amending Regulation (EU) No 347/2013 of the European Parliament and of the Council as regards the Union list of projects of common interest
THE EUROPEAN COMMISSION,
Having regard to the Treaty on the Functioning of the European Union,
Having regard to Regulation (EU) No 347/2013 of the European Parliament and of the Council of 17 April 2013 on guidelines for trans-European energy infrastructure and repealing Decision No 1364/2006/EC and amending Regulations (EC) No 713/2009, (EC) No 714/2009 and (EC) No 715/2009 (1), and in particular Article 3(4) thereof,
Whereas:
(1) |
Regulation (EU) No 347/2013 establishes a framework for the identification, planning and implementation of projects of common interest (‘PCIs’) which are required to implement the nine strategic geographical energy infrastructure priority corridors identified in the fields of electricity, gas and oil, and the three Union-wide energy infrastructure priority areas for smart grids, electricity highways and carbon dioxide transportation networks. |
(2) |
Pursuant to Article 3(4) of Regulation (EU) No 347/2013, the Commission is empowered to adopt delegated acts to establish the Union list of PCIs (‘Union list’). |
(3) |
Projects proposed for the inclusion in the Union list have been assessed by the regional groups and meet the criteria laid down in Article 4 of Regulation (EU) No 347/2013. |
(4) |
The draft regional lists of PCIs were agreed by the regional groups at technical-level meetings. Following positive opinions of the Agency for the Cooperation of Energy Regulators (‘ACER’) on 30 October 2015 on the consistent application of the assessment criteria and the cost/benefit analysis across regions, the regional groups' decision-making bodies adopted the regional lists on 3 November 2015. Pursuant to Article 3(3)(a) of Regulation (EU) No 347/2013, prior to the adoption of the regional lists, all proposed projects were approved by the Member States to whose territory the projects relate. |
(5) |
Organisations representing relevant stakeholders, including producers, distribution system operators, suppliers, and consumer and environmental protection organisations were consulted on the projects proposed for inclusion in the Union list. |
(6) |
PCIs should be listed per strategic trans-European energy infrastructure priorities in the order laid down in Annex I to Regulation (EU) No 347/2013. The Union list should not contain any ranking of projects. |
(7) |
PCIs should be listed either as stand-alone PCIs or as a part of a cluster of several PCIs. However, certain PCIs should be clustered because they are interdependent or (potentially) competing. |
(8) |
The Union list contains projects at different stages of their development, including pre-feasibility, feasibility, permit-granting and construction. For PCIs at an early development stage, studies may be needed to demonstrate technical and economic viability and compliance with Union legislation, including environmental legislation. In this context, potential negative impacts on the environment should be adequately identified, assessed and avoided or mitigated. |
(9) |
The inclusion of projects on the Union list is without prejudice to the outcome of the relevant environmental assessment and permit procedure. Under Article 5(8) of Regulation (EU) No 347/2013, a project that does not comply with Union law may be removed from the Union list. The implementation of PCIs, including their compliance with the relevant legislation, should be monitored in accordance with Article 5 of that Regulation. |
(10) |
Pursuant to the second paragraph of Article 3(4) of Regulation (EU) No 347/2013, the Union list is established every two years, therefore the Union list established by Commission Delegated Regulation (EU) No 1391/2013 (2) is no longer valid and should be replaced. |
(11) |
Pursuant to Article 3(4) of Regulation (EU) No 347/2013, the Union list is to take the form of an annex to that Regulation. |
(12) |
Regulation (EU) No 347/2013 should therefore be amended accordingly, |
HAS ADOPTED THIS REGULATION:
Article 1
Annex VII to Regulation (EU) No 347/2013 is amended in accordance with the Annex to this Regulation.
Article 2
This Regulation shall enter into force on the twentieth day following that of its publication in the Official Journal of the European Union.
This Regulation shall be binding in its entirety and directly applicable in all Member States.
Done at Brussels, 18 November 2015.
For the Commission
The President
Jean-Claude JUNCKER
(1) OJ L 115, 25.4.2013, p. 39.
(2) Commission Delegated Regulation (EU) No 1391/2013 of 14 October 2013 amending Regulation (EU) No 347/2013 of the European Parliament and of the Council on guidelines for trans-European energy infrastructure as regards the Union list of projects of common interest (OJ L 349, 21.12.2013, p. 28).
ANNEX
Annex VII to Regulation (EU) No 347/2013 is replaced by the following:
‘ANNEX VII
The Union list of projects of common interest (“Union list”), referred to in Article 3(4)
A. PRINCIPLES APPLIED IN ESTABLISHING THE UNION LIST
(1) Clusters of PCIs
Some PCIs form part of a cluster because of their interdependent, potentially competing or competing nature. The following types of cluster of PCIs are established:
— |
a cluster of interdependent PCIs is defined as a “Cluster X, including the following PCIs:”. Such cluster has been formed to identify PCIs that are all needed to address the same bottleneck across country borders and provide synergies if implemented together. In this case, all the PCIs have to be implemented to realise the EU-wide benefits; |
— |
a cluster of potentially competing PCIs is defined as a “Cluster X, including one or more of the following PCIs:”. Such cluster reflects an uncertainty around the extent of the bottleneck across country borders. In this case, not all the PCIs included in the cluster have to be implemented. It is left to the market to determine whether one, several or all PCIs are to be implemented, subject to the necessary planning, permit and regulatory approvals. The need for PCIs shall be reassessed in a subsequent PCI identification process, including with regard to the capacity needs; and |
— |
a cluster of competing PCIs is defined as a “Cluster X, including one of the following PCIs:”. Such cluster addresses the same bottleneck. However, the extent of the bottleneck is more certain than in the case of a cluster of potentially competing PCIs, and therefore only one PCI has to be implemented. It is left to the market to determine which PCI is to be implemented, subject to the necessary planning, permit and regulatory approvals. Where necessary, the need for PCIs shall be reassessed in a subsequent PCI identification process. |
All PCIs are subject to the same rights and obligations established under Regulation (EU) No 347/2013.
(2) Treatment of substations and compressor stations
Substations and back-to-back electricity stations and gas compressor stations are considered as parts of PCIs if they are geographically located on transmission lines. Substations, back-to-back stations and compressor stations are considered as stand-alone PCIs and are explicitly listed on the Union list if their geographical location is different from transmission lines. They are subject to the rights and obligations laid down in Regulation (EU) No 347/2013.
(3) Definition of “No longer considered a PCI”
The phrase “No longer considered a PCI” refers to projects from the Union list established by Regulation (EU) No 1391/2013 that are no longer considered PCIs for one or more of the following reasons:
— |
according to the new data the project does not satisfy the eligibility criteria; |
— |
a promoter has not re-submitted it in the selection process for this Union list; |
— |
it has already been commissioned or is to be commissioned in the near future and so it would not benefit from the provisions of Regulation (EU) No 347/2013; or |
— |
it was ranked lower than other candidate PCIs in the selection process. |
Such projects are not PCIs, but are listed with their original PCI numbers on the Union list for the sake of transparency and clarity.
They may be considered for inclusion in the next Union list if the reasons for not-inclusion in the current Union list no longer apply.
(4) Definition of “PCIs with double labelling as electricity highways”
“PCIs with double labelling as electricity highways” means PCIs which belong to one of the priority electricity corridors and to the priority thematic area electricity highways.
B. THE UNION LIST OF PROJECTS OF COMMON INTEREST
(1) Priority Corridor Northern Seas Offshore Grid (“NSOG”)
Construction of the first interconnection between Belgium and United Kingdom:
No. |
Definition |
||||||
1.1 |
Cluster Belgium — United Kingdom between Zeebrugge and Canterbury [currently known as “NEMO” project], including the following PCIs:
|
||||||
1.2 |
No longer considered a PCI |
Increase of the transmission capacity between Denmark, Germany and the Netherlands:
1.3 |
Cluster Denmark — Germany between Endrup and Brunsbüttel, including the following PCIs:
|
||||||
1.4 |
Cluster Denmark — Germany between Kassø and Dollern, including the following PCIs:
|
||||||
1.5 |
Denmark — Netherlands interconnection between Endrup (DK) and Eemshaven (NL) [currently known as “COBRAcable”] |
Increase of the transmission capacity between France, Ireland and United Kingdom:
1.6 |
France — Ireland interconnection between La Martyre (FR) and Great Island or Knockraha (IE) [currently known as “Celtic Interconnector”] |
||||||||||||
1.7 |
Cluster France — United Kingdom interconnections, including one or more of the following PCIs:
|
||||||||||||
1.8 |
Germany — Norway interconnection between Wilster (DE) and Tonstad (NO) [currently known as “NordLink”] |
||||||||||||
1.9 |
Cluster connecting Ireland to United Kingdom, including one or more of the following PCIs:
|
||||||||||||
1.10 |
Norway — United Kingdom interconnection |
||||||||||||
1.11 |
No longer considered a PCI |
||||||||||||
1.12 |
Compressed air energy storage in United Kingdom — Larne |
||||||||||||
1.13 |
Interconnection between Iceland and United Kingdom [currently known as “Ice Link”] |
||||||||||||
1.14 |
Interconnection between Revsing (DK) and Bicker Fen (UK) [currently known as “Viking Link”] |
(2) Priority Corridor North-South Electricity Interconnections in Western Europe (“NSI West Electricity”)
No. |
Definition |
2.1 |
Austria internal line between Westtirol and Zell-Ziller (AT) to increase capacity at the Austrian/German border |
Increase of the transmission capacity between Belgium and Germany — construction of the first interconnection between both countries:
2.2 |
Cluster Belgium — Germany between Lixhe and Oberzier [currently known as the ALEGrO project], including the following PCIs:
|
||||||
2.3 |
Cluster Belgium — Luxembourg capacity increase at the Belgian/Luxembourgian border, including the following PCIs:
|
||||||
2.4 |
No longer considered a PCI |
||||||
2.5 |
Cluster France — Italy between Grande Ile and Piossasco, including the following PCIs:
|
||||||
2.6 |
No longer considered a PCI |
||||||
2.7 |
France — Spain interconnection between Aquitaine (FR) and the Basque country (ES) [currently known as “Biscay Gulf” project] |
||||||
2.8 |
Coordinated installation and operation of a phase-shift transformer in Arkale (ES) to increase capacity of the interconnection between Argia (FR) and Arkale (ES) |
Cluster North-South-West corridor in Germany to increase the transmission capacity and to integrate renewable energy:
2.9 |
Germany internal line between Osterath and Philippsburg (DE) to increase capacity at Western borders |
||||||
2.10 |
Germany internal line between Brunsbüttel-Grοβgartach and Wilster-Grafenrheinfeld (DE) to increase capacity at Northern and Southern borders |
||||||
2.11 |
Cluster Germany — Austria — Switzerland capacity increase in Lake Constance area, including the following PCIs:
|
||||||
2.12 |
Germany — Netherlands interconnection between Niederrhein (DE) and Doetinchem (NL) |
Cluster of projects increasing the integration of renewable energy between Ireland and Northern Ireland:
2.13 |
Cluster Ireland — United Kingdom interconnections, including one or more of the following PCIs:
|
Increase of the transmission capacity between Switzerland and Italy:
2.14 |
Italy — Switzerland interconnection between Thusis/Sils (CH) and Verderio Inferiore (IT) |
||||||||
2.15 |
Cluster Italy — Switzerland capacity increase at IT/CH border, including the following PCIs:
|
Cluster of internal projects increasing the integration of renewable energy in Portugal and improving the transmission capacity between Portugal and Spain:
2.16 |
Cluster Portugal capacity increase at PT/ES border and connecting new RES generation, including the following PCIs:
|
Increase of the transmission capacity between Portugal and Spain:
2.17 |
Portugal — Spain interconnection between Beariz — Fontefría (ES), Fontefria (ES) — Ponte de Lima (PT) (formerly Vila Fria/Viana do Castelo) and Ponte de Lima — Vila Nova de Famalicão (PT) (formerly Vila do Conde) (PT), including substations in Beariz (ES), Fontefría (ES) and Ponte de Lima (PT) |
Storage projects in Austria and Germany:
2.18 |
Capacity increase of hydro-pumped storage in Austria — Kaunertal, Tyrol (AT) |
2.19 |
No longer considered a PCI |
2.20 |
Capacity increase of hydro-pumped storage in Austria — Limberg III, Salzburg (AT) |
2.21 |
Hydro-pumped storage Riedl in the AT/DE border area |
2.22 |
Hydro pumped storage Pfaffenboden in Molln (AT) |
Cluster of projects in northern and western Belgium to increase the transmission capacity:
2.23 |
Cluster of internal lines at the Belgian northern border between Zandvliet — Lillo (BE), Lillo-Mercator (BE), including a substation in Lillo (BE) [currently known as “Brabo”] |
2.24 |
Internal line between Horta-Mercator (BE) |
Clusters of internal lines in Spain to increase the transmission capacity with the Mediterranean:
2.25 |
Cluster of internal lines in Spain to increase capacity between Northern Spain and the Mediterranean area, including the following PCIs:
|
||||
2.26 |
Spain internal line La Plana/Morella — Godelleta to increase capacity of the north-south Mediterranean axis |
||||
2.27 |
Capacity increase between Spain and France (generic project) |
(3) Priority Corridor North-South Electricity Interconnections in Central Eastern and South Europe (“NSI East Electricity”)
Reinforcement of the interconnection between Austria and Germany:
No. |
Definition |
||||||
3.1 |
Cluster Austria — Germany between St. Peter and Isar, including the following PCIs:
|
Reinforcement of the interconnection between Austria and Italy:
3.2 |
Cluster Austria — Italy between Lienz and Veneto region, including the following PCIs:
|
||||||
3.3 |
No longer considered a PCI |
||||||
3.4 |
Austria — Italy interconnection between Wurmlach (AT) and Somplago (IT) |
||||||
3.5 |
No longer considered a PCI |
||||||
3.6 |
No longer considered a PCI |
Reinforcement of the interconnection between Bulgaria and Greece:
3.7 |
Cluster Bulgaria — Greece between Maritsa East 1 and N. Santa, including the following PCIs:
|
Reinforcement of the interconnection between Bulgaria and Romania:
3.8 |
Cluster Bulgaria — Romania capacity increase [currently known as “Black Sea Corridor”], including the following PCIs:
|
Reinforcement of the interconnection between Slovenia, Croatia and Hungary, and reinforcements of the internal grid in Slovenia:
3.9 |
Cluster Croatia — Hungary — Slovenia between Žerjavenec/Hévíz and Cirkovce, including the following PCIs:
|
||||||||
3.10 |
Cluster Israel — Cyprus — Greece between Hadera and Attica region [currently known as “EUROASIA Interconnector”], including the following PCIs:
|
Reinforcements of the internal grid in Czech Republic:
3.11 |
Cluster Czech Republic internal lines to increase capacity at North-Western and Southern borders, including the following PCIs:
|
Cluster North-South-East corridor in Germany to increase transmission capacity and to integrate renewable energy:
3.12 |
Internal line in Germany between Wolmirstedt and Bavaria to increase internal North-South transmission capacity |
3.13 |
Internal line in Germany between Halle/Saale and Schweinfurt to increase capacity in the North-South Corridor East |
Increase of the transmission capacity between Germany and Poland:
3.14 |
Cluster Germany — Poland between Eisenhűttenstadt and Plewiska [currently known as “GerPol Power Bridge” project], including the following PCIs:
|
||||||
3.15 |
Cluster Germany — Poland between Vierraden and Krajnik [currently known as “GerPol Improvements”], including the following PCIs
|
Increase of the transmission capacity between Hungary and Slovakia:
3.16 |
Cluster Hungary — Slovakia between Gőnyϋ and Gabčikovo, including the following PCIs:
|
||||||||
3.17 |
PCI Hungary — Slovakia interconnection between Sajóvánka (HU) and Rimavská Sobota (SK) |
||||||||
3.18 |
Cluster Hungary — Slovakia between Kisvárda area and Velké Kapušany, including the following PCIs:
|
||||||||
3.19 |
Cluster Italy — Montenegro between Villanova and Lastva, including the following PCIs:
|
||||||||
3.20 |
No longer considered a PCI |
||||||||
3.21 |
Italy — Slovenia interconnection between Salgareda (IT) and Divača — Bericevo region (SI) |
||||||||
3.22 |
Cluster Romania — Serbia between Resita and Pancevo [currently known as “Mid Continental East Corridor”], including the following PCIs:
|
Hydro-pumped storages in Bulgaria and Greece:
3.23 |
Hydro-pumped storage in Bulgaria — Yadenitsa |
3.24 |
Hydro-pumped storage in Greece — Amfilochia |
3.25 |
No longer considered a PCI |
3.26 |
No longer considered a PCI |
(4) Priority Corridor Baltic Energy Market Interconnection Plan (“BEMIP Electricity”)
No. |
Definition |
||||||
4.1 |
Denmark — Germany interconnection between Tolstrup Gaarde (DK) and Bentwisch (DE) via offshore windparks Kriegers Flak (DK) and Baltic 1 and 2 (DE) [currently known as “Kriegers Flak Combined Grid Solution”] |
||||||
4.2 |
Cluster Estonia — Latvia between Kilingi-Nõmme and Riga [currently known as 3rd interconnection], including the following PCIs:
|
||||||
4.3 |
Now part of PCI no. 4.9 |
||||||
4.4 |
Cluster Latvia — Sweden capacity increase [currently known as “NordBalt” project], including the following PCIs:
|
Reinforcements in Lithuania and Poland necessary for the operation of “LitPol Link I”:
4.5 |
Cluster Lithuania — Poland between Alytus (LT) and Elk (PL), including the following PCIs:
|
Hydro-pumped storages in Estonia and Lithuania:
4.6 |
Hydro-pumped storage in Estonia — Muuga |
||||||||||||
4.7 |
Capacity increase of hydro-pumped storage in Lithuania — Kruonis |
||||||||||||
4.8 |
Cluster Estonia — Latvia and internal reinforcements in Lithuania, including the following PCIs:
|
||||||||||||
4.9 |
Various aspects of the integration of the Baltic States' electricity network into the continental European network, including their synchronous operation (generic project) |
(5) Priority Corridor North-South Gas Interconnections in Western Europe (“NSI West Gas”)
Projects allowing bidirectional flows between Ireland and the United Kingdom:
No. |
Definition |
||||||
5.1 |
Cluster to allow bidirectional flows from Northern Ireland to Great Britain and Ireland and also from Ireland to United Kingdom, including the following PCIs:
|
||||||
5.2 |
No longer considered a PCI |
||||||
5.3 |
Shannon LNG Terminal and connecting pipeline (IE) |
Projects allowing bidirectional flows between Portugal, Spain, France and Germany:
5.4 |
3rd interconnection point between Portugal and Spain |
||||
5.5 |
Eastern Axis Spain — France — interconnection point between Iberian Peninsula and France at Le Perthus, including the compressor stations at Montpellier and St. Martin de Crau [currently known as “Midcat”] |
||||
5.6 |
Reinforcement of the French network from South to North — Reverse flow from France to Germany at Obergailbach/Medelsheim Interconnection point (FR) |
||||
5.7 |
Reinforcement of the French network from South to North to create a single market zone, including the following PCIs:
|
||||
5.8 |
Reinforcement of the French network to support South to North flows, including the following PCIs:
|
||||
5.9 |
No longer considered a PCI |
||||
5.10 |
Reverse flow interconnection on TENP pipeline in Germany |
||||
5.11 |
Reverse flow interconnection between Italy and Switzerland at Passo Gries interconnection point |
||||
5.12 |
No longer considered a PCI |
||||
5.13 |
No longer considered a PCI |
||||
5.14 |
No longer considered a PCI |
||||
5.15 |
No longer considered a PCI |
||||
5.16 |
No longer considered a PCI |
||||
5.17 |
No longer considered a PCI |
||||
5.18 |
No longer considered a PCI |
||||
5.19 |
Connection of Malta to the European Gas network — pipeline interconnection with Italy at Gela and/or offshore Floating LNG Storage and Re-gasification Unit (FSRU) |
||||
5.20 |
Gas Pipeline connecting Algeria to Italy (via Sardinia) [currently known as “Galsi” pipeline] |
(6) Priority Corridor North-South Gas Interconnections in Central Eastern and South Eastern Europe (“NSI East Gas”)
Projects allowing bidirectional flows between Poland, Czech Republic and Slovakia linking the LNG terminals in Poland and Croatia:
No. |
Definition |
||||||||||||||||||||||||
6.1 |
Cluster Czech — Polish interconnection upgrade and related internal reinforcements in Western Poland, including the following PCIs:
|
||||||||||||||||||||||||
6.2 |
Cluster Poland — Slovakia interconnection and related internal reinforcements in Eastern Poland, including the following PCIs:
|
||||||||||||||||||||||||
6.3 |
No longer considered a PCI |
||||||||||||||||||||||||
6.4 |
PCI Bidirectional Austrian — Czech interconnection (BACI) between Baumgarten (AT) — Reinthal (CZ/AT) — Brečlav (CZ) |
Projects allowing gas to flow from Croatian LNG terminal to neighbouring countries:
6.5 |
Cluster Krk LNG terminal and evacuation pipelines towards Hungary and beyond, including the following PCIs:
|
||||||||
6.6 |
Now PCI no 6.26.1 |
||||||||
6.7 |
No longer considered a PCI |
Projects allowing gas flows from the Southern Gas Corridor and/or LNG terminals in Greece through Greece, Bulgaria, Romania, Serbia and further to Hungary, including reverse flow capability from south to north and integration of transit and transmission systems:
6.8 |
Cluster Interconnection between Greece, Bulgaria and Romania, and necessary reinforcements in Bulgaria, including the following PCIs:
|
||||||||
6.9 |
Cluster LNG terminal in northern Greece, including the following PCIs:
|
||||||||
6.10 |
PCI Gas interconnection Bulgaria — Serbia [currently known as “IBS”] |
||||||||
6.11 |
No longer considered a PCI |
||||||||
6.12 |
No longer considered a PCI |
||||||||
6.13 |
|
||||||||
6.14 |
Now PCI no. 6.24.1 |
||||||||
6.15 |
Interconnection of the national transmission system with the international gas transmission pipelines and reverse flow at Isaccea (RO)
|
Project allowing gas from the Southern Gas Corridor to flow through Italy towards the North-Eastern Europe
6.16 |
No longer considered a PCI |
6.17 |
No longer considered a PCI |
6.18 |
Adriatica pipeline (IT) |
6.19 |
No longer considered a PCI |
Projects allowing development of underground gas storage capacity in South-Eastern Europe:
6.20 |
Cluster increase storage capacity in South-Eastern Europe, including one or more of the following PCIs:
and one of the following PCIs:
|
||||||||||||||||||
6.21 |
No longer considered a PCI |
||||||||||||||||||
6.22 |
No longer considered a PCI |
||||||||||||||||||
6.23 |
Hungary — Slovenia interconnection (Nagykanizsa — Tornyiszentmiklós (HU) — Lendava (SI) — Kidričevo) |
||||||||||||||||||
6.24 |
Cluster phased capacity increase on the Bulgaria — Romania — Hungary — Austria bidirectional transmission corridor (currently known as “ROHUAT/BRUA”) to enable 1.75 bcm/a in the first phase and 4.4 bcm/a in the second phase, including new resources from the Black Sea:
|
||||||||||||||||||
6.25 |
Cluster infrastructure to bring new gas to the Central and South-Eastern European region with the aim of diversification, including one or more of the following PCIs:
|
||||||||||||||||||
6.26 |
Cluster Croatia — Slovenia — Austria at Rogatec, including the following PCIs:
|
(7) Priority corridor Southern Gas Corridor (“SGC”)
No. |
Definition |
||||||||||||||
7.1 |
PCI Cluster of integrated, dedicated and scalable transport infrastructure and associated equipment for the transportation of a minimum of 10 bcm/a of new sources of gas from the Caspian Region, crossing Azerbaijan, Georgia and Turkey and reaching EU markets in Greece and Italy, and including one or more of the following PCIs:
|
||||||||||||||
7.2 |
No longer considered a PCI |
||||||||||||||
7.3 |
|
||||||||||||||
7.4 |
Cluster of interconnections with Turkey, including the following PCIs:
|
(8) Priority Corridor Baltic Energy Market Interconnection Plan in Gas (“BEMIP Gas”)
No. |
Definition |
||||||||||||
8.1 |
Cluster diversifying supply in the Eastern Baltic Sea Region, including the following PCIs:
|
Reinforcement of the transmission infrastructure in the Baltic States and modernisation of the gas underground storage in Latvia:
8.2 |
Cluster infrastructure upgrade in the Eastern Baltic Sea region, including the following PCIs:
|
||||||||
8.3 |
Poland–Denmark interconnection [currently known as “Baltic Pipe”] |
||||||||
8.4 |
No longer considered a PCI |
||||||||
8.5 |
Poland-Lithuania interconnection [currently known as “GIPL”] |
||||||||
8.6 |
Gothenburg LNG terminal in Sweden |
||||||||
8.7 |
Capacity extension of Świnoujście LNG terminal in Poland |
||||||||
8.8 |
No longer considered a PCI |
(9) Priority Corridor Oil Supply Connections in Central Eastern Europe (“OSC”)
Enhancement of the security of oil supply in the Central Eastern European region by increasing interoperability and enabling adequate alternative supply routes:
No. |
Definition |
||||
9.1 |
Adamowo — Brody pipeline: pipeline connecting the JSC Uktransnafta's handling site in Brody (Ukraine) and Adamowo Tank Farm (Poland) |
||||
9.2 |
Bratislava — Schwechat — Pipeline: pipeline linking Schwechat (Austria) and Bratislava (Slovak Republic) |
||||
9.3 |
JANAF-Adria pipelines: reconstruction, upgrading, maintenance and capacity increase of the existing JANAF and Adria pipelines linking the Croatian Omisalj seaport to the Southern Druzhba (Croatia, Hungary, Slovak Republic); (The Hungarian — Slovak interconnection is no longer considered a PCI) |
||||
9.4 |
Litvinov (Czech Republic) — Spergau (Germany) pipeline: the extension project of the Druzhba crude oil pipeline to the refinery TRM Spergau |
||||
9.5 |
Cluster Pomeranian pipeline (Poland), including the following PCIs:
|
||||
9.6 |
TAL Plus: capacity expansion of the TAL pipeline between Trieste (Italy) and Ingolstadt (Germany) |
(10) Priority Thematic Area Smart Grids Deployment
No. |
Definition |
10.1 |
North Atlantic Green Zone Project (Ireland, United Kingdom/Northern Ireland) aims at lowering wind curtailment by implementing communication infrastructure, enhanced grid control and interconnection and establishing (cross-border) protocols for Demand Side Management. |
10.2 |
Green-Me (France, Italy) aims at enhancing RES integration by implementing automation, control and monitoring systems in HV and HV/MV substations, including communication with the renewable generators and storage in primary substations, as well as new data exchange to allow for a better cross-border interconnection management. |
10.3 |
SINCRO.GRID (Slovenia/Croatia) aims at solving network voltage, frequency control and congestion issues enabling further deployment of renewables and displacement of conventional generation by integrating new active elements in the transmission and distribution grids into the virtual cross-border control centre based on advanced data management, common system optimisation and forecasting involving two neighbouring TSOs and the two neighbouring DSOs. |
(11) Priority Thematic Area Electricity Highways
List of PCIs with double labelling as electricity highways
No. |
Definition |
||||
Priority Corridor Northern Seas Offshore Grid (“NSOG”) |
|||||
1.1.1 |
Interconnection between Zeebrugge (BE) and the vicinity of Richborough (UK) |
||||
1.3.1 |
Interconnection between Endrup (DK) and Niebüll (DE) |
||||
1.3.2 |
Internal line between Brunsbüttel and Niebüll (DE) |
||||
1.4.1 |
Interconnection between Kassø (DK) and Audorf (DE) |
||||
1.4.2 |
Internal line between Audorf and Hamburg/Nord (DE) |
||||
1.4.3 |
Internal line between Hamburg/Nord and Dollern (DE) |
||||
1.5 |
Denmark — Netherlands interconnection between Endrup (DK) and Eemshaven (NL) [currently known as “COBRAcable”] |
||||
1.6 |
France — Ireland interconnection between La Martyre (FR) and Great Island or Knockraha (IE) [currently known as “Celtic Interconnector”] |
||||
1.7.1 |
France — United Kingdom interconnection between Cotentin (FR) and the vicinity of Exeter (UK) [currently known as “FAB” project] |
||||
1.7.2 |
France — United Kingdom interconnection between Tourbe (FR) and Chilling (UK) [currently known as “IFA2” project] |
||||
1.7.3 |
France — United Kingdom interconnection between Coquelles (FR) and Folkestone (UK) [currently known as “ElecLink” project] |
||||
1.8 |
Germany — Norway interconnection between Wilster (DE) and Tonstad (NO) [currently known as “NordLink”] |
||||
1.10 |
Norway — United Kingdom interconnection |
||||
1.13 |
Interconnection between Iceland and United Kingdom [currently known as “Ice Link”] |
||||
1.14 |
Interconnection between Revsing (DK) and Bicker Fen (UK) [currently known as “Viking Link”] |
||||
Priority Corridor North-South Electricity Interconnections in Western Europe (“NSI West Electricity”) |
|||||
2.2.1 |
Interconnection between Lixhe (BE) and Oberzier (DE) |
||||
2.5.1 |
Interconnection between Grande Ile (FR) and Piossasco (IT) [currently known as “Savoie- Piemont”project] |
||||
2.7 |
France — Spain interconnection between Aquitaine (FR) and the Basque country (ES) [currently known as “Biscay Gulf” project] |
||||
2.9 |
Germany internal line between Osterath and Philippsburg (DE) to increase capacity at Western borders |
||||
2.10 |
Germany internal line between Brunsbüttel-Grοβgartach and Wilster-Grafenrheinfeld (DE) to increase capacity at Northern and Southern borders |
||||
2.13 |
Cluster Ireland — United Kingdom interconnections, including one or more of the following PCIs:
|
||||
Priority Corridor North-South Electricity Interconnections in Central Eastern and South Europe (“NSI East Electricity”) |
|||||
3.10.1 |
Interconnection between Hadera (IL) and Kofinou (CY) |
||||
3.10.2 |
Interconnection between Kofinou (CY) and Korakia, Crete (EL) |
||||
3.10.3 |
Internal line between Korakia, Crete and Attica region (EL) |
||||
3.12 |
Internal line in Germany between Wolmirstedt and Bavaria to increase internal North-South transmission capacity |
||||
Priority Corridor Baltic Energy Market Interconnection Plan (“BEMIP Electricity”) |
|||||
4.1 |
Denmark — Germany interconnection between Tolstrup Gaarde (DK) and Bentwisch (DE) via offshore windparks Kriegers Flak (DK) and Baltic 1 and 2 (DE) [currently known as “Kriegers Flak Combined Grid Solution”]’ |