Report on budgetary and financial management — Financial year 2009 |
|
|
EN |
|
IV Notices
NOTICES FROM EUROPEAN UNION INSTITUTIONS, BODIES, OFFICES AND AGENCIES
European Parliament
|
30.6.2010 |
EN |
Official Journal of the European Union |
C 172/1 |
REPORT ON BUDGETARY AND FINANCIAL MANAGEMENT
SECTION I: EUROPEAN PARLIAMENT
FINANCIAL YEAR 2009
2010/C 172/01
CONTENTS
INTRODUCTION
|
I. |
FINANCIAL MANAGEMENT IN GENERAL |
|
A. |
Revenue |
|
B. |
Initial budget and amending budgets |
|
C. |
Commitments and payments |
|
D. |
Carryovers from 2009 to 2010 |
|
E. |
Carryovers from 2008 to 2009 |
|
F. |
Appropriations from assigned revenue |
|
G. |
Cancellations |
|
H. |
Transfers |
|
H.1. |
Transfers of provisional appropriations from reserves (Title 10) |
|
H.2. |
Transfers from other sources |
|
II. |
FINANCIAL MANAGEMENT BY CHAPTER |
|
A. |
Chapter (Members of the institution) |
|
B. |
Chapter (Officials and temporary staff) |
|
C. |
Chapter (Other staff and outside services) |
|
D. |
Chapter (Other expenditure relating to persons working with the institution) |
|
E. |
Chapter (Buildings and associated costs) |
|
F. |
Chapter (Data processing, equipment and movable property) |
|
G. |
Chapter (Current administrative expenditure) |
|
H. |
Chapter (Meetings and conferences) |
|
I. |
Chapter (Expertise and information: acquisition, archiving, production and dissemination) |
|
J. |
Chapter (Expenditure relating to certain institutions and bodies) |
|
K. |
Chapter (Expenditure relating to parliamentary assistants) |
|
L. |
Title 10 (Other expenditure) |
|
III. |
2009 OBJECTIVES AND RESULTS |
|
A. |
2009 European elections and communication activities |
|
B. |
Implementation of the new statutes for Members and assistants |
|
C. |
Restructuring and consolidating Parliament's Secretaruat |
|
D. |
Preparations for implementation of the Lisbon Treaty |
ANNEXES
|
ANNEX I — |
Overview of C Transfers |
|
ANNEX II — |
Overview of P Transfers |
|
ANNEX III — |
Implementation of 2009 Appropriations |
INTRODUCTION
|
1. |
This report analyses the European Parliament's budgetary and financial management during financial year 2009. It outlines the use made of financial resources and the events which had a significant influence on activities during the year (in Parts I and II) and gives a overview of the results achieved as against the objectives set for 2009 (in Part III). |
|
2. |
The report has been drawn up in accordance with Article 122 of Council Regulation (EC, Euratom) No 1605/2002 of 25 June 2002 on the Financial Regulation applicable to the general budget of the European Communities (1) (hereinafter ‘Financial Regulation’), Article 185 of Commission Regulation (EC, Euratom) No 2342/2002 of 23 December 2002 laying down detailed rules for the implementation of Council Regulation (EC, Euratom) No 1605/2002 on the Financial Regulation applicable to the general budget of the European Communities (2) (hereinafter ‘Implementing Rules’) and Article 13(2) of the Internal Rules on the implementation of the European Parliament's budget (3). The analysis is based on the provisional accounts, as established by the Accounting Officer. |
I. FINANCIAL MANAGEMENT IN GENERAL
|
3. |
2009 was the third financial year covered by the multiannual financial framework for 2007-2013 (4). Parliament's final appropriations totalled EUR 1 529 970 930, accounting for 19,67 % of the EU's total administrative expenditure (heading V). Table 1 below provides an overview of implementation of Parliament's budget in financial year 2009. Table 1 Use of 2009 appropriations
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
A. Revenue
|
4. |
Revenue entered in the accounts as at 31 December 2009 totalled EUR 141 250 059 and included EUR 27 576 932 of assigned revenue. |
B. Initial budget and amending budgets
|
5. |
Authorised appropriations in Parliament’s initial budget for 2009 totalled EUR 1 529 970 930, representing a 5 % increase over the 2008 budget (EUR 1 452 517 167). There were no amending budgets in 2009. |
C. Commitments and payments
|
6. |
Commitments totalled EUR 1 417 629 732, accounting for 93 % of final appropriations (2008: 97 %). Payments totalled EUR 1 237 363 909, accounting for 87 % of commitments entered into (2008: 86 %). |
D. Carryovers from 2009 to 2010
|
7. |
Automatic carryovers to financial year 2010 totalled EUR 180 265 823, accounting for 13 % of the total appropriations committed (2008: 14 %). Uncommitted appropriations at year-end that were carried forward to financial year 2010 (non-automatic carryovers) totalled EUR 10 100 000 — accounting for 0,7 % of final appropriations (2008: 0,6 %) — and were used for the purposes set out in Table 2. Table 2 Purpose of non-automatic carryovers to 2010
|
|||||||||||||||
E. Carryovers from 2008 to 2009
|
8. |
Automatic carryovers to 2009 totalled EUR 196 133 738. Payments against those carryovers stood at EUR 179 641 279 (92 %, as against 87 % in 2008). The amount cancelled was therefore EUR 16 492 459. The bulk of the cancellations was made against:
The cancellations were necessary for the following main reasons:
|
|
9. |
Non-automatic carryovers to 2009 totalled EUR 8 315 729 and concerned Item (Visitors Centre) and Article (Technical equipment and installations). |
F. Appropriations from assigned revenue
|
10. |
Assigned revenue made available in 2009 totalled EUR 27 576 932 (2008: EUR 47 511 735). The commitment rate was 44 % (2008: 30 %). Payments totalled EUR 9 045 904, accounting for 74 % of the commitments entered into (2008: 71 %). A balance of EUR 20 637 870 was carried forward to financial year 2010 (2008: EUR 36 808 922). |
|
11. |
Assigned revenue carried over to 2009 totalled EUR 36 808 922 (2008: EUR 38 325 182). Commitments entered into totalled EUR 36 024 461 (2008: EUR 38 236 288). Payments in 2009 represented 94 % of commitments entered into (2008: 93 %). |
G. Cancellations
|
12. |
Appropriations totalling EUR 102 241 198 (2008: EUR 42 238 638) and accounting for 7 % of final appropriations (2008: 3 %) were cancelled. Cancellation was necessary for the following main reasons:
|
H. Transfers
|
13. |
Over the course of the financial year, 18 transfers were approved under Articles 24 and 43 of the Financial Regulation (7). They covered a total of EUR 64 853 607, accounting for 4 % of final appropriations (in 2008: 18 transfers accounting for 4 % of final appropriations). The President authorised nine P transfers under Article 22(1) of the Financial Regulation (8), covering a total of EUR 35 665 000, or 2 % of final appropriations (2008: 14 transfers accounting for 1 % of final appropriations). A breakdown of the transfers by legal basis is given in Table 3. |
|
14. |
In all, there were 27 C and P transfers in 2009, involving a total of EUR 100 518 607, or 7 % of final appropriations (2008: 44 transfers involving a total of EUR 98 008 873, or 7 % of final appropriations). Table 3 Transfers by legal basis
Table 4 Purpose of C transfers
Table 5 Purpose of C transfers by expenditure category
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
H.1. Transfers of provisional appropriations from reserves (Title )
|
15. |
This section looks at the use of appropriations from Chapter (Provisional appropriations), Chapter (Contingency reserve), Chapter (Reserve for information and communication policy) and Chapter (Provisional appropriation for buildings). These chapters, included in Title (Other expenditure), are hereinafter referred to as ‘reserves’. Title (Other expenditure) was the main source of the appropriations transferred in 2009 (51 %, or EUR 32 886 706). |
|
16. |
Of that amount, a total of EUR 25 054 099 was transferred for property policy purposes and EUR 7 832 607 for other purposes. The purpose of the transfers of provisional appropriations is set out below in Table 6. Table 6 Purpose of transfers of provisional appropriations
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
H.2. Transfers from other sources
|
17. |
This section looks at the transfers from sources other than Title (Other expenditure). A total of EUR 31 966 901 was transferred from other titles. Property policy accounted for the bulk (70 %) of these transfers, followed by staff (16 %), Members (9 %) and IT (5 %). An overview of these transfers is given in Table 7. Most of the appropriations transferred to property policy lines were intended to cover the 99-year lease with option to purchase on the TREVES I Building in Brussels. Table 7 Purpose of C transfers from sources other than Title
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
18. |
An overview of the P transfers is given in Table 8. Table 8 Purpose of P transfers
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
II. FINANCIAL MANAGEMENT BY CHAPTER
|
19. |
This section looks at the use of appropriations by budget chapter, their share of the overall budget and changes in the use of appropriations with respect to the previous financial year. Four chapters accounted for 71 % of total commitments. They are: Chapter (Members of the institution), Chapter (Officials and temporary staff), Chapter (Buildings and associated costs) and Chapter (Expenditure relating to parliamentary assistants). |
|
20. |
Table 9 provides a breakdown by chapter of the appropriations committed in 2009 as against those committed in 2008. Figures 1 and 2 provide a graphical representation of the changes. Table 9 Appropriations committed in 2009 as against those committed in 2008
Figure 1 Breakdown of 2009 expenditure by chapter
Figure 2 Changes as regards commitments in 2008 and 2009, by chapter
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
A. Chapter (Members of the institution)
|
21. |
This chapter accounted for 12 % of total expenditure in financial year 2009 and was up by 12 % on 2008. 2009 was the first financial year in which the Statute for Members was implemented (between July and December). Parliament paid the Members' monthly salaries, which had previously been paid by the Member States (except in the case of the 32 Members who took advantage of the opt-out provided for in the Statute for Members). The significant additional expenditure required under the Statute for Members related mainly to monthly salaries (Item ) and travel expenses (Items and ). Under the Statute implementing measures, travel is now reimbursed on the basis of actual cost and the costs of travel in the Member State of election is also reimbursed. |
|
22. |
Commitments against Item (Salaries) accordingly stood at EUR 30 601 983 (18 % of Chapter commitments), while EUR 64 968 672 was committed against Item (Ordinary travel expenses), accounting for 38 % of Chapter commitments. The latter item covers travel and subsistence expenses in connection with travelling to and from the places of work and other duty travel. |
|
23. |
In 2009 Members made 10 200 journeys to attend part-sessions in Strasbourg and Brussels, 14 734 journeys to committee meetings in Brussels and 8 142 journeys to political group meetings in Brussels. As regards travel outside Parliament's usual workplaces, there were 641 journeys to committee meetings, 1 093 journeys to political group meetings and 679 journeys in connection with parliamentary delegation meetings. |
|
24. |
Commitments against Item (General expenditure allowance) totalled EUR 42 629 278 (25 % of Chapter commitments). That amount covered expenses resulting from the parliamentary activities of Members in their Member States of election. |
B. Chapter (Officials and temporary staff)
|
25. |
This chapter accounted for 35 % of 2009 spending — the largest share of total expenditure. The 4,2 % increase in spending against Article that was recorded between 2008 and 2009 was due mainly to higher spending (+ 4,6 %) against Item (Remuneration and allowances) stemming from the Staff Regulations provisions on promotions, advancement in step and annual salary adjustments. As in 2008, the higher spending against Article was to a small degree offset by lower spending against Article (Allowances upon early termination of service) resulting from a substantial reduction in the number of beneficiaries, the persons concerned having become eligible for a pension. |
|
26. |
In Chapter , Article (Remuneration and allowances) accounted for some 98 % of expenditure. Commitments against this item totalled EUR 494 054 418. 1,4 % of those commitments were cancelled as a result of the decision taken by the Council in December 2009 to apply an annual salary adjustment of only 1,85 %, while the amount earmarked for that purpose in the budget had been calculated on the basis of the 3,7 % increase which the Commission had proposed to the Council. |
|
27. |
In 2009, 613 vacancies were advertised. 285 officials and temporary staff members were recruited to the Secretariat and 22 to political groups. Parliament had a total of 5 501 officials and temporary staff members as at 31 December 2009. 4 922 of those staff members were employed by the Secretariat, and 579 by the political groups. |
|
28. |
As regards the gender breakdown, women accounted for 23 % of managerial staff as at 31 December 2009. They accounted for 21 % of heads of unit, 25 % of directors and 29 % of directors-general (four out of a total of 14). Figure 3 gives a gender breakdown of staff by function group. A breakdown of staff by country is given in Table 10. Figure 3 Secretariat staff by gender
Table 10 Secretariat staff (official and temporary staff) by country
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
C. Chapter (Other staff and outside services)
|
29. |
This chapter accounted for 6 % of expenditure in 2009. The 3 % increase on 2008 was due to higher spending against Item (Other staff) and Article (Outside services), while spending was lower against Item (Conference interpreters). 48 % of Chapter appropriations were allocated to Item , and 27 % to Item . |
|
30. |
For Item (Conference interpreters), commitments totalled EUR 43 273 028 and covered, among other things: the fees, social security contributions, travel expenses and subsistence allowances of auxiliary conference interpreters employed by Parliament. Parliament interpreters and auxiliary conference interpreters worked 87 473 interpreter days in 2009 (9,2 % down on 2008). Parliament interpreters worked 49 547 days (down 4,2 %), and auxiliary conference interpreters 37 926 (15 % down on 2008). The lower spending in this area was the result of fact that there were no meetings during the election period. |
|
31. |
Commitments against Item (Other staff) totalled EUR 24 230 465. This item mainly covers the remuneration and allowances of contract staff members employed by the Secretariat and the political groups and the services provided by the Manpower firm, which recruits support staff for Strasbourg part-sessions. As at 31 December 2009, Parliament employed 571 contract staff. |
|
32. |
A breakdown of contract staff by function group is given in Figure 4. Figure 4 Contract staff by function group
|
D. Chapter (Other expenditure relating to persons working with the institution)
|
33. |
This chapter accounted for 1 % of expenditure in 2009. There was a 10 % increase in appropriations committed against this chapter in comparison with 2008, owing to higher spending against Item (Expenditure on recruitment). The appropriations against this item were topped up by means of a transfer, in order to cover additional costs arising in connection with the recruitment of accredited parliamentary assistants. |
|
34. |
Thirty-two per cent of Chapter commitments were made against Item (Early childhood centre and approved day nurseries), 24 % against Item (Further training), 16 % against Item (Current operating expenditure for restaurants and canteens) and 9 % against Item (Further training mission costs). |
|
35. |
Sub-item /01 (Early childhood centre and approved day nurseries: outside management of Parliament's day nursery and family room in Brussels and ancillary expenditure) accounted for bulk of spending against Item . Commitments against this item totalled EUR 4 441 145 and covered Parliament's contribution to the overall costs of the early childhood centre and outside crèches with which an agreement has been concluded. |
|
36. |
Commitments against Item (Further training) amounted to EUR 3 387 946 and covered expenditure relating to further training courses, to the purchase or production of teaching materials and to training courses raising awareness of issues relating to equal opportunities and careers advice. In 2009 5 511 people attended language courses, and 265 attended non-Community-language courses. Furthermore, 1 771 people attended IT courses and 737 attended financial training courses. Ninety-seven staff members attended courses held by the European School of Administration, 5 263 attended in-house training courses, and 225 attended outside courses. |
|
37. |
Commitments against Item (Current operating expenditure for restaurants and canteens) stood at EUR 2 260 000. This item covers restaurant and canteen operating costs. The restaurants and canteens served some 1 266 000 customers, and the staff shop some 174 000. |
E. Chapter (Buildings and associated costs)
|
38. |
This chapter accounted for 13 % of 2009 expenditure, up by 1 % on 2008. Appropriations totalling EUR 10,1 m against this chapter were carried over from financial year 2009 to financial year 2010 under the non-automatic transfer procedure provided for in Article 9 of the Financial Regulation. The higher spending against Items (Rent — up 7 %), 2001 (Lease payments — up 499 %), 2008 (Other expenditure on buildings — which was up 49 % and included EUR 1 m in non-automatic carryovers) and 2022 (Cleaning and maintenance) was offset by lower spending against Items (Acquisition of immovable property — EUR 9,1 m in non-automatic carryovers), 2005 (Construction of buildings — down 55 %) and 2007 (Fitting-out of premises — down 20 %). |
|
39. |
A breakdown of Chapter appropriations by expenditure type is given in Figure 5 below. Figure 5 Breakdown of Chapter 2 0 expenditure
|
|
40. |
The commitments entered into against Item (Rent) stood at EUR 28 303 816 and covered the rental of the buildings and parts of buildings occupied by Parliament, as well as property tax. A surplus of some EUR 6,27 m was established (EUR 4,85 m was transferred to another item and EUR 1,42 m was cancelled). This surplus arose as a result of the use of EUR 1,3 m in assigned revenue, late takeover of the Président Building in Luxembourg and the fact that some rents (e.g. for the Schuman Building) were either not index-linked or the index-linking rate was lower than expected. |
|
41. |
The commitments entered into against Item (Fitting-out of premises) totalled EUR 31 611 447 and covered fitting-out work and ancillary costs, including architects', engineers' and other fees. The appropriations against this item were topped-up by EUR 6,7 m to cover, among other things, asbestos removal work in the buildings in Strasbourg (the cost of which was subsequently refunded by Strasbourg City Council) and fire-retardant coating work in the LOW Building (EUR 4 m), the need for which became apparent when the ceiling-support structures were inspected. |
F. Chapter (Data processing, equipment and movable property)
|
42. |
This chapter accounted for 7 % of 2009 expenditure. Chapter spending was 5 % down on 2008, owing in particular to lower spending against Article (Technical equipment and installations), which was down 31 % owing to the fact that the audiovisual equipment investment period in Brussels came to a close. The 6 % increase against Item (Outside assistance for information and innovation technologies) was partially offset by lower spending against Article (Furniture), which was down 31 %. A breakdown of Chapter expenditure is given in Figure 6 below. |
|
43. |
Commitments entered into against Item (Equipment and software for information and innovation technologies) amounted to EUR 43 008 335. This appropriation covered, principally, expenditure on the purchase, hire, production and maintenance of equipment and software for the institution, and related work. |
|
44. |
Commitments entered into against Item (Outside assistance for information and innovation technologies) amounted to EUR 41 155 588 and mainly covered expenditure on the purchase, hire, production and maintenance of equipment and software for the institution, and related work. That expenditure related mainly to the computer and telecommunications centre, computing at departmental level and in the political groups and the electronic voting system. |
|
45. |
Computing capacity and processing power tripled over the period under review. In late 2008, memory capacity stood at 584 000 gigabytes (Gb), as against 1 803 021 Gb in late 2009. As regards processing power, Parliament's central IT systems' capacity to process a given quantity of data within a given period of time increased by 235 % over the previous year. Furthermore, with a view to ensuring information system security, the number of patches tested and integrated into the network, servers, software and workstations doubled (899 in late 2008, as against 1 886 in late 2009). Figure 6 Breakdown of Chapter expenditure
|
G. Chapter (Current administrative expenditure)
|
46. |
This chapter accounted for 1 % of 2009 expenditure. The 10 % increase against this chapter over 2008 was due mainly to higher spending against Article (Legal costs and damages — up 206 %) as a result of legal proceedings initiated in connection with the collapse of the ceiling of the Strasbourg Chamber and an increase in legal costs relating to the KAD Building renovation and extension project in Luxembourg. |
|
47. |
Expenditure against this article broke down as follows: 51 % against Article (Telecommunications); 19 % against Article (Stationery, office supplies and miscellaneous consumables); 12 % against Article (Legal costs and damages); and 6 % against Article (Removals). The remaining 12 % was spread over other items. |
H. Chapter (Meetings and conferences)
|
48. |
This chapter accounted for 2 % of 2009 expenditure. 2009 appropriations were 6 % down on 2008. This was due to lower spending against Article 2 (Staff mission expenses). Against that article, 2,7 % of the initial appropriations were cancelled at the end of the financial year and more than EUR 3 m were used for transfers during the year. The decrease in spending was mainly due to the lower volume of parliamentary business during the election year and the introduction of more stringent rules governing the calculation of mission expenses. |
|
49. |
In 2009, there were 29 384 missions (journeys) representing a total of 84 840 mission days. Most of the missions involved travel between Parliament's three places of work (Brussels — 4 508 missions; Strasbourg — 18 261; and Luxembourg — 2 504). |
I. Chapter (Expertise and information: acquisition, archiving, production and dissemination)
|
50. |
Appropriations against Chapter were tailored to the requirements of the institutional information campaign for the European elections in June 2009. This chapter accounted for 7 % of 2009 expenditure. Twenty-six per cent of the appropriations against this chapter were utilised for Item (Organisation and reception of groups of visitors, Euroscola programme and invitations to opinion multipliers from third countries), 18 % for Item (Expenditure on publication, information and participation in public events), 16 % for Item (Expenditure on audiovisual information) and 10 % for Item (Documentation and library expenditure). |
|
51. |
A breakdown of expenditure is given in Figure 7. Figure 7 Breakdown of Chapter expenditure
|
|
52. |
Commitments made against Item (Organisation and reception of groups of visitors, Euroscola programme and invitations to opinion multipliers from third countries) totalled EUR 24 485 353 and covered subsidies for visitors groups invited by Members and related supervision and infrastructure costs, Euroscola programme running costs and the financing of traineeships for opinion multipliers from third countries. Appropriations totalling EUR 2 619 647 were cancelled against this item, owing mainly to Members having invited a lower number of visitors groups than had been expected (because of the elections). |
|
53. |
Commitments made against Item (Expenditure on publication, information and participation in public events) amounted to EUR 16 678 677 and covered, in particular, expenditure on publications, information activities, and participation in public events, trade fairs and exhibitions in the Member States. |
|
54. |
Commitments entered into against Item (Expenditure on audiovisual information) totalled EUR 15 124 447 and covered expenditure relating to:
|
J. Chapter (Expenditure relating to certain institutions and bodies)
|
55. |
This chapter accounted for 5 % of 2009 expenditure. Article (Current administrative expenditure and expenditure relating to the political and information activities of the political groups and non-attached Members) accounted for 76 % of Chapter appropriations. Commitments against that article totalled EUR 52 337 886 and were intended to cover the following in respect of the political groups and the non-attached Members:
|
|
56. |
Article (Contributions to European political parties) and Article (Contributions to European political foundations) accounted for 23 % (EUR 16,8 m) of Chapter appropriations. |
K. Chapter (Expenditure relating to parliamentary assistants)
|
57. |
2009 was the first financial year in which the new Statute for Assistants was implemented (between July and December). This chapter accounted for 11 % of 2009 expenditure. |
|
58. |
Item (Parliamentary assistance) accounted for 83 % of commitment appropriations against this chapter. Commitments made against the article totalled EUR 126 946 740 and covered (between January and June) the former parliamentary assistance arrangements provided for under the PEAM rules and, starting in June 2009, the new ‘local’ assistants arrangements provided for in the new statutes for Members and assistants. |
|
59. |
Spending on assistants accredited at one of Parliament's three places of work, who are covered by the Staff Regulations, totalled EUR 26,4 m from July to December 2009 against Item (Parliamentary assistants). |
L. Title (Other expenditure)
|
60. |
The chapters in this title contain provisional appropriations that may be committed only once they have been transferred to an operational line. Transfers of provisional appropriations are dealt with in Section I of this report. Initial appropriations against this title amounted to EUR 36 522 592 — some 2 % of total initial appropriations. The unused balance stood at EUR 3 635 886 — around 0,2 % of total final appropriations in 2009. |
III. 2009 OBJECTIVES AND RESULTS
|
61. |
Among the objectives set for Parliament's Secretariat in 2009, special attention should be drawn to the following:
|
|
62. |
The results set out below are based on the annual activity reports for 2009 submitted by the relevant authorising officers by delegation. For a more comprehensive account of the activities of Parliament's directorates-general, readers are advised to refer to the relevant annual activity reports. |
A. 2009 European elections and communication activities
|
63. |
As 2009 was a European election year, in the first half of the year information and communication activities focused on the elections and the Bureau-approved institutional election campaign conducted both centrally and in all the Member States. The main activities involved:
|
|
64. |
Throughout the year, DG COMM also performed it principal role of ensuring the broadest possible media coverage of Parliament's activities and providing the general public and opinion multipliers with information about the institution. Particular attention should be drawn to the following:
|
B. Implementation of the new statutes for Members and assistants
|
65. |
The Statute for Members of the European Parliament came into force on 14 July 2009 along with the new rules for parliamentary assistance of the Members which were adopted following the Members' Statute. In the first months of 2009, DG Finance prepared the Implementing Measures for the assistants' Statute as well as rules for local assistants and for Members' trainees. Work continued on implementing provisions for the Members' Statute and on specific rules for implementation of the statutes at the administrative level, such as the scheme for reimbursement of medical expenses and cooperation with the Commission in managing it, specific rules concerning aspects of the reimbursement of travel expenses, etc. |
|
66. |
Since July, a considerable number of suggestions for modifications were made by Members and assistants taking into account their experiences with the new Statutes. Also on administrative level needs for further clarification or adjustment of rules at the level of implementation become obvious. Therefore, the Bureau decided to set up a Temporary Evaluation Group on Implementation of the Members' and Assistants' Statute composed of four Vice-Presidents and the Quaestor in charge, which was constituted on 29 September. The Temporary Evaluation Group is supported by the Legal Service and the Directorates General concerned, in particular DG Finance and DG Personal. The recommendations of the Temporary Evaluation Group have already resulted in a set of modifications to the Implementing Measures for the Statutes of Members and Assistants adopted by the Bureau in its meetings of 11 and 23 November 2009, which require adjustment of the actual implementation practice, but also new instructions to the services. |
|
67. |
The services of DG Finance prepared, in cooperation with DG ITEC, the IT applications required to implement the Statute as well as adaptation of the necessary forms for Members and assistants and a wealth of information (various sets of Questions and Answers to be distributed to Members, information sheets for the intranet and for DG Finance's own website). The IT applications are not yet completely finalised (in particular features for synchronisation of different applications and statistical features are missing), while they already need to be adjusted following the decisions of the Bureau and to be improved following the experience made during the first months of the implementation of the Statute. |
C. Restructuring and consolidating Parliament's Secretariat
|
68. |
Following his appointment in March 2009 the new Secretary-General proposed to the Bureau that a number of steps be taken to restructure and consolidate Parliament's Secretariat. Those measures may be summarised as follows: |
C.1. Stepping up assistance for the committees and reorganising the Tabling Office
|
69. |
The remit of the Tabling Office, which was set up in 2003, has focused on assisting and advising Members with regard to drafting texts and on verifying that they are in keeping with the current body of law. After a full parliamentary term in operation, and following an assessment of the situation and repeated calls by the budgetary authority for a significant increase in staff directly assisting Members with their legislative work, it became apparent that the appropriate course of action was to improve working methods. |
|
70. |
In this context, the Bureau decided on 6 May 2009 (9) to:
|
C.2. Setting up a Directorate for the Library and Document Management
|
71. |
In addition to the initial restructuring concerning the Tabling Office and strengthening the parliamentary committee structures, the Bureau also embarked on setting up a dedicated entity for document management, with a view to stepping up assistance to Members. The entity includes, in particular, an optimised knowledge-management system, which the budgetary authority has also been calling for. |
|
72. |
Accordingly, the Bureau decided on 16 and 17 June 2009 (10) to:
|
C.3. Security tailored to Parliament’s tasks
|
73. |
Given the traditional dilemma facing Parliament — pitting security against accessibility — and in view of new challenges such as emergency planning, business continuity management, support for delegations, and general and continuous risk assessment, there was a need to overhaul structures, which had changed little since the measures taken after the attacks of 11 September 2001. |
|
74. |
At its meeting of 1 April 2009 the Bureau accordingly decided (11) to improve security services and set up a new Directorate for Security and Risk Assessment within DG PRES, which has been radically reorganised. In particular, the set-up for the new units will be as follows:
|
C.4. Bringing communication structures into line with new ambitions
|
75. |
Following an ambitious reform in 2004, which was a success, the communication sector now had to face up to new demands and the new institutional environment that would result from the entry into force of the Lisbon Treaty. Furthermore, similar conclusions were likely to be reached in the review, yet to be carried out, of the recent European election campaign. To take account of the new challenges, there was a need to adopt an integrated approach to communication, develop political expertise, improve media services and develop online products. |
|
76. |
To this end, on 18 June 2009 (12) the Bureau made a number of changes to DG COMM's internal set-up, essentially involving:
|
C.5. More active management of human resources
|
77. |
Over the last five years, much of DG PERS resources have been devoted to coping with applying the new Staff Regulations of officials and with handling what has been, for Parliament, an unprecedented enlargement process. The relative stability at present, following that period of adjustment, has made it possible to embark, with effect from 1 January 2010, on a process of reorganisation designed to bring about more active management of human resources in Parliament. |
|
78. |
Accordingly, the purpose of the reorganisation approved by the Bureau (13) is to:
|
C.6. Restructuring of DG INLO
|
79. |
The Strasbourg Chamber ceiling incident in August 2008, the size of the property stock managed and the need to carry out a large-scale programme of renovations on the buildings which have come into Parliament's ownership over the last 15 years all called for a fundamental overhaul of DG INLO's structure and resources. |
|
80. |
At its meeting of 1 April 2009 (14) the Bureau accordingly adopted a wide-ranging plan, spread over the period 2010-2012, for restructuring and for increasing human resources. That operation can be summarised as follows:
|
C.7. Other restructuring measures
|
81. |
Lastly, to provide a comprehensive overview of the restructuring measures adopted, reference should be made to the:
|
D. Preparations for implementation of the Lisbon Treaty
|
82. |
Following the ‘no’ vote in the first Lisbon Treaty referendum in Ireland, the Administration's preparations were placed on hold, pending a fresh referendum and final ratification. |
|
83. |
As soon as this happened, Parliament made the arrangements required in order to enable the institution to exercise the new responsibilities and prerogatives provided for in the Lisbon Treaty. To this end, the Bureau adopted preliminary draft estimates in December 2009, as the first stage in the adoption of an amending budget for the financial year 2010. |
(1) OJ L 248, 16.9.2002, p. 1.
(2) OJ L 357, 31.12.2002, p. 1.
(3) PE 349.540/BUR/ANN/FIN.
(4) Interinstitutional Agreement between the European Parliament, the Council and the Commission on budgetary discipline and sound financial management (OJ C 139, 14.6.2006, p. 1).
(5) Article 9(1) and 9(4) of the Financial Regulation.
(6) Article 9(1), 9(2)(a) and 9(5) of the Financial Regulation.
(7) Art. 24 — Budgetary authority decision; Art. 43 — Budgetary authority decision for transfers involving provisional appropriations.
(8) Decision by the institution to transfer appropriations within a given article.
(9) Note of 30 April 2009 to the Bureau, PE422.005/BUR.
(10) Note of 16 June 2009 to the Bureau, PE426.212/BUR/REV.
(11) Note of 18 March 2009 to the Bureau, PE421.838/BUR.
(12) Note of 15 June 2009 to the Bureau, PE426.211/BUR.
(13) Note of 18 June 2009 to the Bureau, PE421.837/BUR.
(14) Note to the Bureau of 18 March 2009, PE421.749/BUR.
ANNEX I
OVERVIEW OF C TRANSFERS IN FINANCIAL YEAR 2009
|
(EUR) |
|||||
|
No |
To/From Chapter/Article/Item |
Chapter/Article/Item number |
Chapter/Article/Item heading |
Amount transferred in |
Amount transferred out |
|
C1 |
from Chapter |
Chapter |
Provisional appropriations |
|
2 700 000 |
|
to Chapter |
|
|
|
|
|
|
to Item |
/02 |
Fitting-out of premises: Strasbourg |
2 700 000 |
|
|
|
C2 |
from Chapter |
Chapter |
Contingency reserve |
|
800 000 |
|
to Chapter |
|
|
|
|
|
|
to Item |
/01 |
Legal costs and damages: legal costs |
800 000 |
|
|
|
C3 |
from Chapter |
Chapter |
Provisional appropriations |
|
112 992 |
|
to Chapter |
|
|
|
|
|
|
to Item |
|
Remuneration and allowances |
112 992 |
|
|
|
C5 |
from Chapter |
Chapter |
Contingency reserve |
|
822 000 |
|
to Chapter |
|
|
|
|
|
|
to Item |
/04 |
Equipment and software for information and innovation technologies: Streamline |
527 000 |
|
|
|
to Item |
/07 |
Outside assistance for information and innovation technologies: Streamline software and cofunding of NAP helpdesk |
295 000 |
|
|
|
C6 |
from Chapter |
Chapter |
Provisional appropriations |
|
1 200 000 |
|
to Chapter |
|
|
|
|
|
|
to Item |
/02 |
Outside services: other translation and typing work |
1 200 000 |
|
|
|
C7 |
from Chapter |
|
|
|
|
|
from Item |
|
Parliamentary assistance |
|
140 000 |
|
|
to Chapter |
|
|
|
|
|
|
to Item |
|
Expenditure on recruitment |
140 000 |
|
|
|
C8 |
from Chapter |
Chapter |
Contingency reserve |
|
2 080 000 |
|
to Chapter |
|
|
|
|
|
|
to Item |
/01 |
Security and surveillance of buildings: Luxembourg |
785 000 |
|
|
|
to Item |
/02 |
Security and surveillance of buildings: Strasbourg |
685 000 |
|
|
|
to Item |
/03 |
Security and surveillance of buildings: Brussels |
610 000 |
|
|
|
C10 |
from Chapter |
Chapter |
Provisional appropriations |
|
591 000 |
|
to Chapter |
|
|
|
|
|
|
to Item |
|
Remuneration and allowances |
591 000 |
|
|
|
C11 |
from Chapter |
Chapter |
Contingency reserve |
|
240 000 |
|
to Chapter |
|
|
|
|
|
|
to Item |
|
Miscellaneous expenditure on the organisation of the Parliamentary Conference on the WTO and other interparliamentary, ad hoc and WTO delegation meetings |
240 000 |
|
|
|
C13 |
from Chapter |
Chapter |
Contingency reserve |
|
95 000 |
|
to Chapter |
|
|
|
|
|
|
to Item |
/04 |
Organisation of seminars, symposia and cultural activities: support for multilingualism |
95 000 |
|
|
|
C14 |
from Chapter |
|
|
|
|
|
from Item |
|
Parliamentary assistance |
|
160 000 |
|
|
to Chapter |
|
|
|
|
|
|
to Item |
|
Expenditure on recruitment |
160 000 |
|
|
|
C16 |
from Chapter |
Chapter |
Contingency reserve |
|
1 273 900 |
|
to Chapter |
|
|
|
|
|
|
to Item |
/01 |
Cleaning and maintenance: Luxembourg |
245 039 |
|
|
|
to Item |
/02 |
Cleaning and maintenance: Strasbourg |
228 384 |
|
|
|
to Item |
/03 |
Cleaning and maintenance: Brussels |
800 477 |
|
|
|
C17 |
from Chapter |
Chapter |
Provisional appropriation for buildings |
|
9 374 099 |
|
assigned revenue |
|
Acquisition of immovable property |
|
22 516 901 |
|
|
to Chapter |
|
|
|
|
|
|
assigned revenue |
|
Lease payments |
22 516 901 |
|
|
|
to Item |
/03 |
Lease payments: Brussels |
9 374 099 |
|
|
|
C19 |
from Chapter |
Chapter |
Contingency reserve |
|
1 247 715 |
|
to Chapter |
|
Members of the institution |
|
|
|
|
to Item |
|
General expenditure allowance |
1 247 715 |
|
|
|
C20 |
from Chapter |
|
Other staff and outside services |
|
|
|
from Item |
/03 |
Graduate traineeships, grants and exchanges of officials: staff movements between the Institution and the public sector |
|
1 000 000 |
|
|
from Item |
/01 |
Outside services: translation of the Verbatim Report of Proceedings |
|
1 000 000 |
|
|
from Chapter |
|
Meetings and conferences |
|
|
|
|
from Item |
/01 |
Staff mission expenses: part-sessions, committees and committee delegations, political groups and miscellaneous |
|
3 000 000 |
|
|
from Chapter |
Chapter |
Contingency reserve |
|
2 000 000 |
|
|
to Chapter |
|
Officials and temporary staff |
|
|
|
|
to Item |
|
Remuneration and allowances |
7 000 000 |
|
|
|
C22 |
from Chapter |
|
Data processing, equipment and movable property |
|
|
|
from Item |
/01 |
Furniture: purchase and replacement of furniture |
|
1 000 000 |
|
|
from Chapter |
|
Expertise and information: acquisition, archiving, production and dissemination |
|
|
|
|
from Item |
|
Official Journal |
|
600 000 |
|
|
from Chapter |
Chapter |
EMAS reserve |
|
250 000 |
|
|
to Chapter |
|
Data processing, equipment and movable property |
|
|
|
|
to Item |
/01 |
Outside assistance for information and innovation technologies: computer centre, telecommunications and equipment and software |
1 850 000 |
|
|
|
C23 |
within Chapter |
|
Members of the institution |
|
|
|
from Article |
|
Provisional appropriation to cover the allowances of Members of the institution |
|
350 000 |
|
|
from Item |
|
Optional pension scheme for Members |
|
2 200 000 |
|
|
to Item |
|
Salaries |
350 000 |
|
|
|
to Item |
|
Specific measures to assist disabled Members and Members’ disabled children |
100 000 |
|
|
|
to Article |
|
Transitional allowances |
2 100 000 |
|
|
|
C24 |
from Chapter |
Chapter |
Provisional appropriation for buildings |
|
10 100 000 |
|
to Chapter |
|
Buildings and associated costs |
|
|
|
|
to Item |
|
Acquisition of immovable property |
9 100 000 |
|
|
|
to Item |
|
Other expenditure on buildings |
1 000 000 |
|
|
|
Total amount for C transfers |
64 853 607 |
64 853 607 |
|||
ANNEX II
OVERVIEW OF P TRANSFERS IN FINANCIAL YEAR 2009
|
(EUR) |
||||
|
No |
Chapter/Article/Item |
Amount |
||
|
P1 |
Within Article |
|
||
|
from Item |
|
Parliamentary assistance |
–10 500 000 |
|
|
to Item |
|
Parliamentary assistants |
10 500 000 |
|
|
P2 |
Within Article |
|
||
|
from Item |
|
Allowances for staff whose service is terminated and special retirement scheme for officials and temporary staff |
– 360 000 |
|
|
to Item |
|
Allowances for staff retired in the interests of the service |
360 000 |
|
|
P3 |
Within Article |
|
||
|
from Item |
|
Miscellaneous expenditure on internal meetings |
–25 000 |
|
|
to Item |
|
Miscellaneous expenditure on the organisation of Eurolat Parliamentary Assembly meetings |
25 000 |
|
|
P4 |
Within Article |
|
||
|
from Item |
|
Parliamentary assistance |
–18 250 000 |
|
|
to Item |
|
Parliamentary assistants |
18 250 000 |
|
|
P5 |
Within Article |
|
||
|
from Item |
/01 |
Expenditure on audiovisual information: coproduction and broadcasting of audiovisual programmes |
– 300 000 |
|
|
to Item |
/01 |
Expenditure on publication, information and participation in public events: publications, information activities, public events |
250 000 |
|
|
to Item |
/02 |
Expenditure on publication, information and participation in public events: electronic information (Internet) |
50 000 |
|
|
P6 |
Within Article |
|
||
|
from Item |
|
Official Journal |
– 780 000 |
|
|
to Item |
/01 |
Digital and traditional publications: publishing |
780 000 |
|
|
P7 |
Within Article |
|
||
|
from Item |
|
Other travel expenses |
– 600 000 |
|
|
to Item |
|
Ordinary travel expenses |
600 000 |
|
|
P8 |
Within Article |
|
||
|
from Item |
/03 |
Rent: Brussels |
– 850 000 |
|
|
to Item |
|
Other expenditure on buildings |
850 000 |
|
|
P9 |
Within Article |
|
||
|
from Item |
/01 |
Rent: Luxembourg |
–4 000 000 |
|
|
to Item |
/02 |
Fitting-out of premises: Strasbourg |
4 000 000 |
|
|
Total amount for P transfers |
35 665 000 |
|||
ANNEX III
IMPLEMENTATION OF 2009 APPROPRIATIONS
|
Article/Item |
Heading |
Initial appropriations |
Transfer |
Final appropriations |
Commitments |
% utilisation |
|
|
Salaries |
30 823 000 |
350 000 |
31 173 000 |
30 601 983 |
98 |
|
|
Ordinary travel expenses |
77 988 000 |
600 000 |
78 588 000 |
64 968 672 |
83 |
|
|
Other travel expenses |
6 875 000 |
– 600 000 |
6 275 000 |
1 874 929 |
30 |
|
|
General expenditure allowance |
41 539 000 |
1 247 715 |
42 786 715 |
42 629 278 |
100 |
|
|
Allowances for performance of duties |
170 000 |
— |
170 000 |
169 748 |
100 |
|
|
Accident and sickness insurance and other social security charges |
2 851 000 |
— |
2 851 000 |
2 557 022 |
90 |
|
|
Specific measures to assist disabled Members and Members’ disabled children |
141 000 |
100 000 |
241 000 |
77 328 |
32 |
|
|
Transitional allowances |
3 875 000 |
2 100 000 |
5 975 000 |
5 456 757 |
91 |
|
|
Retirement pensions |
10 638 000 |
— |
10 638 000 |
9 583 362 |
90 |
|
|
Invalidity pensions |
517 000 |
— |
517 000 |
383 595 |
74 |
|
|
Survivors’ pensions |
2 857 000 |
— |
2 857 000 |
2 690 744 |
94 |
|
|
Optional pension scheme for Members |
9 148 000 |
–2 200 000 |
6 948 000 |
6 433 924 |
93 |
|
|
Language and IT courses |
900 000 |
— |
900 000 |
525 000 |
58 |
|
|
Exchange losses |
100 000 |
— |
100 000 |
— |
0 |
|
|
Provisional appropriation to cover the allowances of Members of the institution |
2 000 000 |
– 350 000 |
1 650 000 |
— |
0 |
|
|
Remuneration and allowances |
493 145 938 |
7 703 992 |
500 849 930 |
494 054 418 |
99 |
|
|
Paid overtime |
410 000 |
— |
410 000 |
350 000 |
85 |
|
|
Entitlements in connection with entering the service, transfer and leaving the service |
4 520 000 |
— |
4 520 000 |
3 520 000 |
78 |
|
|
Allowances for staff retired in the interests of the service |
630 000 |
360 000 |
990 000 |
917 369 |
93 |
|
|
Allowances for staff whose service is terminated and special retirement scheme for officials and temporary staff |
3 950 000 |
– 360 000 |
3 590 000 |
3 347 076 |
93 |
|
|
Provisional appropriation |
— |
— |
— |
— |
— |
|
|
Other staff |
25 807 000 |
— |
25 807 000 |
24 230 465 |
94 |
|
|
Conference interpreters |
45 600 000 |
— |
45 600 000 |
43 273 028 |
95 |
|
|
Graduate traineeships, grants and exchanges of officials |
8 091 000 |
–1 000 000 |
7 091 000 |
6 068 983 |
86 |
|
|
Observers |
— |
— |
— |
— |
— |
|
|
Training allowance (European Parliament apprenticeship programme) |
— |
— |
— |
— |
— |
|
|
Outside services |
21 566 000 |
200 000 |
21 766 000 |
17 362 350 |
80 |
|
|
Provisional appropriation |
— |
— |
— |
— |
— |
|
|
Expenditure on recruitment |
385 000 |
300 000 |
685 000 |
685 000 |
100 |
|
|
Further training |
3 940 000 |
— |
3 940 000 |
3 387 946 |
86 |
|
|
Further training mission costs |
1 580 000 |
— |
1 580 000 |
1 257 000 |
80 |
|
|
Social welfare |
573 900 |
— |
573 900 |
516 822 |
90 |
|
|
Mobility |
189 000 |
— |
189 000 |
186 383 |
99 |
|
|
Social contacts between members of staff and other social measures |
310 000 |
— |
310 000 |
287 888 |
93 |
|
|
Medical Service |
1 000 000 |
— |
1 000 000 |
997 557 |
100 |
|
|
Current operating expenditure for restaurants and canteens |
2 260 000 |
— |
2 260 000 |
2 260 000 |
100 |
|
|
Early childhood centre and approved day nurseries |
5 467 000 |
— |
5 467 000 |
4 441 145 |
81 |
|
|
Rent |
34 577 000 |
–4 850 000 |
29 727 000 |
28 303 816 |
95 |
|
|
Lease payments |
5 700 000 |
9 374 099 |
15 074 099 |
14 636 040 |
97 |
|
|
Acquisition of immovable property |
— |
9 100 000 |
9 100 000 |
— |
0 |
|
|
Construction of buildings |
3 870 000 |
— |
3 870 000 |
3 859 764 |
100 |
|
|
Fitting-out of premises |
25 232 000 |
6 700 000 |
31 932 000 |
31 611 447 |
99 |
|
|
Other expenditure on buildings |
12 348 000 |
1 850 000 |
14 198 000 |
13 066 707 |
92 |
|
|
Cleaning and maintenance |
33 560 000 |
1 273 900 |
34 833 900 |
34 464 155 |
99 |
|
|
Energy consumption |
19 096 500 |
— |
19 096 500 |
16 917 601 |
89 |
|
|
Security and surveillance of buildings |
37 000 000 |
2 080 000 |
39 080 000 |
38 478 371 |
98 |
|
|
Insurance |
1 575 000 |
— |
1 575 000 |
1 563 320 |
99 |
|
|
Equipment and software for information and innovation technologies |
42 610 000 |
527 000 |
43 137 000 |
43 008 335 |
100 |
|
|
Outside assistance for information and innovation technologies |
39 343 000 |
2 145 000 |
41 488 000 |
41 155 588 |
99 |
|
|
Furniture |
3 544 000 |
–1 000 000 |
2 544 000 |
2 508 568 |
99 |
|
|
Technical equipment and installations |
17 550 000 |
— |
17 550 000 |
14 526 966 |
83 |
|
|
Vehicles |
5 851 000 |
— |
5 851 000 |
4 880 606 |
83 |
|
|
Stationery, office supplies and miscellaneous consumables |
2 321 000 |
— |
2 321 000 |
2 098 027 |
90 |
|
|
Financial charges |
820 000 |
— |
820 000 |
318 976 |
39 |
|
|
Legal costs and damages |
540 700 |
800 000 |
1 340 700 |
1 318 036 |
98 |
|
|
Telecommunications |
6 593 000 |
— |
6 593 000 |
5 529 694 |
84 |
|
|
Postage on correspondence and delivery charges |
614 000 |
— |
614 000 |
330 501 |
54 |
|
|
Removals |
1 000 000 |
— |
1 000 000 |
656 863 |
66 |
|
|
Other administrative expenditure |
636 000 |
— |
636 000 |
526 603 |
83 |
|
|
Staff mission expenses |
24 300 000 |
–3 000 000 |
21 300 000 |
20 650 000 |
97 |
|
|
Entertainment and representation expenses |
1 070 000 |
— |
1 070 000 |
769 156 |
72 |
|
|
Miscellaneous expenditure on internal meetings |
2 900 000 |
— 25 000 |
2 875 000 |
2 124 976 |
74 |
|
|
Meetings, congresses and conferences |
1 260 000 |
— |
1 260 000 |
868 097 |
69 |
|
|
Miscellaneous expenditure on the organisation of the Parliamentary Conference on the WTO and other interparliamentary, ad hoc and WTO delegation meetings |
390 000 |
240 000 |
630 000 |
353 756 |
56 |
|
|
Miscellaneous expenditure on the organisation of ACP-EU Joint Parliamentary Assembly meetings |
478 000 |
— |
478 000 |
185 766 |
39 |
|
|
Miscellaneous expenditure on the organisation of Eurolat Parliamentary Assembly meetings |
38 000 |
25 000 |
63 000 |
42 493 |
67 |
|
|
Miscellaneous expenditure on the organisation of Euromed Parliamentary Assembly meetings |
40 000 |
— |
40 000 |
24 796 |
62 |
|
|
Expenditure on travel agency services |
1 223 000 |
— |
1 223 000 |
1 223 000 |
100 |
|
|
Acquisition of expertise |
7 198 000 |
— |
7 198 000 |
6 080 997 |
84 |
|
|
Documentation and library expenditure |
4 301 300 |
— |
4 301 300 |
3 512 010 |
82 |
|
|
Expenditure on archive fonds |
1 830 000 |
— |
1 830 000 |
1 755 947 |
96 |
|
|
Relations with parliaments of third countries and support for parliamentary democracy |
367 000 |
— |
367 000 |
310 311 |
85 |
|
|
Official Journal |
8 320 000 |
–1 380 000 |
6 940 000 |
6 939 096 |
100 |
|
|
Digital and traditional publications |
2 100 000 |
780 000 |
2 880 000 |
2 749 099 |
95 |
|
|
Expenditure on publication, information and participation in public events |
16 835 000 |
300 000 |
17 135 000 |
16 678 677 |
97 |
|
|
Visitors Centre |
3 900 000 |
— |
3 900 000 |
3 897 237 |
100 |
|
|
Organisation and reception of groups of visitors, Euroscola programme and invitations to opinion multipliers from third countries |
27 105 000 |
— |
27 105 000 |
24 485 353 |
90 |
|
|
Organisation of seminars, symposia and cultural activities |
1 930 000 |
95 000 |
2 025 000 |
1 790 335 |
88 |
|
|
Parliamentary television channel (Web TV) |
9 000 000 |
— |
9 000 000 |
8 787 767 |
98 |
|
|
Expenditure on information about the Debate on the Future of Europe |
— |
— |
— |
— |
— |
|
|
Expenditure on audiovisual information |
16 200 000 |
– 300 000 |
15 900 000 |
15 124 447 |
95 |
|
|
Information exchanges with national parliaments |
1 200 000 |
— |
1 200 000 |
561 657 |
47 |
|
|
Expenditure relating to Information Offices |
1 110 000 |
— |
1 110 000 |
974 747 |
88 |
|
|
Current administrative expenditure and expenditure relating to the political and information activities of the political groups and non-attached Members |
52 690 000 |
— |
52 690 000 |
52 337 886 |
99 |
|
|
Contributions to European political parties |
10 858 000 |
— |
10 858 000 |
10 512 377 |
97 |
|
|
Contributions to European political foundations |
7 000 000 |
— |
7 000 000 |
6 365 561 |
91 |
|
|
Parliamentary assistance |
184 767 000 |
–29 050 000 |
155 717 000 |
126 946 740 |
82 |
|
|
Exchange losses |
500 000 |
— |
500 000 |
— |
0 |
|
|
Parliamentary assistants |
— |
28 750 000 |
28 750 000 |
26 411 690 |
92 |
|
|
Cost of meetings and other activities of former Members |
170 000 |
— |
170 000 |
170 000 |
100 |
|
|
Cost of meetings and other activities of the European Parliamentary Association |
140 000 |
— |
140 000 |
140 000 |
100 |
|
Chapter |
PROVISIONAL APPROPRIATIONS |
5 003 992 |
–4 603 992 |
400 000 |
— |
0 |
|
Chapter |
CONTINGENCY RESERVE |
10 018 600 |
–8 558 615 |
1 459 985 |
— |
0 |
|
Chapter |
ENLARGEMENT RESERVE |
500 000 |
— |
500 000 |
— |
0 |
|
Chapter |
RESERVE FOR INFORMATION AND COMMUNICATION POLICY |
— |
— |
— |
— |
— |
|
Chapter |
PROVISIONAL APPROPRIATION FOR BUILDINGS |
20 000 000 |
–19 474 099 |
525 901 |
— |
0 |
|
Chapter |
EMAS RESERVE |
1 000 000 |
– 250 000 |
750 000 |
— |
0 |
|
Total |
|
1 529 970 930 |
— |
1 529 970 930 |
1 417 629 732 |
93 |