Commission Regulation (EU) No 1303/2014 of 18 November 2014 concerning the technical specification for interoperability relating to ‘safety in railway tunnels’ of the rail system of the European Union Text with EEA relevance
Commission Regulation (EU) No 1303/2014 of 18 November 2014 concerning the technical specification for interoperability relating to ‘safety in railway tunnels’ of the rail system of the European Union Text with EEA relevance
Commission Regulation (EU) No 1303/2014 of 18 November 2014 concerning the technical specification for interoperability relating to ‘safety in railway tunnels’ of the rail system of the European Union Text with EEA relevance
OJ L 356, 12.12.2014, p. 394–420
(BG, ES, CS, DA, DE, ET, EL, EN, FR, HR, IT, LV, LT, HU, MT, NL, PL, PT, RO, SK, SL, FI, SV)
In force: This act has been changed. Current consolidated version: 29/01/2024
12.12.2014 |
EN |
Official Journal of the European Union |
L 356/394 |
COMMISSION REGULATION (EU) No 1303/2014
of 18 November 2014
concerning the technical specification for interoperability relating to ‘safety in railway tunnels’ of the rail system of the European Union
(Text with EEA relevance)
THE EUROPEAN COMMISSION,
Having regard to the Treaty on the Functioning of the European Union,
Having regard to Directive 2008/57/EC of the European Parliament and of the Council of 17 June 2008 on the interoperability of the rail system within the Community (1), and in particular Article 6(1), second subparagraph, thereof,
Whereas:
(1) |
Article 12 of Regulation (EC) No 881/2004 of the European Parliament and of the Council (2) requires the European Railway Agency (‘the Agency’) to ensure that the technical specifications for interoperability (the ‘TSIs’) are adapted to technical progress, market trends and social requirements and to propose to the Commission any amendments to the TSIs which it considers necessary. |
(2) |
By Decision C(2010)2576 of 29 April 2010, the Commission gave the Agency a mandate to develop and review the TSI's with a view to extending their scope to the whole rail system in the Union. Under the terms of that mandate, the Agency was requested to extend accordingly the scope of the TSI relating to ‘safety in railway tunnels’. |
(3) |
On 21 December 2012, the Agency issued a recommendation on the revised TSI relating to ‘safety in railway tunnels’. |
(4) |
In order to follow technological evolution and encourage modernisation, innovative solutions should be promoted and their implementation should, under certain conditions, be allowed. Where an innovative solution is proposed, the manufacturer or his authorised representative should state how they deviate from or how they complement to the relevant section of the TSI, and the innovative solution should be assessed by the Commission. If this assessment is positive, the Agency should define the appropriate functional and interface specifications of the innovative solution and develop the relevant assessment methods. |
(5) |
In accordance with Article 17(3) of Directive 2008/57/EC, Member States are to notify to the Commission and other Member States the technical rules, the conformity assessment and verification procedures to be used for specific cases, and the bodies responsible for carrying out these procedures. |
(6) |
Rolling stock currently operates under existing national, bilateral, multinational or international agreements. These agreements should not hinder current and future progress towards interoperability. The Member States should therefore notify such agreements to the Commission. |
(7) |
This Regulation should apply to tunnels irrespective of their traffic volume. |
(8) |
Some Member States already have safety rules in place which require a higher level of safety than that mandated in this TSI. This Regulation should allow Member States keeping such rules only concerning the infrastructure, energy and operation subsystems. Such existing rules are to be considered as national safety rules within the meaning of Article 8 of Directive 2004/49/EC of the European Parliament and of the Council (3). In addition, in accordance with Article 4 of this Directive, Member States shall ensure that railway safety is generally maintained and, where reasonably practicable, continuously improved, taking into consideration the development of Union legislation and technical and scientific progress and giving priority to the prevention of serious accidents. However, no additional measures should be prescribed for rolling stock. |
(9) |
Member States are competent to define the role and responsibility of the rescue services. For tunnels falling within the scope of application of this Regulation, Member States should arrange rescue access in coordination with the rescue services. It is important to specify measures in the field of rescue which are based on the assumption that rescue services intervening in a tunnel accident shall protect lives, not material values such as vehicles or structures. |
(10) |
Commission Decision 2008/163/EC (4) concerning a TSI relating to ‘safety in railway tunnels’ should hereby be repealed. |
(11) |
In order to prevent unnecessary additional costs and administrative burden, Decision 2008/163/EC should continue to apply after its repeal to the subsystems and projects referred to in Article 9(1)(a) of Directive 2008/57/EC. |
(12) |
The measures provided for in this Regulation are consistent with the opinion of the Committee established in accordance with Article 29(1) of Directive 2008/57/EC, |
HAS ADOPTED THIS REGULATION:
Article 1
The technical specification for interoperability (TSI) relating to the ‘safety in railway tunnels’ of the rail system of the entire European Union, as set out in the Annex, is hereby adopted.
Article 2
The TSI shall apply to the control-command and signalling, infrastructure, energy, operation, as well as rolling stock subsystems as described in Annex II to Directive 2008/57/EC.
The TSI shall apply to these subsystems in accordance with Section 7 of the Annex.
Article 3
The technical and geographical scope of this Regulation is set out in Sections 1.1 and 1.2 of the Annex.
Article 4
1. With regard to specific cases listed in Section 7.3 of the Annex to this Regulation, the conditions to be met for the verification of the interoperability pursuant to Article 17(2) of Directive 2008/57/EC shall be those laid down by national rules in force in the Member State which authorise the placing in service of the subsystems covered by this Regulation.
2. Within six months of the entry into force of this Regulation, each Member State shall notify the other Member States and the Commission of:
(a) |
the national rules referred to in paragraph 1; |
(b) |
the conformity assessment and verification procedures to be carried out to apply the national rules referred to in paragraph 1; |
(c) |
the bodies designated in accordance with Article 17(3) of Directive 2008/57/EC to carry out the conformity assessment and verification procedures with respect to the specific cases set out in Section 7.3 of the Annex. |
Article 5
1. Member States shall notify to the Commission the following types of agreement within six months of the entry into force of this Regulation:
(a) |
national agreements between the Member States and railway undertakings or infrastructure managers, agreed on either a permanent or a temporary basis and required by the very specific or local nature of the intended transport service; |
(b) |
bilateral or multilateral agreements between railway undertakings, infrastructure managers or safety authorities which deliver significant levels of local or regional interoperability; |
(c) |
international agreements between one or more Member States and at least one third country, or between railway undertakings or infrastructure managers of Member States and at least one railway undertaking or infrastructure manager of a third country, which deliver significant levels of local or regional interoperability. |
2. The agreements which have already been notified under Commission Decision 2006/920/EC (5), 2008/231/EC (6), 2011/314/EU (7) or 2012/757/EU (8) shall not be notified again.
3. Member States shall forthwith notify to the Commission any future agreements or modifications of the existing and already notified agreements.
Article 6
In accordance with Article 9(3) of Directive 2008/57/EC, each Member State shall communicate to the Commission within one year of the entry into force of this Regulation the list of projects being implemented within its territory and that are at an advanced stage of development.
Article 7
Each Member State, acting in accordance with Chapter 7 of the Annex to this Regulation, shall update the national implementation plans for the TSI, established in accordance with Article 4 of Decision 2006/920/EC, Article 4 of Decision 2008/231/EC and Article 5 of Decision 2011/314/EU.
Each Member State shall forward its updated implementation plan to the other Member States and the Commission by 1 July 2015 at the latest.
Article 8
1. In order to keep pace with technological progress, innovative solutions may be required which do not comply with the specifications set out in the Annex and/or for which the assessment methods set out in the Annex cannot be applied. In that case, new specifications and/or new assessment methods associated with those innovative solutions may be developed according to the provisions of paragraphs 2 to 5.
2. Innovative solutions may be related to the subsystems referred to in Article 2, their parts and their interoperability constituents.
3. If an innovative solution is proposed, the manufacturer or his authorised representative established within the Union shall declare how it deviates from or complements to the provisions of the relevant TSIs and shall submit the deviations to the Commission for analysis. The Commission may request the opinion of the Agency on the proposed innovative solution.
4. The Commission shall deliver an opinion on the innovative solution proposed. If this opinion is positive, the appropriate functional and interface specifications and the assessment method, which need to be included in the relevant TSIs in order to allow the use of this innovative solution, shall be developed and subsequently integrated into the relevant TSIs during the revision process pursuant to Article 6 of Directive 2008/57/EC. If the opinion is negative, the innovative solution proposed cannot be applied.
5. Pending the review of the relevant TSIs, a positive opinion delivered by the Commission shall be considered as an acceptable means of compliance with the essential requirements of Directive 2008/57/EC and may be used for the assessment of the subsystem.
Article 9
Decision 2008/163/EC is repealed with effect from 1 January 2015.
It shall however continue to apply to:
(a) |
subsystems authorised in accordance with that Decision; |
(b) |
projects for new, renewed or upgraded subsystems which, at the time of publication of this Regulation, are at an advanced stage of development or are the subject of a contract which is being carried out. |
Article 10
This Regulation shall enter into force on the twentieth day following that of its publication in the Official Journal of the European Union.
It shall apply from 1 January 2015.
This Regulation shall be binding in its entirety and directly applicable in all Member States.
Done at Brussels, 18 November 2014.
For the Commission
The President
Jean-Claude JUNCKER
(1) OJ L 191, 18.7.2008, p. 1.
(2) Regulation (EC) No 881/2004 of the European Parliament and of the Council of 29 April 2004 establishing a European Railway Agency (Agency Regulation) (OJ L 164, 30.4.2004, p. 1).
(3) Directive 2004/49/EC of the European Parliament and of the Council of 29 April 2004 on safety on the Community's railways and amending Council Directive 95/18/EC on the licensing of railway undertakings and Directive 2001/14/EC on the allocation of railway infrastructure capacity and the levying of charges for the use of railway infrastructure and safety certification (OJ L 164, 30.4.2004, p. 44).
(4) Commission Decision 2008/163/EC of 20 December 2007 concerning the technical specification of interoperability relating to ‘safety in railway tunnels’ in the trans-European conventional and high-speed rail system (OJ L 64, 7.3.2008, p. 1).
(5) Commission Decision 2006/920/EC of 11 August 2006 concerning the technical specification of interoperability relating to the subsystem Traffic Operation and Management of the trans-European conventional rail system (OJ L 359, 18.12.2006, p. 1).
(6) Commission Decision 2008/231/EC of 1 February 2008 concerning the technical specification of interoperability relating to the operation subsystem of the trans-European high-speed rail system adopted referred to in Article 6(1) of Council Directive 96/48/EC and repealing Commission Decision 2002/734/EC of 30 May 2002 (OJ L 84, 26.3.2008, p. 1).
(7) Commission Decision 2011/314/EU of 12 May 2011 concerning the technical specification for interoperability relating to the operation and traffic management subsystem of the trans-European conventional rail system (OJ L 144, 31.5.2011, p. 1).
(8) Commission Decision 2012/757/EU of 14 November 2012 concerning the technical specification for interoperability relating to the operation and traffic management subsystem of the rail system in the European Union and amending Decision 2007/756/EC (OJ L 345, 15.12.2012, p. 1).
ANNEX
1. |
Introduction | 400 |
1.1. |
Technical scope | 400 |
1.1.1. |
Scope related to tunnels | 400 |
1.1.2. |
Scope related to rolling stock | 400 |
1.1.3. |
Scope related to operational aspects | 400 |
1.1.4. |
Risk scope, risks that are not covered by this TSI | 400 |
1.2. |
Geographical scope | 401 |
2. |
Definition of aspect/scope | 401 |
2.1. |
General | 401 |
2.2. |
The risk scenarios | 402 |
2.2.1. |
‘Hot’ incidents: Fire, explosion followed by fire, emission of toxic smoke or gases. | 402 |
2.2.2. |
‘Cold’ incidents: collision, derailment | 403 |
2.2.3. |
Prolonged stop | 403 |
2.2.4. |
Exclusions | 403 |
2.3. |
The role of emergency response services | 403 |
2.4. |
Definitions | 403 |
3. |
Essential requirements | 404 |
4. |
Characterisation of the subsystem | 405 |
4.1. |
Introduction | 405 |
4.2. |
Functional and technical specifications of the subsystems | 405 |
4.2.1. |
Subsystem Infrastructure | 405 |
4.2.2. |
Subsystem Energy | 409 |
4.2.3. |
Subsystem rolling stock | 410 |
4.3. |
Functional and technical specifications of the interfaces | 411 |
4.3.1. |
Interfaces with the Control-Command-Signalling subsystem | 411 |
4.3.2. |
Interfaces with the Traffic Management and Operation subsystem | 412 |
4.4. |
Operating rules | 412 |
4.4.1. |
Emergency rule | 412 |
4.4.2. |
Tunnel emergency plan | 412 |
4.4.3. |
Exercises | 413 |
4.4.4. |
Isolation and Earthing procedures | 413 |
4.4.5. |
Provision of on-train safety and emergency information to passengers | 413 |
4.4.6. |
Operational rules related to trains running in tunnels | 413 |
4.5. |
Maintenance rules | 414 |
4.5.1. |
Infrastructure | 414 |
4.5.2. |
Maintenance of rolling stock | 414 |
4.6. |
Professional qualifications | 414 |
4.6.1. |
Tunnel specific competence of the train crew and other staff | 414 |
4.7. |
Health and safety conditions | 414 |
4.7.1. |
Self-rescue device | 414 |
4.8. |
Infrastructure and Rolling stock registers | 414 |
4.8.1. |
Register of infrastructure | 414 |
4.8.2. |
Rolling Stock Register | 415 |
5. |
Interoperability constituents | 415 |
6. |
Assessment of conformity and/or suitability for use of the constituents and verification of the subsystem | 415 |
6.1. |
Interoperability constituents | 415 |
6.2. |
Subsystems | 415 |
6.2.1. |
EC verification (general) | 415 |
6.2.2. |
Procedures for EC verification of a subsystem (modules) | 415 |
6.2.3. |
Existing solutions | 415 |
6.2.4. |
Innovative solutions | 416 |
6.2.5. |
Assessment of maintenance | 416 |
6.2.6. |
Assessment of operational rules | 416 |
6.2.7. |
Additional requirements for assessment of specifications concerning the IM | 416 |
6.2.8. |
Additional requirements for assessment of specifications concerning the RU | 417 |
7. |
Implementation | 417 |
7.1. |
Application of this TSI to new subsystems | 417 |
7.1.1. |
General | 417 |
7.1.2. |
New rolling stock | 417 |
7.1.3. |
New Infrastructure | 417 |
7.2. |
Application of this TSI to subsystems already in service | 417 |
7.2.1. |
Upgrade or renewal of rolling stock | 417 |
7.2.2. |
Upgrade and renewal measures for tunnels | 418 |
7.2.3. |
Operation subsystem | 418 |
7.2.4. |
Operation of new rolling stock in existing tunnels | 418 |
7.3. |
Specific cases | 418 |
7.3.1. |
General | 418 |
7.3.2. |
Operational rules related to trains running in tunnels (clause 4.4.6) | 418 |
Appendix A: |
Standards or Normative Documents Referred to in this TSI | 419 |
Appendix B: |
Assessment of the Subsystems | 420 |
1. INTRODUCTION
1.1. Technical scope
(a) |
This TSI concerns the following subsystems as defined in Directive 2008/57/EC: control-command and signalling (‘CCS’), infrastructure (‘INF’), energy (‘ENE’), operation (‘OPE’), and rolling stock (locomotives and passenger units ‘LOC&PAS’). |
(b) |
The purpose of this TSI is to define a coherent set of tunnel specific measures for the infrastructure, energy, rolling stock, control-command and signalling and operation subsystems, thus delivering an optimal level of safety in tunnels in the most cost-efficient way. |
(c) |
It shall permit free movement of vehicles which are in compliance with this TSI to run under harmonised safety conditions in railway tunnels. |
(d) |
Only measures, designed to reduce specific tunnel risks, are prescribed in the present TSI. Risks related to pure railway operation, such as derailment and collision with other trains, are addressed by general railway safety measures. |
(e) |
The existing safety level shall not be reduced in a country as stipulated in Directive 2004/49/EC Art 4.1. Member States can retain more stringent requirements, as long as these requirements do not prevent the operation of TSI compliant trains. |
(f) |
Member States can prescribe new and more stringent requirements for specific tunnels in accordance with Directive 2004/49/EC Art 8; such requirements shall be notified to the Commission before they are introduced. Such higher requirements must be based on a risk analysis and must be justified by a particular risk situation. They shall be the result of a consultation of the Infrastructure Manager and of the relevant authorities for emergency response, and they shall be subject to a cost-benefit assessment. |
1.1.1. Scope related to tunnels
(a) |
This TSI applies to new, renewed and upgraded tunnels which are located on the European Union rail network, and which are in accordance with the definition in clause 2.4 of this TSI. |
(b) |
Stations that are in tunnels shall be in conformity with the national rules on fire safety. When they are used as safe areas, they shall comply only with the specifications for clauses 4.2.1.5.1, 4.2.1.5.2 and 4.2.1.5.3 of this TSI. When they are used as fire fighting points, they shall comply only with the specifications of clauses 4.2.1.7 (c) and 4.2.1.7 (e) of this TSI. |
1.1.2. Scope related to rolling stock
(a) |
This TSI applies to rolling stock which is in the scope of the LOC&PAS TSI. |
(b) |
Rolling stock categorised ‘A’ or ‘B’ according to the previous SRT TSI (Decision 2008/163/EC) shall retain its category in this TSI as defined in clause 4.2.3. |
1.1.3. Scope related to operational aspects
This TSI applies to the operation of all units of rolling stock which are running in tunnels described in clause 1.1.1.
1.1.3.1. Operation of freight trains
When each vehicle of a freight train or dangerous goods train as defined in clause 2.4 complies with the structural TSIs which apply to it (LOC&PAS, SRT, NOI, CCS, WAG) and when the dangerous goods wagon(s) comply with Annex II of Directive 2008/68/EC, the freight train or dangerous goods train operated according to the requirements of the OPE TSI shall be allowed to circulate in all tunnels of the European Union rail system.
1.1.4. Risk scope, risks that are not covered by this TSI
(a) |
This TSI covers only specific risks to the safety of passengers and on-board staff in tunnels for the subsystems above. It also covers risks for people in the neighbourhood of a tunnel where collapse of the structure could have catastrophic consequences. |
(b) |
Where a risk analysis comes to the conclusion that other tunnel incidents might be of relevance, specific measures to deal with these scenarios shall be defined. |
(c) |
Risks not covered by this TSI are as follows:
|
1.2. Geographical scope
The geographical scope of this TSI is the network of the whole rail system, composed of:
— |
The trans-European conventional rail system network (TEN) as described in Annex I section 1.1 ‘Network’ of Directive 2008/57/EC |
— |
The trans-European high-speed rail system network (TEN) as described in Annex I section 2.1 ‘Network’ of Directive 2008/57/EC |
— |
Other parts of the network of the whole rail system, following the extension of scope described in Annex I section 4 of Directive 2008/57/EC, |
and excludes the cases referred to in Article 1(3) of Directive 2008/57/EC.
2. DEFINITION OF ASPECT/SCOPE
2.1. General
(a) |
The line of defence for the promotion of safety in tunnels comprises four successive layers: Prevention, mitigation, evacuation and rescue. |
(b) |
The largest contribution is in the area of prevention followed by mitigation and so on. |
(c) |
The layers of safety combine to produce a low level of residual risk. Residual risk Safe side Rescue Evacuation Mitigation Prevention Risks in tunnels |
(d) |
A major feature of railways is their inherent ability to prevent accidents through the traffic running on a guide-way and generally being controlled and regulated using a signalling system. |
2.2. The risk scenarios
(a) |
This TSI provides measures which could prevent or mitigate the difficulty of evacuation or rescue operations following a tunnel-specific railway incident. Not considered No measures required Tunnel-specific incident scenarios: — Collision — Derailment — Fire — Explosion — Toxic gas release — Spontan evaciation Prolonged stop Not tunnel-specific Taken care of by general safety measures Rescue measures Evacuation measures Mitigation measures Prevention measures Railway risks |
(b) |
Relevant measures have been identified, which will control or significantly reduce the risks arising from the tunnel-specific incident scenarios identified above. |
(c) |
They have been developed, in the categories prevention/mitigation/evacuation/rescue; however they do not appear under these headings in this TSI but under the headings of the concerned subsystems. |
(d) |
The measures prescribed can be considered as a response to the following three types of incident. |
2.2.1. ‘Hot’ incidents: Fire, explosion followed by fire, emission of toxic smoke or gases.
(a) |
The main danger is fire. Fire is understood as a combination of heat, flames and smoke. |
(b) |
The fire starts on a train. The fire is detected, either by on-board fire detectors, or by persons on-board. The driver is notified of a problem, either that there is a fire by an automatic notification or that there is a problem in general by passengers using the passenger alarm. The driver is instructed to act appropriately depending on the local circumstances. Ventilation is shut down to prevent smoke distribution. For rolling stock of category B, the passengers in the affected area will move to a non-affected area of the train where they are protected from fire and fumes Whenever possible the train leaves the tunnel. Passengers are evacuated, directed by the train crew, or by self-rescue, to a safe area in the open air. If appropriate, the train may stop at a fire fighting point inside the tunnel. Passengers are evacuated, directed by the train crew, or by self-rescue, to a safe area. If a fire extinguishing system can extinguish the fire, the incident will become a ‘cold’ incident. |
(c) |
The fire starts in the tunnel. If fire starts in a tunnel or in a technical room, the driver is instructed to act appropriately depending on the local circumstances in compliance with the tunnel-specific incident scenarios, described in the Emergency Plan. |
2.2.2. ‘Cold’ incidents: collision, derailment
(a) |
The tunnel specific measures concentrate on access/egress facilities to support evacuation and the intervention of the emergency response services. |
(b) |
The difference compared to the hot incidents is that there is no time constraint due to the presence of a hostile environment created by a fire. |
2.2.3. Prolonged stop
(a) |
Prolonged stop (an unplanned stop in a tunnel, without the occurrence of a hot or cold incident, for longer than 10 minutes) is not by itself a threat to passengers and staff. |
(b) |
However it may lead to panic and to spontaneous, uncontrolled evacuation that exposes people to dangers present in a tunnel environment. |
2.2.4. Exclusions
The scenarios that have not been dealt with are listed in clause 1.1.4.
2.3. The role of emergency response services
(a) |
The definition of the role of the emergency response services is a matter for the relevant national legislation. |
(b) |
The measures specified in this TSI for rescue are based on the assumption that the emergency response services intervening in a tunnel incident shall protect lives as a priority. |
(c) |
It is assumed that they are expected to:
|
(d) |
No demands on time or performance requirements are included in this TSI. |
(e) |
Considering that incidents in railway tunnels involving multiple fatalities are rare, it is implicit that there might be events, with an extremely low probability, for which even well-equipped emergency response services would be restricted, such as a major fire involving a freight train. |
(f) |
If the expectations of the emergency response services expressed in emergency plans go beyond the assumptions described above, then additional measures or tunnel equipment can be provided. |
2.4. Definitions
For the purpose of this TSI the following definitions are used:
(a) |
Railway tunnel: A railway tunnel is an excavation or a construction around the track provided to allow the railway to pass for example higher land, buildings or water. The length of a tunnel is defined as the length of the fully enclosed section, measured at rail level. A tunnel in the context of this TSI is 0.1 km or longer. Where certain requirements apply only to longer tunnels, thresholds are mentioned in the relevant clauses. |
(b) |
Safe area: a safe area is a temporary survivable space, inside or outside the tunnel, for passengers and staff to find refuge after they have evacuated from a train. |
(c) |
Fire fighting point: a fire fighting point is a defined location, inside or outside the tunnel, where fire fighting equipment can be used by rescue services and where passengers and staff can evacuate from a train. |
(d) |
Technical rooms: Technical rooms are enclosed spaces with doors for access/egress inside or outside the tunnel with safety installations which are necessary for at least one of the following functions: self-rescue, evacuation, emergency communication, rescue and fire fighting, signalling and communication equipment, and traction power supply. |
(e) |
Freight train: A freight train is a train composed of one or more locomotive(s) and one or more wagon(s). A freight train including at least one wagon carrying dangerous goods is a dangerous goods train. |
(f) |
All definitions related to rolling stock are defined in the LOC&PAS TSI and the WAG TSI. |
3. ESSENTIAL REQUIREMENTS
The following table indicates basic parameters of this TSI and their correspondence to the essential requirements as set out and numbered in Annex III to Directive 2008/57/EC.
Element of the infrastructure sub-system |
Ref. Clause |
Safety |
Reliability Availability |
Health |
Environmental protection |
Technical compatibility |
Prevent unauthorised access to emergency exits and technical rooms |
4.2.1.1 |
2.1.1 |
|
|
|
|
Fire resistance of tunnel structures |
4.2.1.2 |
1.1.4 2.1.1 |
|
|
|
|
Fire reaction of building material |
4.2.1.3 |
1.1.4 2.1.1 |
|
1.3.2 |
1.4.2 |
|
Fire detection |
4.2.1.4 |
1.1.4 2.1.1 |
|
|
|
|
Evacuation facilities |
4.2.1.5 |
1.1.5 2.1.1 |
|
|
|
|
Escape walkways |
4.2.1.6 |
2.1.1 |
|
|
|
|
Fire fighting points |
4.2.1.7 |
2.1.1 |
|
|
|
1.5 |
Emergency communication |
4.2.1.8 |
2.1.1 |
|
|
|
|
Element of the energy sub-system |
Ref. Clause |
Safety |
Reliability Availability |
Health |
Environmental protection |
Technical compatibility |
Segmentation of overhead line or conductor rails |
4.2.2.1 |
2.2.1 |
|
|
|
|
Overhead line or conductor rail earthing |
4.2.2.2 |
2.2.1 |
|
|
|
|
Electricity supply |
4.2.2.3 |
2.2.1 |
|
|
|
|
Requirements for electrical cables in tunnels |
4.2.2.4 |
2.2.1 1.1.4 |
|
1.3.2 |
1.4.2 |
|
Reliability of electrical installations |
4.2.2.5 |
2.2.1 |
|
|
|
|
Element of the rolling stock sub-system |
Ref. Clause |
Safety |
Reliability Availability |
Health |
Environmental protection |
Technical compatibility |
Measures to prevent fire |
4.2.3.1 |
1.1.4 2.4.1 |
|
1.3.2 |
1.4.2 |
|
Measures to detect and control fire |
4.2.3.2 |
1.1.4 2.4.1 |
|
|
|
|
Requirements related to emergencies |
4.2.3.3 |
2.4.1 |
2.4.2 |
|
|
1.5 2.4.3 |
Requirements related to evacuation |
4.2.3.4 |
2.4.1 |
|
|
|
|
4. CHARACTERISATION OF THE SUBSYSTEM
4.1. Introduction
(a) |
The European Union rail system, to which Directive 2008/57/EC applies and of which the subsystems are parts, has been developed to become an integrated system for which the consistency must be verified. |
(b) |
This consistency has been checked in relation to the development of the specifications within this TSI, its interfaces with respect to the systems in which it is integrated and also the operating rules for the railway. |
(c) |
Taking account of all the applicable essential requirements, the basic parameters related to safety in railway tunnels are set out for the subsystems infrastructure, energy and rolling stock in section 4.2 of this TSI. The operational requirements and responsibilities are set out in the OPE TSI and in section 4.4 of this TSI. |
4.2. Functional and technical specifications of the subsystems
In the light of the essential requirements in Chapter 3, the functional and technical specifications of those aspects specific to tunnel safety in the above-mentioned subsystems are as follows:
4.2.1. Subsystem Infrastructure
4.2.1.1. Prevent unauthorised access to emergency exits and technical rooms
This specification applies to all tunnels.
(a) |
Unauthorised access to technical rooms shall be prevented. |
(b) |
Where emergency exits are locked for security purposes, it shall always be possible to open them from inside. |
4.2.1.2. Fire resistance of tunnel structures
This specification applies to all tunnels.
(a) |
In the event of fire, the integrity of the tunnel lining shall be maintained for a period of time that is sufficiently long to permit self-rescue, evacuation of passengers and staff and intervention of the emergency response services. That period of time shall be in accordance with the evacuation scenarios considered and reported in the emergency plan. |
(b) |
In the cases of immersed tunnels and tunnels which can cause the collapse of important neighbouring structures, the main structure of the tunnel shall withstand the temperature of the fire for a period of time that is sufficient to allow evacuation of the endangered tunnel zones and neighbouring structures. This period of time shall be reported in the emergency plan. |
4.2.1.3. Fire reaction of building material
This specification applies to all tunnels.
(a) |
This specification applies to construction products and building elements inside tunnels. |
(b) |
Tunnel building material shall fulfil the requirements of classification A2 of Commission Decision 2000/147/EC. Non-structural panels and other equipment shall fulfil the requirements of classification B of Commission Decision 2000/147/EC. |
(c) |
Materials that would not contribute significantly to a fire load shall be listed. They are allowed to not comply with the above. |
4.2.1.4. Fire detection in technical rooms
This specification applies to all tunnels of more than 1 km in length.
Technical rooms shall be equipped with detectors which alert the infrastructure manager in case of fire.
4.2.1.5. Evacuation facilities
4.2.1.5.1 Safe area
This specification applies to all tunnels of more than 1 km in length.
(a) |
A safe area shall allow the evacuation of trains that use the tunnel. It shall have a capacity corresponding to the maximum capacity of the trains planned to be operated on the line where the tunnel is located. |
(b) |
The safe area shall maintain survivable conditions for passengers and staff during the time needed for the complete evacuation from the safe area to a final place of safety. |
(c) |
In case of underground/undersea safe areas, the provisions shall allow people to move from the safe area to the surface without having to re-enter the affected tunnel tube. |
(d) |
The lay-out of an underground safe area and its equipment shall take into account the control of smoke, in particular to protect people who use the self-evacuation facilities. |
4.2.1.5.2 Access to the safe area
This specification applies to all tunnels of more than 1 km in length.
(a) |
Safe areas shall be accessible for people who commence self-evacuation from the train as well as for the emergency response services. |
(b) |
One of the following solutions shall be selected for access points from a train to the safe area:
|
(c) |
Doors giving access from the escape walkway to the safe area shall have a minimum clear opening of 1,4 m wide and 2,0 m high. Alternatively it is permitted to use multiple doors next to each other which are less wide as long as the flow capacity of people is demonstrated to be equivalent or higher. |
(d) |
After passing the doors, the clear width shall continue to be at least 1,5 m wide and 2,25 m high. |
(e) |
The way in which the emergency response services access the safe area shall be described in the emergency plan. |
4.2.1.5.3 Communication means in safe areas
This specification applies to all tunnels of more than 1 km in length.
Communication shall be possible, either by mobile phone or by fixed connection from underground safe areas to the control centre of the Infrastructure Manager.
4.2.1.5.4 Emergency lighting on escape routes
This specification applies to all tunnels of more than 0,5 km in length.
(a) |
Emergency lighting shall be provided to guide passengers and staff to a safe area in the event of an emergency. |
(b) |
Illumination shall comply with the following requirements:
|
(c) |
Autonomy and reliability: an alternative power supply shall be available for an appropriate period of time after failure of the main power supply. The time required shall be consistent with the evacuation scenarios and reported in the Emergency Plan. |
(d) |
If the emergency light is switched off under normal operating conditions, it shall be possible to switch it on by both of the following means:
|
4.2.1.5.5 Escape signage
This specification applies to all tunnels.
(a) |
The escape signage indicates the emergency exits, the distance and the direction to a safe area. |
(b) |
All signs shall be designed according to the requirements of Directive 92/58/EEC of 24 June 1992 concerning the provision of health and/or safety signs at work and to the specification referenced in appendix A, index 1. |
(c) |
Escape signs shall be installed on sidewalls along escape walkways. |
(d) |
The maximum distance between escape signs shall be 50 m. |
(e) |
Signs shall be provided in the tunnel to indicate the position of emergency equipment, where such equipment is present. |
(f) |
All doors leading to emergency exits or cross-passage shall be marked. |
4.2.1.6. Escape walkways
This specification applies to all tunnels of more than 0,5 km in length.
(a) |
Walkways shall be constructed in a single track tunnel tube on at least one side of the track and in a multiple track tunnel tube on both sides of the tunnel tube. In tunnel tubes with more than two tracks, access to a walkway shall be possible from each track.
|
(b) |
Continuous handrails shall be installed between 0.8 m and 1.1 m above the walkway providing a route to a safe area.
|
4.2.1.7. Fire fighting points
This specification applies to all tunnels of more than 1 km in length.
(a) |
For the purpose of this clause, two or more consecutive tunnels will be considered as a single tunnel unless both of the following conditions are met:
|
(b) |
Fire fighting points shall be created
|
(c) |
Requirements for all fire fighting points:
|
(d) |
Requirements for fire fighting points outside the portals of the tunnel In addition to the requirements in 4.2.1.7 (c), fire fighting points outside the portals of the tunnel shall comply with the following requirements:
|
(e) |
Requirements for fire fighting points inside the tunnel In addition to the requirements in 4.2.1.7 (c), fire fighting points inside the tunnel shall comply with the following requirements
|
4.2.1.8. Emergency communication
This specification applies to all tunnels of more than 1 km in length.
(a) |
Radio communication between the train and the infrastructure manager control centre shall be provided in each tunnel with GSM-R. |
(b) |
Radio continuity shall be provided for permitting the emergency response services to communicate with their on-site command facilities. The system shall allow the emergency response services to use their own communication equipment. |
4.2.2. Subsystem Energy
This section applies to the infrastructure part of the subsystem Energy.
4.2.2.1. Segmentation of overhead line or conductor rails
This specification applies to tunnels of more than 5 km in length.
(a) |
The traction energy supply system in tunnels shall be divided into sections, each not exceeding 5 km. This specification applies only if the signalling system permits the presence of more than one train in the tunnel on each track simultaneously. |
(b) |
Remote control and switching of each ‘switching section’ shall be provided. |
(c) |
A means of communication and lighting shall be provided at the switching location to enable safe manual operation and maintenance of the switching equipment. |
4.2.2.2. Overhead line or conductor rail earthing
This specification applies to all tunnels of more than 1 km length.
(a) |
Earthing devices shall be provided at tunnel access points and, if the earthing procedures allow the earthing of a single section, close to the separation points between sections. These shall be either portable devices or manually or remotely controlled fixed installations. |
(b) |
Communication and lighting means necessary for earthing operations shall be provided. |
(c) |
Procedures and responsibilities for earthing shall be defined between the Infrastructure Manager and the emergency response services, based on the emergency scenarios considered within the emergency plan. |
4.2.2.3. Electricity supply
This specification applies to all tunnels of more than 1 km length.
The electricity power distribution system in the tunnel shall be suitable for the emergency response services equipment in accordance with the emergency plan for the tunnel. Some national emergency response services groups may be self-sufficient in relation to power supply. In this case, the option of not providing power supply facilities for the use of such groups may be appropriate. Such a decision, however, must be described in the emergency plan.
4.2.2.4. Requirements for electrical cables in tunnels
This specification applies to all tunnels of more than 1 km length.
In case of fire, exposed cables shall have the characteristics of low flammability, low fire spread, low toxicity and low smoke density. These requirements are fulfilled when the cables fulfil as a minimum the requirements of classification B2CA, s1a, a1, as per Commission Decision 2006/751/EC.
4.2.2.5. Reliability of electrical installations
This specification applies to all tunnels of more than 1 km length.
(a) |
Electrical installations relevant for safety (Fire detection, emergency lighting, emergency communication and any other system identified by the Infrastructure Manager or contracting entity as vital to the safety of passengers in the tunnel) shall be protected against damage arising from mechanical impact, heat or fire. |
(b) |
The distribution system shall be designed to enable the system to tolerate unavoidable damage by (for example) energizing alternative links. |
(c) |
Autonomy and reliability: an alternative power supply shall be available for an appropriate period of time after failure of the main power supply. The time required shall be consistent with the evacuation scenarios considered and included in the emergency plan. |
4.2.3. Subsystem rolling stock
(a) |
In the context of this TSI the subsystem rolling stock is subdivided into the following categories.
|
(b) |
The rolling stock category shall be recorded in the technical file and will remain valid regardless of future revisions of this TSI. |
4.2.3.1. Measures to prevent fire
This section is applicable to all categories of rolling stock.
4.2.3.1.1 Material requirements
Requirements are set out in the LOC&PAS TSI clause 4.2.10.2.1. These requirements shall also apply to the on-board CCS equipment.
4.2.3.1.2 Specific measures for flammable liquids
Requirements are set out in the LOC&PAS TSI clause 4.2.10.2.2.
4.2.3.1.3 Hot axle box detection
Requirements are set out in the LOC&PAS TSI clause 4.2.10.2.3.
4.2.3.2. Measures to detect and control fire
4.2.3.2.1 Portable fire extinguishers
Requirements are set out in the LOC&PAS TSI clause 4.2.10.3.1.
4.2.3.2.2 Fire detection systems
Requirements are set out in the LOC&PAS TSI clause 4.2.10.3.2.
4.2.3.2.3 Automatic fire fighting system for freight diesel units
Requirements are set out in the LOC&PAS TSI clause 4.2.10.3.3.
4.2.3.2.4 Fire containment and control systems for passenger rolling stock
Requirements are set out in the LOC&PAS TSI clause 4.2.10.3.4.
4.2.3.2.5 Fire containment and control systems for freight locomotives and freight self-propelling units
Requirements are set out in the LOC&PAS TSI clause 4.2.10.3.5.
4.2.3.3. Requirements related to emergencies
4.2.3.3.1. Emergency lighting system in the train
Requirements are set out in the LOC&PAS TSI clause 4.2.10.4.1.
4.2.3.3.2 Smoke control
Requirements are set out in the LOC&PAS TSI clause 4.2.10.4.2.
4.2.3.3.3. Passenger alarm and communication means
Requirements are set out in the LOC&PAS TSI clause 4.2.10.4.3.
4.2.3.3.4 Running capability
Requirements are set out in the LOC&PAS TSI clause 4.2.10.4.4.
4.2.3.4. Requirements related to evacuation
4.2.3.4.1 Passenger emergency exits
Requirements are set out in the LOC&PAS TSI clause 4.2.10.5.1.
4.2.3.4.2 Driver's cab emergency exits
Requirements are set out in the LOC&PAS TSI clause 4.2.10.5.2.
4.3. Functional and technical specifications of the interfaces
4.3.1. Interfaces with the Control-Command-Signalling subsystem
Interface with the CCS subsystem |
|||
SRT TSI |
|
CCS TSI |
|
Parameter |
Clause |
Parameter |
Clause |
Radio communication |
4.2.1.8 (a) |
Mobile communication functions for railways GSM-R |
4.2.4 |
Material characteristics |
4.2.2.4 (a) |
Essential requirements |
Chapter 3 |
Material characteristics |
4.2.3.1.1 |
Essential requirements |
Chapter 3 |
4.3.2. Interfaces with the Traffic Management and Operation subsystem
Interface with the OPE subsystem |
|||
SRT TSI |
|
OPE TSI |
|
Parameter |
Clause |
Parameter |
Clause |
Emergency rule |
4.4.1 |
Ensuring that the train is in running order |
4.2.2.7 |
Train departure |
4.2.3.3 |
||
Degraded Operation |
4.2.3.6 |
||
Tunnel emergency plan |
4.4.2 |
Managing an emergency situation |
4.2.3.7 |
Exercises |
4.4.3 |
||
Provision of on-train safety and emergency information to passengers |
4.4.5 |
||
Tunnel specific competence of the train crew and other staff |
4.6.1 |
Professional competency |
4.6.1 |
Specific elements for train crew and auxiliary staff |
4.6.3.2.3 |
4.4. Operating rules
(a) |
Operating rules are developed within the procedures described in the Infrastructure Manager safety management system. These rules take into account the documentation related to operation which forms a part of the technical file as required in Article 18(3) and set out in Annex VI of Directive 2008/57/EC. |
The following operating rules do not form any part of the assessment of the structural subsystems.
4.4.1. Emergency rule
These rules apply to all tunnels.
In light of the essential requirements in Chapter 3, the operating rules specific to tunnel safety are:
(a) |
The operational rule is to monitor the train condition before entering a tunnel in order to detect any defect detrimental to its running behaviour and to take appropriate action. |
(b) |
In the case of an incident outside the tunnel, the operational rule is to stop a train with a defect that could be detrimental to its running behaviour before entering a tunnel. |
(c) |
In the case of an incident inside the tunnel the operational rule is to drive the train out of a tunnel, or to the next fire fighting point. |
4.4.2. Tunnel emergency plan
These rules apply to tunnels of > 1 km.
(a) |
An emergency plan shall be developed under the direction of the Infrastructure Manager(s), in cooperation with the emergency response services and the relevant authorities for each tunnel. Railway Undertakings intending to use the tunnel shall be involved in the development or adaptation of the Emergency Plan. Station managers shall be equally involved if one or more stations in a tunnel are used as a safe area or a fire fighting point. |
(b) |
The emergency plan shall be consistent with the self-rescue, evacuation, fire-fighting and rescue facilities available. |
(c) |
Detailed tunnel-specific incident scenarios adapted to the local tunnel conditions shall be developed for the emergency plan. |
4.4.3. Exercises
These rules apply to tunnels of > 1 km.
(a) |
Prior to the opening of a single tunnel or a series of tunnels, a full-scale exercise comprising evacuation and rescue procedures, involving all categories of personnel defined within the emergency plan, shall take place. |
(b) |
The emergency plan shall define how all organisations involved can be familiarised with the infrastructure and how often visits to the tunnel and table top or other exercises have to take place. |
4.4.4. Isolation and Earthing procedures
These rules apply to all tunnels.
(a) |
If disconnection of the traction power supply is required, the infrastructure manager shall make sure that relevant sections of the catenary or the conductor rail have been disconnected, and inform the emergency response services before they enter the tunnel or a section of the tunnel. |
(b) |
It is the responsibility of the infrastructure manager to disconnect the traction power supply. |
(c) |
The responsibility and procedure for earthing shall be defined in the emergency plan. Provision shall be made for isolation of the section in which the incident has taken place. |
4.4.5. Provision of on-train safety and emergency information to passengers
(a) |
Railway undertakings shall inform passengers of on board emergency and safety procedures related to tunnels. |
(b) |
When such information is in written or spoken form, it shall be presented in the language of the country the train is running in as a minimum, plus English. |
(c) |
An operating rule shall be in place describing how the train crew ensures the complete evacuation of the train when this is necessary, including those people with hearing impairments that may be in closed areas. |
4.4.6. Operational rules related to trains running in tunnels
(a) |
Vehicles in conformity with the TSI as defined in clause 4.2.3 shall be permitted to operate in tunnels in accordance with the following principles:
|
(b) |
Operation of Category A rolling stock is permitted on lines where the distance between fire fighting points, or the length of tunnels exceeds 5 km, in the case where there are no passengers on board. |
(c) |
Operational rules shall be put in place to avoid panic and spontaneous, uncontrolled evacuation in the case of a prolonged stop of a train in a tunnel without the occurrence of a hot or cold incident. |
4.5. Maintenance rules
4.5.1. Infrastructure
Before placing a tunnel into service a maintenance file shall be prepared setting out at least:
(1) |
Identification of elements which are subject to wear, failure, ageing or other forms of deterioration or degradation, |
(2) |
Specification of the limits of use of the elements under (1) and a description of the measures to be taken to prevent these limits being exceeded, |
(3) |
Identification of those elements which are relevant to emergency situations and their management, |
(4) |
Necessary periodic checks and servicing activities to ensure the proper functioning of the parts and systems under (3). |
4.5.2. Maintenance of rolling stock
The maintenance requirements for rolling stock are set out in the LOC&PAS TSI.
4.6. Professional qualifications
The professional qualifications of staff required for operations specific to tunnel safety within the subsystems covered by this TSI and in accordance with the operating rules in clause 4.4 of this TSI are as follows:
4.6.1. Tunnel specific competence of the train crew and other staff
(a) |
All professional staff driving and accompanying a train, as well as staff that authorise train movements, shall have the knowledge and ability to apply that knowledge to manage degraded situations in the event of an incident. |
(b) |
For staff undertaking the tasks of accompanying trains, the general requirements are specified in the OPE TSI. |
(c) |
Train crew as defined in the OPE TSI shall have knowledge of the appropriate safety behaviour in tunnels and in particular be able to evacuate the people on board a train, when the train is stopped in a tunnel. |
(d) |
This involves in particular instructing the passengers to go to the next coach or to exit the train, and to lead them outside the train to a safe area. |
(e) |
Auxiliary train staff (e.g. catering, cleaning), who do not form part of the train crew as defined above shall, in addition to their basic instruction, be trained to support the actions of the train crew. |
(f) |
Professional training of engineers and managers responsible for maintaining and operating the subsystems shall include the subject of safety in railway tunnels. |
4.7. Health and safety conditions
The health and safety conditions of staff required for operations specific to tunnel safety for the subsystems concerned by this TSI and for the implementation of the TSI are as follows:
4.7.1. Self-rescue device
Manned traction units of freight trains shall be equipped with a self-rescue device for the driver and other persons on board, satisfying the specifications of either the specification referenced in appendix A, index 2 or the specification referenced in appendix A, index 3. The RU shall choose one of the two solutions defined in these specifications.
4.8. Infrastructure and Rolling stock registers
4.8.1. Register of infrastructure
The characteristics of the infrastructure that must be recorded in the ‘register of railway infrastructure’ are listed in the Commission Implementing Decision 2011/633/EU of 15 September 2011 on the common specifications of the register of railway infrastructure.
4.8.2. Rolling Stock Register
The characteristics of the rolling stock that must be recorded in the ‘European register of authorised types of vehicles’ are listed in the Commission Implementing Decision 2011/665/EU of 4 October 2011 on the European register of authorized types of railway vehicles.
5. INTEROPERABILITY CONSTITUENTS
There are no interoperability constituents defined in the SRT TSI.
6. ASSESSMENT OF CONFORMITY AND/OR SUITABILITY FOR USE OF THE CONSTITUENTS AND VERIFICATION OF THE SUBSYSTEM
6.1. Interoperability constituents
Not applicable, since no interoperability constituents have been defined in the SRT TSI.
6.2. Subsystems
6.2.1. EC verification (general)
(a) |
The EC verification of a Subsystem shall be performed according to one or a combination of the following modules as defined in Decision 2010/713/EU: — Module SB: EC-type examination — Module SD: EC verification based on quality management system of the production process — Module SF: EC verification based on product verification — Module SG: EC verification based on unit verification — Module SH1: EC verification based on full quality management system plus design examination |
(b) |
The approval process and the contents of the assessment shall be defined between the applicant and a Notified Body according to the requirements defined in this TSI and in conformance with the rules set out in section 7 of this TSI. |
6.2.2. Procedures for EC verification of a subsystem (modules)
(a) |
The applicant shall choose one of the modules or module combinations indicated in the following table. Assessment procedures
|
(b) |
The characteristics of the subsystem to be assessed during the relevant phases are indicated in appendix B. |
6.2.3. Existing solutions
(a) |
If an existing solution is already assessed for an application under comparable conditions and is in service, then the following process applies: |
(b) |
The applicant shall demonstrate that the results of tests and verifications for the previous assessment of the application are in conformity with the requirements of this TSI. In this case the previous type assessment of the subsystem related characteristics shall remain valid in the new application. |
6.2.4. Innovative solutions
(a) |
Innovative solutions are technical solutions which do meet the functional requirements and spirit of this TSI, but are not fully in compliance with it. |
(b) |
If an innovative solution is proposed, the manufacturer or his authorised representative established within the European Union shall apply the procedure described in Article 8. |
6.2.5. Assessment of maintenance
(a) |
According to Article 18(3) of Directive 2008/57/EC, a notified body shall be responsible for compiling the technical file, containing the documentation requested for operation and maintenance. |
(b) |
The notified body shall verify only that the documentation requested for operation and maintenance, as defined in clause 4.5 of this TSI, is provided. The notified body is not required to verify the information contained in the documentation provided. |
6.2.6. Assessment of operational rules
In conformity with Articles 10 and 11 of Directive 2004/49/EC, Railway Undertakings and Infrastructure Managers shall demonstrate compliance with the requirements of this TSI within their safety management system when applying for any new or amended safety certificate or safety authorisation. Compliance with operation rules of this TSI does not require assessment by a Notified Body.
6.2.7. Additional requirements for assessment of specifications concerning the IM
6.2.7.1. Prevent unauthorised access to emergency exits and equipment rooms
The assessment shall confirm that:
(a) |
Emergency exit doors to the surface and doors to technical rooms are provided with suitable locks |
(b) |
The locks provided are consistent with the overall strategy for security for the tunnel and adjacent infrastructure |
(c) |
Emergency exits are not lockable from the inside and shall be able to be opened by evacuating persons |
(d) |
Access arrangements are in place for the emergency response services |
6.2.7.2. Fire resistance of tunnel structures
The Notified Body shall assess conformity with the fire protection requirements for structures, defined in 4.2.1.2, by using the results of calculations and/or tests made by the applicant, or by an equivalent method.
(1) |
To demonstrate that the integrity of the tunnel lining is maintained during a period of time that is sufficiently long to permit self-rescue, evacuation of passengers and staff and intervention of the emergency response services, demonstration that the tunnel lining can withstand a temperature of 450 °C at ceiling level during that same period of time is sufficient. |
(2) |
Evaluation of the resistance of immersed tunnels or tunnels which can cause the collapse of important neighbouring structures shall be carried out according to a suitable ‘temperature-time curve’ chosen by the applicant. |
This verification is not needed for rock tunnels without additional support.
6.2.7.3. Fire reaction of building material
For the assessment of 4.2.1.3 (c), the Notified Body shall only check that the list of material that would not contribute significantly to a fire is present.
6.2.7.4. Facilities for self-rescue, rescue and evacuation in the event of an incident
(a) |
The Notified Body shall check that the solution adopted is clearly identified by a statement in the technical file and is in conformity with the requirements of clause 4.2.1.5. For assessing the evolution of the conditions in the safe area during an incident, the Notified Body shall verify that doors and structures separating the safe area from the tunnel can withstand the elevation of temperature in the closest tube. |
(b) |
In the case where clause 4.2.1.2 (b) applies, doors giving access to the safe areas can be assessed according to a different curve to that selected according to clause 6.2.7.2 (2) above. |
6.2.7.5. Access and equipment for emergency response services
The Notified Body shall confirm, by verification of the technical file and also considering evidence of consultation with the emergency response services, that the corresponding requirements in section 4.2.1 and 4.4 have been met:
6.2.7.6. Reliability of electrical installations
The Notified Body shall confirm only that a failure mode assessment complying with the functional requirements of 4.2.2.5 has been carried out.
6.2.8. Additional requirements for assessment of specifications concerning the RU
6.2.8.1. Self-rescue device
The conformity assessment is described in the specifications referenced in Appendix A, indexes 2, 3, 4.
7. IMPLEMENTATION
This section defines the implementation strategy for the SRT TSI.
(a) |
This TSI does not require modifications of subsystems which are already in service unless they are upgraded or renewed. |
(b) |
If not defined otherwise in section 7.3 ‘Specific Cases’, all new TSI compliant category B rolling stock is deemed to achieve a higher fire and tunnel safety level than non-TSI compliant rolling stock. This assumption is used to justify the safe operation of new TSI-compliant rolling stock in old non-TSI compliant tunnels. Therefore, all TSI compliant category B trains are deemed to be suitable for safe integration in accordance with Article 15(1) of Directive 2008/57/EC with all non-TSI compliant tunnels within the geographical scope of this TSI. |
(c) |
Notwithstanding the above, measures over and above those set out in this TSI may be necessary to achieve the desired tunnel safety level. Such measures may only be imposed on the subsystems Infrastructure, Energy and Operations and shall not restrict the authorisation or use of TSI compliant rolling stock. |
7.1. Application of this TSI to new subsystems
7.1.1. General
(a) |
This TSI is applicable to all subsystems in its scope which are placed into service after the date of application of this TSI, except when defined otherwise in the sections below. |
(b) |
The application of this TSI to on-track machines is voluntary. Where on-track machines are not assessed and declared to be in conformity with this TSI, they shall be subject to national rules. In the latter case Articles 24 and 25 of Directive 2008/57/EC apply. |
7.1.2. New rolling stock
For new rolling stock, the implementation rules set out in clause 7.1.1 of the LOC&PAS TSI shall be applied.
7.1.3. New Infrastructure
This TSI is applicable to all new Infrastructure in its scope.
7.2. Application of this TSI to subsystems already in service
7.2.1. Upgrade or renewal of rolling stock
In case of renewal or upgrade of existing rolling stock, the implementation rules as set out in the clause 7.1.2 of LOC&PAS TSI shall be applied.
7.2.2. Upgrade and renewal measures for tunnels
Taking into consideration Directive 2008/57/EC, Article 20(1), any modification of the basic parameters of the structural subsystems as set out in this TSI is deemed to affect the overall safety level of the infrastructure subsystem concerned. Therefore, Member States shall decide to which extent this TSI needs to be applied to the project. If not defined otherwise in section 7.3 ‘Specific Cases’, the result of renewal or upgrade works shall ensure that compatibility of the fixed installations with TSI compliant rolling stock is maintained or improved.
7.2.3. Operation subsystem
(a) |
Operational aspects and their implementation are set out in the OPE TSI. |
(b) |
When commissioning an upgraded or renewed tunnel, the requirements for new tunnels in this TSI apply. |
7.2.4. Operation of new rolling stock in existing tunnels
(a) |
The category of new rolling stock intended to be operated in existing tunnels shall be selected according to clause 4.4.6 (a). |
(b) |
However, a Member State may allow operation of new rolling stock of category A in existing tunnels longer than 5 km under the condition that the operation of such new rolling stock offers an equivalent or improved level of fire safety compared to the operation of previous rolling stock. The equivalent or improved level of safety to passengers and staff shall be demonstrated using the Common Safety Method on risk assessment. |
7.3. Specific cases
7.3.1. General
(a) |
The specific cases, as listed in the following clause, describe special provisions that are needed and authorised on particular networks of each Member State. |
(b) |
These specific cases are classified as ‘T’ cases: ‘temporary’ cases: it is planned that they can be included in the target system in the future. Consequently they will be re-examined in the course of future revisions of this TSI. |
(c) |
Any specific case applicable to rolling stock within the scope of this TSI in detailed in the LOC&PAS TSI. |
7.3.2. Operational rules related to trains running in tunnels (clause 4.4.6)
(a) Specific case Italy (‘T’)
Additional prescriptions for rolling stock intended to be operated in existing Italian tunnels are detailed in the LOC&PAS TSI, clause 7.3.2.20.
(b) Specific case Channel Tunnel (‘T’)
Additional prescriptions for passenger rolling stock intended to be operated in the Channel Tunnel are detailed in the LOC&PAS TSI, clause 7.3.2.21.
Appendix A
Standards or Normative Documents Referred to in this TSI
|
TSI |
|
|
Index N° |
Characteristics to be assessed |
Clause |
Normative document |
1 |
Design of escape signage |
4.2.1.5.5 |
ISO 3864-1:2011 |
2 |
Specification and assessment of self-rescue device |
4.7.1 6.2.8.1 |
EN 402:2003 |
3 |
Specification and assessment of self-rescue device |
4.7.1 6.2.8.1 |
EN 403:2004 |
4 |
Assessment of self-rescue device |
6.2.8.1 |
EN 13794:2002 |
Appendix B
Assessment of the Subsystems
For rolling stock, the sub-system characteristics that must be assessed in the different phases of design, development and production are specified in the LOC&PAS TSI.
For infrastructure and energy, the sub-system characteristics that must be assessed in the different phases of design, development and production are marked by X in the following table.
Characteristics to be assessed |
New line or upgrading/renewal project |
Particular assessment procedures |
|||
Design review |
Assembly before putting into service |
||||
1 |
2 |
3 |
|||
|
X |
X |
6.2.7.1 |
||
|
X |
|
6.2.7.2 |
||
|
X |
|
6.2.7.3 |
||
|
X |
X |
|
||
|
X |
|
6.2.7.4 |
||
|
X |
|
|
||
|
X |
|
|
||
|
X |
|
|
||
|
X |
X |
|
||
|
X |
X |
|
||
|
X |
|
|
||
|
X |
|
|
||
|
X |
|
|