Choose the experimental features you want to try

This document is an excerpt from the EUR-Lex website

Document 52024XC03107

    Commission notice concerning the application of the Regional Convention on pan-Euro-Mediterranean preferential rules of origin or the protocols on rules of origin providing for diagonal cumulation between the Contracting Parties to this Convention

    PUB/2024/368

    OJ C, C/2024/3107, 3.5.2024, ELI: http://data.europa.eu/eli/C/2024/3107/oj (BG, ES, CS, DA, DE, ET, EL, EN, FR, GA, HR, IT, LV, LT, HU, MT, NL, PL, PT, RO, SK, SL, FI, SV)

    ELI: http://data.europa.eu/eli/C/2024/3107/oj

    European flag

    Official Journal
    of the European Union

    EN

    C series


    C/2024/3107

    3.5.2024

    Commission notice concerning the application of the Regional Convention on pan-Euro-Mediterranean preferential rules of origin or the protocols on rules of origin providing for diagonal cumulation between the Contracting Parties to this Convention

    (C/2024/3107)

    For the purpose of the application of diagonal cumulation of origin among the Contracting Parties to the Regional Convention on pan-Euro-Mediterranean preferential rules of origin (1) (hereafter referred to as ‘the Convention’), the Parties concerned notify each other, through the European Commission, of the origin rules in force with the other Parties.

    It is recalled that diagonal cumulation can only be applied if the Parties of final manufacture and of final destination have concluded free trade agreements, containing identical rules of origin, with all the Parties participating in the acquisition of originating status, i.e. with all the Parties from which the materials used originate. Materials originating in a Party which has not concluded an agreement with the Parties of final manufacture and/or of final destination shall be treated as non-originating. Specific examples are given in the Explanatory Notes concerning the pan-Euro-Mediterranean protocols on rules of origin (2).

    Based on the notifications made by the Parties to the European Commission, the tables attached specify:

     

    Table 1 – a simplified overview of cumulation possibilities.

     

    Tables 2 and 3 – the date from which diagonal cumulation becomes applicable.

    In Table 1, an ‘X’ marks the existence between 2 partners of a free trade agreement containing rules of origin allowing cumulation based on pan-Euro-Mediterranean model rules of origin. To use diagonal cumulation with a third partner, an ‘X’ should be present in all the intersection of the table between the 3 partners. However, there are some exceptions to diagonal cumulation. For such cases, either (1), (2) or an (*) next to the ‘X’ will point out the exceptions to consider.

    In Table 2, the dates mentioned refer to:

    The date of application of diagonal cumulation on the basis of Article 3 of Appendix I to the Convention where the free trade agreement concerned refers to the Convention. In that case the date is preceded by ‘(C)’;

    The date of application of the protocols on rules of origin providing for diagonal cumulation attached to the free trade agreement concerned, in other cases;

    The date of application of diagonal cumulation on the basis of Article 7 of Appendix I to the Convention as amended by Decision No 1/2023 of the Joint Committee of the Convention of 7 December 2023  (3). In that case the date is preceded by ‘(R)’

    In Table 3 the dates mentioned refer to the date of application of the protocols on rules of origin providing for diagonal cumulation attached to the free trade agreements between the EU, Türkiye and the participants to the EU's Stabilisation and Association Process. Each time a reference to the Convention is made in a free trade agreement between Parties in this table, a date preceded by ‘(C)’ and/or ‘(R)’, as the case may be, has been added in Table 2.

    It is also recalled that materials originating in Türkiye covered by the EU- Türkiye customs union can be incorporated as originating materials for the purpose of diagonal cumulation between the European Union and the countries participating in the Stabilisation and Association Process with which an origin protocol is in force.

    The codes for the Contracting Parties listed in the tables are given here below.

    European Union

    EU

    EFTA States:

    Iceland

    IS

    Switzerland (including Liechtenstein) (4)

    CH (+ LI)

    Norway

    NO

    The Faroe Islands

    FO

    The participants in the Barcelona Process:

    Algeria

    DZ

    Egypt

    EG

    Israel

    IL

    Jordan

    JO

    Lebanon

    LB

    Morocco

    MA

    Palestine (*1)

    PS

    Syria

    SY

    Tunisia

    TN

    Türkiye

    TR

    The participants in the EU’s Stabilisation and Association Process:

    Albania

    AL

    Bosnia and Herzegovina

    BA

    North Macedonia

    MK

    Montenegro

    ME

    Serbia

    RS

    Kosovo (*2)

    KO

    The Republic of Moldova

    MD

    Georgia

    GE

    Ukraine

    UA

    This notice replaces the notice published in OJ C/2024/1623 of 22.02.2024 ).

    Table 1

    Simplified overview of diagonal cumulation possibilities in the pan-Euro-Med zone

     

     

    EFTA states

     

    Participants in the Barcelona Process

     

    Participants in the EU’s Stabilisation and Association Process

     

     

     

     

    EU

    CH (+LI)

    IS

    NO

    FO

    DZ

    EG

    IL

    JO

    LB

    MA

    PS

    SY

    TN

    TR

    AL

    BA

    KO

    ME

    MK

    RS

    MD

    GE

    UA

    EU

     

    X

    X

    X

    X

    X

    X

    X

    X

     

    X

    X

     

    X

    X (5)

    X

    X

    X

    X

    X

    X

    X

    X

    X

    CH (+LI)

    X

     

    X

    X

    X

     

    X

    X

    X

    X

    X

    X

     

    X

    X

    X

    X

     

    X

    X

    X

     

    X

    X

    IS

    X

    X

     

    X

    X

     

    X

    X

    X

    X

    X

    X

     

    X

    X

    X

    X

     

    X

    X

    X

     

    X

    X

    NO

    X

    X

    X

     

    X

     

    X

    X

    X

    X

    X

    X

     

    X

    X

    X

    X

     

    X

    X

    X

     

    X

    X

    FO

    X

    X

    X

    X

     

     

     

     

     

     

     

     

     

     

    X

     

     

     

     

     

     

     

     

     

    DZ

    X

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

    EG

    X

    X

    X

    X

     

     

     

     

    X

     

    X

     

     

    X

    X

     

     

     

     

     

     

     

     

     

    IL

    X

    X

    X

    X

     

     

     

     

    X

     

     

     

     

     

    X

     

     

     

     

     

     

     

     

     

    JO

    X

    X

    X

    X

     

     

    X

    X

     

     

    X

     

     

    X

     

     

     

     

     

     

     

     

     

     

    LB

     

    X

    X

    X

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

    MA

    X

    X

    X

    X

     

     

    X

     

    X

     

     

     

     

    X

    X

     

     

     

     

     

     

     

     

     

    PS

    X

    X

    X

    X

     

     

     

     

     

     

     

     

     

     

    X

     

     

     

     

     

     

     

     

     

    SY

     

     

     

     

     

     

     

     

     

     

     

     

     

     

    X

     

     

     

     

     

     

     

     

     

    TN

    X

    X

    X

    X

     

     

    X

     

    X

     

    X

     

     

     

    X

     

     

     

     

     

     

     

     

     

    TR

    X (5)

    X

    X

    X

    X

     

    X

    X

     

     

    X

    X

    X

    X

     

    X (*3)

    X (*3)

     (*3)

    X (*3)

    X (*3)

    X (*3)

    X

    X (6)

     

    AL

    X

    X

    X

    X

     

     

     

     

     

     

     

     

     

     

    X (*3)

     

    X

    X

    X

    X

    X

    X

     

     

    BA

    X

    X

    X

    X

     

     

     

     

     

     

     

     

     

     

    X (*3)

    X

     

    X

    X

    X

    X

    X

     

     

    KO

    X

     

     

     

     

     

     

     

     

     

     

     

     

     

     (*3)

    X

    X

     

    X

    X

    X

    X

     

     

    ME

    X

    X

    X

    X

     

     

     

     

     

     

     

     

     

     

    X (*3)

    X

    X

    X

     

    X

    X

    X

     

     

    MK

    X

    X

    X

    X

     

     

     

     

     

     

     

     

     

     

    X (*3)

    X

    X

    X

    X

     

    X

    X

     

    X

    RS

    X

    X

    X

    X

     

     

     

     

     

     

     

     

     

     

    X (*3)

    X

    X

    X

    X

    X

     

    X

     

     

    MD

    X

     

     

     

     

     

     

     

     

     

     

     

     

     

    X

    X

    X

    X

    X

    X

    X

     

     

    X

    GE

    X

    X

    X

    X

     

     

     

     

     

     

     

     

     

     

    X (6)

     

     

     

     

     

     

     

     

    X

    UA

    X

    X

    X

    X

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

    X

     

    X

    X

     

    Table 2

    Date of application of rules of origin providing for diagonal cumulation in the pan-Euro-Med zone

     

     

    EFTA states

     

    Participants in the Barcelona Process

     

    Participants in the EU's Stabilisation and Association Process

     

     

     

     

    EU

    CH(+LI)

    IS

    NO

    FO

    DZ

    EG

    IL

    JO

    LB

    MA

    PS

    SY

    TN

    TR

    AL

    BA

    KO

    ME

    MK

    RS

    MD

    GE

    UA

    EU

     

    1.1.2006

    (C)1.2.2016

    (R) 1.1.2025

    1.1.2006

    (C) 1.5.2015

    (R) 1.1.2025

    1.1.2006

    (C) 1.5.2015

    (R) 1.1.2025

    1.12.2005

    (C) 12.5.2015

    (R) 1.1.2025

    1.11.2007

    1.3.2006

    (C) 1.2.2016

    1.1.2006

    1.7.2006

    (C) 01.09.2021

    (R) 1.1.2025

     

    1.12.2005

    1.7.2009

    (C) 1.3.2016

    (R) 1.1.2025

     

    1.8.2006

     (7)

    (C) 1.5.2015

    (R) 1.1.2025

    (C) 9.12.2016

    (R) 1.1.2025

    (C) 1.4.2016

    (R) 1.1.2025

    (C) 1.2.2015

    (R) 1.1.2025

    (C) 1.5.2015

    (R) 1.1.2025

    (C) 1.2.2015

    (R) 1.1.2025

    (C) 1.12.2016

    (R) 1.1.2025

    (C) 1.6.2018

    (R) 1.1.2025

    (C) 1.1.2019

    (R) 1.1.2025

    CH

    (+LI)

    1.1.2006

    (C) 1.2. 2016

    (R) 1.1.2025

     

    1.8.2005

    (C) 1.7.2013

    (R) 1.1.2025

    1.8.2005

    (C) 1.7.2013

    (R) 1.1.2025

    1.1.2006

     

    1.8.2007

    1.7.2005

    17.7.2007

    1.1.2007

    1.3.2005

    1.5.2016

     

    1.6.2005

    1.9.2007

    (C) 1.12.2019

    (C) 1.5.2015

    (R) 1.1.2025

    (C) 1.1.2015

    (R) 1.1.2025

     

    (C) 1.9.2012

    (R) 1.1.2025

    1.2.2016

    (C) 1.4.2022

    (R) 1.1.2025

    (C) 1.5.2015

    (R) 1.1.2025

     

    (C) 1.5.2018

    (R) 1.1.2025

    1.6.2012

    IS

    1.1.2006

    (C) 1.5.2015

    (R) 1.1.2025

    1.8.2005

    (C) 1.7.2013

    (R) 1.1.2025

     

    1.8.2005

    (C) 1.7.2013

    (R) 1.1.2025

    1.11.2005

     

    1.8.2007

    1.7.2005

    17.7.2007

    1.1.2007

    1.3.2005

    1.5.2016

     

    1.3.2006

    1.9.2007

    (C) 1.12.2019

    (C) 1.5.2015

    (R) 1.1.2025

    (C) 1.1.2015

    (R) 1.1.2025

     

    (C) 1.10.2012

    (R) 1.1.2025

    1.5.2015

    (C) 1.4.2022

    (R) 1.1.2025

    (C) 1.5.2015

    (R) 1.1.2025

     

    (C) 1.9.2017

    (R) 1.1.2025

    1.6.2012

    NO

    1.1.2006

    (C) 1.5.2015

    (R) 1.1.2025

    1.8.2005

    (C) 1.7.2013

    (R) 1.1.2025

    1.8.2005

    (C) 1.7.2013

    (R) 1.1.2025

     

    1.12.2005

     

    1.8.2007

    1.7.2005

    17.7.2007

    1.1.2007

    1.3.2005

    1.5.2016

     

    1.8.2005

    1.9.2007

    (C) 1.12.2019

    (C) 1.5.2015

    (R) 1.1.2025

    (C) 1.1.2015

    (R) 1.1.2025

     

    (C) 1.11.2012

    (R) 1.1.2025

    1.5.2015

    (C) 1.4.2022

    (R) 1.1.2025

    (C) 1.5.2015

    (R) 1.1.2025

     

    (C) 1.9.2017

    (R) 1.1.2025

    1.6.2012

    FO

    1.12.2005

    (C) 12.5.2015

    1.1.2006

    1.11.2005

    1.12.2005

     

     

     

     

     

     

     

     

     

     

    (C) 1.10.2017

     

     

     

     

     

     

     

     

     

    DZ

    1.11.2007

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

    EG

    1.3.2006

    (C) 1.2.2016

    1.8.2007

    1.8.2007

    1.8.2007

     

     

     

     

    6.7.2006

     

    6.7.2006

     

     

    6.7.2006

    1.3.2007

     

     

     

     

     

     

     

     

     

    IL

    1.1.2006

    1.7.2005

    1.7.2005

    1.7.2005

     

     

     

     

    9.2.2006

     

     

     

     

     

    1.3.2006

     

     

     

     

     

     

     

     

     

    JO

    1.7.2006

    (C) 01.09.2021

    (R) 1.1.2025

    17.7.2007

    17.7.2007

    17.7.2007

     

     

    6.7.2006

    9.2.2006

     

     

    6.7.2006

     

     

    6.7.2006

     

     

     

     

     

     

     

     

     

     

    LB

     

    1.1.2007

    1.1.2007

    1.1.2007

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

    MA

    1.12.2005

    1.3.2005

    1.3.2005

    1.3.2005

     

     

    6.7.2006

     

    6.7.2006

     

     

     

     

    6.7.2006

    1.1.2006

     

     

     

     

     

     

     

     

     

    PS

    1.7.2009

    (C) 1.3.2016

    (R) 1.1.2025

    1.5.2016

    1.5.2016

    1.5.2016

     

     

     

     

     

     

     

     

     

     

    (C)) 26.03.2021

     

     

     

     

     

     

     

     

     

    SY

     

     

     

     

     

     

     

     

     

     

     

     

     

     

    1.1.2007

     

     

     

     

     

     

     

     

     

    TN

    1.8.2006

    1.6.2005

    1.3.2006

    1.8.2005

     

     

    6.7.2006

     

    6.7.2006

     

    6.7.2006

     

     

     

    1.7.2005

     

     

     

     

     

     

     

     

     

    TR

     (7)

    1.9.2007

    (C) 1.12.2019

    1.9.2007

    (C) 1.12.2019

    1.9.2007

    (C) 1.12.2019

    (C) 1.10.2017

     

    1.3.2007

    1.3.2006

     

     

    1.1.2006

    (C)) 26.03.2021

    1.1.2007

    1.7.2005

     

    (C) 3.05.2021

    (C) 1.08.2021

    1.9.2019

    (C) 1.06.2021

    ( C) 1.8.2018

    (C) 1.6.2019

    (C) 1.10.2017

    (C) 29.04.2021

     

    AL

    (C) 1.5.2015

    (R) 1.1.2025

    (C) 1.5.2015

    (R) 1.1.2025

    (C) 1.5.2015

    (R) 1.1.2025

    (C) 1.5.2015

    (R) 1.1.2025

     

     

     

     

     

     

     

     

     

     

    (C) 3.05.2021

     

    (C) 1.2.2015

    (R) 1.1.2025

    (C) 1.4.2014

    (R) 1.1.2025

    (C) 1.4.2014

    (R) 1.1.2025

    (C) 1.4.2014

    (R) 1.1.2025

    (C) 1.4.2014

    (R) 1.1.2025

    (C) 1.4.2014

    (R) 1.1.2025

     

     

    BA

    (C) 9.12.2016

    (R) 1.1.2025

    (C) 1.1.2015

    (R) 1.1.2025

    (C) 1.1.2015

    (R) 1.1.2025

    (C) 1.1.2015

    (R) 1.1.2025

     

     

     

     

     

     

     

     

     

     

    (C) 1.08.2021

    (C) 1.2.2015

    (R) 1.1.2025

     

    (C) 1.4.2014

    (R) 1.1.2025

    (C) 1.2.2015

    (R) 1.1.2025

    (C) 1.2.2015

    (R) 1.1.2025

    (C) 1.2.2015

    (R) 1.1.2025

    (C) 1.4.2014

    (R) 1.1.2025

     

     

    KO

    (C) 1.4.2016

    (R) 1.1.2025

     

     

     

     

     

     

     

     

     

     

     

     

     

    1.9.2019

    (C) 1.4.2014

    (R) 1.1.2025

    (C) 1.4.2014

    (R) 1.1.2025

     

    (C) 1.4.2014

    (R) 1.1.2025

    (C) 1.4.2014

    (R) 1.1.2025

    (C) 1.4.2014

    (R) 1.1.2025

    (C) 1.4.2014

    (R) 1.1.2025

     

     

    ME

    (C) 1.2.2015

    (R) 1.1.2025

    (C) 1.9.2012

    (R) 1.1.2025

    (C) 1.10.2012

    (R) 1.1.2025

    (C) 1.11.2012

    (R) 1.1.2025

     

     

     

     

     

     

     

     

     

     

    (C) 1.06.2021

    (C) 1.4.2014

    (R) 1.1.2025

    (C) 1.2.2015

    (R) 1.1.2025

    (C) 1.4.2014

    (R) 1.1.2025

     

    (C) 1.4.2014

    (R) 1.1.2025

    (C) 1.4.2014

    (R) 1.1.2025

    (C) 1.4.2014

    (R) 1.1.2025

     

     

    MK

    (C) 1.5.2015

    (R) 1.1.2025

    1.2.2016

    (C) 1.4.2022

    (R) 1.1.2025

    1.5.2015

    (C) 1.4.2022

    (R) 1.1.2025

    1.5.2015

    (C) 1.4.2022

    (R) 1.1.2025

     

     

     

     

     

     

     

     

     

     

    (C) 1.8.2018

    (C) 1.4.2014

    (R) 1.1.2025

    (C) 1.2.2015

    (R) 1.1.2025

    (C) 1.4.2014

    (R) 1.1.2025

    (C) 1.4.2014

    (R) 1.1.2025

     

    (C) 1.4.2014

    (R) 1.1.2025

    (C) 1.4.2014

    (R) 1.1.2025

     

    (C) 06.07.2023

    (R) 1.1.2025

    RS

    (C) 1.2.2015

    (R) 1.1.2025

    (C) 1.5.2015

    (R) 1.1.2025

    (C) 1.5.2015

    (R) 1.1.2025

    (C) 1.5.2015

    (R) 1.1.2025

     

     

     

     

     

     

     

     

     

     

    (C) 1.6.2019

    (C) 1.4.2014

    (R) 1.1.2025

    (C) 1.2.2015

    (R) 1.1.2025

    (C) 1.4.2014

    (R) 1.1.2025

    (C) 1.4.2014

    (R) 1.1.2025

    (C) 1.4.2014

    (R) 1.1.2025

     

    (C) 1.4.2014

    (R) 1.1.2025

     

     

    MD

    (C) 1.12.2016

    (R) 1.1.2025

     

     

     

     

     

     

     

     

     

     

     

     

     

    (C) 1.10.2017

    (C)1.4.2014

    (R) 1.1.2025

    (C) 1.4.2014

    (R) 1.1.2025

    (C) 1.4.2014

    (R) 1.1.2025

    (C) 1.4.2014

    (R) 1.1.2025

    (C) 1.4.2014

    (R) 1.1.2025

    (C) 1.4.2014

    (R) 1.1.2025

     

     

    (C) 24.5.2023

    (R) 1.1.2025

    GE

    (C) 1.6.2018

    (R) 1.1.2025

    (C) 1.5.2018

    (R) 1.1.2025

    (C) 1.9.2017

    (R) 1.1.2025

    (C) 1.9.2017

    (R) 1.1.2025

     

     

     

     

     

     

     

     

     

     

    (C) 29.04.2021

     

     

     

     

     

     

     

     

    (C) 26.3.2020

    UA

    (C) 1.1.2019

    (R) 1.1.2025

    1.6.2012

    1.6.2012

    1.6.2012

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

    (C) 6.7.2023

    (R) 1.1.2025

     

    (C) 24.5.2023

    (R) 1.1.2025

    (C) 26.3.2020

     

    Table 3

    Date of application of the protocols on rules of origin providing for diagonal cumulation between the European Union, Albania, Bosnia and Herzegovina, Kosovo, North Macedonia, Montenegro, Serbia and Türkiye

     

    EU

    AL

    BA

    KO

    MK

    ME

    RS

    TR

    EU

     

    1.1.2007

    1.7.2008

    1.4.2016

    1.1.2007

    1.1.2008

    8.12.2009

     (8)

    AL

    1.1.2007

     

    22.11.2007

    1.4.2014

    26.7.2007

    26.7.2007

    24.10.2007

    1.8.2011

    BA

    1.7.2008

    22.11.2007

     

    1.4.2014

    22.11.2007

    22.11.2007

    22.11.2007

    14.12.2011

    KO

    1.4.2016

    1.4.2014

    1.4.2014

     

    1.4.2014

    1.4.2014

    1.4.2014

    1.9.2019

    MK

    1.1.2007

    26.7.2007

    22.11.2007

    1.4.2014

     

    26.7.2007

    24.10.2007

    1.7.2009

    ME

    1.1.2008

    26.7.2007

    22.11.2007

    1.4.2014

    26.7.2007

     

    24.10.2007

    1.3.2010

    RS

    8.12.2009

    24.10.2007

    22.11.2007

    1.4.2014

    24.10.2007

    24.10.2007

     

    1.9.2010

    TR

     (8)

    1.8.2011

    14.12.2011

    1.9.2019

    1.7.2009

    1.3.2010

    1.9.2010

     


    (1)   OJ L 54, 26.2.2013, p. 4.

    (2)   OJ C 83, 17.4.2007, p. 1.

    (3)   OJ L, 2024/390, 19.2.2024, ELI: http://data.europa.eu/eli/dec/2024/390/oj

    (4)  Switzerland and the Principality of Liechtenstein form a customs union.

    (*1)  This designation shall not be construed as recognition of a State of Palestine and is without prejudice to the individual positions of the Member States on this issue

    (*2)  This designation is without prejudice to positions on status and is in line with UNSCR 1244 and the ICJ Opinion on the Kosovo Declaration of Independence.

    (*3)  Diagonal cumulation between Türkiye, Albania, Bosnia and Herzegovina, Kosovo, North Macedonia, Montenegro and Serbia is possible. However, plese see Table 3 for the possibility of diagonal cumulation between the European Union, Türkiye, Albania, Bosnia and Herzegovina, Kosovo, North Macedonia, Montenegro and Serbia.

    (5)  For goods covered by the EU- Türkiye customs union, the date of application is 27 July 2006.

    For agricultural products, the date of application is 1 January 2007(cumulation is not applicable with MD and GE).

    For coal and steel products, the date of application is 1 March 2009(cumulation is not applicable with MD and GE)

    (6)  For the products:

    under Chapters 1 to 24 of the Harmonised Commodity Description and Coding System; and

    covered by the Annex 1 to the FTA between the Republic of Türkiye and Georgia cumulation of origin can be applied only when originating in the Republic of Türkiye and Georgia

    (7)  For goods covered by the EU- Türkiye customs union, the date of application is 27 July 2006.

    For agricultural products, the date of application is 1 January 2007.

    For coal and steel products, the date of application is 1 March 2009.

    (8)  For goods covered by the EU- Türkiye customs union, the date of application is 27 July 2006. Not applicable for agricultural products and for coal and steel products.


    ANNEX

    Notifications concerning electronic issuance of movement certificates EUR.1 and EUR-MEDaccording to paragraph 1(d) of the Recommendation no 1/2023 of the Joint Committee of the Convention (1)

    Norway

    System: Altinn - the government portal for digital dialogue between businesses, private individuals and public agencies

    Starting date: 02.04.2020

    Link to verify authenticity the movement certificates: https://eur1.toll.no

    Türkiye

    System: MEDOS - ‘The Automation System for Certificates of Origin and Movement Certificates’

    Starting date: 24 April 2018

    Unique link for every movement certificate starts with ‘ https://mdc.gtb.gov.tr or ’ https://uygulama.gtb.gov.tr (accessed by scanning the QR code on the certificate or by typing the path printed on the certificate)

    Morocco

    Starting date: 12 January 2021

    Link to verify authenticity the movement certificates: http://www2.douane.gov.ma/certificate/

    Israel

    System: Global Gate

    Starting date: 1 April 2024

    Link to verify authenticity the movement certificates:

    https://shaarolami-query.customs.mof.gov.il/CustomsPilotWeb/CertificateOfOrigin


    (1)   OJ L, 2024/243, 15.1.2024, ELI: http://data.europa.eu/eli/reco/2024/243/oj


    ELI: http://data.europa.eu/eli/C/2024/3107/oj

    ISSN 1977-091X (electronic edition)


    Top