ISSN 1977-091X doi:10.3000/1977091X.C_2013.331.eng |
||
|
Official Journal of the European Union |
C 331 |
|
|
||
|
English edition |
Information and Notices |
Volume 56 |
|
Notice No |
Contents |
page |
|
|
IV Notices |
|
|
|
NOTICES FROM EUROPEAN UNION INSTITUTIONS, BODIES, OFFICES AND AGENCIES |
|
|
|
Court of Auditors |
|
|
2013/C 331/01 |
Annual report of the Court of Auditors on the implementation of the budget concerning the financial year 2012, together with the institutions’ replies |
|
|
2013/C 331/02 |
Annual report of the Court of Auditors on the activities funded by the 8th, 9th and 10th European Development Funds (EDFs) concerning the financial year 2012, together with the Commission's replies |
|
|
EN |
|
IV Notices
NOTICES FROM EUROPEAN UNION INSTITUTIONS, BODIES, OFFICES AND AGENCIES
Court of Auditors
|
14.11.2013 |
EN |
Official Journal of the European Union |
C 331/1 |
In accordance with the provisions of Article 287(1) and (4) of the TFEU and Articles 148(1) and 162(1) of Regulation (EU, Euratom) No 966/2012 of the European Parliament and of the Council of 25 October 2012 on the financial rules applicable to the general budget of the Union and repealing Council Regulation (EC, Euratom) No 1605/2002 and Articles 139 and 156 of Council Regulation (EC) No 215/2008 of 18 February 2008 on the Financial Regulation applicable to the 10th European Development Fund
the Court of Auditors of the European Union, at its meeting of 5 September 2013, adopted its
ANNUAL REPORTS
concerning the financial year 2012.
The reports, together with the institutions' replies to the Court's observations, were transmitted to the authorities responsible for giving discharge and to the other institutions.
The Members of the Court of Auditors are:
Vítor Manuel da SILVA CALDEIRA (President), David BOSTOCK, Ioannis SARMAS, Igors LUDBORŽS, Jan KINŠT, Kersti KALJULAID, Karel PINXTEN, Michel CRETIN, Harald NOACK, Henri GRETHEN, Szabolcs FAZAKAS, Louis GALEA, Ladislav BALKO, Augustyn KUBIK, Milan Martin CVIKL, Rasa BUDBERGYTĖ, Lazaros S. LAZAROU, Gijs DE VRIES, Harald WÖGERBAUER, Hans Gustaf WESSBERG, Henrik OTBO, Pietro RUSSO, Ville ITÄLÄ, Kevin CARDIFF, Baudilio TOMÉ MUGURUZA, Iliana IVANOVA, George PUFAN, Neven MATES.
ANNUAL REPORT ON THE IMPLEMENTATION OF THE BUDGET
2013/C 331/01
TABLE OF CONTENTS
General introduction
|
Chapter 1— |
The statement of assurance and supporting information |
|
Chapter 2— |
Revenue |
|
Chapter 3— |
Agriculture: market and direct support |
|
Chapter 4— |
Rural development, environment, fisheries and health |
|
Chapter 5— |
Regional policy; energy and transport |
|
Chapter 6— |
Employment and social affairs |
|
Chapter 7— |
External relations, aid and enlargement |
|
Chapter 8— |
Research and other internal policies |
|
Chapter 9— |
Administrative and other expenditure |
|
Chapter 10— |
Getting results from the EU budget |
GENERAL INTRODUCTION
|
0.1. |
The European Court of Auditors is the institution established by the Treaty to carry out the audit of European Union (EU) finances. As the EU’s external auditor it acts as the independent guardian of the financial interests of the citizens of the Union and contributes to improving EU financial management. More information on the Court can be found in its annual activity report which, together with its special reports on EU spending programmes and revenue and its opinions on new or amended legislation, are available on its website: www.eca.europa.eu |
|
0.2. |
This is the Court’s 36th annual report on the implementation of the EU budget and covers the 2012 financial year. A separate annual report covers the European Development Funds. |
|
0.3. |
The general budget of the EU is decided annually by the Council and the European Parliament. The Court’s annual report, together with its special reports, provides a basis for the discharge procedure, in which the European Parliament decides whether the Commission has satisfactorily carried out its responsibilities for implementing the budget. The Court forwards its annual report to national parliaments at the same time as to the European Parliament and the Council. |
|
0.4. |
The central part of the annual report is the Court’s statement of assurance (the ‘DAS’) on the reliability of the consolidated accounts of the EU and on the legality and regularity of transactions (referred to in the report as ‘regularity of transactions’). The statement of assurance itself begins the report; the material which follows reports mainly on the audit work underlying the statement of assurance. |
|
0.5. |
The report is organised as follows:
|
|
0.6. |
The specific assessments are mainly based on the results of the Court’s testing of the regularity of transactions and on an assessment of the effectiveness of the principal supervisory and control systems governing the revenue or expenditure involved. |
|
0.7. |
Within the specific assessments the definition of underlying transactions has been harmonised. This harmonisation affects in particular chapters 7 and 8 of the annual report (see paragraphs 7.13 to 7.15 and 8.13). A description of the changes and their impact is detailed in chapter 1 (see paragraphs 1.6, 1.7, 1.15 and graph 1.1). |
|
0.8. |
The Commission’s replies (or replies of other EU institutions and bodies, where appropriate) to the Court’s observations are presented within the document. The Court’s description of its findings and conclusions takes into account the relevant replies of the auditee. However it is the Court’s responsibility, as external auditor, to report its audit findings, to draw conclusions from those findings, and thus to provide an independent and impartial assessment of the reliability of the accounts as well as of the regularity of transactions. |
CHAPTER 1
The Statement of Assurance and supporting information
TABLE OF CONTENTS
The Court's Statement of Assurance provided to the European Parliament and the Council — Independent auditor’s report
Introduction
Development of the Court’s sampling approach
Procurement
Audit Findings for the 2012 financial year
Reliability of accounts
Summary of specific assessments and audit results supporting the Statement of Assurance
Taking account of recoveries and financial corrections
The synthesis report and annual activity reports
Budgetary management
Budgetary appropriations for commitments and payments
The pressure on the budget for payments
Future disbursement needs
|
Annex 1.1 — |
Audit approach and methodology |
|
Annex 1.2 — |
Follow-up of observations from previous years concerning the reliability of accounts |
|
Annex 1.3 — |
Extracts from the 2012 consolidated accounts |
|
THE COURT'S STATEMENT OF ASSURANCE PROVIDED TO THE EUROPEAN PARLIAMENT AND THE COUNCIL — INDEPENDENT AUDITOR’S REPORT |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Reliability of the accounts |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Legality and regularity of the transactions underlying the accounts |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Revenue |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Commitments |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Payments |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
5 September 2013 |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Vítor Manuel da SILVA CALDEIRA President |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
INTRODUCTION |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
DEVELOPMENT OF THE COURT’S SAMPLING APPROACH |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
PROCUREMENT |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
AUDIT FINDINGS FOR THE 2011 FINANCIAL YEAR |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Reliability of accounts |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Summary of specific assessments and audit results supporting the Statement of Assurance |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Table 1.1 — Transactions subject to audit for annual report chapters 3 to 9
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Table 1.2 — 2012 Summary of findings on regularity of transactions
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Analysis of audit results |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Taking account of recoveries and financial corrections |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The complex mechanisms for making financial corrections and recoveries |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Financial corrections in 2012 |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The 2012 accounts record a 1,8 billion euro financial correction on the 2000-2006 use of cohesion policy funds in Spain. This is the largest single correction recorded in 2012 (49 % of the total). The Commission proposed the correction in 2008, seeking to address weaknesses in management and breaches of public procurement rules. Authorities in the Member State agreed to the correction at closure of the programme in 2011 and 2012. In order to give effect to this correction, Spanish regions responsible for the management of the programmes declared further expenditure. As a result of the corrections, authorities in Spain were entitled to further funding amounting to 1 390 million euro. Of this, the Commission paid only 211 million euro in 2012 because of the unavailability of payment appropriations (see paragraphs 1.46 to 1.59). This payment led to the recognition of the financial correction in the consolidated accounts. The Commission will pay the remaining 1 179 million euro to Spain in 2013. Spain will therefore receive 27 864 million euro of the 28 019 million euro available to it (all but 155 million euro available) for the 2000-2006 programme period. |
The Commission considers this complex corrective process which resulted in the replacement of more than 2 billion euros by new eligible expenditure as a success for the protection of the EU budget. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Commission identified serious problems in a Romanian ESF operational programme (OP) in April/May 2012. The main issues included deficient selection procedures, deficient management verifications, insufficient checks on public procurement and ineligible expenditure for individual cases. After negotiation, the Commission and Romanian authorities agreed on a 25 % flat-rate correction. As a result Romania made a further declaration of ESF expenditure (exceeding 25 % of all expenditure declared previously), on the basis of which the Commission paid a small amount (7 602 euro) to Romania in December 2012. Corrections (which up to 31 December 2012 amounted to 81 million euro of the EU contribution) were not made at project level, and the impact of the financial correction is equivalent to lowering the co-financing rate for this OP. |
The Commission notes that, whilst acknowledging that it has done everything within its power and acted in full respect of the existing regulations, the Court does not reduce the estimated error rate for 2012 on the basis of the flat rate correction to which the Court refers for the policy area of Employment and Social Affairs. In its own assessment of the level of estimated error in 2012, the Commission also takes into account the impact of flat-rate corrections within the year, which are excluded from the Court’s estimation of the error rate. On this basis, the Commission considers that the error rate is broadly in line with the error rate calculated previously for this Policy area (see paragraphs 6.14 and 6.39). The impact of financial corrections is not only equivalent to lowering the co-financing rate for the related OP; more relevant is that as a result the expenditure incurred in breach of law concerned is excluded from Union expenditure. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
In 2011 the Commission, the Court and authorities in the Member State identified serious deficiencies in the functioning of the management and control systems in two operational programmes (OP Environment (65 million euro EU contribution) and OP Transport (194 million euro EU contribution)). Based on its verifications and the estimated risk for the fund, the Commission and Czech authorities agreed on a flat-rate correction (5 % for OP Environment and 10 % for OP Transport) for all expenditure paid by the managing authority to beneficiaries before 1 September 2012. In this relation, the Czech authorities accepted to deduct the agreed correction in subsequent expenditure declarations to the Commission leading to a reduced reimbursement from the Commission concerning these beneficiaries. |
The Commission has made in 2012 flat rate financial corrections on a cumulative basis to all expenditure in the concerned Czech programmes. The Commission notes that, whilst it has done everything within its power and acted in full respect of the existing regulations in order to protect the EU budget within the same financial year audited by the Court, the above flat rate correction has not affected the Court’s calculation of the 2012 estimated error rate (see paragraphs 5.26, 5.33 and 5.62). |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
For one Romanian ERDF operational programme, the Commission identified from 2010 to 2012 serious deficiencies in management and control systems in general, and deficiencies in public procurement. After payment interruption the Commission agreed with Romanian authorities that individual corrections be carried out at project level. This was reflected in the reimbursement the Commission paid to Romania in December 2012. |
The Commission draws attention to the proactive corrective actions it took in the form of interruption of payments and substantial financial corrections in respect of 4 of the 5 mainstream ERDF programmes in Romania, where it had identified serious deficiencies through its audit work. The programmes have been corrected at flat rate within a range from 10 to 25 % depending on the specific situation of each priority axis. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Commission and the Slovak audit authority identified serious deficiencies in public procurement procedures. The national authorities verified a representative sample of contracts. Based on this work Slovakia accepted a correction of 7,3 % (amounting to 32 million euro of the EU contribution up to the end of 2012) based on an extrapolation of test results applying to each of the 1 919 individual contracts signed before 30 October 2012. |
The Commission has made in 2012 flat rate financial corrections on a cumulative basis to all expenditure in the concerned Slovak programme. The Commission notes that, whilst it has done everything within its power and acted in full respect of the existing regulations in order to protect the EU budget within the same financial year audited by the Court, the above flat rate correction has not affected the Court’s calculation of the 2012 estimated error rate (see paragraphs 5.26, 5.33 and 5.62). The Commission notes that the Court considered that the flat rate correction impacted individual projects in the Slovak example only when these had been subject to individual audits in the frame of the representative sample of 77 contracts which formed the basis for the extrapolation and were thus subject to detailed, individual corrective action. In another project, subject to the flat rate correction but not part of the representative sample audited by the Member State, the Court considered that the error it detected was not corrected despite the flat rate correction and therefore included it in its error rate. Extending management checks and audits on individual projects would have significant cost implications for the Commission and the Member States and therefore, flat rate corrections are applied in accordance with the legislative framework. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Impact on the Statement of Assurance |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
1.31. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The synthesis report and the annual activity reports |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Annual activity reports |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Table 1.3 — Quantified reservations in Commission annual activity reports
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The synthesis report |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
The Commission's proposal for the Common Provisions Regulations covering the Structural Funds for the period 2014-2020, provides for financial corrections reducing the budgetary allocation to the particular Member State, thus has a net reduction effect, in case the weakness/deficiency was not identified by the Member State. This will set better incentives for Member States to operate an effective supervisory and control system. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Overall assessment |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Commission considers that the amounts described above should be taken into consideration when analysing the long term impact on legality and regularity of expenditure declared by final beneficiaries. With a view of providing more complete information, the Commission will therefore include them in its future communications on the protection of the EU budget. The Commission states, based on the legal framework defined in Articles 59 and 80 of the Financial Regulation and data available, that it protects adequately the EU budget as a whole by excluding from Union financing expenditure incurred in breach of applicable law. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
BUDGETARY MANAGEMENT |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Budgetary appropriations for commitments and payments |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The budgetary result |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The pressure on the budget for payments |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Table 1.4 — Comparison between the 2007-2013 financial framework and the annual budgeted appropriations
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Outstanding budgetary commitments |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Outstanding pre-financing |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Table 1.5 — Commission's outstanding budgetary commitments and pre-financing per financial framework heading and in years of commitments (payments)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Future disbursement needs |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
(1) The consolidated financial statements comprise the balance sheet, the statement of financial performance, the cashflow statement, the statement of changes in net assets and a summary of significant accounting policies and other explanatory notes (including segment reporting).
(2) The aggregated reports on implementation of the budget comprise the aggregated reports on implementation of the budget and explanatory notes.
(3) On the basis of the sampling approach used in previous years the estimated most likely error would have been 4,5 %.
(4) See Article 287 TFEU.
(5) The Commission has been preparing accounts on an accruals basis since 2005 and the Court has been assessing them as reliable since 2007.
(6) A small number of errors were noted in procurement for operational expenditure activities from 2010 and earlier which gave rise to payments in 2012; these are not extrapolated nor included in the overall estimated error rate.
(7) Regulation (EU, Euratom) No 966/2012 of the European Parliament and of the Council of 25 October 2012 on the financial rules applicable to the general budget of the Union (OJ L 298, 26.10.2012, p. 1) requires that the final accounts shall be sent by 31 July of the following financial year (see Article 148).
(8) Mainly represented by chapters 7 and 8, but also covering parts of the expenditure covered by chapters 4 and 5. The extrapolated error for shared management expenditure is based upon the examination of 685 transactions (drawn from a population of 110,8 billion euro), the extrapolation for other forms of operational expenditure is based upon the examination of 356 transactions (drawn from a population of 20,1 billion euro).
(9) Implementation is the final stage in the financial correction process. See also the Court’s 2009 annual report, paragraph 1.42.
(10) As presented in Note 6.4.2.2 of the consolidated accounts 2012 and Note 6.2 of the consolidated accounts 2011 respectively.
(11) See the Court’s 2009 annual report, paragraphs 1.32 to 1.50.
(12) A notable exception is the European Agricultural Guarantee Fund (EAGF) spending.
(13) See paragraph 1.34 of the Court’s 2009 annual report.
(14) Financial corrections in agriculture are recorded as assigned revenue and are therefore not lost to the budget title for ‘Agriculture and rural development’.
(15) See section 2 of the Accounting Officer's ‘Quarterly reports regarding provisional figures for 2012 for financial corrections under the Cohesion policy 2012’ at 31 March, 30 June, 30 September 2012 respectively, as included in the discharge 2011 documents of the Committee on Budgetary Control of the European Parliament under the heading ‘Financial corrections – Cohesion policy’ (http://www.europarl.europa.eu/committees/en/cont/publications.html?id=CONT00004#menuzone).
(16) Article 9(1)(a) of Council Regulation (EC) No 1290/2005 (OJ L 209, 11.8.2005, p. 1): ‘Member States shall (a) … (iii) recover sums lost as a result of irregularities or negligence’.
(17) The amounts of recoveries in EAGF (2012: 162 million euro, Note 6.4.2.1 of the consolidated accounts 2012) include amounts recovered from farmers and other beneficiaries of funds based upon action taken by paying agencies which reflect recoveries stemming both from Commission conformity decisions and from paying agencies' own work. In addition recoveries recorded include the application of the fifty-fifty rule where the cost of non-recovery is shared between the EU budget and the Member State concerned. Total recoveries recorded amount to only around one third of recorded financial corrections.
(18) In cohesion policy, it is the responsibility of Member States to recover unduly paid amounts from beneficiaries where appropriate and to report to the Commission on recoveries from beneficiaries and amounts withdrawn from expenditure declarations. (Article 70 of Council Regulation (EC) No 1083/2006 of 11 July 2006 laying down general provisions on the European Regional Development Fund, the European Social Fund and the Cohesion Fund and repealing Regulation (EC) No 1260/1999 (OJ L 210, 31.7.2006, p. 25)). Note 6.7 of the consolidated accounts presents as withdrawals and recoveries (based on data provided by Member States) a total of 1 652 million euro of additional corrections relating to the 2007-2013 programming period, without distinction between corrections linked to national checks or checks carried out by the Commission.
(19) Special report No 7/2010, ‘Audit of the clearance of accounts procedure’, paragraphs 68 to 73 and Graph 3, see ECA website: http://eca.europa.eu
(20) See chapter 4 (paragraph 4.31) and special report No 3/2012, ‘Structural funds: did the Commission successfully deal with deficiencies identified in the Member States' management and control systems?’, ECA website: http://eca.europa.eu
(21) See paragraph 1.40 of the Court’s 2009 annual report.
(22) See paragraph 1.39 of the Court’s 2009 annual report.
(23) See the Court’s 2011 annual report, paragraph 5.73, recommendation 1: ‘The Court recommends that the Commission makes sanction systems more effective by increasing the impact of financial corrections and by reducing the possibility of replacing ineligible expenditure with other expenditure as proposed by the Commission in the area of cohesion for the next programming period.’
(24) The term ‘director-general’ is used here to cover all persons signing declarations. The declarations have been signed by the Secretary-General of the Commission, 36 directors-general, seven directors and four heads of service and the chief operating officer of the European External Action Service.
(25) The annual activity reports of Commission services are available on the Commission's website: http://ec.europa.eu/atwork/synthesis/aar/index_en.htm.
(26) DG Agriculture and Rural Development (see chapter 3, paragraphs 3.31 to 3.36, and chapter 4, paragraphs 4.38 to 4.40), DG Development and Cooperation – EuropeAid (see chapter 7, paragraph 7.24 and box 7.2) and DG Research and Innovation (see chapter 8, paragraph 8.24).
(27) The synthesis is published on the Commission's website: http://ec.europa.eu/atwork/pdf/synthesis_report_2012_en.pdf, together with its annex http://ec.europa.eu/atwork/pdf/synthesis_report_2012_annex_en.pdf
(28) See Article 59(5)(a) of the Financial Regulation (EU, Euratom) No 966/2012.
(29) Synthesis of the Commission’s Management Achievements in 2012, section 4, page 8.
(30) Synthesis report, p. 8, box 1: ‘To ensure consistency and comparability, the Commission instructs the Central Services to review the different approaches followed to evaluate the amounts estimated to be at risk’.
(31) The Court’s assessment of reporting on performance in three selected directorates-general is presented in chapter 10.
(32) For example the management declaration required of bodies in the Member States (Article 59(5)(a) of the Financial Regulation) and the corporate governance statements required under Article 46(a) of the Fourth Council Directive 78/660/EEC of 25 July 1978 based on Article 54(3)(g) of the Treaty on the annual accounts of certain types of companies (OJ L 222, 14.8.1978, p. 11).
(33) See paragraphs 1.36 to 1.38 of the Court’s 2011 annual report.
(34) Amounts available for commitments in 2012 and future years. The total for commitments includes a sum of 0,3 billion euro brought forward from 2011 and an amount from six amending budgets totalling 1,2 billion euro. In addition, assigned revenue of 6,3 billion euro, not included in the 148,7 billion euro, was available for commitments. Assigned revenues are used to finance specific items of expenditure (see Article 18 of the Financial Regulation — Council Regulation (EC, Euratom) No 1605/2002 (OJ L 248, 16.9.2002, p. 1)). They cover inter alia refunds arising from recovery of amounts paid in error, which are re-allocated to their budget line of origin, contributions from EFTA members increasing budget lines, and revenue from third parties where agreements have been concluded involving a financial contribution to EU activities.
(35) Amounts available for payments in the year. The total for payments includes a sum of 1,1 billion euro brought forward from 2011 and an amount from the same six amending budgets totalling 6,7 billion euro. In addition, assigned revenue of 6,8 billion euro, not included in the 136,8 billion euro, was available for payments.
(36) According to the Interinstitutional Agreement between the European Parliament, the Council and the Commission on budgetary discipline and sound financial management (OJ C 139, 14.6.2006, p. 1), certain commitment appropriations entered in the budget such as the Emergency Aid Reserve, the European Union Solidarity Fund, the Flexibility Instrument and the European Globalisation Adjustment Fund may be over and above the ceiling. In 2012 amounts committed were: Emergency Aid Reserve 224 million euro, European Union Solidarity Fund 688 million euro, Flexibility Instrument 200 million euro and European Globalisation Adjustment Fund 74 million euro, totalling 1 186 million euro.
(37) Apart from cash transactions certain payment appropriations brought forward are included. As specified in Article 15 of Council regulation (EC, Euratom) No 1150/2000 of 22 May 2000 implementing Decision 2007/436/EC, Euratom on the system of the Communities' own resources (OJ L 130, 31.5.2000, p. 1), in the calculation of this surplus, payment appropriations brought forward from the previous year, cancellations of unused payment appropriations from the previous year and exchange differences are taken into account.
(38) See Note 1.1 — EU budget result of the consolidated annual accounts of the EU — 2012.
(39) The budgetary result (budget outturn) is not a reserve and it cannot be accumulated and used in future years to finance expenditure.
(40) See paragraphs 1.34 and 1.38 of the Court’s 2011 annual report.
(41) See ‘Report on Budgetary and Financial Management — Financial Year 2012’.
(42) A further 0,6 billion euro of outstanding budgetary commitments is for the other institutions. This amount brings the total outstanding budgetary commitments of the EU to 218 billion euro.
(43) The budget distinguishes between two types of appropriation: non-differentiated appropriations and differentiated appropriations (made up of differentiated commitments and differentiated payments). Non-differentiated appropriations are used to finance operations of an annual nature, e.g. administrative expenditure. Differentiated appropriations were introduced to manage multiannual operations; the related payments can be made during the year of the commitment and during the following years. Differentiated appropriations are used mainly for the structural funds and the Cohesion Fund.
(44) Two lines on Graph 1.4 make up the 140 billion euro. The line of the 2000-2006 accumulated outstanding budgetary commitments (8 billion euro) and the line of the 2007-2013 accumulated outstanding budgetary commitments (132 billion euro). For cohesion details see ‘Report on Budgetary and Financial Management — Financial Year 2012’, p. 25 and 39 to 42.
(45) This amount included both claims that had been approved for payment and claims that have arrived but not yet verified or approved. See ‘Report on Budgetary and Financial Management — Financial Year 2012’, p. 39.
(46) The net figure of 57,7 billion euro shown in the balance sheet reflects the remainder after the Commission’s estimation of the extent to which beneficiaries have fulfilled the conditions for aid. Some DGs fail to record final expenditure even when they are in possession of elements indicating that real progress has been made (paragraph 1.29 of the Court’s 2010 annual report and paragraph 1.12 of the Court’s 2009 annual report).
(47) This time span corresponds to a total of 3 years and 11 months in Table 1.5 , consisting of 2 years and 5 months on average for outstanding budgetary commitments and 18 months on average for pre-financing.
(48) With the notable exception of loans given, most of the liabilities on the balance sheet will eventually turn into a demand for payment from the budget. Of the 137 billion euro liabilities which do not reflect borrowings, only 42 billion euro is already covered by commitments.
(49) This chapter also covers expenditure considered in the general budget as operational although its purpose is in most cases the functioning of the Commission's administration rather than policy delivery.
(50) Administrative expenditure for various policy groups amounts (in million euro) to:
|
— |
chapter 3: 133 |
|
— |
chapter 4: 253 |
|
— |
chapter 5: 229 |
|
— |
chapter 6: 93 |
|
— |
chapter 7: 624 |
|
— |
chapter 8: 1 627. |
(51) The classification of systems is explained in Annex 1.1 . For the specific assessment of the systems examined see paragraphs 2.40 to 2.42, 3.9 and 3.35, 7.25 and 8.39. The Court's summary assessments for 2012 are consistent with those for 2011.
(52) The frequency of errors represents the proportion of the sample affected by quantifiable and non-quantifiable errors. Percentages are rounded.
(53) The estimated error rate for ‘External relations, aid and enlargement’ is higher than the error rate estimated in 2011 (1,1 %). This difference should be interpreted in the light of the development of the Court's sampling approach (see paragraphs 1.6 and 1.7). This change in approach is the principal identifiable reason for the increase in the estimated error rate (see paragraphs 1.15 and 7.13 to 7.15).
(54) The estimated error rate for ‘Research and other internal policies’ is higher than the error rate estimated in 2011 (3,0 %). This difference should be interpreted in the light of the development of the Court's sampling approach (see paragraphs 1.6 and 1.7). This change in approach is the principal identifiable reason for the increase in the estimated error rate (see paragraphs 1.15 and 8.13 to 8.15).
(55) The developments in the Court's sampling approach explained in paragraphs 1.6 and 1.7 represents at most 0,3 percentage points of the most likely error for 2012 (see paragraph 1.13 and Graph 1.1 ).
(56) The audit involved examination at the Commission level of a sample of recovery orders covering all types of revenue (see paragraph 2.9).
(57) For the full list of Commission DGs/services please see http://publications.europa.eu/code/en/en-390600.htm
(58) Source: annual activity reports of the directorates-general, services and executive agencies; ‘reason for reservation’ adjusted from Part 3.2 (titles) or Part 4, ‘quantification of reservations’ as from Part 3.1 and Part 3.2.
For DG MARE see also annual activity report, page 67, however quantified at 0,0 euro because no payments were made in 2012; for DG REGIO including 1,5 million euro for IPA 2007-2013; for DG DEVCO calculated excluding EDF at 3 853,2 × 3,6 %; for the executive agency EACEA the quantification in the annual activity report is for two years, this table includes 50 % of 8,4 million euro.
(59) Source: 2012 consolidated accounts, payments made in 2012 on ‘Activity Based Budgeting’ (ABB) items.
(60) This column presents the Commission's quantification of the ‘amounts at risk’ in the synthesis report. This is based upon the quantification of reservations in the annual activity reports together with, for shared management, quantification of the overall risk for payments to operational programmes not under reservation. For DG DEVCO the figure includes quantification on EDF spending (Source: annual activity reports, Part 3.1 and Part 3.2). The methodology for quantifying the ‘amounts at risk’ in the synthesis report has changed in comparison with previous years.
The amounts are based on information from the annual activity reports: DG AGRI, page 54, Table 3.2 (16,7 + 915,4 million euro), DG REGIO, pages 67 and 68 (see chapter 5, paragraph 5.54), DG EMPL, table on page 71.
(61) The 2013 figure under (D) states the amount voted before any amending budgets.
(62) The voted commitment appropriations were near the amount established in the framework and have not been presented here.
(63) Source: Report on budgetary and financial management — 2012 — section A.6.3.
(64) A part of the pre-financing paid before 2007 has been allocated to the corresponding financial framework heading based on the DG responsible as the information concerning the budget line was not available in the Commission's information system.
(65) Pre-financing paid as at 31.12.2012 divided by payment made from the year's appropriations.
(66) Heading 1 — Sustainable growth is made up of Headings 1a — Competitiveness for Growth and Employment and 1b — Cohesion for Growth and Employment.
ANNEX 1.1
AUDIT APPROACH AND METHODOLOGY
|
1. |
The Court’s audit approach is set out in the Financial and Compliance Audit Manual (FCAM). This manual is available on the Court’s website. In order to plan audit work, and determine the extent of substantive testing, the Court uses an audit assurance model. This involves considering the risk of errors occuring in transactions (inherent risk) and the risk that the supervisory and control systems do not prevent or detect and correct such errors (control risk). |
PART 1 — Audit approach and methodology for the reliability of accounts (financial audit)
|
2. |
In order to assess whether the consolidated accounts (the consolidated financial statements and the aggregated reports on the implementation of the budget) properly present, in all material respects, the financial position of the European Union, and the revenues, expenses and cashflows at the year end, the audit involves the following key elements:
|
PART 2 — Audit approach and methodology for the regularity of transactions (compliance audit)
|
3. |
The approach taken by the Court to audit the regularity of the transactions underlying the accounts comprises:
|
How the Court tests transactions
|
4. |
The direct testing of transactions within each specific assessment (chapters 2 to 9) is based on a representative sample of the receipts (in the case of revenue) and transactions contained within the policy group concerned (1). This testing provides an estimate of the extent to which the transactions in the population concerned are irregular. |
|
5. |
Transaction testing involves an examination of each transaction selected, to determine whether or not the claim or payment was made for the purposes approved by the budget and the legal basis, correctly calculated and in compliance with the relevant rules and regulations. This involves tracing the transaction down from the budgetary accounts to the level of the final recipient (e.g. farmer, organiser of training course, or development aid project promoter) and testing compliance at each level. When the transaction (at any level) is incorrectly calculated or does not meet a regulatory requirement or contractual provision, it is considered to contain an error. |
|
6. |
For expenditure the Court examines interim and final payments and clearing of advances (‘expensed payments’). In other words it examines transactions at a point when the final recipients of EU funds (e.g. a farmer, a research institute, a company providing publicly procured works or services) have undertaken activities or incurred costs, and when the Commission has accepted that the activities undertaken or costs incurred justified payment from the EU budget. The Court thus looks at the economic reality underlying the transactions in EU’s consolidated accounts. |
|
7. |
The Court’s audit sample is designed to provide an estimate of the level of error in the audited population as a whole. The Court does not examine transactions in every Member State, beneficiary state and/or region each year. The examples provided in the annual report are for illustrative purposes and demonstrate the most typical errors found. The naming of certain Member States, beneficiary states and/or regions does not mean that the examples presented cannot occur elsewhere. The illustrative examples presented in this report do not form a basis for conclusions to be drawn on the Member States, beneficiary states and/or regions concerned (2). |
How the Court evaluates and presents the results of transaction testing
|
8. |
Errors in transactions occur for a variety of reasons and take a number of different forms depending on the nature of the breach and specific rule or contractual requirement not followed. Individual transactions may be wholly or partially affected by error. Errors detected and corrected before and independently of the checks carried out by the Court are excluded from the calculation and frequency of error, since they demonstrate that the supervisory and control systems work effectively. The Court considers whether individual errors are quantifiable or non-quantifiable, depending on whether it is possible to measure how much of the amount audited was affected by error. In addition, the Court analyses the nature of errors detected, in particular distinguishing between eligibility (payment does not meet the eligibility rules), occurrence (reimbursement of a cost which is not proven to have been incurred) or accuracy (payment incorrectly calculated). |
|
9. |
Many errors occur in the application of public procurement laws. To respect the basic principles of competition foreseen in the Treaty, contracts have to be advertised; bids must be evaluated according to specified criteria; contracts may not be artificially split to get below thresholds, etc. |
|
10. |
For its audit purposes the Court puts a value on failures to observe the procedural requirements of procurement law. The Court:
|
|
11. |
The quantification by the Court may differ from that used by the Commission or Member States when deciding how to respond to the misapplication of the public procurement rules. |
Estimated rate of error (most likely error)
|
12. |
On the basis of the errors which it has quantified, the Court, estimates the most likely rate of error (MLE) (6) in each specific assessment, and for spending from the budget as whole. The MLE is a statistical estimate of the likely percentage of error (i.e. quantifiable breaches of applicable regulations, rules, and contract and grant conditions) in the population. The Court also estimates the lower error limit (LEL) and the upper error limit (UEL) (see illustration below).
|
|
13. |
The percentage of the shaded area below the curve indicates the probability that the true error rate of the population is between the LEL and the UEL. |
|
14. |
In planning its audit work, the Court seeks to undertake procedures allowing it to compare the estimated rate of error in the population with a planning materiality of 2 %. In assessing audit results, the Court is guided by this level of materiality and takes account of the nature, amount and context of errors when forming its audit opinion. |
Frequency of error
|
15. |
The Court expresses the frequency by which errors occur by presenting the proportion of the sample affected by either quantifiable or non-quantifiable errors. |
How the Court assesses systems and reports the results
|
16. |
Supervisory and control systems are established by the Commission and Member States, beneficiary states and/or regions to manage the risks to the budget, including the regularity of transactions. Assessing the effectiveness of systems in ensuring regularity is therefore a key audit procedure, and particularly useful for identifying recommendations for improvement. |
|
17. |
Each policy group is subject to a multitude of individual systems, as is revenue. The Court therefore normally assesses a sample of systems each year. The results of the systems assessments are presented in the form of a table called ‘Results of examination of systems’ given in Annexes X.2 of chapters 2 to 9. Systems are classified as being effective in mitigating the risk of error in transactions, partially effective (when there are some weaknesses affecting operational effectiveness) or not effective (when weaknesses are pervasive and thereby completely undermine operating effectiveness). |
How the Court arrives at its opinions in the Statement of Assurance
|
18. |
The Court arrives at its opinion on the regularity of transactions underlying the European Union's consolidated accounts, set out in the Statement of Assurance, on the basis of all its audit work as reported in chapters 2 to 9 of this report and including an assessment of the pervasiveness of error. The work performed allows the Court to assess the assurance that errors in the population exceed or fall within the materiality limits. The Court’s best estimate of the rate of error for overall spending in 2012 is 4,8 %. The Court has more than 95 % confidence that the rate of error for the audited population is material. The estimated error rate found in different policy areas varies as described in chapters 3 to 9. The Court assessed error as pervasive — extending across the majority of spending areas. The Court gives an overall opinion on the regularity of commitments based on an additional horizontal sample. |
Irregularity or fraud
|
19. |
The majority of errors arise from misapplication or misunderstanding of the often complex rules of EU expenditure schemes. If the Court has reason to suspect that fraudulent activity has taken place, it reports this to OLAF, the Union’s antifraud office, which is responsible for carrying out any resulting investigations. The Court reports several cases per year to OLAF. |
PART 3 — Link between the audit opinions for the reliability of accounts and the regularity of transactions
|
20. |
Pursuant to the provisions of Article 287 of the TFEU the Court has issued:
|
|
21. |
These audit opinions and the related audits are undertaken in accordance with the IFAC International Standards on Auditing and Codes of Ethics and the INTOSAI International Standards of Supreme Audit Institutions. |
|
22. |
These standards also provide for the situation where auditors issue audit opinions on the reliability of accounts and the regularity of transactions underlying those accounts, by stating that a modified opinion on the regularity of transactions does not in itself lead to a modified opinion on the reliability of accounts. The financial statements on which the Court places an opinion, in particular Note 6, recognise that there is a material issue in relation to breaches of the rules governing expenses charged to the EU budget. Accordingly, the Court has decided that the existence of a material level of error affecting regularity is not in itself a reason to modify its separate opinion on the reliability of the accounts. |
(1) Additionally to this, a horizontal representative sample of commitments is drawn and tested for compliance with the relevant rules and regulations.
(2) The aim of the audit is to reach a valid conclusion on EU expenditure and revenue as a whole. In order to make a valid, statistically significant, comparison among Member States, beneficiary states and/or regions, it would be necessary to sample a much larger number of transactions in each of them than is realistically possible.
(3) There are essentially two award systems: the lowest offer or the most advantageous offer.
(4) Examples of a quantifiable error: no or restricted competition (except where this is explicitly allowed by the legal framework) for the main or a supplementary contract; inappropriate assessment of bids with an impact on the outcome of the tender; substantial change of the contract scope; artificial splitting of contracts in order to bring projects below the threshold at which public procurement rules apply.
(5) Examples of a non-quantifiable error: inappropriate assessment of bids without impact on the outcome of the tender, formal weaknesses of tender procedure or tender specification, formal aspects of the transparency requirements not respected.
(6)
, where ASI is the average sampling interval and i is the numbering of transactions in the sample.
ANNEX 1.2
FOLLOW-UP OF OBSERVATIONS FROM PREVIOUS YEARS CONCERNING THE RELIABILITY OF ACCOUNTS
|
Observations raised in previous years |
Court’s analysis of the progress made |
Commission reply |
||||||
|
|
|
||||||
|
For pre-financings, accounts payable and related cut-off, since the financial year 2007 the Court has identified accounting errors with an immaterial financial impact overall but a high frequency. This underlines the need for further improvement at the level of certain directorates-general. |
|
|
||||||
|
As regards accounting for amounts pre-financed, the Court also identified:
|
The Court found that several directorates-general continue to record estimates in the accounts even when they have an adequate basis for clearing the corresponding pre-financings. In some cases, delays in accounting for expenditure incurred are linked to a loss of audit trail. The Court considers that significant improvements in procedures are required in certain directorates-general. |
The Commission is aware of the importance of this matter and is continuously working to improve its procedures. A specific article has been introduced in the revised Financial Regulation to encourage a more regular clearing of the pre-financings. These provisions are complemented by an interpretative guidance note which has been distributed to all Commission's directorates-general. |
||||||
|
The Commission included financial engineering instruments in the 2010 accounts and advances from other aid schemes in the 2011 accounts. Outstanding balances in both cases are estimated on the assumption that funds are used evenly over the period of operation. The Commission should keep this assumption under review. |
The method described by the Court is applied since these particular items of expenditure have been identified. The Commission considers it unlikely that a different methodology, more reliable and at the same time cost-efficient, can be developed in the few months remaining of the current programming period. |
||||||
|
|
|
||||||
|
Financial reporting guidelines pertaining to what information is to be included and how it should be treated should be examined. Additional efforts are needed to improve the quality of the data presented. |
The accounting officer has refined the presentation of information on recoveries and financial corrections in note 6. This note is now more focussed, and less extensive. Note 6 also contains non-financial information which could be better presented in the report on the protection of the EU budget according to Article 150(4) of the Financial Regulation (EU, Euratom) No 966/2012 to be presented to the budgetary authorities in September of each year. |
The Commission will continue its efforts to further improve the presentation of this information, noting that more detailed information will be presented in the Communication from the Commission on the protection of the EU budget. |
||||||
|
At year-end 2010 and 2011, for cohesion, a total amount of 2,5 billion euro still remained to be implemented (i.e. ‘cashed’ through the receipt of a repayment by the Commission or payment by the Commission on the basis of a claim from which the Member State has deducted ineligible expenditure). The low implementation rate of 71 % for 2010 and 72 % for 2011 was explained by the ongoing closure process for the programme period 2000-2006. Payment claims received end-2010 were not yet authorised, which meant that the related financial corrections could not be taken into account in the 2010 implementation figures. |
At the end of 2012, an amount of 1,1 billion euro remained to be implemented (implementation rate of 90 %). The total for 2012 included amounts of financial corrections that were part of the closure of 2000-2006 programmes (see box 1.1). |
This figure is expected to increase during 2013 due to the closure of the ERDF 2000-2006 programmes. However for the Cohesion Fund, the regulatory provisions are different and the 2000-2006 Cohesion Fund projects will be closed mainly in the following year. |
||||||
|
|
|
||||||
|
The Commission should ensure that all the necessary accounting and technical information is available at the time when the transfer of the assets takes place in order to safeguard assets effectively. |
The Commission is working with the European Space Agency to ensure that at the time of the transfer all the necessary accounting and technical information will be available. |
The Commission has performed in-depth checks and has reasonable assurance that the amounts recognised on the balance sheet for Galileo are reliable. The preparations for the transfer of the assets are steadily advancing. The Commission will continue auditing the financial reports provided by ESA and correct errors if necessary. It will encourage and support ESA in further improving the quality of the financial reporting. |
||||||
|
In its 2010 and subsequent annual reports, the Court has drawn attention to the reservation made by the responsible director-general in his annual activity report concerning the reliability of the European Space Agency’s financial reporting. |
The responsible director-general maintained a reservation concerning the reliability of the financial reporting of the European Space Agency in his 2012 annual activity report. |
|
ANNEX 1.3
EXTRACTS FROM THE 2012 CONSOLIDATED ACCOUNTS (1)
Table 1 — Balance sheet (2)
|
(million euro) |
||
|
|
31.12.2012 |
31.12.2011 |
|
Non-current assets |
||
|
Intangible assets |
188 |
149 |
|
Property, plant and equipment |
5 978 |
5 071 |
|
Investments accounted for using the equity method |
392 |
374 |
|
Financial assets |
62 311 |
43 672 |
|
Receivables and recoverables |
564 |
289 |
|
Long-term pre-financing |
44 505 |
44 723 |
|
|
113 938 |
94 278 |
|
Current assets |
||
|
Inventories |
138 |
94 |
|
Financial assets |
1 981 |
3 721 |
|
Receivables and recoverables |
14 039 |
9 477 |
|
Pre-financing |
13 238 |
11 007 |
|
Cash and cash equivalents |
10 674 |
18 935 |
|
|
40 070 |
43 234 |
|
Total assets |
154 008 |
137 512 |
|
Non-current liabilities |
||
|
Pension and other employee benefits |
(42 503) |
(34 835) |
|
Provisions |
(1 258) |
(1 495) |
|
Financial liabilities |
(57 232) |
(41 179) |
|
Other liabilities |
(2 527) |
(2 059) |
|
|
(103 520) |
(79 568) |
|
Current liabilities |
||
|
Provisions |
(806) |
(270) |
|
Financial liabilities |
(15) |
(51) |
|
Payables |
(90 083) |
(91 473) |
|
|
(90 904) |
(91 794) |
|
Total liabilities |
(194 424) |
(171 362) |
|
Net assets |
(40 416) |
(33 850) |
|
Reserves |
4 061 |
3 608 |
|
Amounts to be called from Member States (3) |
(44 477) |
(37 458) |
|
Net assets |
(40 416) |
(33 850) |
Table 2 — Statement of financial performance (4)
|
(million euro) |
||
|
|
2012 |
2011 |
|
Operating revenue |
||
|
Own resource and contributions revenue |
130 919 |
124 677 |
|
Other operating revenue |
6 826 |
5 376 |
|
|
137 745 |
130 053 |
|
Operating expenses |
||
|
Administrative expenses |
(9 320) |
(8 976) |
|
Operating expenses |
(124 633) |
(123 778) |
|
|
(133 953) |
(132 754) |
|
Surplus/(Deficit) from operating activities |
3 792 |
(2 701) |
|
Financial revenue |
2 157 |
1 491 |
|
Financial expenses |
(1 942) |
(1 355) |
|
Movement in pension and other employee benefits liability |
(8 846) |
1 212 |
|
Share of net deficit of joint ventures and associates |
(490) |
(436) |
|
Economic result for the year |
(5 329) |
(1 789) |
Table 3 — Cashflow statement (5)
|
(million euro) |
||
|
|
2012 |
2011 |
|
Economic result for the year |
(5 329) |
(1 789) |
|
Operating activities |
||
|
Amortisation |
39 |
33 |
|
Depreciation |
405 |
361 |
|
(Increase)/decrease in loans |
(16 062) |
(27 692) |
|
(Increase)/decrease in receivables and recoverables |
(4 837) |
1 605 |
|
(Increase)/decrease in pre-financing |
(2 013) |
(1 534) |
|
(Increase)/decrease in inventories |
(44) |
(3) |
|
Increase/(decrease) in provisions |
299 |
234 |
|
Increase/(decrease) in financial liabilities |
16 017 |
27 781 |
|
Increase/(decrease) in other liabilities |
468 |
(45) |
|
Increase/(decrease) in payables |
(1 390) |
6 944 |
|
Prior year budgetary surplus taken as non-cash revenue |
(1 497) |
(4 539) |
|
Other non-cash movements |
260 |
(75) |
|
Increase/(decrease) in pension and employee benefits liability |
7 668 |
(2 337) |
|
Investing activities |
||
|
(Increase)/decrease in intangible assets and property, plant and equipment |
(1 390) |
(693) |
|
(Increase)/decrease in investments accounted for using the equity method |
(18) |
118 |
|
(Increase)/decrease in available for sale financial assets |
(837) |
(1 497) |
|
Net cashflow |
(8 261) |
(3 128) |
|
Net increase/(decrease) in cash and cash equivalents |
(8 261) |
(3 128) |
|
Cash and cash equivalents at the beginning of the year |
18 935 |
22 063 |
|
Cash and cash equivalents at year end |
10 674 |
18 935 |
Table 4 — Statement of changes in net assets (6)
|
(million euro) |
|||||
|
|
Reserves (A) |
Amounts to be called from Member States (B) |
Net Assets = (A) + (B) |
||
|
Fair value reserve |
Other reserves |
Accumulated Surplus/(Deficit) |
Economic result for the year |
||
|
Balance as at 31 December 2010 |
(61) |
3 545 |
(48 163) |
17 232 |
(27 447) |
|
Movement in Guarantee Fund reserve |
|
165 |
(165) |
|
0 |
|
Fair value movements |
(47) |
|
|
|
(47) |
|
Other |
|
2 |
(30) |
|
(28) |
|
Allocation of the 2010 economic result |
|
4 |
17 228 |
(17 232) |
0 |
|
2010 budget result credited to Member States |
|
|
(4 539) |
|
(4 539) |
|
Economic result for the year |
|
|
|
(1 789) |
(1 789) |
|
Balance as at 31 December 2011 |
(108) |
3 716 |
(35 669) |
(1 789) |
(33 850) |
|
Movement in Guarantee Fund reserve |
|
168 |
(168) |
|
0 |
|
Fair value movements |
258 |
|
|
|
258 |
|
Other |
|
21 |
(19) |
|
2 |
|
Allocation of the 2011 economic result |
|
6 |
(1 795) |
1 789 |
0 |
|
2011 budget result credited to Member States |
|
|
(1 497) |
|
(1 497) |
|
Economic result for the year |
|
|
|
(5 329) |
(5 329) |
|
Balance as at 31 December 2012 |
150 |
3 911 |
(39 148) |
(5 329) |
(40 416) |
Table 5 — EU Budget result (7)
|
(million euro) |
||
|
European Union |
2012 |
2011 |
|
Revenue for the financial year |
139 541 |
130 000 |
|
Payments against current year appropriations |
(137 738) |
(128 043) |
|
Payment appropriations carried over to year N+1 |
(936) |
(1 019) |
|
Cancellation of unused payment appropriations carried over from year N–1 |
92 |
457 |
|
Exchange differences for the year |
60 |
97 |
|
Budget result (8) |
1 019 |
1 492 |
(1) The reader is advised to consult the full text of the consolidated accounts of the European Union for the financial year 2012 including both the consolidated financial statements and explanatory notes and the aggregated reports on implementation of the budget and explanatory notes.
(2) The balance sheet is presented using the layout as in the consolidated accounts of the European Union.
(3) The European Parliament has adopted a budget on 13 December 2012 which provides for the payment of the Union's short-term liabilities from own resources to be collected by, or called up from, the Member States in 2013. Additionally, under Article 83 of the Staff Regulations (Council Regulation (EEC, Euratom, ECSC) No 259/68 of 29 February 1968, as amended), the Member States shall jointly guarantee the liability for pensions.
(4) The statement of financial performance is presented using the layout as in the consolidated accounts of the European Union.
(5) The cashflow statement is presented using the layout as in the consolidated accounts of the European Union.
(6) The statement of changes in net assets is presented using the layout as in the consolidated accounts of the European Union.
(7) The EU budget result is presented using the layout as in the consolidated accounts of the European Union.
(8) Of which EFTA result is (4) million euro in 2012 and (5) million euro in 2011.
CHAPTER 2
Revenue
TABLE OF CONTENTS
Introduction
Specific characteristics of revenue
Audit scope and approach
GNI-based own resources
Traditional own resources
VAT-based own resources
Regularity of transactions
GNI-based own resources
Traditional own resources
VAT-based own resources
Other revenue
Effectiveness of systems
GNI-based own resources
Management of reservations
Assessment of Commission’s verification of GNI data
Traditional own resources
VAT-based own resources
Annual activity reports
Conclusions and recommendations
Conclusions for revenue 2012
Recommendations
Annex 2.1 — Results of transaction testing for revenue
Annex 2.2 — Results of the examination of systems for revenue
Annex 2.3 — Follow-up of previous recommendations for revenue
|
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
INTRODUCTION |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Table 2.1 — Revenue — key information 2012
Source: 2012 consolidated accounts of the European Union. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Specific characteristics of revenue |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Audit scope and approach |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
GNI-based own resources |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Traditional own resources |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
VAT-based own resources |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
REGULARITY OF TRANSACTIONS |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
GNI-based own resources |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Traditional own resources |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
VAT-based own resources |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Other revenue |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
EFFECTIVENESS OF SYSTEMS |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
GNI-based own resources |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Management of reservations |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Table 2.2 — Member States’ specific GNI/GNP reservations as at 31 December 2012 (29)
Source: European Court of Auditors. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Assessment of Commission’s verification of GNI data |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
2.28. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
(b) |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Traditional own resources |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
VAT-based own resources |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Table 2.3 — VAT reservations as at 31 December 2012
Source: European Court of Auditors. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Fines and penalties |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Annual activity reports |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
CONCLUSIONS AND RECOMMENDATIONS |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Conclusions for revenue 2012 |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
2.41. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
2.42. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Recommendations |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
2.44. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
In preparation of the next verification cycle, starting in 2015, the Commission will review its control framework. In that process it will take into consideration the points raised by the Court. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Commission in the course of its regular TOR inspections will continue to verify that the Member States have put in place appropriate control frameworks to protect the financial interests of the EU in the area of traditional own resources. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Commission will continue to examine the use of the A and B accounts in the course of its inspections and will request the Member States to ensure that they are complete and correct. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
(1) Council Decision 2007/436/EC, Euratom of 7 June 2007 on the system of the European Communities’ own resources (OJ L 163, 23.6.2007, p. 17) and Council Regulation (EC, Euratom) No 1150/2000 of 22 May 2000 implementing Decision 2007/436/EC, Euratom on the system of the European Communities’ own resources (OJ L 130, 31.5.2000, p. 1), as last amended by Regulation (EC, Euratom) No 105/2009 (OJ L 36, 5.2.2009, p. 1).
(2) This data is agreed between the Commission and the Member States at the meeting of the Advisory Committee on Own Resources.
(3) Unless reservations are set (see paragraph 2.24).
(4) They may be positive or negative in each Member State. For 2012, net GNI balances and adjustments amounted to 284 million euro, 0,2 % of revenue (positive adjustments amounted to 952 million euro, 0,7 % of revenue, and negative adjustments amounted to 668 million euro, 0,5 % of revenue).
(5) When duties or levies remain unpaid and no security has been provided, or they are covered by securities but have been challenged, Member States may suspend making these resources available by entering them in these separate accounts.
(6) Article 4 of Decision 2007/436/EC, Euratom. This reduction was approximately 4 billion euro in 2012. The 74 million euro referred to in Table 2.1 represents the effect of exchange rate differences.
(7) Articles 2(4) and 2(5) of Decision 2007/436/EC, Euratom. The 2 million euro related to the GNI-based contribution in Table 2.1 is the effect of exchange rate differences.
(8) A recovery order is the procedure by which the authorising officer (AO) registers a Commission entitlement in order to retrieve the amount which is due.
(9) The assessment of the verification of GNI data included visits in the five Member States with the largest contributions to GNI-based own resources: Germany, Spain, France, Italy and United Kingdom.
(10) The Member States examined in descending order of GNI-based own resources contributions were Germany, France, United Kingdom, Italy, Spain, Netherlands, Belgium, Sweden, Poland and Austria.
(11) The Court could not confirm the correctness of 8 million euro out of 240 million euro.
(12) Reservations can be general or specific. General reservations cover all elements of the GNI compilation. Specific reservations cover discrete elements of GNI (GNP until 2001, GNI thereafter).
(13) Same applies to VAT-based own resources.
(14) For Bulgaria and Romania in 2012 there were general reservations covering the years 2007 and 2008. In January 2013 these were lifted and replaced by eight specific reservations for Bulgaria and 11 specific reservations for Romania covering the years 2007 to 2010.
(15) These reservations are defined by the Commission as points notified to all Member States to enable Eurostat to make a comparison of the underlying compilation of data.
(16) One reservation concerns Greece and the other the United Kingdom.
(17) See Article 5(2)(b) of Council Regulation (EC, Euratom) No 1287/2003 of 15 July 2003 on the harmonisation of gross national income at market prices (GNI Regulation) (OJ L 181, 19.7.2003, p. 1).
(18) For example, in the classification and valuation of non-profit institutions serving households in Germany, Spain and France; in the estimation of the underground economy in Germany, Spain, France and Italy, of distribution margins in Germany and of renting services in France and Italy.
(19) For example, in the recording of EU grants and of rents on land.
(20) The scale of the potential impact of the quantifiable observations on the annual GNI contribution of the Member States visited ranged from +0,4 % to –1,1 %, but this assumes that no other changes would have been needed for GNI components in the five Member States concerned, or in the GNI estimates of the other 22 Member States. The weaknesses leading to the non-quantifiable observations may also affect the calculation of Member States' contributions. Overall, the differences found are neither material for GNI for 2002 to 2007 nor for 2012.
(21) The balance of an increase of 31 million euro and a decrease of 35 million euro.
(22) About 10,8 billion out of 11 billion euro.
(23) Articles 84, 85 and 85a of Commission Regulation (EC, Euratom) No 2342/2002 of 23 December 2002 laying down detailed rules for the implementation of Council Regulation (EC, Euratom) No 1605/2002 on the Financial Regulation applicable to the general budget of the European Communities (OJ L 357, 31.12.2002, p. 1), as last amended by Regulation (EC, Euratom) No 478/2007 (OJ L 111, 28.4.2007, p. 13).
(24) See paragraphs 2.29 to 2.31 in the 2011 annual report.
(25) For 2012 the GNI Committee stated that it cannot yet form an opinion on the GNI data of Bulgaria and Romania as the verification is still ongoing.
(26) Ruling of 27 September 2012 for joined cases C- 113/10, C-147/10 and C-234/10.
(27) Commission Regulation (EC) No 1193/2009 of 3 November 2009 correcting Regulations (EC) No 1762/2003, (EC) No 1775/2004, (EC) No 1686/2005, (EC) No 164/2007 and fixing the production levies in the sugar sector for marketing years 2002/2003, 2003/2004, 2004/2005, 2005/2006 (OJ L 321, 8.12.2009, p. 1).
(28) Marketing years 2002/2003 to 2005/2006.
(29) The transversal specific reservations are not included in the table.
ANNEX 2.1
RESULTS OF TRANSACTION TESTING FOR REVENUE
|
|
2012 |
2011 |
2010 |
2009 |
|||||||
|
TOR |
VAT/GNI, corrections under budget Title 1 |
Other revenue |
Total |
||||||||
|
SIZE AND STRUCTURE OF THE SAMPLE |
|||||||||||
|
Total transactions: |
5 |
47 |
3 |
55 |
55 |
55 |
62 |
||||
|
Recovery orders |
5 |
47 |
3 |
55 |
55 |
55 |
62 |
||||
|
Proportion (number) of transactions tested found to be: |
|||||||||||
|
Free of error |
100 % |
(5) |
100 % |
(47) |
100 % |
(3) |
100 % |
(55) |
98 % |
100 % |
95 % |
|
Affected by one or more errors |
0 % |
(0) |
0 % |
(0) |
0 % |
(0) |
0 % |
(0) |
2 % |
0 % |
5 % |
|
ESTIMATED IMPACT OF QUANTIFIABLE ERRORS |
|||||||||||
|
Most likely error rate |
0 % |
|
|
|
|||||||
(1) To improve insight into areas with different risk profiles within the policy group, the sample was split up into segments. The results of testing reflect the proportionate share each segment has within the policy group.
(2) Numbers quoted in brackets represent the actual number of transactions.
ANNEX 2.2
RESULTS OF THE EXAMINATION OF SYSTEMS FOR REVENUE
Assessment of the systems examined
|
System concerned |
Commission checks in Member States |
Commission calculation/desk checks and revenue management |
Commission management of reservations |
Key internal controls in Member States visited |
Overall assessment |
|
GNI |
Partially effective (1) |
Effective |
Effective |
N/A |
Effective |
|
VAT |
Effective |
Effective |
Effective |
N/A |
Effective |
|
TOR |
Effective |
Effective |
N/A |
Partially effective (2) |
Effective |
|
UK correction |
N/A |
Effective |
N/A |
N/A |
Effective |
|
Fines and penalties |
N/A |
Effective |
N/A |
N/A |
Effective |
(1) See paragraphs 2.28 to 2.30.
(2) See paragraphs 2.31 to 2.33.
ANNEX 2.3
FOLLOW-UP OF PREVIOUS RECOMMENDATIONS FOR REVENUE
|
Year |
Court Recommendation |
Court's analysis of the progress made |
Commission reply |
|||||
|
Fully implemented |
Being implemented |
Not implemented |
No longer applicable |
Insufficient evidence |
||||
|
In most respects |
In some respects |
|||||||
|
2010 |
The Court recommended in its 2010 and 2009 annual reports that the Commission should: |
|
|
|
|
|
|
|
|
Present to the GNI Comittee the assessment reports on GNI data of Member States so as to be able to replace in 2012 all existing general reservations with specific reservations for the period 2002 onwards. |
The Comission already presented to the GNI Committee the draft assessment reports and replaced the general reservations by the specific reservations (the draft assesment reports were presented in 2011 for the EU-25 Member States and in 2012 for Bulgaria and Romania and the general reservations were replaced by the specific ones in January 2012 and January 2013, respectively). |
|
|
|
|
|
|
|
|
2010 and 2009 |
Make clear the scope of the opinion it provides in its assessment reports on Member States GNI data. |
In the two reports the Commission presented to the GNI Committee in 2012 (Bulgaria and Romania) the Commission made an assessment on the quality of GNI data and on its conformity with ESA95, clarifying the objectives and identifying the verifications carried-out to support the overall conclusion. |
|
|
|
|
|
|
|
Take into account an evaluation of supervisory and control systems in the national statistical institutes (NSI) for the compilation of national accounts. |
|
|
|
In 2012 Eurostat had not adopted guidelines setting out best practices on the functioning of supervisory control systems for the compilation of national accounts. |
|
|
See reply to paragraph 2.43. |
|
|
Continue its efforts to ensure that B accounts are correctly used by Member States. |
|
Although the Commission follows-up the use of B accounts every year, the problem persists. |
|
|
|
|
See reply to paragraph 2.43. |
|
|
Continue its efforts to ensure that national customs supervision (e.g. granting of the ‘super simplification’ for users of local clearance procedures) is further strenghtened. |
|
|
In December 2012 the Commission presented a report on its follow-up of the local clearance procedure in Member States. Conclusions of the report indicate that the national customs supervision needs further improvement. |
|
|
|
See reply to paragraph 2.43. |
|
|
2009 |
Continue to press the Member States to provide quickly adequate information which would enable it to lift long-outstanding reservations as soon as possible. |
|
|
There were 16 long-outstanding reservations at the end of 2012 compared to 20 in 2009. |
|
|
|
See reply to paragraph 2.43. |
CHAPTER 3
Agriculture: market and direct support
TABLE OF CONTENTS
Introduction
Specific characteristics of the policy group
Audit scope and approach
Regularity of transactions
Effectiveness of systems
Member States' systems related to regularity of transactions
The Integrated Administration and Control System (IACS)
Control systems applicable to the EU food aid scheme for the most deprived persons
Commission’s estimates of the residual error rate
Conclusion and recommendations
The conclusion for 2012
Recommendations
|
Annex 3.1 — |
Results of transaction testing for agriculture: market and direct support |
|
Annex 3.2 — |
Results of examination of systems for agriculture: market and direct support |
|
Annex 3.3 — |
Follow-up of previous recommendations for agriculture: market and direct support |
|
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
INTRODUCTION |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Table 3.1 — Market and direct support for agriculture — Key information 2012
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Specific characteristics of the policy group |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Audit scope and approach |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
REGULARITY OF TRANSACTIONS |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Overdeclarations — Claiming aid for ineligible land In Spain, Austria and Portugal some reference parcels claimed and paid for as permanent pasture were in reality fully or partly covered with rocks, dense forests or bushes, which should exclude them from EU aid (22). Aid claims for these parcels were accepted because their real status was not properly reflected in the LPIS. In some of the cases the parcels may have been used for an agricultural activity in the past, but were found to have been abandoned for years. |
Overdeclarations — Claiming aid for ineligible land The ongoing conformity clearance procedures will cover the risks in relation to all three Member States mentioned by the Court. As regards the eligibility of pasture areas in Spain, the National Authorities were requested to act on this matter and presented the LPIS Improvement Plan in November 2010. This improvement plan includes notably measures to implement the application of an eligibility coefficient to pasture parcels and to ensure systematic update of LPIS with the results of on-the-spot checks. The Commission monitors the implementation of this plan as part of the conformity clearance, via which the corresponding risk for the Fund will be covered. As regards Portugal, the shortcoming was subject to an action plan which was completed in 2013. For the years concerned, the risk for the Fund is subject to a conformity clearance procedure. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Incorrect calculation of payment entitlements recorded in the entitlement database In France SPS aid payments audited were incorrect due to non-compliance with the national ceiling for allocated entitlements fixed by the EU legislation (23). Incorrect entitlement calculations were also found in Luxembourg (see paragraph 3.23). |
Incorrect calculation of payment entitlements recorded in the entitlement database In relation to the incorrect calculation of payments entitlements in France, conformity clearance procedures covering FY2011 and FY2012 are ongoing. France has been requested to correct the value of the entitlements without any unnecessary delay. The Commission observes that its conformity procedure for the incorrectness of the payment entitlements in France was launched as a follow-up to the DAS 2011 exercise and that this error is clearly confined to France. The exact amount of the undue payments for the overall population will be determined and fully recovered via the conformity procedure. The Commission estimates that this ceiling overshoot represents 0,2 percentage points of the overall error rate established by the Court. The observation concerning Luxembourg will be followed up via the conformity clearance procedure. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Box 3.2 — Example of eligibility errors — Ineligible staff costs In Portugal salaries of staff of the regional authorities in charge of carrying out on-the-spot inspections were claimed by these authorities as technical assistance, contrary to the EU legislation (25). |
Box 3.2 — Example of eligibility errors — Ineligible staff costs This issue will be followed up in the framework of the conformity clearance procedure. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
EFFECTIVENESS OF SYSTEMS |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Member States' systems related to regularity of transactions |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Integrated Administration and Control System (IACS) |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Administrative and control procedures and quality of databases |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Box 3.3 — Examples of incorrect data in LPIS/GIS In the United Kingdom (England) the paying agency does not assess the eligibility of common land (329 000 ha) and makes only limited use of ortho-images for assessing the eligibility of other parcels claimed. The Court reviewed a risk-based sample of forest parcels and found that some had benefited from EU aid, contrary to EU legislation. In the United Kingdom (Northern Ireland) ineligible features are not displayed as ineligible land in the GIS. An LPIS update was carried out in 2011 in order to remedy the weaknesses detected during the quality assessment required by EU legislation (31). The Court reviewed a limited risk-based sample of reference parcels which according to the ortho-images were forests and found that several of these parcels were recorded as permanent pasture. For some other parcels the eligible area recorded in the LPIS was found to be bigger than the total area of the parcel. |
Box 3.3 — Examples of incorrect data in LPIS/GIS Presently, there is no legal obligation for the use of ortho-images. However, the Commission has proposed in the horizontal regulation dealing with control, financing and monitoring of the CAP, that MS would be required to use such imagery. If audits show that information in the system is wrong and this has created a risk, this is followed up under the conformity clearance procedure. As regards the situation in Northern Ireland, the update activities carried out by the authorities in 2011 were a result of audits carried out by the Commission services in the years 2006-2009. These have led to financial corrections for the years until 2009. Conformity clearance procedures are still underway in respect of the subsequent years. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Control systems based on physical on-the-spot checks |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Procedures to ensure recovery of undue payments |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Control systems applicable to the EU food aid scheme for the most deprived persons |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Commission’s estimates of the residual error rate |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
CONCLUSION AND RECOMMENDATIONS |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The conclusion for 2012 |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Overall audit evidence indicates that accepted expenditure is affected by a material level of error. |
The Commission underlines that it safeguards the financial interest of the EU budget via financial corrections in the framework of the conformity clearance procedure. In addition, shortcomings in Member States’ management and control systems are addressed through targeted and comprehensive action plans where necessary. The Commission also notes that the lower error limit estimated by the Court is below the materiality threshold. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Recommendations |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
3.37. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
To enable maintenance of agriculture in specific areas, the Member States can implement a procedure which ensures that the eligible area within these parcels is considered for payment, in so far that overall the parcel can still be considered as ‘agricultural’. Guidelines including examples on how to assess the area to be taken into account have been discussed with and distributed to the Member States over the recent years. Where it is found that the Member State fails to correctly record eligible area the case is subject to a clearance procedure. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
When the Commission services detect such problems during the course of their audits, they request the Member State to take remedial actions. Where the problem is particularly acute, the Member State is required to implement a remedial action plan which is closely followed by the services. So far such plans have been found to be very effective. The Commission also ensures that the financial risk to the EU budget arising from such deficiencies is covered via financial corrections imposed via the conformity clearance procedure. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Commission shares the view of the Court in this regard and it will continue to focus its audits on the risk of ineligible land being not detected prior to the payments. Financial corrections will be applied where necessary to protect the EU financial interests. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Commission continues to review the work of the Certification Bodies via the analysis of the documents related to the financial clearance of accounts as well as audit missions to Certification Bodies. In addition, in 2012, specific audit missions were conducted at 14 Certification Bodies to review their work on on-the-spot controls and control statistics, because these fields were identified by the Commission to be particular risks. In September 2012, a Certification Bodies’ expert group meeting was organised. Furthermore, in preparation to the new programming period, and in line with the increased responsibility of Certification Bodies to cover legality and regularity of expenditure, bilateral meetings are organised with Certification Bodies in 2013. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
(1) Article 39 of the Treaty on the Functioning of the European Union (TFEU).
(2) Council Regulation (EC) No 1290/2005 of 21 June 2005 on the financing of the common agricultural policy (OJ L 209, 11.8.2005, p. 1).
(3) With the exception of certain measures such as promotion measures and the school fruit scheme, which are co-financed.
(4) The number and value of each farmer's entitlements are calculated by the national authorities according to one of the models provided for under EU legislation.
(5) Bulgaria, Czech Republic, Estonia, Cyprus, Latvia, Lithuania, Hungary, Poland, Romania and Slovakia.
(6) Coupled aid payments are payments which are calculated on the basis of number of animals and/or number of hectares cultivated with a specific crop (e.g. suckler cows, cotton, rice, etc.).
(7) Articles 4 to 6 of Council Regulation (EC) No 73/2009 (OJ L 30, 31.1.2009, p. 16).
(8) Whilst GAEC standards, as referred to in Annex III of Regulation (EC) No 73/2009, apply in all Member States, SMRs as referred to in Annex II of that regulation are mandatory only in EU-15. For the EU-10, SMRs are being phased in between 2009 and 2013, and for EU-2 between 2012 and 2016.
(9) According to Articles 70 and 71 of Commission Regulation (EC) No 1122/2009 (OJ L 316, 2.12.2009, p. 65), the level of the reduction per SMR or GAEC obligation not complied with can vary between 1 % and 5 % in case of negligence and can lead to full rejection of the aid in case of intentional non-compliance.
(10) Articles 3 and 9 of Regulation (EC) No 1290/2005.
(11) In order to provide additional insight into the non-IACS component of the population, the sample was stratified and comprised 140 IACS transactions and 40 non-IACS transactions.
(12) Czech Republic, Denmark, Germany, Ireland, Greece, Spain, France, Italy, Latvia, Luxembourg, Hungary, Austria, Poland, Portugal, Romania and the United Kingdom.
(13) Avoiding the encroachment of unwanted vegetation, retention of terraces, maintenance of olive groves and respect of minimum livestock stocking rates or mowing obligations.
(14) SMR 4 relating to Council Directive 91/676/EEC of 12 December 1991 concerning the protection of waters against pollution caused by nitrates from agricultural sources (OJ L 375, 31.12.1991, p. 1).
(15) Cross-compliance obligations are substantive legal requirements that must be met by all recipients of EU direct aid. They are the basic and in many cases the only conditions to be respected in order to justify the payment of the full amount of direct aid, hence the Court’s decision to treat cross-compliance infringements as errors.
(16) For each infringement, the national system for reduction of payments has been used for the quantification of the error. See also footnote 9.
(17) Regulation (EC) No 1122/2009 provides that, where the claimed area is found to be overstated by more than 3 % or two hectares, the aid amount shall be calculated on the basis of the area determined reduced by twice the area claimed irregularly. If the difference is more than 20 % no aid shall be granted for the crop group concerned. Similar provisions apply to animal premia.
(18) Except in cases where Member States had already found the irregularity without applying the due reductions/exclusions.
(19) The paying agencies and key controls were selected on the basis of a risk analysis.
(20) Article 43 of Council Regulation (EC) No 1234/2007 of 22 October 2007establishing a common organisation of agricultural markets and on specific provisions for certain agricultural products (Single CMO Regulation) (OJ L 299, 16.11.2007, p. 1).
(21) The Court calculates its estimate of error from a representative sample. The figure quoted is the best estimate. The Court has 95 % confidence that the rate of error in the population lies between 1,7 % and 5,9 % (the lower and upper error limits respectively).
(22) EU legislation defines permanent pasture as land used to grow grasses or other herbaceous forage traditionally found in natural pastures.
(23) The Court referred to this issue already in its 2011 annual report, box 3.2.
(24) 2007 annual report, table in Annex 5.1.2 for Portugal; 2008 annual report, paragraph 5.36 for Spain; 2009 annual report, paragraph 3.38 for Spain and Italy; 2010 annual report, Table 3.2.1 for Spain; 2011 annual report, paragraph 3.20 and Table 3.2 for Spain, Italy and Austria.
(25) Article 13 of Regulation (EC) No 1290/2005.
(26) 13 of the 24 cases affected the payment audited, while the remaining 11 cases only affect future payments.
(27) The infringements observed account for 0,2 percentage points of the error rate presented by the Court in paragraph 3.10.
(28) Findings related to the IACS, except those concerning entitlements, apply also to area-related and animal-related rural development measures.
(29) Articles 28 and 29 of Regulation (EC) No 1122/2009.
(30) Orthoimages are aerial photographs used to assess the eligibility of land in the LPIS.
(31) Article 6(2) of Regulation (EC) No 1122/2009 provides an obligation for Member States to carry out an annual quality assessment of their LPIS.
(32) Article 41 of Regulation (EC) No 73/2009.
(33) Article 34(1) of Regulation (EC) No 1122/2009.
(34) The term ‘Most deprived persons’ is defined in Article 1(3) of Commission Regulation (EU) No 807/2010 of 14 September 2010 laying down detailed rules for the supply of food from intervention stocks for the benefit of the most deprived persons in the Union (OJ L 242, 15.9.2010, p. 9).
(35) EU-27 weighted average of error rates reported by the Member States for the decoupled area aid inspection statistics.
(36) Most recently in the 2011 annual report, paragraph 3.41.
(37) Paragraph 3.1.5 of DG AGRI AAR 2012.
(38) All examined IACS systems were selected on the basis of a risk analysis.
(39) This figure includes 0,7 million euro under centralised management.
(40) This amount represents the total administrative expenditure for policy area agriculture and rural development.
(41) The audit of administrative expenditure is reported in chapter 9.
(42) In line with the harmonised definition of underlying transactions (for details see chapter 1, paragraphs 1.6 and 1.7).
Source: 2012 consolidated accounts of the European Union.
ANNEX 3.1
RESULTS OF TRANSACTION TESTING FOR AGRICULTURE: MARKET AND DIRECT SUPPORT
|
|
2012 |
2011 |
2010 |
2009 |
||||||
|
IACS |
Non-IACS |
Total |
||||||||
|
SIZE AND STRUCTURE OF THE SAMPLE |
||||||||||
|
Total transactions: |
140 |
40 |
180 |
180 |
146 |
148 |
||||
|
Proportion (number) of transactions tested found to be: |
||||||||||
|
Free of error |
60 % |
(84) |
55 % |
(22) |
59 % |
(106) |
61 % |
73 % |
76 % |
|
|
Affected by one or more errors |
40 % |
(56) |
45 % |
(18) |
41 % |
(74) |
39 % |
27 % |
24 % |
|
|
Analysis of transactions affected by error |
||||||||||
|
Analysis by type of error |
||||||||||
|
Non-quantifiable errors: |
14 % |
(8) |
33 % |
(6) |
19 % |
(14) |
14 % |
26 % |
31 % |
|
|
Quantifiable errors: |
86 % |
(48) |
67 % |
(12) |
81 % |
(60) |
86 % |
74 % |
69 % |
|
|
Eligibility |
12 % |
(6) |
67 % |
(8) |
23 % |
(14) |
23 % |
3 % |
13 % |
|
|
Occurrence |
0 % |
(0) |
0 % |
(0) |
0 % |
(0) |
2 % |
0 % |
0 % |
|
|
Accuracy |
88 % |
(42) |
33 % |
(4) |
77 % |
(46) |
75 % |
97 % |
87 % |
|
|
ESTIMATED IMPACT OF QUANTIFIABLE ERRORS |
||||||||||
|
Most likely error rate |
3,8 % |
|
|
|
||||||
|
Upper error limit (UEL) |
5,9 % |
|
|
|
||||||
|
Lower error limit (LEL) |
1,7 % |
|
|
|
||||||
(1) To improve insight into areas with different risk profiles within the policy group, the sample was split up into segments.
(2) Numbers quoted in brackets represent the actual number of transactions.
ANNEX 3.2
RESULTS OF EXAMINATION OF SYSTEMS FOR AGRICULTURE: MARKET AND DIRECT SUPPORT
Assessment of selected supervisory and control systems — EAGF
|
Member State (Paying agency) |
Scheme |
IACS related expenditure (national ceiling, Annex VIII to Regulation (EC) No 73/2009) (1 000 euro) |
Administrative and control procedures to ensure correct payment including quality of databases |
On-the-spot inspection methodology, selection, execution, quality control and reporting of individual results |
Procedures for the recovery of undue payments |
Overall assessment (1) |
||||||||||||||||||||||||||
|
UK (England) |
SPS |
3 988 042 |
Not effective 1, 2, 5, 6, 7, 8, 9 |
Partially effective a |
Partially effective A |
Not effective |
||||||||||||||||||||||||||
|
UK (Northern Ireland) |
SPS |
3 988 042 |
Not effective 1, 3, 5, 6, 9, 10 |
Partially effective a |
Partially effective A, B |
Not effective |
||||||||||||||||||||||||||
|
Luxembourg |
SPS |
37 679 |
Partially effective 2, 4 |
Effective |
Effective |
Partially effective |
||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||
|
Member State (Paying agency) |
Scheme |
Expenditure (2) (1 000 euro) |
Procurement procedures |
Cooperation with other Member States |
Implementation of the plan |
Supervision and control |
Overall assessment |
||||
|
Spain (FEGA) |
Food aid 2011 |
74 731 |
Effective |
Partially effective 1 |
Effective |
Effective |
Effective |
||||
|
Italy (AGEA) |
Food aid 2012 |
22 103 |
Effective |
Partially effective 2 |
Effective |
Effective |
Effective |
||||
|
|||||||||||
(1) The overall assessment cannot be any better than the assessment of the administrative and control procedures.
|
1 |
Incomplete or incorrect information on size and eligibility of land in the LPIS database. |
|
2 |
Claim registration procedure does not have sufficient built-in controls to prevent the date of arrival being backdated. |
|
3 |
Errors in claims were corrected as obvious errors without application of penalties when those should have been applied. |
|
4 |
Values of entitlements were increased contrary to EU legislation. |
|
5 |
Incorrect application of the EU definition of farmer. |
|
6 |
Aid payments made for ineligible areas. |
|
7 |
Inconsistencies in the entitlements database. |
|
8 |
Non application of sanctions for areas claimed incorrectly on common land. |
|
9 |
Inspection results not correctly processed in the IACS databases. |
|
10 |
Deficiencies in administrative cross-checks and aid payments made before clearance of anomalies. |
|
a |
Insufficient quality of area measurements during on-the-spot checks. |
|
A |
Inaccuracies in the debtors accounts. |
|
B |
Delays in recording debts and notifying farmers of repayment obligations. |
(2) Does not include the value of the intervention stocks.
|
1 |
Spain has been allocated cereals and skimmed milk powder held in intervention storage in France and in Ireland respectively. For both products, the successful bidders received reimbursement of the transport costs to Spain. The EU-legislation provides that in such cases, transport to the country of destination should be verified by a specific procedure (T5 form) which the French and Irish authorities refused to open. Thus, the Spanish authorities used an alternative procedure which the Court considers to be less effective. |
|
2 |
Italy organised a joint tendering procedure to deliver pasta in Italy and in Malta partly in exchange for cereals held in intervention storage. As a result of this procedure, Malta should have received 224 tonnes of pasta corresponding to its quantity of cereals. However, due to an administrative error Italy only delivered 180 tonnes of pasta to Malta. |
ANNEX 3.3
FOLLOW-UP OF PREVIOUS RECOMMENDATIONS FOR AGRICULTURE: MARKET AND DIRECT SUPPORT
|
Year |
Court Recommendation |
Court's analysis of the progress made |
Commission reply |
|||||||
|
Fully implemented |
Being implemented |
Not implemented |
No longer applicable |
Insufficient evidence |
||||||
|
In most respects |
In some respects |
|||||||||
|
2010 |
3.58. Following this review as well as the findings and conclusions for 2010, the Court recommends that the Commission takes appropriate action to ensure that:
|
|
X |
|
|
|
|
|
||
|
|
X |
|
|
|
|
|
|||
|
|
|
X |
|
|
|
|
|||
|
|
|
X |
|
|
|
|
|||
|
2009 |
3.73. The Court recommends that the systems weaknesses identified are resolved. In this regard, the most urgent deficiencies to be addressed for the SPS and SAPS are:
|
|
|
X |
|
|
|
|
||
|
|
|
|
X |
|
|
|
|||
|
2009 |
3.75. Furthermore, the Court considers that the Commission guidelines as regards the work to be performed by certification bodies must be reviewed concerning the nature, coverage and reporting obligations, especially as regards the work related to the validation of Member States’ control and inspection statistics. |
|
|
X |
|
|
|
|
||
(1) Similar recommendations were made in paragraph 3.73(a) and (b) of the 2009 annual report.
CHAPTER 4
Rural development, environment, fisheries and health
TABLE OF CONTENTS
Introduction
Specific characteristics of the policy group
Audit scope and approach
Regularity of transactions
Rural development
Environment, fisheries and health
Effectiveness of systems
Rural development
Member States' systems related to the regularity of transactions
Commission's systems related to the regularity of transactions
Environment, fisheries and health
Conclusions and recommendations
The conclusion for 2012
Recommendations
|
Annex 4.1 — |
Results of transaction testing for rural development, environment, fisheries and health |
|
Annex 4.2 — |
Results of examination of systems for rural development |
|
Annex 4.3 — |
Follow-up of previous recommendations for rural development, environment, fisheries and health |
|
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
INTRODUCTION |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Table 4.1 — Rural development, environment, fisheries and health — key information 2012
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Specific characteristics of the policy group |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Audit scope and approach |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
REGULARITY OF TRANSACTIONS |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Rural development |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
The action plans mentioned under point 4.11, in particular the ones following the AAR 2012, address specifically issues related to non-area related measures. For some cases reported the error does not entail a financial impact of the same level as the error reported by the Court. As regards the examples mentioned by the Court in Boxes 4.1-4.4 and 4.6, the Commission services will follow them up with the national authorities and, where appropriate, through the conformity clearance procedure. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Box 4.1 — Example of eligibility error: non-respect of agri-environment commitments A beneficiary in Poland committed to respect, on nine parcels (141,59 hectares), specific requirements related to the maintenance of extensive permanent grassland and the protection of endangered bird species and their habitats. The main commitment was to leave every year, on a different surface area, 5 to 10 % of the parcels uncut, for which the beneficiary would receive 270 euro per hectare. The Court found that on several parcels the requirements were not met: one parcel was completely cut, while on others either the uncut area was the same as in previous years or in a different location to that indicated by the ornithological expert. Only on two of the nine parcels declared (21,02 hectares) were all the requirements respected. Similar cases of non compliance with agri-environment requirements were detected in the Czech Republic, Germany (Schleswig-Holstein), Greece, France and the United Kingdom (England). |
Box 4.1 — Example of eligibility error: non-respect of agri-environment commitments The Commission has in its audits on implementation of agri-environmental measures detected scope for improvements in the control system to better assess the farmers’ compliance with the commitments made. Regarding the Member States mentioned by the Court, conformity clearance procedures are ongoing for Poland, Czech Republic, France and the United Kingdom (England), which will lead to financial corrections where appropriate. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Box 4.2 — Example of eligibility error: non-respect of eligibility requirements for an investment project In Spain (Andalucía), a beneficiary received a 1,4 million euro grant to modernise the irrigation infrastructure, on two conditions: the project should be economically viable and water consumption should be maintained at or decreased from the 3 000 m3 per hectare per year which the beneficiary had at the time of grant application. The Court found that neither condition was fulfilled. The project was not economically viable at the time of grant application and should have been rejected; water consumption in excess of 6 000 m3 per hectare per year, double the beneficiary's water rights at that time, would have been required to meet this condition. Water consumption was not maintained or decreased as required, but instead increased upon project completion to 8 000 m3 per hectare per year, meaning that the payment should not have been made. Failure to respect the two eligibility conditions renders the expenditure ineligible. Non-respect of eligibility requirements for investment projects was also found in Germany (Schleswig-Holstein), Greece, France, Italy (Bolzano, Sardegna), Lithuania, Poland, Portugal, Romania and the United Kingdom (England). |
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Box 4.3 — Example of eligibility error: breach of public procurement rules In Romania, the beneficiary (a rural municipality) applied for support for an investment project which included a water supply network, a sewage system, improvement of local roads and a community building. Seven tenderers submitted offers, of which the beneficiary rejected five as not fulfilling the requirements. The Court found that the winning tenderer did not respect two tender requirements, and, moreover, that other bids had been excluded for not respecting precisely those requirements. Due to the non-compliance with the tender dossier and the non-respect of the principle of equal treatment, which influenced the outcome of the tender, the expenditure concerned is ineligible. The Court found cases of a breach of public procurement rules also in Spain (Andalucía), France, Lithuania, Poland and Slovenia. |
Box 4.3 — Example of eligibility error: breach of public procurement rules Concerning Romania, the Commission has in its audits also found substantial weaknesses, and a clearance of account procedure is ongoing. The Commission services will follow the Court's findings up vis-à-vis the national authorities with a view to protecting the financial interest of the EU and recovering any undue payments. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Box 4.4 — Example of recurrent eligibility error: ineligible VAT included In France, the beneficiary for the measure Conservation and upgrading of the rural heritage was a public body. The latter declared expenditure including VAT, which was accepted by the paying agency and co-financed by the EU budget. However, the applicable legal basis stipulates that VAT is ineligible for bodies governed by public law in respect of the activities or transactions in which they engage as public authorities. The Court found that the paying agency had repeatedly accepted ineligible VAT also for other payments. Recurrent errors with a financial impact were also found in Spain (Andalucía), Italy (Bolzano), Poland, Portugal and Romania. |
Box 4.4 — Example of recurrent eligibility error: ineligible VAT included In the framework of the conformity clearance procedure, the Commission services will follow-up the Court’s findings vis-à-vis the national authorities with a view to protecting the financial interest of the EU and recovering any undue payments. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Environment, fisheries and health |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Box 4.5 — Example of eligibility error: non-respect of the principle of complementarity The LIFE programme does not finance measures covered by other EU financial instruments. This principle of ‘complementarity’ means that beneficiaries must ensure that no other direct or indirect EU funding is used to co-finance their LIFE project. A beneficiary of a LIFE project in Hungary to restore a marsh habitat also received other EU aid (including NATURA 2000 habitats and less-favoured areas) for the same land used for the LIFE project. This situation was accepted by the Commission which authorised payment of the aid. Due to the non-respect of the complementarity principle, the expenditure concerned is partly ineligible. |
Box 4.5 — Example of eligibility error: non-respect of the principle of complementarity The aids quoted by the Court do not concern directly or indirectly the LIFE project or specific action within it, but represent compensations to land owners deriving from specific provisions of the Rural Development scheme. These compensations do not refer to any specific actions included in the project. They are of different scope and different purpose of the LIFE project. The Commission considers that these amounts may not be treated as a direct or indirect financing to the project. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
EFFECTIVENESS OF SYSTEMS |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Rural development |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Member States' systems related to the regularity of transactions |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
The Commission is aware of weaknesses in the Member States’ control system for EAFRD, especially for non-IACS measures. The certification bodies (CB) report on these weaknesses in their annual certification reports. The CBs make recommendations to improve the control systems and follow up their recommendations. The Commission takes the findings of the CBs into account, as well as other available information, when performing its risk analysis and establishing its own audit program in the framework of the conformity clearance procedure. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
These weaknesses were very similar to those found and reported concerning the six different Member States which were audited last year (22). |
The weaknesses mentioned by the Court are addressed in the extensive action plans implemented in collaboration with the Member States in response to the reservations regarding rural development expenditure in 2011 and 2012 in DG AGRI’s annual activity reports 2011 and 2012, and expected to bear fruit in the coming years. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Box 4.6 — Example of insufficient quality of a Member State's administrative checks For one public procurement case checked in Germany (Brandenburg and Berlin), the paying agency itself was the beneficiary of more than 2,2 million euro EAFRD aid under the measure ‘technical assistance’, concerning the paying agency's outsourced IT system between 2008 and 2012. The Court found that the contract for the IT system and subsequent IT maintenance order was awarded to a company through negotiated procedure without notice rather than through the required open or restricted procedure. Failure to follow the required procedures renders the expenditure ineligible for EU financing. The same situation concerning the award of contracts for IT systems occurred in 11 other German regions. |
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Commission's systems related to the regularity of transactions |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Commission's clearance of accounts procedures |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
It is noted that for the EAFRD, the number of audit missions increased from 23 in 2012 to 35 in 2013. These three essential criteria indicate the effectiveness of the implementation of the conformity clearance procedure in mitigating the risk of errors. Nevertheless, and notably in the framework of the CAP reform, the Commission is considering further improvements. The quality of the Commission’s audit work is ensured through the ‘4 eyes’ principle and all audit plans and reports are reviewed by and discussed with the hierarchy of the auditors. The audit work is documented through checklists and reports and, following the Court of Auditors’ remarks in its annual report 2011, the audit documentation is being improved and harmonised. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The reinforcement of assurance procedure |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
DG AGRI's annual activity report (AAR) |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
DG AGRI clearly discloses in its 2012 AAR (Section 3.1.1.1.7) that the new approach adopted for decoupled direct aids would not, mainly due to timing reasons, be applied for rural development in that report. As indicated in the Commission Synthesis Report for 2012, the new integrated approach will be further developed and will also be used for rural development expenditure in the DG AGRI 2013 AAR. This will enable a more accurate quantification of the amounts at risk. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Environment, fisheries and health |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
The checks of external experts form part of the standard written guidelines on the Agency’s working procedures. Moreover, conflict of interest aspects are managed through declarations by the experts and the composition of evaluation panels putting individual experts in a minority position. The Agency will update its evidence of checks in line with the auditor's conclusions. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
CONCLUSIONS AND RECOMMENDATIONS |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The conclusion for 2012 |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
4.42. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Overall audit evidence indicates that accepted expenditure is affected by a material level of error. |
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Recommendations |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
4.44. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Commission shares the view that the Member States should carry out their administrative checks better. In the context of the drafting of its implementing rules for the CAP reform, the Commission is considering how to strengthen the administrative and control systems to be used by the Member States and how to reinforce the various instruments (including suspension of payments) to be used by the Commission for better protecting the EU financial interest in cases where Member States do not play correctly their role under the shared management rules. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Commission will ensure that all the systemic errors detected by the Court are followed up appropriately, including through its conformity procedure where appropriate. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Commission has already clearly indicated in its synthesis report for 2012 that the new integrated approach will be further developed and will also be used for the EAFRD from the year 2013 reports. Furthermore it recalls that the integrated approach also takes into account the findings of the Court’s systems audits and the findings of the certification bodies. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
and for the CAP as a whole that: |
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Commission will take appropriate measures within the limits of the resources available. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Commission will continue to improve its audit methodology and procedures. Moreover, it will continue to make efforts, notably in the framework of the preparation for the implementation of the CAP reform, to improve and speed up the process bearing in mind the need to maintain quality standards and the Member State’s right of reply. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
As evidenced by the increase in the total amount of financial corrections in recent years and the significant reduction of the proportion of flat-rate corrections in 2012, recognised by the Court itself, the Commission has already improved its method of determining financial corrections. That being said, the Commission always and as a matter of course strives to further improve its method of determining financial corrections, notably in the framework of the implementation of the CAP reform. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
4.45. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The weaknesses will be addressed by better evidenced checks and updates to the procedures in view of the entry into force of the new Financial Regulation. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
(1) This amount includes payments for completion of earlier (2000-2006) programmes (135 million euro) and for other measures (genetic resources) (1,2 million euro).
(2) Regulation (EC) No 614/2007 of the European Parliament and of the Council (OJ L 149, 9.6.2007, p. 1).
(3) Council Regulation (EC) No 1198/2006 (OJ L 223, 15.8.2006, p. 1).
(4) European Centre for Disease Prevention and Control, European Food Safety Authority, European Medicines Agency.
(5) Czech Republic, Germany (Brandenburg and Berlin, Schleswig-Holstein), Greece, Spain (Andalucía), France, Italy (Basilicata, Bolzano, Sardegna), Lithuania, Austria, Poland, Portugal, Romania, Slovenia, Finland and the United Kingdom (England, Scotland).
(6) The sample consisted of 11 transactions under direct management; and 6 under shared management in the Czech Republic, Greece, Spain, Poland and the United Kingdom.
(7) All requirements for SMRs 6-8 (concerning the identification and registration of animals) and obvious non-compliance with SMRs 1 (Birds Directive), 2 (Groundwater Directive), 4 (Nitrates Directive), and 16 and 18 (animal welfare).
(8) Articles 16, 17 and 30 of Commission Regulation (EU) No 65/2011 of 27 January 2011 laying down detailed rules for the implementation of Council Regulation (EC) No 1698/2005, as regards the implementation of control procedures as well as cross-compliance in respect of rural development support measures (OJ L 25, 28.1.2011, p. 8).
(9) Except in cases where Member States had already found the irregularity without applying the due reductions/exclusions.
(10) The paying agencies and key controls were selected on the basis of a risk analysis.
(11) The Commission's Directorate General for Health and Consumers (DG SANCO).
(12) The Commission's Directorate General for Agriculture and Rural Development (DG AGRI).
(13) The Commission's Directorate General for Maritime Affairs and Fisheries (DG MARE).
(14) The Court calculates its estimate of error from a representative sample. The figure quoted is the best estimate. The Court has 95 % confidence that the rate of error in the population lies between 4,5 % and 11,3 % (the lower and upper error limits respectively).
(15) As set out in Article 50a of Council Regulation (EC) No 1698/2005 (OJ L 277, 21.10.2005, p. 1).
(16) The infringements observed account for 0,4 percentage points of the error rate presented by the Court in paragraph 4.9.
(17) For area-related rural development measures, such as agri-environment, verification of certain key elements such as eligible area is made through the Integrated Administration and Control System (IACS), described in chapter 3 (paragraph 3.18). Other eligibility requirements are governed by specifically designed controls. As described in chapter 3 ( Annex 3.2 ) the Court found the IACS systems to be partially effective in one paying agency and not effective in two others.
(18) Articles 12 and 25 of Regulation (EU) No 65/2011.
(19) 2010 annual report, Annex 3.2.2.
(20) Lack of systematic review of administrative checks; weaknesses in the procedure for selecting beneficiaries subject to on-the-spot checks; no verification of the reasonableness of the costs; insufficient checks on declared expenditure.
(21) Lack of checks for an eligibility condition for the measure compensatory payments to farmers in areas with natural handicaps.
(22) 2011 annual report, chapter 4, paragraphs 4.24 to 4.32.
(23) In accordance with the Financial Regulation and implementing rules applicable to the general budget of the European Communities.
(24) The lack of quality control and audit documentation was already pointed out in the 2011 annual report (chapter 4, paragraph 4.41).
(25) Article 31(2) of Council Regulation (EC) No 1290/2005 of 21 June 2005 on the financing of the common agriculture policy (OJ L 209, 11.8.2005, p. 1) specifies that ‘The Commission shall assess the amounts to be excluded on the basis of the gravity of the non-conformity recorded. It shall take due account of the nature and gravity of the infringement and of the financial damage caused to the Community’.
(26) Special report No 7/2010, ‘Audit of the clearance of accounts procedure’, paragraphs 68 to 73 and 98.
(27) The amount of flat rate corrections as part of the total amount of financial corrections decreased from 68 % in 2011 to 12 % in 2012.
(28) Article 34(1) of Regulation (EC) No 1122/2009.
(29) The residual error rate is an estimate of the error which remains after correction of the errors detected by the Member States' supervisory and control systems.
(30) All examined systems were selected on the basis of a risk analysis.
(31) The audit of administrative expenditure is reported in chapter 9.
(32) In line with the harmonised definition of underlying transactions (for details see Annex 1.1, paragraph 6).
Source: 2012 consolidated accounts of the European Union.
ANNEX 4.1
RESULTS OF TRANSACTION TESTING FOR RURAL DEVELOPMENT, ENVIRONMENT, FISHERIES AND HEALTH
|
|
2012 |
2011 |
2010 |
2009 |
|||||
|
Rural development |
Env., fish. and health |
Total |
|||||||
|
SIZE AND STRUCTURE OF THE SAMPLE |
|||||||||
|
Total transactions: |
160 |
17 |
177 |
178 |
92 |
93 |
|||
|
Proportion (number) of transactions tested found to be: |
|||||||||
|
Free of error |
37 % |
(59) |
41 % |
(7) |
37 % |
(66) |
43 % |
48 % |
67 % |
|
Affected by one or more errors |
63 % |
(101) |
59 % |
(10) |
63 % |
(111) |
57 % |
52 % |
33 % |
|
Analysis of transactions affected by error |
|||||||||
|
Analysis by type of error |
|||||||||
|
Non-quantifiable errors: |
42 % |
(42) |
60 % |
(6) |
43 % |
(48) |
38 % |
48 % |
42 % |
|
Quantifiable errors: |
58 % |
(59) |
40 % |
(4) |
57 % |
(63) |
62 % |
52 % |
58 % |
|
Eligibility |
71 % |
(42) |
100 % |
(4) |
73 % |
(46) |
68 % |
56 % |
22 % |
|
Occurrence |
0 % |
(0) |
0 % |
(0) |
0 % |
(0) |
2 % |
0 % |
6 % |
|
Accuracy |
29 % |
(17) |
0 % |
(0) |
27 % |
(17) |
30 % |
44 % |
72 % |
|
ESTIMATED IMPACT OF QUANTIFIABLE ERRORS |
|||||||||
|
Most likely error rate |
7,9 % |
|
|
|
|||||
|
Upper error limit (UEL) |
11,3 % |
|
|
|
|||||
|
Lower error limit (LEL) |
4,5 % |
|
|
|
|||||
(1) To improve insight into areas with different risk profiles within the policy group, the sample was split up into segments.
(2) Numbers quoted in brackets represent the actual number of transactions.
ANNEX 4.2
RESULTS OF EXAMINATION OF SYSTEMS FOR RURAL DEVELOPMENT
Assessment of selected supervisory and control systems
|
Member State (Paying agency) |
Administrative and control procedures |
On-the-spot inspection methodology, selection, execution, quality control and reporting of results |
Implementation and control of cross-compliance |
Overall assessment |
|
France (only follow-up of previous observations) |
Partially effective |
Partially effective |
N/A |
Partially effective |
|
Sweden |
Partially effective |
Effective |
Partially effective |
Partially effective |
|
Germany (Brandenburg and Berlin) |
Partially effective |
Partially effective |
Partially effective |
Partially effective |
|
Poland |
Partially effective |
Effective |
Effective |
Partially effective |
|
Bulgaria |
Partially effective |
Partially effective |
Partially effective |
Partially effective |
|
Romania (Agency for Payments and Intervention in Agriculture (APIA) and Paying Agency for Rural Development and Fisheries (PARDF)) |
Not effective |
Not effective |
Not effective |
Not effective |
ANNEX 4.3
FOLLOW-UP OF PREVIOUS RECOMMENDATIONS FOR RURAL DEVELOPMENT, ENVIRONMENT, FISHERIES AND HEALTH
|
Year |
Court recommendation |
Court's analysis of the progress made |
Commission reply |
|||||
|
Fully implemented |
Being implemented |
Not implemented |
No longer applicable |
Insufficient evidence |
||||
|
In most respects |
In some respects |
|||||||
|
2010 |
3.58(d) the quality of inspections is adequately checked and reported by the certification bodies. |
|
|
X |
|
|
|
|
|
3.59. In the area of rural development, the Court recommends that the Commission and the Member States remedy the weaknesses identified, notably by improving the effectiveness of the checks carried out for non-IACS measures. |
|
|
X |
|
|
|
|
|
|
3.60. Finally, effective measures need to be taken by the Commission and the Member States so that the issues identified in the policy areas of environment, fisheries, health and consumer protection are resolved. |
|
|
X |
|
|
|
|
|
|
2009 |
3.74. The Court also reiterates that further efforts are required in the area of rural development to further simplify the rules and conditions. |
|
|
X |
|
|
|
|
|
3.75. Furthermore, the Court considers that the Commission guidelines as regards the work to be performed by certification bodies must be reviewed concerning the nature, coverage and reporting obligations, especially as regards the work related to the validation of Member States’ control and inspection statistics. |
|
|
X |
|
|
|
|
|
|
3.76. Finally, effective measures need to be taken, together with the concerned national authorities, to avoid the payment of ineligible expenditure for fisheries projects. |
|
|
X |
|
|
|
|
|
|
3.76. Internal controls on payments for animal disease eradication and monitoring programmes to the Member States require a clear segregation of functions between the Commission services and the development of appropriate formal control procedures. |
|
X |
|
|
|
|
|
|
CHAPTER 5
Regional policy, energy and transport
TABLE OF CONTENTS
Introduction
Specific characteristics of the policy areas
Policy objectives
Policy instruments
Risks to regularity
Audit scope and approach
Regularity of transactions
Effectiveness of systems
Audit authorities
The Court’s examination of four AAs
Assessment of the Commission’s supervision of AAs
Review of the Commission’s annual activity reports
Directorate-General for Regional and Urban Policy
Directorate-General for Mobility and Transport, and Directorate-General for Energy
Conclusion and recommendations
The conclusion for 2012
Recommendations
|
Annex 5.1 — |
Results of transaction testing for regional policy, energy and transport |
|
Annex 5.2 — |
Results of examination of systems for cohesion policy funds (ERDF/CF/ESF) |
|
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
INTRODUCTION |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Table 5.1 — Regional policy; transport and energy — Key information 2012
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Specific characteristics of the policy areas |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Policy objectives |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Regional policy |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Transport and energy |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Policy instruments |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Regional policy |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Management and control of spending in cohesion policy funds under shared management |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Transport and energy |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Management and control of transport and energy spending under direct, indirect centralised and joint management |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Risks to regularity |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Regional policy |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Transport and energy |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Audit scope and approach |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
REGULARITY OF TRANSACTIONS |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
For more than half of the regional policy transactions, checks at Member State level could have prevented some of the errors found |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Failures to comply with public procurement rules account for more than half of the error rate estimated by the Court for these policy areas |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
The Commission applies flat-rate corrections in Cohesion policy, based on the COCOF guidelines (39), thereby protecting the EU budget taking into account the principle of proportionality and the nature and gravity of the actual irregularities identified. These flat rates are applied by the Commission and by national authorities when imposing financial corrections for infringements of public procurement rules, including when following up the errors reported by the Court. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Box 5.1 — Examples of serious failures to comply with public procurement rules
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Ineligible costs declared for 9 % of all projects audited by the Court |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Box 5.2 — Examples of declared ineligible costs
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Incorrect calculation of the financing gap detected in almost 8 % of the transactions examined by the Court |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Box 5.3 — Example of incorrect calculation of the financing gap for revenue generating projects Unrealistic cost estimates used: In a CF project in Portugal for the reconstruction of the drinkable water network of a city, the beneficiary overstated anticipated staff costs used in the Cost Benefit Analysis (CBA). This led to an overstated financing gap. Similar cases where excessive costs were considered in the CBA were found in ERDF and CF projects in Spain, Poland and the United Kingdom. |
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Non-compliance with State aid rules for 3 % of the projects |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Box 5.4 — Example of projects not in compliance with State aid rules State aid not notified to Commission: In an ERDF project in Greece for the construction of port facilities the aid constituted State aid (21). The project was not notified to the Commission as required by Article 108 TFEU and therefore its compatibility with the internal market had not been assessed. Similar cases were found in ERDF projects in Germany and the United Kingdom. |
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Errors found in the Commission’s closure payments |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
EFFECTIVENESS OF SYSTEMS |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Audit authorities |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Court’s examination of four AAs |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Assessment of the Commission’s supervision of AAs |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
5.52. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Review of the Commission’s annual activity reports |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Directorate-General for Regional and Urban Policy |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Directorate-General for Mobility and Transport, and Directorate-General for Energy |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
CONCLUSION AND RECOMMENDATIONS |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The conclusion for 2012 |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
5.62. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Recommendations |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
5.65. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Commission agrees on the importance of the ‘first level’ checks conducted by the Member States and shares the view that these should be further strengthened. It has already been giving guidelines to the Member States on the way managing authorities should define and implement their management verifications. Moreover, the Commission developed in 2009 comprehensive guidelines for the first level checks and a self-assessment tool for managing authorities, which they can use to improve their functioning. The Commission has also disseminated in 2011 to audit authorities its checklists for the audit of management verifications which can be used by the managing authorities themselves, as a benchmark. Specific training was delivered to managing authorities who are responsible to disseminate further this training material to all levels of projects management involved. The Commission will continue to carry out capacity building actions in this respect. Finally, the Commission is carrying out since 2010 targeted audits on management verifications of high risk programmes where it has identified that deficiencies could remain undetected or not timely detected. Results of these audits by end 2012 are presented in DG Regional und Urban Policy’s AAR (page 39). |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Commission fully shares the need to further simplify national eligibility rules and eliminate unnecessary complex rules, which have a detrimental impact in terms of the burden on beneficiaries and increased error rate. Nonetheless, the Commission only partly accepts this recommendation as a systematic assessment of all national eligibility rules is not feasible. Whenever the Commission identifies complex rules at the level of the Member States it addresses them jointly with the Member States concerned. It will make recommendations to Member States for the next programming period and will encourage them to use simplified cost options offered in the draft regulations. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Commission has recognised the need for improvement in this area and has taken actions accordingly. The regulatory framework for the 2014-2020 programming period includes simplifications in relation to eligibility rules in many respects and also lays down a simplified mechanism in respect of revenue generating projects. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Commission agrees with the importance of this issue and underlines that the work of the audit authorities as reflected in the ACRs is one of the main elements on which the Commission builds its assurance. Further guidance on the treatment of errors and Commission checklists have already been provided to the audit authorities in 2011 and numerous seminars have been organised by the Commission in 2012 and 2013 in order to further improve the audit sampling methodology used in preparation of the ACRs. The Commission continues to work with audit authorities to provide further guidance, including on the reporting of audit findings (see page 87 of DG Regional und Urban Policy’s 2012 AAR). |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
(1) The other two main categories of expenditure for regional policy were for projects under the EU Solidarity Fund (2 %) and projects under the Instrument for Pre-Accession Assistance (1 %).
(2) The other three main categories of expenditure were for research projects mainly funded by the research framework programmes (12 %), for nuclear energy projects (11 %), and inland, air and maritime transport projects (9 %).
(3) In total, 434 OPs have been approved by the Commission for the 2007-2013 programming period: 317 for ERDF/CF (out of which 24 OPs contain CF projects) and 117 for ESF.
(4) Intermediate bodies are public or private bodies acting under the responsibility of a managing authority and carrying out duties on their behalf.
(5) Article 72 of Council Regulation (EC) No 1083/2006 (OJ L 210, 31.7.2006, p. 25).
(6) Article 39(2) of Council Regulation (EC) No 1260/1999 (OJ L 161, 26.6.1999, p. 1); Articles 91 and 92 of Regulation (EC) No 1083/2006.
(7) Article 99 of Regulation (EC) No 1083/2006.
(8) Trans-European Transport Network Executive Agency, Executive Agency for Competitiveness and Innovation and SESAR (Single European Sky Air Traffic Management Research) Joint Undertaking.
(9) This sample comprises 180 transactions related to 168 regional policy projects (138 ERDF and 30 CF), 9 transport and 3 energy projects (see Annex 5.1 ). Of the 168 regional policy transactions to ERDF/CF projects, the 145 relate to the 2007-2013 programming period and 23 to the 2000-2006 period. The sample was drawn from all payments, with the exception of advances which amounted to 1,9 billion euro in 2012.
(10) Belgium, Czech Republic, Germany, Greece, Spain, France, Italy, Luxembourg, Hungary, the Netherlands, Austria, Poland, Portugal, Romania, Slovakia, Finland, and the United Kingdom.
(11) This is part of an examination of AAs which started in 2010 (see the 2010 annual report, paragraphs 4.37 to 4.44) and continued in 2011 (see the 2011 annual report, paragraphs 5.35 to 5.51). Overall, 19 AAs in 15 Member States have been audited between 2010 and 2012.
(12) The Court calculates its estimate of error from a representative sample. The figure quoted is the best estimate. The Court has 95 % confidence that the rate of error in the population lies between 3,7 % and 9,9 % (the lower and upper error limits respectively).
(13) See the 2011 annual report, paragraph 5.30.
(14) For more than half of the 247 public procurement procedures audited by the Court the contract value was above the threshold which made them subject to EU public procurement rules as transposed into national law.
(15) This amount represents the total expenditure for the contracts awarded, part of which has been certified under the audited expenditure declarations.
(16) See the 2010 annual report, paragraphs 4.26 to 4.27, and the 2011 annual report, paragraphs 5.31 to 5.33.
(17) Further information regarding the Court's approach to the quantification of public procurement errors is set out in Annex 1.1 , paragraphs 9 to 11.
(18) According to Article 55 of Regulation (EC) No 1083/2006: ‘Revenue generating project means any operation involving an investment in infrastructure the use of which is subject to charges borne directly by users or any operation involving the sale or rent of land or buildings or any other provision of services against payment’.
(19) Article 107(1) on State aid of the Treaty on the Functioning of the European Union (TFEU).
(20) Case T-443/08 Freistaat Sachsen und Land Sachsen-Anhalt v Commission and T-455/08 Mitteldeutsche Flughafen AG and Flughafen Leipzig–Halle GmbH v Commission, judgment of 24 March 2011 and as upheld by the Court of Justice on 19 December 2012 in C-288/11P.
(21) As defined by Article 107 TFEU.
(22) See the 2011 annual report, paragraphs 5.52 to 5.64.
(23) 63 of these 112 AAs are responsible for auditing OPs for the ERDF/CF as well as the ESF within their Member State or a specific region. These ‘multi-fund’ AAs account for 344 of the 434 corresponding OPs and, in financial terms, audit the 89 % of the total budget (in terms of EU and national public and private funding).
(24) Each AA may produce one or more ACRs which in turn may relate to one or more OPs.
(25) The ACRs and annual opinions are based on the findings of the AAs' audits relating to expenditure certified to the Commission in the previous EU financial year (see Article 62(1)(d) of Regulation (EC) No 1083/2006).
(26) For 13 ERDF OPs, no ACRs and annual opinions for 2012 were provided by the AA by March 2013.
(27) See the 2011 annual report, paragraph 5.43.
(28) Overall, since 2009, 62 of the 112 AAs have been examined by DG Regional and Urban Policy and DG Employment, Social Affairs and Inclusion. These AAs are in charge of 257 of the 317 ERDF/CF OPs and 48 of the 117 ESF OPs. The AAs examined during the four years represent 95 % of the ERDF/CF and 55 % of the ESF budget (in terms of EU and national public and private funding) for the 2007-2013 programming period.
(29) See the 2010 annual report, paragraph 4.42, and the 2011 annual report, paragraph 5.45.
(30) In specific cases, this desk review is complemented by on-the-spot visits to AAs to obtain additional information.
(31) The Court checked for 138 ERDF/CF and ESF OPs whether the Commission’s validation of error rates reported by AAs was effective in verifying the accuracy and reliability of the information provided by AAs. These OPs are under the responsibility of 27 of the 62 AAs for which the Commission has carried out a specific enquiry during the last three years (see paragraph 5.50).
(32) See also the 2011 annual report, paragraph 5.50.
(33) For 2011, the Directorate-General for Regional and Urban Policy estimated the risk to interim and final payments to be between 3,1 % and 6,8 %.
(34) According to sectorial regulations, AAs reported error rates to the Commission in December 2012 based on expenditure declared during 2011.
(35) See the 2011 annual report, paragraph 5.28.
(36) The number of OPs under reservation decreased from 146 in 2011 to 85 in 2012. These figures include fully and partially quantified reservations for OPs for which interim and/or final payments were authorised during the year (121 in 2011 and 61 in 2012) and for OPs for which no such payments were made (25 in 2011 and 24 in 2012). In addition to the 85 reservations mentioned earlier, the Directorate-General for Regional and Urban Policy has issued reservations for four OPs under the IPA programme. In 2011, two reservations were issued in relation to the IPA Programme.
(37) See the 2011 annual report, paragraph 5.69(b).
(38) See Annex 1.1, paragraph 17.
(39) Guidelines for determining financial corrections to be made to expenditure co-financed by the structural funds or the cohesion fund for non-compliance with the rules on public procurement, COCOF note 07/0037/03 of 29 November 2007.
(40) See 2011 annual report Commission reply to paragraphs 5.57 and 5.58.
(41) ARES (2013) 689652 of 12 April 2013 to the European Parliament and ARES(2013) 1044808 of 14 May 2013 to the European Court of Auditors.
(42) ARES (2013) 5521 of 4 January 2013.
(43) The audit of administrative expenditure is reported in chapter 9.
(44) In line with the harmonised definition of underlying transactions (for details see Annex 1.1, paragraph 6).
Source: 2012 consolidated accounts of the European Union.
ANNEX 5.1
RESULTS OF TRANSACTION TESTING FOR REGIONAL POLICY, ENERGY AND TRANSPORT
|
|
2012 |
2011 |
2010 |
2009 |
|||||||||
|
ERDF |
CF |
Energy |
Transport |
Total |
|||||||||
|
SIZE AND STRUCTURE OF THE SAMPLE |
|||||||||||||
|
Total transactions: |
138 |
30 |
3 |
9 |
180 |
180 |
177 |
145 |
|||||
|
Proportion (number) of transactions tested found to be: |
|||||||||||||
|
Free of error |
54 % |
(75) |
47 % |
(14) |
33 % |
(1) |
22 % |
(2) |
51 % |
(92) |
41 % |
43 % |
60 % |
|
Affected by one or more errors |
46 % |
(63) |
53 % |
(16) |
67 % |
(2) |
78 % |
(7) |
49 % |
(88) |
59 % |
57 % |
40 % |
|
Analysis of transactions affected by error |
|||||||||||||
|
Analysis by type of error |
|||||||||||||
|
Non-Quantifiable errors: |
52 % |
(33) |
75 % |
(12) |
50 % |
(1) |
14 % |
(1) |
53 % |
(47) |
64 % |
60 % |
60 % |
|
Quantifiable errors: |
48 % |
(30) |
25 % |
(4) |
50 % |
(1) |
86 % |
(6) |
47 % |
(41) |
36 % |
40 % |
40 % |
|
Eligibility |
87 % |
(26) |
75 % |
(3) |
100 % |
(1) |
100 % |
(6) |
88 % |
(36) |
94 % |
97 % |
78 % |
|
Occurrence |
3 % |
(1) |
0 % |
(0) |
0 % |
(0) |
0 % |
(0) |
2 % |
(1) |
3 % |
0 % |
0 % |
|
Accuracy |
10 % |
(3) |
25 % |
(1) |
0 % |
(0) |
0 % |
(0) |
10 % |
(4) |
3 % |
3 % |
22 % |
|
ESTIMATED IMPACT OF QUANTIFIABLE ERRORS |
|||||||||||||
|
Most likely error rate |
6,8 % |
|
|
|
|||||||||
|
Upper Error Limit (UEL) |
9,9 % |
|
|
|
|||||||||
|
Lower Error Limit (LEL) |
3,7 % |
|
|
|
|||||||||
(1) To improve insight into areas with different risk profiles within the policy group, the sample was split up into segments.
(2) Numbers quoted in brackets represent the actual number of transactions.
ANNEX 5.2
RESULTS OF EXAMINATION OF SYSTEMS FOR COHESION POLICY FUNDS (ERDF/CF/ESF)
Assessment of selected supervisory and control systems: Audit authorities (AA) — compliance with key regulatory requirements and effectiveness in ensuring the regularity of operations
|
Key requirements tested by the Court |
|
Belgium (Wallonia) AA for ERDF/ESF |
Malta AA for ERDF/CF/ESF |
Slovakia AA for ERDF/CF/ESF |
United Kingdom (England) AA for ESF |
|
General aspects |
The set up of the management and control systems of the operational programme provides for an appropriate definition, allocation and separation of functions within the AA and between the AA and other competent management and control bodies |
Compliant |
Compliant |
Compliant |
Compliant |
|
Audit manual coverage |
Existance of audit manual (for both audits on systems and audits on operations), which is in accordance with internationally accepted audit standards and clearly describes the audit procedures |
Compliant |
Compliant |
Compliant |
Compliant |
|
Audit methodology for systems audit |
The audit work carried out by the AA to evaluate the effective functioning of the management and control system is based on a checklist that contains questions that verify key requirements of the applicable regulations (specified for MAs, IBs and CAs) and appropriate assessment criteria for each of these key requirements |
Compliant |
Compliant |
Compliant |
Compliant |
|
Review of audits on systems |
The AA’s audit plan had been implemented in accordance with the approved audit strategy for the period, audits on systems were carried out in accordance with the methodology established by the AA and all phases of the audits on systems were properly documented |
Effective |
Effective |
Effective |
Effective |
|
Sampling methodology for audits of operations |
An appropriate sampling methodology for audits of operations has been specified to draw the sample of operations to be audited for the period under review |
Compliant |
Compliant |
Compliant |
Compliant |
|
Drawing of sample for audits of operations |
The sampling methodology for audits of operations has been used as specified to draw the sample of operations to be audited for the period under review |
Partially effective |
Effective |
Effective |
Effective |
|
Audit methodology for audits of operations |
The audit work carried out to examine the regularity of operations is based on a checklist that contains questions that verify the requirements of the applicable regulation at a sufficient level of detail to address the associated risks |
Compliant |
Compliant |
Compliant |
Partially compliant |
|
Review of audits of operations |
The audits of operations had been implemented in accordance with the sample selected for the period, were carried out in accordance with the methodology established by the AA and all phases of the audits of operations were properly documented |
Effective |
Partially effective |
Effective |
Effective |
|
Re-performance of audits on operations |
A re-performance by the Court of the AA’s audits of operations resulted in findings similar to those of the AA, as reported to the Commission |
Effective |
Partially effective |
Effective |
Partially effective |
|
Annual control report and audit opinion |
The annual control report and audit opinion were established in accordance with the regulatory requirements and the guidance agreed between the Commission and the Member States, and the report and opinion are consistent with the results of the audits on systems and audits on operations carried out by the AA |
Partially compliant |
Partially compliant |
Compliant |
Compliant |
|
Overall assessment (1) |
|
Partially effective |
Partially effective |
Effective |
Partially effective |
(1) As for previous year examination of AAs (see the 2010 annual report, Annex 4.2; and the 2011 annual report, Annex 5.2), the following criteria are applied to obtain the overall assessment of the AA on the basis of the assessment of the specific key requirements tested:
|
(a) |
‘Effective’: the assessment of the key requirement ‘Annual control report and audit opinion’ is ‘Compliant’ and the assessments of the key requirements ‘Review of audits on systems’, ‘Drawing on sample’, ‘Review of audits of operations’ and ‘Re-performance of audits on operations’ are ‘Effective’. |
|
(b) |
‘Partially effective’: the assessment of the key requirement ‘Annual control report and audit opinion’ is at least ‘Partially compliant’ and the assessments of the key requirements ‘Review of audits on systems’, ‘Drawing on sample’, ‘Review of audits of operations’ and ‘Re-performance of audits on operations’ are at least ‘Partially effective’. |
|
(c) |
‘Not effective’: the assessment of the key requirement ‘Annual control report and audit opinion’ is ‘Not compliant’ or the assessments of at least one of the key requirements ‘Review of audits on systems’, ‘Drawing on sample’, ‘Review of audits of operations’ and ‘Re-performance of audits on operations’ is ‘Not effective’. |
CHAPTER 6
Employment and social affairs
TABLE OF CONTENTS
Introduction
Specific characteristics of the policy area
Policy objectives
Policy instruments
Risks to regularity
Audit scope and approach
Regularity of transactions
Effectiveness of systems
The Court’s examination of audit authorities
Assessment of the Commission’s supervision of AAs
Review of DG EMPL annual activity report
Conclusion and recommendations
The conclusion for 2012
Recommendations
Annex 6.1 — Results of transaction testing for employment and social affairs
Annex 6.2 — Follow-up of previous recommendations for cohesion, transport and energy
|
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
INTRODUCTION |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Table 6.1 — Employment and social affairs — key information 2012
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Specific characteristics of the policy area |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Policy objectives |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Policy instruments |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Management and control of spending |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Risks to regularity |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Audit scope and approach |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
REGULARITY OF TRANSACTIONS |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Ineligible projects and expenditure |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Box 6.1 — Examples of ineligible projects and expenditure
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Breaches of public procurement rules |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Box 6.2 — Examples of breaches in public procurement rules
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Ineligible participants |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Box 6.3 — Examples of ineligible participants Ineligible participants: ESF support was given to Spanish companies hiring unemployed persons. An eligibility condition for participants was that the employers had to maintain the newly employed staff for a minimum period of three or, in some cases, up to five years. This condition was not respected for 12 persons. The costs claimed for the ineligible participants were 39,2 % of the audited amount. Similar findings were also identified in an ESF project in Italy. |
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Numerous failures to observe procedural requirements |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Box 6.4 — Examples of failures to observe procedural requirements
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The impact of the use of simplified cost options (SCOs) |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Resuming payments in problematic OPs meant a higher risk population in 2012 |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Errors found in closed OPs |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
EFFECTIVENESS OF SYSTEMS |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Court’s examination of audit authorities |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Assessment of the Commission’s supervision of AAs |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Review of DG EMPL annual activity report |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
CONCLUSION AND RECOMMENDATIONS |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The conclusion for 2012 |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
6.39. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Recommendations |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
6.42. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Commission agrees on the importance of the ‘first level’ checks conducted by the Member States and shares the view that these should be further strengthened. Therefore, it has given guidelines to Member States on the way Managing Authorities should define and implement their management verifications. Moreover, the Commission developed in 2009 comprehensive guidelines for the first level checks and a self-assessment tool for managing authorities. The Commission has disseminated to the Audit Authorities in 2011 checklists for the audit of management verifications, which can be used by the Managing Authorities as a benchmark. Beyond the above actions, being aware of the critical role of the management verifications, DG EMPL has sent in November 2012 a note to all Managing Authorities drawing their attention to the need to further strengthen the reliability and thoroughness of the management verifications and announcing a thematic audit on management verifications, to be conducted in 2013 on 7 selected OPs in 6 Member States. This thematic audit is currently underway. Once finalized, the Commission will prepare an overview report summarizing its results and lessons learned to be shared with all Member States. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Commission fully shares the need to further simplify national eligibility rules and eliminate unnecessary complex rules, which have a detrimental impact in terms of the burden on beneficiaries and increased error rate. The Commission underlines that whilst a systematic assessment of all national eligibility rules is not feasible, any identified instances of ‘gold plating’ have been addressed jointly with the Member States concerned (see reply to paragraph 6.18). The Commission is committed to present a report to the Discharge Authority on gold plating in ESF Operational Programmes in October 2013. The Commission will also continue encouraging and supporting national authorities in their simplification efforts. A series of seminars have been organized by DG EMPL in 2011-2013 to support the managing authorities in this effort (see also the Commission's reply to recommendation 3) |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Commission agrees with the Court on the importance of effectively implementing simplified cost options across all Member States. This is precisely why, besides introducing SCOs in the current regulatory framework, the Commission has very actively promoted their effective implementation in the 2007-2013 programming period, including simplification seminars conducted to date involving 17 Member States. The fact that currently 60 % of the ESF OPs already use at least one of these options shows a reasonable success in this regard. For the 2014-2020 programming period, SCOs are further strengthened, including, among others, the possibility to use flat rates already enshrined in the regulations. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Commission agrees with the importance of this issue. The work of the Audit Authorities as reflected in the ACRs is one of the main elements on which the Commission builds its assurance. Further guidance on the treatment of errors has been provided to the Audit Authorities in 2011 and numerous seminars have been organised by the Commission in 2012 in order to further improve the audit sampling methodology used in preparation of the ACRs. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
(1) Regulation (EC) No 1081/2006 of the European Parliament and of the Council of 5 July 2006 on the European social fund and repealing Regulation (EC) No 1784/1999 (OJ L 210, 31.7.2006, p. 12).
(2) The European Institute for Gender Equality, the European Foundation for the Improvement of Living and Working Conditions, and the European Agency for Safety and Health at Work.
(3) The EGF supports workers in the EU made redundant as a result of major structural changes in world trade patterns and of the financial and economic crisis.
(4) Only payments for the human resources development component of the IPA are included under the ‘Employment and social affairs’ policy budgetary area. Amongst other things, the IPA supports candidate countries in preparing for the implementation and management of the ESF.
(5) The European Progress Microfinance Facility, launched in 2010, increases the availability of microcredit — loans below 25 000 euro — for setting up or developing a small business. The financial envelope for implementing these activities for the period from 1 January 2007 to 31 December 2013 was set at 683,25 million euro.
(6) For the ESF and IPA, the Court’s sample contained 168 interim or final payments to projects . For EGF and other employment and social measures, 12 payments or clearings of expenditure were part of the sample.
(7) Belgium, Germany, Estonia, Greece, Spain, France, Italy, Lithuania, the Netherlands, Poland, Portugal, Romania, Slovenia, Slovakia and the United Kingdom.
(8) The Court calculates its estimate of error from a representative sample. The figure quoted is the best estimate. The Court has 95 % confidence that the rate of error in the population lies between 1,3 % and 5,1 % (the lower and upper error limits respectively).
(9) Commission Regulation (EC) No 448/2004 of 10 March 2004 amending Regulation (EC) No 1685/2000 laying down detailed rules for the implementation of Council Regulation (EC) No 1260/1999 as regards the eligibility of expenditure of operations co-financed by the Structural Funds and withdrawing Regulation (EC) No 1145/2003 (OJ L 72, 11.3.2004, p. 66).
(10) Directives 2004/17/EC and 2004/18/EC of the European Parliament and of the Council (OJ L 134, 30.4.2004).
(11) 2006 annual report, paragraph 6.45 and 2007 annual report, paragraph 6.34.
(12) Regulation (EC) No 396/2009 of the European Parliament and of the Council of 6 May 2009 amending Regulation (EC) No 1081/2006 on the European Social Fund to extend the types of costs eligible for a contribution from the ESF (OJ L 126, 21.5.2009, p. 1).
(13) As amended by Article 1 of Regulation (EC) No 396/2009.
(14) EC Guidance Note COCOF 09/0025/04-EN on Indirect costs declared on a flat rate basis, flat rate costs calculated by application of standard scales of unit costs and lump sums, final version of 28 January 2010.
(15) Spain (Comunidad Valenciana).
(16) See the 2011 annual report, paragraphs 5.52 to 5.64.
(17) The audit of administrative expenditure is reported in chapter 9.
(18) In line with the harmonised definition of underlying transactions (for details see chapter 1, paragraphs 1.6 and 1.7).
Source: 2012 consolidated accounts of the European Union.
ANNEX 6.1
RESULTS OF TRANSACTION TESTING FOR EMPLOYMENT AND SOCIAL AFFAIRS
|
|
2012 |
2011 |
2010 |
2009 |
||||||
|
ESF + IPA |
Other social matters |
Total |
||||||||
|
SIZE AND STRUCTURE OF THE SAMPLE |
||||||||||
|
Total transactions: |
168 |
12 |
180 |
180 |
66 |
44 |
||||
|
Proportion (number) of transactions tested found to be: |
||||||||||
|
Free of error |
65 % |
(109) |
67 % |
(8) |
65 % |
(117) |
60 % |
73 % |
75 % |
|
|
Affected by one or more errors |
35 % |
(59) |
33 % |
(4) |
35 % |
(63) |
40 % |
27 % |
25 % |
|
|
Analysis of transactions affected by error |
||||||||||
|
Analysis by type of error |
||||||||||
|
Non-Quantifiable errors: |
54 % |
(32) |
0 % |
(0) |
51 % |
(32) |
58 % |
39 % |
0 % |
|
|
Quantifiable errors: |
46 % |
(27) |
100 % |
(4 |
49 % |
(31) |
42 % |
61 % |
100 % |
|
|
Eligibility |
89 % |
(24) |
100 % |
(4) |
90 % |
(28) |
77 % |
91 % |
64 % |
|
|
Occurrence |
7 % |
(2) |
0 % |
(0) |
7 % |
(2) |
3 % |
9 % |
0 % |
|
|
Accuracy |
4 % |
(1) |
0 % |
(0) |
3 % |
(1) |
20 % |
0 % |
36 % |
|
|
ESTIMATED IMPACT OF QUANTIFIABLE ERRORS |
||||||||||
|
Most likely error rate |
3,2 % |
|
|
|
||||||
|
Upper error limit (UEL) |
5,1 % |
|
|
|
||||||
|
Lower error limit (LEL) |
1,3 % |
|
|
|
||||||
(1) To improve insight into areas with different risk profiles within the policy group, the sample was split up into segments.
(2) Numbers quoted in brackets represent the actual number of transactions.
ANNEX 6.2
FOLLOW UP OF PREVIOUS RECOMMENDATIONS FOR COHESION, TRANSPORT AND ENERGY
|
Year |
Court Recommendation |
Court's analysis of the progress made |
Commission reply |
|||||
|
Fully implemented |
Being implemented |
Not implemented |
N/A under the current framwork |
Insufficient evidence |
||||
|
In most respects |
In some respects |
|||||||
|
2010 |
Recommendation 1: continue to monitor compliance with the eligibility requirements for EU funding, including in particular the correct application of EU and national public procurement rules; |
|
X |
|
|
|
|
|
|
Recommendation 2: encourage national authorities to rigorously apply the corrective mechanisms prior to certification of the expenditure to the Commission. Whenever significant deficiencies in the functioning of the management and control systems are identified by national or EU bodies, the Commission should continue to interrupt or suspend payments to the OP until corrective action has been taken by the Member State; |
|
X (1) |
|
|
|
|
|
|
|
Recommendation 3: on the basis of its experience gained during the first years of the 2007-2013 programming period, carry out an assessment of the use of national eligibility rules in view of identifying possible areas for further simplification and to eliminate potential sources of errors for the period after 2013; |
|
|
|
X |
|
|
A systemic assessment of all national eligibility rules is not feasible. The Commission considers that the most effective way forward is through the active promotion of simplified cost options. |
|
|
Recommendation 4: propose an amendment to the structural funds regulations for the current programming period, in order to require Member States to report on the financial implementation of FEIs. The implementation of the funds should also be checked by the Commission on a regular basis; |
X |
|
|
|
|
|
|
|
|
Recommendation 5: provide further guidance to AAs for the current programming period, in particular on sampling, the scope of verifications to be undertaken for audits of projects and the reporting of audit findings; |
|
X (2) |
|
|
|
|
|
|
|
2010 |
Recommendation 6: propose to align the reporting periods of the annual control reports with the financial year of the EU budget in the Structural Funds regulations for the period after 2013 and to harmonise the approaches, so that the AAs’ audit opinions can be aggregated for each Fund at the national and EU levels. |
|
|
|
|
X |
|
The Commission reflected this recommendation in its proposals for 2014-2020. |
|
2009 |
Recommendation 1: encourage national authorities to rigorously apply the corrective mechanisms prior to certification of the expenditure to the Commission; |
|
X (3) |
|
|
|
|
|
|
Recommendation 2: ensure that the substitution of ineligible with new expenditure (withdrawal) does not result in new irregular expenditure being declared by Member States; |
|
|
|
|
|
X |
|
|
|
Recommendation 3: ensure, through its supervision, an effective functioning of the national management and control systems for the 2007-2013 programming period. |
|
|
X |
|
|
|
The Commission strictly implements its supervisory role through, where appropriate, interruptions and suspensions of payments, and financial corrections. |
|
|
Recommendation 4: to monitor closely the correct application of the EU Directives on public procurement in Member States. |
|
X |
|
|
|
|
|
|
(1) From the Commission’s side, the recommendation could be assessed as fully implemented, but there’s still room for improvement at Member State level.
(2) The recommendation is implemented with regard to provision of guidance for sampling and for the scope of verifications. However, regarding the reporting of audit findings progress is required.
(3) See recommendation 2 for the 2010 annual report.
CHAPTER 7
External relations, aid and enlargement
TABLE OF CONTENTS
Introduction
Specific characteristics of the policy group
Risks to regularity
Audit scope and approach
Regularity of transactions
Effectiveness of systems
DG Enlargement
EuropeAid
Conclusions and recommendations
The conclusion for 2012
Recommendations
|
Annex 7.1 — |
Results of transaction testing for external relations, aid and enlargement |
|
Annex 7.2 — |
Results of examination of systems for external relations, aid and enlargement |
|
Annex 7.3 — |
Follow-up of previous recommendations for external relations, aid and enlargement |
|
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
INTRODUCTION |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Table 7.1 — External relations, aid and enlargement — key information 2012
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Specific characteristics of the policy group |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Risks to regularity |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Audit scope and approach |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
REGULARITY OF TRANSACTIONS |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Box 7.1 — Examples of quantifiable errors
The Commission made payments of 90 000 euro to a non-governmental organisation in Guatemala. It reimbursed VAT, which was ineligible, and salaries for staff who worked outside the period covered by the grant. Around 18 % of the expenditure reimbursed was not eligible.
The Commission paid 16,7 million euro, towards a programme to support female teachers in rural secondary schools in Bangladesh. For 8,6 million euro, no documentation was available to the Commission when it approved the expenditure, nor to the Court when it audited it. In addition, the Commission accepted as a cost 0,5 million euro which had not been used and for which it did not launch a recovery order. In 2012, the Commission approved the expenditure of 29 million euro implemented by an international organisation during the period 2003-2005 without sufficient documentary evidence. The latter could not be obtained by the auditors as the period for which the beneficiary organisation was required to keep documents and accounting information had already ended. A common feature of the two latter errors is the Commission’s long delay in carrying out the final validation of expenditure. |
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
EFFECTIVENESS OF SYSTEMS |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
DG Enlargement |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
EuropeAid |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The frequency of errors found, including in final claims of expenditure which had in principle been subject to external audits and expenditure verifications, points to weaknesses in checks before payment. Late clearing and contract closure affect the quality of ex ante checks and significantly increase the risk of a broken audit trail or lack of supporting documents. In both EDF and general budget transactions, the Court found old contracts, for which expenditure was cleared late. |
The Commission agrees that while the design of EuropeAid's control system is broadly consistent and sound, progress still has to be made on the implementation of the control mechanisms. Moreover, the Commission highlights the fact that the frequency of errors for external aid as a whole has decreased as compared to previous years. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
As part of an external study in 2012 EuropeAid has put in place a procedure that reviews all contracts for which the activity period has expired for more than 18 months. The services are requested to comment on the reason for the contracts still being open and their plan to ensure the contracts can be closed as soon as possible. This has led to a decrease in open contracts at year end as compared to 2011. A similar exercise has been launched in April 2013 so as to continue this effort. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Shortcomings persist in EuropeAid’s management information system on the results and the follow-up of external audits, expenditure verifications and monitoring visits. There are weaknesses in the selection, planning and follow-up of monitoring visits made by the EU delegations. |
The audit module of the external aid management information system (CRIS) was designed to plan, and record the results of external audits rather than track audit follow-up made by EuropeAid. However, EuropeAid planned to develop this functionality in the medium term, resources permitting. EuropeAid developed a work plan tool for planning of missions. Additionally, EuropeAid is setting up a reform on monitoring and reporting to be implemented in early 2014. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
EuropeAid carried out its first study to assess the level of errors which have evaded all management checks to prevent, detect and correct errors: the Residual Error Rate (RER) study. The study estimates the RER at 3,63 %. The design of the RER methodology was in general appropriate and the study has provided interesting and potentially useful information. However, there is scope for further refinement in the methodology relating to the degree of reliance placed upon previous audit or verification reports, to the method of calculation of error rates on individual transactions, and to the treatment of transactions where there was no readily obtainable documentation. |
The results of the 2012 RER study fed directly into the 2012 AAR assurance process and therefore were actually very useful to EuropeAid. The 2012 RER study was the first one implemented and the lessons learnt from this first exercise will allow for refinements in the methodology. EuropeAid will discuss the issues of the degree of reliance on previous audit or verification reports as well as the method of calculation of error rates with the contractor. The steps to be undertaken to perform estimations are set out in detail in the revised RER instruction manual which will be applied for the 2013 RER exercise. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Commission’s 2011 reorganisation continues adversely to affect the activity of the Internal Audit Capability (IAC). |
Since 2013, due to several measures taken in this respect, the functioning of the IAC has been improving. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Director-General makes a reservation concerning the legality and regularity of transactions since the amount considered at risk (259,5 million euro) represents more than 2 % of payments authorised in the reporting period. The presentation of the RER study's results in the AAR is misleading: |
As foreseen in EuropeAid’s procedures, an Action Plan has been set up in order to further improve the internal control system. It includes, inter alia, awareness raising actions, training and guidance, reinforcement of the accountability of Delegations, an increased cooperation with international organisations and streamlining the control system. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
The Commission agrees that the results of the RER study are not an estimate of the amount at risk. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
CONCLUSIONS AND RECOMMENDATIONS |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The conclusion for 2012 |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
7.25. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Recommendations |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
7.28. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Commission accepts this recommendation and action has recently been taken with a view to ensuring clearance of expenditure is done without delay. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Commission agrees with the recommendation. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Commission accepts this recommendation, and the Action Plan approved in May 2013 includes measures concerning the revision of existing training on procurement and grants in order to reinforce financial and operational aspects linked to procurement procedures. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Commission accepts this recommendation and in the framework of the Action Plan it has planned to examine in 2013 the possibilities of enhancing the quality and effectiveness of audits and verifications. This will be carried out notably with regard to audits and verifications conducted by local audit firms hired by the beneficiaries. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The standing instructions on the AARs contain harmonised guidelines which can be used throughout the Commission on reporting in the AAR for the calculation of (residual) error rates, the financial impact of these errors as amount at risk, the materiality for a potential reservation and their impact on the AOD’s declaration of assurance. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
(1) Aid provided through the European Development Funds is reported separately as it is not financed from the general budget.
(2) Budget support payments made from the general budget in 2012 amounted to 796 million euro.
(3) The payments made to international organisations from the general budget in 2012 amounted to 1,4 billion euro, more than half of which was implemented through multi-donor projects
(4) In Bangladesh, Bosnia and Herzegovina, Guatemala, Indonesia, Kosovo, Morocco, Palestine, Turkey, Ukraine, and Zambia.
(5) The Court calculates its estimate of error from a representative sample. The figure quoted is the best estimate. The Court has 95 % confidence that the rate of error in the population lies between 1,4 % and 5,2 % (the lower and upper error limits respectively).
(6) The detailed results of the assessment of EuropeAid systems, including EuropeAid’s annual activity report, are presented in the Court’s annual report on the 8th, 9th and 10th European Development Funds, paragraphs 31 to 44.
(7) ‘Residual errors are those that have evaded all prevention, detection and correction controls in the existing control framework’. (A Manual for Measuring the Residual Error Rate for EuropeAid, May 2013).
(8) The audit of administrative expenditure is reported in chapter 9.
(9) In line with the harmonised definition of underlying transactions (for details see chapter 1, paragraphs 1.6 and 1.7).
Source: 2012 consolidated accounts of the European Union.
ANNEX 7.1
RESULTS OF TRANSACTION TESTING FOR EXTERNAL RELATIONS, AID AND ENLARGEMENT
|
|
2012 |
2011 |
2010 |
2009 |
|||||||||
|
EuropeAid (3) |
FPI |
ELARG |
ECHO |
Total |
|||||||||
|
SIZE AND STRUCTURE OF THE SAMPLE |
|||||||||||||
|
Total transactions: |
109 |
7 |
34 |
24 |
174 |
120 |
90 |
97 |
|||||
|
Proportion of transactions tested found to be: |
|||||||||||||
|
Free of error |
65 % |
(71) |
100 % |
(7) |
97 % |
(33) |
96 % |
(23) |
77 % |
(134) |
59 % |
62 % |
80 % |
|
Affected by one or more errors |
35 % |
(38) |
0 % |
— |
3 % |
(1) |
4 % |
(1) |
23 % |
(40) |
41 % |
38 % |
20 % |
|
Analysis of transactions affected by error |
|||||||||||||
|
Analysis by type of error |
|||||||||||||
|
Non-Quantifiable errors: |
24 % |
(9) |
0 % |
— |
100 % |
(1) |
0 % |
— |
25 % |
(10) |
55 % |
47 % |
74 % |
|
Quantifiable errors: |
76 % |
(29) |
0 % |
— |
0 % |
— |
100 % |
(1) |
75 % |
(30) |
45 % |
53 % |
26 % |
|
Eligibility |
59 % |
(17) |
0 % |
— |
0 % |
— |
0 % |
— |
57 % |
(17) |
86 % |
72 % |
100 % |
|
Occurrence |
34 % |
(10) |
0 % |
— |
0 % |
— |
0 % |
— |
33 % |
(10) |
0 % |
17 % |
0 % |
|
Accuracy |
7 % |
(2) |
0 % |
— |
0 % |
— |
100 % |
(1) |
10 % |
(3) |
14 % |
11 % |
0 % |
|
ESTIMATED IMPACT OF QUANTIFIABLE ERRORS |
|||||||||||||
|
Most likely error rate |
3,3 % |
|
|
|
|||||||||
|
Upper Error Limit (UEL) |
5,2 % |
|
|
|
|||||||||
|
Lower Error Limit (LEL) |
1,4 % |
|
|
|
|||||||||
(1) To improve insight into areas with different risk profiles within the policy group, the sample was split up into segments.
(2) Numbers quoted in brackets represent the actual number of transactions.
(3) Includes four transactions from the Education, Audiovisual and Culture Executive Agency.
ANNEX 7.2
RESULTS OF EXAMINATION OF SYSTEMS FOR EXTERNAL RELATIONS, AID AND ENLARGEMENT
|
|
Ex-ante controls |
Monitoring and supervision |
Internal audit |
Overall assessment |
|
EuropeAid |
Partially effective |
Partially effective |
Partially effective |
Partially effective |
|
DG Enlargement |
Effective |
Effective |
Effective |
Effective |
ANNEX 7.3
FOLLOW-UP OF PREVIOUS RECOMMENDATIONS FOR EXTERNAL RELATIONS, AID AND ENLARGEMENT
|
Year |
Court recommendation |
Court's analysis of the progress made |
Commission reply |
|||||
|
Fully implemented |
Being implemented |
Not implemented |
No longer applicable |
Insufficient evidence |
||||
|
In most respects |
In some respects |
|||||||
|
2010 |
DG ELARG should set out in greater detail the criteria for lifting ex ante control and suspending the ‘conferral of management’ to decentralised countries and test the performance of the systems used by national authorities. (This is the 2010 follow up/update of a 2009 recommendation) |
X |
|
|
|
|
|
|
|
DG ELARG should continue to improve the quality of the data entered in its management information system. (This is the 2010 follow up/update of a 2009 recommendation) |
X |
|
|
|
|
|
|
|
|
DG ELARG should develop a tool to facilitate the consolidation of the outcomes of audit visits related to legality and regularity issues. (This is the 2010 follow up/update of a 2009 recommendation) |
|
X |
|
|
|
|
DG ELARG considers that the CRIS audit module is appropriate for management needs, and that the information requested by the Court and needed for management can be made available via the current CRIS tool. |
|
|
|
|
|
|
|
|
|
DG ELARG will strengthen its control mechanisms to ensure that all types of audit missions are registered in CRIS and the relevant related explanatory documents uploaded in order to provide a complete picture of the situation to the management and to the Court. |
|
|
DG ELARG should increase the number of ex post reviews of transactions for centralised management |
X |
|
|
|
|
|
|
|
|
2010 |
The Commission should establish a coherent methodology for the external relations directorate to calculate the residual error rate based on which directors-general deliver their management representations. |
X |
|
|
|
|
|
|
|
2009 |
DG RELEX should devote sufficient resources to the analysis and closure of the old RRM and the CFSP contracts for which the implementation deadlines have already expired. |
|
X |
|
|
|
|
|
|
DG RELEX should consolidate its ex post control methodology and promptly address the recommendations made by the internal auditor in this respect. |
X |
|
|
|
|
|
|
|
|
DG ELARG should continue to devote sufficient resources to the analysis of the outstanding final declarations submitted under PHARE and the Transition Facility in the new Member States. |
X |
|
|
|
|
|
|
|
|
DG ECHO should design and introducea mechanism for collecting and analysing the data concerning the use of ‘Humanitarian Procurement Centres’ by its partners. |
|
X |
|
|
|
|
DG ECHO has assessed and tested different options to effectively collect the data. The selected solution will be fully implemented in 2014 with the introduction of the new ‘e-single form’ as part of the new framework partnership with DG ECHO partners. Partners will be required to provide data on the use of the Humanitarian Procurement Centres through the ‘e-single form’ tool. The output of this measure will allow monitoring the use of the HPCs in a more regular and effective way. |
|
CHAPTER 8
Research and other internal policies
TABLE OF CONTENTS
Introduction
Specific characteristics of the policy group
Policy objectives
Policy instruments
Risks to regularity
Audit scope and approach
Regularity of transactions
Effectiveness of systems
Research Framework Programmes
Ex ante desk checks
Audit certification of cost statements
The Commission’s ex post financial audits
Lifelong Learning Programme
Conclusion and recommendations
The conclusion for 2012
Recommendations
Results of the audit of the Guarantee Fund for external actions
|
Annex 8.1 — |
Results of transaction testing for research and other internal policies |
|
Annex 8.2 — |
Results of examination of systems for research and other internal policies |
|
Annex 8.3 — |
Follow-up of previous recommendations for research and other internal policies |
|
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
INTRODUCTION |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Table 8.1 — Research and other internal policies — key information 2012
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Specific characteristics of the policy group |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Policy objectives |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Policy instruments |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Risks to regularity |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Audit scope and approach |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
REGULARITY OF TRANSACTIONS |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Box 8.1 — Errors in costs declared for an FP7 project A beneficiary involved in a FP7 project declared costs of 1,7 million euro in its cost statement, leading to reimbursement by the Commission of the EU contribution of some 1,2 million euro. The Court detected several errors in the declared costs, including:
The ineligible costs declared by the beneficiary amounted to some 60 000 euro. As the EU co-financing rate for this project is 70 %, the Commission has unduly reimbursed 42 000 euro. |
Box 8.1 — Errors in costs declared for an FP7 project Indirect costs are a regular source of error, which is why the Commission proposed, for Horizon 2020, to avoid these errors by having a single flat rate for this type of cost. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Box 8.2 — Errors in costs declared for an ICT-PSP project A beneficiary involved in an ICT-PSP project declared more than 1 million euro in its cost statement, leading to reimbursement by the Commission of the EU contribution of some 500 000 euro. The Court detected several errors in the declared costs, including:
The ineligible costs declared by the beneficiary amounted to some 940 000 euro. As the EU co-financing rate for this project is 50 %, the Commission has unduly reimbursed around 470 000 euro. |
Box 8.2 — Errors in costs declared for an ICT-PSP project The Commission will take the necessary measures to recover the unduly paid amounts pending the finalisation of the contradictory procedures with the audited beneficiaries. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
EFFECTIVENESS OF SYSTEMS |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Research Framework Programmes |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Ex ante desk checks |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Audit certification of cost statements |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Commission’s ex post financial audits |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Lifelong Learning Programme |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
CONCLUSION AND RECOMMENDATIONS |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The conclusion for 2012 |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Recommendations |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
8.42. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Commission has been running a communication campaign to remind beneficiaries and their auditors of the eligibility rules. 1 700 people attended 10 seminars in 2012, among them at least 235 auditors. One event in Germany was exclusively for auditors. 1 170 people have attended the 10 events so far held in 2013, of which around 180 were auditors. Three more events are planned for the remainder of 2013. The Commission services will continue to write to certifying auditors where the Commission’s ex post audits identify material differences between the certified cost statements and its own findings. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
The Commission will also try to address the issue at the contracting stage, by ensuring that participants are made aware of the most common errors in cost claims. The issue is also addressed by the proposal for Horizon 2020, which includes a number of simplifications that would reduce the inherent risk of error. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The distribution of funds is a matter subject to the provisions of the consortium agreement concluded by the beneficiaries, to which the Commission is not a party. Nevertheless, the Commission regularly reminds the coordinators about this obligation. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Commission continues to review its ex ante checks. Improvement of ex ante checks without imposing additional administrative burdens on beneficiaries, and whilst ensuring that payments to researchers are paid promptly, is a permanent challenge. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Commission will continue its efforts to reduce delays in audit completion and to complete the extrapolation of audit findings. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The dedicated audit strategy for non-research projects has been implemented throughout 2012-2013 aiming at 215 audits of non-research projects (ICT PSP included) by 2017. All of these audits will focus on beneficiaries which present a high risk profile. In addition, it is to be noted that the Commission has introduced an audit strategy specific to non-research funded projects (including ICT PSP). In 2012, 27 such ex post audits were launched and another 15 in 2013. More audits on non-research projects will be launched in the second half of 2013. The Commission also applies the same ex ante controls to the CIP ICT PSP as to the other funding schemes. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
RESULTS OF THE AUDIT OF THE GUARANTEE FUND FOR EXTERNAL ACTIONS |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
(1) Council Regulation (EC, Euratom) No 480/2009 of 25 May 2009 establishing a Guarantee Fund for external actions (OJ L 145, 10.6.2009, p. 10) stipulates in its recitals that the financial management of the Guarantee Fund should be subject to audit by the Court of Auditors in accordance with the procedures agreed upon by the Court of Auditors, the Commission and the European Investment Bank.
(2) The seven directorates-general are: DG Research and Innovation (RTD), DG Communications Networks, Content and Technology (CNECT), DG Joint Research Centre (JRC), DG Education and Culture (EAC), DG Enterprise and Industry (ENTR), DG Mobility and Transport (MOVE) and DG Energy (ENER). The two executive agencies are: the Research Executive Agency (REA) and the European Research Council Executive Agency (ERCEA).
(3) The European Union research joint undertakings (JUs) are: the European JU for ITER and the Development of Fusion Energy; the Clean Sky JU; the Artemis JU; the Innovative Medicines Initiative JU; the ENIAC JU; and the Fuel Cells and Hydrogen JU.
(4) For example, the European Space Agency (ESA), the European Association of National Metrology Institutes (EURAMET) and the European and Developing Countries Clinical Trials Partnership (EDCTP).
(5) Directorate-General for Economic and Financial Affairs.
(6) The Court calculates its estimate of error from a representative sample. The figure quoted is the best estimate. The Court has 95 % confidence that the rate of error in the population lies between 1,8 % and 6,0 % (the lower and upper error limits respectively).
(7) Under their common audit strategy for FPs, the research DGs examine only interim and final payments to beneficiaries, and advances are not included in the audit population.
(8) Information and Communication Technologies Policy Support Programme.
(9) See the 2011 annual report, paragraphs 8.31 to 8.34.
(10) The total net assets of the Fund before consolidation were 1 865,5 million euro.
(11) The audit of administrative expenditure is reported in chapter 9.
(12) In line with the harmonised definition of underlying transactions (for details see chapter 1, paragraphs 1.6 to 1.7).
Source: 2012 consolidated accounts of the European Union.
ANNEX 8.1
RESULTS OF TRANSACTION TESTING FOR RESEARCH AND OTHER INTERNAL POLICIES
|
|
2012 |
2011 |
2010 |
2009 |
|||||||||
|
FP6 |
FP7 |
LLP |
Other |
Total |
|||||||||
|
SIZE AND STRUCTURE OF THE SAMPLE |
|||||||||||||
|
Total transactions: |
11 |
79 |
21 |
39 |
150 |
86 |
73 |
226 |
|||||
|
Proportion of transactions tested found to be: |
|||||||||||||
|
Free of error |
27 % |
(3) |
39 % |
(31) |
62 % |
(13) |
77 % |
(30) |
51 % |
(77) |
51 % |
61 % |
72 % |
|
Affected by one or more errors |
73 % |
(8) |
61 % |
(48) |
38 % |
(8) |
23 % |
(9) |
49 % |
(73) |
49 % |
39 % |
28 % |
|
Analysis of transactions affected by error |
|||||||||||||
|
Analysis by type of error |
|||||||||||||
|
Non-Quantifiable errors: |
25 % |
(2) |
31 % |
(15) |
37 % |
(3) |
33 % |
(3) |
32 % |
(23) |
38 % |
33 % |
33 % |
|
Quantifiable errors: |
75 % |
(6) |
69 % |
(33) |
63 % |
(5) |
67 % |
(6) |
68 % |
(50) |
62 % |
67 % |
61 % |
|
Eligibility |
100 % |
(6) |
100 % |
(33) |
100 % |
(5) |
100 % |
(6) |
100 % |
(50) |
98 % |
97 % |
52 % |
|
Occurrence |
0 % |
(0) |
0 % |
(0) |
0 % |
(0) |
0 % |
(0) |
0 % |
(0) |
0 % |
6 % |
7 % |
|
Accuracy |
0 % |
(0) |
0 % |
(0) |
0 % |
(0) |
0 % |
(0) |
0 % |
(0) |
2 % |
3 % |
38 % |
|
ESTIMATED IMPACT OF QUANTIFIABLE ERRORS |
|||||||||||||
|
Most likely error rate |
3,9 % |
|
|
|
|||||||||
|
Upper error limit |
6,0 % |
|
|
|
|||||||||
|
Lower error limit |
1,8 % |
|
|
|
|||||||||
(1) To improve insight into areas with different risk profiles within the policy group, the sample was split up into segments.
(2) Numbers quoted in brackets represent the actual number of transactions.
ANNEX 8.2
RESULTS OF EXAMINATION OF SYSTEMS FOR RESEARCH AND OTHER INTERNAL POLICIES
Assessment of the systems examined
|
System concerned |
Ex ante desk checks |
Audit certification |
Ex post financial audits |
Overall assessment |
|
Research framework programmes (FPs) |
Partially effective |
Partially effective |
N/A (1) |
Partially effective |
|
|
|
|
||
|
System concerned |
Closure |
Overall assessment |
||
|
Lifelong Learning Programme (LLP) |
Effective |
Effective |
||
(1) See paragraph 8.35.
ANNEX 8.3
FOLLOW-UP OF PREVIOUS RECOMMENDATIONS FOR RESEARCH AND OTHER INTERNAL POLICIES
|
Year |
Court Recommendation |
Court's analysis of the progress made |
Commission reply |
|||||||
|
Fully implemented |
Being implemented |
Not implemented |
No longer applicable |
Insufficient evidence |
||||||
|
In most respects |
In some respects |
|||||||||
|
2010 |
The Court recommends that the Commission should:
|
|
|
|
|
|
|
|
||
|
Recommendation 1:
|
|
X |
|
|
|
|
|
|||
|
Recommendation 2:
|
|
X |
|
|
|
|
|
|||
|
Recommendation 3
|
X |
|
|
|
|
|
|
|||
|
2009 |
The Court encourages the Commission to continue its efforts to ensure rigorous application of effective control systems. In the context of the current legal framework, the Commission should: |
|
|
|
|
|
|
|
||
|
Recommendation 4:
|
|
X |
|
|
|
|
|
|||
|
Recommendation 5:
|
|
|
|
|
X |
|
|
|||
|
Recommendation 6:
|
|
X |
|
|
|
|
|
|||
|
Recommendation 7: The Court recommends that the Commission continues to reinforce the checks on closures to ensure that errors are detected and corrected and prevent the reoccurrence of previously identified errors. (paragraph 7.20) |
X |
|
|
|
|
|
|
|||
CHAPTER 9
Administrative and other expenditure
TABLE OF CONTENTS
Introduction
Specific characteristics of the policy group
Audit scope and approach
Regularity of transactions
Effectiveness of systems
Observations on specific Institutions and bodies
Parliament
European Council and Council
Court of Auditors
Other institutions and bodies
Conclusion and recommendations
The conclusion for 2012
Recommendations
|
Annex 9.1 — |
Results of transaction testing for administrative and other expenditure |
|
Annex 9.2 — |
Results of the examination of systems for administrative and other expenditure |
|
Annex 9.3 — |
Follow-up of previous recommendations for administrative and other expenditure |
|
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
INTRODUCTION |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Table 9.1 — Administrative and other expenditure — Key information 2012
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Specific characteristics of the policy group |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Audit scope and approach |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
REGULARITY OF TRANSACTIONS |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
EFFECTIVENESS OF SYSTEMS |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
OBSERVATIONS ON SPECIFIC INSTITUTIONS AND BODIES |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Parliament |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Recruitment of temporary and contract staff |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Procurement |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
European Council and Council |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Recruitment of temporary and contract staff |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Procurement |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Court of Auditors |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Other institutions and bodies |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
CONCLUSION AND RECOMMENDATIONS |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The conclusion for 2012 |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Recommendations |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
(1) The Court’s specific annual report on the European Schools is submitted to the Board of Governors of the European Schools, and is copied to the European Parliament, the Council and the Commission. The Court’s specific annual reports on agencies and other bodies are published in the Official Journal.
(2) Ex ante and ex post controls, internal audit function, exception reporting and internal control standards.
(3) Directorate-General for Human Resources and Security, Office for the Administration and Payment of individual Entitlements, Office for Infrastructure and Logistics in Brussels and Directorate-General for Informatics.
(4) PricewaterhouseCoopers, Société à responsabilité limitée, Réviseur d'Entreprises.
(5) The Court calculates its estimate of error from a representative sample. The figure quoted is the best estimate. The Court has 95 % confidence that the rate of error in the population is 0 %.
(6) See the external auditor’s report on the financial statements referred to in paragraph 9.7.
(7) In line with the harmonised definition of underlying transactions (for details see chapter 1, paragraphs 1.6 and 1.7).
Source: 2012 consolidated accounts of the European Union.
ANNEX 9.1
RESULTS OF TRANSACTION TESTING FOR ADMINISTRATIVE AND OTHER EXPENDITURE
|
|
2012 |
2011 |
2010 |
2009 |
|||||||
|
Expenses related to staff |
Expenses related to buildings |
Other expenses (energy, communications, information technology, etc.) |
Total |
||||||||
|
SIZE AND STRUCTURE OF THE SAMPLE |
|||||||||||
|
Total transactions: |
91 |
17 |
43 |
151 |
56 |
58 |
57 |
||||
|
Proportion (number) of transactions tested found to be: |
|||||||||||
|
Free of error |
100 % |
(91) |
100 % |
(17) |
98 % |
(42) |
99 % |
(150) |
93 % |
93 % |
93 % |
|
Affected by one or more errors |
0 % |
(0) |
0 % |
(0) |
2 % |
(1) |
1 % |
(1) |
7 % |
7 % |
7 % |
|
ESTIMATED IMPACT OF QUANTIFIABLE ERRORS |
|||||||||||
|
Most likely error rate |
, % |
|
|
|
|||||||
(1) To improve insight into areas with different risk profiles within the policy group, the sample was split up into segments. The results of testing reflect the proportionate share each segment has within the policy group.
(2) Numbers quoted in brackets represent the actual number of transactions.
ANNEX 9.2
RESULTS OF THE EXAMINATION OF SYSTEMS FOR ADMINISTRATIVE AND OTHER EXPENDITURE
Assessment of the systems examined
|
System concerned |
European Parliament |
European Council and Council |
Other Institutions and bodies |
Overall assessment |
|
Recruitment, salaries and pensions |
Effective |
Effective |
Effective |
Effective |
|
Procurement |
Effective |
Effective |
Effective |
Effective |
ANNEX 9.3
FOLLOW-UP OF PREVIOUS RECOMMENDATIONS FOR ADMINISTRATIVE AND OTHER EXPENDITURE
|
Year |
Court Recommendation |
Court's analysis of the progress made |
Institution reply |
||||
|
Fully implemented |
Being implemented |
Not implemented |
Insufficient evidence |
||||
|
In most respects |
In some respects |
||||||
|
2010 |
Parliament Recruitment of temporary and contract staff The Parliament should ensure that appropriate documentation is established to justify the recruitment decisions made. |
The in-depth examination of a sample of recruitments of temporary and contract staff (see paragraph 9.11) did not lead to any observation. |
|
|
|
|
|
|
European Economic and Social Committee Recruitment of temporary and contract staff The European Economic and Social Committee should ensure that eligibility criteria set out in vacancy notices are respected. |
|
|
The Court noted that, as a result of this recommendation, the European Economic and Social Committee has implemented measures to consolidate and strengthen rules on recruitment. Under the approach for rotating the in-depth examination of internal control systems among the Institutions, audit work will be performed in the area of recruitment in future years. |
|
|
|
|
|
Parliament Procurement The Parliament should ensure that authorising officers have appropriate checks and better guidance at their disposal so as to improve the design, coordination and performance of procurement procedures. |
|
|
The in-depth examination of a sample of procurement procedures (see paragraph 9.12) showed that errors persist in the design, coordination and performance of procurement procedures. |
|
|
|
|
|
Commission (1) Procurement The Commission should ensure that authorising officers have appropriate checks and better guidance at their disposal so as to improve the design, coordination and performance of procurement procedures. |
|
|
|
|
|
|
|
|
2010 |
European Economic and Social Committee (1) Procurement The European Economic and Social Committee should ensure that authorising officers have appropriate checks and better guidance at their disposal so as to improve the design, coordination and performance of procurement procedures. |
|
|
|
|
|
|
|
Committee of the Regions (1) Procurement The Committee of the Regions should ensure that authorising officers have appropriate checks and better guidance at their disposal so as to improve the design, coordination and performance of procurement procedures. |
|
|
|
|
|
|
|
|
2009 |
Parliament Payment of social allowances to staff members Staff should be requested to deliver at appropriate intervals documents confirming their personal situation. In addition, the Parliament should implement a system for the timely monitoring and control of these documents. |
|
As mentioned in Annex 9.3 of the 2011 annual report, the Parliament implemented measures to mitigate the risk. The Court's audit did not show any new weakness. However, the risk of making incorrect or undue payments remains since the system in place is based on declarations by staff members. |
|
|
|
The measures taken in 2012 improved even further the response rate for the annual procedure for the electronic verification and updating of staff members' personal data. Where necessary, staff members' declarations are accompanied by appropriate supporting documents. |
|
Commission — DG RELEX Payment of social allowances and benefits to staff members Staff should be requested to deliver at appropriate intervals to the Commission's services documents proving their personal situation. In addition, DG RELEX should implement a system for the timely monitoring and control of these documents. |
|
|
As mentioned in Annex 9.3 of the 2011 annual report, the European External Action Service implemented measures to mitigate the risk in cooperation with the Office for Administration and Payment of Individual Entitlements (PMO) of the Commission. The Court's audit however showed that weaknesses persist (see paragraph 9.16). |
|
|
|
|
|
2009 |
European Data Protection Supervisor Payment of social allowances to staff members Staff should be requested to deliver at appropriate intervals documents proving their personal situation. In this respect, the European Data Protection Supervisor should improve its system for the timely monitoring and control of these documents. |
|
As mentioned in Annex 9.3 of the 2011 annual report, the European Data Protection Supervisor implemented measures to mitigate the risk in cooperation with the Office for Administration and Payment of Individual Entitlements (PMO) of the Commission. The Court's audit did not show any new weakness. However, the risk of making incorrect or undue payments remains since the system in place is based on declarations by staff members. |
|
|
|
The EDPS takes good note of the results of the Court's analysis and will continue to improve its system for timely monitoring and control. |
(1) Under the approach for rotating the in-depth examination of internal control systems among the Institutions, the follow-up of these recommendations will be performed in future years.
CHAPTER 10
Getting results from the EU budget
TABLE OF CONTENTS
Introduction
Part 1 — The AAR’s reporting on policy achievements is evolving but it is still of limited use
Introduction
Reporting on policy achievements needs improvement
Performance management and reporting is evolving and some corrective actions have been taken but it is too earlyto assess their results
Part 2 — Evaluation report on the union’s finances based on results achieved
Part 3 — Results of the Court’s audit on performance
Introduction
SMART objectives together with suitable performance indicators not consistently applied inspending programmes
Deficiencies in the relevance, reliability and timeliness of performance data
In several cases sustainability of EU projects was at risk
Conclusions and recommendations
Conclusions
Recommendations
Annex 10.1 — Special reports adopted by the Court of Auditors in 2012
Annex 10.2 — Follow-up of previous recommendations for getting results from the EU budget
|
|
|
||||||||||||||||||||||
|
INTRODUCTION |
|||||||||||||||||||||||
|
|
||||||||||||||||||||||
|
|
||||||||||||||||||||||
|
|
||||||||||||||||||||||
|
|
||||||||||||||||||||||
|
|
The budget allocation by Member State is necessary for the purpose of programming, and in particular for the ex-ante quantification of targets which could otherwise not be done. Envelopes should be proportionate to the needs to be addressed in the different Member States. |
||||||||||||||||||||||
|
PART 1 — THE AAR’S REPORTING ON POLICY ACHIEVEMENTS IS EVOLVING BUT IT IS STILL OF LIMITED USE |
|||||||||||||||||||||||
|
Introduction |
|||||||||||||||||||||||
|
|
||||||||||||||||||||||
|
|
||||||||||||||||||||||
|
Reporting on policy achievements needs improvement |
|||||||||||||||||||||||
|
|
||||||||||||||||||||||
|
|
||||||||||||||||||||||
|
|
||||||||||||||||||||||
|
|
||||||||||||||||||||||
|
|
||||||||||||||||||||||
|
|
||||||||||||||||||||||
|
|
||||||||||||||||||||||
|
Objectives directly taken from high level policy or legislative documents are often not sufficiently focused to be useful for AARs and MPs |
|||||||||||||||||||||||
|
|
||||||||||||||||||||||
|
|
|
||||||||||||||||||||||
|
|
||||||||||||||||||||||
|
Only eight of 52 objectives fulfilled all the SMART criteria |
|||||||||||||||||||||||
|
|
||||||||||||||||||||||
|
|
|
||||||||||||||||||||||
|
To ‘implement the core transport network by 2030’ is one objective of DG MOVE. This objective is specific, timed and relevant. The measurability of this objective is provided in quantified terms in the MP and AAR (for example as ‘five removed bottlenecks on the core transport routes by 2017’). |
|
||||||||||||||||||||||
|
One of the specific objectives presented by DG MOVE in its MP 2012 is: ‘To promote a modern urban mobility’. This objective is not SMART. It is neither specific as it does not provide any information on what needs to be changed nor is it measurable or timed. |
For the objective on urban mobility, it will be considered to be attained by the number of cities that are members of the CIVITAS forum reaching 250-270 by 2015. All necessary information is therefore available to the reader and the objective can in practice be considered to be specific, measurable, achievable, relevant and timed, i.e. SMART. |
||||||||||||||||||||||
|
|
||||||||||||||||||||||
|
Indicators for monitoring performance need improvement |
|||||||||||||||||||||||
|
|
||||||||||||||||||||||
|
|
||||||||||||||||||||||
|
|
||||||||||||||||||||||
|
|
||||||||||||||||||||||
|
|
||||||||||||||||||||||
|
|
|
||||||||||||||||||||||
|
There are indicators which fall outside of DG MARE’s scope of influence as they rely on results of international trade negotiations. DG MARE mentions as a disclaimer that completion of these negotiations is not under its control. |
The indicator on international trade negotiations under ABB 1102 is relevant for measuring progress towards the specific objective concerned, as it indicates the result of the work of the DG. A disclaimer has been added in accordance with Part 4 of the Standing instructions from the central services on the Management Plan 2012. |
||||||||||||||||||||||
|
The specific objective ‘Effective detection, sanctioning, deterrence and remedying of the most harmful anti-competitive practices by undertakings other than cartels’ is measured by one result indicator ‘Benchmark for the (observable) customer benefits from Commission decisions prohibiting anti-competitive practices other than cartels and from Commission decisions making binding the commitments put forward by undertakings’. This indicator is defined according to a calculation methodology used by DG COMP which aims at quantifying estimated consumer benefits. However, DG COMP itself states that this indicator does not measure progress towards the achievement of the objective. Hence, the objective is without an indicator. |
The Commission acknowledges that DG COMP does currently not provide for an indicator for its activity relating to anti-competitive practices by undertakings other than cartels. This is due to the complexity of the calculation due to divergence of such cases compared to the more homogenous nature of the cases for instance for horizontal mergers or cartels implying a less complex calculation, and the incurring resource implication for such more complex calculation (cost-benefit). |
||||||||||||||||||||||
|
For the general objective ‘modernise transport infrastructure and its smart funding’ one of the impact indicators established by DG MOVE is ‘reduction in (average) travelling time on 30 TEN-T priority projects due to improved infrastructure financed through EU funds’ with the target of minus 20 % by 2020 (in comparison to 2011). The impact on the population is stated in quantitative terms as reduced travelling time. However, the way the latest known information is presented in the 2012 AAR is confusing. The current situation for this indicator is presented as follows: ‘St-Pölten-Vienna: 40 min; Unterinntal: 15 min; Barcelona-France: 1 h 40 min’. It is unclear if this is the reduced average traveling time already achieved in 2012 or indeed the reduced average traveling time target for 2020. There is no information to what extent the target of the minus 20 % was achieved. In addition only three values out of 30 are presented. Without additional explanation it is not possible to determine whether the realisation of the objective as monitored by the indicator is on track. |
The Commission considers the indicator for the reduction of travelling time to be very relevant and particularly useful for the assessment of the achievement of the objective to modernise transport infrastructure. It however acknowledges that the progress on achieving the reduction of travelling time on 30 TEN-T priority projects (PPs) could have been more clearly explained and will strive to do so in the future. On the stretches of the three priority projects mentioned, travelling times were shortened by 20-60 % in 2012 due to measures co-financed by the EU. As interventions on further sections will follow until 2020, the Commission expects that individual objectives will be met also for the entire stretches of these priority projects, as well as for other priority projects. |
||||||||||||||||||||||
|
Evaluations have not been a useful source of evidence to substantiate reporting on policy achievements in AARs |
|||||||||||||||||||||||
|
|
||||||||||||||||||||||
|
Performance management and reporting is evolving and some corrective actions have been taken but it is too early to assess their results |
|||||||||||||||||||||||
|
|
||||||||||||||||||||||
|
|
||||||||||||||||||||||
|
|
||||||||||||||||||||||
|
PART 2 — EVALUATION REPORT ON THE UNION’S FINANCES BASED ON RESULTS ACHIEVED |
|||||||||||||||||||||||
|
|
||||||||||||||||||||||
|
|
||||||||||||||||||||||
|
|
||||||||||||||||||||||
|
|
||||||||||||||||||||||
|
|
||||||||||||||||||||||
|
PART 3 — RESULTS OF THE COURT’S AUDIT ON PERFORMANCE |
|||||||||||||||||||||||
|
Introduction |
|||||||||||||||||||||||
|
|
||||||||||||||||||||||
|
|
||||||||||||||||||||||
|
|
||||||||||||||||||||||
|
SMART objectives together with suitable performance indicators not consistently applied in spending programmes |
|||||||||||||||||||||||
|
|
||||||||||||||||||||||
|
|
||||||||||||||||||||||
|
|
||||||||||||||||||||||
|
|
||||||||||||||||||||||
|
Deficiencies in the relevance, reliability and timeliness of performance data |
|||||||||||||||||||||||
|
|
||||||||||||||||||||||
|
|
||||||||||||||||||||||
|
|
||||||||||||||||||||||
|
|
||||||||||||||||||||||
|
|
||||||||||||||||||||||
|
In several cases sustainability of EU projects was at risk |
|||||||||||||||||||||||
|
|
||||||||||||||||||||||
|
|
||||||||||||||||||||||
|
|
||||||||||||||||||||||
|
|
||||||||||||||||||||||
|
|
||||||||||||||||||||||
|
|
||||||||||||||||||||||
|
|
||||||||||||||||||||||
|
|
||||||||||||||||||||||
|
CONCLUSIONS AND RECOMMENDATIONS |
|||||||||||||||||||||||
|
Conclusions |
|||||||||||||||||||||||
|
|
||||||||||||||||||||||
|
|
||||||||||||||||||||||
|
|
||||||||||||||||||||||
|
|
||||||||||||||||||||||
|
|
||||||||||||||||||||||
|
Recommendations |
|||||||||||||||||||||||
|
10.50. |
||||||||||||||||||||||
|
|
||||||||||||||||||||||
|
|
||||||||||||||||||||||
|
|
||||||||||||||||||||||
|
10.51. |
||||||||||||||||||||||
|
The Commission proposals for the programmes under the next multiannual financial framework focus on delivering on key policy priorities and on performance. They included elements of an enhanced performance framework in the form of provisions on objectives and indicators, monitoring arrangements, evaluation and reporting requirements. However, under the ordinary legislative procedure, both the Council and the European Parliament have the final responsibility for the adoption of the legal basic acts. |
||||||||||||||||||||||
|
The Commission is operating in a political environment. The policy objectives it is pursuing are therefore multi-causal and often conditioned by the external environment in which the Commission services operate. Objective-setting is mostly driven by policy and not by the management modes, as stated by the Court. Furthermore, the Commission proposals for the next generation of programmes contain provisions setting out their expected contribution to the achievement of the political objectives of the Union. |
||||||||||||||||||||||
(1) Article 318 of the Treaty on the Functioning of the European Union (TFEU) provides for a report from the Commission to the European Parliament and the Council on the evaluation of the Union’s finances based on the results achieved.
(2) The Court’s special reports cover the EU budget, as well as the European Development Funds. They are available at the Court’s website (http://eca.europa.eu).
(3) Council Regulation (EC, Euratom) No 1605/2002 on the Financial regulation applicable to the general budget of the European Communities, Article 27; repealed by Regulation (EU, Euratom) No 966/2012 of the European Parliament and of the Council (OJ L 298, 26.10.2012, p. 1), Article 30 (entry into force on 1 January 2013).
(4) Opinions No 7/2011 on the proposal for a Regulation of the European Parliament and of the Council laying down common provisions on the European Regional Development Fund, the European Social Fund, the Cohesion Fund, the European Agricultural Fund for Rural Development and the European Maritime and Fisheries Fund covered by the Common Strategic Framework and laying down general provisions on the European Regional Development Fund, the European Social Fund and the Cohesion Fund and repealing Regulation (EC) No 1083/2006 (OJ C 47, 17.2.2012), paragraph 6, and No 1/2012 on certain proposals for regulations relating to the common agricultural policy for the period 2014-2020, paragraph 8 (http://eca.europa.eu).
(5) Opinion No 1/2012, paragraph 8.
(6) The current multi-annual financial framework (MFF 2007-2013) agreed by the European Council and endorsed by the European Parliament, determines the amounts of the annual ceilings on commitments appropriations by category of expenditure and of the annual ceiling on payment appropriations. These categories of expenditure are the six MFF headings (for example ‘Competitiveness for growth and employment’ (heading 1 A) or ‘Cohesion for growth and employment’ (heading 1 B)).
(7) Based on criteria established by the Council, the Commission makes a breakdown by Member States (national envelopes) for example for rural development (Commission decision 2009/545/EC of 7 July 2009 fixing the annual breakdown per Member State of the amount referred to in Article 69(2a) of Council Regulation (EC) No 1698/2005 concerning support to rural development and amending Commission Decision 2006/636/EC (OJ L 181, 14.7.2009, p. 49)) or for the Regional competitiveness and employment objective (Commission decision 2006/593/EC of 4 August 2006 fixing an indicative allocation by Member State of the commitment appropriations for the Regional competitiveness and employment objective for the period 2007-2013 (OJ L 243, 6.9.2006, p. 32)).
(8) Opinion No 7/2011, paragraph 4.
(9) In the Financial Regulation applicable in 2012 there were five management modes (centralised direct, centralised indirect, shared (MS), decentralised (third countries), and joint). In the Financial Regulation applicable since 1 January 2013 there are three main management modes (direct, indirect and shared).
(10) In chapter 8 of its 2010 annual report, the Court examined the AARs of DG for Agriculture and Rural Development (DG AGRI), DG for Regional and Urban Policy (DG REGIO) and DG for Research and Innovation (DG RTD). In chapter 10 of its 2011 annual report, it examined the AAR of EuropeAid and, again, those of DG AGRI and DG REGIO. The observations this year are similar to those of the 2010 and 2011 annual reports.
(11) Financial Regulation, Article 38(3)(e).
(12) A SMART objective fulfils the following criteria: specific, measurable, achievable, relevant and timed.
(13) The Commission has proposed the introduction of ‘programme statements’ to reduce the number of objectives and indicators (starting from the budgetary procedure for the financial year 2014).
(14) Relevant, accepted, credible, easy and robust, Commission’s internal control standard on objectives and performance indicators (ICS 5).
(15) Second evaluation report (COM(2012) 675 Final); third evaluation report (COM(2013) 461 Final).
(16) Articles 318 and 319 TFEU.
(17) Letter from the President of the Court to the President of the Commission: ‘Response of the European Court of Auditors to the Commission’s second Article 318 evaluation report’, 21 December 2012 (http://eca.europa.eu/portal/page/portal/publications/auditreportsandopinions/Otherauditdocuments).
(18) Adopted means approved for publication.
(19) Opinion No 4/2012 on the Commission’s evaluation report on the Union’s finances based on results achieved established under Article 318 of the Treaty on the Functioning of the European Union (http://eca.europa.eu). See also Opinions No 7/2011 on the proposal for a Regulation of the European Parliament and of the Council laying down common provisions on the European Regional Development Fund, the European Social Fund, the Cohesion Fund, the European Agricultural Fund for Rural Development and the European Maritime and Fisheries Fund covered by the Common Strategic Framework and laying down general provisions on the European Regional Development Fund, the European Social Fund and the Cohesion Fund and repealing Regulation (EC) No 1083/2006 and No 1/2012 on certain proposals for regulations relating to the common agricultural policy for the period 2014-2020, as well as the annual report concerning the financial year 2010, paragraph 8.54, Response of the European Court of Auditors to the Commission’s second Article 318 evaluation report.
(20) Article 30(3) of the Financial Regulation.
(21) Special Report No 22/2012 ‘Do the European Integration Fund and European Refugee Fund contribute effectively to the integration of third-country nationals?’, paragraphs 20, 24, 25 and 79.
(22) Special Report No 7/2012 ‘The reform of the common organisation of the market in wine: Progress to date’, paragraphs 50 and 57.
(23) Special Report No 2/2012 ‘Financial instruments for SMEs co-financed by the European Regional Development Fund’, paragraphs 82 and 121.
(24) Special Report No 8/2012 ‘Targeting of aid for the modernisation of agricultural holdings’, paragraph 70.
(25) Special Report No 20/2012 ‘Is Structural measures funding for municipal waste management infrastructure projects effective in helping Member States achieve EU waste policy objectives?’, paragraph 73.
(26) Special Report No 5/2012 ‘The Common External Relations Information System (CRIS)’, paragraph 79.
(27) Special Report No 11/2012 ‘Suckler cow and ewe and goat direct aids under partial implementation of SPS arrangements’, paragraphs 63 and 64.
(28) Special Report No 25/2012 ‘Are tools in place to monitor the effectiveness of European Social Fund spending on older workers’, paragraph 61.
(29) Special Reports No 1/2012 ‘Effectiveness of European Union development aid for food security in Sub-Saharan Africa’, No 6/2012 ‘European Union Assistance to the Turkish Cypriot Community’, No 8/2012 ‘Targeting of aid for the modernisation of agricultural holdings’, No 13/2012 ‘European Union Development Assistance for Drinking-Water Supply and Basic Sanitation in Sub-Saharan Countries’, No 14/2012 ‘Implementation of EU hygiene legislation in slaughterhouses of countries that joined the EU since 2004’, No 17/2012 ‘The European Development Fund (EDF) contribution to a sustainable road network in sub-Saharan Africa’, No 18/2012 ‘European Union Assistance to Kosovo related to the rule of law’ and No 23/2012 ‘Have EU Structural Measures successfully supported the regeneration of industrial and military brownfield sites?’.
(30) Special Report No 14/2012, paragraphs 48 and 49.
(31) Special Report No 13/2012, paragraphs III and 61.
(32) Special Report No 23/2012, paragraph 32.
(33) Special Report No 18/2012, paragraphs 62 and 102.
(34) Special Report No 6/2012, paragraphs 45, 47 and 60.
ANNEX 10.1
SPECIAL REPORTS ADOPTED BY THE COURT OF AUDITORS IN 2012 (1)
|
— |
No 1/2012 ‘Effectiveness of European Union development aid for food security in Sub-Saharan Africa’; |
|
— |
No 2/2012 ‘Financial instruments for SMEs co-financed by the European Regional Development Fund’; |
|
— |
No 3/2012 ‘Structural funds: did the Commission successfully deal with deficiencies identified in the Member States' management and control systems?’; |
|
— |
No 4/2012 ‘Using Structural and Cohesion Funds to co-finance transport infrastructures in seaports: an effective investment?’; |
|
— |
No 5/2012 ‘The Common External Relations Information System (CRIS)’; |
|
— |
No 6/2012 ‘European Union Assistance to the Turkish Cypriot Community’; |
|
— |
No 7/2012 ‘The reform of the common organisation of the market in wine: Progress to date’; |
|
— |
No 8/2012 ‘Targeting of aid for the modernisation of agricultural holdings’; |
|
— |
No 9/2012 ‘Audit of the control system governing the production, processing, distribution and imports of organic products’; |
|
— |
No 10/2012 ‘The effectiveness of staff development in the European Commission’; |
|
— |
No 11/2012 ‘Suckler cow and ewe and goat direct aids under partial implementation of SPS arrangements’; |
|
— |
No 12/2012 ‘Did the Commission and Eurostat improve the process for producing reliable and credible European statistics?’; |
|
— |
No 13/2012 ‘European Union Development Assistance for Drinking-Water Supply and Basic Sanitation in Sub-Saharan Countries’; |
|
— |
No 14/2012 ‘Implementation of EU hygiene legislation in slaughterhouses of countries that joined the EU since 2004’; |
|
— |
No 15/2012 ‘Management of conflict of interest in selected EU Agencies’; |
|
— |
No 16/2012 ‘The effectiveness of the Single Area Payment Scheme as a transitional system for supporting farmers in the New Member States’; |
|
— |
No 17/2012 ‘The European Development Fund (EDF) contribution to a sustainable road network in sub-Saharan Africa’; |
|
— |
No 18/2012 ‘European Union Assistance to Kosovo related to the rule of law’; |
|
— |
No 19/2012 ‘2011 report on the follow-up of the European Court of Auditors’ Special Reports’; |
|
— |
No 20/2012 ‘Is Structural measures funding for municipal waste management infrastructure projects effective in helping Member States achieve EU waste policy objectives?’; |
|
— |
No 21/2012 ‘Cost-effectiveness of Cohesion Policy Investments in Energy Efficiency’; |
|
— |
No 22/2012 ‘Do the European Integration Fund and European Refugee Fund contribute effectively to the integration of third-country nationals?’; |
|
— |
No 23/2012 ‘Have EU Structural Measures successfully supported the regeneration of industrial and military brownfield sites?’; |
|
— |
No 24/2012 ‘The European Union Solidarity Fund’s response to the 2009 Abruzzi earthquake: The relevance and cost of the operations’; |
|
— |
No 25/2012 ‘Are tools in place to monitor the effectiveness of European Social Fund spending on older workers’. |
(1) The ECA’s special reports are available on the Court’s website at: http://eca.europa.eu/portal/page/portal/publications/auditreportsandopinions/specialreports.
ANNEX 10.2
FOLLOW-UP OF PREVIOUS RECOMMENDATIONS FOR GETTING RESULTS FROM THE EU BUDGET
|
Year |
Court Recommendation |
Court's analysis of the progress made |
Commission reply |
|||||
|
Fully implemented |
Being implemented |
Not implemented |
Not longer applicable |
Insufficient evidence |
||||
|
In most respects |
In some respects |
|||||||
|
2010 |
Recommendation 1: Increased focus should be put on performance in the DG annual activity reports, in particular by analysing differences between planned targets and achievements as well as by reporting on the economy and efficiency of EU funding (see paragraph 8.53). |
|
|
X |
|
|
|
As from the 2012 AAR, services are required to include in Part 3 of the AAR key indicators of sound financial management (effectiveness, efficiency, economy) of the EU funding, and report the results of such indicators on an annual basis. Respectively, these indicators could be based on, e.g., the quality results (% of decisions challenged) of the project selection processes, the time-to-pay statistics, and the financial savings made during the contracting process. |
|
Recommendation 2: The Commission services should define appropriate interim milestones for multi-annual targets, so that progress can be assessed adequately (see paragraph 8.54). |
|
|
X |
|
|
|
For output, result and, where appropriate, impact indicators, interim milestones could indeed be defined (e.g. at least by checking the ‘trend’) . For outputs, it is possible to define milestones for multi-annual targets at least at programme level. Furthermore, within the preparatory works for the next financial framework, the Commission included in all its legislative proposals some further requirements to improve the quality of the planning phase: definition of general and specific objectives and related indicators. |
|
|
Recommendation 3: The Commission and the Member States within the context of their respective responsibilities under shared management should agree on consistent performance indicators and ensure the reliability of information on planned targets and achieved results (see paragraph 8.56). |
|
|
X |
|
|
|
The Commission is taking the recommended action and it has already engaged such a process with Member States. The recommendation will be implemented until the beginning of the next programming period. |
|
|
Recommendation 4: During the planning of EU expenditure programmes, the Commission and the Member States should pay greater attention to defining SMART objectives, as well as to identifying and mitigating the risks which may occur during implementation (see paragraph 8.57). |
|
|
X |
|
|
|
The Commission always endeavours to define SMART objectives. Some of the SMART-criteria may only be met once analysed together with the related indicators or other information in the management plans. The Commission has done specific efforts such as the guide on setting objectives and indicators attached to the instructions. |
|
|
2010 |
Recommendation 5: Accountability of the management should also be understood to include reporting on results with a correspondence between achievements expected in the management plan and achievements reported in the annual activity report (see paragraph 8.58). |
|
|
X |
|
|
|
The standing instructions for the Management Plans and for the Annual Activity Reports have been updated to enhance the correspondence between the objectives-related expectations and the achievements, and to explain any divergences (cf. the ‘gap analysis’). The instructions on the 2013 Management Plans prescribe to have a baseline when defining general objectives (see part 3; ‘current situation’) as well as specific objective (see part 4: ‘latest known results’). During the AAR Peer Review Process on the 2012 AARs, the central services have provided to each group of DGs a table showing the comparability between the objectives and indicators as presented in the 2012 Management Plans. |
|
Recommendation 6: The Commission, together with the Members States where appropriate in the context of shared management, should design and operate monitoring and control systems to produce complete and accurate information on results (see paragraph 8.58). |
|
|
X |
|
|
|
For the programmes under shared management, the Commission proposed to the Legislative Authority some key requirements for the design of the systems to produce information on results in the frame of the future regulations post 2013. The responsibility for operating those systems in order to provide complete and accurate information on results lies with the Member States in line with the division of competences under shared management. See as an example COM(2011) 615 of 14 March 2012, proposal for a regulation on the common provisions applicable to the structural funds, in particular article 9 on thematic objectives, article 47 on evaluation and annex 1 on the method for establishing a performance framework. |
|
|
14.11.2013 |
EN |
Official Journal of the European Union |
C 331/261 |
ANNUAL REPORT ON THE ACTIVITIES FUNDED BY THE 8TH, 9TH AND 10TH EUROPEAN DEVELOPMENT FUNDS (EDFs)
2013/C 331/02
Annual Report on the activities funded by the 8th, 9th and 10th European Development Funds (EDFs)
TABLE OF CONTENTS
Introduction
Specific characteristics of the European Development Funds
Chapter I — eighth, ninth and 10th EDFs
Implementation
The Commission’s annual report on the financial management of the eighth to 10th European Development Funds
Chapter II — The Court’s Statement of Assurance on the EDFs
The Court’s Statement of Assurance on the eighth, ninth and 10th European Development Funds (EDFs) to the European Parliament and the Council — Independent Auditor’s Report
Information in support of the Statement of Assurance
Audit scope and approach
Reliability of the accounts
Regularity of transactions
Effectiveness of systems
Conclusions and recommendations
Conclusions
Recommendations
|
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
INTRODUCTION |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Table 1 — European Development Funds — Key information 2012
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Specific characteristics of the European Development Funds |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
CHAPTER I — EIGHTH, NINTH AND 10TH EDFs |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Implementation |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Commission’s annual report on the financial management of the eighth to 10th European Development Funds |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Table 2 — Use of EDF resources at 31 December 2012
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
CHAPTER II — THE COURT’S STATEMENT OF ASSURANCE ON THE EDFs |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Court’s Statement of Assurance on the eighth, ninth and 10th European Development Funds (EDFs) to the European Parliament and the Council — Independent Auditor’s Report |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Reliability of the accounts |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Legality and regularity of the transactions underlying the accounts |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Revenue |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Commitments |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Payments |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
5 September 2013 |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Vítor Manuel da SILVA CALDEIRA President |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Information in support of the Statement of Assurance |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Audit scope and approach |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Reliability of the accounts |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Regularity of transactions |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Revenue |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Commitments |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Expenditure transactions |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Court examined an interim payment of 464 640 euro under a contract for road maintenance in Senegal. Works concerning the consolidation of the lower part of an embankment invoiced by the contractor, certified by the supervisor and paid for by the Commission had not been carried out. The Commission subsequently launched a comprehensive technical audit of the contract. |
The technical audit report of April 2013 indicates that in total 39 095 euro (0,94 % of the total contract price) charged for the road banks' reinforcements, had not been realised. The works contractor meanwhile executed the road banks' reinforcements, which had been invoiced. The decentralised contracting authority will, at the moment of the final statement of account, decide on the possible imposition of recovery orders and contractual penalties upon the works contractor and service contractor who supervised the works. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Court examined the clearance of an advance of 305 738 euro under a health sector support programme in the Democratic Republic of the Congo. The value of two contracts had been increased by 58 % and 68 % respectively for additional works that were necessary to complete the original contract. The project management unit in the national government department was not aware that there was a limit of 50 % of the value of the initial contract for such additional works. |
A complementary audit to identify any other ineligible amounts is ongoing. The EU Delegation reminded the NAO of the applicable rules. The NAO sent out a circular note, the content of which had been previously agreed upon with the EU Delegation. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Court examined a payment of 600 000 euro related to the support for the 2007-2010 Economic Reform Programme in Vanuatu, including a performance-based variable tranche of 200 000 euro. According to the financing agreement, the Commission was required to select specific performance indicators set in the annual development report in respect of public finance management, but it did not do so. The Commission considered that it was sufficient for it to rely on an assessment of Vanuatu’s overall progress in public finance management reform (a general eligibility condition) to disburse the variable tranche. This was in contradiction with the financing agreement, which provides that the Commission will only make the payment if both specific and general conditions are achieved. |
In line with the Commission Decision, both the general and specific PFM conditions in the FA are essentially the same and relate to progress in overall public finance management reform. The Commission positively assessed Vanuatu's overall progress in public finance management reform up until 2010. The relevant indicators on public finance management in the government's annual development report confirm this positive trend. Furthermore, the Delegation confirmed that this positive trend and effort was sustained, in line with the 2008 PFM Reform Strategy, during the politically difficult year of 2011. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Effectiveness of systems |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Ex ante checks |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Monitoring and supervision |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Internal audit |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Review of annual activity report |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
43. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Conclusions and recommendations |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Conclusions |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Recommendations |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Commission agrees to a refinement of the RER methodology on the basis of the lessons learnt from this first exercise The Commission has already taken measures in this regard. At the start of the 2013 exercise the contractor has been requested to elaborate a revised methodology and a manual which will take into account the lessons learnt during the first RER exercise in 2012. This refined methodology will be applied during the 2013 RER exercise. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The 2012 AAR contained a description of the RER exercise that was as detailed as possible and followed the drafting instructions. The Commission agrees that in the 2013 AAR a clear distinction should be drawn between the RER study results and their use for the purpose of assurance. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Commission accepts this recommendation and action has recently been taken with a view to ensuring clearance of expenditure is done without delay. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Commission agrees with the recommendation. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Commission accepts this recommendation and, in the framework of the Action Plan referred to in paragraph 38, it has planned to examine in 2013 the possibilities of enhancing the quality and effectiveness of audits and verifications. This will be carried out notably with regard to audits and verifications conducted by local audit firms hired by the beneficiaries. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Commission will continue to ensure the correct application of specific conditions for budget support payments. A working group on budget support has been set up to address the specific audit findings of the Court. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Commission accepts this recommendation and will remind sub-delegated Authorising officers of the rules concerning annual recovery of interest for pre-financing above 750 000 euro. Additionally, in order to raise awareness, a full review of eventual interest received on these pre-financings will be made so as to ensure compliance with the financial regulation. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
(1) See Articles 118, 125 and 134 of Council Regulation (EC) No 215/2008 of 18 February 2008 on the Financial Regulation applicable to the 10th European Development Fund (OJ L 78, 19.3.2008, p. 1) and the Court’s Opinion No 9/2007 on the proposal for this Regulation (OJ C 23, 28.1.2008, p. 3).
(2) In 2012 a tripartite agreement between the EIB, the Commission and the Court (Article 134 of Regulation (EC) No 215/2008) set out rules for the audit of these operations by the Court.
(3) The Directorate-General for Humanitarian Aid and Civil Protection (DG ECHO) manages 1,2 % of expenditure from the EDFs.
(4) See chapter 7 ‘External relations, aid and enlargement’ of the Court’s 2012 annual report on the implementation of the EU budget.
(5) Budget support involves the transfer of funds by the Commission to the national treasury of the partner country. It provides additional budgetary resources to support a national development strategy.
(6) Under centralised management, aid is implemented directly by the Commission’s services (headquarters or delegations) or indirectly through national bodies (e.g. a development agency of an EU Member State). Under decentralised management, implementation is delegated to a third country. Under joint management, implementation is delegated to an international organisation.
(7) Gross payments estimated at 840 million euro in 2012.
(8) Gross payments estimated at 632 million euro in 2012.
(9) Articles 118, 124 and 156 of Regulation (EC) No 215/2008.
(10) Pursuant to Articles 2, 3, 4, 125(4) and 134 of the Financial Regulation applicable to the 10th EDF this Statement of Assurance does not extend to the part of the EDFs resources that are managed by the EIB and for which it is responsible.
(11) The accounting rules and methods adopted by the EDF accounting officer are drawn up on the basis of International Public Sector Accounting Standards (IPSAS) or by default, International Financial Reporting Standards (IFRS) as respectively issued by the International Federation of Accountants and the International Accounting Standards Board.
(12) See Article 122 of Regulation (EC) No 215/2008: the financial statements comprise the balance sheet, the statement of economic outturn, the statement of cash flow, the statement of changes in net assets and the table of items payable to the EDF.
(13) See Article 123 of Regulation (EC) No 215/2008: the reports on financial implementation include tables of appropriations, commitments and payments.
(14) Global financial commitments and the corresponding legal commitments (financing agreements) following the adoption of a financing decision by the Commission.
(15) EuropeAid: 126 projects and 40 budget support payments; DG ECHO: one project payment on humanitarian aid.
(16) A programme estimate is prepared, usually annually, to establish a work programme and the resources necessary to carry this out. It is implemented by the institution or beneficiary concerned but is subject to prior approval by the partner country's representative and the Commission.
(17) The IAS is a directorate-general of the Commission. It is headed by the Commission’s Internal Auditor and reports to its Audit Progress Committee. Its task is to provide independent assurance as to the effectiveness of internal control systems and to help the Commission by means of opinions, advice and recommendations.
(18) Article 8(3) of the Financial Regulation applicable to the 10th EDF.
(19) E.g. contract type, contract start and end dates, management mode.
(20) The cut-off exercise seeks to ensure that both revenue and expenditure are completely and accurately recorded in the correct accounting period.
(21) The Court calculates its estimate of error from a representative sample. The figure quoted is the best estimate. The Court has 95 % confidence that the rate of error in the population lies between 1,5 % and 4,5 % (the lower and upper error limits respectively).
(22) The Court also notes systems weaknesses. Financing agreements sometimes include strict and unrealistic quantified payment conditions. For example, one set as a payment condition 100 % coverage for a vaccination campaign. Such a level of coverage is met in no country in the world.
(23) Page 71.
(24) In five out of eight such cases the Court found quantifiable errors.
(25) Paragraph 42 of the Court’s 2010 annual report and paragraph 43 of the Court’s 2011 annual report.
(26) Paragraph 54(a) of the 2009 annual report, paragraph 62(a) of the 2010 annual report and paragraph 58(a) of the 2011 annual report.
(27) Pages 54-56.
(28) Paragraph 50 of the Court’s 2011 annual report.
(29) The IAC is a unit of a Commission Directorate-General. It is managed by a Head of Unit who reports directly to the Director-General. Its task is to provide independent assurance on the effectiveness of the internal control system with a view to improving the Directorate-General’s operations.
(30) Commission’s reply to paragraph 59(e) of the Court’s 2011 annual report.
(31) The annual work plan forecast completion of one ongoing audit, three new audits and three follow-up audits. Only one audit was completed by the end of 2012.
(32) Page 73.
(33) Page 71.
(34) Page 72.
(35) ‘Residual errors are those that have evaded all prevention, detection and correction controls in the existing control framework’. (A Manual for Measuring the Residual Error Rate for EuropeAid, May 2013).
(36) Pages 56 and 71.
(37) Global commitments relate to financing decisions. Individual commitments relate to individual contracts.
(38) Include initial allocations to the eighth, ninth and 10th EDFs, co-financing, interest, sundry resources and transfers from previous EDFs.
(39) As a percentage of resources.
(40) Negative amounts correspond to decommitments.
(41) Global commitments relate to financing decisions.
(42) Individual commitments relate to individual contracts.
(43) Net commitments after decommitments. Net payments after recoveries.
Source: Court of Auditors, based on the EDF reports on financial implementation and financial statements at 31 December 2012.
ANNEX 1
RESULTS OF TRANSACTION TESTING FOR THE EUROPEAN DEVELOPMENT FUNDS
|
|
2012 |
2011 |
2010 |
2009 |
||||||
|
Projects |
Budget support |
Total |
||||||||
|
SIZE AND STRUCTURE OF THE SAMPLE |
||||||||||
|
Total of commitments |
23 |
7 |
30 |
30 |
30 |
50 |
||||
|
Total transactions (1) |
127 |
40 |
167 |
163 |
165 |
170 |
||||
|
Proportion of transactions tested found to be: |
||||||||||
|
Free of error |
68 % |
(86) |
93 % |
(37) |
74 % |
(123) |
67 % |
73 % |
78 % |
|
|
Affected by one or more errors |
32 % |
(41) |
8 % |
(3) |
26 % |
(44) |
33 % |
27 % |
22 % |
|
|
Analysis of transactions affected by error |
||||||||||
|
Analysis by type of error |
||||||||||
|
Non-quantifiable errors: |
32 % |
(13) |
33 % |
(1) |
32 % |
(14) |
46 % |
49 % |
65 % |
|
|
Quantifiable errors: |
68 % |
(28) |
67 % |
(2) |
68 % |
(30) |
54 % |
51 % |
35 % |
|
|
Eligibility |
71 % |
(20) |
100 % |
(2) |
73 % |
(22) |
52 % |
70 % |
23 % |
|
|
Occurrence |
18 % |
(5) |
0 % |
(0) |
17 % |
(5) |
38 % |
17 % |
23 % |
|
|
Accuracy |
11 % |
(3) |
0 % |
(0) |
10 % |
(3) |
10 % |
13 % |
54 % |
|
|
ESTIMATED IMPACT OF QUANTIFIABLE ERRORS |
||||||||||
|
Most likely error rate |
3,0 % |
|
|
|
||||||
|
Upper error limit (UEL) |
4,5 % |
|
|
|
||||||
|
Lower error limit (LEL) |
1,5 % |
|
|
|
||||||
(1) The 167 transactions represent 167 sampling units under the Monetary Unit Sampling method used by the Court. Large payments, in particular large budget support payments, may be selected more than once, and appear in the table as more than one transaction (this will happen if they are larger than the sampling interval).
(2) To improve insight into areas with different risk profiles within the policy group, the sample was split up into segments.
(3) Numbers quoted in brackets represent the actual number of transactions.
ANNEX 2
RESULTS OF EXAMINATION OF SYSTEMS FOR THE EUROPEAN DEVELOPMENT FUNDS AND DEVELOPMENT AID UNDER THE EU BUDGET
Assessment of the systems examined
|
System concerned |
Ex ante controls |
Monitoring and supervision |
Internal audit |
Overall assessment |
|
EuropeAid |
Partially effective |
Partially effective |
Partially effective |
Partially effective |
ANNEX 3
FOLLOW-UP OF PREVIOUS RECOMMENDATIONS FOR ADMINISTRATIVE AND OTHER EXPENDITURE
|
Year |
Court Recommendation |
Court's analysis of the progress made |
Commission reply |
|||||
|
Fully implemented |
Being implemented |
Not implemented |
No longer applicable |
Insufficient evidence |
||||
|
In most respects |
In some respects |
|||||||
|
2010 |
EuropeAid should develop a key indicator for the estimated financial impact of residual errors after all ex ante and ex post controls have been implemented (2010 annual report, paragraph 62(a)). |
X |
|
|
|
|
|
|
|
EuropeAid should assess the cost-effectiveness of the various controls, notably of the transactions ex post control systems (2010 annual report, paragraph 62(b)). |
|
|
X |
|
|
|
EuropeAid has joined a working group headed by DG Budget to review the cost-effectiveness of its overall control architecture. |
|
|
EuropeAid should strengthen the effectiveness of project monitoring, including on-the-spot visits, on the basis of multiannual monitoring and evaluation plans (2010 annual report, paragraph 62(c)). |
|
|
X |
|
|
|
EuropeAid is developing tools and guidance for EU delegations to better prioritise their monitoring visits to projects and assess the quality of audit reports. |
|
|
EuropeAid should review the reliability of certificates from external supervisors, audits and expenditure verifications (2010 annual report, paragraph 63(a)). |
|
|
X |
|
|
|
In the framework of the Action Plan referred to in paragraph 38, it is foreseen to improve further the quality of the external audits. |
|
|
EuropeAid should introduce management information systems which allow the Director-General and the Heads of Delegation to better monitor the follow-up of results from on-the-spot visits, external audits and expenditure verifications (2010 annual report, paragraph 63(b)). |
|
|
X |
|
|
|
EuropeAid is developing new functions within of the audit module of its CRIS information system to improve the follow-up of audits and expenditure verification reports. |
|
|
EuropeAid should link the CRIS Audit and CRIS Recovery Orders information systems (2010 annual report, paragraph 63(c)). |
X |
|
|
|
|
|
|
|
|
2010 |
EuropeAid should continue its efforts to ensure that data are recorded in an accurate, comprehensive and timely manner in the CRIS information system (2010 annual report, paragraph 63(d)). |
|
|
X |
|
|
|
Efforts are under way to address those shortcomings, but no financial and/or other critical information is missing in CRIS. A newly defined data quality master plan including actions covering data cleansing, information system improvement, monitoring and control, user documentation and training has been set up and is being implemented. |
|
EuropeAid should ensure that Delegations consistently apply the new format and scheme for Delegations’ annual reporting on reforms of public finance management systems in recipient countries so as to provide a structured and formalised demonstration of public finance management progress (2010 annual report, paragraph 64(a)). |
|
X |
|
|
|
|
The Commission considers that this recommendation has been fully implemented. An online application for the EAMR (External Assistance Management Report) was introduced in 2011 and includes a specific section on Budget Support and especially on issues related to PFM. This tool is available to all EU Delegations and is cumpulsory whenever Budget Support programmes are in place in a country. |
|
|
EuropeAid should promote through policy dialogue the setting of clear assessment frameworks in recipient countries’ reform programmes on public finance management (2010 annual report, paragraph 64(b)). |
X |
|
|
|
|
|
|
|
|
2009 |
EuropeAid should, in the context of its planned review of its overall control strategy, develop a key indicator for the estimated financial impact of residual errors after all ex ante and ex post controls have been implemented, based for example in an examination of a representative statistical sample of closed projects (2009 annual report, paragraph 54(a)). |
X |
|
|
|
|
|
|
|
EuropeAid should, in the context of this review, assess the cost-effectiveness of the various controls, notably of the transactional ex post control system (2009 annual report, paragraph 54(b)). |
|
|
X |
|
|
|
EuropeAid has joined a working group headed by DG Budget to review the cost-effectiveness of its overall control architecture. |
|
|
2009 |
EuropeAid should finalise and disseminate the financial management toolkit targeting the high inherent risk of errors at the level of implementing organisations, contractors and beneficiaries to ensure adequate knowledge of financial management and eligibility rules (2009 annual report, paragraph 54(c)). |
X |
|
|
|
|
|
|
|
EuropeAid should continue its efforts to ensure that the Delegations record data in CRIS Audit in a comprehensive and timely manner (2009 annual report, paragraph 54(d)). |
|
|
X |
|
|
|
Efforts are under way to address those shortcomings, but no financial and/or other critical information is missing in CRIS. A newly defined data quality master plan including actions covering data cleansing, information system improvement, monitoring and control, user documentation and training has been set up and is being implemented. |
|
|
The design of CRIS Audit should be modified to provide information on the amounts of final ineligible expenditure and financial corrections done after the audit clearance process with the auditee has been completed (2009 annual report, paragraph 54(e)). |
|
|
X |
|
|
|
In the working plan that is referred to in the Commission reply to paragraph 38, it is foreseen to develop through the CRIS Audit module a specific tool that will enable the Commission to make a proper follow up of the audit reports. |
|
|
EuropeAid should ensure that the specific conditions for performance-based variable tranches clearly specify the indicators, targets, calculation methods and verification sources (2009 annual report, paragraph 55(a)). |
X |
|
|
|
|
|
|
|
|
EuropeAid should ensure that Delegations’ reports provide a structured and formalised demonstration of public finance management progress by clearly setting the criteria against which progress was to be assessed (i.e. the results that the recipient Government had to achieve during the period concerned), the progress made and the reasons why the reform programme may have not been implemented according to plan (2009 annual report, paragraph 55(b)). |
|
X |
|
|
|
|
The Commission believes that this recommendation has been fully implemented. The budget support performance framework has been improved, notably through the revision of Budget Support Guidelines issued in 2012. |
|