ISSN 1977-091X |
||
Official Journal of the European Union |
C 442 |
|
![]() |
||
English edition |
Information and Notices |
Volume 57 |
Notice No |
Contents |
page |
|
IV Notices |
|
|
NOTICES FROM EUROPEAN UNION INSTITUTIONS, BODIES, OFFICES AND AGENCIES |
|
|
Court of Auditors |
|
2014/C 442/01 |
Summary of the results of the Court’s 2013 annual audits of the European Agencies and other bodies |
|
2014/C 442/02 |
||
2014/C 442/03 |
||
2014/C 442/04 |
||
2014/C 442/05 |
||
2014/C 442/06 |
||
2014/C 442/07 |
||
2014/C 442/08 |
||
2014/C 442/09 |
||
2014/C 442/10 |
||
2014/C 442/11 |
||
2014/C 442/12 |
||
2014/C 442/13 |
||
2014/C 442/14 |
||
2014/C 442/15 |
||
2014/C 442/16 |
||
2014/C 442/17 |
||
2014/C 442/18 |
||
2014/C 442/19 |
||
2014/C 442/20 |
||
2014/C 442/21 |
||
2014/C 442/22 |
||
2014/C 442/23 |
||
2014/C 442/24 |
||
2014/C 442/25 |
||
2014/C 442/26 |
||
2014/C 442/27 |
||
2014/C 442/28 |
||
2014/C 442/29 |
||
2014/C 442/30 |
||
2014/C 442/31 |
||
2014/C 442/32 |
||
2014/C 442/33 |
||
2014/C 442/34 |
||
2014/C 442/35 |
||
2014/C 442/36 |
||
2014/C 442/37 |
||
2014/C 442/38 |
||
2014/C 442/39 |
||
2014/C 442/40 |
||
2014/C 442/41 |
||
2014/C 442/42 |
||
EN |
|
IV Notices
NOTICES FROM EUROPEAN UNION INSTITUTIONS, BODIES, OFFICES AND AGENCIES
Court of Auditors
10.12.2014 |
EN |
Official Journal of the European Union |
C 442/1 |
Summary of the results of the Court’s 2013 annual audits of the European Agencies and other bodies
(2014/C 442/01)
CONTENTS
|
Paragraph |
Page |
||
Introduction |
1 — 5 |
2 |
||
Information in support of the Court’s opinions |
6 |
2 |
||
Audit results |
7 — 20 |
2 |
||
Opinions on the reliability of the accounts |
7 — 8 |
2 |
||
Opinions on the legality and regularity of the transactions underlying the accounts |
9 — 11 |
3 |
||
Comments not calling the Court’s opinions into question |
12 — 20 |
3 |
||
Comments on the reliability of accounts |
14 |
4 |
||
Comments on the legality and regularity of transactions |
15 |
4 |
||
Comments on internal controls |
16 |
4 |
||
Comments on budget implementation |
17 — 18 |
4 |
||
Other comments |
19 |
4 |
||
Follow-up of previous years’ comments |
20 |
4 |
||
Conclusions |
21 — 23 |
4 |
||
|
6 |
|||
|
11 |
|||
|
15 |
INTRODUCTION
1. |
Pursuant to the provisions of Article 287 of the Treaty on the functioning of the European Union, the Court has audited the annual accounts (1) for the financial year ended 31 December 2013 and the legality and regularity of the transactions underlying them for 32 decentralised agencies (2), 6 executive agencies, the Euratom Supply Agency (Euratom), the European Institute of Innovation and Technology (EIT) and the Europol Pension Fund (hereinafter ‘agencies’). Details on the audited agencies, their budgets and staff are provided in Annex I. |
|
3. |
Decentralised agencies play an important role in implementing EU policies, especially tasks of a technical, scientific, operational and/or regulatory nature. Their aim is to allow the Commission to concentrate on policymaking and to reinforce cooperation between the EU and national governments by pooling technical and specialist expertise from both sides. They are located throughout the EU. Executive agencies assist the Commission in the implementation of Union spending programmes. They are set up for a fixed period and based in the same location as the Commission. |
4. |
The agencies’ 2013 budget amounted to some 2 billion euro (2012: EUR 1,6 billion euro), i.e. about 1,4 % of the EU general budget (2012: 1,2 %). Approximately 1 billion euro comes from the European Commission’s subsidies and the rest is income from fees and other sources. The agencies employ some 6 500 (2012: 6 100) permanent and temporary officials, i.e. 14 % (2012: 13 %) of the total number of EU officials authorised under the EU general budget (staff establishment plan). In addition, some 2 900 other staff are working for the agencies (contract or seconded staff). |
5. |
Whereas financial risk related to the agencies is relatively low compared to the total EU budget, the reputational risk for the Union is high: they are highly visible in the Member States and they have significant influence on policy- and decision-making and programme implementation in areas of vital importance to European citizens, i.e. health, safety, security, freedom and justice. |
INFORMATION IN SUPPORT OF THE COURT’S OPINIONS
6. |
The audit approach taken by the Court comprises analytical audit procedures, direct testing of transactions and an assessment of the agencies’ internal controls. This is supplemented by evidence provided by the work of other auditors (where relevant) and an analysis of management representations. In order to consider the particular risks involved, the 2013 audit placed special emphasis on the legality and regularity of grant transactions (in the 11 agencies concerned, see Annex II) and related internal controls. The audit of recruitment procedures focused on a follow-up of previous years’ findings. |
AUDIT RESULTS
Opinions on the reliability of the accounts
7. |
The final accounts of all agencies present fairly, in all material respects, their financial position as at 31 December 2013 and the results of their operations and their cash flows for the year then ended, in accordance with the provisions of the applicable Financial Regulations and the accounting rules adopted by the Commission’s Accounting Officer. |
8. |
Without calling into question its opinion expressed for eu-LISA, the Court’s emphasis of matter (3) paragraph draws attention to the valuation of the Schengen Information System (SIS II), the Visa Information System (VIS) and Eurodac (systems) in the Agency’s accounts. The operational management of these systems was transferred to the Agency from the Commission in May 2013 by way of a non-exchange transaction and is the core task of the Agency. In the absence of reliable and complete information in respect of their total development cost, they are recorded in the Agency’s accounts at their net book values as per the Commission’s books and updated at year end. These values relate mainly to hardware and off-the-shelf software components and do not include software development costs. |
Opinions on the legality and regularity of the transactions underlying the accounts
9. |
As was the case last year, the Court concluded that the transactions underlying the annual accounts for the year ended 31 December 2013 were legal and regular in all material respects for all agencies except EIT and Frontex (European Agency for the Management of Operational Cooperation at the External Borders). |
10. |
A qualified opinion (4) was issued for EIT. Despite further improvements in the Institute’s ex ante and ex post verifications, a material, but not pervasive level of error was found in relation to the legality and regularity of grant transactions and to procurements. |
11. |
The Court also issued a qualified opinion for Frontex. There is still insufficient audit evidence on the legality and regularity of grant transactions. Despite the introduction of more comprehensive ex ante verifications for grant agreements signed since June 2013, the majority of 2013 transactions resulted from grant agreements signed before that date. The possible effects are material but no longer pervasive, as was the case last year (5). |
Comments not calling the Court’s opinions into question
12. |
Without calling its opinions into question, the Court made a total of 97 (2012: 123) comments affecting 35 agencies to highlight matters of importance and to indicate room for improvement. Comments were made regarding the reliability of accounts, the legality and regularity of transactions, internal controls, budget implementation and other matters such as sound financial management. Having audited recruitment procedures in detail for several years, the 2013 audit was a follow-up of previous years’ findings in this area (hence the decrease in the number of comments) (6). |
Chart 1
Number of comments by heading
Source: Specific reports on the agencies’ 2013 annual accounts.
13. |
An overview of the comments made for each of the agencies is provided in Annex II. A summary of the most frequent comments is provided below. |
Comments on the reliability of accounts
14. |
Four comments were made in relation to four agencies and addressed weaknesses in the recording of accruals, the completeness of notes to the financial statements, the accounting of fixed assets and the reconciliation of suppliers’ statements at year-end. (Last year, five of the seven comments made related to non-validated accounting systems which have since been validated by the agencies’ accountants.) |
Comments on the legality and regularity of transactions
15. |
The seven comments concern seven agencies. Six of them relate to weaknesses in procurement procedures in areas such as transparency of the outsourcing procedures, consistency between contract notice and tender specifications, the consistent application of eligibility/selection criteria, and the extension of framework contracts. Last year, the same number of comments was made on procurement procedures. |
Comments on internal controls
16. |
The 17 comments (2012: 34) concern 10 agencies (2012: 22). In four cases (2012: five) they related to weaknesses in the implementation of internal control standards, either because they had not been adopted at year-end or they were adopted but only partially implemented, or corrective action was still ongoing. A positive development is the decrease in comments made on fixed assets management (from seven in 2012 to two in 2013) and grant management (from five in 2012 to two in 2013). |
Comments on budget implementation
17. |
A high level of carry-overs of committed appropriations remains the most frequent comment in this area and concerned 24 (2012: 26) agencies. Although a high level of carry-overs is usually considered to be at odds with the budgetary principle of annuality and can indicate weaknesses in budget planning and implementation, it often resulted from events (partly) beyond the agencies’ control (e.g. invoices or cost declarations that had not been received by the year-end) or were justified by the multiannual nature of operations, procurement procedures or projects. |
18. |
High levels of cancellations of carry-overs from previous years were noted in seven cases (2012: nine). Such cancellations indicate that the appropriations carried over were made on the basis of overestimated needs or were otherwise not justified. |
Other comments
19. |
There were 22 (2012: 27) other comments which concerned 15 agencies (2012: 20). Six related to the absence of headquarter agreements with agencies’ host countries and 11 were to matters of sound financial management, for example:
|
Follow-up of previous years’ comments
20. |
Annex III shows that for the 192 open comments at the end of 2012, in 2013 corrective action was completed in 94 cases, ongoing in 47 and outstanding in five cases (no corrective action was required for 46 comments, mainly in relation to budget carry-overs). |
CONCLUSIONS
21. |
All agencies prepared their accounts in accordance with the provisions of the applicable Financial Regulations and the accounting rules adopted by the Commission’s Accounting Officer. |
22. |
The Court concluded that transactions underlying the accounts were legal and regular for all except two agencies. Qualified opinions were issued for EIT and Frontex (mainly in relation to grant transactions). |
23. |
Agencies further improved their procedures by taking corrective action in response to the Court’s comments from previous years. Nevertheless, there is considerable room for improvement, as indicated by the high number of comments made in respect of 2013. |
(1) These comprise the ‘financial statements’ and the ‘reports on the implementation of the budget’.
(2) The European Agency for the Operational Management of Large-Scale IT Systems in the Area of Freedom, Security and Justice (eu-LISA) was granted financial autonomy by the Commission on 22 May 2013 and was audited by the Court for the first time in 2013.
(3) An Emphasis of Matter paragraph is used to draw readers’ attention to a matter which is not materially misstated in the accounts, but is of such importance that it is fundamental to users’ understanding of the accounts.
(4) The Court expresses a qualified opinion when the auditor has obtained sufficient appropriate audit evidence and concludes that misstatements or instances of non-compliance are material, but not pervasive, to the annual accounts or underlying transactions (as outlined in paragraph 10). The Court also expresses a qualified opinion when the auditor is unable to obtain sufficient appropriate audit evidence on which to base the opinion, and the possible effects on the annual accounts or underlying transactions of that inability are material but not pervasive (as outlined in paragraph 11).
(5) The Court gave a disclaimer of opinion for the financial year 2012.
(6) In 2013, the Court made 3 recruitment-related comments (2012: 17).
ANNEX I
Agencies' income (budget forecasts, entitlements established and amounts received) and staff establishment plans
|
2013 |
2012 |
||||||||||
Agency |
Parent DG |
Policy Area |
Forecasted income budget (2) (million euro) |
Change of forecasted Income budget 2013 vs 2012 |
Entitlements established (2) (million euro) |
Amounts received (2) (million euro) |
Staff establishment plan (3) |
Change of establishment plan 2013 vs 2012 |
Forecasted income budget (4) (million euro) |
Entitlements established (4) (million euro) |
Amounts received (4) (million euro) |
Staff establishment plan (3) |
Decentralised Agencies |
|
|
|
|
|
|
|
|
||||
European Medicines Agency — EMA |
SANCO |
Health and Consumer |
252 |
14 % |
269 |
240 |
611 |
4 % |
222 |
254 |
224 |
590 |
Office for Harmonization in the Internal Market — OHIM |
MARKT |
Internal Market and Services |
418 |
-3 % |
189 |
189 |
861 |
11 % |
429 |
176 |
176 |
775 |
European Aviation Safety Agency — EASA |
MOVE |
Mobility and Transport |
151 |
1 % |
125 |
125 |
692 |
9 % |
150 |
116 |
115 |
634 |
European Agency for the Management of Operational Cooperation at the External Borders — Frontex |
HOME |
Home Affairs |
94 |
4 % |
92 |
92 |
153 |
7 % |
90 |
76 |
76 |
143 |
European Police Office — Europol |
HOME |
Home Affairs |
83 |
-1 % |
83 |
83 |
457 |
0 % |
84 |
83 |
83 |
457 |
European Food Safety Authority — EFSA |
SANCO |
Health and Consumer |
76 |
-1 % |
76 |
76 |
351 |
-1 % |
77 |
77 |
77 |
355 |
European Maritime Safety Agency — EMSA |
MOVE |
Mobility and Transport |
57 |
-3 % |
58 |
56 |
213 |
0 % |
59 |
54 |
53 |
213 |
European Centre for Disease Prevention and Control — ECDC |
SANCO |
Health and Consumer |
58 |
0 % |
59 |
59 |
198 |
-1 % |
58 |
58 |
58 |
200 |
Translation Centre for the Bodies of the European Union — CdT |
DGT |
Translation |
52 |
8 % |
54 |
50 |
206 |
-6 % |
48 |
49 |
45 |
220 |
European Environment Agency — EEA |
ENV |
Environment |
49 |
17 % |
63 |
63 |
138 |
1 % |
42 |
52 |
51 |
136 |
European Body for the Enhancement of Judicial Cooperation — Eurojust |
JUST |
Justice |
32 |
-3 % |
32 |
32 |
213 |
0 % |
33 |
33 |
33 |
213 |
European Chemicals Agency — ECHA |
ENTR |
Enterprise and Industry |
99 |
200 % |
98 |
98 |
503 |
7 % |
33 |
35 |
35 |
470 |
European Railway Agency — ERA |
MOVE |
Mobility and Transport |
26 |
0 % |
26 |
26 |
143 |
-1 % |
26 |
26 |
26 |
144 |
European Union Agency for Fundamental Rights — FRA |
JUST |
Justice |
22 |
5 % |
22 |
22 |
78 |
4 % |
21 |
21 |
21 |
75 |
European Banking Authority — EBA |
MARKT |
Internal Market and Services |
26 |
24 % |
26 |
26 |
93 |
37 % |
21 |
19 |
19 |
68 |
European foundation for the improvement of living & working conditions — Eurofound |
EMPL |
Internal Market and Services |
21 |
0 % |
21 |
21 |
101 |
0 % |
21 |
21 |
21 |
101 |
European Training Foundation — ETF |
EAC |
Education and Culture |
20 |
-5 % |
22 |
22 |
96 |
0 % |
21 |
20 |
20 |
96 |
European Securities and Markets Authority — ESMA |
MARKT |
Internal Market and Services |
28 |
40 % |
30 |
30 |
121 |
61 % |
20 |
19 |
19 |
75 |
European Centre for the Development of Vocational Training — Cedefop |
EAC |
Education and Culture |
19 |
0 % |
18 |
18 |
100 |
-1 % |
19 |
20 |
20 |
101 |
European Insurance and Occupational Pensions Authority — EIOPA |
MARKT |
Internal Market and Services |
19 |
19 % |
18 |
18 |
80 |
16 % |
16 |
14 |
14 |
69 |
European Monitoring Centre for Drugs and Drug Addiction — EMCDDA |
HOME |
Home Affairs |
16 |
0 % |
16 |
16 |
84 |
0 % |
16 |
16 |
16 |
84 |
European Agency for Safety and Health at Work — EU-OSHA |
EMPL |
Internal Market and Services |
15 |
0 % |
16 |
16 |
44 |
0 % |
15 |
15 |
15 |
44 |
Community Plant Variety Office — CPVO |
SANCO |
Health and Consumer |
14 |
8 % |
13 |
13 |
48 |
4 % |
13 |
13 |
13 |
46 |
European GNSS Agency — GSA |
ENTR |
Enterprise and Industry |
14 |
8 % |
54 |
54 |
77 |
75 % |
13 |
21 |
21 |
44 |
European Fisheries Control Agency — EFCA |
MARE |
Maritime Affairs & Fisheries |
9 |
-10 % |
9 |
9 |
54 |
0 % |
10 |
10 |
10 |
54 |
European Institute for Gender equality— EIGE |
JUST |
Justice |
7 |
-13 % |
8 |
8 |
30 |
0 % |
8 |
8 |
8 |
30 |
European Police College — CEPOL |
HOME |
Home Affairs |
8 |
0 % |
9 |
9 |
28 |
0 % |
8 |
9 |
9 |
28 |
European Union Agency for Network and Information Security — ENISA |
CONNECT |
Communication Networks, Content and Technology |
10 |
25 % |
10 |
9 |
47 |
0 % |
8 |
8 |
8 |
47 |
Agency for the Cooperation of Energy Regulators — ACER |
ENER |
Energy |
12 |
71 % |
12 |
12 |
49 |
14 % |
7 |
7 |
7 |
43 |
European Asylum Support Office — EASO |
HOME |
Home Affairs |
11 |
57 % |
10 |
10 |
45 |
18 % |
7 |
2 |
2 |
38 |
Office of the Body of European Regulators for Electronic Communications — BEREC |
CONNECT |
Communication Networks, Content and Technology |
4 |
33 % |
4 |
4 |
16 |
0 % |
3 |
3 |
3 |
16 |
European Agency for the Operational Management of Large-Scale IT Systems in the Area of Freedom, Security and Justice — eu-LISA |
HOME |
Home Affairs |
34 |
|
19 |
19 |
120 |
financially autonomous from 2013 |
n/a |
n/a |
n/a |
n/a |
Executive Agencies |
|
|
|
|
|
|
|
|
|
|
|
|
Education, Audiovisual and Culture Executive Agency — EACEA |
EAC |
Education and Culture |
51 |
2 % |
52 |
52 |
105 |
2 % |
50 |
50 |
50 |
103 |
Research Executive Agency — REA |
RTD |
Research and Innovation |
47 |
2 % |
47 |
47 |
140 |
9 % |
46 |
47 |
47 |
128 |
European Research Council Executive Agency — ERCEA |
RTD |
Research and Innovation |
40 |
3 % |
40 |
40 |
100 |
0 % |
39 |
39 |
39 |
100 |
Executive Agency for Competitiveness and Innovation — EACI |
ENER |
Energy |
16 |
0 % |
16 |
16 |
37 |
0 % |
16 |
17 |
17 |
37 |
Trans-European Transport Network Executive Agency — TEN-T EA |
MOVE |
Mobility and Transport |
10 |
0 % |
10 |
10 |
33 |
0 % |
10 |
10 |
10 |
33 |
Executive Agency for Health and Consumers — EAHC |
SANCO |
Health and Consumer |
7 |
0 % |
7 |
7 |
12 |
0 % |
7 |
7 |
7 |
12 |
Other Bodies |
|
|
|
|
|
|
|
|
|
|
|
|
European Institute of Innovation and Technology — EIT |
EAC |
Education and Culture |
99 |
27 % |
97 |
97 |
34 |
21 % |
78 |
77 |
77 |
28 |
Euratom Supply Agency (1) — Euratom |
ENER & RTD |
Energy & Research and Innovation |
0,1 |
0 % |
0,1 |
0,1 |
25 |
0 % |
0,1 |
0,1 |
0,1 |
25 |
Europol Pension Fund — EPF |
HOME |
Administrative Expenditure of Europol |
n/a |
|
n/a |
n/a |
n/a |
|
n/a |
n/a |
n/a |
n/a |
Total |
|
|
2 026 |
10 % |
1 830 |
1 794 |
6 536 |
8 % |
1 844 |
1 582 |
1 545 |
6 075 |
|
|
2013 |
2012 |
|||||||||
|
Commission subsidy part in agencies’ income: |
|
51,9 % |
64,0 % |
||||||||
|
Agencies’ forecasted income budget in comparison with EU general budget: |
|
1,4 % |
1,4 % |
||||||||
|
Agencies’ staff stablishment plan in comparison with total under the EU general budget: |
|
14,0 % |
13,1 % |
(1) Euratom Supply Agency is not consolidated in the EU annual accounts.
(2) According to 2013 provisional consolidated EU annual accounts.
(3) Permanent and temporary EU officials (AD and AST) only, according to staff establishment plan. In addition, some 2 880 staff are working for EU agencies on the basis of temporary or secondment contracts.
(4) According to 2012 final consolidated EU annual accounts (adjusted for OHIM).
ANNEX II
Comments made by the Court in 2013, not calling its opinion into question
|
Total No of comments |
Reliability of accounts |
Legality/Regularity of Transactions |
Internal Controls |
Budget Implementation |
Other comments |
||||||||||||
Weaknesses in procurement procedures |
Other |
ICS not fully implemented |
Weak controls over fixed assets/stock taking |
Weak grant controls |
Other |
High carry-overs |
High budget transfers |
High cancellations of 2012 carry-overs |
Insufficient commitments |
Other |
Recruitment |
SFM |
No headquarters agreement with MS |
Other |
||||
1 |
ACER — Ljubljana |
3 |
|
|
|
|
|
|
|
X |
|
|
|
X |
|
X |
|
|
2 |
BEREC — Riga |
2 |
|
|
|
|
|
|
|
|
|
X |
|
|
|
X |
|
|
3 |
CdT — Luxembourg |
4 |
|
X |
|
|
|
|
X |
|
|
|
|
|
|
X |
X |
|
4 |
Cedefop — Thessaloniki (1) |
0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5 |
CEPOL — Bramshill (1) |
3 |
|
|
|
|
|
|
|
X |
|
X |
|
|
X |
|
|
|
6 |
EFCA — Vigo |
1 |
|
|
|
|
|
|
|
X |
|
|
|
|
|
|
|
|
7 |
CPVO — Angers |
1 |
|
|
|
|
|
|
|
|
|
|
X |
|
|
|
|
|
8 |
EACEA — Brussels |
1 |
|
|
|
|
|
|
|
X |
|
|
|
|
|
|
|
|
9 |
EACI — Brussels |
1 |
|
|
|
|
|
|
|
|
|
X |
|
|
|
|
|
|
10 |
EAHC — Luxembourg |
3 |
|
|
|
|
|
|
|
X |
|
X |
X |
|
|
|
|
|
11 |
EASA — Cologne |
3 |
|
X |
|
|
|
|
|
X |
|
|
|
|
|
|
X |
|
12 |
EASO — Valletta (1) |
6 |
X |
|
|
X |
|
|
X |
X |
|
|
|
X |
X |
|
|
|
13 |
EBA — London |
2 |
|
|
|
|
|
|
|
X |
|
|
X |
|
|
|
|
|
14 |
ECDC — Stockholm (1) |
4 |
|
X |
|
|
|
|
|
X |
|
X |
X |
|
|
|
|
|
15 |
ECHA — Helsinki |
2 |
|
|
|
|
|
|
|
X |
|
|
|
|
|
|
|
X |
16 |
EEA — Copenhagen (1) |
1 |
|
|
|
|
|
X |
|
|
|
|
|
|
|
|
|
|
17 |
EFSA — Parma (1) |
3 |
|
|
|
X |
|
X |
X |
|
|
|
|
|
|
|
|
|
18 |
EIGE — Vilnius |
1 |
|
|
|
|
|
|
|
X |
|
|
|
|
|
|
|
|
19 |
EIOPA — Frankfurt |
4 |
|
|
|
X |
|
|
XX |
X |
|
|
|
|
|
|
|
|
20 |
EIT — Budapest (1) |
4 |
|
|
X |
|
|
|
|
X |
|
X |
X |
|
|
|
|
|
21 |
EMA — London |
0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
22 |
EMCDDA — Lisbon (1) |
1 |
|
X |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
23 |
EMSA — Lisbon |
0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
24 |
ENISA — Heraklion |
4 |
|
|
|
|
|
|
|
X |
|
|
X |
|
|
XX |
|
|
25 |
ERA — Valenciennes |
5 |
|
|
|
|
|
|
X |
|
|
|
|
|
X |
X |
X |
X |
26 |
ERCEA — Brussels |
0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
27 |
ESMA — Paris |
4 |
|
|
|
|
|
|
|
X |
X |
|
|
|
|
XX |
|
|
28 |
ETF — Turin |
1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
X |
|
|
29 |
eu-LISA — Tallinn |
8 |
|
|
|
X |
X |
|
|
|
|
|
|
XXXX |
|
X |
X |
|
30 |
EU-OSHA — Bilbao |
1 |
|
|
|
|
|
|
|
X |
|
|
|
|
|
|
|
|
31 |
Euratom — Luxembourg |
2 |
X |
|
|
|
|
|
X |
|
|
|
|
|
|
|
|
|
32 |
Eurofound — Dublin |
4 |
X |
|
|
|
X |
|
|
X |
|
|
|
|
|
|
X |
|
33 |
Eurojust — The Hague (1) |
2 |
|
|
|
|
|
|
|
X |
X |
|
|
|
|
|
|
|
34 |
Europol — The Hague |
2 |
|
X |
|
|
|
|
|
X |
|
|
|
|
|
|
|
|
35 |
EPF — The Hague |
0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
36 |
FRA — Vienna |
1 |
|
|
|
|
|
|
|
X |
|
|
|
|
|
|
|
|
37 |
Frontex — Warsaw (1) |
5 |
X |
|
|
|
|
|
|
X |
X |
|
|
X |
|
|
X |
|
38 |
GSA — Prague (1) |
2 |
|
X |
|
|
|
|
|
X |
|
|
|
|
|
|
|
|
39 |
OHIM — Alicante |
3 |
|
|
|
|
|
|
|
X |
|
X |
|
|
|
X |
|
|
40 |
REA — Brussels |
0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
41 |
TEN-T EA — Brussels |
3 |
|
|
|
|
|
|
XX |
X |
|
|
|
|
|
|
|
|
Subtotals: |
97 |
4 |
6 |
1 |
4 |
2 |
2 |
9 |
24 |
3 |
7 |
6 |
7 |
3 |
11 |
6 |
2 |
|
Totals: |
4 |
7 |
17 |
47 |
22 |
|||||||||||||
|
|
4 % |
7 % |
18 % |
48 % |
23 % |
(1) Grant management
ANNEX III
Follow-up of open 2011 and 2012 comments not calling the Court’s opinions into question
|
|
Total |
Completed |
Ongoing |
Outstanding |
N/A |
|
Decentralised Agencies |
|
|
|
|
|
1 |
European Medicines Agency — EMA |
8 |
4 |
1 |
|
3 |
2 |
Office for Harmonization in the Internal Market — OHIM |
5 |
2 |
|
|
3 |
3 |
European Aviation Safety Agency — EASA |
5 |
3 |
|
|
2 |
4 |
European Agency for the Management of Operational Cooperation at the External Borders — Frontex |
10 |
4 |
6 |
|
|
5 |
European Police Office — Europol |
14 |
10 |
1 |
|
3 |
6 |
European Food Safety Authority — EFSA |
6 |
3 |
1 |
|
2 |
7 |
European Maritime Safety Agency — EMSA |
6 |
3 |
2 |
|
1 |
8 |
European Centre for Disease Prevention and Control — ECDC |
3 |
|
1 |
|
2 |
9 |
Translation Centre for the Bodies of the EU — CdT |
2 |
|
2 |
|
|
10 |
European Environment Agency — EEA |
1 |
|
1 |
|
|
11 |
European Body for the Enhancement of Judicial Cooperation — Eurojust |
4 |
2 |
1 |
|
1 |
12 |
European Chemicals Agency — ECHA |
4 |
2 |
|
|
2 |
13 |
European Railway Agency — ERA |
6 |
3 |
3 |
|
|
14 |
European Union Agency for Fundamental Rights — FRA |
3 |
2 |
|
|
1 |
15 |
European Banking Authority — EBA |
7 |
5 |
1 |
|
1 |
16 |
European fFoundation for the Improvement of Living and Working Conditions — Eurofound |
0 |
|
|
|
|
17 |
European Training Foundation — ETF |
1 |
|
|
|
1 |
18 |
European Securities and Markets Authority — ESMA |
13 |
4 |
6 |
0 |
3 |
19 |
European Centre for the Development of Vocational Training — Cedefop |
5 |
4 |
|
|
1 |
20 |
European Insurance and Occupational Pensions Authority — EIOPA |
6 |
4 |
|
1 |
1 |
21 |
European Monitoring Centre for Drugs and Drug Addiction — EMCDDA |
6 |
2 |
4 |
0 |
|
22 |
European Agency for Safety and Health at Work — EU-OSHA |
4 |
3 |
1 |
|
|
23 |
Community Plant Variety Office — CPVO |
3 |
1 |
2 |
|
|
24 |
European GNSS Agency — GSA |
3 |
2 |
|
|
1 |
25 |
European Fisheries Control Agency — EFCA |
3 |
2 |
|
|
1 |
26 |
European Institute for Gender Equality — EIGE |
4 |
2 |
2 |
|
|
27 |
European Police College — CEPOL |
10 |
2 |
4 |
1 |
3 |
28 |
European Union Agency for Network and Information Security — ENISA |
2 |
1 |
1 |
|
|
29 |
Agency for the Cooperation of Energy Regulators — ACER |
7 |
5 |
2 |
|
|
30 |
European Asylum Support Office — EASO |
12 |
2 |
1 |
1 |
8 |
31 |
Office of the Body of European Regulators for Electronic Communications — BEREC |
14 |
11 |
3 |
|
|
32 |
European Agency for the Operational Management of Large-Scale IT Systems in the Area of Freedom, Security and Justice — eu-LISA (1) |
|
|
|
|
|
|
Executive Agencies |
|
|
|
|
|
33 |
Education, Audovisual and Culture Executive Agency — EACEA |
1 |
|
|
|
1 |
34 |
Research Executive Agency — REA |
2 |
1 |
|
|
1 |
35 |
European Research Council Executive Agency — ERCEA |
0 |
|
|
|
|
36 |
Executive Agency for Competitiveness and Innovation — EACI |
2 |
2 |
|
|
|
37 |
Trans-European Transport Network Executive Agency — TEN-T EA |
1 |
|
|
|
1 |
38 |
Executive Agency for Health and Consumers — EAHC |
3 |
|
|
|
3 |
|
Other Bodies |
|
|
|
|
|
39 |
European Institute of Innovation and Technology — EIT |
3 |
2 |
1 |
|
|
40 |
Euratom Supply Agency — EURATOM |
2 |
1 |
|
1 |
|
41 |
Europol Pension Fund — EPF |
1 |
|
|
1 |
|
Totals |
192 |
94 |
47 |
5 |
46 |
(1) Agency first audited in 2013 therefore no 2012 comments to refer to.
10.12.2014 |
EN |
Official Journal of the European Union |
C 442/18 |
REPORT
on the annual accounts of the Agency for Cooperation of Energy Regulators for the financial year 2013, together with the Agency’s replies
(2014/C 442/02)
INTRODUCTION
1. |
The Agency for Cooperation of Energy Regulators (hereinafter ‘the Agency’, aka ‘ACER’), which is located in Ljubljana, was created by Regulation (EC) No 713/2009 of the European Parliament and of the Council (1). The Agency’s main task is to assist National Regulatory Authorities in exercising, at Union level, the regulatory tasks that they perform in the Member States and, where necessary, to coordinate their action. Under the REMIT regulation (2), the Agency was given new additional responsibilities, together with national regulatory authorities, regarding the monitoring of the European wholesale energy market (3). |
INFORMATION IN SUPPORT OF THE STATEMENT OF ASSURANCE
2. |
The audit approach taken by the Court comprises analytical audit procedures, direct testing of transactions and an assessment of key controls of the Agency’s supervisory and control systems. This is supplemented by evidence provided by the work of other auditors (where relevant) and an analysis of management representations. |
STATEMENT OF ASSURANCE
The management’s responsibility
The auditor’s responsibility
Opinion on the reliability of the accounts
Opinion on the legality and regularity of the transactions underlying the accounts
|
10. |
The comments which follow do not call the Court’s opinions into question. |
COMMENTS ON BUDGETARY MANAGEMENT
11. |
The Agency carried over 1,9 million euro or 56 % of total committed title II appropriations (Agency’s building and associated costs), mainly related to the implementation of the REMIT regulation. This is an operational, multiannual activity and should have been budgeted under title III, a shortcoming which was rectified in subsequent commitment appropriations. |
12. |
In addition, the Agency carried over 3,1 million euro or 91 % of total committed title III appropriations, also related to the implementation of the REMIT regulation. The exceptionally high rate of carry-over for title III is mainly due to some 3 million euro in additional funding received through an amended budget approved on 31 October 2013. |
OTHER COMMENTS
13. |
The Agency held 5,5 million euro in cash at year-end, which included some 3 million euro relating to the late budget amendment (see paragraph 12). Nevertheless, average cash balances during the year were significantly higher than justified by operational requirements. |
FOLLOW-UP OF PREVIOUS YEARS’ COMMENTS
14. |
An overview of the corrective actions taken in response to the Court’s comments from previous years is provided in Annex I. |
This Report was adopted by Chamber IV, headed by Mr Milan Martin CVIKL, Member of the Court of Auditors, in Luxembourg at its meeting of 8 July 2014.
For the Court of Auditors
Vítor Manuel da SILVA CALDEIRA
President
(1) OJ L 211, 14.8.2009, p. 1.
(2) Regulation (EU) No 1227/2011 of the European Parliament and of the Council (OJ L 326, 8.12.2011, p. 1) which assigns an important role to the Agency in supervising trading in wholesale energy markets across Europe.
(3) Annex II summarises the Agency’s competences and activities. It is presented for information purposes.
(4) These include the balance sheet and the economic outturn account, the cash flow table, the statement of changes in net assets and a summary of the significant accounting policies and other explanatory notes.
(5) These comprise the budgetary outturn account and the annex to the budgetary outturn account.
(6) Articles 39 and 50 of Commission Delegated Regulation (EU) No 1271/2013 (OJ L 328, 7.12.2013, p. 42).
(7) The accounting rules adopted by the Commission’s accounting officer are derived from the International Public Sector Accounting Standards (IPSAS) issued by the International Federation of Accountants or, where relevant, the International Accounting Standards (IAS)/International Financial Reporting Standards (IFRS) issued by the International Accounting Standards Board.
(8) Article 107 of Regulation (EU) No 1271/2013.
ANNEX I
Follow-up of previous years’ comments
Year |
Court's comment |
Status of corrective action (Completed/Ongoing/Outstanding/N/A) |
2011 |
The high level of appropriations not used and of carry-overs as well as the low level of payments indicate shortcomings in budget planning and implementation and are at odds with the budgetary principle of annuality. |
Completed |
2011 |
There is room to improve the transparency of recruitment procedures. As an example, vacancy notices did not specify the maximum number of candidates to be put on a reserve list and made no reference to the possibility of appeal. Moreover the questions for written tests and interviews and their weightings were not prepared before the examination of the applications. |
Completed |
2012 |
In order to cover higher school fees, the Agency grants staff whose children attend primary or secondary school a top up allowance in addition to the education allowances provided for in the Staff Regulations (1). Total 2012 top up allowances amounted to some 23 000 euro. They are not covered by the Staff Regulations and are therefore irregular. |
Completed |
2012 |
The Agency carried over committed appropriations under title II (Agency’s building and associated costs) of its budget amounting to 1,7 million euro, representing 81 % of total committed title II appropriations. These carry-overs mainly relate to the implementation of the REMIT regulation which is ongoing. Since the implementation is linked to the Agency’s operational activities, it should normally have been budgeted under title III. |
Completed |
2012 |
In 2012, the Agency made 20 budget transfers of some 1 million euro and affecting 43 budget lines. This indicates weaknesses in budget planning. |
Completed |
2012 |
The Agency held 4,2 million euro in cash at the year end, including the 2011 budget surplus of 1,6 million euro which resulted from an excessive call for funds in 2011 and was recovered by the Commission in January 2013. This is not consistent with a rigorous treasury management. |
Ongoing |
2012 |
The audited recruitment procedures revealed shortcomings affecting transparency and an equal treatment of candidates: questions for interviews and tests were not set before the examination of the applications. The conditions for admission to written tests and interviews and for being included in the list of suitable candidates were not specified in sufficient detail and the measures taken to ensure the anonymity of candidates sitting written tests were inadequate. |
Ongoing |
(1) Article 3 of Annex VII provides for twice the basic allowance of 252,81 euro = 505,62 euro.
ANNEX II
Agency for the Cooperation of Energy Regulators (Ljubljana)
Competences and activities
Areas of Union competence deriving from the Treaty (Article 114 (ex Article 95 TEC) and Article 194 of the Treaty on the Functioning of the European Union) |
The European Parliament and the Council shall, acting in accordance with the ordinary legislative procedure and after consulting the Economic and Social committee, adopt the measures for the approximation of the provisions laid down by law, regulation or administrative action in Member States which have as their object the establishment and functioning of the internal market. In the context of the establishment and functioning of the internal market and with regard for the need to preserve and improve the environment, Union policy on energy shall aim, in a spirit of solidarity between Member States to:
The European Parliament and the Council, acting in accordance with the ordinary legislative procedure, shall establish the measures necessary to achieve these objectives. Such measures shall be adopted after consultation of the Economic and Social Committee and the Committee of the Regions. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Competences of the Agency (As specified in Regulation (EC) No 713/2009 of the European Parliament and of the Council; Commission Regulation (EU) No 838/2010; Regulation (EU) No 1227/2011 of the European Parliament and of the Council) |
Objectives The purpose of the Agency is to assist National Regulatory Authorities in exercising, at Union level, the regulatory tasks that they perform in the Member States and, where necessary, to coordinate their action. Tasks
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Governance |
Administrative Board Composition Two members appointed by the European Parliament, two members appointed by the Commission and five members appointed by the Council. Each member has an alternate. Tasks The Administrative Board adopts the Agency’s work programme and the budget. It ensures that the Agency carries out its mission and performs the tasks assigned to it in accordance with the Agency Regulation. Director Appointed by the Administrative Board after a favourable opinion from the Board of Regulators and on the basis of a list of candidates proposed by the Commission. Board of Regulators Composition A senior representative of the regulatory authorities from each Member State and one non-voting representative of the Commission. Each member has an alternate, nominated by the national regulatory authority from each Member State. Tasks
External audit European Court of Auditors. Discharge authority European Parliament acting on a recommendation from the Council. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Resources made available to the Agency in 2013 (2012) |
Budget 2013 (2012) 11,9(7,2) million euro Staff as at 31 December 2013(2012) Posts listed in the establishment plan: 49 (43) Posts occupied on 31 December: 49 (42) Other staff: 20 (14) Total staff: 69 (57), of which assigned to:
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Products and services 2013 |
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Source: Annex provided by the Agency. |
THE AGENCY’S REPLIES
11. |
As noted by the Court the identified shortcoming was already rectified by the Agency through subsequent commitments related to the implementation of REMIT being raised on the operational budget lines within title III. |
12. |
As already acknowledged by the Auditors, the high rate of carry-overs reflected the delay in the implementation of REMIT. This delay was due to the fact that the transfer of the required additional funds from DG ENER was approved only in October 2013 and the funds received by the Agency in early November 2013. However, the Agency has successfully managed to conclude all planned procurement procedures related to the REMIT implementation by December 2013, with the related expenditure to occur in 2014. |
13. |
The account balance at year end included the 3 million euro received late in the year, as a result of a budgetary adjustment, with the difference being held to cover all legal obligations, mainly REMIT related, for which commitments were entered towards the end of 2013. The cash forecasting tool introduced in 2014 will support a better cash management in the future. |
10.12.2014 |
EN |
Official Journal of the European Union |
C 442/28 |
REPORT
on the annual accounts of the Office of the Body of European Regulators for Electronic Communications for the financial year 2013, together with the Office’s replies
(2014/C 442/03)
INTRODUCTION
1. |
The Office of the Body of European Regulators for Electronic Communications (hereinafter ‘the Office’), which is located in Riga, was established by Regulation (EC) No 1211/2009 of the European Parliament and of the Council (1). The Office’s main task is to provide professional and administrative support services to the Body of European Regulators for Electronic Communications (BEREC) and, under the guidance of the Board of Regulators, to collect and analyse information on electronic communications and to disseminate among National Regulatory Authorities regulatory best practices such as common approaches, methodologies or guidelines on the implementation of the EU regulatory framework (2). |
INFORMATION IN SUPPORT OF THE STATEMENT OF ASSURANCE
2. |
The audit approach taken by the Court comprises analytical audit procedures, direct testing of transactions and an assessment of key controls of the Office’s supervisory and control systems. This is supplemented by evidence provided by the work of other auditors (where relevant) and an analysis of management representations. |
STATEMENT OF ASSURANCE
The management’s responsibility
The auditor’s responsibility
Opinion on the reliability of the accounts
Opinion on the legality and regularity of the transactions underlying the accounts
|
10. |
The comments which follow do not call the Court’s opinions into question. |
COMMENTS ON BUDGETARY MANAGEMENT
11. |
Budget implementation rates improved considerably, which indicates better planning and more timely implementation of activities. Although the level of cancelled carry-overs from 2012 is still relatively high at 28 % (2012: 45 %), carry-overs of committed appropriations decreased to EUR 4 61 983 or 13 % (2012: EUR 6 11 223 or 19 %). Carry-overs were mostly related to contracts signed in the second half of 2013 for planned activities in 2013 and 2014. |
OTHER COMMENTS
12. |
Of the 1 183 reimbursements for experts made in 2013, 1 078 were late. Where payments were late, they were overdue by an average delay of 78 days in the first half of 2013 as compared with 33 days in the second half of 2013. |
FOLLOW-UP OF PREVIOUS YEARS’ COMMENTS
13. |
An overview of the corrective actions taken in response to the Court's comments from previous years is provided in Annex I. |
This Report was adopted by Chamber IV, headed by Mr Milan Martin CVIKL, Member of the Court of Auditors, in Luxembourg at its meeting of 1 July 2014.
For the Court of Auditors
Vítor Manuel da SILVA CALDEIRA
President
(1) OJ L 337, 18.12.2009, p. 1.
(2) Annex II summarises the Office’s competences and activities. It is presented for information purposes.
(3) These include the balance sheet and the economic outturn account, the cash flow table, the statement of changes in net assets and a summary of the significant accounting policies and other explanatory notes.
(4) These comprise the budgetary outturn account and the annex to the budgetary outturn account.
(5) Articles 39 and 50 of Commission Delegated Regulation (EU) No 1271/2013 (OJ L 328, 7.12.2013, p. 42).
(6) The accounting rules adopted by the Commission’s accounting officer are derived from the International Public Sector Accounting Standards (IPSAS) issued by the International Federation of Accountants or, where relevant, the International Accounting Standards (IAS)/International Financial Reporting Standards (IFRS) issued by the International Accounting Standards Board.
(7) Article 107 of Regulation (EU) No 1271/2013.
ANNEX I
Follow-up of previous years’ comments
Year |
Court's comment |
Status of corrective action (Completed/Ongoing/Outstanding/N/A) |
2011 |
The Court identified 21 cases with a total value of EUR 94 120 in which appropriations carried over to 2012 did not correspond to legal commitments. These carry-overs were therefore irregular. |
Completed |
2011 |
The Office had not yet adopted and implemented all the internal control standards. Notably, no register of exceptions was introduced. |
Completed (register of exceptions) Ongoing (internal control standards) |
2011 |
The Office needs to improve the transparency of recruitment procedures. Questions for oral and written tests were not set before the applications were examined by the selection board, there was no decision of the Appointing Authority to appoint the selection board and the grade of the members of the selection board was not indicated. |
Completed |
2012 |
The Office’s accounting system was still not validated by the Accounting Officer. |
Completed |
2012 |
Committed appropriations carried over amounting to EUR 61 500 (10 % of the total committed appropriations carried over) did not correspond to legal commitments and were thus irregular. |
Completed |
2012 |
The Office had not yet implemented the Internal Control Standards on ‘Objectives and performance indicators’ (ICS 5), ‘Process and procedures’ (ICS 8), ‘Document management’ (ICS 11) and ‘Information and Communication’ (ICS 12). |
Ongoing |
2012 |
There is no procedure related to the registration and disposal of fixed assets and no physical inventory has been performed. |
Completed |
2012 |
Procedures concerning the establishment, approval and recording of exceptions and deviations from policies and procedures have not been implemented. |
Completed |
2012 |
Some EUR 1 01 000, 45 % of the committed appropriations carried over from 2011, were cancelled. Appropriations for 2012 of EUR 5 45 000, 17 % of total 2012 appropriations, were not used and also had to be cancelled. The level of carry-overs of committed appropriations to 2013 was high at EUR 6 11 000 or 19 % of the total. This indicates difficulties in the planning and/or implementation of the Office’s activities. The carry-overs for 2012 were mostly related to delayed recruitments and the absence of an effective policy to ensure the timely presentation and reimbursement of mission costs claimed by experts. |
Ongoing |
2012 |
There is considerable room for improving the preparation, execution and documentation of procurement procedures. As an example, award procedures did not give sufficient attention to the price quality ratio and general award criteria had not been further broken down into sub criteria to allow a clear and comparable evaluation of the offers. |
Completed |
2012 |
The recruitment procedures examined showed significant shortcomings affecting transparency: questions for written tests and interviews were set after the applications had been examined by the selection board; no threshold scores were set for admission to written tests and interviews and for being included in the list of suitable candidates; nomination and changes in the composition of the selection board were not approved by the Appointing Authority. |
Completed |
2012 |
Most of the Office’s staff have an administrative or support function and do not travel, but all have been provided with a mobile phone with a monthly limit up to approximately EUR 50. There are no controls to monitor private use. |
Completed |
2012 |
The Office does not have a treasury policy. At the end of 2012, all cash (EUR 1,6 million) was held in one bank (BBB rating (1)). |
Completed |
(1) According to a note from the Commission’s accounting officer dated 27.10.2008, the minimum short-term rating should be A-1.
ANNEX II
Office of the Body of European Regulators for Electronic Communications (Riga)
Competences and activities
Areas of Union competence deriving from the Treaty (Article 114 of the Treaty on the Functioning of the European Union) |
Approximation of laws in the field of electronic communications. |
||||||||||
Competences of the Office (Regulation (EC) No 1211/2009 of the European Parliament and of the Council) |
The Office’s powers are defined in Regulation (EC) No 1211/2009 of the European Parliament and of the Council. The Office referred to in Article 6 shall provide administrative and professional support services to BEREC. It shall perform its functions under the guidance of the Board of Regulators. |
||||||||||
Governance |
The Office comprises:
which share between them all administrative and financial responsibilities, including the responsibilities for the staff. However, only the Management Committee is responsible for the appointment of staff (Article 7(4)). Guidance on the services and products specified in the ‘Products and services in 2013’ section is provided by the Board of Regulators. Internal audit European Commission’s internal audit service (IAS). External audit European Court of Auditors. Discharge authority European Parliament, acting on a recommendation from the Council. |
||||||||||
Resources made available to the Office in 2013 (2012) |
Final Budget: EUR 3 5 57 218,93 (amended budget 1/2013 and including internal assigned revenue) Staff as at 31 December: 25 (22) |
||||||||||
Products and services in 2013 |
Under the guidance of the Board of Regulators, the Office provided the following services:
|
||||||||||
Source: Annex supplied by the Office. |
THE OFFICE’S REPLIES
11. |
The BEREC Office takes note of the budgetary management comment and has set as target to further improve execution of budget 2014 in comparison to 2012 and 2013. The high level of cancellation of carry-overs will continue to be addressed by thorough analysis of carried-over amounts at the end of the year. This measure should show a positive effect on the overall level of carry-overs, which the Office will continue to reduce by advancing the period of execution of contracts. |
12. |
The BEREC Office acknowledges the high relevance of the matter brought forward by the Court’s observation and is actively looking for measures to reduce the payment delays to the set target delay of 30 days. The Office will explore three ways in which improvements are possible: further reduction in collection time of documents, ensuring necessary human resources to the financial circuit and pursuing technical improvements accessible via the financial systems. |
10.12.2014 |
EN |
Official Journal of the European Union |
C 442/35 |
REPORT
on the annual accounts of the Translation Centre for the Bodies of the European Union for the financial year 2013, together with the Centre’s replies
(2014/C 442/04)
INTRODUCTION
1. |
The Translation Centre for the Bodies of the European Union (hereinafter ‘the Centre’, aka ‘CdT’), which is located in Luxembourg, was created by Council Regulation (EC) No 2965/94 (1). The Centre's task is to provide any European Union institutions and bodies which call upon its services with the translation services necessary for their activities (2). |
INFORMATION IN SUPPORT OF THE STATEMENT OF ASSURANCE
2. |
The audit approach taken by the Court comprises analytical audit procedures, direct testing of transactions and an assessment of key controls of the Centre’s supervisory and control systems. This is supplemented by evidence provided by the work of other auditors (where relevant) and an analysis of management representations. |
STATEMENT OF ASSURANCE
The management’s responsibility
The auditor’s responsibility
Opinion on the reliability of the accounts
Opinion on the legality and regularity of the transactions underlying the accounts
|
10. |
The comments which follow do not call the Court’s opinions into question. |
COMMENTS ON THE LEGALITY AND REGULARITY OF TRANSACTIONS
11. |
In 2008 the Centre concluded 472 framework contracts with translation services providers for a maximum period of four years. In order to obtain better conditions for the new framework contracts to be signed in 2012, the Centre wanted to participate in the Commission’s ongoing procurement procedure for translation services. However, no agreement on the contract terms could be reached with the Commission. Instead, the Centre extended its existing framework contracts for one more year. Although based on a derogation duly approved by the Centre’s Director, such an extension is not in compliance with the implementing rules for the Centre’s financial regulation, which provide for a maximum period of four years for framework contracts. |
COMMENTS ON INTERNAL CONTROLS
12. |
Formal delegations (sub-delegations) from authorising officers (authorising officers by delegation) are not always consistent with the authorisation rights for transactions in the ABAC accounting system. |
OTHER COMMENTS
13. |
Cash held by the Centre further increased from 35 million euro at the end of 2012 to 40 million euro at the end of 2013 (budgetary surplus and reserves increased from 30,9 million euro to 37,5 million euro). This indicates scope to reduce prices. |
14. |
The Centre became operational in 1994 and has, to date, worked on the basis of correspondence and exchanges with the host Member State. However, there is no comprehensive headquarters agreement between the Centre and the Member State. Such an agreement would further promote transparency in respect of the conditions under which the Centre and its staff operate. |
FOLLOW-UP OF PREVIOUS YEAR’S COMMENTS
15. |
An overview of the corrective actions taken in response to the Court's comments from the previous year is provided in Annex I. |
This Report was adopted by Chamber IV, headed by Mr Pietro RUSSO, Member of the Court of Auditors, in Luxembourg at its meeting of 16 September 2014.
For the Court of Auditors
Vítor Manuel da SILVA CALDEIRA
President
(1) OJ L 314, 7.12.1994, p. 1.
(2) Annex II summarises the Centre's competences and activities. It is presented for information purposes.
(3) These include the balance sheet and the economic outturn account, the cash flow table, the statement of changes in net assets and a summary of the significant accounting policies and other explanatory notes.
(4) These comprise the budgetary outturn account and the annex to the budgetary outturn account.
(5) Articles 39 and 50 of Commission Delegated Regulation (EU) No 1271/2013 (OJ L 328, 7.12.2013, p. 42).
(6) The accounting rules adopted by the Commission’s accounting officer are derived from the International Public Sector Accounting Standards (IPSAS) issued by the International Federation of Accountants or, where relevant, the International Accounting Standards (IAS)/International Financial Reporting Standards (IFRS) issued by the International Accounting Standards Board.
(7) Article 107 of Delegated Regulation (EU) No 1271/2013.
ANNEX I
Follow-up of previous year’s comments
Year |
Court's comment |
Status of corrective action (Completed/Ongoing/Outstanding/N/A) |
2012 |
At the end of 2012, the Centre held cash and short term deposits amounting to 35 million euro (budgetary surplus and reserves amounting to 30,9 million euro). The Centre cannot adjust prices during the year in order to balance income and expenditure although it has occasionally refunded its clients in order to reduce the surplus. |
Ongoing |
2012 |
The Founding Regulation of 20 regulatory agencies audited by the Court in 2012 requires them to use the Centre for all their translation needs (the Centre’s Founding Regulation stipulates the same for four other agencies). Other agencies are not obliged to use the Centre. For non-technical documents agencies could reduce their costs by using local services. In the Court’s opinion the legislator should consider allowing all agencies to do so. |
Ongoing |
ANNEX II
Translation Centre for the Bodies of the European Union (Luxembourg)
Competences and Activities
Areas of Union competence deriving from the Treaty |
The representatives of the Member States’ governments adopted by mutual agreement a declaration concerning the creation, under the aegis of the Commission's translation departments in Luxembourg, of a Translation Centre for the bodies of the Union, which would provide the necessary translation services for the operation of the bodies and services whose seats were established by the Decision of 29 October 1993. |
||||||||||||||||||
Competences of the Centre (Council Regulation (EC) No 2965/94, as last amended by Regulation (EC) No 1645/2003) |
Objectives To provide the necessary translation services for the operation of the following bodies:
Bodies set up by the Council other than the above may use the Centre's services. The institutions and bodies of the European Union which already have their own translation services may, if need be, call upon the Centre's services on a voluntary basis. The Centre plays a full part in the work of the Interinstitutional Translation Committee. Tasks
|
||||||||||||||||||
Governance |
Management Board Composition
Tasks To adopt the Centre’s annual budget and work programme, establishment plan and annual reports. Director Appointed by the Management Board on a proposal from the Commission. External audit European Court of Auditors. Internal audit European Commission's Internal Audit Service (IAS). Discharge authority European Parliament, acting on a recommendation from the Council. |
||||||||||||||||||
Resources made available to the Centre in 2013 (2012) |
Final Budget: 52,194(48,293) million euro Staff: 206 posts (225) in the establishment plan, of which 193 (199) were occupied. + 23 (17) contract staff Total staff: 216 (216), undertaking the following tasks: operational: 118 (114) administrative: 98 (102) |
||||||||||||||||||
Products and services 2013 (2012) |
Number of pages translated: 8 04 986(7 35 007) Number of pages by languages:
Number of pages per client:
Number of pages translated by freelances: 5 12 524(4 80 695) |
||||||||||||||||||
Source: Annex supplied by the Centre. |
THE CENTRE’S REPLIES
11. |
The Centre had joined the Commission’s call for tenders for this type of translation services in the past. Concerning the call for tenders referred to, the Commission began its preparatory work at a rather late stage and changed the conditions applicable to the Centre so that they differed from the call for tenders organised four years previously. Unfortunately, the Centre could not reach an agreement with the Commission as regards the conditions. Furthermore, the starting date for the new contracts did not coincide with the expiry date of the contracts in place and this resulted in practical problems for the Centre. The Centre, therefore, decided to organise its own call for tenders for this specific type of translation services and to extend existing contracts by one year in order to prepare correctly for this extensive call for tenders. Considering the impact on the Centre in the event that no contracts had been in place on the expiry date of the existing contracts, it was considered justified to prolong the existing contracts. |
12. |
The Centre has updated the formal delegation to bring it in line with the rights in ABAC. The internal procedure in place to keep delegations in ABAC updated has been modified slightly to avoid any discrepancies between rights in ABAC and the formal delegations. |
13. |
The Centre is fully aware that it generated an economic surplus for the second consecutive year, but it must be noted that the 2013 surplus came about as a result of external factors beyond the Centre’s control; especially as a result of a higher volume of invoiced pages than forecast, the cancelled salary increase and the pension contribution reimbursed to the Centre. The Centre’s 2013 budget was prepared in 2012 in the light of the economic loss of EUR 1 million in 2011 and considering that revenues from Community trademarks were particularly uncertain. It was only in December 2012, in the preliminary draft budget for 2014, when the Centre could react to the financial results by proposing the 2014 budget with a deficit of EUR 1 0 92 890, financed from the previously created price stability reserve. Based on the 2012 cost analysis and analysis of the first half of 2013 the Centre decreased the 2014 prices considerably in order to reflect not only changes in the cost of products, but also to use up part of the surplus. The 2014 budget was, therefore, constructed as a deficit budget from the outset; the deficit of EUR 4 1 06 650 is balanced by the reserve for price stability created in previous years. The 2015 budget will, again, be prepared as a deficit budget in order to use up part of the previous years’ surplus. Based on the 2014 mid-year cost analysis and simulations and forecasted volumes for 2015, further price modifications will be proposed for 2015. As an additional measure, the Centre, for the first time in its history, proposed that the Management Board further reduce 2014 prices in the middle of 2014, in order to respond more quickly and return back to its clients the positive financial results of 2013. |
14. |
The works on the headquarters agreement have come into a final phase. The draft agreement was submitted to Luxembourg’s Conseil de Gouvernement and was discussed and approved during its meeting at the end of April. The Centre is waiting for confirmation of a date for the signature of the agreement by the Luxembourg authorities. |
10.12.2014 |
EN |
Official Journal of the European Union |
C 442/42 |
REPORT
on the annual accounts of the European Centre for the Development of Vocational Training for the financial year 2013, together with the Centre’s reply
(2014/C 442/05)
INTRODUCTION
1. |
The European Centre for the Development of Vocational Training (hereinafter ‘the Centre’, aka ’Cedefop’), which is located in Thessaloniki, was established by Council Regulation (EEC) No 337/75 (1). Its core mandate is to serve the development of vocational training at Union level. In order to achieve this objective, it has the task of compiling and disseminating documentation on vocational training systems (2). |
INFORMATION IN SUPPORT OF THE STATEMENT OF ASSURANCE
2. |
The audit approach taken by the Court comprises analytical audit procedures, direct testing of transactions and an assessment of key controls of the Centre’s supervisory and control systems. This is supplemented by evidence provided by the work of other auditors (where relevant) and an analysis of management representations. |
STATEMENT OF ASSURANCE
The management’s responsibility
The auditor’s responsibility
Opinion on the reliability of the accounts
Opinion on the legality and regularity of the transactions underlying the accounts
|
10. |
The comments which follow do not call the Court’s opinions into question. |
FOLLOW-UP OF PREVIOUS YEARS’ COMMENTS
11. |
An overview of the corrective actions taken in response to the Court's comments from previous years is provided in Annex I. |
This Report was adopted by Chamber IV, headed by Mr Milan Martin CVIKL, Member of the Court of Auditors, in Luxembourg at its meeting of 8 July 2014.
For the Court of Auditors
Vítor Manuel da SILVA CALDEIRA
President
(2) Annex II summarises the Centre's competences and activities. It is presented for information purposes.
(3) These include the balance sheet and the economic outturn account, the cash flow table, the statement of changes in net assets and a summary of the significant accounting policies and other explanatory notes.
(4) These comprise the budgetary outturn account and the annex to the budgetary outturn account.
(5) Articles 39 and 50 of Commission Delegated Regulation (EU) No 1271/2013 (OJ L 328, 7.12.2013, p. 42).
(6) The accounting rules adopted by the Commission’s accounting officer are derived from the International Public Sector Accounting Standards (IPSAS) issued by the International Federation of Accountants or, where relevant, the International Accounting Standards (IAS)/International Financial Reporting Standards (IFRS) issued by the International Accounting Standards Board.
(7) Article 107 of Regulation (EU) No 1271/2013.
ANNEX I
Follow-up of previous years’ comments
Year |
Court's comment |
Status of corrective action (Completed/Ongoing/Outstanding/N/A) |
2011 |
The excessive level of carry-overs for title II is at odds with the budgetary principle of annuality. |
Completed |
2011 |
A significant number of budgetary transfers was made which were mostly concentrated at the year-end (1). The justification for these budgetary transfers was insufficient, as no estimate of needs was made. This situation indicates weaknesses in budget planning and programming and is at odds with the principle of specification. |
Completed |
2012 |
The Centre awards grants on an annual basis to a network of national partners (2) (grants per agreement range between 23 615 euro and 43 620 euro). Grant expenditure (which mainly relates to beneficiaries’ staff costs) in 2012 amounted to 6 95 337 euro (3), or 4 % of total operating expenditure. The Centre’s ex ante verifications of grants consist of a comprehensive desk-analysis of cost claims submitted by grant beneficiaries, as well as a review of certificates obtained from external auditors which were contracted by the beneficiaries or of certificates from independent public officers. However, the Centre does not usually verify the staff costs claimed by beneficiaries on the basis of original supporting documentation. Related ex post verifications were last carried out in 2009. As a result, ex ante verifications provide only limited assurance. |
Completed |
2012 |
Budget implementation rates were high at 100 % for titles I and III and 98 % for title II. While carry-overs of committed appropriations were high for title II at 39 % (6 73 392 euro), this mainly resulted from reasons beyond the Centre’s control, such as delays in the repair works carried out by the Greek authorities on the Centre’s premises. These led to a postponement of the related maintenance, repair and fitting-out of premises (some 1 24 000 euro), as well as delays in procuring equipment for the Centre’s conference rooms (some 2 42 000 euro). Part of the carry-overs is attributable to delays in procuring IT equipment (some 1 72 000 euro). |
N/A |
2012 |
Two recruitment procedures for the post of the Centre’s future Director had been launched in 2010 and 2011 and both of them were declared unsuccessful (4). A third recruitment procedure was launched at the end of 2012 and is still ongoing. The Court found that in the first two recruitment procedures members of the Pre-selection Committee did not sign a declaration of absence of conflict of interests and that questions for interviews and their weightings, as well as the threshold scores for being included in the list of suitable candidates were set after the screening of candidates. |
Completed |
(1) In total, 77 budget transfers were made, totalling 1,5 million euro, of which 67 transfers (1,3 million euro) were made in November and December 2011.
(2) National agencies and research institutes mainly.
(3) Resulting from final payments and clearings of pre-financings related to grant agreements from previous years. For 2012 grant agreements, only pre-financings were made in 2012 which had not yet led to expenditure.
(4) In the first recruitment procedure, none of the candidates shortlisted by the Centre’s Governing Board was appointed by the European Commission. In the second recruitment procedure, the Pre-selection Committee considered that none of the proposed candidates met the requirements for being shortlisted and did not submit a list of suitable candidates to the Governing Board.
ANNEX II
European Centre for the Development of Vocational Training (Thessaloniki)
Competences and activities
Areas of Union competence deriving from the Treaty (Article 166(1) of the Treaty on the Functioning of the European Union) |
Collection of information The Union shall implement a vocational training policy which shall support and supplement the action of the Member States, while fully respecting the responsibility of the Member States for the content and organisation of vocational training. |
||||||||||
Competences of CEDEFOP (Articles 2 and 3 of Regulation (EEC) No 337/75) |
Objectives In its capacity as the European Union reference centre for vocational education and training, Cedefop provides policy-makers, researchers and professionals with evidence on current trends to enable them to reach soundly based decisions and actions. Cedefop assists the European Commission in promoting and developing vocational education and training at Union level. Tasks
|
||||||||||
Governance |
Governing Board Composition For each Member State:
For the European Commission: three members. The members referred to in (a), (b) and (c) are appointed by the Council. The Commission appoints the members who are to represent it. Coordinators from the Employers’ and Employees’ organisations at European level and observers from the EEA countries also attend Governing Board and Bureau meetings. Duties To adopt the budget, medium term priorities (Cedefop’s multiannual planning) and the work programme and to assess and analyse the annual activity report and the annual accounts. To adopt the final budget and the establishment plan. Bureau Composition The chairman and the three vice-chairmen of the Governing Board, one coordinator per group and one additional representative of the Commission. Director Appointed by the Commission from a list of candidates submitted by the Governing Board; he/she is responsible for the management of Cedefop and implements the decisions of the Governing Board and the Bureau. Internal audit European Commission’s Internal Audit Service (IAS). External audit European Court of Auditors. Discharge authority European Parliament, acting on a recommendation from the Council. |
||||||||||
Resources made available to the Centre in 2013 (2012) |
Final Budget 18,53(19,22) million euro Union contribution (1): 97,4 % (97,6 %) Staff as at 31 December 2013 Number of posts in establishment plan: 100 (101) Posts occupied: 98 (2) (98) Other staff:
Total staff: 125 (124)
|
||||||||||
Products and services in 2013 (2012) |
Policy analysis and reporting Cedefop monitors countries’ progress towards the short-term deliverables agreed in the Bruges Communiqué. Country fiches summarising policy progress were finalised for all EU Member States, Norway and Iceland and were made available to the European Commission, which proposes country specific recommendations for the European semester. To prepare for Cedefop’s 2014 VET policy monitoring report, focus groups with members of the Advisory Committee on Vocational Training (ACVT) discussed the effectiveness of policies. Descriptions of national VET systems prepared by ReferNet partners were published online for 29 countries. Spotlight on VET in Ireland was prepared for the March meeting of the DGVTs. Vocational education and training in Lithuania — Short description and Spotlight on VET in Lithuania were released for the DGVTs’ meeting in November and the Presidency Conference on VET. Cedefop’s On the way to 2020: data for vocational education and training was published. Common European tools, qualifications and learning outcomes Cedefop provided policy advice and expertise to EU-level working groups to support the implementation of EU tools. Cedefop’s study on qualifications at EQF level 5 and its Analysis and overview of NQF level descriptors in European countries contributed directly to EQF/NQF implementation. Cedefop’s study The role of qualifications in governing professions and occupations was published. A briefing note on ECVET opportunities and challenges was released. Europass registered 20,85 million visits (14,8 million) and 10,16 million (8,3 million) CVs generated online. A working dinner with the European Parliament discussed achievements and challenges in relation to European tools. Cedefop’s study Renewing VET provision: Understanding feedback mechanisms between initial VET and the labour market was published. The briefing note Keeping young people in (vocational) education: what works? was drafted for the Lithuanian Presidency Conference on VET. Adult learning and transitions Cedefop’s study Return to Work — work-based learning and the reintegration of unemployed adults into the labour market was debated at the VET conference of the Lithuanian Presidency. Cedefop’s studies Benefits of vocational education and training in Europe for people, organisations and countries and Labour market outcomes of vocational education in Europe were published. Cedefop’s study on Validation of non-formal and informal learning in European enterprises was finalised and a synthesis disseminated at the Cedefop/DG EAC joint seminar marking the start of the follow-up to the 2012 Council Recommendation on validation. To support the European alliance for apprenticeship, Cedefop organised a high-level conference on ‘Renewing vocational education and training to tackle skill mismatch — work-based learning and apprenticeship for all?’. Skills analysis Cedefop supported the development of the EU Skills Panorama (EUSP) for which it will take full responsibility as of 2014. Cedefop’s 2013 projections for skill supply and demand in the European Union were released. Roads to recovery: three skill and labour market scenarios for 2025 summarised the key findings. Cedefop’s research paper Quantifying skill needs in Europe — Occupational skills profiles: methodology and application was published. A briefing note and publication Skills for a low carbon Europe were released. Cedefop’s data and analyses on skill mismatch contributed to the work of the Global Agenda Council (GAC) on Employment of the World Economic Forum (WEF) and were presented at the Summit on the Global Agenda 2013 in Abu Dhabi. Organisational impact The (external) evaluation of Cedefop for the 2007–2012 period examined whether its work was consistent with European policies and looked at its efficiency and impact and its synergies with four other EU agencies. It highlighted that: Cedefop was highly successful in implementing the objectives in its Founding Regulation and is recognised as a leading centre of expertise worldwide on qualifications frameworks and skills; Cedefop’s work did not duplicate the activities of any other actors at European, national or international level; the popularity of its outputs and downloads had increased significantly; its events were of high quality and participant satisfaction very high; operations were cost-effective. Cedefop uses a performance measurement system (PMS) to help manage and evaluate its impact, efficiency and effectiveness. 173 EU-level policy documents (169) cited Cedefop’s findings. Cedefop’s administration continued to support operations in an effective and efficient way. A staff survey in 2013 confirmed the staff’s satisfaction with administrative and support services. For more information see www.cedefop.europa.eu (Annual Report and Annual Activity Report 2013). |
||||||||||
(1) Note: included are the assigned revenues from the DG EMPL Delegation Agreements amounting to 0,6 million euro in 2013 (1,32 million euro in 2012).
(2) This includes posts actually filled (96) and job offers made (2) for vacant posts (in line with the Multiannual Staff Policy Plan approach).
Source: Annex supplied by the Centre.
CENTRE’S REPLY
Cedefop has taken note of the Court's report.
10.12.2014 |
EN |
Official Journal of the European Union |
C 442/51 |
REPORT
on the annual accounts of the European Police College for the financial year 2013, together with the College’s replies
(2014/C 442/06)
INTRODUCTION
1. |
The European Police College (hereinafter ‘the College’, aka ‘CEPOL’), which is located in Bramshill, was established by Council Decision 2000/820/JHA (1), repealed and replaced in 2005 by Council Decision 2005/681/JHA (2). The College’s task is to function as a network and bring together the national police training institutes in the Member States to provide training sessions, based on common standards, for senior police officers (3). |
INFORMATION IN SUPPORT OF THE STATEMENT OF ASSURANCE
2. |
The audit approach taken by the Court comprises analytical audit procedures, direct testing of transactions and an assessment of key controls of the College’s supervisory and control systems. This is supplemented by evidence provided by the work of other auditors (where relevant) and an analysis of management representations. |
STATEMENT OF ASSURANCE
The management’s responsibility
The auditor’s responsibility
Opinion on the reliability of the accounts
Opinion on the legality and regularity of the transactions underlying the accounts
|
10. |
The comments which follow do not call the Court’s opinions into question. |
COMMENTS ON BUDGETARY MANAGEMENT
11. |
Out of the committed appropriations carried over from 2012 amounting to EUR 1,7 million, EUR 0,3 million (17,6 %) were cancelled in 2013. This was mainly due to lower than estimated costs to be reimbursed under 2012 grant agreements (EUR 0,21 million or 70 % of cancelled carry-overs), which indicates the need to obtain more accurate information from beneficiaries at year-end on the actual cost incurred. |
12. |
The level of committed 2013 appropriations for the different titles varied between 92 % and 95 %, indicating that legal commitments were made in a timely manner. The level of committed appropriations carried over to 2014 was high for Title II (administrative expenditure) at EUR 1 45 410 (30,5 %), but this mainly arose from events beyond the College’s control, such as payments due in 2014 for services and goods ordered and received as planned in 2013. |
OTHER COMMENTS
13. |
The College’s recruitment procedures are still not fully transparent. Guidance to members of the selection boards on the consistent assessment of selection criteria was not sufficiently clear; requirements set in respect of professional experience were not always compliant with the Implementing Rules to the College’s Staff Regulations and recruitment documentation was incomplete. |
FOLLOW-UP OF PREVIOUS YEARS’ COMMENTS
14. |
An overview of the corrective actions taken in response to the Court's comments from previous years is provided in Annex I. |
This Report was adopted by Chamber IV, headed by Mr Milan Martin CVIKL, Member of the Court of Auditors, in Luxembourg at its meeting of 1 July 2014.
For the Court of Auditors
Vítor Manuel da SILVA CALDEIRA
President
(1) OJ L 336, 30.12.2000, p. 1.
(2) OJ L 256, 1.10.2005, p. 63.
(3) Annex II summarises the College’s competences and activities. It is presented for information purposes.
(4) These include the balance sheet and the economic outturn account, the cash flow table, the statement of changes in net assets and a summary of the significant accounting policies and other explanatory notes.
(5) These comprise the budgetary outturn account and the annex to the budgetary outturn account.
(6) Articles 39 and 50 of Commission Delegated Regulation (EU) No 1271/2013 (OJ L 328, 7.12.2013, p. 42).
(7) The accounting rules adopted by the Commission’s accounting officer are derived from the International Public Sector Accounting Standards (IPSAS) issued by the International Federation of Accountants or, where relevant, the International Accounting Standards (IAS)/International Financial Reporting Standards (IFRS) issued by the International Accounting Standards Board.
(8) Article 107 of Regulation (EU) No 1271/2013.
ANNEX I
Follow-up of previous years’ comments
Year |
Court's comment |
Status of corrective action (Completed/Ongoing/Outstanding/N/A) |
2011 |
The high level of carry-overs as well as the high level of cancellations indicate shortcomings in budget planning and/or implementation and are at odds with the budgetary principle of annuality. |
Not applicable |
2011 |
The high level of budget transfers indicates weaknesses in budget planning and is at odds with the principle of specification. |
Ongoing |
2011 |
The College is located in Bramshill, using premises of the UK National Policing Improvement Agency (NPIA). NPIA is due to close at the end of 2012 and it is not clear until when the College can continue using its current premises. |
Ongoing |
2011 |
The College needs to improve the transparency of recruitment procedures. Vacancy notices made no reference to the possibility of appeal; weightings for selection criteria were not set before the examination of applications and reports summarising screening procedures and decisions on reserve lists were not always prepared. |
Completed |
2012 |
The College has carried over to 2013 committed appropriations amounting to EUR 3 55 500 for the 2013 exchange programme, which is scheduled to take place between March and November 2013. In the absence of any reference to the 2013 exchange programme in the College’s 2012 annual work programme and in view of the fact that no financing decision had been made on the matter in 2012, the carry-over is irregular. |
Not applicable |
2012 |
Out of the committed appropriations carried over from 2011 amounting to EUR 1,7 million, EUR 0,7 million (41,2 %) were cancelled in 2012. This was mainly due to lower than estimated costs to be reimbursed under 2011 grant agreements (EUR 0,44 million or 62 % of cancelled carry-overs). |
Outstanding |
2012 |
The level of committed 2012 appropriations for the different titles varied between 90 % and 99 % of total appropriations, indicating that legal commitments were made in a timely manner. The level of committed appropriations carried over to 2013 was high for Title III (operating expenditure) as it amounted to EUR 1,5 million (36 %). This however was not due to delays in implementing the College’s 2012 annual work programme, but mainly arose from the carry-over referred to in paragraph 11 and from the fact that costs relating to courses that were organised in the last months of 2012 under 2012 grant agreements were not due for reimbursement until the beginning of 2013 (EUR 1 million). |
Not applicable |
2012 |
In 2012, the College made 37 budgetary transfers amounting to EUR 1 million, out of which 36 within their respective titles. |
Ongoing |
2012 |
Discussions about the College's future that have been ongoing for several years have created a situation of uncertainty which continues to hamper business planning and implementation. |
Ongoing |
2012 |
The College needs to ensure full compliance with the ‘Guide to CEPOL recruitment’ and to improve further the transparency of recruitment procedures: vacancy notices were not always published at least 6 weeks before applications were due; there was no evidence that assessors checked that the rules for the submission of applications had been respected; the selection criteria that were applied did not always match those that had been specified in the vacancy notices; there were major delays in some cases in the examination of applications. |
Completed |
ANNEX II
European Police College (Bramshill)
Competences and activities
Areas of Union competence deriving from the Treaty (Article 87 TFEU) |
Approximation of laws
|
||||||||||||||||||||
Competences of the College (Council Decision 2005/681/JHA) |
Objectives ‘The aim of CEPOL shall be to help train the senior police officers of the Member States by optimising cooperation between CEPOL’s various components. It shall support and develop a European approach to the main problems facing Member States in the fight against crime, crime prevention and the maintenance of law and order and public security, in particular the cross-border dimensions of those problems.’ Tasks
|
||||||||||||||||||||
Governance |
Governing Board Composition One delegation from each Member State. Each delegation shall have one vote. Representatives of the European Commission and of the General Secretariat of the Council of the European Union and Europol shall be invited to attend meetings as non-voting observers. Director Manages the College, is appointed and removed by the Governing Board. External audit European Court of Auditors. Internal audit European Commission’s Internal Audit Service (IAS). Discharge authority European Parliament, acting on a recommendation from the Council. |
||||||||||||||||||||
Resources made available to the College in 2013 (2012) |
Budget 8,4(8,4) million euro Staff The Establishment Plan for 2013 provided for 28 (28) Temporary Staff. In addition: 10 (10) Contract Staff posts were budgeted for. Member States also seconded a total of: five (five) National Experts during the course of the year. |
||||||||||||||||||||
Products and services in 2013 (2012) |
Courses, Seminars and Conferences The College implemented a total of 72 (82) residential activities (courses, seminars and conferences). The assessment of the evaluation of the activities shows that general satisfaction with the College activities and its learning outcomes remained outstanding at 94 % (93 %). CEPOL has brought together highest number of participants in its history: 2 251(2 098) law enforcement participants and 707 (772) trainers from 42 (33) countries (EU Member States and Third Countries) and 21 (27) EU and international bodies. Attendance rate (attendance v seats available) has considerably increased reaching the highest ever rate of 116 % (96 %) demonstrating increasing demand for CEPOL training. The College itself organised 19 (15) activities in support of the network and initiated a Grant Agreement application process for 2014. No activities were postponed to the next calendar year. External Relations In 2013 CEPOL continued its fruitful cooperation with candidate, potential candidate and ENP/EaP countries as well as Strategic Partners, JHA agencies and EU institutions, including the European External Action Service. In 2013 CEPOL signed two working arrangements with Albania and the Russian Federation (significantly, in 2013 for the first time a joint RF-CEPOL activity took place in Moscow) as well as one with EU-LISA. Negotiations were further pursued with the Former Yugoslav Republic of Macedonia and with Bosnia and Herzegovina, while formal contacts were initiated with Kosovo and Armenia, leading to two expert missions there to explore cooperation opportunities. Contacts were also initiated with law enforcement training actors in the United States. CEPOL successfully concluded its chairmanship of the Contact Group of Justice and Home Affairs agencies carrying out agreed common activities included in a final report validated by the COSI. In 2013 CEPOL supported seven capacity-building projects implemented by EU Member States; those ranged from e-Learning methodologies through training against Child Sexual Exploitation to civilian crisis management and other important policing topics. Development of Training Manuals and (Common) Curricula The SIRENE Trainers Manual was used in the context of SIRENE activities in 2013 and updated by the SIRENE Training Committee. It will be distributed to the General Secretariat of the Council of the European Union at the beginning of 2014. The Common Curriculum on Drug Trafficking was updated and two new Common Curricula were developed: Counter-Terrorism and Eurojust, the latter with the strong involvement of Eurojust experts. A Europol expert contributed to the Common Curriculum on Counter-Terrorism and Europol also provided comments to the Common Curriculum on Drug Trafficking (four Common Curricula updated and one completed in 2012). Research and Science The Annual CEPOL European Police Research and Science Conference 2013 with the title ‘Policing civil societies in times of economic constraints’ attracted 126 (120) participants from EU Member-States as well as from overseas and was well received. Contributions to the conference were put on CEPOL’s websites and a conference volume is in preparation for publication. With the support of the CEPOL network of National Research and Science Correspondents and the Knowledge Transfer Working Group, two new issues of the ‘European Science and Research Bulletin’ were published on the website. In addition, a web page was made available collecting scientific police publications published in the area of the European Union. The CEPOL e-Library continued to be offered as a knowledge repository for registered e-Net users. European Police Exchange Programme CEPOL’s 2013 European Police Exchange Programme (EPEP) comprised six segments plus a Study Visit part:
The programme included topics deriving from the Stockholm Programme priorities, the EU Policy Cycle as well as requests from the Member States. The exchange visits are done on bilateral basis, with an implementation period of a maximum of 12 calendar days and a minimum of five working days. Study visits were organised for three-five days to the abovementioned organisations. For the first time, Western Balkan countries, Turkey and the Eastern Partnership countries participated in EPEP. Altogether 444 (293) participants from 25 Member States and ENP-WB countries took part — the biggest attendance ever since project inception in 2007. The programme had a budget of just over EUR 6 00 000 financed by CEPOL, and the utilisation rate was above 95 %. The feedback collected from 135 exchangees and 54 study visit participants indicated a remarkable 98 % general satisfaction rate with the 2013 European Police Exchange Programme. Electronic Network (e-Net)
E-Learning
|
||||||||||||||||||||
Source: Annex supplied by the College. |
THE COLLEGE’S REPLIES
11 & 12: |
The Agency has taken note of the Court's comments. The facts described enable us to acknowledge that the measures introduced by CEPOL in the recent years led to a significantly reduced amount of carry-overs. We are committed to further increase and maintain compliance with the budgetary principle of annuality provided in the Financial Regulation. |
13: |
The Agency has taken note of the Court's comments. CEPOL has completed the documentation of the human resources processes by redesigning and improving the related work instructions, templates and checklists. We expect that these further developments, to be applied for the recently launched recruitments, will contribute to a better administration and increased transparency of the recruitment process. |
10.12.2014 |
EN |
Official Journal of the European Union |
C 442/61 |
REPORT
on the annual accounts of the Community Plant Variety Office for the financial year 2013, together with the Office’s reply
(2014/C 442/07)
INTRODUCTION
1. |
The Community Plant Variety Office (hereinafter ‘the Office’, aka ‘CPVO’), which is located in Angers, was created by Council Regulation (EC) No 2100/94 (1). Its main task is to register and examine applications for the grant of Union industrial property rights for plant varieties and to ensure that the necessary technical examinations are carried out by the competent offices in the Member States (2). |
INFORMATION IN SUPPORT OF THE STATEMENT OF ASSURANCE
2. |
The audit approach taken by the Court comprises analytical audit procedures, direct testing of transactions and an assessment of key controls of the Office’s supervisory and control systems. This is supplemented by evidence provided by the work of other auditors (where relevant) and an analysis of management representations. |
STATEMENT OF ASSURANCE
The management’s responsibility
The auditor’s responsibility
Opinion on the reliability of the accounts
Opinion on the legality and regularity of the transactions underlying the accounts
|
10. |
The comments which follow do not call the Court’s opinions into question. |
COMMENTS ON BUDGETARY MANAGEMENT
11. |
The budget execution rate for 2013 is low at 86 % (EUR 1 2 7 55 144) with a corresponding high rate of cancellations. This is partly explained by the fact that revenue and related operational expenditure (Title III) is highly dependent on the number of applications to register plant variety rights, which is difficult to forecast accurately. However, there is scope to further improve budget planning and monitoring, particularly with regard to administrative expenditure (Title II). |
FOLLOW-UP OF PREVIOUS YEARS’ COMMENTS
12. |
An overview of the corrective actions taken in response to the Court's comments from previous years is provided in Annex I. |
This Report was adopted by Chamber IV, headed by Mr Milan Martin CVIKL, Member of the Court of Auditors, in Luxembourg at its meeting of 1 July 2014.
For the Court of Auditors
Vítor Manuel da SILVA CALDEIRA
President
(2) Annex II summarises the Office's competences and activities. It is presented for information purposes.
(3) These include the balance sheet and the economic outturn account, the cash flow table, the statement of changes in net assets and a summary of the significant accounting policies and other explanatory notes.
(4) These comprise the budgetary outturn account and the annex to the budgetary outturn account.
(5) Articles 38 to 42 of the Financial Regulation of the Office.
(6) The accounting rules adopted by the Commission’s accounting officer are derived from the International Public Sector Accounting Standards (IPSAS) issued by the International Federation of Accountants or, where relevant, the International Accounting Standards (IAS)/International Financial Reporting Standards (IFRS) issued by the International Accounting Standards Board.
(7) Articles 87 to 92 of the Financial Regulation of the Office
ANNEX I
Follow-up of previous years’ comments
Year |
Court’s comment |
Status of corrective action (Completed/Ongoing/Outstanding/N/A) |
2011 |
The Office did not adopt the Implementing Rules of the Staff Regulations as regards the engagement and use of contract staff and the temporary occupation of management posts. |
Ongoing |
2012 |
The CPVO carried out a physical verification of its assets in December 2012. However, no physical verification report was produced. It is therefore not possible to verify the accuracy of the corresponding accounting records. |
Completed |
2012 |
Recruitment procedures showed significant shortcomings affecting transparency and equal treatment of candidates: the weightings and thresholds set were not always applied, no consistent evaluation method was used throughout the various recruitment procedures and the possibility of appeal was not mentioned in the vacancy notice. |
Ongoing |
ANNEX II
Community Plant Variety Office (Angers)
Competences and Activities
Areas of Union competence deriving from the Treaty (Extract of Article 36 of the Treaty on the Functioning of the European Union) |
Free movements of goods Such prohibitions or restrictions (the protection of industrial and commercial property) shall not, however, constitute a means of arbitrary discrimination or a disguised restriction on trade between Member States. |
||||||||
Competences of the Office (Council Regulation (EC) No 2100/94 and Strategic Plan 2010-2015) |
Objectives To apply the system of European Union plant variety rights as the sole and exclusive form of European Union industrial property rights for plant varieties. To foster innovation in plant varieties by high quality processing of applications for Community plant variety rights at affordable costs while providing policy guidance and assistance in the exercise of these rights for the benefit of stakeholders. Tasks
|
||||||||
Governance |
The President Directs the Office. He is appointed by the Council from a list of candidates proposed by the Commission after obtaining the opinion of the Administrative Council. The Administrative Council Oversees the Office's work programme and draws up rules governing the Office’s working methods. It is composed of one representative of each Member State and one representative of the Commission, plus their alternates. Decisions regarding the grant of Community plant variety rights are adopted by Committees composed of three members of staff of the Office and by the Board of Appeal in appeal proceedings. Control of the legality of the Office's acts Review by the Commission of the legality of the acts of the Office's President in respect of which European Union law does not provide for any control on legality by another body and of the acts of the Administrative Council relating to the Office's budget. External audit European Court of Auditors. Discharge authority Administrative Council. |
||||||||
Resources made available to the Office in 2013 (2012) |
Final Budget EUR 14,8(14,3) million Staff as at 31 December 2013 Number of posts in the establishment plan: 48 (46) Posts occupied: 45 (45) Total staff: 45 (45), undertaking the following tasks:
|
||||||||
Products and services 2013 (2012) |
Applications received: 3 297(2 868) Rights granted: 2 706(2 640) European Union rights in force at 31 December 2013: 21 576(20 362) International Cooperation on Plant Variety Protection
|
||||||||
(1) Union pour la Protection des Obtentions végétales.
(2) International Community of Breeders of Asexually Reproduced Ornamental and Fruit Plants.
(3) European Seed Association.
(4) Organisation africaine de la Propriété intellectuelle.
(5) Organisation for Economic Co-operation and Development.
(6) Ministry of Agriculture, Food & Fisheries (JP).
Source: Annex supplied by the Office.
THE OFFICE’S REPLY
11. |
The CPVO takes note of the Court’s comments regarding execution levels. In addition to external demand fluctuations, the non-resolution of an open court case related to salary levels contributed to lower execution levels in 2013. These events were beyond the control of the CPVO. The CPVO would draw attention to the fact that cancellations for Title II amount to only 2 % of the total budget for the Agency and reflect prudent spending. |
10.12.2014 |
EN |
Official Journal of the European Union |
C 442/67 |
REPORT
on the annual accounts of the Education, Audiovisual and Culture Executive Agency for the financial year 2013 together with the Agency’s reply
(2014/C 442/08)
INTRODUCTION
1. |
The Education, Audiovisual and Culture Executive Agency (hereinafter ‘the Agency’, aka ‘EACEA’), which is located in Brussels, was established by Commission Decision No 2009/336/EC (1). The Agency’s task is to manage programmes decided by the Commission in the educational, audiovisual and cultural fields, including undertaking the detailed implementation of technical projects (2). |
INFORMATION IN SUPPORT OF THE STATEMENT OF ASSURANCE
2. |
The audit approach taken by the Court comprises analytical audit procedures, direct testing of transactions and an assessment of key controls of the Agency’s supervisory and control systems. This is supplemented by evidence provided by the work of other auditors (where relevant) and an analysis of management representations. |
STATEMENT OF ASSURANCE
The management’s responsibility
The auditor’s responsibility
Opinion on the reliability of the accounts
Opinion on the legality and regularity of the transactions underlying the accounts
|
10. |
The comment which follows does not call the Court’s opinions into question. |
COMMENTS ON BUDGETARY MANAGEMENT
11. |
The level of committed appropriations was high at 97 % for both title I (staff expenditure) and title II (administrative expenditure). Although carry-overs of committed appropriations were relatively high for title II at 25 %, they mainly relate to IT services and equipment ordered and partly received in 2013 for which invoices had not been issued at year-end, and also to the multiannual nature of the Agency’s activities (experts’ project reviews and project audits). |
FOLLOW-UP OF PREVIOUS YEAR’S COMMENTS
12. |
An overview of the corrective actions taken in response to the Court's comments from the previous year is provided in Annex I. |
This Report was adopted by Chamber IV, headed by Mr Milan Martin CVIKL, Member of the Court of Auditors, in Luxembourg at its meeting of 8 July 2014.
For the Court of Auditors
Vítor Manuel da SILVA CALDEIRA
President
(1) OJ L 101, 21.4.2009, p. 26.
(2) The Annex II summarises the Agency’s competences and activities. It is presented for information purposes.
(3) These include the balance sheet and the economic outturn account, the cash flow table, the statement of changes in net assets and a summary of the significant accounting policies and other explanatory notes.
(4) These comprise the budgetary outturn account and the annex to the budgetary outturn account.
(5) Articles 62 and 68 in conjunction with Articles 53 and 58 of Regulation (EU, Euratom) No 966/2012 (OJ L 298, 26.10.2012, p. 1).
(6) The accounting rules adopted by the Commission’s accounting officer are derived from the International Public Sector Accounting Standards (IPSAS) issued by the International Federation of Accountants or, where relevant, the International Accounting Standards (IAS)/International Financial Reporting Standards (IFRS) issued by the International Accounting Standards Board.
(7) Article 162 of Regulation (EU, Euratom) No 966/2012.
ANNEX I
Follow-up of previous year’s comments
Year |
Court's comment |
Status of corrective action (Completed/Ongoing/Outstanding/N/A) |
2012 |
The level of committed appropriations was high at 99 % for both title I (staff expenditure) and title II (administrative expenditure). Although carry-overs of committed appropriations were relatively high for title II at 28 %, they mainly related to services received in 2012 for which invoices had not been issued at year-end (building costs and IT consultancy) and to the multi-annual nature of activities (experts’ project reviews and project audits). |
N/A |
ANNEX II
Education, Audiovisual and Culture Executive Agency (Brussels)
Competences and activities
Areas of Union competence deriving from the Treaty (Articles 165(1), 166(1), 167(1) and 173(1) TFEU) |
Collection of information The European Union shall contribute to the development of quality education. The European Union shall implement a vocational training policy. The European Union shall contribute to the flowering of the cultures of the Member States. The European Union and the Member States shall ensure that the conditions necessary for the competitiveness of the Union’s industry exist. |
||||||||||||||||||||||||||||||||||||||||||||||
Competences of the Agency (Council Regulation (EC) No 58/2003; Commission Decision 2009/336/EC, as amended by Decision 2012/797/EU; Commission Decision C(2009) 3355 as amended by Decision C(2012) 9475 final) |
Objectives In the framework of the education, culture and industry policies, numerous measures have been taken to promote education, vocational training, audiovisual, culture, youth and active citizenship in the European Union. The main objectives of these measures are to reinforce social cohesion and to contribute to competitiveness, to economic growth and to an ever closer union amongst the people of Europe. These measures include a variety of programmes. The Agency is responsible for managing certain strands of these programmes — e.g. Lifelong learning, Culture, Youth in Action, Europe for Citizens, MEDIA, Erasmus Mundus, MEDIA Mundus and Tempus. In this respect, it implements the aid of the Union, except for tasks which require discretionary powers in translating political choices. Tasks
|
||||||||||||||||||||||||||||||||||||||||||||||
Governance |
Steering Committee Composition Comprises five members appointed by the European Commission. Duties It adopts the Agency's annual work programme after approval by the European Commission. In addition, it adopts the administrative budget of the Agency and its annual activity report. Director Appointed by the European Commission. External audit European Court of Auditors. Internal audit Internal Audit Capability. European Commission's Internal Audit Service (IAS). Discharge authority European Parliament acting on a recommendation from the Council. |
||||||||||||||||||||||||||||||||||||||||||||||
Resources made available to the Agency in 2013 (2012) |
Budget The 2013 administrative budget of the Agency was 51 (50) million euro (100 % financed by the general budget of the European Union). The Agency has managed 850 (728) million euro related to the programmes and projects delegated by the Commission to the Executive Agency. Staff as at 31 December 2013 Temporary staff: 105 (103) posts for temporary staff in the establishment plan Post occupied: 99 (99) Contract staff: 348 (335) contract staff posts Posts occupied: 336 (329) Total staff: 435 (428) posts occupied by staff undertaking the following tasks: Operational: 352 Administrative: 83 |
||||||||||||||||||||||||||||||||||||||||||||||
Products and services in 2013 (2012) |
Communication
Selections
Monitoring visits
Simplification measures
Cooperation with parent DGs
Policy support
Audits 114 audits under the 2012 audit plan are being implemented. 114 new audits are scheduled under the 2013 audit plan. Contracts and projects: 5 492 contracts were signed, 4 969 projects were closed. Mandate
|
||||||||||||||||||||||||||||||||||||||||||||||
(1) Electronic platform for the dissemination and exploitation of results of projects supported by programmes managed by the European Commission in the fields of education, training, culture, youth and citizenship.
Source: Annex supplied by the Agency.
THE AGENCY’S REPLY
11: |
The Agency takes note of the Court's comments. Compared to last year, the level of carried-over appropriations has been reduced. The Agency will continue the efforts put in place to control and further reduce the rate of carry-over. |
10.12.2014 |
EN |
Official Journal of the European Union |
C 442/74 |
REPORT
on the annual accounts of the Executive Agency for Competitiveness and Innovation for the financial year 2013, together with the Agency’s replies
(2014/C 442/09)
INTRODUCTION
1. |
The Executive Agency for Competitiveness and Innovation (hereinafter ‘the Agency’, aka ‘EACI’), which is located in Brussels, is the former Intelligent Energy Executive Agency (IEEA). Its mandate and duration were modified by Commission Decision 2007/372/EC (1) amending Decision 2004/20/EC (2). The Agency was established for a period beginning on 1 January 2004 and ending on 31 December 2015, to manage EU actions in the field of energy, entrepreneurship and innovation, and sustainable freight transport (3). |
INFORMATION IN SUPPORT OF THE STATEMENT OF ASSURANCE
2. |
The audit approach taken by the Court comprises analytical audit procedures, direct testing of transactions and an assessment of key controls of the Agency’s supervisory and control systems. This is supplemented by evidence provided by the work of other auditors (where relevant) and an analysis of management representations. |
STATEMENT OF ASSURANCE
The management’s responsibility
The auditor’s responsibility
Opinion on the reliability of the accounts
Opinion on the legality and regularity of the transactions underlying the accounts
|
10. |
The comments which follow do not call the Court’s opinions into question. |
COMMENTS ON BUDGETARY MANAGEMENT
11. |
Although budget implementation rates for 2013 were satisfactory, the extent to which appropriations carried over from 2012 were cancelled in 2013 (2 15 000 euro, or 19 % of carry-overs) indicates weaknesses in the Agency’s budget planning and is at odds with the budgetary principle of annuality. These cancellations are mainly related to provisional commitments made for routine administrative expenditure. |
FOLLOW-UP OF PREVIOUS YEAR’S COMMENTS
12. |
An overview of the corrective actions taken in response to the Court’s comments from the previous year is provided in Annex I. |
This Report was adopted by Chamber IV, headed by Mr Pietro RUSSO, Member of the Court of Auditors, in Luxembourg at its meeting of 16 September 2014.
For the Court of Auditors
Vítor Manuel da SILVA CALDEIRA
President
(1) OJ L 140, 1.6.2007, p. 52.
(3) Annex II summarises the Agency’s competences and activities. It is presented for information purposes.
(4) These include the balance sheet and the economic outturn account, the cash flow table, the statement of changes in net assets and a summary of the significant accounting policies and other explanatory notes.
(5) These comprise the budgetary outturn account and the annex to the budgetary outturn account.
(6) Articles 62 and 68 in conjunction with Articles 53 and 58 of Regulation (EU, Euratom) No 966/2012 of the European Parliament and of the Council (OJ L 298, 26.10.2012, p. 1).
(7) The accounting rules adopted by the Commission’s accounting officer are derived from the International Public Sector Accounting Standards (IPSAS) issued by the International Federation of Accountants or, where relevant, the International Accounting Standards (IAS)/International Financial Reporting Standards (IFRS) issued by the International Accounting Standards Board.
(8) Article 162 of Regulation (EU, Euratom) No 966/2012.
ANNEX I
Follow-up of previous year’s comments
Year |
Court’s comment |
Status of corrective action (Completed/Ongoing/Outstanding/N/A) |
2012 |
The Agency’s Internal Audit Capability (IAC) is also responsible for the Agency’s ex post verifications, which form part of its internal control system. This reduces the IAC’s resources for internal audit activities and means that it is not in a position to carry out independent audits in this area. This dual role is incompatible with the Internal Control Standards and International Standards for the professional practice of Internal Auditing. |
Completed |
2012 |
There is room for improving the recruitment procedures: selection criteria were not fully in line with those mentioned in the vacancy notice; certain selection criteria were weighted disproportionately; no threshold scores for the pre-selection phase and no maximum number of candidates for the reserve lists were set in advance; the justification for the exclusion of candidates at the final stage of the procedures was not always sufficiently documented and declarations on confidentiality and absence of conflict of interest were not always signed. |
Completed |
ANNEX II
Executive Agency for Competitiveness and Innovation (Brussels)
Competences and activities
Areas of Union competence deriving from the Treaty on the Functioning of the European Union (TFEU) |
|
||||||||||||||||||||||||||||||||||||||||
Competences of the Agency (as defined in Commission Decision 2004/20/EC, amended by Decision 2007/372/EC) |
Objectives Within the framework of the Lisbon strategy for growth and jobs, the European Union has taken measures to promote and develop competitiveness and innovation. These measures include the establishment of the Competitiveness and Innovation Framework Programme (CIP) 2007-2013 (Decision No 1639/2006/EC of the European Parliament and of the Council), notably with the programmes Intelligent Energy — Europe (IEE) and Entrepreneurship and Innovation (EIP). The main objectives are to foster competitiveness of enterprises, in particular SMEs; to promote all forms of innovation, as well as eco-innovation; to promote energy efficiency and new and renewable energy sources. The measures taken in the framework of the Lisbon strategy also include the second Marco Polo (MP) programme (Regulation (EC) No 1692/2006 of the European Parliament and of the Council). The main objectives are to reduce congestion, improve the environmental performance of the transport system and to enhance inter-modal transport, thereby contributing to efficient and sustainable transport systems and to competitiveness and innovation, especially of SMEs. Under these EU programmes, the Agency is responsible for all implementing tasks concerning EU aid, except for programme evaluation, monitoring of legislation and strategic studies, or any other action which comes under the exclusive competence of the European Commission. Tasks Implementing the EU programmes according to the delegations received from the Commission:
|
||||||||||||||||||||||||||||||||||||||||
Governance |
Steering Committee Comprises five members appointed by the European Commission. It adopts the Agency’s annual work programme after approval by the European Commission. It also adopts the administrative budget of the Agency and its annual activity report. Director Appointed by the European Commission. External audit European Court of Auditors. Discharge authority European Parliament, acting on a recommendation by the Council. |
||||||||||||||||||||||||||||||||||||||||
Resources made available to the Agency in 2013 (2012) |
Budget Operational budget The total planned amount was 242,9(241,3) million euro (of which 100 % came from the general budget of the EU). This amount was committed, and 213,9 million euro was paid, as approved by the Budgetary Authority. EACI implements the operational budget under the responsibility of the Commission.
Administrative budget The Agency had an administrative budget of 16,4(16,4) million euro, for which EACI is independently responsible. The Agency’s administrative budget was subsidised by the EU at a rate of 100 %. Staff at 31 December 2013
|
||||||||||||||||||||||||||||||||||||||||
Products and services provided in 2013 |
EACI is responsible for the management of Union actions in the fields of energy; entrepreneurship and innovation (including eco-innovation); and sustainable freight transport, under the following Union programmes:
Intelligent Energy Europe (IEE) Key activities
Eco-innovation Key activities Eco-innovation is supported via the CIP through several types of measures (financial instruments, networks of national and regional actors, first application and market replication projects). The Agency is entrusted with the management of the eco-innovation first application and market replication projects with a budget of approximately 200 million euro for the 2008-2013 period. In 2013, efforts were concentrated on the following areas.
Marco Polo programme Key activities
EIP programme — Enterprise Europe Network Key activities The programme is made up of more than 600 partner organisations in more than 50 countries, including the 28 EU Member States. In addition to project management tasks for 92 contracts (specific grant agreements) and the IPeuropAware project, the EACI is also responsible for supporting the Enterprise Europe Network and for managing the IT tools and databases used for interactive communication among the network partners.
|
||||||||||||||||||||||||||||||||||||||||
Source: Annex supplied by the Agency. |
THE AGENCY’S REPLIES
11. |
As every year, we reviewed our commitments end 2012 on the basis of our best knowledge and carried over around EUR 1,125 million of payment appropriations (less than 8 % of the 2012 budget) to cover our obligations. A part of these carried over appropriations (0,215 million euro) was finally cancelled because the payments actually due were lower than expected. The main reasons were: first, a subcontractor that could not deliver all its work before year-end; second, lower amounts paid on certain commitments, due to external factors (share of costs related to the building and in SLAs, experts who worked in the last weeks of 2012); third, the number of budget lines (more than 20), which made that small amounts of a few thousand euros or less on each line, contributed to the cumulated amount of 0,215 million euro pointed by the Court of Auditors. It is worth noting nevertheless that this amount of 0,215 million euro was 30 % lower than the year before (0,309 million euro) and represented 1,5 % only of the 2012 administrative budget of the Agency. The new structure of the administrative budget adopted as of 2014, with less budget lines, should to some extent make it easier to reduce cancellations of carried-over appropriations. |
10.12.2014 |
EN |
Official Journal of the European Union |
C 442/83 |
REPORT ON THE ANNUAL ACCOUNTS
of the Executive Agency for Health and Consumers for the financial year 2013, together with the Agency’s replies
(2014/C 442/10)
INTRODUCTION
1. |
The Executive Agency for Health and Consumers (hereinafter ‘the Agency’, aka ‘EAHC’), located in Luxembourg, was set up by Commission Decision No 2004/858/EC (1) and amended by Decision No 2008/544/EC (2). The Agency was established for a period beginning 1 January 2005 and ending 31 December 2015 for the management of Union actions in the field of health and consumer policy (3). By Commission Decision No 2013/770/EU (4), the Agency was replaced by its legal successor Consumers, Health and Food Executive Agency (CHAFEA) established for a period beginning 1 January 2014 and ending 31 December 2024. |
INFORMATION IN SUPPORT OF THE STATEMENT OF ASSURANCE
2. |
The audit approach taken by the Court comprises analytical audit procedures, direct testing of transactions and an assessment of key controls of the Agency’s supervisory and control systems. This is supplemented by evidence provided by the work of other auditors (where relevant) and an analysis of management representations. |
STATEMENT OF ASSURANCE
The management’s responsibility
The auditor’s responsibility
Opinion on the reliability of the accounts
Opinion on the legality and regularity of the transactions underlying the accounts
|
10. |
The comments which follow do not call the Court’s opinions into question. |
COMMENTS ON BUDGETARY MANAGEMENT
11. |
Of the 1,1 million euro carried over from 2012, 0,23 million euro or 21 % were cancelled in 2013. Such a high level of cancellations indicates weaknesses in budget planning, particularly in forecasting costs for meetings with external participants. |
12. |
The overall level of committed appropriations was relatively low at 94 %. The 2013 payment rates against committed appropriations were satisfactory for title I and II at 97 % and 87 % respectively. Although carry-overs for title III are high at 1,0 million euro or 43 % of committed title III appropriations, they reflect the multiannual nature of the Agency’s activities and payments were planned and made according to operational needs. |
FOLLOW-UP OF PREVIOUS YEARS’ COMMENTS
13. |
An overview of the corrective actions taken in response to the Court's comments from previous years is provided in Annex I. |
This Report was adopted by Chamber IV, headed by Mr Milan Martin CVIKL, Member of the Court of Auditors, in Luxembourg at its meeting of 8 July 2014.
For the Court of Auditors
Vítor Manuel da SILVA CALDEIRA
President
(1) OJ L 369, 16.12.2004, p. 73.
(2) OJ L 173, 3.7.2008, p. 27.
(3) Annex II summarises the Agency’s competences and activities. It is presented for information purposes.
(4) OJ L 341, 18.12.2013, p. 69.
(5) These include the balance sheet and the economic outturn account, the cash flow table, the statement of changes in net assets and a summary of the significant accounting policies and other explanatory notes.
(6) These comprise the budgetary outturn account and the annex to the budgetary outturn account.
(7) Articles 62 and 68 in conjunction with Articles 53 and 58 of Regulation (EU, Euratom) No 966/2012 (OJ L 298, 26.10.2012, p. 1).
(8) The accounting rules adopted by the Commission’s accounting officer are derived from the International Public Sector Accounting Standards (IPSAS) issued by the International Federation of Accountants or, where relevant, the International Accounting Standards (IAS)/International Financial Reporting Standards (IFRS) issued by the International Accounting Standards Board.
(9) Article 162 of Regulation (EU, Euratom) No 966/2012.
ANNEX I
Follow-up of previous years’ comments
Year |
Court's comment |
Status of corrective action (Completed/Ongoing/Outstanding/N/A) |
2011 |
For title III — Expenditure related to operational expenditure, an amount of 0,8 million euro, or 46 % of commitments made, was carried forward to 2012. The high level of carry-over is at odds with the budgetary principle of annuality. |
N/A |
2012 |
Of the 1,1 million euro carried over from 2011, 0,2 million euro (18 %) were cancelled in 2012. Although this is partly related to difficulties in forecasting costs for meetings with external participants, such a high level indicates deficits in terms of budget planning. |
N/A |
2012 |
The 2012 payment rates against committed appropriations are satisfactory for title I and II at 96 % and 84 % respectively. Carry-overs for title III, however, are high at 1,1 million euro or 47 % of committed title III appropriations. Although this is partly related to the late presentation of mission cost claims by external meeting participants, such a high level is at odds with the budgetary principle of annuality. |
N/A |
ANNEX II
Executive Agency for Health and Consumers (Luxembourg)
Competences and activities
Areas of Union competence deriving from the Treaty (Article 168 and 169 of the Treaty on the Functioning of the European Union) |
A high level of human health protection shall be ensured in the definition and implementation of all Union policies and activities. Union action, which shall complement national policies, shall be directed towards improving public health, preventing human illness and diseases, and obviating sources of danger to human health. Such action shall cover the fight against the major health scourges, by promoting research into their causes, their transmission and their prevention, as well as health information and education. The Union shall complement the Member States' action in reducing drugs-related health damage, including information and prevention. In order to promote the interests of consumers and to ensure a high level of consumer protection, the Union shall contribute to protecting the health, safety and economic interests of consumers, as well as to promoting their right to information, education and to organise themselves in order to safeguard their interests. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||
Competences of the Agency |
Objectives
Tasks Under the Union programmes mentioned below, the Agency is responsible for implementing the following tasks as defined in the delegation act adopted on 9 September 2008 (1): Public Health Programme 2003-2008 — Decision No 1786/2002/EC Public Health Programme 2008-2013 — Decision No 1350/2007/EC Consumers Programme 2007-2013 — Decision No 1926/2006/EC Food Safety Training Measures — Regulation (EC) No 882/2004 and Directive 2000/29/EC:
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||
Governance |
Steering Committee Comprises five members appointed by the European Commission. The members of the Steering Committee are appointed for two years. It adopts the Agency's annual work programme after approval by the European Commission. In addition, it adopts the administrative budget of the Agency and its annual activity report. Director Appointed by the European Commission for four years. External audit European Court of Auditors. Discharge authority European Parliament following a recommendation from the Council. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||
Resources made available to the Agency in 2013 (2012) |
Final Budget The Agency's administrative budget for 2013 amounted to 7,23(7,22) million euro. Staff at 31 December 2013 On 31 December 2013, the Agency employed 49 (50) statutory staff members, including 11 (11) temporary staff and 38 (39) contract staff. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||
Products and services 2013 |
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||
(1) Commission Decision of 9 September 2008 — delegating powers to the Agency.
(2) OJ C 378/6, 8.12.2012, http://ec.europa.eu/eahc/documents/health/calls/2013/HP_work_plan_for_2013.pdf
(3) http://ec.europa.eu/eahc/
Source: Annex supplied by the Agency.
THE AGENCY’S REPLIES
11. |
The Agency takes note of the Court's observation. Efforts are made to further reduce the level of cancellation of commitment appropriations carried forward. Notably, related to meeting and information days specific actions are implemented to lower the cancellation from the observed 94 953 € (2013) to below 24 000 € (2014). |
12. |
The Agency takes note of the Court's observation and maintains its commitment to keep the level of carry forward of commitment appropriations — to the extent possible — low. Regarding the low overall level of commitmed appropriations — 94 % — it is to be noted that Title I (Staff Expenditure) represents 58,77 % of the total budget. The not fully implemented appropriations related principally to the Court of Justice ruling in November 2013 on the refused salary increases of 2011 and 2012, which concerns an isolated event. |
10.12.2014 |
EN |
Official Journal of the European Union |
C 442/93 |
REPORT
on the annual accounts of the European Aviation Safety Agency, for the financial year 2013 together with the Agency’s replies
(2014/C 442/11)
INTRODUCTION
1. |
The European Aviation Safety Agency (hereinafter ‘the Agency’, aka ‘EASA’), which is located in Cologne, was established by Regulation (EC) No 1592/2002 of the European Parliament and of the Council (1) as last amended by Regulation (EC) No 1108/2009 (2). The Agency has been given specific regulatory and executive tasks in the field of aviation safety (3). |
INFORMATION IN SUPPORT OF THE STATEMENT OF ASSURANCE
2. |
The audit approach taken by the Court comprises analytical audit procedures, direct testing of transactions and an assessment of key controls of the Agency’s supervisory and control systems. This is supplemented by evidence provided by the work of other auditors (where relevant) and an analysis of management representations. |
STATEMENT OF ASSURANCE
The management’s responsibility
The auditor’s responsibility
Opinion on the reliability of the accounts
Opinion on the legality and regularity of the transactions underlying the accounts
|
10. |
The comments which follow do not call the Court’s opinions into question. |
COMMENTS ON THE LEGALITY AND REGULARITY OF TRANSACTIONS
11. |
In 2012 EASA selected 14 National Aviation Authorities (NAAs) and 10 ‘Qualified Entities’ (QEs) through procurement procedures to outsource part of its certification activities (9). Expenditure for such outsourced certification activities amounted to some 22 million euro in 2013. The process of allocating specific certification tasks to NAAs and QEs and the criteria to be used are described in specific guidelines established by the Agency (10)..However, the transparency of outsourcing could be improved through better documentation of the allocation processes, including the assessments made on the basis of the criteria set in the guidelines. This is also the case for the allocation of the many other low-value contracts to bidders. |
COMMENTS ON BUDGETARY MANAGEMENT
12. |
The overall level of appropriations committed was high at 98 %. Although the Agency reduced further the overall level of carry-overs of committed appropriations from 10,1 million euro (11 %) in 2012 to 7,2 million euro (8 %) in 2013, carry-overs of committed appropriations for title III were high at 3,4 million euro (42 %). Although this is partly justified by the multiannual nature of the Agency’s operations and the carry-overs included in the Court’s sample were duly justified, such a high level is at odds with the budgetary principle of annuality. |
OTHER COMMENTS
13. |
The Agency became operational in 2004 and has, to date, worked on the basis of correspondence and exchanges with the host Member State. However, a comprehensive headquarters agreement between the Agency and the Member State has not been signed. Such an agreement would promote transparency in respect of the conditions under which the Agency and its staff operate. |
FOLLOW-UP OF PREVIOUS YEARS’ COMMENTS
14. |
An overview of the corrective action taken in response to the Court's comments from previous years is provided in Annex I. |
This Report was adopted by Chamber IV, headed by Mr Milan Martin CVIKL, Member of the Court of Auditors, in Luxembourg at its meeting of 1 July 2014.
For the Court of Auditors
Vítor Manuel da SILVA CALDEIRA
President
(2) OJ L 309, 24.11.2009, p. 51.
(3) Annex II summarises the Agency’s competences and activities. It is presented for information purposes.
(4) These include the balance sheet and the economic outturn account, the cash flow table, the statement of changes in net assets and a summary of the significant accounting policies and other explanatory notes.
(5) These comprise the budgetary outturn account and the annex to the budgetary outturn account.
(6) Articles 39 and 50 of Commission Delegated Regulation (EU) No 1271/2013 (OJ L 328, 7.12.2013, p. 42).
(7) The accounting rules adopted by the Commission’s accounting officer are derived from the International Public Sector Accounting Standards (IPSAS) issued by the International Federation of Accountants or, where relevant, the International Accounting Standards (IAS)/International Financial Reporting Standards (IFRS) issued by the International Accounting Standards Board.
(8) Article 107 of Regulation (EU) No 1271/2013.
(9) At the end of May 2014, 3 contracts with QEs had been terminated and consequently there were 14 active contracts with NAAs and 7 with QEs.
(10) ‘Guidelines for the allocation of certification tasks to National Aviation Authorities and Qualified Entities’, EASA Management Board Decision 01-2011.
ANNEX I
Follow-up of previous years’ comments
Year |
Court's comment |
Status of corrective action (Completed/Ongoing/Outstanding/N/A) |
2011 |
At the end of 2011, the Agency held bank balances of 55 million euro (2010: 49 million euro) at one bank only. There was no treasury policy in place to limit this risk while gaining appropriate investment returns. |
Completed |
2012 |
The Agency established a standard procedure for ex ante verifications. However, the related checklists were not completed and documentation justifying the validation of expenditure was not always available (1). |
Completed |
2012 |
A methodology for ex post verifications was approved in 2009. Although the Agency made further developments in its implementation, room for improvement still exists in the following areas: there is still no annual planning of verifications, the sample of transactions to be checked is not risk-based and the methodology does not cover public procurement procedures. |
Completed |
2012 |
The overall level of appropriations committed was 95 %, varying between 96 % for title I (staff expenditure), 95 % for title II (administrative expenditure) and 89 % for title III (operational expenditure). However, carry-overs of committed appropriations were high for title III at 46 %. Although this is partly justified by the multiannual nature of the Agency’s operations and the carry-overs included in the Court’s sample were duly justified, such a high level is at odds with the budgetary principle of annuality. |
N/A |
2012 |
In one of the audited recruitment procedures, the selected candidate did not meet the Staff Regulations’ requirements as regards university degrees or equivalent professional training. |
N/A |
(1) Timesheets to justify services charged on a man/days basis did not exist.
ANNEX II
European Aviation Safety Agency (Cologne)
Competences and activities
Areas of Union competence deriving from the Treaty (Article 100 of the Treaty on the Functioning of the European Union) |
The European Parliament and the Council, acting in accordance with the ordinary legislative procedure, may lay down appropriate provisions for sea and air transport. They shall act after consulting the Economic and Social Committee and the Committee of the Regions. |
||||||||||||
Competences of the Agency (The Agency's powers as defined in Regulation (EC) No 216/2008 of the European Parliament and of the Council (the ‘Basic Regulation’)) |
Objectives
Tasks
|
||||||||||||
Governance |
Management Board Composition: consisting of one representative of each Member State and one representative of the Commission, Tasks The tasks of the Management Board are described in the Basic regulation and are, for example:
Executive Director Manages the Agency and is appointed by the Management Board on a proposal from the Commission. The Board of Appeal Decides on appeals against the Agency's decisions in accordance with Article 44 of Regulation (EC) No 216/2008 in certain respects such as certification, fees & charges and investigation of undertakings. External audit European Court of Auditors. Discharge authority European Parliament, acting on a recommendation by the Council. |
||||||||||||
Resources made available to the Agency in 2013 (2012) |
Final Budget Total budget: 151,2(150,2) million euro, including:
Staff as at 31 December 2013 692 (634) temporary staff in the establishment plan Posts occupied: 647 (612) Post occupied by other staff Total: 100 (74,6) of which contract staff: 85 (63,3); seconded national experts: 15 (11,3); special advisors: 0 (0) Total temporary staff: 648 (1) (613) Filled posts subsidy-financed: 219 (2) (216) Filled posts fee-financed: 429 (2) (396) |
||||||||||||
Products and services in 2013 (2012) |
Opinions 12 Opinions Rulemaking Decisions 28 Decisions related to: Certification specifications (8); Acceptable Means of Compliance and Guidance Material (20) Additional deliverables in 2013 (which will lead to Rules in the forthcoming years) 32 Terms of Reference (ToRs), 26 Notices of Proposed Amendment (NPAs), 24 Comment Response Document (CRDs) International Cooperation 12 Working Arrangements. 2 modifications of Appendices to a Working Arrangement 2 Rulemaking cooperation arrangements with EASA bilateral partners Support for the negotiations of the EU — Ukraine Common Aviation Area Agreement (agreement was initialled in 2013) 10 recommendations provided on International Civil Aviation Organization (ICAO) State Letters. BASA (Bilateral Aviation Safety Agreement) Support for the ratification process of the BASA EU-Brazil and the process for the development of the relevant instruments required for the practical implementation of the Agreement. Support for the implementation of the EU — US Bilateral Aviation Safety Agreement (BASA), including for the preparation of the board meetings, and the annual Flight Standards meeting with the Federal Aviation Administration (FAA). Support to the European Commission for the development of new Annexes to the EU-US BASA (Flight Crew Licensing, Flight Simulation Training Devices, Pilot Training Organisations) Certification decisions at 31 December 2013 Type Certificates/Restricted Type Certificates (TCs/RTCs): 11 (3) Supplemental Type Certificates (STCs): 688 Airworthiness Directives (ADs): 382 Alternative Method of Compliance (AMOC): 82 European Technical Standard Order Authorisation (ETSOA): 214 Major changes/Major repairs/TC New Derivatives: 1 017 Minor changes/Minor repairs: 643 Aircraft Flight Manual (AFM): 318 Approval of flight conditions (PTF): 457 Flight Simulation Training Devices (FSTD): 311 Approval of Design organisations (AP and Alternative Procedures to DOA (AP-DOA): 550 Approval of Maintenance organisations (bilateral) (4): 1 544 Approval of Maintenance organisations (foreign) (4): 328 Approval of Maintenance training organisations (4): 52 Approval of Manufacturing (4): 23 Approval of Flight Crew Licencing Organisations (4): 15 Approval of ATM/ANS Organisations (4): 3 Standardisation inspections (number of inspections by type) at 31 December 2013 In the field of Airworthiness (AIR): 22 In the field of Operations (OPS): 16 In the field of flight crew licensing (FCL): 16 In the field of medical flight crew licensing (MED): 12 In the field of flight simulation training devices (FSTD): 9 In the field of Air Traffic Management/Air Navigation Services (ANS): 14 In the field of Safety Assessment of Foreign Aircraft (SAFA): 13 |
||||||||||||
(1) Two structural part-time pilots occupy one post.
(2) The split of filled posts between fee-financed and subsidy-financed may change subject to possible revision of the cost-accounting allocation keys as of 31 December 2013.
(3) Only those TCs/RTCs are counted which were issued for a new design type. TCs issued as a result of grandfathering, transfer or administrative re-issuance are excluded.
(4) The organisation approval activity is subdivided into a main surveillance activity of already approved organisations (with a renewal every 2/3 years) and an activity linked to new approvals. The data supplied concern the total number of approvals on 31 December 2013.
Source: Annex supplied by the Agency.
THE AGENCY’S REPLIES
11. |
In the frame of a better control of the certification activities outsourced to National Aviation Authorities (NAA) and potentially qualified entities (QE), the certification directorate (C) together with the finance directorate (F) will implement in 2014 a simple means to record that the selection of the provider for any given outsourcing purchase order has been made and optimised in accordance with the criteria of Annex 1 to ED decision 2011/056/F. As regards shortlisting of candidates for low-value contracts the Agency will systematically consider the ECA’s comment in selecting invitees and documenting it accordingly as relevant. |
12. |
The Agency would like to highlight that great efforts have already been made to reduce the level of title III carry-overs and this is already reflected in the significant decrease compared to the previous year: i.e. 6,2 million euro in 2012 compared to 3,4 million euro in 2013. During 2013 some appropriations had to be held back in case 2011 salary adjustments and were reassigned during the year to high priorities projects (rulemaking and safety research projects). This inhibited commitments early in the year resulting in a substantial impact on the level of carry overs at year end. |
13. |
As the EASA has already experienced some unclarities concerning our relations with our host state due to the absence of a proper seat agreement, the EASA acknowledges the recommendation and will work closely with the EU Council, Parliament and Commission, to establish a proper headquarters agreement. Such agreement should — apart from promoting transparency of relations with the host Member State — ensure that the host State takes all necessary measures to facilitate the unimpeded exercise by the Agency of its legal mandate as well as clarifying the relations between national judicial authorities and the Agency. |
10.12.2014 |
EN |
Official Journal of the European Union |
C 442/102 |
REPORT
on the annual accounts of the European Asylum Support Office for the financial year 2013, together with the Office’s replies
(2014/C 442/12)
INTRODUCTION
1. |
The European Asylum Support Office (hereinafter ‘the Office’, aka ‘EASO’), which is located in Valletta, was established by Regulation (EU) No 439/2010 of the European Parliament and of the Council (1). The Office’s task is to support the development of the Common European Asylum System. It was established with the aim of enhancing practical cooperation on asylum matters and helping Member States fulfil their European and international obligations to give protection to people in need. EASO acts as a centre of expertise on asylum. It also provides support to Member States whose asylum and reception systems are under particular pressure. |
INFORMATION IN SUPPORT OF THE STATEMENT OF ASSURANCE
2. |
The audit approach taken by the Court comprises analytical audit procedures, direct testing of transactions and an assessment of key controls of the Office’s supervisory and control system. This is supplemented by evidence provided by the work of other auditors (where relevant) and an analysis of management representations. |
STATEMENT OF ASSURANCE
The management’s responsibility
The auditor’s responsibility
Opinion on the reliability of the accounts
Opinion on the legality and regularity of the transactions underlying the accounts
|
10. |
The comments which follow do not call the Court’s opinions into question. They should be considered in the light of the fact that 2013 was the Agency’s first full year of financial autonomy. |
COMMENTS ON THE RELIABILITY OF THE ACCOUNTS
11. |
The basis for an accrual amounting to 40 000 euro relating to expenses and allowances for staff who entered into service in 2013 was not made available in the course of the audit. |
COMMENTS ON INTERNAL CONTROLS
12. |
Of the total number of payments, 446 (18 %) were made after the time limits set in the Financial Regulation. The average delay for late payments was 21 days. |
13. |
Six of the 16 internal control standards have not been fully implemented. |
COMMENTS ON BUDGETARY MANAGEMENT
14. |
The Agency had overestimated its budgetary needs for 2013 by 13 % (2012: 32 %) and only 10,4 million of the 12 million euro budget were committed. Appropriations carried over amounted to 2,5 million euro or 24 % (2012: 65 %) of total committed appropriations, of which 3 37 031 euro were not covered by a legal commitment. While there is scope for improved budgetary planning, both the overestimation of budgetary needs and the carry-overs of committed appropriations were significantly lower than the previous year. |
15. |
Carry-overs of committed appropriations mainly concern title II (other administrative expenditure) at 5 40 269 euro, i.e. 31 % of committed appropriations, and title III (operational activities) at 1 8 41 798 euro (45 % of committed appropriations). They are mostly related to invoices not yet received and/or paid at year-end or where the services in question had not been delivered. |
OTHER COMMENTS
16. |
There is room to improve the transparency of recruitment procedures: questions for interviews and written tests were drafted after examination of the applications, which increases the risk of questions being influenced by individual applications; the selection committees did not always award scores to all selection criteria included in the vacancy notices; the declaration of conflict of interest signed by selection committee members only considers a personal relationship to constitute a potential conflict of interest and explicitly excludes professional relationships; in the case of one specific recruitment procedure a discrepancy was noted between one eligibility criterion indicated in the vacancy notice and the corresponding selection criterion concerning the number of years of proven professional experience. |
FOLLOW-UP OF PREVIOUS YEAR’S COMMENTS
17. |
An overview of the corrective actions taken in response to the Court’s comments from the previous year is provided in Annex I. |
This Report was adopted by Chamber IV, headed by Mr Milan Martin CVIKL, Member of the Court of Auditors, in Luxembourg at its meeting of 8 July 2014.
For the Court of Auditors
Vítor Manuel da SILVA CALDEIRA
President
(1) OJ L 132, 29.5.2010, p. 11.
(2) These include the balance sheet and the economic outturn account, the cash flow table, the statement of changes in net assets and a summary of the significant accounting policies and other explanatory notes.
(3) These comprise the budgetary outturn account and the annex to the budgetary outturn account.
(4) Articles 39 and 50 of Commission Delegated Regulation (EU) No 1271/2013 (OJ L 328, 7.12.2013, p. 42).
(5) The accounting rules adopted by the Commission’s accounting officer are derived from the International Public Sector Accounting Standards (IPSAS) issued by the International Federation of Accountants or, where relevant, the International Accounting Standards (IAS)/International Financial Reporting Standards (IFRS) issued by the International Accounting Standards Board.
(6) Article 107 of Regulation (EU) No 1271/2013.
ANNEX I
Follow-up of previous year’s comments
Year |
Court’s comment |
Status of corrective action (Completed/Ongoing/Outstanding/N/A) |
2012 |
The Office’s accounting system has not yet been validated by the Accounting Officer. |
Completed |
2012 |
A carry-over of 0,2 million euro was not covered by a legal commitment (contract) and was therefore irregular. |
N/A |
2012 |
No physical inventory has been performed to ensure that all equipment purchased to set up the Office is included in the register. |
Completed |
2012 |
Fifty payments, representing about 20 % of the total amount of payments, were made after the deadlines set by the Financial Regulation. |
N/A |
2012 |
Ten of the 16 internal control standards (1)have not yet been fully implemented. |
Ongoing |
2012 |
The budgetary needs for 2012 were considerably overestimated: only 4,8 million euro out of the 7 million euro transferred upon receiving financial autonomy were committed. |
N/A |
2012 |
Committed appropriations of 3,2 million euro have been carried over, representing 65,13 % of total committed appropriations for the period of financial autonomy (2). These carry-overs concern title I (staff expenditure) at 0,3 million euro, title II (other administrative expenditure) at 1,4 million euro and title III (operational activities) at 1,5 million euro. They are mostly related to invoices not yet received and/or paid at year-end and to pending reimbursements of costs relating to experts. Furthermore, some 0,8 million euro concern refurbishment work carried out at the Office’s premises in 2012, for which the payments will be made following final acceptance (3). Such a high level of carry-overs is however at odds with the budgetary principle of annuality. |
N/A |
2012 |
The amounts of several budget commitments were insufficient to cover the related goods and services delivered. The estimated amount of deliveries not covered was 0,2 million euro, resulting in a corresponding overstatement in the Budget Outturn Account. |
N/A |
2012 |
EASO coordinates the deployment of Member States’ experts to support other Member States in crises (emergency support actions) and reimburses experts’ mission costs on a flat-rate basis. Total reimbursed mission costs amounted to some 4 17 000 euro (24 % of total payments). Flat-rate reimbursements of costs were also made to external participants attending meetings held at EASO’s premises. Meeting costs are spread over various budget lines and the total amount is unknown. Although the application of flat rates reduces administrative burdens, they may be higher than the actual costs incurred. |
N/A |
2012 |
To host EASO, the Maltese Government offered the building (4) and the lease agreement with the Maltese Transport Authority stipulates that the premises ‘are being transferred in a finished state with essential service points being provided’. For the building to become functional, however, it needed to be adapted (5) at an estimated cost of 4,3 million euro, of which 3,8 million euro was to be covered by the Commission. By the end of 2012, most of the work had been completed and advance payments amounting to some 3 million euro had been made to the Maltese Government. Furthermore EASO will pay rent amounting to some 3,7 million euro over a nine-year period. |
N/A |
2012 |
The Commission had informed the European Parliament and Council about the host arrangements and the fact that the building required some adaptation to be financed by the Maltese Government and the Commission. Although the budgetary authorities were informed about the project, there is no evidence that they were aware of the expected costs and the EU’s share thereof. |
N/A |
2012 |
There is room to improve the transparency of recruitment procedures: there was no evidence that weightings and threshold scores to be invited for interviews and for being put on the reserve list were set before examination of the applications, or that questions for interviews and written tests were set before the examination of applications. |
Outstanding |
(1) ICS Nos 3, 4, 5, 6, 8, 9, 10, 11, 13 and 14.
(2) 40,32 % when taking the full 2012 calendar year into account.
(3) Final acceptance was on-going in May 2013.
(4) Described in the bid as state of the art.
(5) According to the related grant agreement between the Commission and the Maltese Government, this includes i.e. the modification of office space layout, double glazing, IT and security infrastructure, installation of a conference room, etc.
ANNEX II
European Asylum Support Office, EASO (Valletta Harbour, Malta)
Competences and activities
Areas of Union competence deriving from the Treaty (Article 3 of the Treaty on European Union and Articles 67, 78 and 80 of the Treaty on the Functioning of the European Union) |
The Union shall offer its citizens an area of freedom, security and justice without internal frontiers, in which the free movement of persons is ensured in conjunction with appropriate measures with respect to external border controls, asylum, immigration and the prevention and combating of crime. The Union shall develop a common policy on asylum, subsidiary protection and temporary protection with a view to offering appropriate status to any third-country national requiring international protection and ensuring compliance with the principle of non-refoulement. This policy must be in accordance with the Geneva Convention of 28 July 1951 and the Protocol of 31 January 1967 relating to the status of refugees, and other relevant treaties. For that purpose, measures should be adopted for a common European asylum system comprising: a uniform status of asylum for nationals of third countries, valid throughout the Union; a uniform status of subsidiary protection for nationals of third countries who, without obtaining European asylum, are in need of international protection; a common system of temporary protection for displaced persons in the event of a massive inflow; common procedures for the granting and withdrawing of uniform asylum or subsidiary protection status; criteria and mechanisms for determining which Member State is responsible for considering an application for asylum or subsidiary protection; standards concerning the conditions for the reception of applicants for asylum or subsidiary protection; partnership and cooperation with third countries for the purpose of managing inflows of people applying for asylum or subsidiary or temporary protection. In the event of one or more Member States being confronted by an emergency situation characterised by a sudden inflow of nationals of third countries, provisional measures may be adopted for the benefit of the Member State(s) concerned. The policy of the Union on asylum and its implementation shall be governed by the principle of solidarity and fair sharing of responsibility, including its financial implications, between the Member States. |
||||||||||
Competences of the Office (Regulation (EU) No 439/2010 of the European Parliament and of the Council establishing a European Asylum Support Office) |
Objectives EASO contributes to the implementation of a Common European Asylum System. EASO’s purpose is to facilitate, coordinate and strengthen practical cooperation among Member States on the many aspects of asylum, such as: providing practical and operational support to Member States; providing operational support to Member States with specific needs or Member States subject to particular pressure on their asylum systems; providing scientific and technical assistance for EU policymaking and legislation in all areas having a direct or indirect impact on asylum. Tasks
|
||||||||||
Governance |
Management Board Composition The EASO Management Board is composed of one member from each Member State except Denmark, two members from the European Commission and one non-voting member from the UNHCR. All members are appointed on the basis of their experience, professional responsibility and high degree of expertise in the asylum field. Croatia was invited to attend all meetings of the Management Board and other relevant meetings as an observer until 1 July 2013, when it became a full member of EASO following the entry into force of the Treaty of Accession between the EU and Croatia of 9 December 2011. Denmark, Iceland, Liechtenstein, Norway and Switzerland are invited to attend all meetings of the Management Board and other relevant meetings as observers. Tasks The key functions of the Management Board, as the governing and planning body of EASO, are outlined in Article 29 of the EASO Regulation and include the appointment of the Executive Director and the adoption of EASO’s work programmes and annual reports, and of EASO’s general budget. It has overall responsibility for ensuring that EASO performs its duties effectively. Executive Director The Executive Director, who is independent in the performance of his tasks, is the legal representative of the Office and is responsible, inter alia, for the administrative management of EASO and for the implementation of the work programme and the decisions of the Management Board. The Executive Director of EASO, Dr Robert K. Visser, took up office on 1 February 2011. His term of office is five years, renewable once for a further three years. Consultative Forum EASO has set up a Consultative Forum in accordance with Article 51 of the EASO Regulation. The Consultative Forum enables EASO to ensure close dialogue with civil society organisations and relevant competent bodies. The Consultative Forum constitutes a mechanism for the exchange of information and pooling of knowledge between EASO, civil society organisations and relevant bodies operating in the asylum field. In accordance with the EASO Regulation, the Consultative Forum meets in plenary at least once a year. In addition, EASO has an annual consultation calendar to organise its various consultation methodologies and activities, i.e. expert meetings, workshops, seminars and online consultation. Internal audit European Commission’s Internal Audit Service (IAS). External audit European Court of Auditors. Discharge authority European Parliament acting on a recommendation from the Council. |
||||||||||
Resources made available to the Office in 2013 |
Final Budget 12 million euro Staff as at 31 December 2013 Authorised posts (temporary staff): 45. Posts occupied: 44 Other posts (contract staff and SNEs): 32. Posts occupied: 27 Total posts: 77 Posts occupied: 71, by staff assigned to the following duties:
|
||||||||||
Products and services in 2013 |
EASO’s activities can be divided into five focus areas: permanent support, special support, emergency support, information and analysis support and third country support. Permanent support: With regards to training, EASO organised 13 train-the-trainer sessions, developed three new training modules and updated six modules already existing, developed two training handbooks and a training cockpit, designed a new learning path, organised the Annual Didactic Seminar, two training National Contact Points meetings and a meeting with the training reference group. EASO’s work on quality of asylum processes and decisions included the development of the EASO quality matrix, the organisation of four thematic practical cooperation meetings and a meeting of the national contact points on quality. With regards to Country of Origin Information (COI), EASO adopted the COI Network Approach, created three COI specific networks on Syria, Somalia and Pakistan, made available through the Common European COI Portal 2 108 new COI documents, organised two meetings of the National Common Portal Administrators, two meetings of the Strategic COI Network and ten country specific workshop and seminars. In addition, EASO produced a comparative analysis on the Western Balkans and delivered a training of the COI portal. In the field of unaccompanied minors, EASO issued a publication entitled EASO age assessment practice in Europe, organised four practical cooperation meetings, an annual conference on unaccompanied minors and conducted a research on family tracing. EASO updated the list of languages available for direct translation within the Member States, participated in relevant meetings of the JHA Agencies of trafficking in human beings and strengthen the cooperation with members of the Courts and Tribunals. Special support: EASO provided special support to Sweden and to Italy. In case of Sweden, EASO delivered specific training on two EASO modules, while in the case of Italy, EASO contributed in the implementation of a Special Support Plan comprising 45 support activities. Twenty-five experts were deployed within ten support teams, delivering six thematic workshops on Dublin and COI, mapping the reception system of Italy and providing training to the Italian judiciary. In addition EASO organised two practical cooperation meetings on relocation, participated in the first Annual Relocation Forum and was involved in the Task Force Mediterranean, being eight actions earmarked for EASO. Emergency support: EASO provided emergency support to Greece and to Bulgaria, deploying 49 experts within 25 Asylum Support Teams. An EASO-UNHCR project for Greece on processing of pending cases was implemented and an emergency exercise with Frontex in the Romanian and Hungarian border was conducted. EASO organised three meetings of the Asylum Intervention Pool National Contact Points. Information and analysis support: EASO published its Annual Report on the state of asylum in the EU in 2012, three quarterly asylum reports and 12 monthly asylum reports. Moreover, EASO developed the stage II of its Early warning and Preparedness System. Third country support: EASO adopted the External Action Strategy, participated in the Prague Process and in the EU Mobility Partnerships with Tunisia and Morocco and the dialogue on migration, mobility and security with Jordan. A project with these three countries was agreed in December 2013 in the context of the European Neighbourhood Partnership Instrument. Finally, EASO organised two practical cooperation meetings, one on resettlement and one on the external dimension of the CEAS and participated in two workshops of the Technical Assistance and Information Exchange (TAIEX) instrument. With regard to EASO’s organisation, EASO organised four Management Board meetings, adopted three Management Board decisions, signed a working agreement with UNHCR and with FRA, held its third Consultative Forum meeting and consulted the civil society on various topics. EASO adopted its Multi-Annual Work Programme 2014-2016. Finally, an evaluation on the impact of EASO practical cooperation on asylum and on the CEAS was carried out by the European Commission in 2013. |
||||||||||
Source: Annex supplied by the Office. |
THE OFFICE’S REPLIES
11. |
The accrual was a rough estimate and EASO was waiting for PMO’s confirmation of all entitlements to be received by the staff entered into service in 2013. EASO has currently a payroll tracking system (excel) to register all entitlements received or pending for each staff member. |
12. |
EASO late payments radically decreased by summer 2013; however due to a considerable increase in workload related to the year-end activities, late payments occurred again in the last quarter of 2013. New procedures such as mass upload payments have been put in place to decrease the rate of late payments. |
13. |
The implementation of the six pending internal control standards is on-going and they will be fully implemented in 2014. |
14. |
EASO acknowledges a significant improvement in its budgetary management in 2013 and will continuously monitor the consumption of budgetary commitments. This will ensure a high rate of budget execution and a regular carry-over. |
15. |
EASO has implemented a monthly monitoring and reporting system of established budgetary commitments in order to ensure timely de-commitments and limit the carry-forward to year n+1 to the amount necessary and sufficient to cover existing legal obligations. |
16. |
The questions for interviews and written tests are drafted based on the job requirements, as stated in the vacancy notice. The main reason for not drafting them prior to the preliminary meeting is to ensure their confidentiality. For a number of criteria which are essential for a job, such as excellent planning and problem-solving skills, there is the risk of being unfair when assessing them through the application form. To increase transparency, EASO is mentioning all criteria that will be assessed during the interview under a specific paragraph of the vacancy notice. EASO complied with ECA’s comments and changed the conflict of interest statement for the Selection Committees. Furthermore, a policy on prevention and management of conflict of interests has been signed on 29 November 2013. |
17. |
Weightings and threshold scores are both set in advance before the examination of the applications. In accordance with the EASO Recruitment Policy, the threshold to be invited to the interviews and being put on the reserve list is 70 % and applies to all selection procedures. Furthermore, it is also stated in the Minutes of the selection procedures that the threshold is set in advance. |
10.12.2014 |
EN |
Official Journal of the European Union |
C 442/112 |
REPORT
on the annual accounts of the European Banking Authority for the financial year 2013, together with the Authority’s replies
(2014/C 442/13)
INTRODUCTION
1. |
The European Banking Authority (hereinafter ‘the Authority’, aka ‘EBA’), which is located in London, was established by Regulation (EU) No 1093/2010 of the European Parliament and of the Council (1). The Authority’s task is to contribute to the establishment of high-quality common regulatory and supervisory standards and practices, to contribute to the consistent application of legally binding Union acts, to stimulate and facilitate the delegation of tasks and responsibilities among competent authorities, to monitor and assess market developments in the area of its competence and to foster depositor and investor protection (2). |
INFORMATION IN SUPPORT OF THE STATEMENT OF ASSURANCE
2. |
The audit approach taken by the Court comprises analytical audit procedures, direct testing of transactions and an assessment of key controls of the Authority’s supervisory and control systems. This is supplemented by evidence provided by the work of other auditors (where relevant) and an analysis of management representations. |
STATEMENT OF ASSURANCE
The management’s responsibility
The auditor’s responsibility
Opinion on the reliability of the accounts
Opinion on the legality and regularity of the transactions underlying the accounts
|
10. |
The comments which follow do not call the Court’s opinions into question. |
COMMENTS ON BUDGETARY MANAGEMENT
11. |
In 2013, the overall level of committed appropriations was 90 % as compared to 89 % in 2012, varying between 87 % for title I (staff expenditure), 98 % for title II (administrative expenditure) and 92 % for title III (operational expenditure). The commitment rate for title I was negatively impacted by the Court of Justice’s decision against the indexation of staff salaries for the period 1 July 2011 to 30 June 2013 (1,8 million euro). |
12. |
Although the overall level of carry-overs decreased significantly to 3 8 76 564 euro (17 %) compared with 6 5 47 808 euro (36 %) for the previous year, carry-overs of committed appropriations remained relatively high for title II at 1 9 74 511 euro (35 %) and title III at 1 6 51 203 euro (36 %). These carry-overs mainly result from the planned procurement of IT infrastructure and IT services, for which the contracts were concluded as planned in December 2013 and the related services will be provided in 2014. |
FOLLOW-UP OF PREVIOUS YEARS’ COMMENTS
13. |
An overview of the corrective actions taken in response to the Court's comments from previous years is provided in Annex I. |
This Report was adopted by Chamber IV, headed by Mr Milan Martin CVIKL, Member of the Court of Auditors, in Luxembourg at its meeting of 1 July 2014.
For the Court of Auditors
Vítor Manuel da SILVA CALDEIRA
President
(1) OJ L 331, 15.12.2010, p. 12.
(2) Annex II summarises the Authority’s competences and activities. It is presented for information purposes.
(3) These include the balance sheet and the economic outturn account, the cash flow table, the statement of changes in net assets and a summary of the significant accounting policies and other explanatory notes.
(4) These comprise the budgetary outturn account and the annex to the budgetary outturn account.
(5) Articles 39 and 50 of Commission Delegated Regulation (EU) No 1271/2013 (OJ L 328, 7.12.2013, p. 42).
(6) The accounting rules adopted by the Commission’s accounting officer are derived from the International Public Sector Accounting Standards (IPSAS) issued by the International Federation of Accountants or, where relevant, the International Accounting Standards (IAS)/International Financial Reporting Standards (IFRS) issued by the International Accounting Standards Board.
(7) Article 107 of Regulation (EU) No 1271/2013.
ANNEX I
Follow-up of previous years’ comments
Year |
Court's comment |
Status of corrective action (Completed/Ongoing/Outstanding/N/A) |
2011 |
The low budget execution rates show difficulties in budget planning and implementation. |
Completed |
2011 |
The Authority’s budget for the financial year 2011 was 12,7 million euro. In accordance with its Founding Regulation (1), 60 % of the 2011 budget was financed from Member States’ and EFTA countries’ contributions and 40 % from the Union budget. At the end of 2011, the Authority recorded a positive budget outturn of 3,6 million euro. In compliance with Articles 15(4) and 16(1) of its Financial Regulation the full amount was then recorded in the accounts as a liability towards the European Commission. |
Completed |
2011 |
The Authority needs to improve the transparency of recruitment procedures: weightings for selection criteria and threshold scores for being invited to interviews or for inclusion in the list of suitable candidates were not set before the examination of applications. |
Completed |
2012 |
In order to cover higher school fees, the Authority grants staff whose children attend primary or secondary school an education contribution in addition to the education allowances provided for in the Staff Regulations (2). Total 2012 education contributions amounted to some 76 000 euro. They are not covered by the Staff Regulations and therefore irregular. |
Ongoing (3) |
2012 |
In accordance with the Authority’s IT strategy which was drawn up by its predecessor organisation (4), the EBA’s IT core application systems were outsourced to an external IT provide (5) until December 2013. This poses risks related to the Authority’s limited control and supervision over its IT systems. |
Completed |
2012 |
The overall level of appropriations committed was 89 %, varying between 84 % for title I (staff expenditure), 86 % for title II (administrative expenditure) and 100 % for title III (operational expenditure) (6). Carry-overs of committed appropriations were high for title II (45 %) mainly for reasons beyond the Authority’s control, such as the unsuccessful attempt to find new premises and delays in the implementation of some IT projects for which it was difficult to obtain information needed from the predecessor organisation. For title III, carry-overs of committed appropriations were high (85 %), mainly due to the complexity and lengthy duration of two IT procurement procedures which however were carried out according to plan, delays in the launching and implementation of three other IT projects and the late invoicing for certain IT services by the suppliers. |
N/A |
2012 |
The Court identified the following weaknesses in the audited recruitment procedures affecting transparency and equal treatment: candidates were given a global score instead of one score for each of the selection criteria; there was no evidence that the questions for interviews and tests had been set before the date of the examinations. |
Completed |
(1) Article 62(1) of Regulation (EU) No 1093/2010 of the European Parliament and of the Countil of 24 November 2010.
(2) Article 3 of Annex VII provides for twice the basic allowance of 252,81 euro = 505,62 euro.
(3) For 3 of the 9 schools concerned contracts had yet to be concluded in 2013.
(4) Committee of European Banking Supervisors.
(5) Banque de France.
(6) Following an analysis of needs for the remaining part of the year, the budget was revised and appropriations were reduced by 8,9 % in September 2012.
ANNEX II
European Banking Authority (London)
Competences and activities
Areas of Union competence deriving from the Treaty (Articles 26 and 114 of the Treaty on the Functioning of the European Union) |
Article 26
Article 114
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Competences of the Authority (Regulation (EU) No 1093/2010 of the European Parliament and of the Council) (Regulation (EU) No 1022/2013 of the European Parliament and of the Council, amending Regulation (EU) No 1093/2010) |
Objectives
Tasks
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Governance |
Board of Supervisors Composed of the Chairperson, one representative per Member State (head of NSA (2)), Commission, ECB (3), ESRB, EIOPA (4) and ESMA (5). Management Board Composed of the Chairperson and six other members of the Board of Supervisors. Chairperson Appointed by Board of Supervisors. Executive Director Appointed by Board of Supervisors. Board of Appeal Joint body of the three ESAs. External audit European Court of Auditors. Discharge authority European Parliament. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Resources made available to the Authority in 2013 (2012) |
2013 Budget 26,0(20,7) million euro Including: European Union subsidy: 10,4(8,3) million euro Contributions from Member States: 15,2(12,1) million euro Contributions from observers: 0,4(0,3) million euro Posts filled as of 31 December 2013 93 temporary staff (68) — of which offer letters sent to and accepted by seven TAs before 31 December 2013. 14 contract staff (12) 17 Seconded National Experts (14) |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Products and services 2013 |
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
(1) European Systemic Risk Board.
(2) National Supervisory Authority.
(3) European Central Bank.
(4) European Insurance and Occupational Pensions Authority.
(5) European Securities and Markets Authority.
Source: Annex supplied by the Authority.
THE AUTHORITY’S REPLIES
11. |
The EBA adopted a prudent approach to the 2011/2012 salary adjustments which, due to the form and timing of the Court of Justice decision, resulted in commitment execution of just over 90 %. The authority anticipates significantly improved budget execution in 2014, given ongoing improvement in budget management by the authority and taking account of the greater clarity regarding the salary adjustments. |
12. |
The EBA acknowledges that, while there has been a significant decrease in the overall level of carry-overs, there is still room for further improvement. Given that the bulk of the carry-overs arises due to the timing of various annually renewable IT contracts, the EBA intends within the calendar year to pursue options to amend supplier contracts so as to change renewal periods and so reduce the level of carry-over. |
10.12.2014 |
EN |
Official Journal of the European Union |
C 442/123 |
REPORT
on the annual accounts of the European Centre for Disease Prevention and Control for the financial year 2013, together with the Centre’s replies
(2014/C 442/14)
INTRODUCTION
1. |
The European Centre for Disease Prevention and Control (hereinafter ‘the Centre’, aka ‘ECDC’), which is located in Stockholm, was established by Regulation (EC) No 851/2004 of the European Parliament and of the Council (1). The Centre’s main tasks are to collect and disseminate data on the prevention and control of human diseases and to provide scientific opinions on this subject. It is also required to coordinate the European network of bodies operating in this field (2). |
INFORMATION IN SUPPORT OF THE STATEMENT OF ASSURANCE
2. |
The audit approach taken by the Court comprises analytical audit procedures, direct testing of transactions and an assessment of key controls of the Centre’s supervisory and control systems. This is supplemented by evidence provided by the work of other auditors (where relevant) and an analysis of management representations. |
STATEMENT OF ASSURANCE
The management’s responsibility
The auditor’s responsibility
Opinion on the reliability of the accounts
Opinion on the legality and regularity of the transactions underlying the accounts
|
10. |
The comments which follow do not call the Court’s opinions into question. |
COMMENTS ON THE LEGALITY AND REGULARITY OF TRANSACTIONS
11. |
Although the Centre has improved its management of procurement procedures, for one procedure launched in 2013 there was conflicting information between the contract notice and the tender specifications which may have affected the competitive process and the outcome of the procedure. Payments made in 2013 under the framework contract and the two specific contracts concerned amounted to 1 08 000 euro. Following the Court’s audit, the Centre took immediate corrective action and the framework contract was cancelled. |
COMMENTS ON BUDGETARY MANAGEMENT
12. |
The overall budget execution rate was relatively low (92 %). Cancellations of 2013 appropriations appeared in all budget titles. |
13. |
Carry-overs of committed appropriations were relatively high, with 1 7 14 484 euro (26 %) for Title II (administrative expenditure) and 7 9 07 139 euro (44 %) for Title III (operational expenditure). |
14. |
For Title II, this mainly related to procurement of IT hardware and software (1 0 86 203 euro), and the ongoing external evaluation of the Centre (2 10 000 euro). |
15. |
For Title III, committed appropriations carried over mainly concerned multiannual projects (4 6 20 605 euro), and IT items to support operational activities (1 9 62 443 euro) for which activities were implemented and payments were made according to operational needs. However, weaknesses were noted in respect of the budgetary planning and execution for operational meetings, mainly due to overestimated attendance levels and hotel and flight costs. For the respective budget line, 29 % of 2013 appropriations (6 55 142 euro) and 59 % of carry-overs from 2012 (4 55 820 euro) were cancelled. In addition, 38 % of committed 2013 appropriations for operational meetings (amounting to 5 94 758 euro) were carried over to 2014. |
FOLLOW-UP OF PREVIOUS YEAR’S COMMENTS
16. |
An overview of the corrective actions taken in response to the Court's comments from the previous year is provided in Annex I. |
This Report was adopted by Chamber IV, headed by Mr Pietro RUSSO, Member of the Court of Auditors, in Luxembourg at its meeting of 16 September 2014.
For the Court of Auditors
Vítor Manuel da SILVA CALDEIRA
President
(1) OJ L 142, 30.4.2004, p. 1.
(2) Annex II summarises the Centre’s competences and activities. It is presented for information purposes.
(3) These include the balance sheet and the economic outturn account, the cash flow table, the statement of changes in net assets and a summary of the significant accounting policies and other explanatory notes.
(4) These comprise the budgetary outturn account and the annex to the budgetary outturn account.
(5) Articles 39 and 50 of Commission Delegated Regulation (EU) No 1271/2013 (OJ L 328, 7.12.2013, p. 42).
(6) The accounting rules adopted by the Commission’s accounting officer are derived from the International Public Sector Accounting Standards (IPSAS) issued by the International Federation of Accountants or, where relevant, the International Accounting Standards (IAS)/International Financial Reporting Standards (IFRS) issued by the International Accounting Standards Board.
(7) Article 107 of Regulation (EU) No 1271/2013.
ANNEX I
Follow-up of previous years’ comments
Year |
Court’s comment |
Status of corrective action (Completed/Ongoing/Outstanding/N/A) |
2012 |
The opinion on the legality and regularity of the Centre’s transactions was qualified for the year 2011 because the Centre did not respect the maximum amount of a framework contract from 2009. According to this framework contract, the Centre could sign specific contracts with selected suppliers up to a maximum amount of 9 million euro. By the end of 2011 however, payments of 12,2 million euro had been made. In order to purchase essential services for the continuation of the related project, the Centre in 2012 concluded additional specific contracts for an amount of 2,5 million euro. Together with 2,7 million euro of payments made in 2012 for contracts signed already in 2011, payments made totalled 17,4 million euro by the end of 2012. Whilst payments above the 9 million euro ceiling set in the framework contract are irregular, the Centre has taken corrective action in 2012 and signed a replacement framework contract in June 2012 (no further payments will be made under the old contract) and has improved monitoring the consumption of framework contracts in general. |
N/A |
|
The 2012 payments amounting to 5,2 million euro stem from failures in previous years when the ceiling of the framework contract was not respected. They relate to contractual obligations stemming from previous years (2,7 million euro) or taken in 2012 for business continuity reasons (2,5 million euro) pending the finalisation of the procurement procedure for the new framework contract. Given the corrective action taken by the Centre in 2012, the Court has not qualified the opinion on the legality and regularity of transactions this year. |
|
2012 |
In 2012, the Centre awarded grants to research institutions and individuals. Total grant expenditure amounted to 7 52 000 euro, representing 1,4 % of 2012 operating expenditure. The Centre’s ex ante verifications before reimbursement of costs claimed by beneficiaries consist of a desk analysis of cost claims and partly also of audit certificates issued by independent audit firms contracted by the beneficiaries. The Centre does not usually obtain from beneficiaries any documents to substantiate the eligibility and accuracy of the costs claimed. In order to strengthen controls, the Centre has adopted an ex post verification strategy and planned for its implementation in 2012. However, it experienced a 10-month delay in gaining access to an interinstitutional audit contract and, at the time of the audit, no ex post verifications of 2012 grant expenditure had yet taken place. For the transactions audited by the Court, supporting documentation was obtained by the Centre on the Court’s behalf which provided reasonable assurance as to their legality and regularity. |
Ongoing |
2012 |
Budget implementation rates were satisfactory for Title I (staff expenditure) and Title II (administrative expenditure) at 97 % and 80 % of committed appropriations respectively. While the level of carry-overs related to Title III is high at 8,3 million euro (41 % of Title III appropriations committed), this did not arise from delays in the implementation of the Centre’s annual work programme, but reflects the multiannual nature of activities. The Centre has adopted a budgetary planning module that is linked directly to its annual work programme and payments were planned and made according to operational needs. |
N/A |
ANNEX II
European Centre for Disease Prevention and Control (Stockholm)
Competences and activities
Areas of Union competence deriving from the Treaty (Article 168 of the Treaty on the Functioning of the European Union) |
‘A high level of human health protection shall be ensured in the definition and implementation of all Union policies and activities.’ ‘Union action, which shall complement national policies, shall be directed towards improving public health, preventing physical and mental illness and diseases, and obviating sources of danger to physical and mental health. Such action shall cover the fight against the major health scourges, by promoting research into their causes, their transmission and their prevention, as well as health information and education, and monitoring, early warning of and combating serious cross-border threats to health.’ |
||||||||||||||
Competences of the Centre (Regulation (EC) No 851/2004 of the European Parliament and of the Council) |
Objectives
Tasks
|
||||||||||||||
Governance |
Management Board Composition One member designated by each Member State, two members designated by the European Parliament and three representatives of the Commission. Tasks The Board adopts the Centre's annual programme and budget and monitors their implementation. Director Appointed by the Management Board on the basis of a list of candidates proposed by the Commission. Advisory Forum Composition A representative of each Member State and three non-voting representatives of the Commission. Tasks The Forum is to assure the scientific excellence of the work and the independence of the activities and opinions of the Centre. External audit European Court of Auditors. Internal audit European Commission's Internal Audit Service (IAS). Discharge authority European Parliament acting on the recommendation of the Council. |
||||||||||||||
Resources made available to the Centre in 2013 (2012) |
Final Budget 58,3(58,2) million euro Staff as at 31 December 2013 Posts in establishment plan: 198 (200) Occupied posts: 190 (187) Other posts: 95 (91) Total: 285 (278), assigned to the following duties:
|
||||||||||||||
Products and services in 2013 (2012) |
42 (69) health threats identified and monitored using the Threat Tracking Tool (TTT). 52 (52) weekly threat reports on communicable diseases sent to 400 (334) recipients. In addition, as from 2012, the report is also made available on ECDC website every week and has become one of the site’s most visited pages (8 000 visits in 2013). Provision of support to epidemic intelligence for 2 (3) large mass-gathering events. In addition, 4 (3) events of an exceptional nature or of exceptional public importance were also monitored. Preparation of 3 (6) risk assessments,12 (16) new rapid risk assessments and 9 (16) rapid risk assessment updates. 1 (1) simulation exercise conducted for testing and improving preparedness and response to communicable diseases. 117 (104) fellows coached in the European Programme for Intervention Epidemiology Training (EPIET) and the European Public Health Microbiology Training (EUPHEM). 112 (114) public health experts from 30 EU-EEA countries participated in the Centre’s short training modules. 9 45 000(7 80 000) visitors to the Centre’s web portal. 216 (204) scientific publications published. Five-year impact factor citations: 5,6(4,55) Sixth European Antibiotic Awareness Day organised, with the participation of over 40 (43) countries; The date of 18 November is increasingly being recognised and is becoming a landmark for raising awareness about the prudent use of antibiotics not only in Europe, but also in the United States, Canada and Australia, and elsewhere. 16,3(12,9) million unique records in the TESSy databases; 1 492(1 324) active users from 57 (56) countries. Enhanced surveillance; integration into the Centre of 15 (15) of the 17 dedicated surveillance networks at the end of 2013 (one discontinued and the last one outsourced). Annual Epidemiological Report published. 18 surveillance reports published on subjects including tuberculosis, HIV/AIDS and anti-microbioresistance annual reports. 41 (40) weekly influenza bulletins/weekly influenza surveillance overviews for 2013. 89 (34) scientific opinions produced based on stakeholder requests; over 80 % of scientific advice requests were answered on time Organisation of the seventh European Scientific Conference on Applied Infectious Disease Epidemiology (ESCAIDE) on 5—7 November 2013 in Stockholm, with 550 (511) participants. Weekly publication of the Eurosurveillance scientific journal, with 11 600(14 000) online subscribers. In 2013, Eurosurveillance was awarded an impact factor for the second year, which was with 5,49 a bit lower than 2012 (6,15). This places Eurosurveillance at rank 6 among the top 70 journals worldwide in the ‘Infectious Diseases’ category. |
||||||||||||||
Source: Annex supplied by the Centre. |
THE CENTRE’S REPLIES
11. |
ECDC has taken immediate corrective action to communicate the situation to the contractors and cancel the contract. The Centre’s procurement section was reorganised in March 2014. The re-organisation and the revised internal procedures clarify tasks, roles and responsibilities of all actors and parties involved. Intensive training was organised for ECDC staff members during dedicated training sessions held during March and April 2014. |
12. 13. 14. 15. |
The Centre had reserved funds from the 2013 budget in order to meet its obligations towards staff related to the salary adjustments of 2011, 2012 and 2013. The funds reserved amounted to 3,3 million euro. As the European Court of Justice ruled in the final quarter of the year, the Centre was unable to use these funds for other purposes. These funds had been earmarked from all budget titles, consequently these cancellations affected all budget titles. Should the decision have come in 2013, the budget execution would have been of 97,8 %. Regarding the operational meetings, 4 00 000 euro of the 6 55 142 euro was due to the abovementioned salary and weighting coefficient adjustments and therefore the cancellation is 11 %. From the 5 94 758 euro carried over to 2014, 3 84 938 euro is carried over to meet financial obligations for meetings into 2014 for which the meeting invitations had to be sent in 2013 whilst 2 09 820 euro is carried over to meet outstanding financial obligations for meetings held in 2013. The Centre will more closely monitor the operational meeting expenses to avoid unnecessary carry-overs or cancellations. |
10.12.2014 |
EN |
Official Journal of the European Union |
C 442/132 |
REPORT
on the annual accounts of the European Chemicals Agency for the financial year 2013, together with the Agency’s replies
(2014/C 442/15)
INTRODUCTION
1. |
The European Chemicals Agency (hereinafter ‘the Agency’, aka ‘ECHA’), which is located in Helsinki, was set up by Regulation (EC) No 1907/2006 of the European Parliament and of the Council (1). Its main tasks are to ensure a high level of protection of human health and the environment as well as the free movement of substances on the internal market while enhancing competitiveness and innovation. The Agency also promotes the development of alternative methods for the assessment of hazards relating to substances (2). |
INFORMATION IN SUPPORT OF THE STATEMENT OF ASSURANCE
2. |
The audit approach taken by the Court comprises analytical audit procedures, direct testing of transactions and an assessment of key controls of the Agency’s supervisory and control systems. This is supplemented by evidence provided by the work of other auditors (where relevant) and an analysis of management representations. |
STATEMENT OF ASSURANCE
The management’s responsibility
The auditor’s responsibility
Opinion on the reliability of the accounts
Opinion on the legality and regularity of the transactions underlying the accounts
|
10. |
The comments which follow do not call the Court’s opinions into question. |
COMMENTS ON BUDGETARY MANAGEMENT
11. |
As in the previous year, budget implementation rates for the year 2013 were satisfactory for Titles I and II. Although the level of committed appropriations carried over to 2014 remained high for Titles III, IV and V (operational expenses) at EUR 10,6 million (46 %), this mainly resulted from the multiannual nature of planned IT development projects (EUR 6,3 million), cost for translations ordered in 2013 but not received by the year end (EUR 1,3 million) and substance evaluations for which the regulatory deadline was February 2014 (EUR 1,7 million). |
OTHER COMMENTS
12. |
In his Declaration of assurance for the year 2013 ECHA’s Executive Director confirmed reasonable assurance that resources have been used for their intended purpose and in accordance with the principles of sound financial management, and that the control procedures in place give the necessary guarantees concerning the legality and regularity of the underlying transactions. However, a reservation to this assurance was made since the mandate of the Agency does not include controls or inspections at national level and therefore no confirmation could be given that only registered or authorised substances and products, for which a fee has been paid to the Agency, were circulating on the European Union market. |
FOLLOW-UP OF PREVIOUS YEARS’ COMMENTS
13. |
An overview of the corrective actions taken in response to the Court’s comments from previous years is provided in Annex I. |
This Report was adopted by Chamber IV, headed by Mr Milan Martin CVIKL, Member of the Court of Auditors, in Luxembourg at its meeting of 1 July 2014.
For the Court of Auditors
Vítor Manuel da SILVA CALDEIRA
President
(1) OJ L 396, 30.12.2006, p. 1.
(2) Annex II summarises the Agency's competences and activities. It is presented for information purposes.
(3) These include the balance sheet and the economic outturn account, the cash flow table, the statement of changes in net assets and a summary of the significant accounting policies and other explanatory notes.
(4) These comprise the budgetary outturn account and the annex to the budgetary outturn account.
(5) Articles 39 and 50 of Commission Delegated Regulation (EU) No 1271/2013 (OJ L 328, 7.12.2013, p. 42).
(6) The accounting rules adopted by the Commission’s accounting officer are derived from the International Public Sector Accounting Standards (IPSAS) issued by the International Federation of Accountants or, where relevant, the International Accounting Standards (IAS)/International Financial Reporting Standards (IFRS) issued by the International Accounting Standards Board.
(7) Article 107 of Regulation (EU) No 1271/2013.
ANNEX I
Follow-up of previous years’ comments
Year |
Court's comment |
Status of corrective action (Completed/Ongoing/Outstanding/N/A) |
2011 |
The Agency's 2011 budget amounted to EUR 93,2 million, of which EUR 14,9 million (16 %) was carried over to 2012. Carry-overs related to Title III (operational expenditure) amounted to EUR 11,5 million (55 %). The level of carry-overs is excessive and at odds with the budgetary principle of annuality. |
N/A |
2011 |
The results of the latest physical inventory carried out in 2011 show several shortcomings, notably as regards the low proportion of ICT assets checked in terms of value. No formal policy on the inventory of fixed assets is in place. |
Completed |
2012 |
Physical inventory results show serious weaknesses in the safeguarding and tracking of fixed assets. There is no tracking procedure for software and internal components (2 370 items out of the 5 878 ICT fixed assets recorded). In addition, 306 items could not be found, of which 93 laptops and 29 computers. |
Completed |
2012 |
Budget implementation rates for the year 2012 were satisfactory for Titles I and II. While the rate of committed appropriations carried over was high for Title III at 50 % (EUR 11,3 million), this primarily relates to the multiannual nature of significant IT development projects (EUR 3,7 million), substance evaluations with an annual regulatory deadline set at February N+1 (EUR 1,8 million), translations not yet delivered by year-end (EUR 1,3 million) and the start of two new activities Biocides (EUR 1,2 million) and PIC (EUR 1,3 million) in the second half of the year. |
N/A |
ANNEX II
European Chemicals Agency (Helsinki)
Competencies and activities
Areas of Union competence deriving from the Treaty |
Collection of information
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Competences of the Agency (as defined in Regulation (EC) No 1907/2006 of the European Parliament and of the Council (REACH Regulation), Regulation (EC) No 1272/2008 of the European Parliament and of the Council (Classification, labelling and packaging of substances and mixtures — CLP Regulation), Regulation (EU) No 528/2012 of the European Parliament and of the Council (Biocidal Products Regulation) and Regulation (EU)No 649/2012 of the European Parliament and of the Council (Prior informed consent)) |
Objectives
Tasks
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Governance |
Management Board One representative of each Member State appointed by the Council and a maximum of six representatives appointed by the Commission, including three individuals from interested parties without voting rights and, in addition, two independent persons appointed by the European Parliament (Article 79 of the REACH Regulation). Tasks Article 78 of the REACH Regulation and framework financial regulation for agencies, mainly adopting annual and multi-annual work programmes, the final budget, a general report, internal rules of procedures and the appointment of and disciplinary authority over the Executive Director. In addition, the appointment of the Board of Appeal and Committee members. Executive Director Tasks Article 83 of the REACH Regulation. Committees The Agency comprises three Scientific Committees (Risk Assessment, Member States and Socio-Economic Analysis). Tasks Article 77(3)(a)-(c) of the REACH Regulation. Forum for Exchange of Information on Enforcement Tasks Article 77(4)(a)-(h) of the REACH Regulation. Secretariat Tasks Article 77(2)(a)-(o) of the REACH Regulation. Board of Appeal Tasks Article 76(1)(h) of the REACH Regulation. External audit European Court of Auditors. Internal audit European Commission’s Internal Audit Service (IAS). Discharge authority European Parliament, upon a recommendation from the Council (Article 97(10) of the REACH Regulation). |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Resources made available to the Agency in 2013 (2012) |
Budget (including amending budgets)
Staff at 31 December 2013
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Activities and services provided in 2013 (2012) |
ECHA’s work programme was divided into the following 17 activities: Registration, Pre-registration and Data-sharing
Evaluation
Risk Management
Classification and Labelling (C&L)
Advice and assistance
Scientific IT Tools
Scientific and technical advice to EU institutions and bodies
Committees and Forum
Board of Appeal
Communication
International Cooperation
Management
Finance, Procurement and Accounting
Human resources and corporate services
Information and communication technology
Biocides
PIC
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Source: Annex supplied by the Agency. |
THE AGENCY’S REPLIES
11. |
ECHA appreciates the conclusion from the Court of Auditors and will continue to be attentive to avoid any non-justified carry-over operations. |
12. |
In response to the European Court of Auditors’ observation made during the autumn 2013 mission, the Executive Director of the European Chemicals Agency included the following text in his Declaration of Assurance for 2013: ‘As regards the implementation of the European Union legislation and the fee regulations under the Agency’s remit, this assurance has to be limited to the field of competences of the Agency. Since the mandate of the European Chemicals Agency does not include controls or inspections at national level, it cannot be confirmed that only registered or authorised substances and products, for which a fee has been paid to the Agency, are circulating on the European Union market.’ |
10.12.2014 |
EN |
Official Journal of the European Union |
C 442/144 |
REPORT
on the annual accounts of the European Environment Agency for the financial year 2013, together with the Agency’s replies
(2014/C 442/16)
INTRODUCTION
1. |
The European Environment Agency (hereinafter ‘the Agency’, aka ‘EEA’), which is located in Copenhagen, was established by Council Regulation (EEC) No 1210/90 (1). It is responsible for setting up an observation network to provide the Commission, the Parliament, the Member States and, more generally, the public with reliable information on the state of the environment. This information should, in particular, enable the European Union and the Member States to take action to safeguard the environment and assess the effectiveness of such action (2). |
INFORMATION IN SUPPORT OF THE STATEMENT OF ASSURANCE
2. |
The audit approach taken by the Court comprises analytical audit procedures, direct testing of transactions and an assessment of key controls of the Agency’s supervisory and control systems. This is supplemented by evidence provided by the work of other auditors (where relevant) and an analysis of management representations. |
STATEMENT OF ASSURANCE
The management’s responsibility
The auditor’s responsibility
Opinion on the reliability of the accounts
Opinion on the legality and regularity of the transactions underlying the accounts
|
10. |
The comments which follow do not call the Court’s opinions into question. |
COMMENTS ON INTERNAL CONTROLS
11. |
In 2013 the Agency awarded grants under five grant programmes (8) to consortia consisting of environmental institutions and bodies in Europe, UN organisations and national environment organisations. Total grant expenditure in 2013 was 13,9 million euro, representing 31 % of total operating expenditure. The Agency’s ex ante verifications consist of a desk analysis of cost claims. |
12. |
Following the Court’s comment of last year (see Annex I), the EEA intensified its checks on the eligibility and accuracy of staff costs claimed under the grant programmes, as these represent the major part of costs. In particular, for a sample of beneficiaries, time sheets were obtained to check the salary costs claimed, but payslips have not been obtained. On-the-spot verifications of costs at beneficiary level are rare. |
13. |
Existing controls therefore provide only limited assurance on the eligibility and accuracy of the costs claimed by beneficiaries. For the transactions audited by the Court supporting documentation was obtained which provided reasonable assurance as to their legality and regularity. |
FOLLOW-UP OF PREVIOUS YEAR’S COMMENTS
14. |
An overview of the corrective actions taken in response to the Court’s comments from the previous year is provided in Annex I. |
This Report was adopted by Chamber IV, headed by Mr Milan Martin CVIKL, Member of the Court of Auditors, in Luxembourg at its meeting of 8 July 2014.
For the Court of Auditors
Vítor Manuel da SILVA CALDEIRA
President
(1) OJ L 120, 11.5.1990, p. 1.
(2) Annex II summarises the Agency's competences and activities. It is presented for information purposes.
(3) These include the balance sheet and the economic outturn account, the cash flow table, the statement of changes in net assets and a summary of the significant accounting policies and other explanatory notes.
(4) These comprise the budgetary outturn account and the annex to the budgetary outturn account.
(5) Articles 39 and 50 of Commission Delegated Regulation (EU) No 1271/2013 (OJ L 328, 7.12.2013, p. 42).
(6) The accounting rules adopted by the Commission’s accounting officer are derived from the International Public Sector Accounting Standards (IPSAS) issued by the International Federation of Accountants or, where relevant, the International Accounting Standards (IAS)/International Financial Reporting Standards (IFRS) issued by the International Accounting Standards Board.
(7) Article 107 of Regulation (EU) No 1271/2013.
(8) European Topic Centres (ETCs), European Neighbourhood Partnership Instrument (ENPI) Global Monitoring for Environment and Security Initial Operations (GIO and GIO2), GMES in-situ coordination (GISC) and Instrument for Pre-Accession Assistance (IPA2).
ANNEX I
Follow-up of previous year’s comments
Year |
Court's comment |
Status of corrective action (Completed/Ongoing/Outstanding/N/A) |
2012 |
In 2012 the Agency awarded grants under three major grant programmes (1) to consortia consisting of environmental institutions and bodies in Europe, UN organisations and national environment organisations. Total grant expenditure in 2012 was 11,9 million euro, representing 27 % of the total operating expenditure. The Agency’s ex ante verifications before reimbursement of costs claimed by beneficiaries consist of a desk analysis of cost claims. It does not usually obtain from beneficiaries any document to substantiate the eligibility and accuracy of the staff costs claimed, which represent the main part of costs (2). Ex ante on-the-spot verifications of costs at beneficiary level are rare (3). |
Ongoing |
2012 |
Existing controls therefore provide only limited assurance to the Agency’s management as to the eligibility and accuracy of the costs claimed by beneficiaries. For the transactions audited by the Court supporting documentation was obtained by the Agency on the Court’s behalf which provided reasonable assurance as to their legality and regularity. A random verification of supporting documents for staff expenses and a higher coverage of beneficiaries by on-the-spot verifications could considerably increase assurance. |
Ongoing |
(1) European Topic Centers (ETC), European Neighbourhood Partnership Instrument (ENPI) and Global Monitoring for Environment and Security Initial Operations (GIO).
(2) For other types of costs (i.e. sub-contracting, acquisition of equipment), supporting documents are requested and analysed.
(3) In 2012 and in 2011 one ex ante verification was carried out to check one beneficiary’s control systems. In 2010 one ex ante verification had been carried out to check the eligibility of expenditure declared by one beneficiary.
ANNEX II
European Environment Agency (Copenhagen)
Competences and activities
Areas of Union competence deriving from the Treaty (Article 191 of the Treaty on the Functioning of the European Union) |
Environment policy Union policy on the environment shall contribute to pursuit of […] the objectives of preserving, protecting and improving the quality of the environment, protecting human health, prudent and rational utilisation of natural resources, promoting measures at international level to deal with regional or worldwide environmental problems, and in particular combating climate change. Union policy on the environment shall aim at a high level of protection taking into account the diversity of situations in the various regions of the Union. It shall be based on the precautionary principle and on the principles that preventive action should be taken, that environmental damage should as a priority be rectified at source and that the polluter should pay. [...] In preparing its policy [...], the Union shall take account of available scientific and technical data, environmental conditions in the various regions of the Union, the potential benefits and costs of action or lack of action, the economic and social development of the Union as a whole and the balanced development of its regions [...]. |
||||||||||||||||||||||||||||||||||
Competences of the Agency (Regulation (EEC) No 1210/90) |
Objectives To set up a European environment information and observation network to provide the Union and the Member States with:
Tasks
|
||||||||||||||||||||||||||||||||||
Governance |
Management Board Composition One representative of each Member State, one of each EEA member country, two representatives of the Commission, and two scientists appointed by the European Parliament. Tasks To adopt the multiannual and annual work programmes and to ensure their implementation and to adopt the annual report on the Agency’s activities. Executive Director Appointed by the Management Board on a proposal from the Commission. Scientific Committee Consisting of qualified persons in the field of the environment, designated by the Management Board. External audit European Court of Auditors. Discharge authority European Parliament, acting on a recommendation from the Council. |
||||||||||||||||||||||||||||||||||
Resources made available to the Agency in 2013 (2012) |
Final Budget 41,7(41,7) million euro Union subsidy: 100 % (100 %) Staff as of 31 December 2013 Number of posts in the establishment plan: 138 (136) Posts occupied: 132 (131) plus 78 (86) other posts (contract staff and seconded national experts) Total staff numbers: 210 (217) Establishment plan posts assigned to the following tasks:
|
||||||||||||||||||||||||||||||||||
Products and services in 2013 (2012) |
Articles 48 (19) Highlights 53 (50) Press releases 11 (12) Data sets 29 (36) Indicators 46 (66) Maps, graphs 217 (466) Brochures, flyers etc. 5 Corporate docs 5 (3) Reports 13 (11) Technical reports 21 (18) EEA Signals 1 (1) Pan-European assessments 0 (1) SOER 2010 0 (2) |
||||||||||||||||||||||||||||||||||
Source: Annex supplied by the Agency. |
THE AGENCY’S REPLIES
11. — 13. |
We have taken note of the contents, and would like to highlight that our efforts as regards intensified verification measures goes well beyond what is reflected in the preliminary observations. A new verification policy has been adopted which ensure a common risk approach towards all ETCs, has an increased focus on staff costs, and is supervised and coordinated by the internal audit capability. As regards the on-the-spot verifications, two verification missions have been performed regarding the 2013 final cost claims, covering approx. 18 % of the ETCs’ total staff costs at the level of the beneficiary. At least two more verification missions are planned for the autumn 2014. Additionally, we are issuing written guidelines to the beneficiaries to ensure a greater understanding as regards eligibility of costs and supporting documentation needs. |
10.12.2014 |
EN |
Official Journal of the European Union |
C 442/152 |
REPORT
on the annual accounts of the European Fisheries Control Agency for the financial year 2013, together with the Agency’s replies
(2014/C 442/17)
INTRODUCTION
1. |
The European Fisheries Control Agency (hereinafter ‘the Agency’, aka ‘EFCA’), which is located in Vigo, was established by Council Regulation (EC) No 768/2005 (1). The Agency’s main task is to organise the operational coordination of fisheries control and inspection activities by the Member States in order to ensure an effective and uniform application of the rules of the common fisheries policy (2). |
INFORMATION IN SUPPORT OF THE STATEMENT OF ASSURANCE
2. |
The audit approach taken by the Court comprises analytical audit procedures, direct testing of transactions and an assessment of key controls of the Agency’s supervisory and control systems. This is supplemented by evidence provided by the work of other auditors (where relevant) and an analysis of management representations. |
STATEMENT OF ASSURANCE
The management’s responsibility
The auditor’s responsibility
Opinion on the reliability of the accounts
Opinion on the legality and regularity of the transactions underlying the accounts
|
10. |
The comments which follow do not call the Court’s opinions into question. |
COMMENTS ON BUDGETARY MANAGEMENT
11. |
In 2013 the overall level of committed appropriations was 99 %, indicating that commitments were made in a timely manner. The level of committed appropriations carried over to 2014 however was high at 4 98 592 euro (38 %) for title II (administrative expenditure) and 7 34 301 euro (43 %) for title III (operating expenditure). |
12. |
For Title III, an important reason for the high level of planned carry-overs was the considerable workload faced by the agency as a result of the large number of IT projects that were either launched or ongoing during 2013. |
FOLLOW-UP OF PREVIOUS YEARS’ COMMENTS
13. |
An overview of the corrective actions taken in response to the Court’s comments from previous years is provided in Annex I. |
This Report was adopted by Chamber IV, headed by Mr Milan Martin CVIKL, Member of the Court of Auditors, in Luxembourg at its meeting of 1 July 2014.
For the Court of Auditors
Vítor Manuel da SILVA CALDEIRA
President
(1) OJ L 128, 21.5.2005, p. 1.
(2) Annex II summarises the Agency’s competences and activities. It is presented for information purposes.
(3) These include the balance sheet and the economic outturn account, the cash flow table, the statement of changes in net assets and a summary of the significant accounting policies and other explanatory notes.
(4) These comprise the budgetary outturn account and the annex to the budgetary outturn account.
(5) Articles 39 and 50 of Commission Delegated Regulation (EU) No 1271/2013 (OJ L 328, 7.12.2013, p. 42).
(6) The accounting rules adopted by the Commission’s accounting officer are derived from the International Public Sector Accounting Standards (IPSAS) issued by the International Federation of Accountants or, where relevant, the International Accounting Standards (IAS)/International Financial Reporting Standards (IFRS) issued by the International Accounting Standards Board.
(7) Article 107 of Regulation (EU) No 1271/2013.
ANNEX I
Follow-up of previous years’ comments
Year |
Court's comment |
Status of corrective action (Completed/Ongoing/Outstanding/N/A) |
2011 |
The Court identified a need to further improve staff selection procedures. Vacancy notices did not provide information on complaint and appeal procedures. Meetings of the Selection Board were insufficiently documented and in one recruitment case the Appointing Authority did not follow the order of the Selection Board’s list without providing a reason. |
Completed |
2012 |
The level of committed appropriations for the different titles varied between 94 % and 99 % of total appropriations, indicating that legal commitments were signed in a timely manner. However, the level of committed appropriations carried over to 2013 was high for title II (administrative expenditure) at 35 % and title III (operating expenditure) at 46 %. For title II, this was caused, to a large extent, by events beyond the Agency’s control, such as the late invoicing of the 2012 office rental costs by the Spanish authorities. Also, in order to meet the increased operational needs that it was faced with in the last quarter of 2012, the Agency ordered a high volume of goods and services for which delivery was still pending by the year end. For title III, an important reason for the high level of carry-overs was the considerable workload faced by the agency as a result of the large number of IT projects that were either launched or ongoing during 2012. This workload had an impact on the timeliness of procurement procedures in the case of two IT projects launched in 2012. Furthermore, expenses related to training and missions undertaken by staff and experts in the last quarter of 2012 were only due for reimbursement at the beginning of 2013. |
N/A |
2012 |
In response to the Court’s 2011 report, the Agency took corrective action in June 2012 to improve the transparency of recruitment procedures. In 2012, the only weaknesses identified related to three audited recruitment procedures that were initiated prior to the Court’s 2011 report: the vacancy notices did not provide information to the candidates on complaint and appeal procedures; candidates were given a global score instead of one score for each of the selection criteria; there was no evidence that the questions for interviews and written tests had been set before the date of the examinations. |
Completed |
ANNEX II
European Fisheries Control Agency (Vigo)
Competences and activities
Areas of Union competence deriving from the Treaty (Article 43 TFEU) |
The European Parliament and the Council, acting in accordance with the ordinary legislative procedure and after consulting the Economic and Social Committee, shall establish the common organisation of agricultural markets provided for in Article 40(1) and the other provisions necessary for the pursuit of the objectives of the common fisheries policy. |
||||||||||||||||||||||||||||||||||||||||||||
Competences of the Agency (Council Regulation (EC) No 768/2005, amended by Regulation (EC) No 1224/2009) |
Objectives
Tasks/Mission
|
||||||||||||||||||||||||||||||||||||||||||||
Governance |
Administrative Board Composition Comprises one representative from each Member State and six representatives of the Commission. Duties, inter alia, to adopt the budget and the establishment plan, the multiannual and annual work programmes, the annual report and multiannual staff policy plan. To give an opinion on the final accounts. Executive Director Appointed by the Administrative Board from a list of at least two candidates proposed by the Commission. External audit European Court of Auditors. Internal control European Commission’s Internal Audit Service (IAS). Discharge authority European Parliament acting on a recommendation from the Council. |
||||||||||||||||||||||||||||||||||||||||||||
Resources made available to the Agency in 2013 (2012) |
Final Budget Total Budget 2013: 9,22(9,22) million euro
Staff as at 31 December 2013 54 (54) posts for temporary staff in the establishment plan, of which occupied: 52 (1) (50) + five (five) posts for contract staff, of which occupied: five (five) + four (four) posts for Seconded National Experts (SNEs), of which occupied: three (four) SNE Total number of posts including SNEs: 63 (63), of which occupied 60 (59) |
||||||||||||||||||||||||||||||||||||||||||||
Products and services 2013 (2012) |
Operational Coordination
Capacity Building
(see Annual Work Program 2013 of the Agency for details) |
||||||||||||||||||||||||||||||||||||||||||||
(1) Job offers made for staff recruitment (three offers) are included in this figure in line with the statistical information provided in the multiannual staff policy plan 2015-2017 (Status 31.1.2014).
Source: Annex supplied by the Agency.
THE AGENCY’S REPLIES
11. |
The Agency agrees with the facts presented by the Court concerning the high level of planned carry overs. A certain part of this was due to the situation concerning the amount and timing of possible payments for retroactive salary adjustments of 2011 and 2012, which was finally clarified in November 2013. |
12. |
As indicated by the Court, the nature and cycle of the projects implementation implied the need for planned carry-over. |
10.12.2014 |
EN |
Official Journal of the European Union |
C 442/160 |
REPORT
on the annual accounts of the European Food Safety Authority for the financial year 2013, together with the Authority’s replies
(2014/C 442/18)
INTRODUCTION
1. |
The European Food Safety Authority (hereinafter ‘the Authority’, aka ‘EFSA’), which is located in Parma, was established by Regulation (EC) No 178/2002 of the European Parliament and of the Council (1). The Authority’s main tasks are to supply the scientific information needed for Union legislation to be drawn up concerning food and food safety, to collect and analyse data that allow risks to be identified and monitored and to provide independent information on these risks (2). |
INFORMATION IN SUPPORT OF THE STATEMENT OF ASSURANCE
2. |
The audit approach taken by the Court comprises analytical audit procedures, direct testing of transactions and an assessment of key controls of the Authority’s supervisory and control systems. This is supplemented by evidence provided by the work of other auditors (where relevant) and an analysis of management representations. |
STATEMENT OF ASSURANCE
The management’s responsibility
The auditor’s responsibility
Opinion on the reliability of the accounts
Opinion on the legality and regularity of the transactions underlying the accounts
|
10. |
The comments which follow do not call the Court’s opinions into question. |
COMMENTS ON INTERNAL CONTROLS
11. |
According to the Authority's self-assessment of its internal control system which was carried out in 2012 and 2013, the majority of internal control standards (ICS) are met. This is not yet the case for ICS 4 (Staff appraisal and development) and ICS 11 (Document management), for which corrective action was still ongoing at the time of the audit. |
12. |
The Authority’s Annual Work Programmes do not contain sufficient details on planned procurements and grants to support financing decisions in the sense of Article 64 of the Implementing Rules to its Financial Regulation. Including such details in the Annual Work Programme would allow a more effective monitoring of procurements and grants. |
FOLLOW-UP OF PREVIOUS YEARS’ COMMENTS
13. |
An overview of the corrective actions taken in response to the Court’s comments from previous years is provided in Annex I. |
This Report was adopted by Chamber IV, headed by Mr Pietro RUSSO, Member of the Court of Auditors, in Luxembourg at its meeting of 16 September 2014.
For the Court of Auditors
Vítor Manuel da SILVA CALDEIRA
President
(2) Annex II summarises the Authority’s competences and activities. It is presented for information purposes.
(3) These include the balance sheet and the economic outturn account, the cash flow table, the statement of changes in net assets and a summary of the significant accounting policies and other explanatory notes.
(4) These comprise the budgetary outturn account and the annex to the budgetary outturn account.
(5) Articles 39 and 50 of Commission Delegated Regulation (EU) No 1271/2013 (OJ L 328, 7.12.2013, p. 42).
(6) The accounting rules adopted by the Commission’s accounting officer are derived from the International Public Sector Accounting Standards (IPSAS) issued by the International Federation of Accountants or, where relevant, the International Accounting Standards (IAS)/International Financial Reporting Standards (IFRS) issued by the International Accounting Standards Board.
(7) Article 107 of Regulation (EU) No 1271/2013.
ANNEX I
Follow-up of previous years’ comments
Year |
Court's comment |
Status of corrective action (Completed/Ongoing/Outstanding/N/A) |
2011 |
This high number of budget transfers indicates weaknesses in budget planning and implementation and is at odds with the principle of specification. |
Completed |
2011 |
The Authority purchased a new headquarters building in December 2011 for 36,8 million euro which will be paid by quarterly instalments over 25 years, resulting in interest payments of 18,5 million euro. The Court questions whether a more economic alternative could have been sought from the budgetary authorities in accordance with the principle of sound financial management and ensuring full respect of the Financial Regulation. |
N/A (The Commission did not agree to provide additional funds to repay the loan in full). |
2011 |
There is room for improving the transparency of recruitment procedure. Questions for written tests and interviews were set after the examination of the applications by the selection board and declarations on confidentiality and absence of conflict of interest were signed by the selection board members only during, not before the evaluation of candidates’ applications. |
Completed |
2012 |
The validation of the accounting systems by the Authority’s accounting officer covers the central ABAC and SAP systems, but not the local systems and the reliability of data exchanges between central and local systems. This represents a risk as to the reliability of accounting data. |
Completed |
2012 |
Following high level risk assessments carried out by an external consultation 2012 and by the Commission’s Internal Audit Service in February 2013 a number of potential critical risks were identified in the operation of the Authority’s internal controls, particularly in the areas of data management, business continuity and IT security. The Authority started a comprehensive self-assessment of its internal control system in 2012. The process is on-going and implementation of corrective actions is planned for 2013. |
Ongoing |
2012 |
The overall level of appropriations committed was 99 %. The level of committed appropriations carried over was however high for title II (administrative expenditure) at 2,3 million euro (22 % of title II appropriations) and title III (operational expenditure) at 5,6 million euro (30 % of title III appropriations). For title II, carry-overs amounting to 1,1 million euro were made in conformity with EFSA’s management plan or were related to payments suspended for reasons beyond the Authority’s control. In case of title III, carry-overs of 2,1 million were made in conformity with EFSA’s management plan and an amount of 0,83 million euro was carried-over for reasons beyond the Authority’s control. |
N/A |
ANNEX II
European Food Safety Authority (Parma)
Competences and activities
Areas of Union competence deriving from the Treaty |
Collection of information
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Competences of the Authority (Regulation (EC) No 178/2002 of the European Parliament and of the Council) |
Objectives
Tasks
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Governance |
Management Board Composition 14 members appointed by the Council (in cooperation with the European Parliament and the Commission) and one representative of the Commission. Task To adopt the work programme and the budget and ensure that they are implemented. Executive Director Appointed by the Management Board on the basis of a list of candidates proposed by the Commission, following a hearing before the European Parliament. Advisory Forum Composition One representative per Member State. Task To advise the Executive Director. Scientific Committee and scientific panels To draw up the Authority’s scientific opinions. External audit European Court of Auditors Interrnal audit EFSA’s Internal Audit unit. European Commission’s Internal Audit Service (IAS). Discharge authority European Parliament acting on recommendation by the Council. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Resources made available to the Authority in 2013 (2012) |
Budget 78,1(78,3) million euro of which 100 % (100 %) is a European Union subsidy. Staff as at 31 December 2013 Posts in the establishment plan: 351 (355), of which occupied:
Total staff (including three offer letters pending acceptance on 31.12.2013): 448 (466), of which for:
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Products and services provided in 2013 (2012) |
Scientific outputs and supporting publications 2013 Activity 1: Provision of scientific opinions and advice and risk assessment approaches
Total scientific outputs activity 1 = 62 (65) Activity 2: Evaluation of products, substances and claims subject to authorisation
Total scientific outputs activity 2 = 267 (320) Activity 3: Data Collection, scientific cooperation and networking
Total scientific outputs activity 3 = 122 (131) Supporting Publications
Total Supporting Publications = 155 (162) Total outputs = 606 (678)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
(1) 2013 FTE allocation computed according to EC methodology; for comparison purposes the data of 2012 were recalculated
Source: Annex supplied by the Authority.
THE AUTHORITY’S REPLIES
11. |
According to EFSA’s self-assessment of its internal control system which was carried out in 2012 and 2013, the majority of internal control standards are met. This is not yet the case for ICS 4 (staff appraisal and development) and ICS 11 (Document management), for which corrective action was still ongoing. |
12. |
EFSA welcomes the ECA finding that mirrors the evolution being implemented as part of 2014 budget cycle. EFSA already published in its Work Programme more detailed information on science procurements and grants as well as on all other procurements, such as those under communication programme or operational support. We trust that this evolution from 2013 practises commented by the Court above goes beyond the requirements foreseen, in line with EFSA endeavour to continuously improve the transparency of the information provided. |
10.12.2014 |
EN |
Official Journal of the European Union |
C 442/167 |
REPORT
on the annual accounts of the European Institute for Gender Equality for the financial year 2013, together with the Institute’s reply
(2014/C 442/19)
INTRODUCTION
1. |
The European Institute for Gender Equality (hereinafter ‘the Institute’, aka ‘EIGE’), which is located in Vilnius, was established by Regulation (EC) No 1922/2006 of the European Parliament and of the Council (1). The Institute’s task is to collect, analyse and disseminate information as regards gender equality and to develop, analyse, evaluate and disseminate methodological tools in order to support the integration of gender equality into all Union policies and the resulting national policies (2). |
INFORMATION IN SUPPORT OF THE STATEMENT OF ASSURANCE
2. |
The audit approach taken by the Court comprises analytical audit procedures, direct testing of transactions and an assessment of key controls of the Institute’s supervisory and control systems. This is supplemented by evidence provided by the work of other auditors (where relevant) and an analysis of management representations. |
STATEMENT OF ASSURANCE
The management’s responsibility
The auditor’s responsibility
Opinion on the reliability of the accounts
Opinion on the legality and regularity of the transactions underlying the accounts
|
10. |
The comments which follow do not call the Court’s opinions into question. |
COMMENTS ON BUDGETARY MANAGEMENT
11. |
In 2013 the overall level of committed appropriations was 99 %, indicating that commitments were made in a timely manner. The Institute has further reduced the overall level of carry-overs of committed appropriations from 2,5 million euro (32 %) in 2012 to 2,2 million euro (29 %) in 2013. These carry-overs mainly relate to title III (operational expenditure) with 2,0 million euro, representing 56 % of the corresponding committed appropriations. They mainly concern procurement procedures that were concluded late in the year due to reasons mostly beyond the Institute’s control, such as a late communication by the Presidency of the EU Council regarding a study to be performed (1,1 million euro) and complex IT-related projects for which procurement was time consuming (0,6 million euro). |
FOLLOW-UP OF PREVIOUS YEARS’ COMMENTS
12. |
An overview of the corrective actions taken in response to the Court's comments from previous years is provided in Annex I. |
This Report was adopted by Chamber IV, headed by Mr Milan Martin CVIKL, Member of the Court of Auditors, in Luxembourg at its meeting of 8 July 2014.
For the Court of Auditors
Vítor Manuel da SILVA CALDEIRA
President
(1) OJ L 403, 30.12.2006, p. 9.
(2) Annex II summarises the Institute’s competences and activities. It is presented for information purposes.
(3) These include the balance sheet and the economic outturn account, the cash flow table, the statement of changes in net assets and a summary of the significant accounting policies and other explanatory notes.
(4) These comprise the budgetary outturn account and the annex to the budgetary outturn account.
(5) Articles 39 and 50 of Commission Delegated Regulation (EU) No 1271/2013 (OJ L 328, 7.12.2013, p. 42)
(6) The accounting rules adopted by the Commission’s accounting officer are derived from the International Public Sector Accounting Standards (IPSAS) issued by the International Federation of Accountants or, where relevant, the International Accounting Standards (IAS)/International Financial Reporting Standards (IFRS) issued by the International Accounting Standards Board.
(7) Article 107 of Regulation (EU) No 1271/2013.
ANNEX I
Follow-up of previous years’ comments
Year |
Court's comment |
Status of corrective action (Completed/Ongoing/Outstanding/N/A) |
2011 |
The high level of carry-over is at odds with the budgetary principle of annuality. |
Completed |
2011 |
The European Commission’s Internal Audit Service carried out a ‘Limited review of the implementation of Internal Control Standards’ at the Institute in December 2011. The Institute accepted the recommendations to finalise the procedure for the implementation of the Internal Control Standards and management adopted an action plan to be implemented in 2012. |
Ongoing |
2012 |
The Institute has reduced the overall level of carry-overs of committed appropriations from 50 % in 2011 to 32 % in 2012. The carry-overs to 2013 amount to 2,5 million euro and mainly concern title II (administrative expenditure) with 0,3 million euro and title III (operational expenditure) with 2,1 million euro, representing 23 % and 59 % of the corresponding committed appropriations. Carry-overs for title II mainly relate to commitments made at year-end in connection with the move to new premises, which took place in January 2013. Carry-overs for title III mainly relate to procurement procedures that were concluded late in the year. The Institute does not have a formalised procurement planning and monitoring procedure. In particular, its Annual Work Programme does not include a procurement schedule linked to the planned activities that would define the optimal scope and timing of procurements. However, only 7 % of committed appropriations carried over from 2011 to 2012 have not been used and needed to be cancelled. |
Completed |
2012 |
The Court identified shortcomings in the documentation of recruitment procedures. There is no evidence that questions for written tests and interviews, as well as their respective weightings were prepared before the examination of the applications. |
Ongoing |
ANNEX II
European Institute for Gender Equality (Vilnius)
Competences and activities
Areas of Union competence deriving from the Treaty (Articles 2 and 3 of the Treaty of the European Union) |
The Union is founded on the values of respect for human dignity, freedom, democracy, equality, the rule of law and respect for human rights, including the rights of persons belonging to minorities. These values are common to the Member States in a society in which pluralism, non-discrimination, tolerance, justice, solidarity and equality between women and men prevail. It shall combat social exclusion and discrimination, and shall promote social justice and protection, equality between women and men, solidarity between generations and protection of the rights of the child. |
||||||||||||||||||||||||
Competences of the Institute (Regulation (EC) No 1922/2006 of the European Parliament and of the Council) |
Objectives To contribute to and strengthen the promotion of gender equality including gender mainstreaming in all Union policies and the resulting national policies, and the fight against discrimination based on sex, and to raise EU citizens’ awareness of gender equality. Tasks
|
||||||||||||||||||||||||
Governance |
Management Board Composition Eighteen representatives appointed by the Council, on a proposal from each Member State concerned and one member representing the Commission, appointed by the Commission. The members are appointed on the basis of the highest standards of competence and a broad range of relevant and trans-disciplinary expertise in the area of gender equality. The Council and the Commission aim to achieve a balanced representation between men and women on the Management Board. The members appointed by the Council shall represent eighteen Member States in the order of the rotating Presidencies. Duties
Experts' Forum Composition Members from competent bodies specialised in gender equality issues, one representative designated by each Member State, two members designated by the European Parliament representing other relevant organisations specialised in gender equality issues, three members designated by the Commission. Duties Supports the Director in ensuring the excellence and independence of the Institute’s activities, constitutes a mechanism for an exchange of information in relation to gender equality issues and the pooling of knowledge, and ensures close cooperation between the Institute and competent bodies in the Member States. The Director is appointed by the Management Board on the basis of a list of candidates proposed by the Commission after an open competition. Duties Responsible for performance of the tasks referred to in Regulation (EC) No 1922/2006, preparing and implementing the Institute's annual and medium-term programmes of activities; preparing the meetings of the Management Board and the Experts' Forum; preparing and publishing the annual report; all staff-related matters: matters of day-to-day administration; implementation of effective monitoring and evaluation procedures relating to the Institute's performance. External audit European Court of Auditors. Internal audit European Commission's Internal Audit Service (IAS). Discharge authority European Parliament on a recommendation from the Council. |
||||||||||||||||||||||||
Resources made available to the Institute in 2013 (2012) |
Final Budget 7,5(7,7) million euro of which the Union subsidy is 100 % (100 %) Staff as at 31 December 2013 30 (30) posts foreseen in the establishment plan, of which occupied: 30 (30); 16 (14) other staff (contract staff, seconded national experts). Total staff as at 31 December 2013 46 (44), undertaking the following tasks:
|
||||||||||||||||||||||||
Products and services in 2013 (2012) |
Focal Areas: Comparable and reliable data and indicators on gender equality; collecting and processing methods and good practices for gender equality work; resource and documentation centre; awareness-raising, networking and communication. Number of studies launched: 14 (7) Number of contributions to Presidency countries: 2 (2) Number of experts' and working group meetings: 13 (23) Many additional meetings were held in the framework of the LT presidency of the Council of the EU. International conferences: 2 (1) Number of research reports: 2 (2) Annual reports: 1 (1) |
||||||||||||||||||||||||
Source: Annex supplied by the Institute. |
THE INSTITUTE’S REPLY
11. |
Agreed. EIGE has introduced acceptable ceilings by Title (TITLE I: MAX 10 %, TITLE II: MAX 20 %, TITLE III: MAX 30 %). However as stated in previous years again in 2013 under operational appropriations delays are due to the circumstances outside EIGE’s control, i.e. a delayed decision by the Presidency of the Council of the EU regarding a subject of study. In order to improve the procurement planning and monitoring EIGE has now in place a monitoring tool which follows the expected dates of each step of the annual procurement proceedings. |
10.12.2014 |
EN |
Official Journal of the European Union |
C 442/174 |
REPORT
on the annual accounts of the European Insurance and Occupational Pensions Authority for the financial year 2013, together with the Authority’s replies
(2014/C 442/20)
INTRODUCTION
1. |
The European Insurance and Occupational Pensions Authority (hereinafter ‘the Authority’, aka ‘EIOPA’), which is located in Frankfurt, was established by Regulation (EU) No 1094/2010 of the European Parliament and of the Council (1). The Authority’s task is to contribute to the establishment of high-quality common regulatory and supervisory standards and practices, to contribute to the consistent application of legally binding Union acts, to stimulate and facilitate the delegation of tasks and responsibilities among competent authorities, to monitor and assess market developments in the area of its competence and to foster the protection of policyholders, pension scheme members and beneficiaries (2). The Authority was set up on 1 January 2011. |
INFORMATION IN SUPPORT OF THE STATEMENT OF ASSURANCE
2. |
The audit approach taken by the Court comprises analytical audit procedures, direct testing of transactions and an assessment of key controls of the Authority’s supervisory and control systems. This is supplemented by evidence provided by the work of other auditors (where relevant) and an analysis of management representations. |
STATEMENT OF ASSURANCE
The management’s responsibility
The auditor’s responsibility
Opinion on the reliability of the accounts
Opinion on the legality and regularity of the transactions underlying the accounts
|
10. |
The comments which follow do not call the Court’s opinions into question. |
COMMENTS ON INTERNAL CONTROLS
11. |
The Management Board adopted the Authority’s 16 Internal Control Standards in March 2013. At the end of the year, their implementation was ongoing on the basis of a clear action plan agreed with the Commission’s Internal Audit Service. |
12. |
Legal commitments were not always authorised by officers with a proper delegation and were not always preceded by a properly authorised budgetary commitment. This shows the need to improve the definition of, and compliance with, financial circuits in accordance with the Financial Regulation. |
COMMENTS ON BUDGETARY MANAGEMENT
13. |
The overall level of committed appropriations was 95 %. However, the level of committed appropriations carried over further increased as compared with previous years and was high at 5,2 million euro (28 %), particularly for title II at 1,0 million euro (30 %) and title III at 3,7 million euro (85 %). This mainly resulted from specific contracts with a cumulative value of 3 million euro signed late in the year, particularly for the development and maintenance of a European database (2,6 million euro) and other IT services to be provided in 2014. Although the related commitments are legal and regular and low cancellation rates for carry-overs from 2012 confirmed sound estimations, the extent to which 2013 appropriations were used to cover 2014 activities is at odds with the budgetary principle of annuality. |
FOLLOW-UP OF PREVIOUS YEARS’ COMMENTS
14. |
An overview of the corrective actions taken in response to the Court’s comments from previous years is provided in Annex I. |
This Report was adopted by Chamber IV, headed by Mr Milan Martin CVIKL, Member of the Court of Auditors, in Luxembourg at its meeting of 8 July 2014.
For the Court of Auditors
Vítor Manuel da SILVA CALDEIRA
President
(1) OJ L 331, 15.12.2010, p. 48.
(2) Annex II summarises the Authority’s competences and activities. It is presented for information purposes.
(3) These include the balance sheet and the economic outturn account, the cash flow table, the statement of changes in net assets and a summary of the significant accounting policies and other explanatory notes.
(4) These comprise the budgetary outturn account and the annex to the budgetary outturn account.
(5) Articles 39 and 50 of Commission Delegated Regulation (EU) No 1271/2013 (OJ L 328, 7.12.2013, p. 42).
(6) The accounting rules adopted by the Commission’s accounting officer are derived from the International Public Sector Accounting Standards (IPSAS) issued by the International Federation of Accountants or, where relevant, the International Accounting Standards (IAS)/International Financial Reporting Standards (IFRS) issued by the International Accounting Standards Board.
(7) Article 107 of Regulation (EU) No 1271/2013.
ANNEX I
Follow-up of previous years’ comments
Year |
Court’s comment |
Status of corrective action (Completed/Ongoing/Outstanding/N/A) |
2011 |
The Authority’s budget for the financial year 2011 amounted to 10,7 million euro. In accordance with Article 62(1) of its Founding Regulation, 55 % of the 2011 budget was financed from Member States’ and EFTA countries’ contributions and 45 % from the Union budget. At the end of 2011 the Authority recorded a positive budget outturn of 2,8 million euro. In compliance with its Financial Regulation the full amount was then recorded in the accounts as a liability towards the European Commission. |
Completed |
2011 |
The audited procurement procedures were not fully consistent with the provisions of the general Financial Regulation. For five purchases of IT equipment (total amount of 1 60 117 euro) the award criteria applied were not set in advance and no written contracts were signed. In another case related to recruitment services (55 000 euro), the award criteria were incorrectly applied. The Authority should ensure that all new contracts are awarded in full compliance with the EU procurement rules. |
Completed |
2011 |
The Authority needs to improve the transparency of recruitment procedures: threshold scores for admission to written tests and interviews or for inclusion in the list of suitable candidates, and questions for oral and written tests, were not set before the examination of applications, and there was no decision of the Appointing Authority to appoint the selection boards. |
Completed |
2012 |
EIOPA has improved its procurement procedures in order to become fully compliant with EU procurement rules. However, one contract related to the design of a financial database was subdivided into four lots of 60 000 euro each, which were all directly awarded to two companies. Given the total value of the services to be procured for the same project (2 40 000 euro), an open or restricted procedure should have been applied and the related commitments and payments are thus irregular. |
N/A |
2012 |
A physical verification of assets was carried out in May and June 2012, but no physical verification report was produced. The Authority has not adopted any procedures or guidelines on physical checks on tangible assets. |
Completed |
2012 |
The carry-over of committed appropriations to 2013 was very high for title III (operational expenditure) at 79 % of total appropriations. This mainly results from the complexity and lengthy duration of one IT procurement procedure for which the contract of 2,2 million euro was signed as planned in December 2012. |
Outstanding |
ANNEX II
European Insurance and Occupational Pensions Authority (Frankfurt am Main)
Competences and activities
Areas of Union competence deriving from the Treaty (Articles 26, 114, 290, 291 of the Treaty on the Functioning of the European Union) |
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Competences of the Authority (Regulation (EU) No 1094/2010 of the European Parliament and of the Council establishing the Authority, Article 1(6) and Article 8 on tasks and powers) |
Objectives Protect the public interest by contributing to the short, medium and long-term stability and effectiveness of the financial system, for the Union economy, its citizens and businesses. Tasks
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Governance (Regulation (EU) No 1094/2010 establishing the Authority: Articles 40-44: Board of Supervisors; Articles 45-47: Management Board; Articles 48-50: Chair; Articles 51-53: Executive Director) |
Board of Supervisors (BoS) Composition Chairperson (non-voting), the head of the national public authority competent for the supervision of financial institutions in each Member State (one voting member per Member State), one representative of the Commission (non-voting), of the European Systemic Risk Board (non-voting), the European Banking Authority, the European Securities Markets Authority (both non-voting); observers may be permitted and the Executive Director may participate in meetings (non-voting). Tasks The Authority’s main decision-making body. Management Board (MB) Composition Chairperson of the Authority (voting), six Members of the BoS (voting). A representative of the European Commission shall participate in MB meetings and may vote on budget issues. The Executive Director shall participate in meetings of the MB without the right to vote. Tasks The MB shall ensure that the Authority carries out its mission and performs the tasks assigned to it in accordance with Regulation No 1094/2010. The Authority’s Chairperson Represents the Authority, prepares the work of the Board of Supervisors (BoS), chairs the BoS and MB meetings. The Authority’s Executive Director Is in charge of the management of the Authority and the implementation of the annual work programme and the budget; prepares the work of the Management Board, the budget, the work programme. Quality Control Committee Composition The Authority’s Alternate Chairperson (chair) and two Members of the Management Board. The Executive Director participates as an observer. Tasks To oversee and assess appropriate implementation of the internal procedures and decisions. External audit European Court of Auditors. Internal audit European Commission’s Internal Audit Service (IAS). Discharge authority European Parliament acting on a recommendation from the Council. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Resources made available to the Authority in 2013 (2012) |
Final Budget Final Budget Appropriations: 1 8 7 67 470(1 5 6 55 000) euro Establishment Plan Statutory staff: 80 (69) posts authorized in the establishment plan, of which occupied: 80 (69) Establishment plan 100 % (100 %) fulfilled Contract staff posts: 22 (12) planned in the budget, 19 (14) occupied Seconded National Experts posts: 12 (8) planned in the budget, of which occupied: 11 (8) Total: 110 (91) staff |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Products and services in 2013 |
Regulatory tasks
Supervisory tasks
Consumer protection and financial innovation
Common supervisory culture
Financial stability
Crisis management
External relations
Conferences/other public events in 2013
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Source: Annex supplied by the Authority. |
THE AUTHORITY’S REPLIES
11. |
Further to an audit by the Internal Audit Service (IAS) in 2013 on the implementation of the Internal Control Standards in EIOPA, the Authority has developed an action plan to implement all recommended actions by the IAS. The action plan was presented to EIOPA’s Management Board and agreed with the IAS. The full implementation of the plan is nearly completed and the remaining work will be finished by the end of 2014. |
12. |
With regard to the legal commitments, EIOPA has put in place extra approval arrangements taking away any ambiguity regarding the duly authorisation of these commitments. With regard to the sequencing of the budget and legal commitments, EIOPA acknowledges that in certain instances the full completion of the budget commitment was only finalised after having established the corresponding legal commitments. The corrective measures that have been taken are: regular revisions of EIOPA’s financial circuits, strengthened finance and budget processes with a focus on compliance to the financial circuits as well as, in regular intervalls, specific finance and procurement training for all EIOPA officials involved in the financial circuits. |
13. |
In order to fulfil its ambitious mandate, the Authority has developed a multi-annual IT strategy and implementation plan (including data standardisation, data collection, storage and analysis solutions as well as online communication and collaboration tools). EIOPA acknowledges that the percentage of carried over appropriations from 2013 to 2014 to cover for these initiatives in title III of the Budget was high. This is however due to the multi-annual nature of the work, the challenging time frame (mainly driven by the Solvency II calendar), the complex and lengthy procurement exercises involved and the necessity to guarantee service continuity. Yet, as these carried over commitments are critical to the further implementation of the IT plan in accordance with the agreed timing, their execution rate will be again very high, like it was the case in the previous year. As regards the way forward, the following measures will reduce the carry-over percentages in the next years: (1) an increased level of maturity of EIOPA’s IT capability (the remaining major IT developments will be completed at the end of 2015) and (2) reinforced finance and budget management processes (including the integration of budget and procurement processes into the overall planning and coordination processes of EIOPA). |
10.12.2014 |
EN |
Official Journal of the European Union |
C 442/184 |
REPORT
on the annual accounts of the European Institute of Innovation and Technology for the financial year 2013, together with the Institute’s replies
(2014/C 442/21)
INTRODUCTION
1. |
The European Institute of Innovation and Technology (hereinafter ‘the Institute’, aka ‘EIT’), which is located in Budapest, was created by Regulation (EC) No 294/2008 of the European Parliament and of the Council (1). The Institute’s objective is to contribute to sustainable European economic growth and competitiveness by reinforcing the innovation capacity of the Member States and the European Union. The Institute awards grants to three ‘Knowledge and Innovation Communities’ (KICs), linking the higher education, research and business sectors with one another and aiming thereby to boost innovation and entrepreneurship (2). KICs coordinate the activities of hundreds of partners. The grants provided by EIT reimburse partners’ costs and costs stemming from the KICs’ coordination activities. |
INFORMATION IN SUPPORT OF THE STATEMENT OF ASSURANCE
2. |
The audit approach taken by the Court comprises analytical audit procedures, direct testing of transactions and an assessment of key controls of the Institute’s supervisory and control systems. This is supplemented by evidence provided by the work of other auditors (where relevant) and an analysis of management representations. |
STATEMENT OF ASSURANCE
The management’s responsibility
The auditor’s responsibility
Opinion on the reliability of the accounts
Basis for a qualified opinion on the legality and regularity of the underlying transactions No reasonable assurance on the legality and regularity of grant transactions
Material procurement errors
Qualified opinion on the legality and the regularity of the transactions underlying the accounts
|
14. |
The comments which follow do not call into question the Court’s opinion on the reliability of the accounts or its qualified opinion on the legality and regularity of the underlying transactions. |
COMMENTS ON THE LEGALITY AND REGULARITY OF TRANSACTIONS
15. |
The Framework Partnership Agreements (FPA) with the three KICs stipulate that the EIT financial contribution may cover up to 25 % of the KIC’s global expenditure over the first four years, from 1 January 2010 to December 2013. According to the figures reported by the KICs, this ceiling was respected by all three KICs. However, as these figures will not be audited before 2015, there is no appropriate audit evidence that the EIT funding did not exceed this 25 % ceiling. |
COMMENTS ON BUDGETARY MANAGEMENT
16. |
In 2013 the overall level of committed appropriations was 97 %, indicating that overall commitments were made in a timely manner. The budget implementation rate was low, however, at 74 % of the EU contributions for title I (staff expenditure), which is mainly related to the high turnover of staff and the outstanding adoption of the regulations on salary adjustments. |
17. |
The Institute carried over committed appropriations under title II (administrative expenditure) amounting to 1 93 420 euro (24 %). Carry-overs mainly concerned invoices not yet received and ongoing IT projects. It did not implement 91 918 euro (29 %) of the committed appropriations carried over from 2012 to 2013 under this title, which were largely due to overestimated costs for a Governing Board meeting. |
18. |
The Institute had budgeted 3 4 0 78 025 euro under title III (operational expenditure) for KIC grants. The relatively low execution rate of 82 % is due to the fact that the KICs did not fully absorb the available funding for 2012 activities (2012 grants). |
FOLLOW-UP OF PREVIOUS YEARS’ COMMENTS
19. |
An overview of the corrective actions taken in response to the Court's comments from previous years is provided in Annex I. |
This Report was adopted by Chamber IV, headed by Mr Pietro RUSSO, Member of the Court of Auditors, in Luxembourg at its meeting of 16 September 2014.
For the Court of Auditors
Vítor Manuel da SILVA CALDEIRA
President
(2) Annex II summarises the Institute's competences and activities. It is presented for information purposes.
(3) These include the balance sheet and the economic outturn account, the cash flow table, the statement of changes in net assets and a summary of the significant accounting policies and other explanatory notes.
(4) These comprise the budgetary outturn account and the annex to the budgetary outturn account.
(5) Articles 39 and 50 of Commission Delegated Regulation (EU) No 1271/2013 (OJ L 328, 7.12.2013, p. 42).
(6) The accounting rules adopted by the Commission’s accounting officer are derived from the International Public Sector Accounting Standards (IPSAS) issued by the International Federation of Accountants or, where relevant, the International Accounting Standards (IAS)/International Financial Reporting Standards (IFRS) issued by the International Accounting Standards Board.
(7) Article 107 of Regulation (EU) No 1271/2013.
ANNEX I
Follow-up of previous years’ comments
Year |
Court’s comment |
Status of corrective action (Completed/Ongoing/Outstanding/N/A) |
2012 |
In 2012, the Institute made final payments and clearings of pre-financings (transactions) for grants amounting to 11,3 million euro (2010 activities) and 48,6 million euro (2011 activities). All grant transactions are subject to review by the Commission before authorisation by EIT. The Institute itself made considerable efforts to implement effective ex ante verifications with the aim of providing reasonable assurance on the legality and regularity of grant transactions. About 80 % of grant expenditure claimed by KIC’s is covered by certificates issued by independent audit firms contracted by the KICs and their partners. EIT itself carried out ex ante verifications consisting of comprehensive desk checks. Supporting documents obtained from the KICs and their partners were reviewed by EIT initially only in the case of particular risks identified. The Court found however that the quality of the audit certificates is inadequate in many instances (1). In order to have a second layer of assurance on the legality and regularity of grant transactions, at the end of 2012 the Institute introduced complementary ex post verifications for grants related to 2011 activities. They were carried out by independent audit firms contracted by EIT and are assessed as reliable. Ex post verification results confirmed that ex ante verifications are not fully effective. The Institute has however recovered the irregular payments found and the residual error rate for 2011 grant transactions is not material. No ex post verifications have been carried out yet for the transactions related to grants for 2010 activities (11,3 milllion euro). In addition, given the limited assurance that can be drawn from ex ante verifications, there is no reasonable assurance as to the legality and regularity of these transactions. The Court could not obtain sufficient appropriate audit evidence on the legality and regularity of the audited grant transactions related to 2010 activities. |
Completed |
2012 |
In addition to the matter described in paragraphs 9 to 13, budgets for grant agreements signed in 2010 and 2011, which resulted in payments in 2012, were not sufficiently specific. There was no link between the approved funds and the activities to be implemented. Grant agreements did not set individual thresholds for specific cost categories (i.e. staff costs, sub-contracting, legal services, etc.) and did not include rules for the procurement of goods and services by the KICs and their partners. EIT also carried out technical verifications for all funded projects as part of its ex ante verifications. However, there was a lack of quantifiable targets that hampered an effective assessment of project activities and results. Business plans did not define in detail the activities to be implemented; nor did they set clear milestones, deliverables per activity or quality criteria. Out of the committed appropriations carried over from 2011 amounting to some 22 million euro, some 10 million euro (45 %) were cancelled in 2012. The high level of cancellations is mainly due to lower than estimated costs claimed by beneficiaries under 2011 grant agreements (9,2 million euro or 92 % of cancelled carry-overs). |
Ongoing |
2011 |
Grant agreements resulting in payments in 2011 were systematically signed by the European Commission (Directorate General for Education and Culture) and the Institute after most of the activities had already been implemented. Between September and December 2011, the Institute made final payments (2), amounting to 4,2 million euro, related to three grant agreements that were signed well after the start of activities (3). This is an issue in terms of good financial management. |
Completed |
(1) I.e. Audit certificates did not always indicate the cost claim audited. Not all cost categories had to be audited in sufficient detail (as an example, actual indirect costs, which can be declared without threshold, was not checked on the basis of original supporting evidence). The risk of double funding of equipment declared as cost was not comprehensively checked. Most audit certificates did not mention the coverage of costs audited and there was no common methodology to identify the overall error in the cost claims.
(2) Advance payments had been made by the European Commission.
(3) In one case, the contract was signed 14 days before the end of the 13-month implementation period.
ANNEX II
European Institute of Innovation and Technology (Budapest)
Competences and activities
Areas of Union competence deriving from the Treaty (Article 173 of the Treaty on the Functioning of the European Union) |
The Union and the Member States shall ensure that the conditions necessary for the competitiveness of the Union’s industry exist. For that purpose, in accordance with a system of open and competitive markets, their action shall be aimed at:
|
||||||||||||||||||||||
Competences of the Institute (Regulation (EC) No 294/2008 of the European Parliament and of the Council) |
Objectives The Institute’s objective is to contribute to sustainable European economic growth and competitiveness by reinforcing the innovation capacity of the Member States and the Community. It shall do this by promoting and integrating higher education, research and innovation of the highest standards. Tasks In order to achieve its objective, the Institute shall:
|
||||||||||||||||||||||
Governance |
Governing Board Composition The Institute's Governing Board (GB) consists of 18 appointed members providing a balance between experience and excellence in business, higher education and research, and four representative members proposed by the Knowledge and Innovation Communities (KICs). The European Commission has observer status. Tasks The Governing Board is responsible for steering the activities of the Institute, for the selection, designation, grant allocation to and evaluation of the KICs, and for all other strategic decisions. Executive Committee Composition The Executive Committee consists of five Governing Board members, including the Chairperson and Vice-Chairperson. It is chaired by the Chairperson of the Governing Board. Tasks The Executive Committee oversees the running of the Institute and takes such decisions as are necessary between meetings of the Governing Board. Director Appointed by and responsible to the Governing Board for the administrative and financial management of the Institute; the Institute's legal representative. External audit European Court of Auditors. Discharge authority European Parliament acting on a recommendation from the Council. |
||||||||||||||||||||||
Resources made available to the Institute in 2013 (2012) |
Final Budget 142,20 million euro for commitment appropriations and 98,76 million euro for payment appropriations. Staff as at 31 December 2013 Authorised posts: 58 (52) Posts occupied: 41 (47) Other posts: 0 (0) Total staff: 41 (47) assigned to the following duties:
|
||||||||||||||||||||||
Products and services in 2013 |
|
||||||||||||||||||||||
Source: Annex supplied by the Institute. |
THE INSTITUTE’S REPLIES
9. |
The EIT welcomes the acknowledgement by the Court of Auditors concerning the considerable efforts made by EIT to implement effective ex ante verifications with the aim to obtain reasonable assurance on the legality and regularity of grant transactions. The EIT is committed to further improve the instructions provided to certifying auditors in order to remedy the weaknesses identified by the Court of Auditors and to increase the level of assurance obtained from audit certificates. |
10. |
In accordance with the ex-post audit strategy of the EIT, KIC Partners to be audited are selected primarily on the basis of a risk assessment for maximum efficiency of limited resources. However, in order to be in a position to provide a representative error rate, the EIT selects part of the sample on a random basis. This ensures a more balanced coverage of KIC Partners over the duration of the Framework Partnership Agreements. As regards Grant Agreements 2012, while the overall error rate was indeed 3 % of the audited grants, as reported by the Court of Auditors, the detected error rate in the random sample was only 1,37 %. The detected error rate of 3,29 % in the risk-based sample is by definition not representative for the overall population. As the representative error rate of 1,37 % remained below the materiality threshold of 2 %, the EIT did not make a reservation in the Annual Activity Report and considers that grants paid under Grant Agreements 2012 are free from material errors. |
11. |
The EIT has taken a proactive approach in order to launch immediate mitigating actions in the area of procurement as follows. 1) Extensive revision of the internal procedures, circuits and templates to fully comply with the respective public procurement rules, with special attention to the sound planning and estimation of needs. 2) In order to ensure the provision of the necessary services, the EIT has started to use the available Commission framework contracts and has launched procurement procedures to award new service contracts. 3) The EIT has planned a series of trainings for EIT staff on procurement. The EIT is committed to implement mitigating measures in order to avoid procurement procedural errors in the future. |
12. |
According to the EIT’s calculation, based on the methodology of the Court of Auditors, the combined error rate for 2013 expenditure was 2,12 %. While this error rate is indeed in the range reported by the Court of Auditors, it is important to note that the level of financial errors in grants (i.e. representative error rate of 1,37 %) was well below the materiality threshold of 2 %. Furthermore, the EIT is committed to improve its internal procedures to avoid future procurement procedural errors. |
15. |
The EIT will obtain audit certificates on costs of KIC complementary activities in the first quarter of 2015 and compliance with the 25 % ceiling set out in the Framework Partnership Agreements will be verified on the basis of final figures in the first half of 2015. If the 25 % ceiling is not met, the corresponding amount will be recovered from the KIC(s) in accordance with the provisions of the Framework Partnership Agreement. Such a recovery will be reflected in the annual accounts of the EIT for the financial year 2014. |
16. |
The EIT welcomes the acknowledgement by the Court of Auditors concerning the budget execution. The overall implementation rate of commitment appropriations for title 1 (staff expenditure) was 84 %. While it is true that the implementation rate of EU contribution was 74 %, as reported by the Court of Auditors, it is important to note that 100 % of Host Member State contribution was implemented. The non-executed part of staff expenditure relates to high staff turnover and the appropriations earmarked for salary adjustments for the years 2011 and 2012, for which the European Court of Justice eventually made a ruling that prevented such adjustments to be paid before year-end. |
17. |
The EIT acknowledges the comments of the Court of Auditors on the execution of carry-overs on title 2 (administrative expenditure). Non-execution of appropriations carried over from 2012 to 2013 under this title was largely due to overestimated costs for a Governing Board meeting of December 2012, more specifically, the actual costs turned out to be lower than the estimates. |
18. |
The EIT acknowledges the comments of the Court of Auditors on the execution of commitments for 2012 KIC grants carried over from 2012 to 2013. |
10.12.2014 |
EN |
Official Journal of the European Union |
C 442/193 |
REPORT
on the annual accounts of the European Medicines Agency for the financial year 2013, together with the Agency’s reply
(2014/C 442/22)
INTRODUCTION
1. |
The European Medicines Agency (hereinafter ‘the Agency’, aka ‘EMA’), which is located in London, was established by Council Regulation (EEC) No 2309/93, which was replaced by Regulation (EC) No 726/2004 of the European Parliament and of the Council (1). The Agency operates through a network and coordinates the scientific resources made available by the national authorities in order to ensure the evaluation and supervision of medicinal products for human or veterinary use (2). |
INFORMATION IN SUPPORT OF THE STATEMENT OF ASSURANCE
2. |
The audit approach taken by the Court comprises analytical audit procedures, direct testing of transactions and an assessment of key controls of the Agency’s supervisory and control systems. This is supplemented by evidence provided by the work of other auditors (where relevant) and an analysis of management representations. |
STATEMENT OF ASSURANCE
The management’s responsibility
The auditor’s responsibility
Opinion on the reliability of the accounts
Opinion on the legality and regularity of the transactions underlying the accounts
|
10. |
The comments which follow do not call the Court’s opinions into question. |
FOLLOW-UP OF PREVIOUS YEARS’ COMMENTS
11. |
An overview of the corrective actions taken in response to the Court's comments from previous years is provided in Annex I. |
This Report was adopted by Chamber IV, headed by Mr Milan Martin CVIKL, Member of the Court of Auditors, in Luxembourg at its meeting of 1 July 2014.
For the Court of Auditors
Vítor Manuel da SILVA CALDEIRA
President
(1) OJ L 214, 24.8.1993, p. 1 and OJ L 136, 30.4.2004, p. 1. In accordance with the latter Regulation, the Agency’s original name, the European Agency for the Evaluation of Medicinal Products, was changed to the European Medicines Agency.
(2) Annex II summarises the Agency’s competences and activities. It is presented for information purposes.
(3) These include the balance sheet and the economic outturn account, the cash flow table, the statement of changes in net assets and a summary of the significant accounting policies and other explanatory notes.
(4) These comprise the budgetary outturn account and the annex to the budgetary outturn account.
(5) Articles 39 and 50 of Commission Delegated Regulation (EU) No 1271/2013 (OJ L 328, 7.12.2013, p. 42).
(6) The accounting rules adopted by the Commission’s accounting officer are derived from the International Public Sector Accounting Standards (IPSAS) issued by the International Federation of Accountants or, where relevant, the International Accounting Standards (IAS)/International Financial Reporting Standards (IFRS) issued by the International Accounting Standards Board.
(7) Article 107 of Regulation (EU) No 1271/2013.
ANNEX I
Follow-up of previous years’ comments
Year |
Court's comment |
Status of corrective action (Completed/Ongoing/Outstanding/N/A) |
2011 |
There is scope for improving the transparency of procurement procedures. |
Completed |
2011 |
The Court identified a need to improve the transparency of staff selection procedures. Selection Board members did not always complete their conflict of interest declarations, or did not do so in a timely manner, and there was no evidence of any action taken to address the issues raised by these declarations. The documentation of the Selection Board’s proceedings was not always adequate and there is no evidence as to how the method for the short-listing of candidates was established and that the questions for the written tests or interviews were set before the examinations. |
Completed |
2012 |
The Agency applies differing recognition criteria for fee revenue and associated expenditure. Revenue from application fees is recognised on a straight-line basis over a set time period. Expenditure for the evaluation of such applications by the competent national authorities is however accrued when a specific milestone in service delivery is reached. This is in contradiction with the matching principle. |
Completed |
2012 |
The Agency has not yet validated its accounting system in the area of intangible fixed assets. Given the considerable investment in the ICT development (1), this is a crucial part of the whole accounting system. |
Completed |
2012 |
In 2011 and 2012, the Council refused salary increases for EU staff. The Commission appealed this decision to the Court of Justice which did not yet rule on the matter. Since the Agency is located in London, the salary increases in question will be paid in GBP whereas the Agency’s accounts are prepared in Euros. Given the fluctuations in the exchange rate over the period concerned, the possible back pay to staff would lead to an estimated exchange rate loss for the Agency of 2,9 million euro. The Agency has included this amount in the calculation of its budgetary outturn account, leading to an equivalent understatement of funds to be paid back to the Commission (2). |
N/A |
2012 |
In 2012, the Agency issued cascading framework contracts for the provision of services (3). The procurement procedure presented some irregularities affecting the principle of transparency. |
N/A |
2012 |
In addition to the education allowances provided for in the Staff Regulations (4), the Agency pays education contributions directly to schools for staff whose children attend primary or secondary school without having contracts with schools in place. Total 2012 education contributions amounted to some 3 89 000 euro. Such expenditure is not covered by the Staff Regulations and irregular. |
Ongoing (5) |
2012 |
The Agency’s budget implementation rates for the year 2012 were satisfactory for titles I and III. While the rate of committed appropriations carried over was high for title II at 27 %, this primarily relates to the Agency’s planned move to new premises in 2014 (4 2 05 000 euro) and the development of ICT systems (1 5 96 000 euro). While the latter is of a multiannual nature that can partly justify the carry-overs, the Agency’s ICT Unit was significantly reorganised in 2012 and a number of projects planned for 2012 were delayed. |
N/A |
(1) 2012 investments in ICT development amounted to 1 1 6 25 000 euro.
(2) In so doing, the Agency followed an instruction from the Commission dated December 2012 which however was further clarified in June 2013.
(3) By 31 December 2012, total budgetary commitments of 1 3 4 75 000 euro had been made for specific contracts under these framework contracts, and payments of 4 6 90 000 euro had been made.
(4) Article 3 of Annex VII provides for twice the basic allowance of 252,81 euro = 505,62 euro.
(5) A new procedure was prepared in 2013 and will enter into force in 2014.
ANNEX II
European Medicines Agency (London)
Competences and activities
Areas of Union competence deriving from the Treaty (Article 168 of the Treaty on the Functioning of the European Union) |
Collection of information A high level of human health protection shall be ensured in the definition and implementation of all Union policies and activities. Union action, which shall complement national policies, shall be directed towards improving public health, preventing physical and mental illness and diseases, and obviating sources of danger to physical and mental health. Such action shall cover the fight against the major health scourges, by promoting research into their causes, their transmission and their prevention, as well as health information and education, and monitoring, early warning of and combating serious cross-border threats to health. |
||||||||||||||||||||||||||||||
Competences of the Agency (Regulation (EC) No 726/2004 of the European Parliament and of the Council) |
Objectives
Tasks
|
||||||||||||||||||||||||||||||
Governance |
The Committee for Medicinal Products for Human Use (CHMP) is responsible for preparing the Agency's opinions on all questions concerning medicines for human use. The CHMP consists of one member and one alternate from each Member State, one member and an alternate nominated by Iceland and by Norway and up to five co-opted members. The Committee for Medicinal Products for Veterinary Use (CVMP) is responsible for preparing the Agency's opinions on all questions concerning veterinary medicines. The CVMP consists of one member and one alternate from each Member State, Iceland and Norway and up to five co-opted members. The Committee on Orphan Medicinal Products (COMP) is responsible for reviewing applications from people or companies seeking orphan medicinal product designation. The COMP consists of one member from each Member State, three members nominated by the European Commission representing patients’ organisations, three members nominated by the European Commission on the Agency’s recommendation, one member nominated by Iceland, one by Liechtenstein and one by Norway, and one European Commission representative. The Committee on Herbal Medicinal Products (HMPC) is responsible for preparing the Agency’s opinions on herbal medicines. The HMPC consists of one member and one alternate from each Member State, Iceland and Norway, and up to five co-opted members. The Paediatric Committee (PDCO) is responsible for assessing the content of applications: for paediatric investigation plans, with or without request of deferral(s) and/or partial waivers; for modification of a previously agreed paediatric investigation plan; for product-specific waivers and for compliance checks. The PDCO consists of five members of the CHMP and their five alternates, one member and one alternate from each Member State which is not represented by the five above, and six members and alternates appointed by the European Commission representing healthcare professionals and patients’ associations. The Committee for Advanced Therapy (CAT) is responsible for assessing the quality, safety and efficacy of advanced therapy medicinal products (ATMPs) and following scientific developments in the field. The CAT consists of five members of the CHMP and their five alternates, one member and one alternate from each Member State which is not represented by the five above, and four members and four alternates appointed by the European Commission representing patients’ associations and clinicians. The Pharmacovigilance Risk Assessment Committee (PRAC) is responsible for assessing and monitoring safety issues for human medicines. The PRAC consists of one member and one alternate from each Member State, Iceland and Norway, six independent scientific experts nominated by the European Commission and two members and two alternates nominated by the European Commission to represent healthcare professionals and patients’ organisations The Management Board consists of one member and one alternate from each Member State, two representatives of the Commission, two representatives of the European Parliament and two representatives from patients' organisations, one representative from doctors' organisations and one representative from veterinarians' organisations. The Board adopts the work programme and the annual report. The Executive Director is appointed by the Management Board on a proposal from the Commission. Internal audit Commission’s Internal Audit Service (IAS) EMA Internal Audit Capability (IAC) External audit European Court of Auditors Discharge authority European Parliament, acting on a recommendation from the Council |
||||||||||||||||||||||||||||||
Resources made available to the Agency in 2013 (2012) |
Final Budget 251,560(222,489) million euro (1); Union contribution: 13,0 % (9,6 %) (2) Staff as at 31 December 2013 611 (590) in the establishment plan, of which occupied: 583 (575) 144 (160) other staff (contract staff, seconded national experts, employment agency staff) Total staff: 727 (735), undertaking the following tasks: operational: 590 (594), administrative 137 (141) |
||||||||||||||||||||||||||||||
Products and services in 2013 (2012) |
Medicinal Products for Human Use
Medicinal Products for Veterinary Use
Inspections Inspections: 480 (450) Herbal Medicinal Products Herbal monographs: 9 (15) List of herbal substances, preparations and combinations thereof: 0 (0) Orphan Medicinal Products
SMEs
|
||||||||||||||||||||||||||||||
(1) This is the final budget, not the actual total of the budgetary outturn account.
(2) This is the percentage of the budgeted EU contribution (excluding special contribution for orphan fee reductions and excluding the use of surplus n-2) in relation to the final budget.
Source: Annex supplied by the Agency.
THE AGENCY’S REPLY
The European Medicines Agency has taken note of the Court of Auditors’ report.
10.12.2014 |
EN |
Official Journal of the European Union |
C 442/201 |
REPORT
on the annual accounts of the European Monitoring Centre for Drugs and Drug Addiction for the financial year 2013, together with the Centre’s replies
(2014/C 442/23)
INTRODUCTION
1. |
The European Monitoring Centre for Drugs and Drug Addiction (hereinafter ‘the Centre’, aka ‘EMCDDA’), which is located in Lisbon, was established by Council Regulation (EEC) No 302/93 (1). Its main task is to collect, analyse and disseminate information as regards drugs and drug addiction in order to prepare and publish information at European level that is objective, reliable and comparable. The information is intended to provide a basis for analysing the demand for drugs and ways of reducing it, as well as, in general, phenomena associated with the drug market (2). |
INFORMATION IN SUPPORT OF THE STATEMENT OF ASSURANCE
2. |
The audit approach taken by the Court comprises analytical audit procedures, direct testing of transactions and an assessment of key controls of the Centre’s supervisory and control systems. This is supplemented by evidence provided by the work of other auditors (where relevant) and an analysis of management representations. |
STATEMENT OF ASSURANCE
The management’s responsibility
The auditor’s responsibility
Opinion on the reliability of the accounts
Opinion on the legality and regularity of the transactions underlying the accounts
|
10. |
The comments which follow do not call the Court’s opinions into question. |
COMMENTS ON THE LEGALITY AND REGULARITY OF TRANSACTIONS
11. |
The Centre launched a procurement procedure to rent photocopying machines over a four-year period for a maximum amount of 1 60 000 euro. The technical requirements were subject to a significant modification during the procedure. Following this modification, an amended contract notice was published extending the deadline for the submission of tenders, but there was no clear indication of the changes in the technical requirements. The latter were again adjusted for the conclusion of the contract, in accordance with the option announced in the published specifications, leading to a decrease in the contract value by 35 %. The information published on the contract’s price structure was not sufficiently clear and this led to a misinterpretation by one bidder, who therefore had lower chances to win the procedure. In addition, the evaluation criteria were not sufficiently specific to ensure full transparency and equal treatment of bidders. The above referred weaknesses affected the efficiency and effectiveness of this procurement procedure and created a risk of hampering competition. |
FOLLOW-UP OF PREVIOUS YEARS’ COMMENTS
12. |
An overview of the corrective actions taken in response to the Court's comments from previous years is provided in Annex I. |
This Report was adopted by Chamber IV, headed by Mr Milan Martin CVIKL, Member of the Court of Auditors, in Luxembourg at its meeting of 22 July 2014.
For the Court of Auditors
Vítor Manuel da SILVA CALDEIRA
President
(1) OJ L 36, 12.2.1993, p. 1. This Regulation and its amendments were repealed by Regulation (EC) No 1920/2006 of the European Parliament and of the Council (OJ L 376, 27.12.2006, p. 1).
(2) Annex II summarises the Centre’s competences and activities. It is presented for information purposes.
(3) These include the balance sheet and the economic outturn account, the cash flow table, the statement of changes in net assets and a summary of the significant accounting policies and other explanatory notes.
(4) These comprise the budgetary outturn account and the annex to the budgetary outturn account.
(5) Articles 39 and 50 of Commission Delegated Regulation (EU) No 1271/2013 (OJ L 328, 7.12.2013, p. 42).
(6) The accounting rules adopted by the Commission’s accounting officer are derived from the International Public Sector Accounting Standards (IPSAS) issued by the International Federation of Accountants or, where relevant, the International Accounting Standards (IAS)/International Financial Reporting Standards (IFRS) issued by the International Accounting Standards Board.
(7) Article 107 of Regulation (EU) No 1271/2013.
ANNEX I
Follow-up of previous years’ comments
Year |
Court's comment |
Status of corrective action (Completed/Ongoing/Outstanding/N/A) |
2011 |
The Centre currently bears the annual cost of about 2 75 000 euro for unused office space in its former building and in the new Headquarters. The Centre should continue, in cooperation with the European Commission and National Authorities, to seek adequate solutions for the unused office space. |
Ongoing |
2011 |
The Centre’s procurement files were not always complete and adequately organised. |
Completed |
2012 |
In 2012, the Centre gave grants to Member States’ national drug monitoring centres (beneficiaries) in order to support cooperation under the REITOX network (1). Total grant expenditure in 2012 was 2,6 million euro, representing 16 % of total operating expenditure. The Centre’s ex ante verifications before reimbursement of costs claimed by beneficiaries consist of a desk analysis of cost claims and of audit certificates issued by external auditors contracted by the beneficiaries. The Centre does not usually obtain from beneficiaries any documents to substantiate the eligibility and accuracy of the costs claimed. Ex post on-the-spot verifications of costs at beneficiary level are rare (2). Existing controls therefore provide only limited assurance to the Centre’s management as to the eligibility and accuracy of the costs claimed by beneficiaries. For the transactions audited by the Court supporting documentation was obtained by the Centre on the Court’s behalf which provided reasonable assurance as to their legality and regularity. A random verification of supporting documents and a higher coverage of beneficiaries by on-the-spot verifications could considerably increase assurance. |
Ongoing |
2012 |
No ex post verifications were carried out for any transactions made after 2008, except for grants |
Ongoing |
2012 |
The Centre had not yet adopted Business Continuity or Disaster Recovery Plans. |
Completed |
2012 |
The Centre currently bears the annual cost of about 2 00 000 euro for unused office space in its former building and in the new Headquarters. The Centre should continue, in cooperation with the Commission and National Authorities, to seek adequate solutions for this unused office space. |
Ongoing |
(1) Under the European Information Network on Drugs and Drug Addiction (REITOX) the Centre collects country data on drugs from national drug monitoring centres.
(2) In 2011, two ex post verifications were carried out in two Member States. No such verifications took place in 2012.
ANNEX II
European Monitoring Centre for Drugs and Drug Addiction (Lisbon)
Competences and activities
Areas of Union competence deriving from the Treaty (Articles 168 and 114 of the Treaty on the Functioning of the European Union) |
The Union shall complement the Member States’ action in reducing drugs-related health damage, including information and prevention. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Competences of the Centre (Regulation (EC) No 1920/2006 of the European Parliament and of the Council) |
Objectives To provide the Union and its Member States with factual, objective, reliable and comparable information at Union level concerning drugs, drug addiction and their consequences. The Monitoring Centre is to focus on the following priority areas:
Tasks
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Governance |
Management Board Comprises one representative from each Member State, two representatives from the Commission and two independent experts, designated by the European Parliament, who are particularly knowledgeable in the field of drugs. The Management Board adopts the work programme, the general activities report and the budget, and gives an opinion on the final accounts. Executive Committee Composition Chairperson of the Management Board Vice-Chairperson of the Management Board Two other elected members from the Management Board representing the Member States Two representatives from the Commission Director Appointed by the Management Board on a proposal by the Commission. Scientific Committee Delivers opinions. It consists of, at most, fifteen well-known scientists appointed in view of their excellence by the Management Board following a call for expressions of interest. The Management Board may also appoint a panel of experts to the extended Scientific Committee for the risk assessment of new psychoactive substances. External audit European Court of Auditors. Internal audit European Commission's Internal Audit Service (IAS). Discharge authority European Parliament, acting on a recommendation from the Council. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Resources made available to the Centre in 2013 (2012) |
Budget 16,31(16,32) million euro. Union subsidy: 95,4 % (95,3 %). Staff at 31 December 2013 Number of posts in establishment plan: 84 (84) Posts occupied: 76 (79) + 24 (25) other staff (seconded national experts, contract staff and temporary replacements) Total staff: 100 (104) Allocated to the following tasks:
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Products and services 2013 (2012) |
Network The Centre runs a computerised network for the collection and exchange of information called the ‘European Information Network on Drugs and Drug Addiction’ (Reitox); this network connects national drug information networks, specialist centres in the Member States and the information systems of international organisations working with the Centre. Publications 2013 was the first year of the 2013-15 EMCDDA strategy and work programme and the first year of implementation of the new communication strategy adopted by the Management Board in July 2012, together with the three-year work programme. In accordance with this strategy, some product lines were streamlined and others were redesigned. There is therefore no strict correspondence between the 2013 products and those of 2012.
Other websites Reorganisation/updating/content development of public Centre website including:
Promotional material Conference materials: 4 EN (2) Media products: 12 (13) news releases and 13 (10) fact sheets, EN Participation in international conferences, technical and scientific meetings: 285 (266). |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Source: Annex supplied by the Centre. |
THE CENTRE’S REPLIES
11. |
The referred modification of the technical specifications was intended to update the Centre’s capacity/speed for copying/printing. The relevant contract notice was duly published via the information system for European public procurement (SIMAP). This system imposes some restrictions to the information that can be published on the terms and content of changes to the initial publication. The published technical specifications, along with the draft contract attached to these specifications, explicitly gave the option of adjusting the number and combination of the equipment to be provided by the winning tenderer/contractor, depending on the EMCDDA’s actual needs. This adjustment was the result of a review of the use of the EMCDDA’s printing and copying devices, carried out in 2013 in order to promote efficiency. All tenderers were treated equally and evaluated in accordance with the established and published award criteria and method, which determined the tender providing the best value for money. The EMCDDA will pursue its efforts to improve its procurement processes, namely to reduce further the need to adjust technical specifications and ensure the provision of more effective information to tenderers on such adjustments. |
10.12.2014 |
EN |
Official Journal of the European Union |
C 442/210 |
REPORT
on the annual accounts of the European Maritime Safety Agency for the financial year 2013, together with the Agency’s reply
(2014/C 442/24)
INTRODUCTION
1. |
The European Maritime Safety Agency (hereinafter ‘the Agency’, aka ‘EMSA’), which is located in Lisbon, was set up by Regulation (EC) No 1406/2002 of the European Parliament and of the Council (1). The Agency’s tasks are to ensure a high level of maritime safety and to prevent pollution by ships, provide the Commission and the Member States with technical assistance, and monitor the implementation of Union legislation, as well as to evaluate its effectiveness (2). |
INFORMATION IN SUPPORT OF THE STATEMENT OF ASSURANCE
2. |
The audit approach taken by the Court comprises analytical audit procedures, direct testing of transactions and an assessment of key controls of the Agency’s supervisory and control systems. This is supplemented by evidence provided by the work of other auditors (where relevant) and an analysis of management representations. |
STATEMENT OF ASSURANCE
The management’s responsibility
The auditor’s responsibility
Opinion on the reliability of the accounts
Opinion on the legality and regularity of the transactions underlying the accounts
|
FOLLOW-UP OF PREVIOUS YEARS’ COMMENTS
10. |
An overview of the corrective action taken in response to the Court’s comments from previous years is provided in Annex I. |
This Report was adopted by Chamber IV, headed by Mr Milan Martin CVIKL, Member of the Court of Auditors, in Luxembourg at its meeting of 8 July 2014.
For the Court of Auditors
Vítor Manuel da SILVA CALDEIRA
President
(2) Annex II summarises the Agency’s competences and activities. It is presented for information purposes.
(3) These include the balance sheet and the economic outturn account, the cash flow table, the statement of changes in net assets and a summary of the significant accounting policies and other explanatory notes.
(4) These comprise the budgetary outturn account and the annex to the budgetary outturn account.
(5) Articles 39 and 50 of Commission Delegated Regulation (EU) No 1271/2013 (OJ L 328, 7.12.2013, p. 42).
(6) The accounting rules adopted by the Commission’s accounting officer are derived from the International Public Sector Accounting Standards (IPSAS) issued by the International Federation of Accountants or, where relevant, the International Accounting Standards (IAS)/International Financial Reporting Standards (IFRS) issued by the International Accounting Standards Board.
(7) Article 107 of Regulation (EU) No 1271/2013.
ANNEX I
Follow-up of previous years’ comments
Year |
Court's comment |
Status of corrective action (Completed/Ongoing/Outstanding/N/A) |
2011 |
The Agency’s 2011 budget (1) amounted to 56 million euro compared with 51 million euro the previous year. Budget commitments amounting to 0,9 million euro were not related to existing legal commitments and the Agency should have decommitted and paid back the amount to the Commission at the beginning of 2012. However, the Agency initiated the process too late. As a consequence, due to restrictions imposed by the IT system, the funds will be blocked for one year and will only be decommitted and paid back at the end of 2012. |
Completed |
2011 |
The Court identified the need to improve the Agency’s asset management. There are unexplained differences between the recorded annual and cumulated depreciation. For internally created intangible assets, accounting procedures and information on costs are not reliable. Evidence of a physical inventory of administrative equipment within the required period is lacking. |
Completed for physical inventory Ongoing for internally-created intangible assets |
2012 |
A budget commitment amounting to 0,8 million euro was not related to an existing legal commitment and was thus irregular. |
N/A |
2012 |
Accounting procedures and information in respect of costs for internally generated intangible assets are not fully reliable. |
Ongoing |
2012 |
The Court identified shortcomings in the transparency of two recruitment procedures carried out during the first half of 2012. Questions for written tests and interviews, as well as their weightings, were not prepared before the examination of the applications. In addition, threshold scores for being included on a list of suitable candidates were not prepared before the examination of the applications. However, following the Court’s comments from last year, the Agency implemented corrective measures and no such weaknesses were found for the two audited recruitment procedures carried out in the second half of 2012. |
Completed |
(1) According to third budget amendment dated 3.12.2011, not yet published in the Official Journal; current year appropriations only.
ANNEX II
European Maritime Safety Agency (Lisbon)
Competences and activities
Areas of Union competence deriving from the Treaty (Article 100 of the Treaty on the Functioning of the European Union) |
Common transport policy ‘The European Parliament and the Council, acting in accordance with the ordinary legislative procedure, may lay down appropriate provisions for sea and air transport’. |
||||||||||||||||||||
Competences of the Agency (Regulation (EC) No 1406/2002 of the European Parliament and of the Council as amended by Regulations (EC) No 1644/2003 and (EC) No 724/2004 and Regulation (EU) No 100/2013) |
Objectives The European Maritime Safety Agency has been established for the purpose of ensuring a high, uniform and effective level of maritime safety, maritime security, and prevention of and response to pollution by ships within the Union. The Agency provides the Member States and the Commission with the technical and scientific assistance needed, with a high level of expertise, in order to help them:
The Agency also provides operational means, upon request, as well as technical and scientific assistance, to help Member States and the Commission respond to marine pollution by ships within the EU. Tasks The last amendment has further fine-tuned the Agency’s mandate, enabling EMSA to better assist the Commission and the Member States in its core tasks and make broader use of its resources to help EU Member States respond to pollution caused by ships as well as respond to marine pollution caused by oil and gas installations. Moreover, ancillary tasks have been introduced, with the possibility for the Agency to use its expertise and tools for other EU activities related to the Union’s maritime transport policy. The Agency’s tasks are broadly divided into four key areas in line with its founding Regulation and relevant EU legislation. Firstly, the Agency assists the Commission in monitoring the implementation of EU legislation relating, among other things, to ship survey and certification, the certification of marine equipment, ship security, the training of seafarers and port state control. Secondly, the Agency develops and operates maritime information capabilities at EU level. Significant examples are SafeSeaNet, the vessel traffic monitoring system to enable EU-wide tracking of vessels and their cargoes, and accidents and incidents; the EU LRIT Cooperative Data Centre, to ensure the identification and tracking of EU flagged ships worldwide; and THETIS, the information system to support the new port state control regime. In parallel, a marine pollution preparedness, detection and response capability is provided by EMSA to coastal States. This includes a European Network of Stand-by Oil Spill Response Vessels as well as a European satellite oil spill and vessel detection service (CleanSeaNet), contributing to an effective system for protecting EU coasts and waters from pollution by ships. Finally, the Agency provides technical and scientific advice to the Commission in the field of maritime safety and prevention of pollution by ships in the continuous process of evaluating the effectiveness of the measures in place, and in the updating and development of new legislation. It also provides support to, and facilitates co-operation between, the Member States and disseminates information on best practice. |
||||||||||||||||||||
Governance |
Administrative Board Composition One representative per Member State, four representatives of the Commission and four representatives without the right to vote from the professional sectors concerned. Tasks
Executive Director Appointed by the Administrative Board. The Commission may propose one or more candidates. External audit European Court of Auditors. Internal audit
Discharge authority European Parliament, acting on a recommendation from the Council. |
||||||||||||||||||||
Resources made available to the Agency in 2013 (2012) |
Final Budget Commitment Appropriations (C1) 57,8(55,1) million euro Payment Appropriations (C1) 54,03(57,5) million euro Amending budgets published in the Official Journal of the European Union cover a variety of fund sources, with C1 being almost the exclusive fund source. For the sake of clarity and transparency, only predominant and therefore relevant C1 budget appropriations are quoted. Staff as at 31 December 2013 Statutory Staff 210 (213) posts authorised in the establishment plan, of which occupied: 203 (204) Contract staff 29 (29) posts planned in the budget, of which occupied: 25 (25). The Agency also recruited three additional project-financed contract staff. Seconded National Experts 15 (15) posts planned in the budget, of which occupied: 14 (12) N.B. As regards statutory posts, EMSA has taken into consideration the target of 210 posts to be implemented on 1 January 2014 rather than the number of posts (213) authorised in the establishment plan for 2013. Please note that in 2013 budgetary resources were already available for 18 SNEs. |
||||||||||||||||||||
Products and services 2013 (2012) |
|
||||||||||||||||||||
Source: Annex supplied by the Agency. |
THE AGENCY’S REPLY
The Agency has taken note of the Court’s report.
10.12.2014 |
EN |
Official Journal of the European Union |
C 442/217 |
REPORT
on the annual accounts of the European Union Agency for Network and Information Security for the financial year 2013, together with the Agency’s replies
(2014/C 442/25)
INTRODUCTION
1. |
The European Union Agency for Network and Information Security (hereinafter ‘the Agency’, aka ‘ENISA’), which is located in Athens and Heraklion (1), was created by Regulation (EC) No 460/2004 of the European Parliament and of the Council (2) which, following different amendments was superseded by Regulation (EU) No 526/2013 (3). The Agency's main task is to enhance the Union’s capability to prevent and respond to network and information security problems by building on national and Union efforts (4). |
INFORMATION IN SUPPORT OF THE STATEMENT OF ASSURANCE
2. |
The audit approach taken by the Court comprises analytical audit procedures, direct testing of transactions and an assessment of key controls of the Agency's supervisory and control systems. This is supplemented by evidence provided by the work of other auditors (where relevant) and an analysis of management representations. |
STATEMENT OF ASSURANCE
The management’s responsibility
The auditor’s responsibility
Opinion on the reliability of the accounts
Opinion on the legality and regularity of the transactions underlying the accounts
|
10. |
The comments which follow do not call the Court’s opinions into question. |
COMMENTS ON BUDGETARY MANAGEMENT
11. |
The overall level of committed appropriations was 94 %, which is explained mainly by the fact that additional funds requested from the Commission to finance the refurbishment of the new office in Athens were only approved in November 2013. In this context, an amount of 0,5 million euro that was not yet committed at year-end was carried over following a Management Board decision. |
12. |
In total, non-committed and committed appropriations carried over to 2014 amounted to 1,2 million euro (or 13,5 % of total appropriations). This mainly concerned Title II (administrative expenditure) with 0,8 million euro or 59 % of Title II appropriations. This high level is explained by the 0,5 million euro carry-over referred to in paragraph 11 and an additional 0,3 million euro carried over in order to finance furniture and networking equipment for the Athens office which was ordered towards the year-end. |
OTHER COMMENTS
13. |
Operational staff of ENISA were relocated to Athens in 2013 while administrative staff remain in Heraklion. It is likely that the administrative costs could be reduced if all staff were centralised in one location. |
14. |
According to the lease agreement between the Greek authorities, the Agency and the landlord, rent for the offices in Athens is paid by the Greek authorities. This rent is constantly paid with a delay of several months which is a business continuity and financial risk to the Agency: its operations would be affected, and its investments in office fitting and refurbishment would be lost, if the landlord were to cancel the lease agreement because of these delays in payment. |
FOLLOW-UP OF PREVIOUS YEARS’ COMMENTS
15. |
An overview of the corrective actions taken in response to the Court's comments from previous years is provided in Annex I. |
This Report was adopted by Chamber IV, headed by Mr Pietro RUSSO, Member of the Court of Auditors, in Luxembourg at its meeting of 16 September 2014.
For the Court of Auditors
Vítor Manuel da SILVA CALDEIRA
President
(1) The Agency’s operational staff were relocated to Athens in March 2013. Its administrative staff remain in Heraklion.
(3) OJ L 165, 18.6.2013, p. 41.
(4) Annex II summarises the Agency's competences and activities. It is presented for information purposes.
(5) These include the balance sheet and the economic outturn account, the cash flow table, the statement of changes in net assets and a summary of the significant accounting policies and other explanatory notes.
(6) These comprise the budgetary outturn account and the annex to the budgetary outturn account.
(7) Articles 39 and 50 of Commission Delegated Regulation (EU) No 1271/2013 (OJ L 328, 7.12.2013, p. 42).
(8) The accounting rules adopted by the Commission’s accounting officer are derived from the International Public Sector Accounting Standards (IPSAS) issued by the International Federation of Accountants or, where relevant, the International Accounting Standards (IAS)/International Financial Reporting Standards (IFRS) issued by the International Accounting Standards Board.
(9) Article 107 of Regulation (EU) No 1271/2013.
ANNEX I
Follow-up of previous years’ comments
Year |
Court’s comment |
Status of corrective action (Completed/Ongoing/Outstanding/N/A) |
2011 |
The Court identified the need to improve the documentation of fixed assets. Purchases of fixed assets are recorded at invoice and not at item level. When several new assets are covered by one single invoice, there is only one entry for all the purchased assets and the total amount. |
Completed |
2012 |
Whereas the Financial Regulation and the corresponding Implementing Rules provide for a physical inventory of fixed assets at least every three years, the Agency has not carried out a comprehensive physical inventory since 2009. |
Ongoing |
ANNEX II
European Union Agency for Network and Information Security (Athens and Heraklion)
Competences and activities
Areas of Union competence deriving from the Treaty (Article 114 of the Treaty on the functioning of the European Union) |
‘The European Parliament and the Council shall, acting in accordance with the ordinary legislative procedure and after consulting the Economic and Social Committee, adopt the measures for the approximation of the provisions laid down by law, regulation or administrative action in Member States which have as their object the establishment and functioning of the internal market.’ (Article 114 TFEU) Responsibility for the internal market is shared between the Union and the Member States (Article 4(2)(a) TFEU). |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Competences of the Agency (Quoted from Regulation (EU) No 526/2013 of the European Parliament and of the Council) |
Objectives
Tasks
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Governance |
Management Board The Management Board is composed of one representative of each Member State, and two representatives appointed by the Commission. All representatives have voting rights. Each member of the Management Board has an alternate to represent the member in their absence. Members of the Management Board and their alternates are appointed in light of their knowledge of the Agency’s tasks and objectives, taking into account the managerial, administrative and budgetary skills relevant to fulfil the tasks of a member of the Management Board. The term of office of members of the Management Board and of their alternates is four years. That term is renewable. Permanent Stakeholders Group The Management Board, acting on a proposal by the Executive Director, appoints a Permanent Stakeholders’ Group composed of recognised experts representing the relevant stakeholders, such as the ICT industry, providers of electronic communications networks or services available to the public, consumer groups, academic experts in network and information security, and representatives of national regulatory authorities notified under Directive 2002/21/EC as well as of law enforcement and privacy protection authorities. The term of office of the Permanent Stakeholders’ Group’s members is two and a half years. The Permanent Stakeholders’’ Group advises the Agency in respect of the performance of its activities. In particular, it advises the Executive Director on drawing up a proposal for the Agency’s work programme, and on ensuring communication with the relevant stakeholders on all issues related to the work programme. Executive Director The Executive Director is appointed by the Management Board, from a list of candidates proposed by the Commission, following an open and transparent selection procedure, for a term of five years which is renewable. Executive Board The Executive Board is made up of five members appointed from among the members of the Management Board. It must include the Chairperson of the Management Board, who may also chair the Executive Board, and one of the representatives of the Commission. External audit European Court of Auditors. Internal audit Internal Audit Service of the European Commission. Discharge authority European Parliament on a recommendation from the Council. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Resources made available to the Agency in 2013 (2012) |
Final Budget 9,7 million euro (8,2 million euro) of which the Union subsidy is 93 % (100 %) Staff at 31 December 2013 47 (44) posts provided for in the establishment plan, of which occupied: 43 (42). Other posts occupied: 13 (12) contract agents; 3 (4) seconded national experts. Total staff: 59 (58), undertaking the following tasks: operational: 42 (40) administrative: 17 (18) |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Products and services provided in 2013 (2012) |
WS (1) 1 — Evolving risk environment & opportunities The objective of this work stream was to identify the most important evolving threats that are relevant to critical infrastructure and trust services. This was done by monitoring publicly available sources that publish threat-related data and by making a regular assessment of this data. Based on the analysis done, ENISA has proposed good practices and guidelines for mitigating these risks. The work has been performed in a collaborative manner with involved stakeholders and has used existing information sources wherever possible. The following objectives and results are achieved:
Number of deliverables: 7 (7) WS2 — Improving Pan-European CIIP (2) & Resilience Protecting Critical Information Infrastructures (CIIP) is a key priority for Member States, the Commission and industry (operators, service providers, manufacturers). By facilitating cooperation and coordination among Member States, ENISA has continued in this work stream to support all of these stakeholders in developing sound and implementable preparedness, response and recovery strategies, policies and measures to meet the challenges of a continuously evolving threat environment. The objectives and consequently results of this work stream were to:
Number of deliverables: 16 (13) WS3 — Enabling communities to improve network and information security (NIS) The aim of this work stream was to help the communities that are instrumental in improving NIS to enhance their capabilities and to facilitate their work through the improvement of the legal and regulatory scenarios that they must comply with. ENISA has continued to work with CERTs to improve baseline capabilities in Europe. The Agency has also complemented this approach by addressing other communities that are active in improving NIS of their systems and infrastructure such as network and information systems managers as well as providers of security services within individual organisations (e.g. Information Security Officers (ISOs)). The objectives and results of this work stream were:
Number of deliverables: 15 (10) |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
(1) WS: Work stream
(2) CIIP: Critical Information Infrastructure Protection
Source: Annex supplied by the Agency.
THE AGENCY’S REPLIES
11. |
The Agency notes that the 0,5 million euro carried over at year end were committed in 2014 at a rate of 99,78 %, and only an amount of 1 100.00 euro was cancelled. |
12. |
The total carry over of Title II, which reached the rate of 59,1 % of total Title II appropriations for 2013 can be further broken down to 50,5 % linked to projects and purchases relevant to the refurbishment works and upgrade of infrastructure of Athens office and 8,6 % relevant to projects not linked to the refurbishment project, such as day to day utilites’ costs. The funds for the refurbishment works were only approved on 4 November 2013. |
13. |
The Agency notes that the creation of an additional office based in Athens was a political compromise reached among the European Parliament, the Commission and the government of the host country, in order to increase the operational efficiency of the Agency and in particular of the work of the Core Operations Department. This decision was beyond the influence of ENISA. |
14. |
The Agency agrees with the comment and notes that it continuously communicates the problems and the risks involved to the partner DG CNECT and various authorities of the Greek Government in order to ensure that the issues pertaining to the payment of the subsidy from the Greek Government are overcome. To date the landlord has accepted the delays attributed to procedures of the Greek Government without imposing any penalty on the Agency. The landlord has given his consent to the launch of the refurbishment works, despite the delay in the payment of rent in 2014. The Agency, following a risk assessment which took into account the facts also noted by the Court, has launched the refurbishment works in June 2014, as the risk of cancellation of the lease agreement is considered low. The Agency continues to exercise and explore all possible remedies arising from the late payments from the Greek Government. To date the Agency has been able to mitigate any risks arising from the late payments. |
10.12.2014 |
EN |
Official Journal of the European Union |
C 442/228 |
REPORT
on the annual accounts of the Europol Pension Fund for the financial year 2013, together with the Fund’s replies
(2014/C 442/26)
INTRODUCTION
1. |
The Europol Pension Fund (hereinafter ‘the Fund’, aka ‘EPF’), which is located in The Hague, was established by Article 37, Appendix 6, of the former Staff Regulations of the European Police Office, The Hague (Europol). Rules on the implementation of the Fund were established by Council Act of 12 March 1999 (1) and amended by Council Decision 2011/400/EU (2). The objective of the Fund is to finance and pay pensions for staff already employed by Europol before it became a European Agency on 1 January 2010. |
INFORMATION IN SUPPORT OF THE STATEMENT OF ASSURANCE
2. |
The audit approach taken by the Court comprises analytical audit procedures, direct testing of transactions and an assessment of the Fund’s internal controls. This is supplemented by evidence provided by the work of other auditors (where relevant) and an analysis of management representations. |
STATEMENT OF ASSURANCE
The management’s responsibility
The auditor’s responsibility
Opinion on the reliability of the accounts
Opinion on the legality and regularity of the transactions underlying the accounts
Emphasis of Matter
|
11. |
The comments which follow do not call the Court’s opinions into question. |
FOLLOW-UP OF PREVIOUS YEAR’S COMMENTS
12. |
An overview of the corrective actions taken in response to the Court's comments from the previous year is provided in Annex I. |
This Report was adopted by Chamber IV, headed by Mr Pietro RUSSO, Member of the Court of Auditors, in Luxembourg at its meeting of 16 September 2014.
For the Court of Auditors
Vítor Manuel da SILVA CALDEIRA
President
(1) Document 5397/99 on the Council’s public register: http://register.consilium.europa.eu/
(3) The accounts comprise the balance sheet, the statement of income and expenses, the cash-flow statement and the explanatory notes.
(4) Articles 33 and 43 of Commission Regulation (EC, Euratom) No 2343/2002 (OJ L 357, 31.12.2002, p. 72).
(5) In accordance with Council Act of 12 March 1999 adopting rules on the EPF and Council Decision of 28 June 2011 amending the latter, the accounts are prepared on the basis of The Netherlands accounting rules on Pension Funds, namely Directive 610 of the Dutch financial reporting rules, and on the international Financial Reporting Standards (IFRS) issued by the International Accounting Standards Board.
(6) Article 185(2) of Council Regulation (EC, Euratom) No 1605/2002 (OJ L 248, 16.9.2002, p. 1).
ANNEX
Follow-up of previous year’s comments
Year |
Court's comment |
Status of corrective action (Completed/Ongoing/Outstanding/N/A) |
2012 |
Europol Staff Regulations set the capitalisation of pension contributions paid by officials at an annual rate of 3,5 %. Since contributions are made monthly and can be different from one month to another, the use of an annual rate is incorrect and a monthly rate should be applied. However, there is no material effect on the annual accounts. |
Outstanding |
THE FUND'S REPLY
The Europol Pension Fund has taken note of the Court’s report.
10.12.2014 |
EN |
Official Journal of the European Union |
C 442/232 |
REPORT
on the annual accounts of the European Railway Agency for the financial year 2013, together with the Agency’s replies
(2014/C 442/27)
INTRODUCTION
1. |
The European Railway Agency (hereinafter ‘the Agency’, aka ‘ERA’), which is located in Lille and Valenciennes, was created by Regulation (EC) No 881/2004 of the European Parliament and of the Council (1). The Agency's task is to enhance the level of interoperability of railway systems and to develop a common approach to safety in order to contribute to creating a more competitive European railway sector with a high level of safety (2). |
INFORMATION IN SUPPORT OF THE STATEMENT OF ASSURANCE
2. |
The audit approach taken by the Court comprises analytical audit procedures, direct testing of transactions and an assessment of key controls of the Agency’s supervisory and control systems. This is supplemented by evidence provided by the work of other auditors (where relevant) and an analysis of management representations. |
STATEMENT OF ASSURANCE
The management’s responsibility
The auditor’s responsibility
Opinion on the reliability of the accounts
Opinion on the legality and regularity of the transactions underlying the accounts
|
10. |
The comments which follow do not call the Court’s opinions into question. |
COMMENTS ON INTERNAL CONTROLS
11. |
There is room to improve the accuracy and documentation of information used in the Agency’s procurement procedures. |
OTHER COMMENTS
12. |
According to the Agency's founding regulation (8), staff shall consist of:
|
13. |
At the end of 2013, 136 temporary employees were working for the Agency. The founding regulation also stipulates that during the first 10 years of the Agency’s operations, the five-year period for them may be extended by up to a maximum of a further three years when required to guarantee business continuity. The Agency used this option as standard practice until mid-2013. Furthermore, in the period from September 2013 to March 2014, the Agency re-employed four temporary employees (for an eight-year period) whose contracts with ERA had ended in 2013 after the maximum eight-year period. |
14. |
In 2013 the Agency adopted a new decision in agreement with its Administrative Board and the Commission, according to which temporary employees can have indefinite contracts. The proposal for a revised founding regulation for ERA includes similar provisions but it is unclear if and when this will be adopted by Parliament and Council. |
15. |
The Agency is located in Lille and Valenciennes. As the Court mentioned in its Specific Annual Report for the financial year 2006, it is likely that costs could be reduced if all operations were centralised in one location. This might also facilitate a comprehensive seat agreement with the host Member State thereby clarifying the conditions under which the Agency and its staff operate. |
FOLLOW-UP OF PREVIOUS YEARS’ COMMENTS
16. |
An overview of the corrective actions taken in response to the Court’s comments from previous years is provided in Annex I. |
This Report was adopted by Chamber IV, headed by Mr Milan Martin CVIKL, Member of the Court of Auditors, in Luxembourg at its meeting of 8 July 2014.
For the Court of Auditors
Vítor Manuel da SILVA CALDEIRA
President
(1) OJ L 220, 21.6.2004, p. 3.
(2) Annex II summarises the Agency's competences and activities. It is presented for information purposes.
(3) These include the balance sheet and the economic outturn account, the cash flow table, the statement of changes in net assets and a summary of the significant accounting policies and other explanatory notes.
(4) These comprise the budgetary outturn account and the annex to the budgetary outturn account.
(5) Articles 39 and 50 of Commission Delegated Regulation (EU) No 1271/2013 (OJ L 328, 7.12.2013, p. 42).
(6) The accounting rules adopted by the Commission’s accounting officer are derived from the International Public Sector Accounting Standards (IPSAS) issued by the International Federation of Accountants or, where relevant, the International Accounting Standards (IAS)/International Financial Reporting Standards (IFRS) issued by the International Accounting Standards Board.
(7) Article 107 of Regulation (EU) No 1271/2013.
(8) Regulation (EC) No 881/2004, Article 24(3).
ANNEX I
Follow-up of previous years’ comments
Year |
Court’s comment |
Status of corrective action (Completed/Ongoing/Outstanding/N/A) |
2011 |
The level of payments against budget appropriations improved for all titles, but remained low for title III (operational expenditure) at 47 % (39 % in 2010). This situation is at odds with the budgetary principle of annuality. |
Completed |
2011 |
The Agency’s Founding Regulation sets maximum employment periods for temporary staff recruited by the Agency from the professionals of the railways sector. According to these provisions, the Agency will have to replace half of its operational staff in the period 2013-2015, which may cause major disruptions in the Agency’s operational activities (1). |
Ongoing |
2011 |
There is room to improve the Agency’s recruitment procedures in order to fully ensure transparency and equal treatment of candidates. As an example, vacancy notices did not provide information on the required minimum number of years of post-secondary or university studies which however was used as a selection criterion. The pass marks for interviews and reserve lists, the scoring of selection criteria, the questions for oral and written tests and the weightings between written and oral tests were not set before applications were examined. |
Ongoing |
2012 |
The Agency has suppressed the Internal Audit Capability and has replaced it with an Internal Control Coordinator (ICC). The internal auditor left the Agency and there are uncertainties on how the internal auditing function provided for in the Agency’s financial regulation will be carried out under the new structure. |
Completed |
2012 |
The Agency should reinforce the controls in place to ensure that family allowances are correctly calculated and paid on the basis of complete and up to date information. |
Completed |
2012 |
The Agency does not comply with its Internal Control Standard regarding business continuity; there are no approved IT Business Continuity and Disaster Recovery plans. |
Ongoing |
(1) Regulation (EC) No 881/2004, Article 24.
ANNEX II
European Railway Agency (Lille/Valenciennes)
Competences and activities
Areas of Union competence deriving from the Treaty (Article 91(1) of the Treaty on the Functioning of the European Union) |
‘For the purpose of implementing Article 90, and taking into account the distinctive features of transport, the European Parliament and the Council shall, acting in accordance with the ordinary legislative procedure and after consulting the Economic and Social Committee and the Committee of the Regions, lay down:
|
||||||||||||||||||||||||||||||||||||
Competences of the Agency (Regulation (EC) No 881/2004 of the European Parliament and of the Council) |
Objectives To contribute, on technical matters, to the implementation of the Union legislation aimed at:
in order to contribute to creating a European railway area without frontiers and guaranteeing a high level of safety. Tasks
|
||||||||||||||||||||||||||||||||||||
Governance |
Administrative Board Comprises one representative from each Member State, four representatives from the Commission and six representatives, without the right to vote, from the professional sectors concerned. Director Appointed by the Administrative Board on a proposal from the Commission. External audit European Court of Auditors. Discharge authority European Parliament, following a recommendation from the Council. |
||||||||||||||||||||||||||||||||||||
Resources made available to the Agency in 2013 (2012) |
Budget 25,8(25,8) million euro Staff at 31 December 2013 Posts listed in the establishment plan: 143 (144) Posts occupied on 31.12.2013: 135 (139) Other staff: 15 (14) Total staff: 150 (153), of which assigned to:
|
||||||||||||||||||||||||||||||||||||
Products and services in 2013 |
Follow-up activities, modifications of the texts, dissemination and monitoring activities in relation to the Single Safety Certificate. Evaluation of the effectiveness and practical implementation of measures through the Joint Network Secretariat. Development of a Single Safety Certificate Regime. Implementation of a common template based on the relevant Directives and Commission Recommendation 2011/217/EU (known as DV29) to be used by the Member States to document the authorisation process applied. Completion of the drafting of almost all the Technical Specifications for Interoperability (TSIs) applicable to the entire EU railway network. Definition and compilation of the reference document of national rules for vehicle authorisation and classification of their equivalence for cross acceptance. Reports on railway safety and interoperability. Recommendations on safety assessment and reporting, including Common Safety Indicators and Common Safety Methods, coordination of safety authorities and investigation bodies and reporting on safety performance in the Member States. Recommendations on safety regulation, including evaluating the way national safety rules are made available, and examination of the transposition of the Railway Safety Directive in the Member States. Setting up and maintaining a series of registers for safety and interoperability. Guidance, support and advice to the rail sector and MSs when implementing the telematics TSIs (TAF and TAP). Acting as the System Authority and Change Control Manager for ERTMS (European Railway Traffic Management System); issuing the ETCS Baseline 3 specification; assisting the Commission in evaluating ERTMS projects. Cooperation with the TEN-T Executive Agency in evaluating specific ERTMS projects. Technical Opinions on national rules and monitoring of the work of Notified Bodies. Accompanying appropriate recommendations with an impact assessment. |
||||||||||||||||||||||||||||||||||||
Source: Annex supplied by the Agency. |
THE AGENCY’S REPLIES
11. |
The Agency has taken good note of the remark of the Court and will review its procurement procedure. |
12-14. |
The Agency has taken note of the comments of the Court. |
15. |
The Agency has regular contacts with the host Member State about a seat agreement. However, the French authorities have so far taken the view that the ‘Protocol on Privileges and Immunities’ applies and that is sufficient for the Agency. |
10.12.2014 |
EN |
Official Journal of the European Union |
C 442/240 |
REPORT
on the annual accounts of the European Research Council Executive Agency for the financial year 2013, together with the Agency’s reply
(2014/C 442/28)
INTRODUCTION
1. |
The European Research Council Executive Agency (hereinafter ‘the Agency’, aka ‘ERCEA’), which is located in Brussels, was created by Commission Decision 2008/37/EC (1). The Agency was established for a period beginning on 1 January 2008 and ending on 31 December 2017 with the aim of managing the ‘Ideas’ specific programme under the 7th Framework Programme for Research (2). |
INFORMATION IN SUPPORT OF THE STATEMENT OF ASSURANCE
2. |
The audit approach taken by the Court comprises analytical audit procedures, direct testing of transactions and an assessment of key controls of the Agency’s supervisory and control systems. This is supplemented by evidence provided by the work of other auditors (where relevant) and an analysis of management representations. |
STATEMENT OF ASSURANCE
The management’s responsibility
The auditor’s responsibility
Opinion on the reliability of the accounts
Opinion on the legality and regularity of the transactions underlying the accounts
|
This Report was adopted by Chamber IV, headed by Mr Milan Martin CVIKL, Member of the Court of Auditors, in Luxembourg at its meeting of 1 July 2014.
For the Court of Auditors
Vítor Manuel da SILVA CALDEIRA
President
(2) The Annex summarises the Agency’s competences and activities. It is presented for information purposes.
(3) These include the balance sheet and the economic outturn account, the cash flow table, the statement of changes in net assets and a summary of the significant accounting policies and other explanatory notes.
(4) These comprise the budgetary outturn account and the annex to the budgetary outturn account.
(5) Articles 62 and 68 in conjunction with Articles 53 and 58 of Regulation (EU, Euratom) No 966/2012 (OJ L 298, 26.10.2012, p. 1).
(6) The accounting rules adopted by the Commission’s accounting officer are derived from the International Public Sector Accounting Standards (IPSAS) issued by the International Federation of Accountants or, where relevant, the International Accounting Standards (IAS)/International Financial Reporting Standards (IFRS) issued by the International Accounting Standards Board.
(7) Article 162 of Regulation (EU, Euratom) No 966/2012.
ANNEX
European Research Council Executive Agency (Brussels)
Competences and activities
Areas of Union competence deriving from the Treaty (Article 182 of the Treaty on the Functioning of the European Union) |
|
||||||||||||||||
Competences of the Agency (Commission Decision 2008/37/EC) |
Objectives The Agency was set up in December 2007 by Commission Decision 2008/37/EC, for the management of the specific Community Programme “Ideas” in the field of frontier research in the application of Council Regulation (EC) No 58/2003. “Ideas” is implemented by the European Research Council (ERC), comprising an independent Scientific Council which establishes the ERC’s scientific strategy and monitors its implementation by the Agency that handles the operational management. The Agency became autonomous from the Directorate-General for Research and Innovation on 15 July 2009. Tasks The tasks of the Agency are described in the Delegation Act (See Commission Decision C(2008) 5694), namely in Articles 5-7 thereof. Among these tasks, the Agency has been entrusted with tasks covering:
|
||||||||||||||||
Governance (Commission Decisions C(2008) 5132 and C(2011) 4877) (Commission Decisions 2007/134/EC and 2011/12/EU) (Council Decision 2006/972/EC) (Council Regulation (EC) No 58/2003) |
Steering Committee The Steering Committee is the body that supervises the operations of the Agency and is appointed by the Commission (See Commission Decision C(2008) 5132). It adopts the Agency’s annual work programme (after approval by the Commission), administrative budget and annual reports. It is composed of five members and one observer. Scientific Council of the ERC The Scientific Council of the ERC is entrusted by virtue of Commission Decision 2007/134/EC with establishing a scientific strategy for the Ideas Specific Programme, deciding on the type of research to be funded in accordance with Article 5(3) of Council Decision 2006/972/EC and acting as a guarantor of the quality of the activity from a scientific perspective. Its tasks cover, in particular, the establishment of the annual work programme for the Ideas Specific Programme, and of the peer review process, as well as the monitoring and quality control of the implementation of the Specific Programme “Ideas”, without prejudice to the responsibility of the Commission. It is composed of twenty-two members appointed by the Commission. Director of the Agency Appointed by the European Commission for four years. External audit European Court of Auditors. Discharge authority European Parliament, following a recommendation from the Council. |
||||||||||||||||
Resources made available to the Agency in 2013 (2012) |
Budget 40,1(37,8) million euro Staff at 31 December 2013 The 2013 operating budget provides for an establishment plan of 100 (100) Temporary Staff (TS) and a budget for 289 (289) Contract Staff (CS) and Seconded National Experts (SNE), i.e. a total of 389 (389) staff. Of these posts, 379 (380) were occupied at year-end 2013:
Allocated to:
|
||||||||||||||||
Products and services in 2013 (2012) |
In 2013, four of the five working groups organised four main events in Brussels:
|
||||||||||||||||
Source: Annex supplied by the Agency. |
THE AGENCY’S REPLY
The Agency has taken note of the Court’s report.
10.12.2014 |
EN |
Official Journal of the European Union |
C 442/247 |
REPORT
on the annual accounts of the European Securities and Markets Authority for the financial year 2013, together with the Authority’s replies
(2014/C 442/29)
INTRODUCTION
1. |
The European Securities and Markets Authority (hereinafter ‘the Authority’, aka ‘ESMA’), which is located in Paris, was established by Regulation (EU) No 1095/2010 of the European Parliament and of the Council (1). The Authority’s task is to improve the functioning of the EU internal financial market by ensuring a high, effective and consistent level of regulation and supervision, promoting the integrity and stability of the financial systems and strengthening international supervisory coordination in order to ensure the stability and effectiveness of the financial system (2). ESMA was set up on 1 January 2011. |
INFORMATION IN SUPPORT OF THE STATEMENT OF ASSURANCE
2. |
The audit approach taken by the Court comprises analytical audit procedures, direct testing of transactions and an assessment of key controls of the Authority’s supervisory and control systems. This is supplemented by evidence provided by the work of other auditors (where relevant) and an analysis of management representations. |
STATEMENT OF ASSURANCE
The management’s responsibility
The auditor’s responsibility
Opinion on the reliability of the accounts
Opinion on the legality and regularity of the transactions underlying the accounts
|
10. |
The comments which follow do not call the Court’s opinions into question. |
COMMENTS ON BUDGETARY MANAGEMENT
11. |
The overall level of committed appropriations increased from 86 % in 2012 to 93 % in 2013, indicating that commitments were made on a more timely basis. However, the level of committed appropriations carried over to 2014 was high for title III (operational expenditure) at 3 6 88 487 euro (58 %). This was caused by IT services received in 2013 but not yet paid for (0,8 million euro), IT services planned in the 2014 work programme and contracted at year-end (1,1 million euro), some delays in IT procurements (0,4 million euro) and also the multiannual nature of some IT projects. |
12. |
In 2013 the Authority made 12 budget transfers amounting to 5,1 million euro or 18 % of the budget (2012: 22 transfers amounting to 3,2 million euro or 16 % of the budget), which indicates continued weaknesses in budget planning. |
OTHER COMMENTS
13. |
Some 27 % of payments made in 2013 for goods and services received were late. Where payments were late, they were overdue by an average of 32 days. Late interest paid in 2013 amounted to 3 834 euro. |
14. |
According to the Protocol on the privileges and immunities of the European Union (8) and the EU VAT Directive (9), the Authority is exempt from indirect taxes. Total VAT charged to ESMA in the period 2011-2013 was 3,3 million euro. Following lengthy discussions with the host Member State, the Authority started claiming VAT reimbursements in the last quarter of 2012, but only 1,3 million euro had been claimed back by the end of 2013. |
FOLLOW-UP OF PREVIOUS YEARS’ COMMENTS
15. |
An overview of the corrective actions taken in response to the Court’s comments from previous years is provided in Annex I. |
This Report was adopted by Chamber IV, headed by Mr Milan Martin CVIKL, Member of the Court of Auditors, in Luxembourg at its meeting of 1 July 2014.
For the Court of Auditors
Vítor Manuel da SILVA CALDEIRA
President
(1) OJ L 331, 15.12.2010, p. 84.
(2) Annex II summarises the Authority’s competences and activities. It is presented for information purposes.
(3) These include the balance sheet and the economic outturn account, the cash flow table, the statement of changes in net assets and a summary of the significant accounting policies and other explanatory notes.
(4) These comprise the budgetary outturn account and the annex to the budgetary outturn account.
(5) Articles 39 and 50 of Commission Delegated Regulation (EU) No 1271/2013 (OJ L 328, 7.12.2013, p. 42).
(6) The accounting rules adopted by the Commission’s accounting officer are derived from the International Public Sector Accounting Standards (IPSAS) issued by the International Federation of Accountants or, where relevant, the International Accounting Standards (IAS)/International Financial Reporting Standards (IFRS) issued by the International Accounting Standards Board.
(7) Article 107 of Regulation (EU) No 1271/2013.
(8) Protocol (No 7) on the privileges and immunities of the European Union (OJ C 115, 9.5.2008, p. 266).
(9) Council Directive 2006/112/EC (OJ L 347, 11.12.2006, p. 1).
ANNEX I
Follow-up of previous years’ comments
Year |
Court's comment |
Status of corrective action (Completed/Ongoing/Outstanding/N/A) |
2011 |
The Authority’s commitments amounted to 1 2 8 41 997 euro or 76 % of the 2011 budget. The commitment rates were low especially for title III ‘Operational expenditure’ (47 %). This impacted on the Authority’s IT objectives which were not entirely achieved. The low budget execution rates indicate difficulties in budget planning and implementation. |
N/A |
2011 |
The Authority’s budget for the financial year 2011 amounted to 16,9 million euro. In accordance with Article 62(1) of its Founding Regulation, 60 % of the 2011 budget was financed from Member States’ and EFTA countries’ contributions and 40 % from the Union budget. At the end of 2011, ESMA recorded a positive budget outturn of 4,3 million euro. In compliance with its Financial Regulation (1), the full amount was then recorded in the accounts as a liability towards the European Commission. |
Ongoing |
2011 |
Weaknesses were noted as regards six legal commitments made in advance of budget commitments (4 83 845 euro). |
Ongoing (2) |
2011 |
The Court identified a number of cases with a total value of 2 07 442 euro in which payment appropriations carried over to 2012 did not correspond to legal commitments made. These carry-overs were therefore irregular and should be cancelled. |
Ongoing |
2011 |
There is a need to improve the Authority’s management of fixed assets. For intangible assets developed by the Authority, accounting procedures and information on costs were not reliable. |
Completed |
2011 |
The Authority needs to improve the transparency of recruitment procedures. The number of years of experience required for a given position was not respected, applications received after the deadline were accepted, questions for oral and written tests were not set before the applications were examined by the selection board and there was no decision of the Appointing Authority to appoint the selection board. |
Completed |
2012 |
The Authority’s accounting system has not yet been validated by the Accounting Officer. |
Completed |
2012 |
During its second year of activity, the Authority took an important step with the adoption and implementation of the baseline requirements for all internal control standards. However, full implementation of the standards has not been achieved. |
Ongoing |
2012 |
There is considerable room to improve the timeliness and documentation of procurement procedures. |
Ongoing |
2012 |
The Authority’s total appropriations for 2012 amounted to 20,3 million euro, out of which 2,8 million euro (14 %) were cancelled and 4,2 million euro (21 %) of committed appropriations were carried over to 2013. The high level of cancellations results mainly from the fact that the budget was established on the basis of a fully implemented staff establishment plan at the beginning of 2012, whereas some recruitments were only made during the year. Delays in IT procurements also caused cancellations. |
N/A |
2012 |
The level of committed appropriations carried over is high for title II (administrative expenditure) at 39 % and for title III (operational expenditure) at 52 %. For title II, this was mainly caused by the fact that a significant contract for works on the Authority’s premises was awarded in December 2012 (0,6 million euro) and by the purchase of IT hardware (0,5 million euro), telephony equipment (0,1 million euro) and furniture (0,3 million euro) for which delivery was not completed at year-end. For title III, the high level of committed appropriations carried over results from the multiannual nature of significant IT development projects and delays in related procurements. |
N/A |
2012 |
In 2012, the Authority made 22 budget transfers amounting to 3,2 million euro (16 % of total 2012 budget), which indicates weaknesses in budget planning. |
Ongoing |
2012 |
The Authority needs to further improve the transparency of its recruitment procedures. In particular, in one audited recruitment procedure, the number of years of experience for a given position was not applied and in three audited recruitment procedures there was no evidence that thresholds for the shortlists were established before the examination of the applications. |
Completed |
(1) Articles 15(4) and 16(1).
(2) Similar cases were found in 2013.
ANNEX II
European Securities and Markets Authority (Paris)
Competences and activities
Areas of Union competence deriving from the Treaty (Article 114 of the Treaty on the Functioning of the European Union) |
The European Parliament and the Council shall, acting in accordance with the ordinary legislative procedure and after consulting the Economic and Social Committee, adopt the measures for the approximation of the provisions laid down by law, regulation or administrative action in Member States which have as their object the establishment and functioning of the internal market. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Competences of the Authority (Regulation (EU) No 1095/2010 of the European Parliament and of the Council and Regulation (EC) No 1060/2009 of the European Parliament and of the Council) |
Tasks
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Governance |
Board of Supervisors Composition Chairperson (non-voting); the head of the national public authority competent for the supervision of financial market participants in each Member State; one representative of the Commission (non-voting); one representative of the European Systemic Risk Board (non-voting); one representative of each of the other two European Supervisory Authorities (non-voting). Tasks Gives guidance to the work of the Authority and is in charge of taking decisions referred to in Chapter II of the founding Regulation. Management Board Composition Chairperson and six other members of the Board of Supervisors, elected by and from the voting members of the Board of Supervisors. The Executive Director and a representative of the Commission participate in meetings without the right to vote (though the representative of the Commission can vote on budgetary matters). Tasks Ensures that the Authority carries out its mission and performs the tasks assigned to it in accordance with the founding Regulation. Chairperson Representative of the Authority responsible for preparing the work of the Board of Supervisors and chairing the meetings of the Board of Supervisors and the Management Board. Appointed by the Board of Supervisors after having been heard by the European Parliament. Executive Director Appointed by the Board of Supervisors after confirmation by the European Parliament. In charge of the management of the Authority and prepares the work of the Management Board. Internal audit European Commission’s Internal Audit Service (IAS). External audit European Court of Auditors. Discharge authority European Parliament, acting on a recommendation from the Council. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Resources made available to the Authority in 2013 |
Final Budget Total budget: 28,189 million euro, including: Union subsidy: 8,6 million euro Contributions from National Competent Authorities: 12,9 million euro Fees from supervised entities: 6,53 million euro (Credit Rating Agencies: 5,7 million euro; Trade Repositories: 0,83 million euro) Staff as at 31 December 2013
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Products and services in 2013 |
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Source: Annex supplied by the Authority. |
THE AUTHORITY’S REPLIES
11. |
Regarding the high level of carry-overs, even so they are due to the not yet paid financial liabilities of the IT contracts and the multiannual nature of IT projects under those contracts and, therefore, impossible to eliminate completely, ESMA is further strengthening the procurement plan monitoring to reduce the level of carry-overs to the minimum level possible. |
12. |
Regarding the number of budget transfers, the comment of the Court is noted. It should be kept in mind that ESMA’s budget 2013 was prepared at the end of 2011, e.g. after less than a year of operation for the Authority. In 2013, a new budget planning methodology has been put in place to minimise the need of budget transfers in 2015 and beyond. ESMA has also started in 2013 to set up periodic budget reviews to improve budget implementation. |
13. |
ESMA is aware of the issue related to late payments and took several initiatives in 2013 in order to address it. ESMA has enhanced monitoring with the setup of biweekly reports and has developed a training campaign on the payment circuits. Finally, ESMA streamlined at the end of 2013 the financial circuits and adapted the forms to improve the timeliness of the process. |
14. |
Due to the ongoing discussions on the headquarter agreement, ESMA’s process to recover VAT from the French government was implemented only end 2012. In 2013, ESMA had therefore to process a back log of VAT claims for which the last batch was sent out in May 2014. Together with finalising the handling of the backlog, a regular quarterly VAT claiming procedure has been put in place at the end of 2013. With the above measures, ESMA expects to significantly reduce or eliminate the outstanding VAT by the end of 2014. |
10.12.2014 |
EN |
Official Journal of the European Union |
C 442/260 |
REPORT
on the annual accounts of the European Training Foundation for the financial year 2013, together with the Foundation’s reply
(2014/C 442/30)
INTRODUCTION
1. |
The European Training Foundation (hereinafter ‘the Foundation’, aka ‘ETF’), which is located in Turin, was established by Council Regulation (EEC) No 1360/90 (1) (recast Regulation (EC) No 1339/2008 of the European Parliament and of the Council (2)). The Foundation’s task is to support the reform of vocational training in the European Union’s partner countries. To do this, it assists the Commission in the implementation of various programmes (e.g. IPA, FRAME, GEMM) (3). |
INFORMATION IN SUPPORT OF THE STATEMENT OF ASSURANCE
2. |
The audit approach taken by the Court comprises analytical audit procedures, direct testing of transactions and an assessment of key controls of the Foundation’s supervisory and control systems. This is supplemented by evidence provided by the work of other auditors (where relevant) and an analysis of management representations. |
STATEMENT OF ASSURANCE
The management’s responsibility
The auditor’s responsibility
Opinion on the reliability of the accounts
Opinion on the legality and regularity of the transactions underlying the accounts
|
10. |
The comments which follow do not call the Court’s opinions into question. |
OTHER COMMENTS
11. |
At the end of 2013, the Foundation had 7,5 million euro in accounts at a single bank with a low credit rating (F3, BBB). |
FOLLOW-UP OF PREVIOUS YEAR’S COMMENTS
12. |
An overview of the corrective actions taken in response to the Court's comments from the previous year is provided in Annex I. |
This Report was adopted by Chamber IV, headed by Mr Milan Martin CVIKL, Member of the Court of Auditors, in Luxembourg at its meeting of 8 July 2014.
For the Court of Auditors
Vítor Manuel da SILVA CALDEIRA
President
(1) OJ L 131, 23.5.1990, p. 1.
(2) OJ L 354, 31.12.2008, p. 82.
(3) Annex II summarises the Foundation’s competences and activities. It is presented for information proposes.
(4) These include the balance sheet and the economic outturn account, the cash flow table, the statement of changes in net assets and a summary of the significant accounting policies and other explanatory notes.
(5) These comprise the budgetary outturn account and the annex to the budgetary outturn account.
(6) Articles 39 and 50 of Commission Delegated Regulation (EU) No 1271/2013 (OJ L 328, 7.12.2013, p. 42).
(7) The accounting rules adopted by the Commission’s accounting officer are derived from the International Public Sector Accounting Standards (IPSAS) issued by the International Federation of Accountants or, where relevant, the International Accounting Standards (IAS)/International Financial Reporting Standards (IFRS) issued by the International Accounting Standards Board.
(8) Article 107 of Regulation (EU) No 1271/2013.
ANNEX I
Follow-up of previous year’s comments
Year |
Court’s comment |
Status of corrective action (Completed/Ongoing/Outstanding/N/A) |
2012 |
In 2012 the overall level of committed appropriations was 99,9 %, indicating that commitments were made in a timely manner. The level of committed appropriations carried over to 2013 however was high for title II (administrative expenditure) at 0,6 million euro (36,8 %). The main reasons were the late receipt of invoices for building-related services delivered in 2012 (0,3 million euro) and a number of IT hardware and software purchases ordered as planned during the last months of 2012 (0,3 million euro) but not delivered until 2013. |
N/A |
ANNEX II
European Training Foundation (Turin)
Competences and activities
Areas of Union competence deriving from the Treaty (Article 166(3) of the Treaty on the Functioning of the European Union) |
‘The Union and the Member States shall foster cooperation with third countries and the competent international organisations in the sphere of vocational training.’ |
||||||||||||||||||||||||||||||||||||||
Competences of the Foundation (Council Regulation (EEC) No 1360/90) |
Objective
Tasks For the purpose of achieving the objective, the Foundation, within the limits of the powers conferred on the Governing Board and following the general guidelines established at Union level, has the following functions:
|
||||||||||||||||||||||||||||||||||||||
Governance |
Governing Board One representative of each Member State. Three representatives of the Commission. Three non-voting experts appointed by the European Parliament. In addition, three representatives of the partner countries may attend meetings of the Governing Board as observers. Director Appointed by the Governing Board on a proposal from the Commission. External audit European Court of Auditors. Internal audit European Commission’s Internal Audit Service (IAS). Discharge authority European Parliament acting on a recommendation from the Council. |
||||||||||||||||||||||||||||||||||||||
Resources made available to the Foundation in 2013 (2012) |
Budget 22,0(20,1) million euro for commitments and 22,0(20,1) million euro for payments, of which 19,9 million euro was funded by a Commission subsidy. Staff at 31 December 2013 96 (96) temporary posts in the establishment plan, of which 92 (1) (93) posts occupied. 40 (37) other staff (local staff, contract staff, seconded national experts) Total staff: 132 (130), assigned to the following duties: operational tasks: 76,5(73) administrative tasks: 28 (28) + two replacement pool in the ETF according to need corporate coordination and communication tasks: 25,5(29) |
||||||||||||||||||||||||||||||||||||||
Products and services supplied during the financial year 2013 (2012) |
Activities The Foundation contributes, in the context of EU external relations policies, to improving human capital development (HCD) in 30 partner countries designated by its establishing Regulation and the Governing Board. Its main activities involve supporting EU policies and projects, providing policy analyses, disseminating and exchanging information and experience and supporting partner-country capacity building. The Foundation’s added value comes from its neutral, non-commercial and unique established knowledge base consisting of expertise in human capital development and its links to employers. This includes expertise in adapting the approaches to human capital development in the EU and its Member States to the context of the partner countries. In 2013, the Torino Process, implemented in 27 ETF partner countries as a participatory, evidence-based analysis of vocational education and training (VET) policies and systems, was validated in a corporate conference organised in May with a title ‘Torino Process: Moving Skills Forward’. The Foundation worked on its main functions, as defined in the Council Regulation, as follows:
Outputs measure the accomplishment of the results of a project, and put the budget in relation to the Foundation’s functions and results. In addition to these functions carried out in the context of its work programme, the Foundation also responded to direct requests from the European Commission throughout the year.
|
||||||||||||||||||||||||||||||||||||||
(1) Including 1 job offer accepted, starting 1.3.2014.
Source: Annex supplied by the Foundation.
THE FOUNDATION’S REPLY
11. |
ETF agrees with the Court's finding and confirms its intention to participate in 2014 in a joint procurement procedure for banking services launched by the Commission. In the event of this procurement procedure failing, ETF will launch its own procurement in order to have a contract with a bank with a higher credit rating. The high bank balance at 31 December 2013 is due to the first instalment of the 2014 subvention being paid in advance and funds received for the new GEMM and FRAME projects. |
10.12.2014 |
EN |
Official Journal of the European Union |
C 442/267 |
REPORT
on the annual accounts of the Euratom Supply Agency for the financial year 2013, together with the Agency’s replies
(2014/C 442/31)
INTRODUCTION
1. |
The Euratom Supply Agency (hereinafter ‘the Agency’), located in Luxembourg, was created in 1958 (1). Council Decision 2008/114/EC, Euratom (2) replaced the preceding Statutes of the Agency. The Agency’s main task is to ensure a regular supply of nuclear materials, in particular nuclear fuels, to EU users, by means of a common supply policy based on the principle of equal access to sources of supply. |
2. |
From 2008 up to and including 2011, the Agency did not receive a budget of its own to cover its operations. The Commission bore all costs incurred by the Agency when implementing its activities. For 2012 and 2013, the Agency was granted its own budget by the Commission, which however only covers a minor part of its expenditure. |
STATEMENT OF ASSURANCE
The management’s responsibility
The auditor’s responsibility
Opinion on the reliability of the accounts
Opinion on the legality and regularity of the transactions underlying the accounts
|
10. |
The comments which follow do not call the Court’s opinions into question. |
COMMENTS ON THE RELIABILITY OF ACCOUNTS
11. |
The notes to the Agency’s 2013 annual accounts explain that all salaries and some additional costs for administrative services were paid directly from the Commission’s budget. The salary costs are disclosed, but no details are provided on the costs for the administrative services. Therefore the extent to which the Agency is dependent upon the Commission is not fully visible. |
COMMENTS ON INTERNAL CONTROLS
12. |
There is insufficient documentation of the main elements of the Agency’s internal controls, such as a risk management and control strategy, procedures to monitor performance, an assessment of the functioning of the internal control system and a code of professional standards. |
FOLLOW-UP OF PREVIOUS YEARS’ COMMENTS
13. |
An overview of the corrective actions taken in response to the Court's comments from previous years is provided in Annex I. |
This Report was adopted by Chamber IV, headed by Mr Milan Martin CVIKL, Member of the Court of Auditors, in Luxembourg at its meeting of 1 July 2014.
For the Court of Auditors
Vítor Manuel da SILVA CALDEIRA
President
(1) OJ 27, 6.12.1958, p. 534/58.
(2) OJ L 41, 15.2.2008, p. 15.
(3) These include the balance sheet and the economic outturn account, the cash flow table, the statement of changes in net assets and a summary of the significant accounting policies and other explanatory notes.
(4) These comprise the budgetary outturn account and the annex to the budgetary outturn account.
(5) Articles 39 and 50 of Commission Delegated Regulation (EU) No 1271/2013 (OJ L 328, 7.12.2013, p. 42).
(6) The accounting rules adopted by the Commission’s accounting officer are derived from the International Public Sector Accounting Standards (IPSAS) issued by the International Federation of Accountants or, where relevant, the International Accounting Standards (IAS)/International Financial Reporting Standards (IFRS) issued by the International Accounting Standards Board.
(7) Article 107 of Regulation (EU) No 1271/2013.
ANNEX I
Follow-up of previous years’ comments
Year |
Court's comment |
Status of corrective action (Completed/Ongoing/Outstanding/N/A) |
2011 |
Without calling into question the opinion expressed in paragraph 10, the Court wishes to draw again attention to the following matter. Article 54 of the Treaty establishing the European Atomic Energy Community provides that the Agency shall have financial autonomy. Article 7 of the Agency’s Statutes provides that ‘the expenditure of the Agency shall consist of administrative expenses of its staff and of the Committee, as well as expenses resulting from contracts entered into with third parties’. In fact, the Agency has not, since 2008, received a budget. That being the case, the European Commission has directly discharged the Agency’s expenses mentioned in Article 7 above. In the Court’s view, this situation is at odds with the Statutes of the Agency and the Court considers that the Agency and the Commission should, together with all interested parties, consider measures to eliminate this situation. |
Completed |
2012 |
Without calling into question the opinion expressed in paragraph 9, the Court wishes to draw attention to the following matter. Between 2008 and 2011, the Agency did not receive its own budget and the European Commission directly financed and discharged all expenditure. The Court had considered this situation to be at odds with the Statutes of the Agency. For 2012, following the Court’s comments, the Commission granted the Agency its own budget amounting to 98 000 euro (1 04 000 euro including financial revenue from own investments). Whereas Article 54 of the Treaty establishing the European Atomic Energy Community and Article 6 of the Agency’s Statutes provide that it shall have financial autonomy, most of the Agency’s expenditure (staff, office space and IT systems) is still financed directly by the Commission. As far as staff costs are concerned, this is foreseen in Article 4 of its Statutes. The provisions are contradictory which goes against the required financial autonomy of the Agency. |
Outstanding |
ANNEX II
Euratom Supply Agency (Luxembourg)
Competencies and activities
Areas of Union competence deriving from the Treaty |
Common supply policy for nuclear materials in accordance with the principles and the objectives (security of supply) set by the Euratom Treaty. The Euratom Supply Agency (ESA) was established directly by Article 52 of the Euratom Treaty, signed in 1957. The ESA is further governed by its Statutes, laid down by a Council decision on the legal basis of Article 54 of the Euratom Treaty. |
||||||||||||||||||||||||||
Competences of the Agency (as defined in the Euratom Treaty, mainly Chapter 6 thereof, and Council Decision 2008/114/EC, Euratom of 12 February 2008 establishing Statutes for the Euratom Supply Agency) |
Objectives
Tasks As per the Euratom Treaty, the ESA is endowed with a right of option on nuclear materials produced in the territories of Member States and with an exclusive right to conclude contracts relating to the nuclear materials coming from inside the Community or from outside. In the light of the above, the ESA’s tasks include:
|
||||||||||||||||||||||||||
Governance |
Director-General Appointed by the Commission, for an indefinite period of time. The DG’s duties and powers are determined, in particular, in the ESA’s Statutes. The Euratom Supply Agency’s Supervision by the Commission The Commission may issue directives to the Agency and possesses a right of veto over the Agency’s decisions. Moreover, certain decisions of the ESA are subject to prior Commission authorisation. Advisory Committee Composed from members of the Member States, who are appointed intuitu personae for a (renewable) three-year term. The AC assists the Agency in carrying out its tasks. It acts as a link between the ESA and both producers and users in the nuclear industry. The Committee may be consulted upon all matters in the Agency’s purview. It has to give its opinion on all matters listed in Article 13 of the Statutes. It normally meets twice every year. External audit European Court of Auditors. Discharge authority European Parliament. |
||||||||||||||||||||||||||
Resources made available to the Agency in 2013 (2012) |
Budget 1 04 000 (1 04 000) euro, including contribution from the Commission: 98 000(98 000) euro. Staff on 31 December 2013 Total staff number: 18 (17) (including the Director-General). |
||||||||||||||||||||||||||
Products and services provided in 2013 (2012) |
Security of supply ensured Transactions processed Some 279 (270) transactions, including contracts, amendments and notifications of the front-end activities, were processed by the Agency in 2013. Reports In 2013, the Agency issued:
Participation to activities of the Euratom Supply Agency’s Advisory Committee
Relations with other EU Institutions and International Cooperation Relation with the EC as described above. Each year the Agency has to submit to the European Parliament, the Council and the Commission a report covering its activities in the previous year, as well as its work programme for the coming year. The ESA cooperates also with the international organisations, namely the IAEA (International Atomic Energy Agency) and the OECD/NEA (Nuclear Energy Agency). In that context, the Agency participates in the joint NEA/IAEA Uranium Group and in the NEA High-Level Group on the Security of Supply of Medical Radioisotopes (HLG-MR). Security of supply of medical radioisotopes In September 2013, ESA was entrusted the chairmanship of the European Observatory on the Supply of Medical Radioisotopes to help implement a European Council policy towards ensuring continuity of supply for medical radioisotopes. |
||||||||||||||||||||||||||
Source: Information supplied by the Agency. |
THE AGENCY’S REPLIES
12. |
The notes to the Agency’s 2013 final accounts include an estimate of salary costs. Precise data concerning the Agency’'s administrative costs covered by the Commission are owned by the latter. In our view, the fact that the Commission pays the salaries of the Agency’s staff (and some other administrative expenses) does not jeopardise per se the ESA’s independence while it enables economies of scale. |
13. |
In the Agency’s understanding, an appropriate risk management and control strategy is effectively in place. However, starting within the current year, the Agency will provide further, structured documentation on risk-assessment and risk-mitigation actions. |
10.12.2014 |
EN |
Official Journal of the European Union |
C 442/275 |
REPORT
on the annual accounts of the European Foundation for the Improvement of Living and Working Conditions for the financial year 2013, together with the Foundation’s replies
(2014/C 442/32)
INTRODUCTION
1. |
The European Foundation for the Improvement of Living and Working Conditions (hereinafter ‘the Foundation’, aka ‘Eurofound’), which is located in Dublin, was established by Council Regulation (EEC) No 1365/75 (1). The Foundation’s task is to contribute to the planning and establishment of better living and working conditions in the Union by increasing and disseminating knowledge which is relevant to this subject (2). |
INFORMATION IN SUPPORT OF THE STATEMENT OF ASSURANCE
2. |
The audit approach taken by the Court comprises analytical audit procedures, direct testing of transactions and an assessment of key controls of the Foundation’s supervisory and control systems. This is supplemented by evidence provided by the work of other auditors (where relevant) and an analysis of management representations. |
STATEMENT OF ASSURANCE
The management’s responsibility
The auditor’s responsibility
Opinion on the reliability of the accounts
Opinion on the legality and regularity of the transactions underlying the accounts
|
10. |
The comments which follow do not call the Court’s opinions into question. |
COMMENTS ON THE RELIABILITY OF THE ACCOUNTS
11. |
The Foundation carried out a comprehensive physical inventory exercise at the end of 2013 and the beginning of 2014. At the time of the Court’s audit in February 2014, a physical inventory report had not yet been finalised. Tests carried out by the Court revealed that not all fixed assets were barcoded and recorded in the register and accounts. Equipment with a value of 2 09 843 euro (8) had been expensed instead of being capitalised, the error was corrected following the Court’s audit. Some assets could not be traced to the suppliers’ delivery notes in order to ensure the correct starting date for the calculation of the depreciation charge. |
COMMENTS ON INTERNAL CONTROLS
12. |
The facts presented in paragraph 11 represent considerable internal control weaknesses in the area of fixed assets registration and accounting. |
COMMENTS ON BUDGETARY MANAGEMENT
13. |
In 2013, the overall level of committed appropriations was 99 %, indicating that commitments were made in a timely manner. However, the level of committed appropriations carried over to 2014 however was high at some 6 62 831 euro (35,6 %) for title II (administrative expenditure) and some 3 3 75 781 euro (48,6 %) for title III (operating expenditure). |
14. |
Carry-overs of committed title II appropriations mainly related to the procurement of IT hard- and software (2 81 934 euro, of which purchases amounting to 1 89 934 euro were originally planned for 2014), urgent and unforeseen repair works (69 000 euro) and refurbishment works to be contracted and planned for the beginning of 2014 (2 30 718 euro). |
15. |
For title III, committed appropriations carried over amounting to 2 6 25 543 euro concerned multiannual projects for which activities were implemented and payments were made according to schedule. Unplanned carry-overs of 7 50 238 euro mainly related to an increase in the budget for several projects to enhance their scope and quality (65 %), translation services ordered in December 2013 but originally planned for 2014 (14 %), delays in procurement procedures (7 %), late invoicing by contractors (14 %) and other events beyond the Foundation’s control. |
OTHER COMMENTS
16. |
The Foundation became operational in 1975 and has, to date, worked on the basis of correspondence and exchanges with the host Member State. However, a comprehensive headquarters agreement between the Foundation and the Member State has not been signed. Such an agreement would further promote transparency in respect of the conditions under which the Foundation and its staff operate. |
This Report was adopted by Chamber IV, headed by Mr Milan Martin CVIKL, Member of the Court of Auditors, in Luxembourg at its meeting of 8 July 2014.
For the Court of Auditors
Vítor Manuel da SILVA CALDEIRA
President
(1) OJ L 139, 30.5.1975, p. 1.
(2) Annex I summarises the Foundation’s competences and activities. It is presented for information purposes.
(3) These include the balance sheet and the economic outturn account, the cash flow table, the statement of changes in net assets and a summary of the significant accounting policies and other explanatory notes.
(4) These comprise the budgetary outturn account and the annex to the budgetary outturn account.
(5) Articles 39 and 50 of Commission Delegated Regulation (EU) No 1271/2013 (OJ L 328, 7.12.2013, p. 42).
(6) The accounting rules adopted by the Commission’s accounting officer are derived from the International Public Sector Accounting Standards (IPSAS) issued by the International Federation of Accountants or, where relevant, the International Accounting Standards (IAS)/International Financial Reporting Standards (IFRS) issued by the International Accounting Standards Board.
(7) Article 107 of Regulation (EU) No 1271/2013.
(8) Air conditioning system and other equipment in the Foundation’s Conference Centre.
ANNEX I
European Foundation for the Improvement of Living and Working Conditions (Dublin)
Competences and activities
Areas of Union competence deriving from the Treaty (Article 151 of the Treaty on the Functioning of the European Union) |
The Union and the Member States, having in mind fundamental social rights such as those set out in the European Social Charter signed at Turin on 18 October 1961 and in the 1989 Community Charter of the Fundamental Social Rights of Workers, shall have as their objectives the promotion of employment, improved living and working conditions, so as to make possible their harmonisation while the improvement is being maintained, proper social protection, dialogue between management and labour, the development of human resources with a view to lasting high employment and the combating of exclusion. [...] |
||||||||||||||||||||||||||||||||||||||||
Competences of the Foundation (Council Regulation (EEC) No 1365/75, as amended by Regulation (EC) No 1111/2005) |
Objectives The aim of the Foundation shall be to contribute to the establishment of better living and working conditions by increasing and disseminating knowledge which is relevant to this subject. In particular, it is required to consider the following areas:
Tasks
|
||||||||||||||||||||||||||||||||||||||||
Governance |
The Governing Board (GB)
The Bureau of the GB
The Director and Deputy Director are appointed by the Commission from a list of candidates submitted by the GB. The Director implements the decisions of the GB and its Bureau and manages the Foundation. Internal audit European Commission’s Internal Audit Service (IAS). External audit European Court of Auditors. Discharge authority European Parliament acting on recommendation of the Council. |
||||||||||||||||||||||||||||||||||||||||
Resources available to the Foundation in 2013 (2012) |
Budget 20,6(21,4) million euro Staff at 31 December 2013 Officials and temporary staff: 101 posts provided for in the establishment plan, of which 99 (98) were occupied at 31 December 2013 Other staff: Seconded National Experts: 0 (0) Contract staff: 13 (12) Total staff employed: 112 (110) Allocated to: Operating activities: 78 (77) Administrative tasks: 29 (28) Mixed: 5 (5) |
||||||||||||||||||||||||||||||||||||||||
Activities and services provided in 2013 |
Increasing labour market participation and combating unemployment by creating jobs, improving labour market functioning and promoting integration
Improving working conditions and making work sustainable throughout the life course
Developing industrial relations to ensure equitable and productive solutions in a changing policy context
Improving standards of living and promoting social cohesion in the face of economic disparities and social inequalities
Communication and sharing ideas and experience
|
||||||||||||||||||||||||||||||||||||||||
Source: Annex supplied by the Foundation. |
THE FOUNDATION’S REPLIES
11. |
The physical inventory report was in the meantime finalised and published. Mistakes in relation to barcoding and registration have been rectified. Due to the low value of the items involved they are not considered assets and, therefore, the impact of these mistakes on the financial accounts was zero. In all cases there is now a copy of the delivery note attached to the invoice which ensures proper tracing of the correct starting date for calculation of the depreciation. |
12. |
The weaknesses in the area of fixed assets registration and accounting were largely due to the transition period towards a new assets accounting system. This is now remedied by the full implementation of ABAC Assets and substantial changes in the internal workflows. |
13.-15. |
The figures and analysis are accepted and confirmed. The high level of carry-overs relating to services originally planned for 2014 (43 % of all unplanned carry-overs) are due to the decisions on staff salaries for 2011 and 2012 which were taken late in 2013 and led to some available budget left. To ensure a high level of budget execution it was decided to use up the available funds according to the advice received from the Commission. Carry-overs (excl. those related to activities planned for 2014 and brought forward) show that less than 20 % were unplanned and partly outside Eurofound’s control. |
16. |
For over 30 years Eurofound had quite detailed arrangements with the Irish government on the application of the Protocol on Privileges and Immunities. Nevertheless, in early February Eurofound started negotiations on this topic with a view to come to an agreement with the Irish government by the end of 2014. |
10.12.2014 |
EN |
Official Journal of the European Union |
C 442/282 |
REPORT
on the annual accounts of Eurojust for the financial year 2013, together with Eurojust’s replies
(2014/C 442/33)
INTRODUCTION
1. |
The European Union’s Judicial Cooperation Unit (hereinafter ‘Eurojust’), which is located in The Hague, was set up by Council Decision 2002/187/JHA (1) with a view to stepping up the fight against serious organised crime. Its objective is to improve the coordination of cross-border investigations and prosecutions between the Member States of the European Union, and between Member States and non-Member States (2). |
INFORMATION IN SUPPORT OF THE STATEMENT OF ASSURANCE
2. |
The audit approach taken by the Court comprises analytical audit procedures, direct testing of transactions and an assessment of key controls of Eurojust’s supervisory and control systems. This is supplemented by evidence provided by the work of other auditors (where relevant) and an analysis of management representations. |
STATEMENT OF ASSURANCE
The management’s responsibility
The auditor’s responsibility
Opinion on the reliability of the accounts
Opinion on the legality and regularity of the transactions underlying the accounts
|
10. |
The comments which follow do not call the Court’s opinions into question. |
COMMENTS ON BUDGETARY MANAGEMENT
11. |
The level of committed appropriations for the different titles varied between 99 % and 98 % of total appropriations, indicating that legal commitments were made in a timely manner. However, the level of committed appropriations carried over to 2014 was high for title III (operating expenditure) at 2 3 41 825 euro (32 %). This was mainly the result of delays associated with the handover of internal software management to a new service provider at the year-end. Also, reimbursements of expenditure from grant schemes which were used to support ‘Joint Investigation Teams’ were only due in 2014. |
12. |
In 2013, the Agency made 49 budget transfers affecting 101 budget lines. This indicates weaknesses in budget planning and implementation. |
FOLLOW-UP OF PREVIOUS YEARS’ COMMENTS
13. |
An overview of the corrective actions taken in response to the Court's comments from previous years is provided in Annex I. |
This Report was adopted by Chamber IV, headed by Mr Milan Martin CVIKL, Member of the Court of Auditors, in Luxembourg at its meeting of 1 July 2014.
For the Court of Auditors
Vítor Manuel da SILVA CALDEIRA
President
(2) Annex II summarises Eurojust’s competences and activities. It is presented for information purposes.
(3) These include the balance sheet and the economic outturn account, the cash flow table, the statement of changes in net assets and a summary of the significant accounting policies and other explanatory notes.
(4) These comprise the budgetary outturn account and the annex to the budgetary outturn account.
(5) Articles 39 and 50 of Commission Delegated Regulation (EU) No 1271/2013 (OJ L 328, 7.12.2013, p. 42).
(6) The accounting rules adopted by the Commission’s accounting officer are derived from the International Public Sector Accounting Standards (IPSAS) issued by the International Federation of Accountants or, where relevant, the International Accounting Standards (IAS)/International Financial Reporting Standards (IFRS) issued by the International Accounting Standards Board.
(7) Article 107 of Regulation (EU) No 1271/2013.
ANNEX I
Follow-up of previous years’ comments
Year |
Court’s comment |
Status of corrective action (Completed/Ongoing/Outstanding/N/A) |
2011 |
In the report for the financial year 2010, the Court noted that there was scope to reconsider the definition of respective roles and responsibilities between the Director and the College of Eurojust in order to avoid the overlap of responsibilities, currently resulting from the Founding Regulation (1). No corrective measures were taken in 2011. |
Ongoing |
2011 |
Eurojust has not yet adopted all Implementing Rules of the Staff Regulations (2). |
Completed |
2012 |
A framework contract for security services was signed in 2008 and amended in 2009. The amended formula to calculate prices increased them progressively up to 22 %, whereas the original framework contract had provided for a maximum increase of 4 %. The total price increase above the 4 % ceiling amounted to some 4 40 000 euro for the 2008 to 2012 period, of which some 68 000 euro were paid in 2012. Such a significant increase may undermine the transparency and fairness of the initial procurement procedure and distort competition. |
N/A |
2012 |
There is room to improve the transparency of recruitment procedures. There was no evidence that questions for tests and interviews were set before the examination of the applications by the Selection Board and there is no evidence that the weighting between written tests and interviews was set before candidates’ screening. |
Completed |
(1) Articles 28, 29, 30 and 36 of Decision 2002/187/JHA, as amended by Decisions 2003/659/JHA (OJ L 245, 29.9.2003, p. 44) and 2009/426/JHA (OJ L 138, 4.6.2009, p. 14).
(2) Implementing rules are missing for the following areas: ‘Reclassification’, ‘Administrative inquiries and disciplinary procedure’, ‘Part-time work’, ‘Job-Sharing’, ‘Middle management’, ‘Temporary occupation of management posts’, ‘Appraisal senior management’, ‘Early retirement without reduction of pension rights’, ‘Leave’, ‘Staff Committee’ and ‘Mission guide.’
ANNEX II
Eurojust (The Hague)
Competences and activities
Areas of Union competence deriving from the Treaty (Article 85 of the Treaty on the Functioning of the European Union) |
Eurojust’s mission is to support and strengthen coordination and cooperation between national authorities in the fight against serious cross-border crime affecting the European Union. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Competences of Eurojust (as defined in Articles 3, 5, 6 and 7 of Council Decision 2002/187/JHA, as amended by Decision 2003/659/JHA and Decision 2009/426/JHA) |
Objectives Article 3 of Council Decision 2002/187/JHA, as amended by Decision 2003/659/JHA and Decision 2009/426/JHA In the context of investigations and prosecutions, concerning two or more Member States, of criminal behaviour referred to in Article 4 in relation to serious crime, particularly when it is organised, the objectives of Eurojust shall be:
Tasks Article 5 of Council Decision 2002/187/JHA, as amended by Decision 2003/659/JHA and Decision 2009/426/JHA
Article 6 of Council Decision 2002/187/JHA, as amended by Decision 2003/659/JHA and Decision 2009/426/JHA
Article 7 of Council Decision 2002/187/JHA, as amended by Decision 2003/659/JHA and Decision 2009/426/JHA
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Governance (Articles 2, 9, 23, 28, 29 and 36 of Eurojust Decision 2002/187/JHA; Article 3 of the Rules of Procedure of Eurojust) |
College The College is responsible for the organisation and operation of Eurojust. The College is composed of National Members who are seconded by each Member State in accordance with its legal system and who are prosecutors, judges or police officers. The College elects its President from among the National Members. Director The Administrative Director is appointed by the College acting by a two-thirds majority. The Joint Supervisory Body Supervises the processing of personal data. External audit European Court of Auditors. Discharge authority European Parliament acting on a Recommendation from the Council acting by qualified majority. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Resources made available to Eurojust in 2013 (2012) |
Final budget 32,4(33,3) million euro including assigned revenue Staff as at 31 December 2013 National Members: 28 (of which 2 based in Member States) (27, of which 2 based in Member States) Deputy National Members: 20 (of which 11 based in Member States) (17, of which 10 based in Member States) Assistants to National Members: 21 (of which 8 based in Member States) (22, of which 11 based in Member States) Temporary staff: 203 (188) Contract staff: 27 (29) Seconded national experts: 14 (18) |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Products and services provided in 2013 (2012) |
Number of coordination meetings: 206 (194) Total number of cases: 1 576(1 533) Deception and fraud: 472 (382) (1) (Mobile) organised crime: 264 (231) (1) Drug trafficking: 248 (263) (1) Money laundering: 202 (144) (1) Illegal immigration and trafficking in human beings: 110 (89) (1) Corruption: 56 (30) (1) Cybercrime: 29 (42) (1) Terrorism: 17 (32) (1) Criminal offences affecting the EU’s financial interests: 15 (27) (1) |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
(1) The crime list used for the classification of the cases reflects the Eurojust priority crime types in 2013.
Source: Annex supplied by Eurojust.
EUROJUST’S REPLIES
11. |
Eurojust accepts the fact that carry-overs to 2014 for title III are relatively high, however refers to the justifications identified by the Court. Eurojust remains vigilant to avoid any unjustified carry-overs. |
12. |
Eurojust accepts the comment and has already implemented the guidance of the Court through the reduction of the number of budget lines used in financial year 2014 by 26,4 %. |
10.12.2014 |
EN |
Official Journal of the European Union |
C 442/290 |
REPORT
on the annual accounts of the European Police Office for the financial year 2013, together with the Office’s replies
(2014/C 442/34)
INTRODUCTION
1. |
The European Police Office (hereinafter ‘the Office’, aka ‘Europol’), which is located in The Hague, was established by Council Decision (2009/371/JHA) (1). The objective of the Office is to support and strengthen action by the Member States’ police authorities and other law enforcement services and their mutual cooperation in preventing and combating serious crime affecting two or more Member States, terrorism and forms of crime which affect a common interest covered by a Union policy (2). |
INFORMATION IN SUPPORT OF THE STATEMENT OF ASSURANCE
2. |
The audit approach taken by the Court comprises analytical audit procedures, direct testing of transactions and an assessment of key controls of the Office’s supervisory and control systems. This is supplemented by evidence provided by the work of other auditors (where relevant) and an analysis of management representations. |
STATEMENT OF ASSURANCE
The management’s responsibility
The auditor’s responsibility
Opinion on the reliability of the accounts
Opinion on the legality and regularity of the transactions underlying the accounts
|
10. |
The comments which follow do not call the Court’s opinions into question. |
COMMENTS ON THE LEGALITY AND REGULARITY OF TRANSACTIONS
11. |
Although the Office has improved the preparation, execution and documentation of procurement procedures over the years, not all decisions taken in 2013 were based on sufficiently specific selection criteria, realistic price offers or in accordance with the established professional requirements. This affected the effectiveness of the procurement procedures. |
COMMENTS ON BUDGETARY MANAGEMENT
12. |
Budget implementation rates further improved in 2013 and total carry-overs of committed appropriations decreased to 9,4 million euro or 11,6 % (2012: 16,3 million euro or 19,6 %). However, carry-overs of committed appropriations were still high for Title II (administrative expenditure) with 3,0 million euro or 41 % (2012: 4,2 million euro or 49 %). They mainly related to planned modifications of the building late in the year (1,8 million euro) and other administrative costs for which invoices had not been received at year end. |
FOLLOW-UP OF PREVIOUS YEARS’ COMMENTS
13. |
An overview of the corrective actions taken in response to the Court’s comments from previous years is provided in Annex I. |
This Report was adopted by Chamber IV, headed by Mr Pietro RUSSO, Member of the Court of Auditors, in Luxembourg at its meeting of 16 September 2014.
For the Court of Auditors
Vítor Manuel da SILVA CALDEIRA
President
(1) OJ L 121, 15.5.2009, p. 37.
(2) Annex II summarises the Office’s competences and activities. It is presented for information purposes.
(3) These include the balance sheet and the economic outturn account, the cash flow table, the statement of changes in net assets and a summary of the significant accounting policies and other explanatory notes.
(4) These comprise budgetary outturn account and the annex to the budgetary outturn account.
(5) Articles 39 and 50 of Commission Delegated Regulation (EU) No 1271/2013 (OJ L 328, 7.12.2013, p. 42).
(6) The accounting rules adopted by the Commission’s accounting officer are derived from the International Public Sector Accounting Standards (IPSAS) issued by the International Federation of Accountants or, where relevant, the International Accounting Standards (IAS)/International Financial Reporting Standards (IFRS) issued by the International Accounting Standards Board.
(7) Article 107 of Regulation (EU) No 1271/2013.
ANNEX I
Follow-up of previous years’ comments
Year |
Court’s comment |
Status of corrective action (Completed/Ongoing/Outstanding/N/A) |
2011 |
The high carry-over and cancellation rates and also the high number of budget transfers made in 2011 indicate difficulties in the planning and/or implementation of the Office’s activities. |
Completed |
2011 |
The level of payments against commitments was low, with 34 % for Title II and 45 % for Title III and is at odds with the budgetary principle of annuality. |
N/A |
2011 |
Procedures concerning the establishment, approval and recording of exceptions and deviations from policies and procedures have not been adopted. Exceptions and deviations were recorded for 7 % of 2011 payments. |
Procedures: Completed Level of exceptions and deviations: Ongoing |
2011 |
The accounting system has not been fully validated by the Accounting Officer. Key processes such as year-end closing and the establishment of staff’s financial rights are not yet covered. |
Completed |
2011 |
Weaknesses were found as regards the physical verification and recording of assets before and after the move to the new headquarters. In addition, insurance contracts do not reflect the value of the Office’s assets. Whereas, before the move, net assets were over-insured by about 17 million euro, they are now under-insured by about 21 million euro. |
Completed |
2011 |
The Office’s Financial Regulation refers to detailed rules and procedures laid down in its Implementing Rules. However, they have not yet been adopted. |
N/A |
2011 |
There is considerable room for improving the transparency of recruitment procedures: questions for written tests and interviews were set after the applications had been examined by the selection board; no threshold scores were set for admission to written tests and interviews and for being included in the list of suitable candidates; selection boards did not document all their meetings and decisions. |
Completed |
2012 |
The Office carried over 1,2 million euro for changes to the Office’s building in connection with setting up the European cybercrime centre. Whilst it agreed these changes with the host state in July 2012, the contract for the works required was only signed in April 2013. In addition, Europol carried over 0,1 million euro related to the introduction of a new HR system. The contract expired at the end of the year and was not extended. Both carry-overs did not correspond to legal commitments made at year-end and were thus irregular. |
Completed |
2012 |
The Office does not regularly require from staff up-to-date information on the amount of child allowance received from other sources. In consequence, a number of cases were found where the child allowance was not reduced accordingly and any amounts paid unduly should be recovered. |
Completed |
2012 |
Commitments amounting to 2,6 million euro (out of 15 million euro) carried over from 2011 had to be cancelled in 2012, as these were in excess of the actual needs. |
Completed |
2012 |
The Office carried over 16,3 million euro of committed appropriations (19,64 % of total committed appropriations) to 2013. These carry-overs mainly concern Title II — other administrative expenditure — (4,2 million euro) and Title III — operational activities — (11,2 million euro) and are mostly related to the new task assigned to Europol in June 2012 of running the European cybercrime centre. The implementation of this task resulted in significant budgetary commitments made close to year-end and affected the amount carried over to 2013. |
N/A |
2012 |
The Office made 19 budgetary transfers amounting to 4,5 million euro affecting 82 of the 115 budget lines. They were mainly performed to purchase IT equipment for the European cybercrime centre. |
Completed |
2012 |
The recruitment procedures examined showed the following shortcomings: questions for written tests and interviews were set after the applications had been examined by the selection board; there was no evidence that the weighting of the selection criteria used for shortlisting was set before the examination of the applications; selection boards did not appropriately document all their meetings and decisions. |
Completed |
ANNEX II
European Police Office (The Hague)
Competences and activities
Areas of Union competence deriving from the Treaty (Article 88 of the Treaty on the functioning of the European Union) |
‘Europol's mission shall be to support and strengthen action by the Member States’ police authorities and other law enforcement services and their mutual cooperation in preventing and combating serious crime affecting two or more Member States, terrorism and forms of crime which affect a common interest covered by a Union policy’. |
||||||||||||||||||||||||||||||||||||||||||
Competences of the Office (Council Decision 2009/371/JHA establishing the European Police Office (Europol) (ECD)) |
Competence Europol’s competence covers organised crime, terrorism and other forms of serious crime affecting two or more Member States in such a way as to require a common approach by the Member States owing to the scale, significance and consequences of the offences. Europol’s competence also covers related criminal offences as defined in Article 4(3) ECD. Principal tasks
Additional tasks
Additionally, to assist Member States through support, advice and research in the following areas
Europol also acts as the Central Office for combating euro counterfeiting in accordance with Council Decision 2005/511/JHA of 12 July 2005 on protecting the euro against counterfeiting, by designating Europol as the Central Office for combating euro counterfeiting. Europol also processes and transfers financial messaging data in accordance with the Agreement between the European Union and the United States of America on the processing and transfer of Financial Messaging Data from the European Union to the United States for the purposes of the ‘Terrorist Finance Tracking Program’ (TFTP). Europol also continues efforts to establish the Prüm Helpdesk in order to support the daily application of the Prüm Decisions in accordance with the Council conclusions of 13 December 2011 on intensifying the implementation of the Prüm Decisions. Europol also supports the EU Policy Cycle for serious and organised crime and Empact (1) projects in line with the Council’s conclusions on the creation and implementation of an EU policy cycle for organised and serious international crime and the Council’s subsequent conclusions of 27 May 2011 on setting the EU’s priorities for the fight against organised crime between 2011 and 2013. Europol also hosts the European Cybercrime Centre (EC3) and acts as the focal point in Europe’s fight against cybercrime in accordance with the communication from the Commission to the Council and European Parliament COM(2012) 140 final of 28 March 2012‘Tackling crime in our Digital Age: Establishing a European Cybercrime Centre’. |
||||||||||||||||||||||||||||||||||||||||||
Governance |
Management Board The Management Board is composed of one representative of each Member State and one representative of the Commission. Director
External audit European Court of Auditors. Internal audit
Data protection and safeguarding of personal rights
Discharge authority European Parliament, taking into account a recommendation from the Council, acting by qualified majority. |
||||||||||||||||||||||||||||||||||||||||||
Resources made available to the Office in 2013 (2012) |
Final budget 2013 82,5(84,2) million euro Staff in 2013
|
||||||||||||||||||||||||||||||||||||||||||
Products and services in 2013 (2012) |
Europol as the principal EU support centre for law enforcement operations Operational support to operations and Joint Investigation Teams (JITs) includes: data processing, cross-match reports, intelligence notifications, technical/forensic support and expertise, mobile office deployments, analysis reports, operational coordination at Europol HQ, operational meetings, financial assistance, etc. Once more, the amount of operational support provided to Member States had increased; this confirms the growing trend which has been evident in previous years in the number of requests for all Europol services:
Strategic analysis capability Strategic products including threat assessments and situation reports
Europol as the EU criminal information hub Information management capabilities, Secure Information Exchange Network Application (SIENA), Europol Information System (EIS), Liaison Bureaux network.
Europol as the EU centre for law enforcement expertise Europol Platforms for Experts (EPE), Data exchange platforms and storage solutions, Knowledge products and services, Training, Conferences and awareness sessions:
External relations Europol cooperates with a number of EU partners, third countries and international organisations. The exchange of information with these partners takes place on the basis of cooperation agreements. Strategic agreements make it possible for the two parties involved to exchange all information with the exception of personal data, while operational agreements also allow the exchange of personal data.
|
||||||||||||||||||||||||||||||||||||||||||
(1) European Multidisciplinary Platform against Criminal Threats (Empact)
(2) European Monitoring Centre for Drugs and Drug Addiction (EMCDDA)
Source: Annex supplied by the Office.
THE OFFICE’S REPLIES
11. |
Europol acknowledges the comment by the ECA which relates to three individual tender procedures. In Q1 2014, next to the ECA findings, Europol initiated an organisational-wide review of the overall procurement process (in particular regarding the key stages of tendering, contracting and monitoring of contracts), with a view to refining the current internal organisational set-up and the underlying processes (including respective quality controls). |
12. |
Europol acknowledges the ECA’s comment on the high level of carry forward appropriations for administrative expenditure and will continue its efforts to reduce future carry forwards as much as possible. |
10.12.2014 |
EN |
Official Journal of the European Union |
C 442/301 |
REPORT
on the annual accounts of the European Union Fundamental Rights Agency for the financial year 2013, together with the Agency’s replies
(2014/C 442/35)
INTRODUCTION
1. |
The European Union Fundamental Rights Agency (hereinafter ‘the Agency’, aka ‘FRA’), which is located in Vienna, was established by Council Regulation (EC) No 168/2007 (1). The objective of the Agency is to provide the relevant authorities of the Union and its Member States with assistance and expertise when implementing Union law relating to fundamental rights (2). |
INFORMATION IN SUPPORT OF THE STATEMENT OF ASSURANCE
2. |
The audit approach taken by the Court comprises analytical audit procedures, direct testing of transactions and an assessment of key controls of the Agency’s supervisory and control systems. This is supplemented by evidence provided by the work of other auditors (where relevant) and an analysis of management representations. |
STATEMENT OF ASSURANCE
The management’s responsibility
The auditor’s responsibility
Opinion on the reliability of the accounts
Opinion on the legality and regularity of the transactions underlying the accounts
|
10. |
The comments which follow do not call the Court’s opinions into question. |
COMMENTS ON BUDGETARY MANAGEMENT
11. |
In 2013, the overall level of committed appropriations was 100 %, indicating that commitments were made in a timely manner. However the level of committed appropriations carried over to 2014 was high at 5 79 429 euro (27 %) for title II (administrative expenditure) and 5 6 25 444 euro (69 %) for title III (operating expenditure). |
12. |
The amounts carried over under title II mainly relate to the planned purchase of IT goods and services. The carry-overs under title III mainly reflect the multi-annual nature of the Agency’s operational projects, where payments are made according to planned schedules. |
FOLLOW-UP OF PREVIOUS YEAR’S COMMENTS
13. |
An overview of the corrective actions taken in response to the Court's comments from the previous year is provided in Annex I. |
This Report was adopted by Chamber IV, headed by Mr Pietro RUSSO, Member of the Court of Auditors, in Luxembourg at its meeting of 16 September 2014.
For the Court of Auditors
Vítor Manuel da SILVA CALDEIRA
President
(2) Annex II summarises the Agency’s competences and activities. It is presented for information purposes.
(3) These include the balance sheet and the economic outturn account, the cash flow table, the statement of changes in net assets and a summary of the significant accounting policies and other explanatory notes.
(4) These comprise the budgetary outturn account and the annex to the budgetary outturn account.
(5) Article 39 and 50 of Commission Delegated Regulation (EU) No 1271/2013 (OJ L 328, 7.12.2013, p. 42).
(6) The accounting rules adopted by the Commission’s accounting officer are derived from the International Public Sector Accounting Standards (IPSAS) issued by the International Federation of Accountants or, where relevant, the International Accounting Standards (IAS)/International Financial Reporting Standards (IFRS) issued by the International Accounting Standards Board.
(7) Article 107 of Regulation (EU) No 1271/2013.
ANNEX I
Follow-up of previous year’s comments
Year |
Court's comment |
Status of corrective action (Completed/Ongoing/Outstanding/N/A) |
2012 |
In 2012, the Agency procured cleaning services via cascading framework contracts to two suppliers. Due to a clerical error during the evaluation of offers, the ranking of the contractors was incorrect. One specific contract for 56 784 euro awarded in 2012 and the related payments are irregular. Following the Court’s audit, the Agency has amended the ranking of the contractors accordingly. |
Completed |
2012 |
The Agency did not have a formal ex post verification procedure in place during 2012. A formal procedure was however implemented at the beginning of 2013, following a comprehensive risk analysis conducted by the Agency. |
Completed |
2012 |
While budget implementation for title III (operational expenditure) was low at 49 % of committed appropriations, this did not arise from delays in the implementation of the Agency’s Annual Work Programme and reflects the multi-annual nature of activities. The Agency has adopted a budgetary planning module that is linked directly to its Annual Work Programme and payments were planned and executed according to operational needs. |
N/A |
ANNEX II
European Union Agency for Fundamental Rights (Vienna)
Competences and activities
Areas of Union competence deriving from the Treaty |
Collection of information
|
||||||||||||||||||
Competences of the Agency (Council Regulation (EC) No 168/2007) |
Objectives
Tasks
|
||||||||||||||||||
Governance |
Management Board Composition One independent person appointed by each Member State, one independent person appointed by the Council of Europe and two representatives of the Commission. Duties To adopt the budget, work programme and annual reports. To adopt the final budget and the establishment plan. To give an opinion on the final accounts. Executive Board Composition
Scientific Committee Composition
Director Appointed by the Management Board on a proposal from the Commission and after opinions of the European Parliament and the Council of the European Union (who will state their preference). External audit European Court of Auditors. Internal audit European Commission's Internal Audit Service (IAS). Discharge authority European Parliament on a recommendation from the Council. |
||||||||||||||||||
Resources made available to the Agency in 2013 (2012) |
Final Budget 21,620(20,376) million euro of which the Union subsidy is 99 % (99 %) Staff as at 31 December 2013 78 (72) posts in the establishment plan, of which occupied: 75 (70) + 38 (22) other staff (contract staff, seconded national experts) Total staff: 116 (94), undertaking the following tasks:
|
||||||||||||||||||
Products and services 2013 (2012) |
FRANET Number of contributions by the 28 contractors (national lots): 403 (185) Number of contributions by the partner in charge of the EU International Analysis: 1 (1) Number of contributions by the partner in charge of the Comparative Analysis: 2 (1) Number of meetings: 3 (3) (one with 4 participants, one with 10 participants and one with 2 participants) Research Reports Number of reports: 19 (13) plus 12 (23) language versions Number of meetings: 1 (2) Annual reports: 2 (2) plus 2 (3) language versions Annual Report Summary: 1 (1) plus 2 (2) language versions FRA opinions: 2 (3) E-book FRA Annual Report 2012: 1 (0) plus 1 (0) language versions Factsheets: 4 (11) plus 71 (118) language versions Non-Research Materials Various FRA publications: 20 (5) plus various (31) language versions Posters: 15 (20) Key Conferences and Events Fundamental Rights Conference: 1 (1) Diversity Day Event: 0 (1) FRA Symposium: 1 (1) Meeting of Fundamental Rights Platform: 1 (1) Joint Seminar with (Irish) EU Presidency 1 (1) Cooperation with institutions and bodies at EU and Member State level Member States: 29 (7) Council of the EU: 19 (9) European Commission: 22 (12) European Parliament: 15 (20) EU external action service: 4 (-) EU Agencies and other bodies: 23 (-) European Court of Justice: 2 (1) Committee of the Regions: 1 (1) European Economic and Social Committee: 0 (1) European Ombudsman: 2 (1) Fundamental Rights Platform: 3 (3) Council of Europe: 25 (24) OSCE: 4 (2) United Nations: 9 (2) Specialised Bodies (NHRIs and Equality Bodies): 8 (3) Other Meetings and Round Tables: 7 (12) |
||||||||||||||||||
Source: Annex supplied by the Agency. |
THE AGENCY’S REPLIES
11 and 12. |
At the beginning of year, the Agency plans the carry overs for the following year and closely monitors their evolution. The level of cancellations (less than 2 %) is an indicator of the precise planning and management of the carry overs. The Agency’s consumption of its EU subsidy over the past two budget years has been in excess of 99 % demonstrating an excellent budgetary management. |
10.12.2014 |
EN |
Official Journal of the European Union |
C 442/308 |
REPORT
on the annual accounts of the European Agency for the Management of Operational Cooperation at the External Borders of the Member States for the financial year 2013, together with the Agency’s replies
(2014/C 442/36)
INTRODUCTION
1. |
The European Agency for the Management of Operational Cooperation at the External Borders of the Member States (hereinafter ‘the Agency’, aka ‘Frontex’), which is located in Warsaw, was created by Council Regulation (EC) No 2007/2004 (1). The Agency's task is to coordinate the Member States’ activities in the field of the management of external borders (support for operational cooperation, technical and operational assistance, and risk analysis) (2). |
INFORMATION IN SUPPORT OF THE STATEMENT OF ASSURANCE
2. |
The audit approach taken by the Court comprises analytical audit procedures, direct testing of transactions and an assessment of key controls of the Agency’s supervisory and control systems. This is supplemented by evidence provided by the work of other auditors (where relevant) and an analysis of management representations. |
STATEMENT OF ASSURANCE
The management’s responsibility
The auditor’s responsibility
Opinion on the reliability of the accounts
Basis for a qualified opinion on the legality and regularity of the transactions underlying the accounts
Qualified opinion on the legality and the regularity of the transactions underlying the accounts
|
14. |
The comments which follow do not call into question the Court’s opinion on the reliability of the accounts or its qualified opinion on the legality and regularity of the underlying transactions. |
COMMENTS ON THE RELIABILITY OF THE ACCOUNTS
15. |
Suppliers’ statements at year-end were reconciled with considerable difficulty. There is a need to monitor supplier balances more regularly and to analyse differences in a more timely manner. |
COMMENTS ON BUDGETARY MANAGEMENT
16. |
Some 32 million euro or 35 % of committed 2013 appropriations were carried over to 2014. Although the multiannual nature of the Agency’s operations and the heightened risk of unforeseen events represent a particular challenge in respect of annual budget planning and implementation, there is still scope for improved budget monitoring to help reduce the level of carry-overs. |
17. |
The carry-overs include global commitments of 5,2 million euro, which are the leftover balance of an 8,2 million euro additional subsidy made available by the budgetary authorities towards the end of 2013 to deal with unforeseen and urgent operational needs. Although the global commitment was made to cover the related operations in 2014, the Agency’s Financial Regulation does not provide a clear basis for such carry-overs. |
18. |
In 2013, 29 budgetary transfers amounting to 12,2 million euro were made. This is partly due to the fact that funds needed for operations had been transferred from other budget lines until the additional subsidies were made available. |
OTHER COMMENTS
19. |
Frontex became operational in 2005 and has, to date, worked on the basis of correspondence and exchanges with the host Member State. However a comprehensive headquarters agreement between the Agency and the Member State has not been signed. Such an agreement would further promote transparency in respect of the conditions under which the Agency and its staff operate. |
FOLLOW-UP OF PREVIOUS YEARS’ COMMENTS
20. |
An overview of the corrective actions taken in response to the Court's comments from previous years is provided in Annex I. |
This Report was adopted by Chamber IV, headed by Mr Milan Martin CVIKL, Member of the Court of Auditors, in Luxembourg at its meeting of 8 July 2014.
For the Court of Auditors
Vítor Manuel da SILVA CALDEIRA
President
(1) OJ L 349, 25.11.2004, p. 1.
(2) Annex II summarises the Agency's competences and activities. It is presented for information purposes.
(3) These include the balance sheet and the economic outturn account, the cash flow table, the statement of changes in net assets and a summary of the significant accounting policies and other explanatory notes.
(4) These comprise the budgetary outturn account and the annex to the budgetary outturn account.
(5) Articles 39 and 50 of Commission Delegated Regulation (EU) No 1271/2013 (OJ L 328, 7.12.2013, p. 42).
(6) The accounting rules adopted by the Commission’s accounting officer are derived from the International Public Sector Accounting Standards (IPSAS) issued by the International Federation of Accountants or, where relevant, the International Accounting Standards (IAS)/International Financial Reporting Standards (IFRS) issued by the International Accounting Standards Board.
(7) Article 107 of Regulation (EU) No 1271/2013.
ANNEX I
Follow-up of previous years’ comments
Year |
Court’s comment |
Status of corrective action (Completed/Ongoing/Outstanding/N/A) |
2011 |
As in the previous year, the level of carry-overs is excessive and at odds with the budgetary principle of annuality. |
Ongoing |
2011 |
Within the total amount carried over, the Agency carried over global commitments of 5,1 million euro. The Agency’s Financial Regulation however does not provide a clear basis for such a carry-over (1). |
Ongoing |
2011 |
In 2011, the Agency financed grants for joint operations amounting to 74 million euro. In order to verify the expenditure claimed by the beneficiaries (Member States and Schengen Associated Countries), the Agency, although it performs reasonableness checks, does not usually request supporting documentation that would address the risk of ineligible expenditure. |
Ongoing |
2011 |
Internal control weaknesses were identified as regards the management of fixed assets. There is no procedure related to the disposal of fixed assets and the physical inventory is incomplete. |
Completed |
2012 |
The physical inventory was incomplete and did not cover all assets owned by the Agency. Assets under construction and assets purchased near year-end were not taken into account. |
Completed |
2012 |
There is no procedure for the disposal of fixed assets. Fixed assets no longer in use are written off from the fixed assets register without being physically disposed of. No register of these assets is kept. |
Completed |
2012 |
Weaknesses were still noted in the system for reconciling suppliers’ statements with the corresponding records at the Agency. |
Ongoing |
2012 |
The Agency’s 2012 budget amounted to 89,6 million euro of which 21,8 million euro (25 % of committed appropriations) were carried over to 2013. Carry-overs related to Title III (operational expenditure) amounted to 19,6 million euro. Such a high level of carry-overs is excessive and at odds with the budgetary principle of annuality, although it is partly related to the operational, multiannual nature of the Agency’s activities. By the end of February 2013, 1,1 million euro of these carry-overs had been cancelled. |
Ongoing |
2012 |
The Agency made 39 budgetary transfers amounting to 11,5 million euro in 2012, affecting 70 of the 79 budget lines. This is partly due to the fact that the second budgetary amendment for 2012 was only approved in October 2012 and the funds needed for operations had meanwhile been transferred from other budget lines. |
Completed |
2012 |
The recruitment procedures examined showed significant shortcomings affecting transparency and the equal treatment of candidates: questions for written tests and interviews were set after the applications had been examined by the selection board; no threshold scores were set for admission to written tests and interviews and for being included in the list of suitable candidates; the Selection Board did not document all its meetings and decisions. |
Ongoing |
(1) The Agency Financial Regulation states in its Article 62(2) that ‘Global budget commitments shall cover the total cost of the corresponding individual legal commitments concluded up to 31 December of year N+1’. Both the EU Financial Regulation and the Agency Financial Regulation are however unclear concerning the use of global commitments for non differentiated appropriations. The Agency used global commitments to justify an automatic carry-over of non-differentiated appropriations.
ANNEX II
European Agency for the Management of Operational Cooperation at the External Borders (Warsaw)
Competences and activities
Areas of Union competence deriving from the Treaty Articles 74 and 77(2)(b) and (d) of the Treaty on the Functioning of the European Union |
Article 74: ‘The Council shall adopt measures to ensure administrative cooperation between the relevant departments of the Member States in the areas covered by this title, as well as between those departments and the Commission. (...)’ Article 77(2): ‘(…) the European Parliament and the Council, acting in accordance with the ordinary legislative procedure, shall adopt measures concerning:
|
||||||||||||||||||
Competences of the Agency Council Regulation (EC) No 2007/2004, amended by Regulation (EC) No 863/2007 and Regulation (EU) No 1168/2011 of the European Parliament and of the Council The last amendment entered into force on 12 December 2011; the content of the table reflects the situation after this last amendment. |
Objectives Frontex was established with a view to improving the integrated management of the external borders of the Member States of the EU. Main Tasks
|
||||||||||||||||||
Governance |
Management Board Composition One representative of each Member State (MS) + two representatives of the Commission + one representative per Schengen Associated Country (SAC). Tasks
Executive Director Appointed by the Management Board on a proposal from the Commission. External audit European Court of Auditors. Discharge authority European Parliament acting on a recommendation of the Council. |
||||||||||||||||||
Resources made available to the Agency in 2013 (2012) |
Final Budget 93,95(89,6) million euro Union subsidy 87,7(84) million euro Staff as at 31 December 2013 Establishment plan Temporary staff planned: 153 (143) — Temporary staff posts occupied: 142 (137) Other posts Contract staff planned: 87 (87) — Contract staff posts occupied: 82 (84) Seconded National Experts planned: 78 (83) — Seconded National Experts posts occupied: 76 (82) Total staff posts: 318 (313) — of which occupied: 300 (303) Assigned to the following tasks: operational 227 (216) — administrative 91 (87) |
||||||||||||||||||
Products and services in 2013 (2012) |
The Risk Analysis Unit (RAU) produced 79 (80) strategic reports including 6 regular annual reports, 1 annual report of new type, 3 tailored reports, 12 quarterly reports with situational updates and analyses for EU MSs and selected neighbouring regions, 57 strategic monitoring reports; 510 (482) analytical products supporting the planning, implementation and evaluation of Joint Operations; 81 (54) reports/contributions of other types, including briefings for the Agency’s Management, the EU Commission and others; published 7 (7) strategic reports for the general public via the Agency website. The updated Common Integrated Risk Analysis Model (CIRAM v 2.0) was made available to MSs in selected EU languages. 4 (4) regular Frontex Risk Analysis Network meetings, 5 (5) meetings of the specialist network with MSs on EU Document Fraud, 4 (2) Tactical Risk Analysis meetings, 10 (6) regional expert meetings/conferences, and 1 (3) regional technical workshop were organised. In line with the tasks of the Risk Analysis Unit within Eurosur, in 2013 the following were undertaken (and MSs informed/consulted as appropriate within the framework of the Analysis Layer User Group, which met five times in 2013): within the CPIP/ESP analysis layer — delivery of content (317 (281) products) and basic services, completion of design for the analysis tools, development of the initial impact levels methodology and long term planning for its implementation. The Joint Operations Unit (JOU) organised 19 (17) joint operations, 10 (12) pilot projects and projects, 8 (10) conferences and 64 (25) meetings with external stakeholders including preparatory/planning/evaluation meetings and workshops. Furthermore, during 39 (39) Frontex coordinated joint return operations 2 152(2 110) third country nationals were returned. The total number of operational days accumulated in all joint operations amounted to 2 832(3 503); the number of operational man-days accumulated came to 89 548(1 17 114). The Frontex Situation Centre (FSC) provided 2 226(2 169) situational reports, 43 (31) serious incident reports, 44 (27) flash news reports and 10 (13) mission awareness reports, while uploading 20 084(2 130) artefacts to Eurosur and 107 (145) document alerts in the FOSS portal. 237 Daily Newsletters were delivered to approx. 500 (241) subscribers; 795 (308) media contributions were made to daily situational reports and operational briefings. The FSC, as a single point of contact, managed over 25 000(24 000) correspondence items; it consolidated the Frontex One-Stop-Shop (FOSS) as the main information exchange platform between Frontex and external partners, with 6 238 (6 000) documents uploaded and almost 4 500 users at the end of 2013. FSC received around 29 000 (30 000) incidents through the Joint Operations Reporting Application (JORA) and provided JORA training to 200 (500) officers from Frontex and MSs/SACs. The Pooled Resources Unit (PRU) organised 9 (11) events with the participation of 252 (295) attendees from the MSs. Over 1 250 man-days (551) were invested by stakeholders in the unit’s activities. The focus of attention for PRU in 2013 was the development of the European Border Guards Teams (EBGT) and Technical Equipment (TE) pools, creating a suitable software application to manage them and, in addition, developing the Seconded Guest Officers mechanism. Attention was also given to the acquisition of aerial means for border surveillance. In particular, PRU organised and managed the Annual Bilateral Talks between Frontex and the MSs, as well as talks with 3rd countries, in order to agree the national contributions to the pools. To this end, PRU implemented 7 (7) projects designed to improve the overall effectiveness of Frontex operations. In the framework of 3 (3) programmes comprising 17 (19) projects, the Training Unit (TRU) organised 205 (207) activities with the participation of 3 253(2 980) attendees (training experts, trainees, etc.). In total, 12 460 (13 300) man-days were invested by the stakeholders in training activities. Under the first programme, the Sectoral Qualifications Framework for Border Guarding (SQF) was launched and work on the implementation of the Common Core Curricula (CCC) and the development of the Joint Master Study Programme continued. For the further training and specialisation of Border Guards, to which the second programme is dedicated, TRU finalised the development of the Fundamental Rights Trainers’ Manual for border guards and continued the development and implementation of specialised training courses for border guards. Induction training courses were organised for members of the EBGT and a new pre-deployment briefing concept was developed in order to ensure that all guest officers participating in Frontex coordinated joint operations receive adequate training prior to their deployment. Thirdly, for networking and IT-related issues, TRU implemented new administrative tools for online registration for events, sharing documents and planning activities. New e-learning components are under development ensuring the delivery of parts of Frontex training in a modern, cost-effective way. The Research and Development Unit (RDU) organised 8 projects (including Eurosur) covering 40 activities with the participation of above 950 (1 020) attendees (participants from MSs, SACs, EU institutions, intergovernmental and international organisations, academies, research institutes and industry representatives). In total, 2 000 man-days were invested by the stakeholders in these activities. RDU continued its efforts to identify and develop best practice guidelines in the area of Automated Border Control, Border Checks at land border crossing points, the roll-out and implementation of the Visa Information System (VIS) by MSs and land border surveillance. In order to improve the capabilities to detect document fraud in the first line, several events were organised aiming at assessing performance of both machines and human experts. In 2013, RDU undertook activities to boost the MSs’ awareness concerning new developments in the field of sensors, platforms and advanced system solutions while also facilitating the deployment (try-out) of new technologies for border surveillance in MSs and in the context of Joint Operations coordinated by Frontex. Also, an end-user informal Advisory Group on Border Security Research consisting of representatives of 22 EU MSs and SACs was set-up. This Group prepared a first draft of a report on Border Security Challenges and Research Topics for the mid- and long-term perspective with the goal of providing input to the European Commission for the research activities to be organised and financed under the new EU research funding framework Horizon 2020. Partnership and cooperation with third countries: During 2013, 1 Working Arrangement (WA) was concluded with the competent authorities of Azerbaijan, increasing the overall number of WAs to 19 (18). Within the framework of the respective WAs, operational cooperation on border security/management related matters between the Agency and the third country authorities was further enhanced, with a view to progressively developing mutually beneficial and sustainable partnerships. Tangible results have been achieved particularly in the field of information sharing, training and joint operational activities. Cooperation with EU bodies and international organisations: During 2013 within the framework of the respective Agreements already concluded (11 WA, 2 Cooperation Arrangements, 2 Memoranda of Understanding (MoU), 1 Administrative Agreement and 1 Service Level Agreement) cooperation with EU bodies and international organisations was further enhanced. 1 MoU was signed with Eurojust. Within the area of ‘Trafficking in Human Beings’, Frontex continued the ‘train the trainers’ programme and organised 3 sessions to tutor MS trainers. The conference on the European System of Border Guards was organised, involving numerous stakeholders of the JHA area. Preparatory work has been done in order to facilitate the implementation of the first technical assistance project led by Frontex within the framework of the Eastern Partnership, involving extensive cooperation with IOM, UNHCR and ICMPD and WCO. Contacts were established with the Joint European Research Centre to find synergies in projects in the field of security. |
||||||||||||||||||
Source: Annex supplied by the Agency. |
THE AGENCY’S REPLIES
9-13. |
The Agency takes note of the qualified opinion of the Court on the legality and regularity of the underlying transactions. Frontex acknowledges the view of the Court with regard to the reasonableness checks prior to payments and the introduction of reinforced ex ante controls as of June 2013. The statistical sample of the Court for the audit 2013 did unfortunately not include transactions falling under the reinforced ex ante control system. Thus the functioning of the reinforced ex ante control system was not audited, although in place for seven months in 2013. |
15. |
The reconciliation process is a lengthy and time-consuming exercise, requiring cooperation and accounting information systems on both sides. Most of the public entities have neither centralised accounting systems nor do they implement accrual-based accounting. In order to improve the quality of the reconciliation, the Agency will launch an additional reconciliation exercise in summer 2014. |
16. |
Continuous efforts are made to reduce the rate of carry-overs in Title III; late amending budgets remain beyond the control of the Agency; an improved control over the financing of operational activities which are of a multiannual nature, linked to a timely consumption of C1 funds is targeted. |
17. |
With regard to the carry-forward rules of global commitments, the Agency would like to point out that the Frontex Financial Regulation, which follows the revised Framework Financial Regulation, remains also after its revision from 2013 vague. |
18. |
The Agency managed to reduce the number of transfer compared to 2012 by 30 % and will continue its efforts; however the operational needs will continue to steer the allocation of appropriations to the budget lines most in need. |
19. |
Since its inception, Frontex has requested repeatedly the Polish authorities to conclude a Headquarters Agreement, with no success; the entry into force of the amended Frontex Regulation in December 2011 did not change the situation. Recently, Polish authorities have expressed willingness to start negotiations and exchanges are under way. The follow-up and corrective action of this finding is therefore only to a limited extent in the hands of the Agency. |
10.12.2014 |
EN |
Official Journal of the European Union |
C 442/318 |
REPORT
on the annual accounts of the European GNSS Agency for the financial year 2013, together with the Agency’s replies
(2014/C 442/37)
INTRODUCTION
1. |
The European GNSS (Global Navigation Satellite System) Agency (hereinafter ‘the Agency’, aka ‘GSA’), which is located in Prague (1), was set up by Regulation (EU) No 912/2010 of the European Parliament and the Council (2), repealing Council Regulation (EC) No 1321/2004 (3) and amending Regulation (EC) No 683/2008 (4). The Agency’s main tasks are the operation of the Galileo Security Monitoring Centre, the security accreditation of Galileo and EGNOS satellite navigation systems, the preparation of their commercialisation and the performance of other tasks in relation to the implementation of the two programmes (5). |
INFORMATION IN SUPPORT OF THE STATEMENT OF ASSURANCE
2. |
The audit approach taken by the Court comprises analytical audit procedures, direct testing of transactions and an assessment of key controls of the Agency’s supervisory and control systems. This is supplemented by evidence provided by the work of other auditors (where relevant) and an analysis of management representations. |
STATEMENT OF ASSURANCE
The management’s responsibility
The auditor’s responsibility
Opinion on the reliability of the accounts
Opinion on the legality and regularity of the transactions underlying the accounts
|
10. |
The comments which follow do not call the Court’s opinions into question. |
COMMENTS ON THE LEGALITY AND REGULARITY OF TRANSACTIONS
11. |
The Agency is in charge of organising and managing the exploitation of the European Geostationary Navigation Overlay Service (EGNOS) which is the first pan-European satellite navigation system. On the basis of a delegation agreement with the Commission, the Agency signed a contract for the exploitation of EGNOS for the 2014 to 2021 period for an amount of some 588 million euro. Although the competiveness of the procedure is not called into question, an eligibility criterion applied in the first phase of the procurement procedure excluding applications from consortia was not in accordance with the rules on implementation of the Financial Regulation (11) (12). |
COMMENTS ON BUDGETARY MANAGEMENT
12. |
The overall level of committed appropriations was close to 100 % for all titles. However, carry-overs of committed appropriations were high for title II (administrative expenditure) at 1,8 million euro (52 %). This is mainly due to specific contracts signed at year-end (0,9 million euro), following the late approval of an amending budget in September that provided additional funds to the Agency. Another 0,4 million euro relate to services rendered by suppliers but not invoiced in 2013. |
FOLLOW-UP OF PREVIOUS YEARS’ COMMENTS
13. |
An overview of the corrective actions taken in response to the Court's comments from previous years is provided in Annex I. |
This Report was adopted by Chamber IV, headed by Mr Pietro RUSSO, Member of the Court of Auditors, in Luxembourg at its meeting of 16 September 2014.
For the Court of Auditors
Vítor Manuel da SILVA CALDEIRA
President
(1) Decision 2010/803/EU taken by common accord between the Representatives of the Governments of the Member States (OJ L 342, 28.12.2010, p. 15).
(2) OJ L 276, 20.10.2010, p. 11.
(3) OJ L 246, 20.7.2004, p. 1.
(4) OJ L 196, 24.7.2008, p. 1.
(5) Annex II summarises the Agency's competences and activities. It is presented for information purposes.
(6) These include the balance sheet and the economic outturn account, the cash flow table, the statement of changes in net assets and a summary of the significant accounting policies and other explanatory notes.
(7) These comprise the budgetary outturn account and the annex to the budgetary outturn account.
(8) Articles 39 and 50 of Commission Delegated Regulation (EU) No 1271/2013 (OJ L 328, 7.12.2013, p. 42).
(9) The accounting rules adopted by the Commission’s accounting officer are derived from the International Public Sector Accounting Standards (IPSAS) issued by the International Federation of Accountants or, where relevant, the International Accounting Standards (IAS)/International Financial Reporting Standards (IFRS) issued by the International Accounting Standards Board.
(10) Article 107 of Regulation (EU) No 1271/2013.
(11) Article 116(6) of Commission Regulation (EC, Euratom) No 2342/2002 (OJ L 357, 31.12.2002, p. 1).
(12) Article 121(5) of Commission Delegated Regulation (EU) No 1268/2012 (OJ L 362, 31.12.2012, p. 1).
ANNEX I
Follow-up of previous years’ comments
Year |
Court's comment |
Status of corrective action (Completed/Ongoing/Outstanding/N/A) |
2011 |
In 2011, the Agency made grant payments under the Seventh Framework Programme for Research and Development (FP7) amounting to 5,8 million euro. In order to verify the expenditure claimed by the beneficiaries (private and public entities performing research), the Agency, although it performs reasonableness checks, does not usually request supporting documentation that would address the risk of ineligible expenditure. |
Completed |
2012 |
The overall level of committed appropriations was close to 100 % for all titles. However, carry-overs of committed appropriations were relatively high for title II (administrative expenditure) at 1,7 million euro (38 %). This was partly due to events beyond the Agency’s control, such as the relocation of its seat to Prague in September 2012 (0,4 million euro) and the setting-up of the Galileo Security Monitoring Centre (0,4 million euro), which necessitated the provision of certain goods and services in the last quarter of the year. In addition, an amount of 0,7 million euro was transferred from title I (staff expenditure) to title II in November 2012 and several contracts relating to IT and legal services included in the 2013 work programme were signed in December 2012. |
N/A |
2012 |
The Court identified the following weaknesses in the recruitment procedures audited which affected transparency and equal treatment: no threshold scores were determined for admission to written tests and interviews or for inclusion in the list of suitable candidates; the vacancy notice made no provision for appeals by rejected candidates |
Completed |
ANNEX II
European GNSS Agency (Prague)
Competences and activities
Areas of Union competence deriving from the Treaty |
Competitiveness for growth and employment. |
||||||||||||||||||||||||||||||||||
The Agency's powers (Regulation (EU) No 912/2010 of the European Parliament and of the Council) |
Objectives: To contribute to the achievement of fully operational European satellite navigation systems established under the EGNOS and Galileo programmes. Tasks:
|
||||||||||||||||||||||||||||||||||
Governance |
Administrative Board Composition
Tasks
Executive Director Appointed by the Administrative Board. Security Accreditation Board Composition
Tasks To act as the security accreditation authority in relation to the European GNSS systems. External audit European Court of Auditors. Discharge authority European Parliament acting on a recommendation from the Council. |
||||||||||||||||||||||||||||||||||
Resources made available to the Agency in 2013 (2012) |
Final Budget 53,3(20,8) million euro consisting of the EU subsidy of 13,9(12,9) million euro, which is the operating subsidy from the Commission, and 39,4(7,9) million euro in operational funds provided by the Commission to perform delegated tasks. Staff as at 31 December 2013 Authorised posts: 77 (44) Posts occupied: 59 (39) Other posts: 35 (29) Total staff: 94 (68), assigned to the following duties:
|
||||||||||||||||||||||||||||||||||
Products and services 2013 |
Programmes Support for the European Commission in the implementation of the EGNOS and Galileo programmes. Systems Security Systems Security (Security Accreditation of the systems and sites, Galileo System-specific Security requirements, Flight Key Cell activities). Support for Public Regulated Service — PRS (Preparation of the PRS User Segment). Operation of the Galileo Security Monitoring Centres — GSMCs. EGNOS/Galileo Exploitation Preparatory activities for EGNOS and Galileo exploitation. Market development Market analysis and publication of GNSS Market Reports. Market readiness for the launch of Galileo early services. Market development actions focused on receiver manufacturers to foster Galileo penetration in consumer and professional markets. Implementation of adoption roadmaps for EGNOS in all priority markets with special focus on aviation, maritime and rail. Launch of the European GNSS Service Centre helpdesk. Information and outreach — EGNOS information portal, GSA website, events (European Space Solutions conference in Munich, 40 participations in events with stands and brochures, EP-GSA event, opening of Facebook page for GSA) Research and development Management of projects under the 7th Framework Programme for research and under Horizon 2020. Maximisation of the projects’ results and achievement of strategic objectives. Dissemination of the results of R&D. |
||||||||||||||||||||||||||||||||||
Source: Annex supplied by the Agency. |
THE AGENCY’S REPLIES
11. |
It followed from the Single European Sky legal framework that:
The express exclusion of consortia was in that sense only translating a fact for the sake of transparency. More generally the Agency appreciates the Court’s recognition that this exclusion did not affect the conduct of the procedure which de facto achieved effective competition, as demonstrated by the submission of five applications. |
12. |
A rather large volume of commitments was made at the end of the year due to the late approval of the amending budget. The amendment was initially planned in March, but not finally adopted until mid-September. While these contracts had been planned earlier in the year, the GSA was compelled to put them on hold until the approval of the amending budget and its exact amount was certain. Other title II carry-overs were largely due to services for the new Galileo Security Monitoring Centre site in France which was only functional as of September 2013 and many of these payments were made in the first quarter of 2014. The Agency is making a concerted effort in 2014 not only to align contracting with the calendar year but also to ensure earlier commitments on title II, given that it does not face the same budgetary constraints as in 2013. |
10.12.2014 |
EN |
Official Journal of the European Union |
C 442/326 |
REPORT
on the annual accounts of the European Agency for the Operational Management of Large-Scale IT Systems in the Area of Freedom, Security and Justice (eu-LISA) for the financial year 2013, together with the Agency’s replies
(2014/C 442/38)
INTRODUCTION
1. |
The European Agency for the Operational Management of Large-Scale IT Systems in the Area of Freedom, Security and Justice (eu-LISA), hereinafter ‘the Agency’, which is located in Tallinn, Strasbourg and St. Johann im Pongau (see para. 18), was established by Regulation (EC) No 1077/2011 of the European Parliament and of the Council (1). The core mission of this Agency is to fulfil the operational management tasks for the Second Generation Schengen Information System (SIS II), the Visa Information System (VIS) and Eurodac (2). |
2. |
The Commission granted financial autonomy to the Agency on 22 May 2013. Therefore the audited period for the financial year 2013 runs from 22 May 2013 to 31 December 2013. |
INFORMATION IN SUPPORT OF THE STATEMENT OF ASSURANCE
3. |
The audit approach taken by the Court comprises analytical audit procedures, direct testing of transactions and an assessment of key controls of the Agency’s supervisory and control systems. This is supplemented by evidence provided by the work of other auditors (where relevant) and an analysis of management representations. |
STATEMENT OF ASSURANCE
The management’s responsibility
The auditor’s responsibility
Opinion on the reliability of the accounts
Opinion on the legality and regularity of the transactions underlying the accounts
Emphasis of matter in relation to the reliability of the accounts
|
12. |
The comments which follow do not call the Court’s opinion on the reliability of the accounts and its opinion on the legality and regularity of the transactions underlying the accounts into question. It should be noted that 2013 was the first year of the Agency’s financial autonomy and that the establishment of its procedures is ongoing. |
COMMENTS ON INTERNAL CONTROLS
13. |
The development of the Agency’s Internal Control Standards was ongoing at the end of the year. They were approved by the Management Board in June 2014. |
14. |
There is no insurance coverage for fixed tangible assets, except for multi-risk fire for the premises in Tallinn. |
COMMENTS ON BUDGETARY MANAGEMENT
15. |
According to the Agency’s Founding Regulation (8), the Commission was responsible for the establishment and initial operation of the Agency until it was granted financial autonomy on 22 May 2013. The migration of data on commitment and payment appropriations from the Commission to the Agency was a complex process and a reconciliation of the figures between the Commission’s and the Agency’s accounting systems was finally completed in June 2014. This affected the Agency’s payment planning and the preparation of its provisional accounts. |
16. |
According to the Agency’s final accounts budget implementation rates were 96 % for commitment appropriations and 67 % for payment appropriations. Due to the fact that part of the Agency’s total annual budget was executed by the Commission and the differences between the Commission’s and the Agency’s budgetary structures, a more detailed analysis per budget title could not be carried out for 2013. |
17. |
According to the Agency’s Founding Regulation (9), countries associated with the implementation, application and development of the Schengen acquis and Eurodac-related measures must make a contribution to the Agency’s budget. Although Schengen associated countries were using the systems managed by the Agency in 2013 the Commission’s negotiations were still ongoing. |
OTHER COMMENTS
18. |
Though the seat of the Agency is in Tallinn (with 46 occupied posts), operational activities are carried out in Strasbourg (with 79 occupied posts) (10). It is likely that management effectiveness could be increased and administrative costs reduced if all staff were centralised in one location. |
19. |
A headquarters agreement that would clarify the conditions under which the Agency and its staff operate has not yet been signed with the host Member State, Estonia, and negotiations were still ongoing at the time of the audit. |
This Report was adopted by Chamber IV, headed by Mr Pietro RUSSO, Member of the Court of Auditors, in Luxembourg at its meeting of 16 September 2014.
For the Court of Auditors
Vítor Manuel da SILVA CALDEIRA
President
(1) OJ L 286, 1.11.2011, p. 1.
(2) Annex summarises the Agency’s competences and activities. It is presented for information purposes.
(3) These include the balance sheet and the economic outturn account, the cash flow table, the statement of changes in net assets and a summary of the significant accounting policies and other explanatory notes.
(4) These comprise the budgetary outturn account and the annex to the budgetary outturn account.
(5) Articles 39 and 50 of Commission Delegated Regulation (EU) No 1271/2013 (OJ L 328, 7.12.2013, p. 42)
(6) The accounting rules adopted by the Commission’s accounting officer are derived from the International Public Sector Accounting Standards (IPSAS) issued by the International Federation of Accountants or, where relevant, the International Accounting Standards (IAS)/International Financial Reporting Standards (IFRS) issued by the International Accounting Standards Board.
(7) Article 107 of Regulation (EU) No 1271/2013.
(8) Article 32 of Regulation (EU) No 1077/2011 of the European Parliament and of the Council (OJ L 286, 1.11.2011, p. 1).
(9) Article 32 of Regulation (EU) No 1077/2011.
(10) The Agency’s back-up systems are located in Sankt Johann im Pongau with no staff located there.
ANNEX
EU Agency for the operational management of large-scale IT systems in the area of freedom, security and justice (Tallinn)
Competences and activities
Areas of Union competence deriving from the Treaty (Article 74, 77(2)(a) and (b), 78(2)(e), 79(2)(c), 82(1)(d), 85(1), 87(2)(a) and Article 88(2) of the Treaty on the Functioning of the European Union) |
Contribute to the creation of an area of free circulation of people by increasing cooperation on cross-border issues, such as asylum, immigration, border control, as well as judicial and police cooperation in criminal matters. |
||||||||||||||||||
Competences of the Agency (Regulation (EC) No 1077/2011of the European Parliament and of the Council) |
With reference to its establishing Regulation (EU) No 1077/2011, and without prejudice to the respective responsibilities of the Commission and of the Member States under the legislative instruments governing large-scale IT Systems, the Agency’s objectives are the following:
|
||||||||||||||||||
Governance |
|
||||||||||||||||||
Resources made available to the Agency in 2013 |
Final Budget (1) 61,35 million euro (commitment appropriations) 34,38 million euro (payment appropriations) Staff as at 31 December 2013 Posts authorised:
Posts occupied:
|
||||||||||||||||||
Products and services in 2013 |
Products and services in 2013 included:
|
||||||||||||||||||
(1) For the period 22nd May 2013, when the Agency was granted financial autonomy, to 31 December 2013
Source: Annex supplied by the Agency.
THE AGENCY’S REPLIES
11. |
The Agency acknowledges the Court’s mention, having regard to it in the notes to the balance sheet, 6.3.1 ‘Non-current assets’, section ‘Material transfer of tangible & intangible fixed assets received from other consolidated entities’. |
13. |
The Agency acknowledges the Court’s comment and will continue to develop further its robust processes and procedures already in place in order to ensure full compliance with Internal Control Standards’ requirements. |
14. |
Technical specifications are being drafted, procurement is planned for the second half of the year, aiming at start of contractual execution in the fourth quarter 2014. |
15. |
During the handover of responsibilities on operational management of the systems from the European Commission to the Agency there was intensive exchange of information at working level. As the Commission informed the Agency:
A comprehensive set of documents relating to the technical documentation or contracts signed were transmitted to eu-LISA in electronic or paper format in support of the migration exercise; some original documents were retained by the Commission for control and audit purposes. While the Agency acknowledges the complexity and length of the reconciliation exercise, a full reconciliation of the budgetary data has been achieved, presenting a complete — i.e. combining DG HOME’s and the Agency’s implementation — overview of the 2013 budget. As the migration of appropriations following financial independence is a non-recurring exercise, future budgetary implementation reporting is expected to provide the basis for fully detailed analysis. |
17. |
The procedure for adoption by the Council will be launched as soon as the negotiations led by the Commission are over. Following the decision by the Council, the associated countries will have to ratify the agreement in line with their national legislation. It should be noted that the text of the agreements currently includes a provision which entails retroactive payment of contribution to the Agency starting from December 2012. |
18. |
The organisational set-up of the Agency is governed by its establishing Regulation. The Agency is not in a position to elaborate on this comment. |
19. |
The Agency acknowledges the observation. The only outstanding item subject of negotiations with the Estonian Government is VAT regime applicable to the Agency's staff. |
10.12.2014 |
EN |
Official Journal of the European Union |
C 442/332 |
REPORT
on the annual accounts of the Office for Harmonization in the Internal Market for the financial year 2013, together with the Office’s replies
(2014/C 442/39)
INTRODUCTION
1. |
The Office for Harmonization in the Internal Market (hereinafter ‘the Office’, aka ‘OHIM’), which is located in Alicante, was established by Council Regulation (EC) No 40/94 (1), which was repealed and replaced by Regulation (EC) No 207/2009 (2). The Office’s task is to implement the Union legislation on trade marks and designs, which gives undertakings uniform protection throughout the entire area of the European Union (3). |
INFORMATION IN SUPPORT OF THE STATEMENT OF ASSURANCE
2. |
The audit approach taken by the Court comprises analytical audit procedures, direct testing of transactions and an assessment of key controls of the Office’s supervisory and control systems. This is supplemented by evidence provided by the work of other auditors (where relevant) and an analysis of management representations. |
STATEMENT OF ASSURANCE
The management’s responsibility
The auditor’s responsibility
Opinion on the reliability of the accounts
Opinion on the legality and regularity of the transactions underlying the accounts
|
10. |
The comments which follow do not call the Court’s opinions into question. |
COMMENTS ON BUDGETARY MANAGEMENT
11. |
The amount of cancelled carry-overs from previous years increased from 4,2 million euro (13 %) in 2012 to 6,0 million (16 %) in 2013. In both years this was mainly due to lower than estimated costs to be reimbursed under cooperation agreements with Member States’ National Offices (1,9 million euro in 2012 and 3,8 million euro in 2013), which indicates the need to obtain more accurate information from National Offices at year-end on the actual cost incurred. |
12. |
The level of committed 2013 appropriations for the different titles varied between 98 % and 89 % of total appropriations, indicating that legal commitments were made in a timely manner. The level of committed appropriations carried over to 2014 was high for title II (administrative expenditure) at 23,9 million euro (28 %) and title III at 13,3 million euro (38 %). For title II this resulted from multiannual contracts mainly related to the construction of the new building and IT developments and services/supplies ordered, as planned, at the end of 2013 which were only due for payment in 2014. For title III, it was mainly related to cooperation agreements with National Offices for which cost claims were not due to be submitted by National Offices until 2014, and the usual order of translation services in the last months of 2013, which were only due for payment in 2014. |
OTHER COMMENTS
13. |
The Office has a Business Continuity and Crisis Management Plan in place which stipulates that some 25 roles have to be covered permanently by employees on stand-by duty. Although budget appropriations for stand-by duty allowances are approved annually by the Office’s Budget Committee, the amount paid in 2013 (4 02 458 euro) considerably exceeds such allowances paid by other agencies which need to ensure permanent service. |
FOLLOW-UP OF PREVIOUS YEARS’ COMMENTS
14. |
An overview of the corrective actions taken in response to the Court's comments from previous years is provided in Annex I. |
This Report was adopted by Chamber IV, headed by Mr Milan Martin CVIKL, Member of the Court of Auditors, in Luxembourg at its meeting of 8 July 2014.
For the Court of Auditors
Vítor Manuel da SILVA CALDEIRA
President
(3) Annex II summarises the Office’s competences and activities. It is presented for information purposes.
(4) These include the balance sheet and the economic outturn account, the cash flow table, the statement of changes in net assets and a summary of the significant accounting policies and other explanatory notes.
(5) These comprise the budgetary outturn account and the annex to the budgetary outturn account.
(6) Articles 38 and 43 of Regulation No CB-3-09 of the Budget Committee of the Office for the harmonisation in the internal market.
(7) The accounting rules adopted by the Commission’s accounting officer are derived from the International Public Sector Accounting Standards (IPSAS) issued by the International Federation of Accountants or, where relevant, the International Accounting Standards (IAS)/International Financial Reporting Standards (IFRS) issued by the International Accounting Standards Board.
(8) Articles 91 to 95 of Regulation No CB-3-09 of the Budget Committee of the Office for the harmonisation in the internal market.
ANNEX I
Follow-up of previous years’ comments
Year |
Court's comment |
Status of corrective action (Completed/Ongoing/Outstanding/N/A) |
2011 |
The Court identified several shortcomings as regards the 2011 service level agreement between the Office and the Translation Center for the Bodies of the EU (CDT). The agreement was signed by the Office on 20 June 2011 and according to Article 10, applied from 1 January 2011. The execution of the contract started before the contract signature. On request of CDT, the Office made a payment of 1,8 million euro in compensation (1). Furthermore, this payment was authorised without a budget commitment and without available appropriations (2). |
N/A |
2011 |
There is a need to improve the Office’s management of fixed assets. For intangible assets developed by the Office, accounting procedures and information on costs were not reliable. |
Completed |
2011 |
Cash held by the Office as at 31 December 2011 totalled 520 million euro (495 million euro in 2010). Following the treasury policy approved by the Budget committee in 2010 the cash was held in 9 banks in 5 Member States. |
Completed However the Court notes the still high level of cash. |
2012 |
Out of the 31,9 million euro of committed appropriations carried over from 2011 to 2012, 4,16 million euro (13 %) were cancelled in 2012. Of this amount, 1,93 million euro was related to cooperation agreements with Member States which did not absorb the full amounts allocated to them. |
N/A |
2012 |
In 2012 the overall level of committed appropriations was 93 %, indicating that commitments were made in a timely manner. The level of committed appropriations carried over to 2013 however was high at 36,7 million euro (19 % of total committed appropriations), out of which 21,7 million euro related to title II (administrative expenditure) and 14,1 million euro related to title III (operating expenditure). The main reason for the high level of carry-overs was the late receipt of invoices for goods and services delivered in 2012. More specifically, for title II, the high level of carry-overs also arose from a number of multiannual contracts relating to the construction of the Office’s new building (6,09 million euro) and the procurement of IT developments (7,67 million euro). For title III, carry-overs are largely related to cooperation agreements signed with Member States for which cost claims were only due to be submitted in 2013 (8,13 million euro). In addition, translation services were ordered in the last months of 2012 (5,43 million euro) which were only due for payment in 2013. |
N/A |
(1) The minimum value was set in the agreement to be 16,3 million euro. The services provided in 2011 totalled 14,5 million euro.
(2) This payment was made from the 2012 budget.
ANNEX II
Office for Harmonization in the Internal Market (Alicante)
Competences and activities
Areas of Union competence deriving from the Treaty (Articles 36 and 56 of the Treaty on the Functioning of the European Union) |
Free movement of goods [...] prohibitions or restrictions [...] justified on grounds of […] the protection of industrial and commercial property [shall not] constitute a means of arbitrary discrimination or a disguised restriction on trade between Member States. [...] restrictions on freedom to provide services within the Union shall be prohibited in respect of nationals of Member States who are established in a Member State other than that of the person for whom the services are intended. [...] |
||||||||||||||||||||||||||||||||
Competences of the Office (Council Regulation (EC) No 207/2009) (Regulation EU No 386/2012 of the European Parliament and of the Council) |
Objectives To implement the Union legislation on trade marks and designs, which gives undertakings the right to uniform protection throughout the entire area of the European Union. To promote discussion, research, training, communication, the creation of advanced IT support tools and the spread of best practice on IP matters. Tasks
|
||||||||||||||||||||||||||||||||
Governance |
Administrative Board Composition
Task
President of the Office
Budget Committee Composition
Task
Decisions related to the applications Decisions are taken by:
External audit European Court of Auditors. Discharge authority The Office's Budget Committee. |
||||||||||||||||||||||||||||||||
Resources made available to the Office in 2013 (2012) |
Budget 418 (429) million euro. Staff at 31 December 2013 861 (775) posts in the establishment plan; posts occupied: 731 (680) + 171 (138) other staff (auxiliary contracts, seconded national experts, local and employment agency staff, special advisers) Total staff: 902 (818) |
||||||||||||||||||||||||||||||||
Products and services supplied 2013 (2012) |
Trade marks Number of applications: 1 14 421(1 07 924) Number of registrations: 98 092(95 645) Cases of opposition: 17 006(16 634) Appeals to the Boards of Appeal: 2 602(2 339) Appeals pending: 2 361(2 352) Designs Designs received: 95 429(92 175) Designs registered: 84 056(78 658) |
||||||||||||||||||||||||||||||||
Source: Annex supplied by the Office. |
THE OFFICE’S REPLIES
11. |
The Office is currently putting in place measures, together with the National Offices, to reduce the high cancellation rate of carryovers. A pilot of interim execution report every 6 months has been put in place. The idea is to extend these pilots to the important projects that the Office has with the National Offices, once the participation in this pilot has broadened. Finally, the Office will also analyse possible adjustments of the contracts (for 2015) with the National Offices in order to minimize unnecessary carryovers. |
12. |
Apart from the measures referred to above, that would reduce the high level of carryovers mainly in title III, but also in title II, the Office is currently setting up a system with the CDT to reduce the volume of carryovers at year end. Furthermore, as mentioned by the Court, the extension of the Office's headquarters and IT developments justifies the high level of carryovers in title II. The Office is putting in place measures in order to better control the amounts carried over every year. |
13. |
In line with requirements of international quality standards (ISO 27001) and the internal control standards (ICS 10) adopted by the Office's Budget Committee, the Office put in place a Business Continuity Plan (BCP). This is now also foreseen in the 2013 Framework Financial Regulation. In November 2006, the governing boards of the Office — Administrative Board and Budget Committee — were informed of and supported the OHIM strategy based on a three-level scenario (Level 0: Crisis management team; Level 1: IT & logistics teams, recovery coordination team, and global communication team; Level 2: teams that will work on the recovery). A payment to the staff involved in stand-by duties is prescribed by the Staff Regulation. The budgetary impact of this payment is included in a specific budget line, updated (in line with the needs of the organisation) and adopted in the budget every year. The BCP was established after an exhaustive impact analysis made, with the help of external consultants and covers ALL activities of the Office. The Office has 25 roles permanently on stand-by duty and the payments in 2013 amounted to € 4 02 458. The reasons for which the BCP implemented such a robust structure are the following: The Office has a strong exposure and visibility towards its stakeholders and need to ensure a 24/7 operational e-business service and an immediate response to its users. Lack of availability of the IT system would have a serious impact on the continuity of business. Throughout the Office, business continuity is therefore essential and all departments are involved (visibility of activities such as cooperation activities with the Member States and in the remit of the Observatory, interaction with the Brussels office, support of teleworking staff, ensuring good functioning of fee collection (automated IT system used by the whole Office) and finally involvement of Procurement staff since it has a defined centralizing role of intervention (managing of all economic files) in case of a disaster. Due to the size and the international background of our suppliers, the quantity of formal documentation is very high and extremely dependent on IT. These reasons justify, in our view, the differences with other agencies. The Office has already made use of the stand-by shifts twice since its establishment, the last time in relation to the introduction of its new website. The level of stand-by duty paid in 2013 represents less than 0,5 % of the total expenditure of title I. These costs also represent less than a business day of income through the Office's online services. The Office will consider the observation made by the Court of Auditors in its yearly revision of processes, procedures and schemes with a view to continual improvement. |
14. |
The Office takes note that the Court of Auditors has considered all previous year findings as completed or not applicable. |
10.12.2014 |
EN |
Official Journal of the European Union |
C 442/340 |
REPORT
on the annual accounts of the European Agency for Safety and Health at Work for the financial year 2013, together with the Agency’s reply
(2014/C 442/40)
INTRODUCTION
1. |
The European Agency for Safety and Health at Work (hereinafter ‘the Agency’, aka ‘EU-OSHA’), which is located in Bilbao, was created by Council Regulation (EC) No 2062/94 (1). The Agency's task is to collect and disseminate information on national and Union priorities in the field of health and safety at work, to support national and Union organisations involved in policymaking and implementation and provide information on preventive measures (2). |
INFORMATION IN SUPPORT OF THE STATEMENT OF ASSURANCE
2. |
The audit approach taken by the Court comprises analytical audit procedures, direct testing of transactions and an assessment of key controls of the Agency’s supervisory and control systems. This is supplemented by evidence provided by the work of other auditors (where relevant) and an analysis of management representations. |
STATEMENT OF ASSURANCE
The management’s responsibility
The auditor’s responsibility
Opinion on the reliability of the accounts
Opinion on the legality and regularity of the transactions underlying the accounts
|
10. |
The comments which follow do not call the Court’s opinions into question. |
COMMENTS ON BUDGETARY MANAGEMENT
11. |
The overall level of committed appropriations was 99 % as compared to 95 % in 2012. However, the level of committed appropriations carried over to 2014 was high at 6 01 426 euro (30 %) for Title II (administrative expenditure) and 3 6 93 549 euro (46 %) for Title III (operational expenditure). |
12. |
For Title II, this was caused by the purchase of goods and services, as planned, at the end of the year in connection with the Agency’s move to its new premises and with the renewal of annual IT contracts. For Title III, the high level of planned carry-overs mainly resulted from the multiannual nature of major projects launched in 2013, such as the European Survey of Enterprises on New and Emerging Risks (ESENER II). |
FOLLOW-UP OF PREVIOUS YEARS’ COMMENTS
13. |
An overview of the corrective actions taken in response to the Court's comments from previous years is provided in Annex I. |
This Report was adopted by Chamber IV, headed by Mr Milan Martin CVIKL, Member of the Court of Auditors, in Luxembourg at its meeting of 1 July 2014.
For the Court of Auditors
Vítor Manuel da SILVA CALDEIRA
President
(1) OJ L 216, 20.8.1994, p. 1. The Regulation was last amended by Regulation (EC) No 1112/2005 (OJ L 184, 15.7.2005, p. 5).
(2) Annex II summarises the Agency's competences and activities. It is presented for information purposes.
(3) These include the balance sheet and the economic outturn account, the cash flow table, the statement of changes in net assets and a summary of the significant accounting policies and other explanatory notes.
(4) These comprise the budgetary outturn account and the annex to the budgetary outturn account.
(5) Articles 39 and 50 of Commission Delegated Regulation (EU) No 1271/2013 (OJ L 328, 7.12.2013, p. 42).
(6) The accounting rules adopted by the Commission’s accounting officer are derived from the International Public Sector Accounting Standards (IPSAS) issued by the International Federation of Accountants or, where relevant, the International Accounting Standards (IAS)/International Financial Reporting Standards (IFRS) issued by the International Accounting Standards Board.
(7) Article 107 of Regulation (EU) No 1271/2013.
ANNEX I
Follow-up of previous years’ comments
Year |
Court's comment |
Status of corrective action (Completed/Ongoing/Outstanding/N/A) |
2011 |
The high cancellation rate for appropriations indicates difficulties in the implementation of the actions foreseen in the annual work programme and in complying with the budgetary principle of annuality. |
Completed |
2011 |
In contrast to the other two European Agencies based in Spain (OHIM in Alicante and CFCA in Vigo), a seat agreement had not been concluded. |
Completed |
2012 |
The Agency’s 2012 budget amounted to 15,3 million euro, out of which 3,2 million euro (22 %) was carried over to 2013. The level of committed appropriations carried over is high for Title II (infrastructure) at 36 % and for Title III (operational expenditure) at 33 %. For Title II, this was mainly caused by the renewal of annual IT contracts concluded as planned in the fourth quarter of 2012. For Title III, the high level resulted from both the multiannual nature of major projects and from delays in the award of specific contracts. The delays mainly result from a decentralised organisation of procurement procedures which prevents effective monitoring of the implementation of the procurement plan. |
Ongoing |
2012 |
The cancellation rate for Title I appropriations for the year 2012 was high at 9,5 % (0,5 million euro) which mainly resulted from frozen recruitment procedures and an anticipated salary increase which had not yet been paid out. |
Completed |
ANNEX II
European Agency for Safety and Health at Work (Bilbao)
Competences and activities
Areas of Union competence deriving from the Treaty (Articles 151 and 153 of the Treaty on the Functioning of the European Union) |
Article 151 The Union and the Member States [...], shall have as their objectives the promotion of employment, improved living and working conditions, so as to make possible their harmonisation while the improvement is being maintained, proper social protection, dialogue between management and labour, the development of human resources with a view to lasting high employment and the combating of exclusion. Article 153 With a view to achieving the objectives of Article 151, the Union shall support and complement the activities of the Member States in the following fields:
|
||||||||||||||||||||
Competences of the Agency (Council Regulation (EC) No 2062/94) |
Objectives In order to improve the working environment, as regards the protection of the safety and health of workers as provided for in the Treaty and successive strategies and action programmes concerning health and safety at the workplace, the aim of the Agency shall be to provide the Union and the Member States, the social partners and those involved in the field with technical, scientific and economic information of use in the field of safety and health at work (Article 2). Tasks
|
||||||||||||||||||||
Governance |
Governing Board (GB)
Bureau of the GB
Director is appointed by the Governing Board on the basis of a short-list from the Commission. Committees Obligatory consultation of the European Commission and the Advisory Committee on Safety and Health at Work in respect of the work programme and budget. External audit European Court of Auditors. Discharge authority European Parliament, acting on a recommendation from the Council. |
||||||||||||||||||||
Resources available to the Agency in 2013 (2012) |
Budget 17,5(16,9) million euro of which:
Staff at 31 December 2013 44 (44) posts in the establishment plan, of which, 42 (42) posts were occupied. Other staff:
Total staff employed: 67(67) Allocated to:
|
||||||||||||||||||||
Products and services in 2013 (Collecting and analysing information) |
PREVENTION AND RESEARCH Specific objective 1: To provide a basis for priority setting for OSH research and actions via identifying and monitoring trends and anticipating new and emerging risks related to OSH by carrying out a large-scale foresight study Two e-facts and two accompanying hazard identification checklists on OSH in green building construction and on OSH and small-scale applications of solar energy were published and promoted on 3 June through a web teaser on the occasion of the EU Green Week and are available from the single entry point (SEP) on OSH in green jobs created earlier in the year. The German, Spanish, Italian and Polish versions of the summary report ‘Foresight on new and emerging OSH risks associated with new technologies in green jobs’ were published beginning of June. The French version of the summary report was published early October. A foresight workshop with the Focal Points was held on 12-13 November in order to disseminate the scenarios and foresight findings, to demonstrate and encourage the application of scenarios to decision-making and to promote the policy relevance of the foresight on green jobs. A draft report on the state of the art review on ‘current and emerging issues in the health care sector including community and home care’ was received. Specific objective 2: To provide input for more focused research and prevention efforts via the review and analysis of research on risk factors and health outcomes A draft was received of a report on work-related cancer and cancer risk factors from the Topic Centre following the 2012 workshop on the topic. Three e-facts on OSH and nanomaterials (Tools for the management of nanomaterials in the workplace and prevention; Nanomaterials in the health care sector, OSH risks and prevention; Nanomaterials and maintenance: OSH risks and prevention) were published and promoted on 24 June, together with a new single entry point (SEP) on Managing nanomaterials in the workplace, from which all EU-OSHA’s information material on OSH and nanomaterials is available. The ‘Women at work’ report was published. It covers employment trends and their impact on the OSH of women (incl. recent trends), OSH statistics, work-related cancer (incl. the links between shift work and breast cancer), MSDs and stress, violence and harassment in service professions, and explores existing research on the OSH of women in informal work, as well as disability and rehabilitation of women at work. It includes selected examples of gender mainstreaming into OSH from three Member States and is intended to be complementary to an EU-OSHA case study report on recent policy initiatives that will be published in 2014. Specific objective 3: To support priority setting for OSH research and actions via the provision of an overview of safety and health at work in Europe based on historical and current data The final report for the project ‘Estimation of the costs of non-OSH at macro-level’ was delivered in September. The aim of the project is to assess different methodologies for estimating the cost of poor or non-OSH at macro-level in order to understand the rationale behind the different estimates and get a better knowledge of the economic impact of poor OSH; provide information to support policymakers at European and national level; establish a sound basis for debate on key issues on the subject; and contribute to the promotion and fostering of further research. Specific objective 4: To stimulate debate about, and ensure the relevance of, the observatory’s findings through discussion and consolidation with target groups and beneficiaries The Agency presented its approach to emerging risks and work-related diseases at the COST Modernet meeting on 16 October in Paris. A jointly organised workshop between the Agency and the German Road Safety Council at the A+A conference was held on 6 November in Düsseldorf. Specific objective 5: To help policymakers and providers of OSH information in giving better support to enterprises through the implementation of surveys to collect real-time information on OSH management and key emerging OSH risks All draft reports (summary overview report, national overview report and substantive findings report) of the qualitative post-test on ESENER were finalised for publication. The report ‘Analysis of the determinants of workplace occupational safety and health practice in a selection of EU Member States (Report and summary in several languages)’ was published in September. Preparations for ESENER-2 proceeded according to plan, including cognitive pre-tests. Fieldwork is planned for 2014 and first results will be received at the end of 2014, with first publications planned for early 2015. Specific objective 6: To seek a current consensus on research priorities in OSH, and to encourage national OSH research institutes to set joint priorities, exchange results as well as encourage the inclusion of OSH requirements in research programmes The report on OSH research priorities in the EU for the years 2013-20, including feedback from Focal Points and seminar participants, was published online and promoted in June. As a follow-up to the report, a high-level seminar was organised on 9-10 October to discuss and validate the priorities identified in the report and the ways in which to foster research coordination in the field of OSH. The seminar brought together representatives of research funding bodies, research institutes and policymakers at European and national level. WORKING ENVIRONMENT INFORMATION: SHARING KNOWLEDGE ON GOOD PRACTICE AT WORKPLACE LEVEL Specific objective 1: To develop useful, practical and high-quality information products to support the Healthy Workplaces Campaigns HWC 2012-13: ‘Working together for risk prevention’ The closing event of the campaign took place on 11-12 November together with the Healthy Workplaces summit on ‘Working together for risk prevention’. Three parallel workshops were held as part of the Closing Event that reflected the Good Practice Awards, the Campaign Partner Benchmarking scheme and the Campaigning aspects of HWC 2012-13. HWC 2014-15 ‘Healthy Workplaces Manage Stress’. A first interim report ’Stress and psychosocial risk management — portable application for micro and small enterprises’ was delivered by the contractor. The report included, as requested, outlines of the main sections of the application, and a ‘Memorandum of Understanding’ describing the technical aspects. A final draft of the report ‘Costs of stress and psychosocial risks at work’ is under the internal review and editing process. A final draft was delivered of the joint EU-OSHA — Eurofound report on psychosocial risks. Specific objective 2: To strengthen prevention measures via the provision of useful and practical good practice information on priority sectors and topics The ‘Safer and healthier work at any age — occupational safety and health (OSH) in the context of an ageing workforce’ project aims to assess the prerequisites for OSH systems to take account of an ageing workforce and ensure better prevention for all throughout working life. The contract was signed in June, kick-off meeting was held on 10 June in Brussels. Further to the meeting, the contractor prepared the inception report and revised the time schedule for the whole project. At the end of July, the first progress report was received, at the beginning of October the contractor submitted the interim country inventories and the long list of examples of good practices. A half-day meeting on progress took place on 2 December at the European Parliament. An e-fact on dangerous substances and successful workplace communication was published to complement 2012 materials (Napo material, FAQs, ppt, and website sections on REACH, CLP and links to OSH). It offers hints for successful communication in the workplace about dangerous substances, including the use of safety data sheets, and provides a list of sources of further information. Results from the 2012 Focal Points survey on national initiatives related to cooperation between national REACH and OSH authorities were made available to the SLIC Chemex group for the development of their labour inspection guidance on links between REACH and OSH. Specific objective 3: To support prevention measures via ensuring the continued relevance of existing information products The legislation section of the website continued to be updated under the contract with the Topic Centre. The latest new information concerns Directive 2013/35/EU — electromagnetic fields. Specific objective 4: To improve the implementation and quality of risk assessments in micro and small enterprises (1-49 employees) via increased awareness on the need to do risk assessment and how to do it The Agency further developed the Online interactive Risk Assessment (OiRA) tool project at both EU level and at Member State level. Basic development of the software approached completion in 2013 and saw a limited number of new functionalities being developed to better meet the needs identified by OiRA partners. The Agency was very active in the promotion and the development of the OiRA community, with tools being taken up widely at national level and through the sectoral social dialogue committees at EU level. Networking and Coordination Further development of focal point network, the governance of the Agency and liaison with European and International organisations. Institutional capacity building in candidate and potential candidate countries (earmarked funds). Programming and evaluation coordination. COMMUNICATION, CAMPAIGNING AND PROMOTION Specific objective 1: To raise awareness amongst key target groups of the importance of working together for risk prevention through the organisation of a decentralised pan-European campaign In 2013, EU-OSHA implemented the second year of its Healthy Workplaces Campaign 2012-13 on ‘Working together for risk prevention’. Flagship campaign events were organised in cooperation with the incumbent EU Presidencies, including the European Good Practice Awards Ceremony and the Healthy Workplaces Summit. Campaign-related press, media and public relations activities were carried out at EU and national level. The Agency also continued to support its network of national focal points through the implementation of the ‘European Campaign Assistance’ programme (ECAP), including the provision of seminars, conferences, media actions and campaign promotion material in 24 languages. The ‘Campaign Partnership’ programme, including the active engagement of partners, organising meetings and providing campaign promotion material, added a further important dimension to the campaign while the launch of an online OSH campaigning toolkit provided practical tips and advice for anyone wanting to run an OSH awareness raising campaign. Preparatory actions for the Healthy Workplaces Campaign 2014-15 included the development of the campaign plan, the campaign branding and the core promotion material (including Napo film). Work also started on an independent external evaluation of the Healthy Workplaces Campaign 2012-13. Specific objective 2: To maintain the Agency, including its website, as Europe’s first reference point for OSH information by using appropriate communication tools and channels to reach the intended target groups Research and development actions were carried out to support the implementation of a new Agency online strategy and redevelopment of the Agency online presence in 2014. At the same time, the Agency produced and published online content and further developed its online promotion and presence in social media. The year saw the organisation of awareness raising and communication partnership activities including strengthened relations with the Enterprise Europe Network. The 2013 publications programme resulted in a range of publications in a variety of EU languages. There was also further development of the Online Interactive Risk Assessment (OiRA) site and application and of the Healthy Workplaces Campaign’s sites and applications. Specific objective 3: To effectively promote the agency’s information to the intended target groups via media and public relations, events and exhibitions A range of press and PR activities were implemented, including news releases, press articles and press conferences to promote, among other things, the results of the 3rd OSH opinion poll; the foresight project and green jobs; CLP regulation; ESENER secondary analyses and macroeconomic costs of OSH information project; carcinogenic-related publications. Diffusion strategy of the NAPO teachers‘online kit successfully implemented. Further development of promotion and author recruitment strategy for the OSHwiki and of the promotion and developers’ recruitment strategy for the Online interactive Risk Assessment tool Presentations and active participation in selected European and international conferences and exhibitions by providing Agency speakers and/or an Agency stand and/or Agency literature: Annual general report 2012 and other publications (reports, factsheets, Napo DVDs, etc.) and promotion materials were distributed across Europe and beyond to reach our target audiences. Joint activities with EU Council Presidencies (Ireland and Lithuania) were carried out in order to promote OSH in Council Presidency agendas. |
||||||||||||||||||||
Source: Annex supplied by the Agency. |
THE AGENCY’S REPLY
The Agency confirms the reasons for high carry forward reported by the Court.
10.12.2014 |
EN |
Official Journal of the European Union |
C 442/351 |
REPORT
on the annual accounts of the Research Executive Agency for the financial year 2013, together with the Agency’s reply
(2014/C 442/41)
INTRODUCTION
1. |
The Research Executive Agency (hereinafter ‘the Agency’, aka ‘REA’), which is located in Brussels, was set up by Commission Decision 2008/46/EC (1). The Agency was established for a limited period beginning on 1 January 2008 and ending on 31 December 2017 with the aim of managing specific Union activities in the field of research (2). On 15 June 2009 the Agency was officially granted its administrative and operational autonomy by the European Commission. |
INFORMATION IN SUPPORT OF THE STATEMENT OF ASSURANCE
2. |
The audit approach taken by the Court comprises analytical audit procedures, direct testing of transactions and an assessment of key controls of the Agency’s supervisory and control systems. This is supplemented by evidence provided by the work of other auditors (where relevant) and an analysis of management representations. |
STATEMENT OF ASSURANCE
The management’s responsibility
The auditor’s responsibility
Opinion on the reliability of the accounts
Opinion on the legality and regularity of the transactions underlying the accounts
|
FOLLOW-UP OF PREVIOUS YEAR'S COMMENTS
10. |
An overview of the corrective actions taken in response to the Court's previous years’ comments is provided in Annex I. |
This Report was adopted by Chamber IV, headed by Mr Milan Martin CVIKL, Member of the Court of Auditors, in Luxembourg at its meeting of 8 July 2014.
For the Court of Auditors
Vítor Manuel da SILVA CALDEIRA
President
(2) Annex II summarises the Agency's competences and activities. It is presented for information purposes.
(3) These include the balance sheet and the economic outturn account, the cash flow table, the statement of changes in net assets and a summary of the significant accounting policies and other explanatory notes.
(4) These comprise the budgetary outturn account and the annex to the budgetary outturn account.
(5) Articles 62 and 68 in conjunction with Articles 53 and 58 of Regulation (EU, Euratom) No 966/2012 of the European Parliament and of the Council (OJ L 298, 26.10.2012, p. 1).
(6) The accounting rules adopted by the Commission’s accounting officer are derived from the International Public Sector Accounting Standards (IPSAS) issued by the International Federation of Accountants or, where relevant, the International Accounting Standards (IAS)/International Financial Reporting Standards (IFRS) issued by the International Accounting Standards Board.
(7) Article 162 of Regulation (EU, Euratom) No 966/2012.
ANNEX I
Follow-up of previous year’s comments
Year |
Court's comment |
Status of corrective action (Completed/Ongoing/Outstanding/N/A) |
2011 |
There is room for improving the transparency of recruitment procedures. Questions for written tests and interviews were set after the applications had been examined by the selection board; threshold scores for being included in the reserve list were not set in advance; the selection board did not fully document all its meetings and decisions. |
Completed |
2012 |
In 2012 a REA officer signed payment orders amounting to 8,86 million euro (19 % of the 2012 REA budget) as authorising officer when deputising for his head of unit. The officer did not receive a formal subdelegation nor was he officially nominated by the authorising officer as his deputy. This is not in compliance with the subdelegation system laid down in the Financial Regulation. |
N/A |
ANNEX II
Research Executive Agency (Brussels)
Competences and activities
Areas of Union competence deriving from the Treaty (Articles 179 and 180 of the TFEU) |
Collection of information The Union shall have the objective of strengthening its scientific and technological bases by achieving a European research area in which researchers, scientific knowledge and technology circulate freely, and encouraging it to become more competitive, including in its industry. For this purpose the Union shall encourage undertakings, including SMEs, research centres and universities in their research and technological development activities of high quality; it shall support their efforts to cooperate with one another, aiming, notably, at permitting researchers to cooperate freely across borders and at enabling undertakings to exploit the internal market potential to the full, in particular through […] the definition of common standards and the removal of legal and fiscal obstacles to that cooperation. […] In pursuing these objectives, the Union shall carry out the following activities, complementing the activities carried out in the Member States:
|
||||||||||||||||||||||||
Competences of the Agency (Commission Decision 2008/46/EC) |
Objectives The objective of the Agency is to manage the programmes entrusted to it under the seventh framework programme of the Union for Research, Technological Development and Demonstration Activities (2007-2013) (hereafter FP7) (the People Specific Programme, the SME actions of the Capacities Specific Programme, and the Space and Security themes of the Cooperation Specific Programme) efficiently and effectively, to deliver efficient and effective services to the research community and to provide centralised FP7 support services to the respective Commission services for all areas of the Cooperation, Capacities and People Specific Programmes. With regard to efficient and effective programme implementation, the Agency — as promoter of the European Research Area — aims at improving project management, establishing close contact with final beneficiaries and providing high visibility for the European Union. Tasks With regard to the management of projects, the Agency concludes and manages grant agreements, involving the following operations:
With regard to FP7 Support Services, the Agency performs the following tasks:
|
||||||||||||||||||||||||
Governance |
Steering Committee Comprises five members appointed by the European Commission. It adopts the Agency's organisation chart and its Annual Work Programme after approval by the Commission. In addition, it adopts the administrative budget of the Agency and its Annual Activity Report. Director Appointed by the Commission, manages the Agency together with the Steering Committee, implements the administrative budget, sets up management and internal control systems adapted to the tasks entrusted to the Agency and prepares the reports to be presented to the Commission. External audit European Court of Auditors. Discharge authority European Parliament acting on a recommendation from the European Council. With respect to the Agency's implementation of its administrative budget, the discharge decision is addressed to the Director. For the implementation of the operational budget delegated by the Commission to the Agency, the Commission remains accountable. |
||||||||||||||||||||||||
Resources made available to the Agency in 2013 (2012) |
Operational Budget 2013 (2012) 1 759,2(1 479,9) million euro of commitment appropriations and 1 443,6(1 459,6) million euro of payment appropriations. The Agency implements the Commission's operational budget under a delegation decision of the Commission. Administrative Budget 2013 (2012) 46,8(46,4) million euro. The Agency implements the administrative budget autonomously. Staff at 31 December 2013(2012) Establishment plan posts: 140 (128) of which 138 (122) occupied. Contract staff: 418 (385) staff planned of which 407 (374) were in place as of 31 December 2013. Total staff in place: 545 (496) undertaking the following tasks:
|
||||||||||||||||||||||||
Products and services 2013 (2012) |
For the People Programme, 9 (10) calls were closed in 2013 and 10 (10) evaluations completed. 1 874(1 899) new grant agreements were signed and 3 787(3 599) payments made (excluding payments for expert evaluators). The Agency now manages a total of 6 090(5 492) projects under this programme. For the SME actions of the Capacities Programme, 1 (1) call was closed and 1 (1) evaluation completed. 204 (201) new grant agreements were signed and 577 (508) payments made (excluding payments for expert evaluators). The Agency now manages a total of 691 (625) projects under this scheme. For the Space and Security themes of the Cooperation Programme, 2 (2) calls were closed in 2013 and 2 (2) evaluations completed. 79 (80) new grant agreements were signed and 294 (258) payments made (excluding payments to expert evaluators). The Agency now manages a total of 348 (317) projects under these themes. As regards the FP7 support services, the results obtained for 2013 are as follows:
|
||||||||||||||||||||||||
Source: Annex supplied by the Agency. |
THE AGENCY’S REPLY
The Agency has taken note of the Court's Report
10.12.2014 |
EN |
Official Journal of the European Union |
C 442/358 |
REPORT
on the annual accounts of the Trans-European Transport Network Executive Agency for the financial year 2013, together with the Agency’s replies
(2014/C 442/42)
INTRODUCTION
1. |
The Executive Agency for the Trans-European Transport Network (hereinafter ‘the Agency’, aka ’TEN-TEA’), located in Brussels, was set up by Commission Decision 2007/60/EC (1), amended by Decision 2008/593/EC (2). The Agency was established for a period beginning on 1 November 2006 and ending on 31 December 2015 for the management of EU actions in the field of the trans-European transport network (3). |
INFORMATION IN SUPPORT OF THE STATEMENT OF ASSURANCE
2. |
The audit approach taken by the Court comprises analytical audit procedures, direct testing of transactions and an assessment of key controls of the Agency’s supervisory and control systems. This is supplemented by evidence provided by the work of other auditors (where relevant) and an analysis of management representations. |
STATEMENT OF ASSURANCE
The management’s responsibility
The auditor’s responsibility
Opinion on the reliability of the accounts
Opinion on the legality and regularity of the transactions underlying the accounts
|
10. |
The comments which follow do not call the Court’s opinions into question. |
COMMENTS ON INTERNAL CONTROLS
11. |
The Agency does not perform satisfactory ex ante verifications on the charges for its premises invoiced by the building manager. Most of the underlying contracts, invoices and receipts were not at the Agency’s disposal. |
12. |
According to the Protocol on the privileges and immunities of the European Union (9) and the EU VAT Directive (10), the Agency is exempt from indirect taxes. However, by the end of 2013 it had paid and not claimed back VAT for the period 2011 to 2013 amounting to 1 13 513 euro on premises charges. |
COMMENTS ON BUDGETARY MANAGEMENT
13. |
While budget implementation was satisfactory for titles I and III, the rate of committed appropriations carried over was high for title II at 27 % (6 66 119 euro). These carry-overs mainly related to IT goods and services contracted and/or ordered at year-end which will be provided as planned in late 2013 or in 2014 (2 96 486 euro), and invoices for 2013 expenses not received by year-end (2 86 197 euro). |
FOLLOW-UP OF PREVIOUS YEAR’S COMMENTS
14. |
An overview of the corrective actions taken in response to the Court's comments from the previous year is provided in Annex I. |
This Report was adopted by Chamber IV, headed by Mr Milan Martin CVIKL, Member of the Court of Auditors, in Luxembourg at its meeting of 1 July 2014.
For the Court of Auditors
Vítor Manuel da SILVA CALDEIRA
President
(2) OJ L 190, 18.7.2008, p. 35.
(3) Annex II summarises the Agency’s competences and activities. It is presented for information purposes.
(4) These include the balance sheet and the economic outturn account, the cash flow table, the statement of changes in net assets and a summary of the significant accounting policies and other explanatory notes.
(5) These comprise the budgetary outturn account and the annex to the budgetary outturn account.
(6) Article 162 of Regulation (EU, Euratom) No 966/2012 of the European Parliament and of the Council (OJ L 298, 26.10.2012, p. 1).
(7) The accounting rules adopted by the Commission’s accounting officer are derived from the International Public Sector Accounting Standards (IPSAS) issued by the International Federation of Accountants or, where relevant, the International Accounting Standards (IAS)/International Financial Reporting Standards (IFRS) issued by the International Accounting Standards Board.
(8) Article 162 of Regulation (EU, Euratom) No 966/2012.
(9) Protocol (No 7) on the privileges and immunities of the European Union (OJ C 115, 9.5.2008, p. 266).
(10) Council Directive 2006/112/EC (OJ L 347, 11.12.2006, p. 1).
ANNEX I
Follow-up of previous year’s comments
Year |
Court’s comment |
Status of corrective action (Completed/Ongoing/Outstanding/N/A) |
2012 |
Budget implementation was satisfactory for title I while the rate of committed appropriations carried over was high for titles II and III at 38 % (8 05 755 euro) and 50 % (3 63 613 euro) respectively. Out of the total amount carried over (1,37 million euro), 74 % is linked to services delivered in 2012 or early 2013. The remaining 26 % relates to goods and services ordered at the end of 2012 that were originally planned on the 2013 budget, but which were advanced to 2012. |
N/A |
ANNEX II
Trans-European Transport Network Executive Agency (Brussels)
Competences and activities
Areas of Union competence deriving from the Treaty (Articles 26, 170, 171, 172, 174 of the Treaty on the Functioning of the European Union) |
The Union shall adopt measures with the aim of establishing or ensuring the functioning of the internal market. The internal market shall comprise an area in which the free movement of goods, persons, services and capital is ensured. In order to promote its overall harmonious development, the Union shall develop and pursue its actions leading to the strengthening of its economic, social and territorial cohesion. To help achieve these objectives, and to enable citizens in the Union, economic operators and regional and local communities to derive full benefit from the setting up of an area without internal frontiers, the Union shall contribute to the establishment and development of trans-European networks in the areas of transport, telecommunications and energy infrastructures. Action by the Union shall aim at promoting the interconnection and interoperability of national networks as well as access to them. In order to achieve these objectives, the Union shall establish a series of guidelines covering the objectives, priorities and broad lines of measures envisaged in the sphere of trans-European networks (TENs). |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Competences of the Agency (Decision No 661/2010/EU of the European Parliament and of the Council) (Regulation (EC) No 67/2010 of the European Parliament and of the Council) (Regulation (EC) No 680/2007 of the European Parliament and of the Council) (Council Regulation (EC) No 58/2003) (Commission Decision 2007/60/EC, last amended by 2008/593/EC) |
Objectives The Decision on Union Guidelines for the development of the Trans-European Transport Network (TEN-T) establishes the guidelines covering the objectives, priorities and broad lines envisaged in the area of TEN-T. General rules were laid down for the Union financing of TENs, in order to permit the implementation of these guidelines. Council Regulation (EC) No 58/2003 empowers the Commission to establish executive agencies to carry out tasks related to Union programmes. TEN-TEA was therefore set up to manage Union action in the field of the TENs on the basis of the TEN-T Guidelines and Financial Regulation and add value in the management of the TEN-T Programme. It remains under the supervision of its parent DG MOVE, which retains responsibility for policy issues. TEN-TEA is responsible for managing the technical and financial implementation of the TEN-T Programme by following the entire project lifecycle. In its day to day work it aims to improve the effectiveness and flexibility of TEN-T implementation at a lower cost whilst at the same time mobilising a high level of expertise by recruiting more specialised staff. It also strengthens the links between the TEN-T and key stakeholders, ensures a better coordination of funds with other EU instruments, raises the profile and benefits of EU funding and provides support/feedback to the Commission. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Governance |
Steering Committee The Agency's activities are supervised by a Steering Committee which is composed of five members from the EU Directorates-General Mobility and Transport (two members), Regional and Urban Policy, Environment, Human Resources and Security and an observer from the European Investment Bank. The Committee meets four times a year and approves the Agency's Administrative Budget, Work Programme, Annual Activity Report, Accounts of all revenue and expenditure and the external evaluation report, and adopts other specific implementing rules. Director Appointed by the European Commission. Internal audit European Commission’s Internal Audit Service (IAS) and the Agency's Internal Audit Capability (IAC). External audit European Court of Auditors. Discharge authority European Parliament acting on a recommendation from the Council. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Resources available to the Agency in 2013 |
Budget
Staff at 31 December 2013 Temporary Agent posts: 33 posts listed in establishment plan, of which 32 occupied. Contract staff: 67 posts planned, of which 66 were occupied. Total staff: 100 (98 occupied). Allocated to:
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Products and services 2013 |
Selections
Project Management
Simplification measures
Communication
Cooperation with parent DG
Audits
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Source: Annex supplied by the Agency. |
THE AGENCY’S REPLIES
11. |
The Agency performs ex-ante controls on each statement of charges which include verification that the services have been rendered; that the invoiced amounts are comparable to previous reporting periods; that the invoiced periods are correct and that the repartitions correspond to those foreseen in the contract. In case of anomalies copies of the invoices are requested and unduly invoiced services are reimbursed. As the Agency does not have the in-house technical capacities required to manage and check the underlying contracts, it pays the building management company a fee to carry out this service on its behalf. The verification of the contracts, invoices and receipts underlying the charges is included in the service. To further improve the verification of the statements of charges, the Agency will systematically request for each statement copies of invoices on a sampling basis. |
12. |
During the negotiations of the building contract, the VAT was included in the contract for all common services as it was not possible to make distinction between the rest of the building and the space rented by the Agency. In March 2014 the Agency requested the recovery of the VAT paid for the period 2011 to 2013 from the building management company, which had issued the invoices and collected the VAT. The total amount of 1 13 513 euro will be repaid to the Agency by June 2014. The receivable was recorded in the 2013 Agency accounts. The Agency also requested the building management company to exempt VAT at the base for all future invoices as of 1 January 2014. |
13. |
The Agency is continuously making efforts to reduce the level of carry-overs. Between 2012 and 2013 the percentage of carry-overs for title II diminished from 38 to 27 %, the total budgetary carry-overs decreased from 14 to 9 %. The carry-overs to 2014 were justified by the need to advance certain expenditures in the preparation of the new mandate of the Agency and reduce the burden of the very tight 2014 budget. The guiding principle in the carry-overs was the sound and efficient financial management. |