31.8.2007 |
EN |
Official Journal of the European Union |
L 228/7 |
Statement of revenue and expenditure of the European Agency for Safety and Health at Work for the financial year 2007 — Amending budget No 2
(2007/574/EC)
Overall objectives
Preamble
Following the decision by the budgetary authority to release the amounts placed in the reserve (EUR 282 000 for Titles I and II, EUR 254 000 for Title III), the Community subsidies allocated to EU-OSHA for 2007 amount to EUR 6 300 000 and EUR 7 700 000 for Titles I and II and Title III respectively.
As regards the expenditure allocated (in particular Chapter 3 4), it should be noted that the amounts set out under the heading ‘2007 initial’ represent costs carried over in the PHARE IV contracts (Chapter 3 4). The amounts set out under the heading ‘2007 total’ represent expenditure forecast this year on the basis of revenue received in 2006 (EUR 236 540) and any budget revenue for 2007 (EUR 213 460), giving a cumulative total of EUR 450 000.
As regards the expenditure allocated (in particular Chapter 3 6), the amounts set out under the heading ‘2007 total’ are intended to reflect the legal basis as signed and set out in the AESS's budget for 2007, totalling EUR 227 100.
REVENUE
TITLE 1
EUROPEAN COMMUNITY SUBSIDY
|
Title Chapter |
Heading |
Budget 2007 |
Amending budget No 2 |
New amount |
|
1 0 |
EUROPEAN COMMUNITY SUBSIDY |
14 473 180 |
–32 620 |
14 440 560 |
|
|
Title 1 — Total |
14 473 180 |
–32 620 |
14 440 560 |
CHAPTER 1 0 —
EUROPEAN COMMUNITY SUBSIDY
|
Title Chapter Article Item |
Heading |
Budget 2007 |
Amending budget No 2 |
New amount |
|
1 0 |
EUROPEAN COMMUNITY SUBSIDY |
|||
|
1 0 0 |
European Community subsidy |
14 000 000 |
|
14 000 000 |
|
|
Article 1 0 0 — Subtotal |
14 000 000 |
|
14 000 000 |
|
1 0 1 |
Phare program III (earmarked) |
0 |
|
0 |
|
|
Article 1 0 1 — Subtotal |
0 |
|
0 |
|
1 0 2 |
Phare program IV (earmarked) |
148 080 |
65 380 |
213 460 |
|
|
Article 1 0 2 — Subtotal |
148 080 |
65 380 |
213 460 |
|
1 0 3 |
Ca 2005 Regional Programme (earmarked) |
325 100 |
–98 000 |
227 100 |
|
|
Article 1 0 3 — Subtotal |
325 100 |
–98 000 |
227 100 |
|
|
Chapter 1 0 — Total |
14 473 180 |
–32 620 |
14 440 560 |
1 0 2
Phare program IV (earmarked)
|
Budget 2007 |
Amending budget No 2 |
New amount |
|
148 080 |
65 380 |
213 460 |
Remarks
This article corresponds to earmarked Phare revenue and includes financing for a Phare IV program agreed by the EC, which will run within the period 2006-2007 for a total amount of EUR 450 000. Activities under Phare IV are linked to the approved program of work with earmarked revenues and expenses.
1 0 3
Ca 2005 Regional Programme (earmarked)
|
Budget 2007 |
Amending budget No 2 |
New amount |
|
325 100 |
–98 000 |
227 100 |
Remarks
This article corresponds to earmarked CARDS revenue and includes financing for a CARDS 2005 Regional Programme, which will run up to 2008 for a total amount of EUR 410 000. Figures reflect current estimates for 2007.
TITLE 2
OTHER SUBSIDIES
|
Title Chapter |
Heading |
Budget 2007 |
Amending budget No 2 |
New amount |
|
2 0 |
OTHER SUBSIDIES |
237 303 |
–30 101 |
207 202 |
|
|
Title 2 — Total |
237 303 |
–30 101 |
207 202 |
CHAPTER 2 0 —
OTHER SUBSIDIES
|
Title Chapter Article Item |
Heading |
Budget 2007 |
Amending budget No 2 |
New amount |
|
2 0 |
OTHER SUBSIDIES |
|||
|
2 0 0 |
Grant from the Basque Regional Government |
60 101 |
|
60 101 |
|
|
Article 2 0 0 — Subtotal |
60 101 |
|
60 101 |
|
2 0 1 |
Grant from the County of Bizkaia |
60 101 |
–60 101 |
— |
|
|
Article 2 0 1 — Subtotal |
60 101 |
–60 101 |
— |
|
2 0 2 |
Grant from the Spanish Government |
60 101 |
|
60 101 |
|
|
Article 2 0 2 — Subtotal |
60 101 |
|
60 101 |
|
2 0 3 |
Other grants |
57 000 |
30 000 |
87 000 |
|
|
Article 2 0 3 — Subtotal |
57 000 |
30 000 |
87 000 |
|
|
Chapter 2 0 — Total |
237 303 |
–30 101 |
207 202 |
2 0 1
Grant from the County of Bizkaia
|
Budget 2007 |
Amending budget No 2 |
New amount |
|
60 101 |
–60 101 |
— |
Remarks
This grant is meant to finance current expenditure.
2 0 3
Other grants
|
Budget 2007 |
Amending budget No 2 |
New amount |
|
57 000 |
30 000 |
87 000 |
Remarks
Revenue from other grants: EUR 57 000 from FIOH (earmarked) and EUR 30 000 from German Presidency.
TITLE 5
MISCELLANEOUS REVENUE
|
Title Chapter |
Heading |
Budget 2007 |
Amending budget No 2 |
New amount |
|
5 0 |
PROCEEDS FROM THE SALE OF MOVABLE AND IMMOVABLE PROPERTY |
p.m. |
|
p.m. |
|
5 2 |
REVENUE FROM INVESTMENTS OR LOANS, BANK INTEREST AND OTHER ITEMS |
p.m. |
|
p.m. |
|
5 4 |
MISCELLANEOUS REVENUE AVAILABLE FOR REUSE BUT NOT USED |
p.m. |
279 941 |
279 941 |
|
5 9 |
OTHER REVENUE FROM ADMINISTRATIVE OPERATIONS |
p.m. |
|
p.m. |
|
|
Title 5 — Total |
p.m. |
279 941 |
279 941 |
CHAPTER 5 4 —
MISCELLANEOUS REVENUE AVAILABLE FOR REUSE BUT NOT USED
|
Title Chapter Article Item |
Heading |
Budget 2007 |
Amending budget No 2 |
New amount |
|
5 4 |
MISCELLANEOUS REVENUE AVAILABLE FOR REUSE BUT NOT USED |
|||
|
5 4 0 |
Miscellaneous revenue available for reuse but not used |
p.m. |
279 941 |
279 941 |
|
|
Article 5 4 0 — Subtotal |
p.m. |
279 941 |
279 941 |
|
|
Chapter 5 4 — Total |
p.m. |
279 941 |
279 941 |
5 4 0
Miscellaneous revenue available for reuse but not used
|
Budget 2007 |
Amending budget No 2 |
New amount |
|
p.m. |
279 941 |
279 941 |
Remarks
Miscellaneous revenue available for reuse but not used.
EXPENDITURE
|
Title |
Heading |
Appropriations 2007 |
Amending budget No 2 |
New amount |
|
1 |
STAFF |
4 797 295 |
–18 500 |
4 778 795 |
|
2 |
BUILDINGS, EQUIPMENT AND MISCELLANEOUS OPERATING EXPENDITURE |
1 683 008 |
–60 101 |
1 622 907 |
|
3 |
OPERATING EXPENDITURE |
8 230 180 |
349 321 |
8 579 501 |
|
|
Expenditure D — Total |
14 710 483 |
270 720 |
14 981 203 |
TITLE 1
STAFF
|
Title Chapter |
Heading |
Appropriations 2007 |
Amending budget No 2 |
New amount |
|
1 1 |
STAFF IN ACTIVE EMPLOYMENT |
4 770 945 |
–27 500 |
4 743 445 |
|
1 4 |
SOCIOMEDICAL INFRASTRUCTURE |
26 350 |
6 500 |
32 850 |
|
1 5 |
MOBILITY |
p.m. |
2 500 |
2 500 |
|
1 6 |
SOCIAL WELFARE |
p.m. |
|
p.m. |
|
1 8 |
REGULARISATION OF ACCUMULATED LOSSES |
p.m. |
|
p.m. |
|
1 9 |
PENSIONS AND SEVERANCE GRANTS |
p.m. |
|
p.m. |
|
|
Title 1 — Total |
4 797 295 |
–18 500 |
4 778 795 |
CHAPTER 1 1 —
STAFF IN ACTIVE EMPLOYMENT
|
Title Chapter Article Item |
Heading |
FF |
Appropriations 2007 |
Amending budget No 2 |
New amount |
|
1 1 |
STAFF IN ACTIVE EMPLOYMENT |
||||
|
1 1 0 |
Staff holding a post provided for in the establishment plan |
||||
|
1 1 0 0 |
Basic salaries |
|
2 410 503 |
– 167 500 |
2 243 003 |
|
1 1 0 1 |
Family allowances |
|
273 415 |
|
273 415 |
|
1 1 0 2 |
Expatriation and foreign-residence allowances |
|
364 568 |
|
364 568 |
|
1 1 0 3 |
Secretarial allowances |
|
3 906 |
|
3 906 |
|
|
Article 1 1 0 — Subtotal |
|
3 052 392 |
– 167 500 |
2 884 892 |
|
1 1 1 |
Other staff |
||||
|
1 1 1 0 |
Auxiliary staff |
|
207 600 |
15 000 |
222 600 |
|
1 1 1 2 |
Local staff |
|
70 255 |
|
70 255 |
|
1 1 1 3 |
Contract agents |
|
441 019 |
|
441 019 |
|
|
Article 1 1 1 — Subtotal |
|
718 874 |
15 000 |
733 874 |
|
1 1 2 |
Professional training of staff |
||||
|
1 1 2 0 |
Professional training of staff |
|
47 450 |
|
47 450 |
|
|
Article 1 1 2 — Subtotal |
|
47 450 |
|
47 450 |
|
1 1 3 |
Employer's social security contributions |
||||
|
1 1 3 0 |
Insurance against sickness |
|
87 118 |
|
87 118 |
|
1 1 3 1 |
Insurance against accidents and occupational disease |
|
24 513 |
|
24 513 |
|
1 1 3 2 |
Insurance against unemployment |
|
34 102 |
|
34 102 |
|
1 1 3 3 |
Constitution or maintenance of pension rights |
|
p.m. |
|
p.m. |
|
|
Article 1 1 3 — Subtotal |
|
145 733 |
|
145 733 |
|
1 1 4 |
Miscellaneous allowances and grants |
||||
|
1 1 4 0 |
Childbirth and death allowances and grants |
|
828 |
|
828 |
|
1 1 4 1 |
Travel expenses for annual leave |
|
76 245 |
|
76 245 |
|
1 1 4 3 |
Fixed-duty allowances |
|
p.m. |
|
p.m. |
|
|
Article 1 1 4 — Subtotal |
|
77 073 |
|
77 073 |
|
1 1 5 |
Overtime |
|
p.m. |
|
p.m. |
|
|
Article 1 1 5 — Subtotal |
|
p.m. |
|
p.m. |
|
1 1 7 |
Supplementary services |
||||
|
1 1 7 5 |
Interim services |
|
100 000 |
125 000 |
225 000 |
|
1 1 7 6 |
Officials on secondment from Member States |
|
113 900 |
|
113 900 |
|
1 1 7 7 |
DG ADMIN administrative help |
|
48 350 |
|
48 350 |
|
|
Article 1 1 7 — Subtotal |
|
262 250 |
125 000 |
387 250 |
|
1 1 8 |
Miscellaneous expenditure on staff recruitment and transfer |
||||
|
1 1 8 0 |
Miscellaneous expenditure on staff recruitment |
|
66 550 |
|
66 550 |
|
1 1 8 1 |
Travel expenses |
|
18 050 |
|
18 050 |
|
1 1 8 2 |
Installation, resettlement and transfer allowances |
|
121 254 |
|
121 254 |
|
1 1 8 3 |
Removal expenses |
|
107 100 |
|
107 100 |
|
1 1 8 4 |
Temporary daily subsistence allowances |
|
87 380 |
|
87 380 |
|
|
Article 1 1 8 — Subtotal |
|
400 334 |
|
400 334 |
|
1 1 9 |
Salary weightings — Adjustments to remuneration |
||||
|
1 1 9 0 |
Salary weightings |
|
66 839 |
|
66 839 |
|
1 1 9 1 |
Adjustments to remuneration |
|
p.m. |
|
p.m. |
|
|
Article 1 1 9 — Subtotal |
|
66 839 |
|
66 839 |
|
|
Chapter 1 1 — Total |
|
4 770 945 |
–27 500 |
4 743 445 |
1 1 0
Staff holding a post provided for in the establishment plan
1 1 0 0
Basic salaries
|
Appropriations 2007 |
Amending budget No 2 |
New amount |
|
2 410 503 |
– 167 500 |
2 243 003 |
Remarks
Staff Regulations applicable to officials of the European Communities, and in particular Articles 62 and 66 thereof and Article 2 of the Conditions of employment of other servants.
This appropriation is intended to cover basic salaries of permanent officials and temporary staff.
1 1 1
Other staff
1 1 1 0
Auxiliary staff
|
Appropriations 2007 |
Amending budget No 2 |
New amount |
|
207 600 |
15 000 |
222 600 |
Remarks
Conditions of employment of other servants of the European Communities, and in particular Article 3 and Title III thereof.
1 1 5
Overtime
|
Appropriations 2007 |
Amending budget No 2 |
New amount |
|
p.m. |
|
p.m. |
Remarks
Staff Regulations applicable to officials of the European Communities, in particular Article 56 thereof and Annex VI thereto.
This article is intended to cover flat-rate payments or hourly-rate payments for overtime worked by relevant staff, local staff and other servants whom it has not been possible to compensate by free time under the normal arrangements.
1 1 7
Supplementary services
1 1 7 5
Interim services
|
Appropriations 2007 |
Amending budget No 2 |
New amount |
|
100 000 |
125 000 |
225 000 |
Remarks
This appropriation is intended to cover use of interim services, mainly typists. Recourse to interim services is required to adapt flexibly to ad hoc needs.
CHAPTER 1 4 —
SOCIOMEDICAL INFRASTRUCTURE
|
Title Chapter Article Item |
Heading |
FF |
Appropriations 2007 |
Amending budget No 2 |
New amount |
|
1 4 |
SOCIOMEDICAL INFRASTRUCTURE |
||||
|
1 4 1 |
Medical service |
|
19 850 |
|
19 850 |
|
|
Article 1 4 1 — Subtotal |
|
19 850 |
|
19 850 |
|
1 4 2 |
Other welfare expenditure |
|
6 500 |
6 500 |
13 000 |
|
|
Article 1 4 2 — Subtotal |
|
6 500 |
6 500 |
13 000 |
|
|
Chapter 1 4 — Total |
|
26 350 |
6 500 |
32 850 |
1 4 2
Other welfare expenditure
|
Appropriations 2007 |
Amending budget No 2 |
New amount |
|
6 500 |
6 500 |
13 000 |
Remarks
This appropriation is intended to cover expenditure by the Agency on the social welfare activities of its staff.
CHAPTER 1 5 —
MOBILITY
|
Title Chapter Article Item |
Heading |
FF |
Appropriations 2007 |
Amending budget No 2 |
New amount |
|
1 5 |
MOBILITY |
||||
|
1 5 2 |
Mobility |
||||
|
1 5 2 0 |
Staff exchanges |
|
p.m. |
|
p.m. |
|
1 5 2 1 |
Agency officials seconded to national administrations, international organisations or public sector institutions or undertakings |
|
p.m. |
|
p.m. |
|
1 5 2 2 |
Trainees |
|
p.m. |
2 500 |
2 500 |
|
|
Article 1 5 2 — Subtotal |
|
p.m. |
2 500 |
2 500 |
|
|
Chapter 1 5 — Total |
|
p.m. |
2 500 |
2 500 |
1 5 2
Mobility
1 5 2 2
Trainees
|
Appropriations 2007 |
Amending budget No 2 |
New amount |
|
p.m. |
2 500 |
2 500 |
Remarks
This appropriation is intended to cover expenditure relating to trainees.
TITLE 2
BUILDINGS, EQUIPMENT AND MISCELLANEOUS OPERATING EXPENDITURE
|
Title Chapter |
Heading |
Appropriations 2007 |
Amending budget No 2 |
New amount |
|
2 0 |
RENTAL OF BUILDINGS AND ASSOCIATED COSTS |
940 723 |
1 000 |
941 723 |
|
2 1 |
INFORMATION TECHNOLOGIES |
390 435 |
–25 401 |
365 034 |
|
2 2 |
MOVABLE PROPERTY ASSOCIATED COSTS |
47 388 |
|
47 388 |
|
2 3 |
CURRENT ADMINISTRATIVE EXPENDITURE |
107 541 |
–35 700 |
71 841 |
|
2 4 |
POSTAGE AND TELECOMMUNICATIONS |
196 921 |
|
196 921 |
|
|
Title 2 — Total |
1 683 008 |
–60 101 |
1 622 907 |
CHAPTER 2 0 —
RENTAL OF BUILDINGS AND ASSOCIATED COSTS
|
Title Chapter Article Item |
Heading |
FF |
Appropriations 2007 |
Amending budget No 2 |
New amount |
|
2 0 |
RENTAL OF BUILDINGS AND ASSOCIATED COSTS |
||||
|
2 0 0 |
Rent |
||||
|
2 0 0 0 |
Rent |
|
664 488 |
|
664 488 |
|
|
Article 2 0 0 — Subtotal |
|
664 488 |
|
664 488 |
|
2 0 1 |
Insurance |
||||
|
2 0 1 0 |
Insurance |
|
11 485 |
|
11 485 |
|
|
Article 2 0 1 — Subtotal |
|
11 485 |
|
11 485 |
|
2 0 2 |
Water, gas, electricity and heating |
||||
|
2 0 2 0 |
Water, gas, electricity and heating |
|
82 380 |
1 000 |
83 380 |
|
|
Article 2 0 2 — Subtotal |
|
82 380 |
1 000 |
83 380 |
|
2 0 3 |
Cleaning and maintenance |
||||
|
2 0 3 0 |
Cleaning and maintenance |
|
56 370 |
|
56 370 |
|
|
Article 2 0 3 — Subtotal |
|
56 370 |
|
56 370 |
|
2 0 4 |
Fitting-out of premises |
||||
|
2 0 4 0 |
Fitting-out of premises |
|
56 000 |
|
56 000 |
|
|
Article 2 0 4 — Subtotal |
|
56 000 |
|
56 000 |
|
2 0 5 |
Security and surveillance of buildings |
||||
|
2 0 5 0 |
Security and surveillance of buildings |
|
65 000 |
|
65 000 |
|
|
Article 2 0 5 — Subtotal |
|
65 000 |
|
65 000 |
|
2 0 9 |
Administrative expenditure, taxes |
||||
|
2 0 9 0 |
Administrative expenditure, taxes |
|
5 000 |
|
5 000 |
|
|
Article 2 0 9 — Subtotal |
|
5 000 |
|
5 000 |
|
|
Chapter 2 0 — Total |
|
940 723 |
1 000 |
941 723 |
2 0 2
Water, gas, electricity and heating
2 0 2 0
Water, gas, electricity and heating
|
Appropriations 2007 |
Amending budget No 2 |
New amount |
|
82 380 |
1 000 |
83 380 |
Remarks
This appropriation is intended to cover current expenditure.
CHAPTER 2 1 —
INFORMATION TECHNOLOGIES
|
Title Chapter Article Item |
Heading |
FF |
Appropriations 2007 |
Amending budget No 2 |
New amount |
|
2 1 |
INFORMATION TECHNOLOGIES |
||||
|
2 1 0 |
IT operating expenditure |
||||
|
2 1 0 0 |
IT operating expenditure |
|
191 138 |
–25 401 |
165 737 |
|
|
Article 2 1 0 — Subtotal |
|
191 138 |
–25 401 |
165 737 |
|
2 1 2 |
Services provided by IT staff |
||||
|
2 1 2 0 |
Services provided by IT staff |
|
106 629 |
|
106 629 |
|
|
Article 2 1 2 — Subtotal |
|
106 629 |
|
106 629 |
|
2 1 3 |
Technical installations and electronic office equipment |
||||
|
2 1 3 0 |
New and replacement purchases |
|
73 114 |
|
73 114 |
|
2 1 3 2 |
Hire |
|
6 294 |
|
6 294 |
|
2 1 3 3 |
Maintenance, use and repair |
|
12 240 |
|
12 240 |
|
2 1 3 4 |
Electronic office equipment |
|
1 020 |
|
1 020 |
|
|
Article 2 1 3 — Subtotal |
|
92 668 |
|
92 668 |
|
|
Chapter 2 1 — Total |
|
390 435 |
–25 401 |
365 034 |
2 1 0
IT operating expenditure
2 1 0 0
IT operating expenditure
|
Appropriations 2007 |
Amending budget No 2 |
New amount |
|
191 138 |
–25 401 |
165 737 |
Remarks
This appropriation is intended to cover expenditure on software licences, installation, development and maintenance of information systems and data-processing consumables.
CHAPTER 2 3 —
CURRENT ADMINISTRATIVE EXPENDITURE
|
Title Chapter Article Item |
Heading |
FF |
Appropriations 2007 |
Amending budget No 2 |
New amount |
|
2 3 |
CURRENT ADMINISTRATIVE EXPENDITURE |
||||
|
2 3 0 |
Stationery and office supplies |
||||
|
2 3 0 0 |
Stationery and office supplies |
|
20 400 |
|
20 400 |
|
|
Article 2 3 0 — Subtotal |
|
20 400 |
|
20 400 |
|
2 3 2 |
Financial charges |
||||
|
2 3 2 0 |
Bank charges |
|
11 131 |
|
11 131 |
|
2 3 2 1 |
Exchange-rate losses |
|
3 000 |
|
3 000 |
|
2 3 2 9 |
Other financial charges |
|
1 000 |
|
1 000 |
|
|
Article 2 3 2 — Subtotal |
|
15 131 |
|
15 131 |
|
2 3 3 |
Outsourced services |
||||
|
2 3 3 0 |
Legal expenses |
|
20 798 |
|
20 798 |
|
2 3 3 1 |
Internal audit services |
|
35 700 |
–35 700 |
— |
|
|
Article 2 3 3 — Subtotal |
|
56 498 |
–35 700 |
20 798 |
|
2 3 4 |
Damages |
||||
|
2 3 4 0 |
Damages |
|
p.m. |
|
p.m. |
|
|
Article 2 3 4 — Subtotal |
|
p.m. |
|
p.m. |
|
2 3 5 |
Other operating expenditure |
||||
|
2 3 5 0 |
Miscellaneous insurance |
|
p.m. |
|
p.m. |
|
2 3 5 2 |
Internal catering expenses |
|
9 366 |
|
9 366 |
|
2 3 5 3 |
Departmental removals |
|
5 623 |
|
5 623 |
|
2 3 5 9 |
Other expenditure |
|
523 |
|
523 |
|
|
Article 2 3 5 — Subtotal |
|
15 512 |
|
15 512 |
|
|
Chapter 2 3 — Total |
|
107 541 |
–35 700 |
71 841 |
2 3 3
Outsourced services
2 3 3 1
Internal audit services
|
Appropriations 2007 |
Amending budget No 2 |
New amount |
|
35 700 |
–35 700 |
— |
Remarks
This appropriation is intended to cover the Agency's expenses on internal audit services.
TITLE 3
OPERATING EXPENDITURE
|
Title Chapter |
Heading |
Appropriations 2007 |
Amending budget No 2 |
New amount |
|
3 0 |
GENERAL OPERATING EXPENDITURE |
6 150 000 |
339 941 |
6 489 941 |
|
3 1 |
SMALL AND MEDIUM-SIZED ENTERPRISES (SME) |
|
|
|
|
3 2 |
PHARE PROGRAMME |
|
|
|
|
3 3 |
HEALTHY WORKPLACE INITIATIVE |
1 550 000 |
|
1 550 000 |
|
3 4 |
PHARE PROGRAMME IV (EARMARKED) |
148 080 |
65 380 |
213 460 |
|
3 5 |
NEW OSH ERA |
57 000 |
0 |
57 000 |
|
3 6 |
CARDS 2005 REGIONAL PROGRAMME |
325 100 |
–56 000 |
269 100 |
|
|
Title 3 — Total |
8 230 180 |
349 321 |
8 579 501 |
CHAPTER 3 0 —
GENERAL OPERATING EXPENDITURE
|
Title Chapter Article Item |
Heading |
FF |
Appropriations 2007 |
Amending budget No 2 |
New amount |
|
3 0 |
GENERAL OPERATING EXPENDITURE |
||||
|
3 0 0 |
Focal Points activities including expert group activities, meetings and interpretation costs |
||||
|
3 0 0 0 |
Information request and other costs |
|
p.m. |
|
p.m. |
|
3 0 0 1 |
Focal Point subsidy |
|
1 030 000 |
|
1 030 000 |
|
3 0 0 2 |
Meetings of Focal Points |
|
88 500 |
|
88 500 |
|
3 0 0 3 |
External evaluation of the Agency and Focal Point Network |
|
|
|
|
|
|
Article 3 0 0 — Subtotal |
|
1 118 500 |
|
1 118 500 |
|
3 0 1 |
Establishment and management of the information network on Internet |
||||
|
3 0 1 0 |
Establishment and management of the information network on Internet |
|
200 000 |
|
200 000 |
|
|
Article 3 0 1 — Subtotal |
|
200 000 |
|
200 000 |
|
3 0 2 |
Information projects and schemes/Topic Centres (TC) and external contractors |
||||
|
3 0 2 0 |
Risk observatory |
|
1 028 500 |
|
1 028 500 |
|
3 0 2 4 |
Work environment |
|
1 140 000 |
|
1 140 000 |
|
|
Article 3 0 2 — Subtotal |
|
2 168 500 |
|
2 168 500 |
|
3 0 3 |
Conferences, seminars, workshops and public events, promotional activities, ad hoc meetings, etc. |
||||
|
3 0 3 0 |
Conferences, seminars, workshops, public events, promotional activities, etc. |
|
480 000 |
|
480 000 |
|
3 0 3 2 |
Other meetings |
|
66 690 |
|
66 690 |
|
|
Article 3 0 3 — Subtotal |
|
546 690 |
|
546 690 |
|
3 0 4 |
Editing, publication and distribution of information, and other activities |
||||
|
3 0 4 0 |
Publication and distribution of results of studies and of other information activities and corporate products |
|
380 000 |
|
380 000 |
|
3 0 4 4 |
Editing |
|
51 250 |
30 000 |
81 250 |
|
|
Article 3 0 4 — Subtotal |
|
431 250 |
30 000 |
461 250 |
|
3 0 6 |
Translation and interpretation |
||||
|
3 0 6 0 |
Translation of studies, reports and working documents |
|
705 811 |
279 941 |
985 752 |
|
3 0 6 1 |
Interpretation |
|
p.m. |
|
p.m. |
|
|
Article 3 0 6 — Subtotal |
|
705 811 |
279 941 |
985 752 |
|
3 0 7 |
Preparation, organisation and management of a European Week for Safety and Health at Work |
||||
|
3 0 7 2 |
Preparation, organisation and management of a European Week for Safety and Health at Work |
|
480 000 |
30 000 |
510 000 |
|
|
Article 3 0 7 — Subtotal |
|
480 000 |
30 000 |
510 000 |
|
3 0 8 |
Meetings of the Administrative Board and its Bureau |
||||
|
3 0 8 0 |
Meetings of the Administrative Board and its Bureau |
|
271 202 |
|
271 202 |
|
|
Article 3 0 8 — Subtotal |
|
271 202 |
|
271 202 |
|
3 0 9 |
Mission, entertainment and representation expenses |
||||
|
3 0 9 1 |
Mission expenses, duty travel expenses and other ancillary expenditure |
|
219 351 |
|
219 351 |
|
3 0 9 2 |
Entertainment and representation expenses |
|
8 696 |
|
8 696 |
|
|
Article 3 0 9 — Subtotal |
|
228 047 |
|
228 047 |
|
|
Chapter 3 0 — Total |
|
6 150 000 |
339 941 |
6 489 941 |
3 0 0
Focal Points activities including expert group activities, meetings and interpretation costs
3 0 0 1
Focal Point subsidy
|
Appropriations 2007 |
Amending budget No 2 |
New amount |
|
1 030 000 |
|
1 030 000 |
Remarks
This appropriation is intended to support the activities of the Agency's network of Focal Points to ensure the effective dissemination of Agency information and campaign messages at Member State level.
3 0 4
Editing, publication and distribution of information, and other activities
3 0 4 4
Editing
|
Appropriations 2007 |
Amending budget No 2 |
New amount |
|
51 250 |
30 000 |
81 250 |
Remarks
This appropriation is intended to cover the costs of editing.
3 0 6
Translation and interpretation
3 0 6 0
Translation of studies, reports and working documents
|
Appropriations 2007 |
Amending budget No 2 |
New amount |
|
705 811 |
279 941 |
985 752 |
Remarks
This appropriation is intended to cover the translation of studies, reports, as well as working documents for the Administrative Board and Bureau and for congresses, seminars, etc. into the different Community languages. The translation work will be carried out by the Translation Centre for the Bodies of the European Union in Luxembourg.
3 0 7
Preparation, organisation and management of a European Week for Safety and Health at Work
3 0 7 2
Preparation, organisation and management of a European Week for Safety and Health at Work
|
Appropriations 2007 |
Amending budget No 2 |
New amount |
|
480 000 |
30 000 |
510 000 |
Remarks
This appropriation is intended to cover the costs of the production and distribution of campaign material, organisation and management of conferences (closing event and good practice award scheme), seminars, exhibitions, public events, promotional activities and evaluations within the framework of a European Week for Safety and Health at Work.
CHAPTER 3 4 —
PHARE PROGRAMME IV (EARMARKED)
|
Title Chapter Article Item |
Heading |
FF |
Appropriations 2007 |
Amending budget No 2 |
New amount |
|
3 4 |
PHARE PROGRAMME IV (EARMARKED) |
||||
|
3 4 0 |
Phare programme IV (earmarked) |
||||
|
3 4 0 0 |
Salaries expat/international staff |
|
81 000 |
|
81 000 |
|
3 4 1 0 |
Travel costs (international) |
|
58 680 |
–46 080 |
12 600 |
|
3 4 1 1 |
Mission expenses of project staff abroad |
|
3 400 |
|
3 400 |
|
3 4 1 2 |
Mission expenses seminar/conference participants |
|
5 000 |
–4 000 |
1 000 |
|
3 4 2 0 |
Translation/Interpreters |
|
|
— |
— |
|
3 4 3 0 |
European Week workshop |
|
|
— |
— |
|
3 4 4 0 |
Webmasters/assistant Focal Points |
|
|
29 700 |
29 700 |
|
3 4 4 1 |
Computer equipment |
|
|
4 800 |
4 800 |
|
3 4 5 0 |
Furniture |
|
|
4 000 |
4 000 |
|
3 4 6 0 |
Printing of information material |
|
|
1 410 |
1 410 |
|
3 4 7 0 |
Healthy Workplace Initiative (HWI) campaign activities |
|
|
75 550 |
75 550 |
|
|
Article 3 4 0 — Subtotal |
|
148 080 |
65 380 |
213 460 |
|
|
Chapter 3 4 — Total |
|
148 080 |
65 380 |
213 460 |
3 4 0
Phare programme IV (earmarked)
Remarks
This chapter includes preparatory measures for the future participation in the Agency of the countries of the Western Balkan eligible under the Phare Programme. A Phare IV Programme for a total amount of EUR 450 000 has been agreed by the EC, which will run within the period 2006-2007. Activities under Phare IV are linked to the approved program of work with earmarked revenue and expenditures. Figures are indicative of activity levels in 2006 and 2007. Uncommitted balances in 2006 will be carried over to 2007 and take into account the income cashed in 2006.
3 4 1 0
Travel costs (international)
|
Appropriations 2007 |
Amending budget No 2 |
New amount |
|
58 680 |
–46 080 |
12 600 |
3 4 1 2
Mission expenses seminar/conference participants
|
Appropriations 2007 |
Amending budget No 2 |
New amount |
|
5 000 |
–4 000 |
1 000 |
3 4 2 0
Translation/Interpreters
|
Appropriations 2007 |
Amending budget No 2 |
New amount |
|
|
— |
— |
3 4 3 0
European Week workshop
|
Appropriations 2007 |
Amending budget No 2 |
New amount |
|
|
— |
— |
3 4 4 0
Webmasters/assistant Focal Points
|
Appropriations 2007 |
Amending budget No 2 |
New amount |
|
|
29 700 |
29 700 |
3 4 4 1
Computer equipment
|
Appropriations 2007 |
Amending budget No 2 |
New amount |
|
|
4 800 |
4 800 |
3 4 5 0
Furniture
|
Appropriations 2007 |
Amending budget No 2 |
New amount |
|
|
4 000 |
4 000 |
3 4 6 0
Printing of information material
|
Appropriations 2007 |
Amending budget No 2 |
New amount |
|
|
1 410 |
1 410 |
3 4 7 0
Healthy Workplace Initiative (HWI) campaign activities
|
Appropriations 2007 |
Amending budget No 2 |
New amount |
|
|
75 550 |
75 550 |
CHAPTER 3 5 —
NEW OSH ERA
|
Title Chapter Article Item |
Heading |
FF |
Appropriations 2007 |
Amending budget No 2 |
New amount |
|
3 5 |
NEW OSH ERA |
||||
|
3 5 0 |
New OSH ERA project (earmarked) |
||||
|
3 5 0 0 |
Allowances and other expenses |
|
55 000 |
–6 000 |
49 000 |
|
3 5 1 0 |
Allowances and other expenses |
|
p.m. |
|
p.m. |
|
3 5 1 1 |
Mission expenses of project |
|
2 000 |
6 000 |
8 000 |
|
3 5 1 2 |
Meetings |
|
p.m. |
|
p.m. |
|
|
Article 3 5 0 — Subtotal |
|
57 000 |
0 |
57 000 |
|
|
Chapter 3 5 — Total |
|
57 000 |
0 |
57 000 |
3 5 0
New OSH ERA project (earmarked)
Remarks
This appropriation is intended to develop and reinforce activities related to the new OSH ERA projects running for a 24 months-period up to 2008. A total amount of EUR 120 000 is expected for this period. Activities under new OSH ERA project are linked to the Risk Observatory work programme with earmarked expenditures and revenues.
3 5 0 0
Allowances and other expenses
|
Appropriations 2007 |
Amending budget No 2 |
New amount |
|
55 000 |
–6 000 |
49 000 |
3 5 1 1
Mission expenses of project
|
Appropriations 2007 |
Amending budget No 2 |
New amount |
|
2 000 |
6 000 |
8 000 |
CHAPTER 3 6 —
CARDS 2005 REGIONAL PROGRAMME
|
Title Chapter Article Item |
Heading |
FF |
Appropriations 2007 |
Amending budget No 2 |
New amount |
|
3 6 |
CARDS 2005 REGIONAL PROGRAMME |
||||
|
3 6 0 |
CARDS 2005 Regional Programme (earmarked) |
||||
|
3 6 0 0 |
Salaries expat/international staff |
|
40 800 |
1 800 |
42 600 |
|
3 6 1 0 |
Travel costs (international) |
|
48 000 |
|
48 000 |
|
3 6 1 1 |
Mission expenses of project staff abroad |
|
3 300 |
|
3 300 |
|
3 6 1 2 |
Mission expenses seminar/conference participants |
|
8 000 |
|
8 000 |
|
3 6 2 0 |
Translation/Interpreters |
|
48 000 |
–24 000 |
24 000 |
|
3 6 3 0 |
Workshops/Conferences |
|
25 200 |
–9 200 |
16 000 |
|
3 6 4 0 |
Webmasters |
|
90 000 |
–1 800 |
88 200 |
|
3 6 4 1 |
Furniture, Office Equipment |
|
6 000 |
|
6 000 |
|
3 6 4 2 |
Equipment (computers, printers, etc.) |
|
21 000 |
|
21 000 |
|
3 6 6 0 |
Administrative costs |
|
p.m. |
|
p.m. |
|
3 6 7 0 |
Printing of information material |
|
34 800 |
–22 800 |
12 000 |
|
|
Article 3 6 0 — Subtotal |
|
325 100 |
–56 000 |
269 100 |
|
|
Chapter 3 6 — Total |
|
325 100 |
–56 000 |
269 100 |
3 6 0
CARDS 2005 Regional Programme (earmarked)
Remarks
This chapter includes preparatory measures related to support the raising of awareness on Occupational Safety and Health issues and to establish a partnership between the countries of the Western Balkan eligible under the CARDS programme. The expenses related to the financing for CARDS 2005 Regional Programme, which runs until 2008, will amount to an estimated total of EUR 410 000.
3 6 0 0
Salaries expat/international staff
|
Appropriations 2007 |
Amending budget No 2 |
New amount |
|
40 800 |
1 800 |
42 600 |
3 6 2 0
Translation/Interpreters
|
Appropriations 2007 |
Amending budget No 2 |
New amount |
|
48 000 |
–24 000 |
24 000 |
3 6 3 0
Workshops/Conferences
|
Appropriations 2007 |
Amending budget No 2 |
New amount |
|
25 200 |
–9 200 |
16 000 |
3 6 4 0
Webmasters
|
Appropriations 2007 |
Amending budget No 2 |
New amount |
|
90 000 |
–1 800 |
88 200 |
3 6 7 0
Printing of information material
|
Appropriations 2007 |
Amending budget No 2 |
New amount |
|
34 800 |
–22 800 |
12 000 |