EUR-Lex Access to European Union law
This document is an excerpt from the EUR-Lex website
Document 02014R0447-20200701
Commission Implementing Regulation (EU) No 447/2014 of 2 May 2014 on the specific rules for implementing Regulation (EU) No 231/2014 of the European Parliament and of the Council establishing an Instrument for Pre-accession assistance (IPA II)
Consolidated text: Commission Implementing Regulation (EU) No 447/2014 of 2 May 2014 on the specific rules for implementing Regulation (EU) No 231/2014 of the European Parliament and of the Council establishing an Instrument for Pre-accession assistance (IPA II)
Commission Implementing Regulation (EU) No 447/2014 of 2 May 2014 on the specific rules for implementing Regulation (EU) No 231/2014 of the European Parliament and of the Council establishing an Instrument for Pre-accession assistance (IPA II)
02014R0447 — EN — 01.07.2020 — 001.001
This text is meant purely as a documentation tool and has no legal effect. The Union's institutions do not assume any liability for its contents. The authentic versions of the relevant acts, including their preambles, are those published in the Official Journal of the European Union and available in EUR-Lex. Those official texts are directly accessible through the links embedded in this document
COMMISSION IMPLEMENTING REGULATION (EU) No 447/2014 of 2 May 2014 (OJ L 132 3.5.2014, p. 32) |
Amended by:
|
|
Official Journal |
||
No |
page |
date |
||
COMMISSION IMPLEMENTING REGULATION (EU) 2020/891 of 26 June 2020 |
L 206 |
3 |
30.6.2020 |
Corrected by:
COMMISSION IMPLEMENTING REGULATION (EU) No 447/2014
of 2 May 2014
on the specific rules for implementing Regulation (EU) No 231/2014 of the European Parliament and of the Council establishing an Instrument for Pre-accession assistance (IPA II)
TITLE I
SUBJECT MATTER AND GENERAL FRAMEWORK FOR IMPLEMENTATION OF IPA ASSISTANCE
CHAPTER I
Subject matter and definitions
Article 1
Subject matter
This Regulation lays down specific rules establishing uniform conditions for implementing Regulation (EU) No 231/2014 and detailed rules implementing Regulation (EU) No 236/2014 with regards to methods of implementation, financial management, monitoring, evaluation and reporting, transparency and visibility of IPA II assistance as well as specific rules for cross-border cooperation in the policy area ‘regional and territorial cooperation’ and assistance under rural development programmes in the policy area ‘agriculture and rural development’.
Article 2
Definitions
For the purposes of this Regulation the following definitions shall apply:
‘IPA II beneficiary’ means one of the beneficiaries listed in Annex I to Regulation (EU) No 231/2014;
‘programme’ means an action programme, individual, special or support measures provided for in Articles 2 and 3 of Regulation (EU) No 236/2014;
‘framework agreement’ means an arrangement concluded between the Commission and an IPA II beneficiary applying to all IPA II policy areas and laying down the principles of the financial cooperation between the IPA II beneficiary and the Commission under this Regulation;
‘sectoral agreement’ means an arrangement concluded between the Commission and an IPA II beneficiary relating to a specific IPA II policy area or programme, setting out the rules and procedures to be respected which are not contained in the framework agreement or financing agreements;
‘policy area(s)’ means the main areas of cooperation addressed by actions funded by IPA II assistance, as provided for in Article 3(1) of Regulation (EU) No 231/2014;
‘authorities’ means public entities or bodies of an IPA II beneficiary or a Member State at national, regional or local level;
‘major project’ means a project comprising of a series of works, activities or services which is intended, in itself, to accomplish a definite and indivisible task of a precise economic or technical nature, which has clearly identified goals and whose total cost exceeds that which is specified in the Framework Agreement;
‘participating countries’ means the IPA II beneficiaries alone or the IPA II beneficiaries together with the Member State(s) or with the countries falling within the scope of the European Neighbourhood Instrument participating in a multi-annual programme for cross-border cooperation jointly drawn up by the participating countries;
‘financing agreement’ means an annual or multi-annual agreement concluded between the Commission and an IPA II beneficiary, for implementing the Union's financial assistance through an action falling within the scope of this Regulation.
CHAPTER II
General Framework for Implementation of IPA II Assistance
Article 3
Principles of Union financing
Article 4
Principle of ownership
The NIPAC shall:
ensure coordination within the IPA II beneficiary's administration and with other donors and a close link between the use of IPA II assistance and the general accession process;
coordinate the participation of IPA II beneficiaries in the relevant territorial cooperation programmes, in particular cross-border cooperation programmes referred to in points (a) to (c) of Article 27 and, if appropriate, transnational or interregional cooperation programmes established and implemented under Regulation (EU) No 1299/2013. The NIPAC may delegate this coordination task to a territorial cooperation coordinator or operating structure as appropriate;
ensure that the objectives set out in the actions or programmes proposed by the IPA II beneficiaries are coherent with the objectives in the Country Strategy Papers and take due account of the relevant macro-regional and sea basin strategies;
endeavour that the IPA II beneficiary's administration takes all necessary steps to facilitate the implementation of the related programmes.
The NIPAC shall be a high-ranking representative of the government or the national administration of the IPA II beneficiary with the appropriate authority.
Article 5
Framework agreements and sectoral agreements
The framework agreement and, where relevant, sectoral agreements shall lay down, in particular, detailed provisions concerning:
the structures and authorities needed for the management, control, supervision, monitoring, evaluation, reporting and audit of IPA II assistance, as well as their functions and responsibilities;
conditions and control requirements for:
the establishment of the required structures and authorities by the IPA II beneficiary in order to allow for entrusting budget implementation tasks of IPA II assistance;
the monitoring, suspension or termination of the budget implementation tasks entrusted;
programming and implementation of IPA II assistance and in particular provisions concerning aid intensities, rates of Union contribution and eligibility;
procurement, grant and other award procedures, in accordance with Articles 1(3), 8 and 10 of Regulation (EU) No 236/2014;
rules on taxes, customs duties and other fiscal charges in accordance with Article 5 of Regulation (EU) No 236/2014;
requirements for payments, examination and acceptance of accounts and financial corrections procedures and de-commitment of unused funds;
protection of the financial interests of the Union, as provided for in Article 7 of Regulation (EU) No 236/2014, and provisions on the reporting of fraud and other irregularities;
transparency, visibility, information and publicity requirements.
Article 6
Financing decisions and financing agreements
TITLE II
INDIRECT MANAGEMENT BY IPA II BENEFICIARIES
CHAPTER I
Management and control systems
Article 7
Structures and authorities
The IPA II beneficiary shall establish the following structures and authorities needed for the management, control, supervision, monitoring, evaluation, reporting and internal audit of IPA II assistance:
the National IPA Coordinator (NIPAC);
the National Authorising Officer (NAO);
the Operating Structures.
Article 8
Functions and responsibilities of the National IPA Coordinator
In addition to the functions provided for in Article 4(2), the NIPAC shall take measures to ensure that the objectives set out in the actions or programmes for which budget implementation tasks have been entrusted are appropriately addressed during the implementation of IPA II assistance.
Article 9
Functions and responsibilities of the National Authorising Officer
The NAO shall, in particular, be responsible for:
the management of IPA II accounts and financial operations;
the effective functioning of the internal control systems for the implementation of IPA II assistance;
putting into place effective and proportionate anti-fraud measures taking into account the risks identified;
launching the process provided for in Article 14.
At the end of the implementation of a programme, the NAO shall provide a final statement of expenditure.
Article 10
Functions and responsibilities of the operating structures
Article 11
Functions and responsibilities of the management structure
Article 12
Functions and responsibilities of the audit authority
CHAPTER II
Specific provisions relating to entrusting budget implementation tasks
Article 13
Conditions for entrusting an IPA II beneficiary with budget implementation tasks
The management, control, supervision and audit systems set up in the IPA II beneficiary shall provide for an effective internal control system which includes at least the following five areas:
control environment;
risk management;
control activities;
information and communication;
monitoring activities.
Article 14
Entrusting budget implementation tasks
For entrusting budget implementation tasks of IPA II assistance, the Commission may rely on an ex ante assessment carried out with regard to an earlier financing agreement with the IPA II beneficiary or an ex ante assessment carried out with regard to the conferral of management powers decided under Council Regulation (EC) No 1085/2006 ( 1 ). The Commission shall request additional evidence if those assessments do not address all the requirements.
TITLE III
FINANCIAL MANAGEMENT
CHAPTER I
Financial contribution by the Union
Article 15
Eligibility of expenditure
The following expenditure shall not be eligible for funding under Regulation (EU) No 231/2014:
purchase of land and existing buildings, except where duly justified by the nature of the action in the financing decision;
other expenditure as may be provided for in the sectoral or financing agreements.
CHAPTER II
Rules relating to indirect management by the IPA II beneficiary
Article 16
Reporting on suspected fraud and other irregularities
The IPA II beneficiary shall report suspected fraud and other irregularities which have been the subject of a primary administrative or judicial finding, without delay, to the Commission and keep the latter informed of the progress of administrative and legal proceedings. Reporting shall be done by electronic means using the module provided by the Commission for this purpose.
Article 17
Financial corrections
A financial correction may arise from the following:
identification of a specific error, irregularity or fraud;
identification of a weakness or deficiency in the management and control systems of the IPA II beneficiary.
TITLE IV
MONITORING, EVALUATION AND REPORTING
CHAPTER I
Monitoring
Article 18
IPA monitoring committee
Article 19
Sectoral monitoring committees
Article 20
Other monitoring activities
Other monitoring platforms may be set up where appropriate. Their activities shall be reported to the IPA monitoring committee.
CHAPTER II
Evaluation
Article 21
Principles
Article 22
Evaluations by the IPA II beneficiary under indirect management
CHAPTER III
Reporting
Article 23
Annual reports on implementation of IPA II assistance by IPA II beneficiaries under indirect management
By 15 February of the following financial year, the IPA II beneficiary shall in accordance with points (a) to (c) of the first subparagraph of Article 60(5) of Regulation (EU, Euratom) No 966/2012 provide the Commission with:
an annual report on the implementation of the tasks entrusted;
annual financial reports or statements on accrual basis as specified in the financing agreement, drawn up for the expenditure incurred in the execution of the tasks entrusted;
an annual management declaration, as provided for by Article 9(4);
a summary of the reports on the audits and controls carried out by the management structure, providing a sound basis for the management declaration. Such summary shall include an analysis of the nature and extent of errors and weaknesses identified in systems, corrective action taken or planned as well as the follow-up given to the reports issued by the audit authority.
TITLE V
TRANSPARENCY AND VISIBILITY
Article 24
Information, publicity and transparency
Article 25
Visibility and communication
TITLE VI
CROSS-BORDER COOPERATION
CHAPTER I
General provisions
Article 26
Definitions
For the purposes of this Title the following definitions shall apply:
‘operation’ means a project, contract, action or group of projects selected by the joint monitoring committee or the contracting authority of the programme concerned, or under its responsibility, that contribute to the objectives, as regards the cross-border cooperation programmes under point (a) of Article 27, of the priority axis or priority axes to which it relates or, as regards cross-border cooperation programmes in points (b) or (c) of Article 27 of a thematic priority or thematic priorities to which it relates;
‘beneficiary’ means a public or private body, responsible for initiating or initiating and implementing operations; in the context of State aid schemes (as defined in Article 2(13) of Regulation (EU) No 1303/2013 of the European Parliament and of the Council ( 2 )), the term ‘beneficiary’ means the body which receives the aid, as far as cross-border cooperation programmes involving Member States are concerned.
Article 27
Form of assistance
Assistance shall be provided to one of the following forms of cross-border cooperation:
cross-border cooperation between one or more Member States and one or more IPA II beneficiaries as provided for in Chapter II;
cross-border cooperation between two or more IPA II beneficiaries as provided for in Chapter III;
cross-border cooperation between an IPA II beneficiary and countries under the European Neighbourhood Instrument as provided for in Chapter III.
Article 28
Aid intensity and rate of IPA II assistance
The Commission decision adopting a cross-border cooperation programme for the forms of cooperation referred to in Article 27 shall fix the co-financing rate and the maximum amount of IPA II assistance, based either on:
total eligible expenditure, including public and private expenditure; or
public eligible expenditure.
Request for modification of the co-financing rate shall be submitted in accordance with the procedure for the amendment of programmes set out in Article 31(5A) and shall be accompanied by a revised programme. The co-financing rate of 100% shall apply only if the relevant amendment of the cooperation programme is approved by the Commission before the submission of the final application for an interim payment in accordance with Article 135(2) of Regulation (EU) No 1303/2013.
On the first day of the accounting year starting 1 July 2021 and ending 30 June 2022, the co-financing rate shall come back automatically to the level it was on the day when the request for modification of the co-financing rate, referred to in the second subparagraph, was submitted to the Commission.
Article 29
Thematic priorities and concentration of IPA II assistance
Article 30
Geographical coverage
The list of eligible regions shall be included in the relevant cross-border cooperation programme which shall be as follows:
for cross-border cooperation programmes referred to in point (a) of Article 27, Nomenclature of Territorial Units for Statistics (NUTS) level 3 regions or, in the absence of NUTS classification, equivalent areas along land borders or along maritime borders separated by a maximum of 150 km, without prejudice to potential adjustments needed to ensure the coherence and continuity of cross-border programmes established for the 2007-2013 programming period;
for cross-border cooperation programmes referred to in points (b) and (c) of Article 27, the eligible regions shall be established in the relevant cross-border cooperation programme, as appropriate.
Article 31
Preparation, assessment, approval and amendment of cross-border cooperation programmes
They shall be considered to be not substantial and shall not require a decision of the Commission amending the programme. They shall however comply with all regulatory requirements and shall be approved by the Joint monitoring committee in advance. The Member State shall notify the revised financing plan to the Commission.
Paragraphs 2 and 3 shall not apply to programme amendments under this paragraph.
Article 32
Technical assistance
CHAPTER II
Cross-border cooperation between Member States and IPA II beneficiaries
Article 33
Applicable provisions
Article 34
Programming
The Commission may consult the EIB before the adoption of cross-border cooperation programmes.
Article 35
Technical assistance
The amount of IPA II assistance to be allocated to technical assistance shall be limited to 10 % of the total amount allocated to the cross-border cooperation programme, but shall not be less than EUR 1 500 000 .
Article 36
Implementation mode and designation of programme authorities
Articles 73 and 74 of Regulation (EU) No 1303/2013 concerning the responsibilities of the Member States under shared management shall apply to the Member State where the managing authority is located.
Article 75 of Regulation (EU) No 1303/2013 concerning the powers and responsibilities of the Commission under shared management shall apply.
The procedure for the designation of the managing authority and, where appropriate, of the certifying authority, set out in Article 124 of Regulation (EU) No 1303/2013, shall be carried out by the Member State in which the authority is located.
Designations provided for in this Article shall be without prejudice to the apportionment of liabilities in relation to the application of financial corrections among the participating countries as provided for in the cross-border cooperation programme.
Article 37
Functions of the programme authorities
The certifying authority shall receive the payments made by the Commission and shall, as a general rule, make payments to the lead beneficiary in accordance with Article 132 of Regulation (EU) No 1303/2013.
Article 38
Joint monitoring committee
Articles 49 and 110 of Regulation (EU) No 1303/2013 concerning its functions shall also apply.
The JMC and the managing authority shall carry out monitoring by reference to indicators laid down in the relevant cross-border cooperation programme, in accordance with Article 16 of Regulation (EU) No 1299/2013.
Article 39
Selection of operations
The JMC may set up a steering committee acting under its responsibility for the selection of operations.
Article 40
Beneficiaries
The lead beneficiary shall carry out the following tasks:
lay down the arrangements with other beneficiaries in an agreement comprising provisions that, inter alia, guarantee the sound financial management of the funds allocated to the operation, including the arrangements for recovering amounts unduly paid;
assume responsibility for ensuring implementation of the entire operation;
ensure that expenditure presented by all beneficiaries has been incurred in implementing the operation and corresponds to the activities agreed between all the beneficiaries, and in accordance with the document provided by the managing authority as provided for in paragraph 6;
ensure that the expenditure presented by other beneficiaries has been verified by a controller(s) where this verification is not carried out by the managing authority in accordance with Article 23(1) of Regulation (EU) No 1299/2013.
Article 41
Evaluation
Article 42
Reporting, information and communication
By 31 January, 31 July and 31 October of each year, the managing authority shall transmit electronically to the Commission for monitoring purposes, for each cross-border programme and by priority axis:
the total and public eligible cost of the operations and the number of operations selected for support;
the total eligible expenditure declared by beneficiaries to the managing authority.
In addition, the transmission made by 31 January shall contain the data referred to in points (a) and (b) broken down by category of intervention. This transmission shall be considered to fulfil the requirement for the submission of financial data referred to in Article 50(2) of Regulation (EU) No 1303/2013.
A forecast of the amount for which the managing authority expects to submit payment applications for the current financial year and the subsequent financial year shall accompany the transmissions to be made by 31 January and 31 July.
The cut-off date for the data submitted under this paragraph shall be the end of the month preceding the month of submission.
By way of derogation from Article 25 of this Regulation, the managing authority shall be responsible for the information and communication activities as set out in Articles 115 and 116 of Regulation (EU) No 1303/2013.
Article 43
Eligibility and durability
By way of derogation from Article 15(1) of this Regulation, expenditure shall be eligible for funding under IPA II cross-border cooperation assistance:
►C1 if it has been incurred by a beneficiary from a Member State and paid between 1 January 2014 and 31 December 2023; or ◄
if it has been incurred by a beneficiary from an IPA II beneficiary and paid after the submission of the cross-border cooperation programme.
In addition to the rules set out in Article 15(2) of this Regulation, IPA II cross-border cooperation assistance shall not support:
interest on debt;
value added tax (VAT) except where it is non-recoverable under national VAT legislation;
the decommissioning and the construction of nuclear power stations;
investment to achieve the reduction of greenhouse gas emissions from activities falling under Annex I to Directive 2003/87/EC of the European Parliament and of the Council ( 5 );
the manufacturing, processing and marketing of tobacco and tobacco products;
undertakings in difficulties as defined under Union State aid rules;
investment in airport infrastructure unless related to environmental protection or accompanied by investment necessary to mitigate or reduce its negative environmental impact.
By way of derogation from Article 15(2) of this Regulation, the purchase of land not built on and land built on in the amount up to 10 % of the total eligible expenditure for the operation concerned shall be eligible for funding under IPA II cross-border cooperation assistance. For derelict sites and for those formerly in industrial use which comprise buildings, this limit shall be increased to 15 %. In exceptional and duly justified cases, this limit may be raised above the respective preceding percentages for operations concerning environmental conservation.
Article 44
Eligibility depending on location
The managing authority may accept that all or part of an operation is implemented outside the programme area, provided that all the following conditions are satisfied:
the operation is for the benefit of the programme area;
the total amount allocated under the cross-border cooperation programme to operations located outside the programme area does not exceed 20 % of the support from the Union at programme level;
the obligations of the managing and audit authorities in relation to management, control and audit concerning the operation are fulfilled by the cross-border cooperation programme authorities or they enter into agreements with authorities in the Member State or third country in which the operation is implemented.
Article 45
Procurement
Article 46
Financial management, decommitment, examination and acceptance of accounts, closure and financial corrections
The pre-financing shall amount to 50 % of the first three budgetary commitments to the programme.
The pre-financing amount may be paid in two instalments, where necessary, according to budgetary needs.
The total amount paid as pre-financing shall be reimbursed to the Commission if no payments application under the cross-border cooperation programme is sent within 24 months of the date on which the Commission pays the first instalment of the pre-financing amount.
Article 47
Management and control systems and audit
Article 48
Discontinuation of cross-border cooperation programmes
European Regional Development Fund annual instalments already committed shall remain available for their normal lifetime but may be used only for activities which take place exclusively in the Member States concerned and contracted before the Commission discontinuation decision. The managing authority shall transmit the final report within three months of the closure of the contracts to the Commission which shall proceed in conformity with paragraphs 2 and 3.
Where the programme is discontinued, the managing authority shall transmit the final report within six months following the Commission's decision. After clearing the previous pre-financing payments, the Commission shall pay the final balance or, where appropriate, issue the recovery order. The Commission shall also decommit the balance of commitments.
As an alternative, it may be decided to reduce the programme's allocation to the programme scope in accordance with Article 31(5).
IPA II assistance corresponding to annual instalments not yet committed or annual instalments committed and decommitted totally or partially during the same budgetary year shall be used to finance other programmes or projects eligible for IPA II assistance.
CHAPTER III
Cross-border cooperation between IPA II beneficiaries or between IPA II beneficiaries and countries under the European Neighbourhood Instrument
Article 49
Programming
Article 50
Technical assistance
The amount of IPA II assistance to be allocated to technical assistance shall be limited to 10 % of the total amount allocated to the cross-border cooperation programme.
Article 51
Implementation modes
Article 52
Structures and authorities
The following structures shall be involved in the management of cross-border cooperation programmes in the IPA II beneficiaries:
the NIPACs of the countries participating in the cross-border cooperation programme as referred to in Article 4 and, where applicable, the territorial cooperation coordinators;
the NAO and the management structure as referred to in Article 7 of the participating IPA II beneficiary in which the contracting authority is located when the cross-border programme is implemented in indirect management;
the operating structures in all the participating countries which shall cooperate closely in the programming and implementation of the relevant cross-border cooperation programme. In case of indirect management the operating structure shall include a contracting authority;
the audit authority as referred to in Article 7(3) when the cross-border programme is implemented in indirect management. Where it does not have the authorisation to carry out the functions provided for in Article 12, it shall be assisted by a group of auditors comprising a representative of each country participating in the cross-border cooperation programme.
Article 53
Selection of operations
Article 54
Beneficiaries
TITLE VII
AGRICULTURE AND RURAL DEVELOPMENT
Article 55
Specific provisions on rural development programmes
The operating structure to be established in accordance with Article 10 shall, for rural development programmes, consist of the following separate authorities operating in close cooperation:
the Managing Authority, being a public body acting at national level, to be in charge of preparing and implementing the programmes, including selection of measures and publicity, coordination, evaluation, monitoring and reporting of the programme concerned and managed by a senior official with exclusive responsibilities; and
the IPA Rural Development Agency with functions of a similar nature as a paying agency in the Member States being in charge of publicity, selection of projects as well as authorisation, control and accounting of commitments and payments and execution of payments.
TITLE VIII
FINAL PROVISIONS
Article 56
Entry into force and application
This Regulation shall enter into force on the third day following that of its publication in the Official Journal of the European Union.
It shall apply from 1 January 2014.
This Regulation shall be binding in its entirety and directly applicable in all Member States.
( 1 ) Council Regulation (EC) No 1085/2006 of 17 July 2006 establishing an instrument for pre-accession assistance (IPA) (OJ L 210, 31.7.2006, p. 82.)
( 2 ) Regulation (EU) No 1303/2013 of the European Parliament and of the Council of 17 December 2013 laying down common provisions on the European Regional Development Fund, the European Social Fund, the Cohesion Fund, the European Agricultural Fund for Rural Development and the European Maritime and Fisheries Fund and laying down general provisions on the European Regional Development Fund, the European Social Fund, the Cohesion Fund and the European Maritime and Fisheries Fund and repealing Council Regulation (EC) No 1083/2006 (OJ L 347, 20.12.2013, p. 320).
( 3 ) Regulation (EU) No 1299/2013 of the European Parliament and of the Council of 17 December 2013 on specific provisions for the support from the European Regional Development Fund to the European territorial cooperation goal (OJ L 347, 20.12.2013, p. 259).
( 4 ) Regulation (EC) No 1082/2006 of the European Parliament and of the Council of 5 July 2006 on a European grouping of territorial cooperation (EGTC) (OJ L 210, 31.7.2006, p. 19).
( 5 ) Directive 2003/87/EC of the European Parliament and of the Council of 13 October 2003 establishing a scheme for greenhouse gas emission allowance trading within the Community and amending Council Directive 96/61/EC (OJ L 275, 25.10.2003, p. 32).
( 6 ) Regulation EU No 1305/2013 of the European Parliament and of the Council of 17 December 2013 on support for rural development by the European Agricultural Funds for Rural Development. (EAFRD) and repealing Council Regulation (EC) No 1698/2005, (OJ L 347, 20.12.2013, p. 487).