demonstration projects shall be those extra investment costs which are borne by the project as a result of the application of an innovative renewable energy technology net of the net present value of the best estimate of operating costs and benefits arising during the first 5 years compared to a conventional production with the same capacity in terms of effective production of energy.

4.   The investment costs referred to in paragraphs 2 and 3 shall cover the cost of investment in land, plant and equipment.

Investment costs may also relate to investment in technology transfer and operating licenses of know-how (hereinafter ‘intangible assets’) where the following conditions are fulfilled:

(a)

the intangible asset can be considered as a depreciable asset;

(b)

the intangible asset is purchased on market terms at the lowest price possible;

(c)

the intangible asset remains in the establishment of the recipient for at least 5 years.

If the intangible asset is sold before the expiry of the 5-year period referred to in point (c) of the second subparagraph, the yield from the sale shall be deducted from the relevant costs.

5.   The net operating costs and benefits referred to in paragraphs 2 and 3 shall be based on the best estimate of operating expenses borne by the project regarding production costs and take into account any additional benefits resulting from support schemes even if they do not constitute State aid within the meaning of Article 107(1) of the Treaty, avoided costs and existing tax incentive measures.

Article 4

Role of the EIB

The European Investment Bank (EIB) shall perform its tasks under this Decision on request of, on behalf of and for the account of the Commission. The Commission shall be responsible with regard to third parties.

The EIB shall be reimbursed for the performance of those tasks from income generated from its management of the revenues.

The Commission and the EIB shall enter into an agreement laying down the specific terms and conditions under which the EIB shall perform its tasks.

Article 5

Selection procedure

1.   The calls for proposals shall be published in the Official Journal of the European Union.

2.   Member States shall collect funding applications for projects that are intended to take place on their territory.

However, where a project is intended to take place on the territory of several Member States (hereinafter a ‘transboundary project’), the Member State receiving the funding application shall inform the other Member States concerned thereof and shall cooperate with the other Member States with a view to reaching a common decision on the submission of the project by the Member State receiving the funding application.

3.   Member States shall assess whether a project meets the eligibility criteria referred to in Article 6. Where this is the case and where the Member State supports the project, that Member State shall submit the proposal to the EIB and inform the Commission thereof.

When submitting proposals for funding, the Member State shall provide the following information for each project:

(a)

the relevant costs, in euro, referred to in Article 2(3);

(b)

the total request for public funding in euro, which is the relevant costs minus any contribution to those costs from the operator;

(c)

the best estimate of the net present value of additional benefits resulting from support schemes as calculated according to Article 3(5);

(d)

for CCS demonstration projects, the total projected amount of CO2 stored in the first 10 years of operation, or, for RES demonstration projects, the total projected amount of energy produced in the first 5 years of operation.

Member States shall also notify the Commission of any financing for the project involving State aid pursuant to Article 108(3) of the Treaty so as to allow coordination of the selection procedure with the State aid assessment.

4.   On the basis of the proposals submitted pursuant to paragraph 3 of this Article, the EIB shall perform an assessment of the financial and technical viability (financial and technical due diligence) of the project in accordance with Article 7.

Where that assessment has been concluded positively, the EIB shall, in accordance with Article 8, make recommendations for award decisions to the Commission.

5.   On the basis of the recommendations referred to in paragraph 4, after reconsulting the Member States concerned to confirm, where appropriate, the value and structure of the total public funding contribution, and following an opinion from the Climate Change Committee pursuant to Article 3 of Council Decision 1999/468/EC (3), the Commission shall adopt award decisions addressed to the relevant Member States, indicating the awarded funding for the projects concerned in euro.

Article 6

Eligibility criteria

1.   A project shall be eligible for funding where the following criteria are fulfilled:

(a)

the project must fall into one of the categories set out in Part A of Annex I;

(b)

the project must comply with the requirements set out in Part B of Annex I;

(c)

the projects listed in Part A.II of Annex I must be innovative in nature. Existing, proven technologies are ineligible.

2.   Where a Member State is not in a position to submit proposals for projects falling under any of the subcategories specified in Part A.II of Annex I which meet the relevant thresholds to the EIB pursuant to Article 5(3), proposals for projects below the relevant thresholds for any of the subcategories concerned may be submitted by this Member State and shall be considered eligible for the award of financing by way of derogation from paragraph 1.

Article 7

Financial and technical due diligence

The EIB shall perform the due diligence assessment of any proposed project in accordance with specifications laid down in the calls for proposals referred to in Article 5(1) and shall cover at least the following aspects:

(1)

technical scope;

(2)

costs;

(3)

financing;

(4)

implementation;

(5)

operation;

(6)

environmental impact;

(7)

procurement procedures.

Article 8

Project selection

1.   Eight projects falling under Part A.I of Annex I and one project in each project subcategory specified in Part A.II of Annex I shall be funded.

However, where resources allow, further projects may be funded while maintaining the balance between CCS and RES demonstration projects.

Where no more than two proposals are submitted in a given subcategory, the Commission shall assess the possible impact of the limited number of proposals on the competition for selection under this Decision, and may, where appropriate, decide to postpone award decisions in the relevant subcategory to the second round of calls for proposals.

2.   Projects shall be ranked in order of increasing cost-per-unit performance. CCS demonstration projects shall be ranked as a single group. RES demonstration projects shall be ranked within each of the subcategories specified in Part A.II of Annex I.

For the purposes of the first subparagraph, cost-per-unit performance shall be calculated as the sum of the amounts specified in Article 5(3)(b) and (c), divided by the total projected amount of CO2 stored in the first 10 years of operation for CCS demonstration projects, or, the total projected amount of energy produced in the first 5 years of operation for the RES demonstration projects.

Where the relevant Member States confirm, pursuant to Article 5(5), that there is a sufficient public funding for CCS demonstration projects, the highest ranked projects shall be selected in order of their ranking, provided all the following criteria are met:

(a)

at least one project and at most three projects are selected in each project category;

(b)

at least three projects with hydrocarbon reservoir storage are selected;

(c)

at least three projects with saline aquifer storage are selected.

Where those criteria are not met, the project under consideration for selection shall not be selected, and the next highest ranked project shall be considered for selection. The procedure shall be repeated until eight projects are selected.

Where the relevant Member States confirm, pursuant to Article 5(5), that there is a sufficient public funding for RES demonstration projects, the highest ranked project in each subcategory shall be selected. Where, in either of the rounds for calls for proposals there are no eligible and financially and technically viable projects in one or more project subcategories, a corresponding number of additional projects shall be funded in other subcategories of the same project category. Details shall be specified in the call for proposals pursuant to Article 5(1).

The selected CCS demonstration projects shall collectively constitute ‘the CCS group’ and the selected RES demonstration projects shall collectively constitute ‘the RES group’.

3.   By way of derogation from paragraph 1, where the total request for funding under this Decision is higher than the available funds, the number of selected projects shall be reduced so that the request for funding is reduced in the same proportion in each of the groups referred to in the third and fifth subparagraphs of paragraph 2.

For each of the groups, the project representing the highest cost-per-unit performance shall be deselected first, the project representing the highest cost-per-unit performance in another category shall be deselected next. The procedure shall be repeated until the requested funding is covered by the available funds.

4.   Subject to the availability of proposals submitted to the EIB pursuant to Article 5(3) and recommended by the EIB for award decisions to the Commission pursuant to Article 5(4), at least one and no more than three projects shall be funded within one Member State.

However, the first subparagraph shall not apply to transboundary projects.

Article 9

Award decisions

Award decisions shall be conditional upon all relevant national permits in accordance with relevant requirements under Union law being issued, approval by the Commission of any State aid in respect of a project being granted, and final investment decisions being reached by the sponsors, within 24 months of adoption of the award decisions.

With regard to CCS demonstration projects, with saline aquifer storage, award decisions shall be conditional upon all relevant national permits in accordance with relevant requirements under Union law being issued, approval by the Commission of any State aid in respect of a project being granted, and final investment decisions being reached by the sponsors, within 36 months of adoption of the award decisions.

Award decisions shall cease to have legal effect where the conditions referred to in the first or second paragraph are not met.

Article 10

Monetisation of allowances and management of revenues

1.   For the purposes of monetisation of allowances and management of revenues, the Commission shall act on behalf of Member States.

2.   The Member States and the Commission shall ensure that the 300 million allowances referred to in Article 2(1) shall be transferred to the EIB for monetisation and management of the revenues.

3.   The EIB shall sell the allowances for the first round of calls for proposals before the award decisions are adopted by the Commission for each round of calls for proposals referred to in Article 5(1).

The EIB shall manage the revenues and shall pass them to Member States as required for disbursement pursuant to Article 11.

Article 11

Disbursement of revenues and use of non-disbursed revenues

1.   Member States shall disburse the revenues to project sponsors on the basis of legally binding instruments which shall set out at least the following:

(a)

the project and the awarded funding in euro;

(b)

the date of entry into operation;

(c)

the requirements for knowledge-sharing pursuant to Article 12;

(d)

requirements regarding disbursement of the revenues pursuant to paragraphs 2 to 6 of this Article;

(e)

requirements for reporting pursuant to Article 13;

(f)

the information on conditions of applicability of the decision referred to in Article 9.

For the first round of calls for proposals referred to in Article 5(1), the date of entry into operation referred to in point (b) of the first subparagraph of this paragraph shall be 31 December 2015 at the latest except where the respective award decision is adopted after 31 December 2011, in which case the date of entry into operation shall be no later than 4 years from the date of the award decision.

2.   Disbursement shall take place annually. The disbursed amount shall be, for CCS demonstration projects, the amount of CO2 stored in the relevant year as monitored, reported and verified pursuant to Articles 14 and 15 of Directive 2003/87/EC multiplied by the funding rate, and for RES demonstration projects, the amount of energy produced multiplied by the funding rate.

The funding rate shall be calculated by dividing the awarded funding by 75 % of the projected total amount of stored CO2 in the first 10 years of operation in case of CCS demonstration projects, or 75 % of the projected total amount of energy produced in the first 5 years of operation in the case of RES demonstration projects.

3.   Disbursement for a given year shall take place only where the knowledge-sharing requirements are met for that year.

4.   Disbursement shall be limited to a period of 10 years from the date referred to in paragraph (1)(b) in the case of CCS demonstration projects, and to a period of 5 years from that date in the case of RES demonstration projects. The total funds disbursed shall not exceed the awarded funding referred to in paragraph 1(a).

5.   Where the Member State concerned guarantees that any funding which exceeds the funding determined pursuant to paragraphs 2, 3, and 4 will be returned to the EIB, part or all of the funding for a project may be disbursed prior to the entry into operation of that project in accordance with specifications set out in the award decision.

6.   Without prejudice to the second paragraph of Article 4, revenues which are not disbursed to projects and income generated from the management of revenues shall be used to co-finance further demonstration projects under this Decision until 31 December 2015.

Member States shall return revenues which are not disbursed to the EIB.

After 31 December 2015, any remaining funds shall accrue to the Member States. At the end of disbursement, these funds shall be passed on to the Member States in accordance with the principles laid down in Article 10a(7) of Directive 2003/87/EC.

Article 12

Knowledge-sharing

Member States shall ensure that all project operators, consortium members, suppliers and subcontractors who receive substantial benefit regarding the development of their product or service from the public finance provided, share the information on the elements set out in Annex II with other project operators, public authorities, research institutes, non-governmental organisations and the public in accordance with the further specifications set out in the calls for proposals referred to in Article 5(1).

Information shall be shared on an annual basis and shall comprise all information generated and processed in a given year.

Article 13

Reporting by Member States

During the periods referred to in Article 11(4), Member States shall, by 31 December of each year, submit reports on the implementation of the projects to the Commission.

Those reports shall include at least the following information for each project:

(1)

the amount of CO2 stored or clean energy produced;

(2)

the funds disbursed;

(3)

any significant problems with project implementation.

Article 14

Reporting by the Commission

After completion of the first round of calls for proposals, the Commission shall report to the Climate Change Committee on the implementation of that round of calls for proposals, indicating whether any amendment to this Decision is necessary with the view to ensuring geographical and technical balance in the second round of calls for proposals.

Article 15

Addressees

This Decision is addressed to the Member States.

Done at Brussels, 3 November 2010.

For the Commission

Connie HEDEGAARD

Member of the Commission


(1)   OJ L 275, 25.10.2003, p. 32.

(2)  COM(2009) 519 final.

(3)   OJ L 184, 17.7.1999, p. 23.


ANNEX I

ELIGIBILITY CRITERIA

A.   PROJECT CATEGORIES

I.   CCS demonstration project categories (with minimum capacity thresholds (1) )

power generation: pre-combustion 250 MW,

power generation: post-combustion 250 MW,

power generation: oxyfuel 250 MW,

industrial applications implementing: (a) CCS on refineries with 500 kilotonnes per year (kt/y) stored CO2 from one or more sources within the refinery; (b) CCS application to cement kiln with 500 kt/y stored CO2; (c) CCS application for primary production routes in iron and steel production with 500 kt/y stored CO2; or (d) CCS application for primary production routes in aluminium production with 500 kt/y stored CO2.

II.   Innovative RES demonstration project categories (with minimum size thresholds)

Bioenergy – project subcategories:

Lignocellulose to intermediate solid, liquid or slurry bioenergy carriers via pyrolysis with capacity 40 kt/y of the final product.

Lignocellulose to intermediate solid, liquid or slurry bioenergy carriers via torrefaction with capacity 40 kt/y of the final product.

Lignocellulose to Synthetic Natural Gas or synthesis gas and/or to power via gasification with capacity 40 million normal cubic metres per year (MNm3/y) of the final product or 100 GWh/y of electricity.

Lignocellulose to biofuels or bioliquids and/or to power including via directly heated gasification with capacity 15 million litres per year (Ml/y) of the final product or 100 GWh/y of electricity. Production of Synthetic Natural Gas is excluded under this subcategory.

Lignocellulosic raw material, such as black liquor and/or products from pyrolysis or torrefaction, via entrained flow gasification to any biofuels with capacity 40 Ml/y of the final product.

Lignocellulose to electricity with 48 % efficiency based on lower heating value (50 % moisture) with capacity 40 MWe or higher.

Lignocellulose to ethanol and higher alcohols via chemical and biological processes with capacity 40 Ml/y of the final product.

Lignocellulose and/or household waste to biogas, biofuels or bioliquids via chemical and biological processes with capacity 6 MNm3/y of Methane or 10 Ml/y of the final product.

Algae and/or micro-organisms to biofuels or bioliquids via biological and/or chemical processes with capacity 40 Ml/y of the final product.

Note: sustainability criteria as provided in Directive 2009/28/EC of the European Parliament and of the Council (2) on the promotion of the use of energy from renewable sources shall be met for biofuels and bioliquids within the meaning of that Directive.

Concentrated solar power – project subcategories:

Parabolic trough or Fresnel system using molten salts or other environmentally-benign heat transfer fluid with nominal capacity 30 MW.

Parabolic trough or Fresnel system based on Direct Steam Generation with nominal capacity 30 MW. Direct steam solar temperature to be above 500 °C.

Tower system using superheated steam cycle (either multi-tower or combination liner collectors – tower) with nominal capacity 50 MW.

Tower system using pressurised air with temperature above 750 °C and solar hybrid gas turbine with nominal capacity 30 MW.

Large-scale Stirling dish power plants with solar to electric efficiency of over 20 % and nominal capacity of at least 25 MW.

Note: Dry cooling, hybridisation and (advanced) heat storage solution may be included in the demonstration plants.

Photovoltaics – project subcategories:

Large-scale concentrator photovoltaics power plants with nominal capacity 20 MW.

Large-scale multi-junction Si-thin-film photovoltaics power plants with nominal capacity 40 MW.

Large-scale Copper indium gallium (di)selenide (CIGS)-based photovoltaics power plants with nominal capacity 40 MW.

Geothermal – project subcategories:

Enhanced geothermal systems in tensional stress fields with nominal capacity 5 MWe.

Enhanced geothermal systems in compressional stress fields with nominal capacity 5 MWe.

Enhanced geothermal systems in areas with deep compact sedimentary and granite rocks and other crystalline structures with nominal capacity 5 MWe.

Enhanced geothermal systems in deep limestone with nominal capacity 5 MWe.

Note: Combined Heat and Power (CHP) applications with the same electricity thresholds are equally eligible.

Wind – project subcategories:

Off-shore wind (minimum turbines size 6 MW) with nominal capacity 40 MW.

Off-shore wind (minimum turbines size 8 MW) with nominal capacity 40 MW.

Off-shore wind (minimum turbines size 10 MW) with nominal capacity 40 MW.

Floating off-shore wind systems with nominal capacity 25 MW.

On-shore wind turbines optimised for complex terrains (such as forested terrains or mountainous areas): with nominal capacity 25 MW.

On-shore wind turbines optimised for cold climates (compatible with temperature lower than – 30 °C and severe icing conditions) with nominal capacity 25 MW.

Ocean – project subcategories:

Wave energy devices with nominal capacity 5 MW.

Marine/tidal currents energy devices with nominal capacity 5 MW.

Ocean thermal energy conversion (OTEC) with nominal capacity 10 MW.

Hydropower – project subcategories:

Power generation with High Temperature Superconducting Generators: 20 MW.

Distributed Renewable Management (smart grids) – project subcategories:

Renewable energy management and optimisation for small and medium-scale Distributed Generators in rural environment with predominant solar generation: 20 MW on Low Voltage (LV) network + 50 MW on Medium Voltage (MV) network.

Renewable energy management and optimisation for small and medium-scale Distributed Generators in rural environment with predominant wind generation: 20 MW on LV network + 50 MW on MV network.

Renewable energy management and optimisation for small and medium-scale Distributed Generators in urban environment: 20 MW on LV network + 50 MW on MV network.

Note: The use of active loads (electric heaters/heat pumps etc.) shall not be excluded.

B.   PROJECT REQUIREMENTS

I.   Common requirements

The capacity thresholds laid down in Part A must be met.

With regard to the first round of calls for proposals, projects must demonstrate a reasonable expectation of entry into operation by 31 December 2015 on the basis of the adoption of the respective award decision by 31 December 2011.

All relevant national permits for the project must be in place and in line with relevant requirements under Union legislation or the relevant permit procedures under way and sufficiently advanced to ensure start-up of commercial operation could take place by 31 December 2015 for the first round on the basis of the adoption of the respective award decision by 31 December 2011.

The project operator has to make a binding commitment to knowledge-sharing pursuant to the requirements laid down in Article 12.

Projects shall be located in the territories of the Member States, their exclusive economic zones and their continental shelves.

II.   CCS demonstration projects

Each project has to implement the full chain (capture, transport and storage).

Each demonstration project must implement heat integration for the capture component of the process.

The capture rate has to be at least 85 % of CO2 from the flue gases to which capture is applied.

Each project has to contain an independent research block related to safety of storage sites and improvement of monitoring technologies especially in the field of brine migration, its possible pathways and impacts.


(1)  CCS power thresholds are expressed as gross electrical output before capture.

(2)   OJ L 140, 5.6.2009, p. 16.


ANNEX II

KNOWLEDGE-SHARING REQUIREMENTS

A.   Technical set-up and performance

reliability,

CO2 captured,

performance at different levels, including differences between expected and real performance,

increase in fuel demand; electricity, heat and cooling demand,

key inputs and outputs and design,

future identified Research and Development issues,

B.   Cost level

capital and operating costs,

totals and costs per unit performance (tonne CO2 stored, clean MWh produced),

C.   Project management

legislation/permitting,

stakeholder management, including interaction with Governments,

planning,

project organisation,

D.   Environmental impact

effectiveness: reduction of CO2 emissions per unit energy,

other environmental impacts at undisturbed operation,

E.   Health and safety

incidents and near misses occurred (disturbed operation),

monitoring and resolution systems to track safety,

health issues in undisturbed operation,

F.   CCS storage site performance

models and simulations (development CO2 plume – pressure front),

history match results and adjustments (assessment to be made: normal within a deviation range or significant irregularity that needs action),

behaviour of displaced brine through CO2 injection.


Top