EUR-Lex Access to European Union law

Back to EUR-Lex homepage

This document is an excerpt from the EUR-Lex website

Document 32022D2462

Commission Implementing Decision (EU) 2022/2462 of 14 December 2022 amending Commission Implementing Decision (EU) 2016/2323 establishing the European List of ship recycling facilities pursuant to Regulation (EU) No 1257/2013 of the European Parliament and of the Council (Text with EEA relevance)

C/2022/9292

OJ L 321, 15.12.2022, p. 42–70 (BG, ES, CS, DA, DE, ET, EL, EN, FR, GA, HR, IT, LV, LT, HU, MT, NL, PL, PT, RO, SK, SL, FI, SV)

Legal status of the document In force

ELI: http://data.europa.eu/eli/dec_impl/2022/2462/oj

15.12.2022   

EN

Official Journal of the European Union

L 321/42


COMMISSION IMPLEMENTING DECISION (EU) 2022/2462

of 14 December 2022

amending Commission Implementing Decision (EU) 2016/2323 establishing the European List of ship recycling facilities pursuant to Regulation (EU) No 1257/2013 of the European Parliament and of the Council

(Text with EEA relevance)

THE EUROPEAN COMMISSION,

Having regard to the Treaty on the Functioning of the European Union,

Having regard to Regulation (EU) No 1257/2013 of the European Parliament and of the Council of 20 November 2013 on ship recycling and amending Regulation (EC) No 1013/2006 and Directive 2009/16/EC (1), and in particular Article 16 thereof,

Whereas:

(1)

Article 6(2) of Regulation (EU) No 1257/2013 requires ship owners to ensure that ships destined to be recycled are only recycled at ship recycling facilities included in the European List of ship recycling facilities (‘European List’) published pursuant to Article 16 of that Regulation.

(2)

The European List is set out in Commission Implementing Decision (EU) 2016/2323 (2).

(3)

The authorisation of UAB Armar and Démonaval Recycling, ship recycling facilities located respectively in Lithuania and in France, had an expiry date respectively on 19 April 2022 and 11 December 2022. The Commission has received information from Lithuania and France that the authorisation granted to those facilities to conduct ship recycling has been renewed prior to its expiry, in accordance with Article 14 of Regulation (EU) No 1257/2013. The date of expiry of the inclusion of these facilities in the European List should therefore be updated.

(4)

Bulgaria has informed the Commission that Ship and Industrial Service Ltd., a ship recycling facility located in its territory, has been authorised by the competent authority, in accordance with Article 14 of Regulation (EU) No 1257/2013. Bulgaria has provided the Commission with all information relevant for that facility to be included in the European List. The European List should therefore be updated to include that facility.

(5)

The Commission has been informed of changes of the contact details of Dales Marine Services Ltd and of Gardet & De Bezenac Recycling, ship recycling facilities located respectively in the United Kingdom and in France. The European List should therefore be updated accordingly.

(6)

The Commission has been informed by Kishorn Port Ltd about modification of the licence that limits the operations and places conditions on the operator of the facility. The change increases the maximum ship dimensions that are accepted. The European List should therefore be updated accordingly.

(7)

The Commission has carried out a mid-term review of Işıksan, a ship recycling facility located in Türkiye, in accordance with Article 15(4) of Regulation (EU) No 1257/2013, which could not confirm that the facility in question continues to comply with the relevant requirements of Article 13(1), in particular points (b), (f) and (i), of Regulation (EU) No 1257/2013. Furthermore, it has been established that the facility in question has failed to comply with the requirements concerning the recycling of EU Member States flag ships set out in Article 13(2), points (a) to (c), of Regulation (EU) No 1257/2013. In addition, the information available does not allow to conclude that a number of ships flying the flag of EU Member States destined to be recycled at Işıksan were finally dismantled in that facility, but indicates that they were instead transferred at nearby facilities which are not included on the European List. This practice represents a breach of the requirements pursuant to Article 13(1) point (e) of the Regulation (EU) No 1257/2013 that requires that operators of facilities included in the European List must recycle ships flying the flag of EU Member States at their facility in accordance with a ship-specific recycling plan. The European List should therefore be updated to remove this facility.

(8)

The Commission has carried out an assessment of accident investigation and root cause analysis of two fatal accidents that occurred in February 2021 and June 2022 in Simsekler, another ship recycling facility located in Türkiye. The assessments concluded that the causes of the accidents were due not only to individual actions, but rather to underlying organisational factors that the yard should focus on to improve their control of risk. In addition, the report on the first fatal accident transmitted to the facility in June 2021 included a number of concrete recommendations to improve workers’ safety. The Commission request to be kept informed of the measures taken in this respect was not followed up by the facility. The facility in question has therefore failed to comply with the relevant requirements of Article 13(1), in particular points (b), (f) and (i), of Regulation (EU) No 1257/2013. Consequently, the European List should be updated to remove this facility.

(9)

Implementing Decision (EU) 2016/2323 should therefore be amended accordingly.

(10)

The measures provided for in this Decision are in accordance with the opinion of the Committee established by Article 25 of Regulation (EU) No 1257/2013,

HAS ADOPTED THIS DECISION:

Article 1

The Annex to Implementing Decision (EU) 2016/2323 is replaced by the text in the Annex to this Decision.

Article 2

This Decision shall enter into force on the twentieth day following that of its publication in the Official Journal of the European Union.

Done at Brussels, 14 December 2022.

For the Commission

The President

Ursula VON DER LEYEN


(1)   OJ L 330, 10.12.2013, p. 1.

(2)  Commission Implementing Decision (EU) 2016/2323 of 19 December 2016 establishing the European List of ship recycling facilities pursuant to Regulation (EU) No 1257/2013 of the European Parliament and of the Council on ship recycling (OJ L 345, 20.12.2016, p. 119).


ANNEX

‘ANNEX

The European List of ship recycling facilities referred to in Article 16 of Regulation (EU) No 1257/2013

PART A

Ship recycling facilities located in a Member State

Name of the facility

Method of recycling

Type and size of ships that can be recycled

Limitations and conditions under which the ship recycling facility operates, including as regards hazardous waste management

Details on the explicit or tacit procedure for the approval of the ship recycling plan by the competent authority (1)

Maximum annual ship recycling output, calculated as the sum of the weight of ships expressed in LDT that have been recycled in a given year in that facility (2)

Date of expiry of inclusion in the European List (3)

BELGIUM

NV Galloo Recycling Ghent

Scheepszatestraat 9

9000 Gent

Belgium

Phone: +32(0)9/251 25 21

Email: peter.wyntin@galloo.com

Alongside (wet berth), slope

Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013

Maximum ship dimensions:

Length: 265 metres

Width: 37 metres

Draught: 12,5 metres

 

Tacit approval, with a maximum review period of 30 days

34 000  (4)

31 March 2025

BULGARIA

Ship and Industrial Service Ltd

Slipway 3

Asparuhovo district

9000 Varna

Bulgaria

Phone: + 359 888 334114

Email: d_kondov@yahoo.co.uk

Drydock

Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013

Maximum ship dimensions:

Length: 140 metres

Width: 16 metres

Draught: 6 metres

Lightweight: 1 800 tons

The limitations and conditions are laid down in the waste management permit (Decision No 03-DO-655-00/25.1.2019)

Explicit approval with a maximum review period of 30 days. The competent authority for the approval decision is the Director of the Regional Inspectorate of Environment and Water where the ship recycling facility is located

12 500  (5)

25 January 2024

DENMARK

FAYARD A/S

Kystvejen 100

DK-5330 Munkebo

Denmark

www.fayard.dk

Phone: +45 7592 0000

Email: fayard@fayard.dk

Drydock

Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013

Maximum ship dimensions:

Length: 415 metres

Width: 90 metres

Draught: 7,8 metres

The ship recycling facility is regulated in accordance with applicable legislation and with the conditions set out in Environmental Permit of 7 November 2018 issued by the Municipality of Kerteminde. The Environmental Permit includes conditions for operating hours, special operating conditions, handling and storage of waste and also includes a condition that the activity must be carried out in a dry dock.

Tacit approval, with a maximum review period of 14 days.

0  (6)

7 November 2023

Fornæs ApS

Rolshøjvej 12-16

8500 Grenaa

Denmark

www.fornaes.com

Phone: +45 86326393

Email: recycling@fornaes.dk

Alongside, drydock

Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013

Maximum ship dimensions:

Length: 150 metres

Width: 25 metres

Draught: 7 metres

GT: 10 000

The municipality of Norddjurs has the right to allocate hazardous waste for environmentally approved reception facilities.

Tacit approval, with a maximum review period of 14 days.

30 000  (7)

12 May 2026

Jatob ApS

Langerak 12

9900 Frederikshavn

Denmark

www.jatob.dk

Phone: +45 8668 1689

Email: post@jatob.dk

mathias@jatob.dk

Alongside, slipway

Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013

Maximum ship dimensions:

Length: 150 metres

Width: 30 metres

Draught: 6 metres

Handling and storage of waste fractions is given by Environmental Authorization. Intermediate storage of hazardous waste may occur for up to one year at the site.

Tacit approval, with a maximum review period of 14 days.

13 000  (8)

9 March 2025

Modern American Recycling Services Europe (M.A.R.S)

Sandholm 60

9900 Frederikshavn

Denmark

www.modernamericanrecyclingservices.com/

Email: kim@mars-eu.dk

Slipway

Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013

Maximum ship dimensions:

Length: 290 metres

Width: 90 metres

Draught: 14 metres

The conditions under which the ship recycling facility operates are defined in the Environmental Permit of 9 March 2018 issued by the Municipality of Frederikshavn.

The Municipality of Frederikshavn has the right to allocate hazardous waste to environmentally approved reception facilities.

The facility must not store hazardous waste for more than one year.

Tacit approval, with a maximum review period of 14 days.

0  (9)

23 August 2023

Smedegaarden A/S

Vikingkaj 5

6700 Esbjerg

Denmark

www.smedegaarden.net

Phone: +45 75128888

Email: m@smedegaarden.net

Alongside, slipway

Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013

Maximum ship dimensions:

Length: 200 metres*

Width: 48 metres

Draught: 7,5 metres

(*If length > 170 metres, acceptation from the Municipality of Esbjerg is required)

The conditions under which the ship recycling facility operates are defined in the Environmental Permit of 4 June 2015 issued by the Municipality of Esbjerg.

The Municipality of Esbjerg has the right to allocate hazardous waste to environmentally approved reception facilities.

Tacit approval, with a maximum review period of 14 days

20 000  (10)

11 March 2026

Stena Recycling A/S

Grusvej 6

6700 Esbjerg

Denmark

www.stenarecycling.dk

Phone: +45 20699190

Email: jakob.kristensen@stenarecycling.com

Drydock

Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013.

Maximum ship dimensions:

 

Length: 40 metres

 

Width: 40 metres

 

Draught: 10 metres

The conditions under which the ship recycling facility operates are defined in the Environmental Permit of 5 October 2017 issued by Esbjerg Municipality.

Esbjerg Municipality has the right to allocate hazardous waste to environmentally approved reception facilities, as set out in the Environmental Permit for the ship recycling facility

Tacit approval, with a maximum review period of 14 days

0  (11)

7 February 2024

ESTONIA

BLRT Refonda Baltic OÜ

Kopli 103, 11712 Tallinn, Estonia

Phone: +372 610 2933

Fax +372 610 2444

Email: refonda@blrt.ee

www.refonda.ee

Afloat at the quayside and in the floating dock

Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013

Maximum ship dimensions:

Length: 197 metres

Width: 32 metres

Draught: 9,6 metres

Waste permit No KL-511809. Hazardous waste management licence No 0546. Rules of the Vene-Balti Port, Manual on Ships Recycling MSR-Refonda. Environmental Management System, Waste management EP 4.4.6-1-13

The facility can recycle only the hazardous materials for which it has been licensed.

Tacit approval, with a maximum review period of 30 days.

24 364  (12)

15 February 2026

SPAIN

DESGUACE INDUSTRIAL Y NAVAL, S.L.U. (DINA)

Vega de Tapia, s/n

48903 Barakaldo-Bizkaia

Spain

Phone: +34 944 971 552

Email: dina@dinascrapping.com

www.redena.es

Alongside, dismantling ramp

Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013

Maximum ship dimensions:

Length: 120 metres

Width: 20 metres

Draught: 6 metres

The limitations are included in the integrated environmental authorisation.

Tacit approval. The competent authority for approval is the environmental authority of the Autonomous Community where the facility is located.

2 086  (13)

3 March 2026

DDR VESSELS XXI, S.L.

Port of “El Musel”

Gijon

Spain

Phone: +34 630 14 44 16

Email: abarredo@ddr-vessels.com

Alongside, dismantling ramp

Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013

Maximum ship dimensions:

Length: 169,9 metres

(Ships above that size which can operate a zero rollover or negative ramp movement may be accepted depending on the outcome of a detailed feasibility study)

Width: 25 metres

The limitations are included in the integrated environmental authorisation.

Tacit approval. The competent authority for approval is the environmental authority of the Autonomous Community where the facility is located.

3 600  (14)

28 July 2025

FRANCE

Démonaval Recycling

ZI du Malaquis

Rue François Arago

76580 LE TRAIT

Phone: (+ 33) (0)7 69 79 12 80

Email: patrick@demonaval-recycling.fr

Alongside, drydock

Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013

Maximum ship dimensions:

Length: 140 metres

Width: 25 metres

Depth: 5 metres

Environmental limitations are defined in the prefectural authorisation.

Explicit approval – The competent authority for the approval decision is the minister of environment

1 500  (15)

21 September 2027

GARDET & DE BEZENAC Recycling

/Groupe BAUDELET ENVIRONNEMENT – GIE MUG

616, Boulevard Jules Durand

76600 Le Havre

France

Phone: +33(0)2 35 95 16 34

Email: normandie@baudelet.fr

Floating and slipway

Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013

Maximum ship dimensions:

Length: 150 metres

Width: 18 metres

Depth: 7 metres

LDT: 7 000

Environmental limitations are defined in the prefectural authorisation.

Explicit approval – The competent authority for the approval decision is the minister of environment.

7 730  (16)

29 December 2026

Grand Port Maritime de Bordeaux

152, Quai de Bacalan – CS 41320 – 33082 Bordeaux Cedex

France

Phone: +33(0)5 56 90 58 00

Email: maintenance@bordeaux-port.fr

Alongside, drydock

Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013

Maximum ship dimensions:

Length: 240 metres

Width: 37 metres

Depth: 17 metres

Environmental limitations are defined in the prefectural authorisation.

Explicit approval – The competent authority for the approval decision is the minister of environment.

9 000  (17)

27 September 2026

Recycleurs Bretons – Navaléo

170 rue Jacqueline Auriol

29470 Guipavas

France

Phone: +33(0)2 98 01 11 06

Email: navaleo@navaleo.fr

Alongside, drydock

Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013

Maximum ship dimensions:

Length: 225 metres

Width: 34 metres

Depth: 27 metres

Environmental limitations are defined in the prefectural authorisation.

Explicit approval – The competent authority for the approval decision is the minister of environment.

15 000  (18)

19 June 2025

ITALY

San Giorgio del Porto S.p.A.

Calata Boccardo 8

16128 – Genova –

Italy

Phone: +39 (0)10 251561

Email:

segreteria@sgdp.it;

sangiorgiodelporto@legalmail.it

www.sgdp.it

Alongside, drydock

Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013

Maximum ship dimensions:

Length: 350 metres

Width: 75 metres

Depth: 16 metres

GT: 130 000

The limitations and restrictions are included in the integrated environmental authorisation.

Explicit approval

38 564  (19)

6 June 2023

LATVIA

“Galaksis N”, Ltd.

Kapsedes street 2D,

Liepāja, LV – 3414

Latvia

Phone: +371 29410506

Email: galaksisn@inbox.lv

Alongside (wet berth), drydock

Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013

Maximum ship dimensions:

Length: 165 metres

Width:22 metres

Depth: 7 metres

GT: 12 000

See national permit No LI12IB0053

Explicit approval – written notification in 30 working days

0  (20)

17 July 2024

LITHUANIA

UAB APK

Minijos 180 (berth 133A), LT 93269, Klaipėda,

Lithuania

Phone: +370 (46) 365776

Fax +370 (46) 365776

Email: uab.apk@gmail.com

Alongside (wet berth)

Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013

Maximum ship dimensions:

Length: 130 metres

Width: 35 metres

Depth: 10 metres

GT: 3 500

See national permit No TL-KL.1-15/2015

Explicit approval – written notification in 30 working days

1 500  (21)

12 March 2025

UAB Armar

Minijos 180 (berth 131A), LT 93269, Klaipėda,

Lithuania

Phone: +370 685 32607

Email: armar.uab@gmail.com

Alongside (wet berth)

Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013

Maximum ship dimensions:

Length: 80 metres

Width: 16 metres

Depth: 5 metres

GT: 1 500

See national permit No TL-KL.1-51/2017

Explicit approval – written notification in 30 working days

3 910  (22)

12 April 2027

UAB Demeksa

Nemuno g. 42A (berth 121), LT 93277 Klaipėda

Lithuania

Phone: +370 630 69903

Email: uabdemeksa@gmail.com

Alongside (wet berth)

Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013

Maximum ship dimensions:

Length: 58 metres

Width: 16 metres

Depth: 5 metres

GT: 3 500

See national permit No TL-KL.1-64/2019

Explicit approval – written notification in 30 working days

0  (23)

22 May 2024

UAB Vakarų refonda

Minijos 180 (berths 129, 130, 131A, 131, 132, 133A), LT 93269, Klaipėda,

Lithuania

Phone: +370 (46) 483940/483891

Fax +370 (46) 483891

Email: refonda@wsy.lt

Alongside (wet berth)

Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013

Maximum ship dimensions:

Length: 230 metres

Width: 55 metres

Depth: 14 metres

GT: 70 000

See national permit No (11.2)-30-161/2011/TL-KL.1-18/2015

Explicit approval – written notification in 30 working days

20 140  (24)

30 April 2025

THE NETHERLANDS

Damen Verolme Rotterdam B.V.

Prof. Gerbrandyweg 25

3197 KK Rotterdam

The Netherlands

Phone: +31 (0)181 23 4353

Email: MZoethout@damenverolme.com

Drydock

Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013

Maximum ship dimensions:

Length: 400 metres

Width: 90 metres

Depth: 12 metres

Height: 90 metres

The site has a permit to operate; this permit contains limitations and conditions to operate in an environmental sound manner.

Explicit approval

0  (25)

21 May 2026

DECOM Amsterdam B.V.

Siciliëweg 10 1045 AS Amsterdam

The Netherlands

Phone: +31 23 558 1937

Email: info@decomamsterdam.eu

Preparatory actions along the quayside, lifted onshore for scrapping

Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013

Maximum ship dimensions:

Length: 240 metres

Width: 50 metres

Draught: 9 metres

The site has a permit to operate; this permit contains limitations and conditions to operate in an environmental sound manner.

Explicit approval

17 500  (26)

5 October 2026

Hoondert Services & Decommissioning B.V.

Spanjeweg 4

4455 TW Nieuwdorp

Phone: +31 113352510

Email: info@hsd.nl

Preparatory actions along the quayside, lifted onshore for scrapping

Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013

Maximum ship dimensions:

Length: 175 metres

Width: 40 metres

Depth: 10 metres

The site has a permit to operate; this permit contains limitations and conditions to operate in an environmental sound manner.

Explicit approval

30 000  (27)

26 January 2026

Sagro Aannemingsmaatschappij Zeeland B.V.

Estlandweg 10

4455 SV Nieuwdorp

The Netherlands

Phone: +31 113 351 710

Email: slf@sagro.nl

Preparatory actions along the quayside, lifted onshore for scrapping

Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013

Maximum ship dimensions:

Length: 120 metres

Width: 20 metres

Depth: 6 metres

The site has a permit to operate; this permit contains limitations and conditions to operate in an environmental sound manner.

Explicit approval

15 000  (28)

28 March 2024

Scheepssloperij Nederland B.V.

Havenweg 1

3295 XZ

s-Gravendeel

Postbus 5234

3295 ZJ

s-Gravendeel

The Netherlands

Phone: +31 18 046 39 90

Email: gsnoek@sloperij-nederland.nl

Wet mooring and slipway

Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013

Maximum ship dimensions:

Length: 200 metres

Width: 33 metres

Depth: 5,5 metres

Height: 45 metres (Botlekbridge)

The site has a permit to operate; this permit contains limitations and conditions to operate in an environmental sound manner.

Preparatory actions take place along the quayside, until the hull can be towed onto the slipway using a winch which has a pulling capacity of 2 000 tonnes.

Explicit approval

17 500  (29)

12 May 2026

NORWAY

ADRS Decom Gulen

Facility address:

Sløvågen 2,

5960 Dalsøyra,

Norway

Office address:

Statsminister Michelsens vei 38,

5230 Paradis,

Norway

https://adrs.no/

Alongside, slipway, dry/wet-dock

Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013.

Maximum ship dimensions:

Length: 360 metres

Width: No limit

Depth: No limit

See national permit No 2019.0501.T

Explicit approval

0  (30)

1 October 2024

AF Offshore Decom

Raunesvegen 597,

5578 Nedre Vats

Norway

https://afgruppen.no/selskaper/af-offshore-decom/

Alongside

Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013

Maximum ship dimensions:

Length: 290 metres

Width: no limit

Depth: no limit

See national permit No 2005.0038.T

Explicit approval

31 000  (31)

28 January 2024

Green Yard AS

Angholmen,

4485 Feda,

Norway

www.greenyard.no

Drydock (indoors), slipway

Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013

Maximum ship dimensions:

Length: 230 metres

Width: 25 metres

Depth: 20 metres

See national permit No 2018.0833.T

Major dismantling operations must be performed indoors.

The only dismantling and cutting operations that are allowed outside in open air are minor operations necessary to fit ships to the indoor facility. See permit for further details.

Explicit approval

0  (32)

28 January 2024

Green Yard Kleven AS

6065 Ulsteinvik

Norway

www.kleven.no

Alongside, slipway

Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013

Maximum ship dimensions:

Length: 170 metres

Width: 35 metres

Depth: No limit

See national permit No 2021.0011.T

Explicit approval

0  (33)

9 April 2026

Fosen Gjenvinning AS

Stokksundveien 1432,

7177 Revsnes

Norway

Phone: +47 400 39 479

Email: knut@fosengjenvinning.no

Alongside

Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013, with the exception of rigs or vessels used for extracting hydrocarbons

Maximum ship dimensions:

Length: 150 metres

Width: 20 metres

Depth: 7 metres

See national permit No 2006.0250.T

Explicit approval

8 000  (34)

9 January 2024

Aker Solutions AS (Stord)

Eldøyane 59

5411 Stord

Norway

www.akersolutions.com

Alongside (wet berth), slipway

Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013

Maximum ship dimensions:

Length: 230 metres

Width: No limit

Depth: No limit

See national permit No 2013.0111.T

Explicit approval

43 000  (35)

28 January 2024

Lutelandet Industrihamn

Lutelandet Offshore AS

6964 Korssund,

Norway

www.lutelandetoffshore.com

Alongside

Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013

Maximum ship dimensions:

Length: No limit

Width: No limit

Depth: No limit

See national permit No 2014.0646.T

Explicit approval

14 000  (36)

28 January 2024

Norscrap West AS

Hanøytangen 122,

5310 Hauglandhella,

Norway

www.norscrap.no

Alongside, floating slipway, drydock

Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013

Maximum ship dimensions:

Length: 150 metres

Width: 34 metres

Depth: no limit

See national permit No 2017.0864.T

Maximum 8 000 LDT on floating slipway. Ships exceeding 8 000 LDT need to be reduced prior to pulling in the slipway

Explicit approval

4 500  (37)

1 March 2024

FINLAND

Turun Korjaustelakka Oy (Turku Repair Yard Ltd)

Navirentie, 21100 Naantali

Finland

Phone: +358 2 44 511

Email try@turkurepairyard.com

Alongside, drydock

Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013

Maximum ship dimensions:

Length: 250 metres

Width: 40 metres

Draught: 7,9 metres

The limitations are included in the national environmental permit.

Explicit approval

20 000  (38)

1 October 2023

UNITED KINGDOM – NORTHERN IRELAND

Harland and Wolff (Belfast) Ltd

Queen’s Island

Belfast

BT3 9DU

Phone +44(0)2890534189

Fax +44(0)2890458515

Email Eoghan.Rainey@harland-wolff.com

Dry dock and wet berth

Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013

Maximum ship dimensions:

Length: 556 metres

Width: 93 metres

Draught: 7,5 metres

DWT: 550 000

The site is authorised by way of a waste management licence, authorisation number LN/20/11 that limits the operations and places conditions on the operator of the facility.

Explicit approval

12 000  (39)

16 June 2025

PART B

Ship recycling facilities located in a third country

Name of the facility

Method of recycling

Type and size of ships that can be recycled

Limitations and conditions under which the ship recycling facility operates, including as regards hazardous waste management

Details on the explicit or tacit procedure for the approval of the ship recycling plan by the competent authority (40)

Maximum annual ship recycling output, calculated as the sum of the weight of ships expressed in LDT that have been recycled in a given year in that facility (41)

Date of expiry of inclusion in the European List (42)

TÜRKIYE

Avsar Gemi Sokum San. Dis Tic. Ltd. Sti.

Gemi Söküm Tesisleri,

Parcel 5 Aliağa

İzmir 35800,

Türkiye

Phone: +90 232 618 21 07 – 08 – 09

Email: info@avsargemiltd.com

Landing

Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013, with the exception of rigs

Maximum ship dimensions:

Length: no limit

Width: 50 metres

Draught: 15 metres

The site has a Ship Dismantling Permit, issued by the Ministry of Environment and Urban Planning, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport and Infrastructure, which contain limitations and conditions under which the facility operates.

Tacit approval, with a maximum review period of 15 days

The ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship. The SRP is neither explicitly approved nor rejected as a standalone document.

54 224  (43)

2 December 2025

EGE CELIK SAN. VE TIC. A.S.

Gemi Söküm Tesisleri,

Parcel 10 Aliağa,

Izmir 35800,

Türkiye

Phone: +90 232 618 21 62

Email: pamirtaner@egecelik.com

Landing

Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013

Maximum ship dimensions:

Length: no limit

Width: 50 metres

Draught: 15 metres

The site has a Ship Dismantling Permit, issued by the Ministry of Environment and Urban Planning, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport and Infrastructure, which contain limitations and conditions under which the facility operates.

Tacit approval, with a maximum review period of 15 days

The ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship. The SRP is neither explicitly approved nor rejected as a standalone document.

55 503  (44)

12 February 2025

LEYAL GEMİ SÖKÜM SANAYİ ve TİCARET

LTD.

Gemi Söküm Tesisleri,

Parcel 3-4 Aliağa,

Izmir 35800,

Türkiye

Phone: +90 232 618 20 30

Email: info@leyal.com.tr

Landing

Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013

Maximum ship dimensions:

Length: no limit

Width: 100 metres

Draught: 15 metres

The site has a Ship Dismantling Permit, issued by the Ministry of Environment and Urban Planning, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport and Infrastructure, which contain limitations and conditions under which the facility operates.

Tacit approval, with a maximum review period of 15 days

The ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship. The SRP is neither explicitly approved nor rejected as a standalone document.

64 815  (45)

9 December 2023

LEYAL-DEMTAŞ GEMİ SÖKÜM SANAYİ ve TİCARET A.Ş.

Gemi Söküm Tesisleri,

Parcel 25 Aliağa,

Izmir 35800,

Türkiye

Phone: +90 232 618 20 65

Email: demtas@leyal.com.tr

Landing

Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013

Maximum ship dimensions:

Length: no limit

Width: 63 metres

Draught: 15 metres

The site has a Ship Dismantling Permit, issued by the Ministry of Environment and Urban Planning, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport and Infrastructure, which contain limitations and conditions under which the facility operates.

Tacit approval, with a maximum review period of 15 days

The ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship. The SRP is neither explicitly approved nor rejected as a standalone document.

57 275  (46)

9 December 2023

ÖGE GEMİ SÖKÜM İTH. İHR. TİC. SAN.AŞ.

Gemi Söküm Tesisleri,

Parcel 23 Aliağa,

Izmir 35800,

Türkiye

Phone: +90 232 618 21 05

Email: oge@ogegemi.com

www.ogegemi.com

Landing

Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013

Maximum ship dimensions:

Length: no limit

Width: 70 metres

Draught: 15 metres

The site has a Ship Dismantling Permit, issued by the Ministry of Environment and Urban Planning, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport and Infrastructure, which contain limitations and conditions under which the facility operates.

Tacit approval, with a maximum review period of 15 days

The ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship. The SRP is neither explicitly approved nor rejected as a standalone document.

62 471  (47)

12 February 2025

Sök Denizcilik Tic. Ltd. Sti

Gemi Söküm Tesisleri,

Parcel 8-9 Aliağa,

Izmir 35800,

Türkiye

Phone: +90 232 618 2092

Email: info@sokship.com

Landing

Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013

Maximum ship dimensions:

Length: no limit

Width: 90 metres

Draught: 15 metres

The site has a Ship Dismantling Permit, issued by the Ministry of Environment and Urban Planning, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport and Infrastructure, which contain limitations and conditions under which the facility operates.

Tacit approval, with a maximum review period of 15 days

The ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship. The SRP is neither explicitly approved nor rejected as a standalone document.

66 167  (48)

12 February 2025

UNITED KINGDOM

Dales Marine Services Ltd

Imperial Dry Dock

Leith

Edinburgh

EH6 7DR

Phone: + 44 (0)131 454 3380; + 44 (0)7834 658 588

Email: Phil@dalemarine.co.uk

Drydock and wet berth

Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013, with the exception of rigs

Maximum ship dimensions:

Length: 165 metres

Width: 20 metres

Draught: 7,7 metres

The site is authorised by way of a waste management licence, authorisation number WML/L/1157331 that limits the operations and places conditions on the operator of the facility.

Explicit approval

5 019  (49)

22 May 2027

Kishorn Port Ltd

Kishorn Base

Kishorn

Strathcarron

IV54 8XA

United Kingdom

Phone: +44 (0)139 777 3840

Email: enquiries@kishornportltd.com

alasdair@kishornportltd.com

frank@fergusontransport.co.uk

Drydock

Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013

Maximum ship dimensions:

Length: 160 metres

Width: 160 metres

Draught: 13,8 metres

LDT: 26 448

The site is authorised by way of a waste management licence, authorisation number “WML/L/1175043 Modification 01” and “WML/L/1175043 Modification 02” that limits the operations and places conditions on the operator of the facility.

Explicit approval

38 148  (50)

22 May 2027

UNITED STATES OF AMERICA

International Shipbreaking Limited L.L.C

18601 R.L Ostos Road

Brownsville TX, 78521

United States

Phone: 956-831-2299

Email: chris.green@internationalshipbreaking.com

robert.berry@internationalshipbreaking.com

Alongside (wet berth), slope

Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013

Maximum ship dimensions:

 

Length: 366 metres

 

Width: 48 metres

 

Draught: 9 metres

The conditions under which the facility is authorised to operate are defined in permits, certificates and authorizations issued to the facility by the Environmental Protection Agency, the Texas Commission of Environmental Quality, the Texas General Land Office and the U.S Coast Guard.

The U.S. Toxic Substances Control Act prohibits the import into the US of foreign flagged vessels that contain PCB concentrations greater than 50 parts per million.

The facility has two slips with ramps for final vessel recycling (East Slip and West Slip). Ships flying a flag of EU Member States shall be recycled exclusively on the East Slip ramp.

There is currently no procedure in US law related to the approval of ship recycling plans

120 000  (51)

9 December 2023


(1)  As referred to in Article 7(3) of Regulation (EU) No 1257/2013 on ship recycling

(2)  As referred to in the third sentence of Article 32(1)(a) of Regulation (EU) No 1257/2013

(3)  The date of expiry of inclusion in the European List corresponds to the date of expiry of the permit or authorisation granted to the facility in the Member State.

(4)  According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 50 000 LDT per year.

(5)  According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 12 500 LDT per year.

(6)  According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 30 000 LDT per year.

(7)  According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 50 000 LDT per year.

(8)  According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 30 000 LDT per year.

(9)  According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 200 000 LDT per year.

(10)  According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 50 000 LDT per year.

(11)  According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 45 000 LDT per year.

(12)  According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 36 000 LDT per year.

(13)  According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 6 000 LDT per year.

(14)  According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 60 000 LDT per year.

(15)  According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 15 000 LDT per year.

(16)  According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 12 000 LDT per year.

(17)  According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 23 000 LDT per year.

(18)  According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 40 000 LDT per year.

(19)  According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 60 000 LDT per year.

(20)  According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 10 000 LDT per year.

(21)  According to its permit, the facility is authorised to recycle a maximum 30 000 LDT per year.

(22)  According to its permit, the facility is authorised to recycle a maximum 6 000 LDT per year.

(23)  According to its permit, the facility is authorised to recycle a maximum 10 000 LDT per year.

(24)  According to its permit, the facility is authorised to recycle a maximum 45 000 LDT per year.

(25)  According to its permit, the theoretical maximum annual ship recycling capacity of the facility is 100 000 LDT per year.

(26)  According to its permit, the theoretical maximum annual ship recycling capacity of the facility is 47 500 LDT per year.

(27)  According to its permit, the theoretical maximum annual ship recycling capacity of the facility is 100 000 LDT per year.

(28)  According to its permit, the theoretical maximum annual ship recycling capacity of the facility is 100 000 LDT per year.

(29)  According to its permit, the theoretical maximum annual ship recycling capacity of the facility is 40 000 LDT per year.

(30)  According to its permit, the facility is authorised to recycle a maximum 75 000 LDT per year

(31)  According to its permit, the facility is authorised to recycle a maximum 75 000 LDT per year.

(32)  According to its permit, the facility is authorised to recycle a maximum 30 000 LDT per year.

(33)  According to its permit, the facility is authorised to recycle a maximum 30 000 LDT per year.

(34)  According to its permit, the facility is authorised to recycle a maximum 10 000 LDT per year.

(35)  According to its permit, the facility is authorised to recycle a maximum 85 000 LDT per year.

(36)  According to its permit, the facility is authorised to recycle a maximum 200 000 LDT per year.

(37)  According to its permit, the facility is authorised to recycle a maximum 100 000 LDT per year

(38)  According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 40 000 LDT per year

(39)  According to its permit, the facility is authorised to recycle a maximum of 300 000 LDT per year.

(40)  As referred to in Article 7(3) of Regulation (EU) No 1257/2013 on ship recycling

(41)  As referred to in the third sentence of Article 32(1)(a) of Regulation (EU) No 1257/2013

(42)  The inclusion of a ship recycling facility located in a third country in the European List is valid for a period of five years from the date of entry into force of the relevant Commission Implementing Decision which provides for the inclusion of that facility, unless otherwise stated.

(43)  The theoretical maximum annual ship recycling capacity of the facility is 60 000 LDT per year.

(44)  The theoretical maximum annual ship recycling capacity of the facility is 60 000 LDT per year.

(45)  The theoretical maximum annual ship recycling capacity of the facility is 80 000 LDT per year.

(46)  The theoretical maximum annual ship recycling capacity of the facility is 70 000 LDT per year.

(47)  The theoretical maximum annual ship recycling capacity of the facility is 90 000 LDT per year.

(48)  The theoretical maximum annual ship recycling capacity of the facility is 100 000 LDT per year.

(49)  According to its permit, the facility is authorised to recycle a maximum of 7 275 LDT per year.

(50)  According to its permit, the facility is authorised to recycle a maximum of 38 148 LDT per year.

(51)  The theoretical maximum annual ship recycling capacity of the facility is 120 000 LDT per year.


Top