Order of the President of the General Court of 4 December 2015 —
E‑Control v ACER
(Case T‑671/15 R)
‛Application for interim measures — Opinion on the compliance of national regulatory authorities’ decisions approving the methods of cross-border electricity transmission capacity — Application for suspension of operation of a measure — Infringement of procedural requirements — Inadmissibility’
|
1. |
Application for interim measures — Suspension of operation of a measure — Interim measures — Conditions for granting — Prima facie case — Urgency — Serious and irreparable damage — Cumulative nature (Arts 278 TFEU and 279 TFEU; Rules of Procedure of the General Court, Art. 156(3)) (see para. 6) |
|
2. |
Application for interim measures — Formal requirements — Submission of applications — Brief summary of the pleas in law on which the application is based — Insufficient explanation of the grounds constituting a prima facie case — General reference to other documents — Inadmissibility (Arts 278 TFEU and 279 TFEU; Rules of Procedure of the General Court, Arts 76(d), and 156(4)) (see paras 7-10) |
|
3. |
Application for interim measures — Suspension of operation of a measure — Interim measures — Conditions for granting — Urgency — Serious and irreparable damage — Burden of proof (Arts 278 TFEU and 279 TFEU; Rules of Procedure of the General Court, Art. 156(3)) (see paras 13-14) |
Re:
APPLICATION for suspension of operation of Opinion of the Agency for the Cooperation of Energy Regulators No 09/2015 of 23 September 2015 on the compliance of national regulatory authorities’ decisions approving the methods of allocation of cross-border transmission capacity in the Central-East Europe region with Regulation (EC) No 714/2009 of the European Parliament and of the Council of 13 July 2009 on conditions for access to the network for cross-border exchanges in electricity and repealing Regulation (EC) No 1228/2003 (OJ 2009 L 211, p. 15), and the guidelines on the management and allocation of available transfer capacity of interconnections between national systems contained in Annex I thereto.
Operative part
|
1. |
The application for interim measures is dismissed. |
|
2. |
The costs are reserved. |