COMMISSION DELEGATED REGULATION (EU) 2026/764
of 1 December 2025
amending Regulation (EU) 2022/869 of the European Parliament and of the Council, as regards the Union list of projects of common interest and projects of mutual interest
THE EUROPEAN COMMISSION,
Having regard to the Treaty on the Functioning of the European Union,
Having regard to Regulation (EU) 2022/869 of the European Parliament and of the Council of 30 May 2022 on guidelines for trans-European energy infrastructure, amending Regulations (EC) No 715/2009, (EU) 2019/942 and (EU) 2019/943 and Directives 2009/73/EC and (EU) 2019/944, and repealing Regulation (EU) No 347/2013 (1), and in particular Article 3(4) thereof,
Whereas:
|
(1) |
Regulation (EU) 2022/869 sets up a framework for identifying, planning and implementing projects of common interest (‘PCIs’) that are required to implement the 11 strategic geographical energy infrastructure priority corridors identified in the fields of electricity, offshore grids, hydrogen and electrolysers, and the three Union-wide energy infrastructure priority areas for smart electricity grids, smart gas grids and carbon dioxide transportation networks. It also sets up a framework for identifying, planning and implementing projects of mutual interest (‘PMIs’) developed by the Union together with third countries in the fields of electricity, hydrogen and carbon dioxide transportation networks. |
|
(2) |
Commission Delegated Regulation (EU) 2024/1041 (2) established the first Union list of PCIs and PMIs as Annex VII to Regulation (EU) 2022/869. |
|
(3) |
The eligible projects proposed for inclusion in the Union list of projects of PCIs and PMIs referred to in Article 3 of Regulation (EU) 2022/869 were all assessed against the mandatory sustainability criterion for all project categories in accordance with the provisions in that is laid down in that Regulation. Only the projects that demonstrated significant contributions to sustainability were assessed further by the regional groups referred to in Article 3 of Regulation (EU) 2022/869 who confirmed that those projects meet the criteria laid down in Article 4 of that Regulation. |
|
(4) |
The Commission has assessed the candidate projects in view of the requirements of Article 3(5) of Regulation (EU) 2022/869. |
|
(5) |
The draft regional lists of PCIs and PMIs were agreed upon by the regional groups at technical-level meetings. |
|
(6) |
On 30 September 2025, the Agency for the Cooperation of Energy Regulators (ACER) issued its opinion on the consistent application of the assessment criteria and the cost/benefit analysis across regions. Subsequently, on 24 October 2025, the regional groups’ decision-making bodies adopted the final regional lists. Pursuant to Article 3(3), second subparagraph, point (a), of Regulation (EU) 2022/869, prior to the adoption of the regional lists, all proposed projects were approved by the Member States to whose territory the projects relate. |
|
(7) |
The projects proposed for inclusion in the second Union list were subject to a public consultation. Moreover, organisations representing relevant stakeholders, including representatives of third countries, producers, distribution system operators, suppliers, local populations and consumer and environmental protection organisations were invited to the technical discussions in the regional groups and consulted on the projects proposed for inclusion in the Union list. |
|
(8) |
PCIs should be listed per strategic trans-European energy infrastructure priorities in the order laid down in Annex I to Regulation (EU) 2022/869. PMIs that are not required to implement the energy infrastructure priority corridors and areas set out in Annex I to Regulation (EU) 2022/869, should be listed separately as per the infrastructure category they belong to and by the region where they are located. |
|
(9) |
PCIs and PMIs should be listed either as stand-alone PCIs and PMIs or as a part of a cluster of several PCIs and PMIs where they are interdependent or (potentially) competing. |
|
(10) |
In the case of Cyprus and Malta regarding one interconnection for each of those Member States, which is provided for in Article 24 of Regulation (EU) 2022/869, the Commission has received the documentation required in accordance with paragraphs 1 and 2 of that Article. The respective projects were presented during the technical regional group meetings and the relevant documentation, excluding business secrets, was published. One interconnection for Malta and one interconnection for Cyprus, which are necessary to interconnect those Member States to the trans-European gas network, should, therefore, maintain their status as PCIs. |
|
(11) |
The Union list contains projects at different stages of their development, including the pre-feasibility, feasibility, permit-granting and construction. For PCIs and PMIs at an early stage of development, studies may be needed to demonstrate technical and economic viability and compliance with Union legislation, including environmental legislation. In this context, potential negative impacts on the environment should be adequately identified, assessed and avoided or mitigated. Moreover, relevant climate adaptation measures as regards the development of the projects should be identified and taken into consideration. |
|
(12) |
The inclusion of projects on the Union list is without prejudice to the outcome of the relevant environmental assessment and permit procedure. |
|
(13) |
Regulation (EU) 2022/869 should therefore be amended accordingly, |
HAS ADOPTED THIS REGULATION:
Article 1
Annex VII to Regulation (EU) 2022/869 is replaced by the text in the Annex to this Regulation.
Article 2
This Regulation shall enter into force on the twentieth day following that of its publication in the Official Journal of the European Union.
This Regulation shall be binding in its entirety and directly applicable in all Member States.
Done at Brussels, 1 December 2025.
For the Commission
The President
Ursula VON DER LEYEN
(1) OJ L 152, 3.6.2022, p. 45, ELI: http://data.europa.eu/eli/reg/2022/869/oj.
(2) Commission Delegated Regulation (EU) 2024/1041 of 28 November 2023 amending Regulation (EU) 2022/869 of the European Parliament and of the Council as regards the Union list of projects of common interest and projects of mutual interest (OJ L, 2024/1041, 8.4.2024, ELI: http://data.europa.eu/eli/reg_del/2024/1041/oj).
ANNEX
‘ANNEX VII
THE UNION LIST OF PROJECTS OF COMMON INTEREST AND PROJECTS OF MUTUAL INTEREST (“UNION LIST”)
(referred to in Article 3(4))
A. PRINCIPLES APPLIED IN ESTABLISHING THE UNION LIST
|
(1) |
Clusters of PCIs and PMIs
Some PCIs/PMIs form part of a cluster because of their interdependent, potentially competing or competing nature. The following types of clusters of PCIs/PMIs have been drawn up:
|
|
(2) |
Treatment of substations and compressor stations
Substations and back-to-back electricity stations and compressor stations are considered parts of PCIs/PMIs if they are geographically located on transmission lines or next to pipelines, as the case may be. Substations, back-to-back stations and compressor stations are considered stand-alone PCIs and are listed explicitly on the Union list if their geographical location is different from transmission lines or pipelines, as the case may be. They are subject to the rights and obligations laid down in Regulation (EU) 2022/869. |
|
(3) |
Projects that are no longer considered PCIs or PMIs, and projects that have become part of other PCIs or PMIs
Several projects included in the first Union list are no longer considered PCIs or PMIs for one or more of the following reasons:
Those projects (with the exception of the projects commissioned or to be commissioned by March 2026) may be considered for inclusion on the next Union list if the reasons for non-inclusion in the current Union list no longer apply. Such projects are not PCIs or PMIs but, for reasons of transparency and clarity, are listed with their original PCI or PMI numbers in part C of this Annex as “Projects no longer considered PCIs or PMIs”. Some projects included in the first Union list became, during their implementation process, integral parts of other (clusters of) PCIs or PMIs. Such projects are no longer considered independent PCIs or PMIs but, for reasons of transparency and clarity, are listed with their original PCI or PMI numbers in part C of this Annex as “Projects that are now integral parts of other PCIs or PMIs”. |
|
(4) |
Non-eligible parts of the PCI/PMI projects
Some PCI/PMI projects include one or more non-eligible investments. These following investments shall not be considered as part of the Union list:
|
|
(5) |
Numbering of the projects on the Union list
Projects that were included in the first Union list shall retain their original PCI/PMI number in the current Union list. Projects that are newly included in the current Union list shall be assigned a new unique PCI/PMI number. |
B. THE UNION LIST OF PROJECTS OF COMMON INTEREST AND PROJECTS OF MUTUAL INTEREST
|
(1) |
North-South electricity interconnections in Western Europe (NSI West Electricity)
Projects of common interest developed in the region:
Projects of mutual interest developed in the region:
|
|
(2) |
North-South electricity interconnections in Central Eastern and South Eastern Europe (NSI East Electricity)
Projects of common interest developed in the region:
Projects of mutual interest developed in the region:
|
|
(3) |
Baltic Energy Market Interconnection Plan in electricity (BEMIP Electricity)
Projects of common interest developed in the region:
|
|
(4) |
Northern Seas offshore grids (NSOG):
Projects of common interest developed in the region:
Projects of mutual interest developed in the region:
|
|
(5) |
Baltic Energy Market Interconnection Plan offshore grids (BEMIP offshore):
Projects of common interest developed in the region:
|
|
(6) |
South and West offshore grids (SW offshore):
Projects of common interest developed in the region:
|
|
(7) |
South and East offshore grids (SE offshore):
No projects were submitted for this corridor. |
|
(8) |
Atlantic offshore grids:
Projects of common interest developed in the region:
|
|
(9) |
Hydrogen interconnections in Western Europe (HI West):
Projects of common interest developed in the region:
Projects of mutual interest developed in the region:
|
|
(10) |
Hydrogen interconnections in Central Eastern and South Eastern Europe (HI East):
Projects of common interest developed in the region:
Projects of mutual interest developed in the region:
|
|
(11) |
Baltic Energy Market Interconnection Plan in hydrogen (BEMIP Hydrogen):
Projects of common interest developed in the region:
|
|
(12) |
Priority Thematic Area Smart electricity grids deployment:
Projects of common interest developed in the thematic area:
|
|
(13) |
Priority Thematic Area Cross-border carbon dioxide network:
Projects of common interest developed in the thematic area:
Projects of mutual interest developed in the thematic area:
|
|
(14) |
Priority Thematic Area Smart gas grids:
|
|
(15) |
Projects that maintain their status of project of common interest (Article 24 derogation):
|
C. LISTS OF THE “PROJECTS NO LONGER CONSIDERED PCIS OR PMIS” AND OF THE “PROJECTS THAT ARE NOW INTEGRAL PARTS OF OTHER PCIS or PMIS”
|
(1) |
North-South electricity interconnections in Western Europe (NSI West Electricity)
PCI/PMI numbers of the projects no longer considered PCIs/PMIs
|
|
(2) |
North-South electricity interconnections in Central Eastern and South Eastern Europe (NSI East Electricity)
PCI/PMI numbers of the projects no longer considered PCIs/PMIs
|
|
(3) |
Baltic Energy Market Interconnection Plan in electricity (BEMIP Electricity)
PCI/PMI numbers of the projects no longer considered PCIs/PMIs
|
|
(4) |
Northern Seas offshore grids (NSOG)
PCI/PMI numbers of the projects no longer considered PCIs/PMIs
|
|
(9) |
Hydrogen interconnections in Western Europe (HI West)
PCI/PMI numbers of the projects no longer considered PCIs/PMIs
|
|
(10) |
Hydrogen interconnections in Central Eastern and South Eastern Europe (HI East)
Projects that are now integral parts of other PCIs/PMIs
|
|
(12) |
Priority Thematic Area Smart electricity grids deployment
PCI/PMI numbers of the projects no longer considered PCIs/PMIs
|
|
(13) |
Priority Thematic Area Cross-border carbon dioxide network
PCI/PMI numbers of the projects no longer considered PCIs/PMIs
|