This document is an excerpt from the EUR-Lex website
Document 32024R0873
Commission Delegated Regulation (EU) 2024/873 of 30 January 2024 amending Delegated Regulation (EU) 2019/331 as regards transitional Union-wide rules for harmonised free allocation of emission allowances
Commission Delegated Regulation (EU) 2024/873 of 30 January 2024 amending Delegated Regulation (EU) 2019/331 as regards transitional Union-wide rules for harmonised free allocation of emission allowances
Commission Delegated Regulation (EU) 2024/873 of 30 January 2024 amending Delegated Regulation (EU) 2019/331 as regards transitional Union-wide rules for harmonised free allocation of emission allowances
C/2024/441
OJ L, 2024/873, 4.4.2024, ELI: http://data.europa.eu/eli/reg_del/2024/873/oj (BG, ES, CS, DA, DE, ET, EL, EN, FR, GA, HR, IT, LV, LT, HU, MT, NL, PL, PT, RO, SK, SL, FI, SV)
In force
Official Journal |
EN L series |
2024/873 |
4.4.2024 |
COMMISSION DELEGATED REGULATION (EU) 2024/873
of 30 January 2024
amending Delegated Regulation (EU) 2019/331 as regards transitional Union-wide rules for harmonised free allocation of emission allowances
(Text with EEA relevance)
THE EUROPEAN COMMISSION,
Having regard to the Treaty on the Functioning of the European Union,
Having regard to Directive 2003/87/EC of the European Parliament and of the Council of 13 October 2003 establishing a system for greenhouse gas emission allowance trading within the Union and amending Council Directive 96/61/EC (1), and in particular Article 10a(1), thereof,
Whereas:
(1) |
Directive 2003/87/EC has been revised and amended by Directive (EU) 2023/959 of the European Parliament and of the Council (2) to align it with Regulation (EU) 2021/1119 of the European Parliament and of the Council (3) setting a target of at least 55 % net emission reductions by 2030 compared to 1990. The revision of Directive 2003/87/EC also concerns free allocation of allowances and requires changes to Commission Delegated Regulation (EU) 2019/331 (4). |
(2) |
Directive (EU) 2023/959 introduces obligations for monitoring and reporting of emissions on operators of installations for the incineration of municipal waste. Given that those installations do not have to surrender allowances in accordance with Article 12 of that Directive, it is appropriate not to consider heat delivered by those installations to other installations as covered by the European Union Emissions Trading System (EU ETS) for the purpose of free allocation. |
(3) |
In order to incentivise the electrification of industrial processes as an important technology to significantly reduce emissions from such processes and to ensure equal treatment of processes covered by product benchmarks and the heat and fuel benchmarks, measurable and non-measurable heat produced from electricity should in principle be eligible for free allocation under the heat and fuel benchmarks. |
(4) |
In Case C-271/20 (5), the Court of Justice ruled that chemical energy stored in the raw material and released as heat during the combustion process is to be treated as a fuel for the purpose of free allocation. As such combustion processes release emissions other than greenhouse gases, it is appropriate to explicitly exclude the heat released during such combustion processes from free allocation under the fuel benchmark to ensure environmental integrity, in particular in view of the release of sulphur oxides during such combustion processes. Therefore, the use of the fuel benchmark should be restricted to combustion processes where the primary purpose is the generation of non-measurable heat. |
(5) |
Article 10a of Directive 2003/87/EC provides the Commission with a mandate to integrate the implementation of the new conditionality on energy efficiency measures into the existing five-year cycle for installations applying for free allocation established by this Regulation, in order to ensure harmonisation with existing procedures and to avoid undue administrative burden. |
(6) |
The competent authority should approve the monitoring methodology plan in order to ensure consistency with the monitoring rules. Due to time constraints, approval by the competent authority had not been required for the submission of baseline data reports in 2019, the year in which the monitoring methodology plans were introduced by Delegated Regulation (EU) 2019/331. This exemption is no longer necessary and should no longer apply. |
(7) |
Directive 2003/87/EC provides that no free allocation shall be given in relation to the production of products covered by the Carbon Border Adjustment Mechanism (CBAM), established by Regulation (EU) 2023/956 of the European Parliament and of the Council (6), with a gradual phase-out of free allocation during a transitional period. To ensure a harmonised implementation of this provision, operators should provide information and evidence, in particular based on Combined Nomenclature (CN) codes established by Council Regulation (EEC) No 2658/87 (7), on the goods produced. |
(8) |
In order to simplify procedures, in particular in relation to annual activity level reporting and subsequent adjustments to free allocation in accordance with Commission Implementing Regulation (EU) 2019/1842 (8), data for all sub-installations, including small sub-installations, should be reported as a basis for later free allocation adjustments. |
(9) |
In order to incentivise the electrification of industrial processes to significantly reduce emissions from such processes, it is necessary to remove the rules for the exchangeability of fuel and electricity. Consequently, highly or entirely electrified processes covered by the EU ETS should benefit from free allocation in the same way as processes with high direct emissions. Therefore, the amount of free allocation should be determined regardless of the share of direct and indirect emissions for installations falling under the same benchmark. Even though free allocation for those processes will cover also indirect emissions, it does not necessarily imply that carbon leakage risks determined in accordance with Article 10a(6) of Directive 2003/87/EC have been fully addressed for those processes. Indirect costs passed on to electricity consumers may vary depending on the electricity mix in a relevant geographic area. Any free allocation granted to indirect emissions of electrified processes should not prejudge the possibility to receive compensation for indirect costs in accordance with Article 10a(6) of Directive 2003/87/EC. In turn, financial measures to compensate indirect costs passed on in electricity prices should not compensate the same indirect costs covered by free allocation. For the purpose of the determination of electricity benchmarks, it is appropriate to collect data on electricity consumption for relevant product benchmarks. |
(10) |
In order to further incentivise the recovery of heat from fuel benchmark sub-installations and process emissions sub-installations, such heat should be eligible for free allocation in addition to the allocation based on fuel consumption and process emissions. The risk of double counting should be considered mitigated by the updates of the value of the fuel benchmark and of the multiplier applied to process emissions in accordance with Article 16(2), point (e), of Delegated Regulation (EU) 2019/331. |
(11) |
In order to minimise the administrative burden for operators, the information on the climate-neutrality plans should be integrated in the existing national implementation measures which serve as the basis for calculating free allocation. |
(12) |
To reward best performers and innovation, Directive 2003/87/EC exempts installations whose greenhouse gas emission levels are below the average of the 10 % most efficient installations under a given benchmark, from the application of the cross-sectoral correction factor. As benchmarks are defined at sub-installation level, it is appropriate to trigger the exemption if the greenhouse gas emission levels of at least one sub-installation meets the threshold, provided that this sub-installation contributes significantly to the total free allocation for the installation. |
(13) |
To facilitate the harmonised implementation of allocation adjustments and cessations of operation, excess allowances not duly returned by an operator should be deducted from free allocation to the operator concerned. |
(14) |
To ensure that operators correct any non-conformities or any errors in baseline data reports that impact on the determination of the historical activity levels, the competent authorities should ensure that those errors or non-conformities are corrected and not only request the corrections. |
(15) |
To ensure that the historical activity levels are, as far as possible, representative of industry cycles and to reduce the impact of special circumstances, such as economic crises, those levels should be calculated using the median of the activity levels during the baseline period. |
(16) |
To ensure a harmonised and correct application of the free allocation rules, it is appropriate to clarify the determination of historical activity levels in cases where a sub-installation only started normal operation during the baseline period. In this respect, historical activity levels should be based on activities of full calendar years. |
(17) |
Free allocation for process emissions not covered by product benchmarks is based on the grandfathering of historical emissions. Since 2013 free allocation has been given at the level of 97 % of the historical emissions. To incentivise the reduction of such process emissions and to ensure better alignment with free allocation for process emissions covered by product benchmarks, it is necessary to reduce the level of free allocation for process emissions not covered by product benchmarks to 91 %, equivalent to an annual reduction of 0,3 % as the minimum update rate applied to product benchmarks in accordance with Article 10a(2) of Directive 2003/87/EC. The reduced multiplication factor should apply from 1 January 2028 to better align with the timeline for the deployment of solutions to abate process emissions, such as carbon capture and storage. |
(18) |
To ensure the gradual phase-out of free allocation for goods covered by Regulation (EU) 2023/956, the relevant CBAM factor set out in Article 10a(1a), second subparagraph, of Directive 2003/87/EC, should be applied to the preliminary free allocation for the sub-installation concerned. Potential future changes to the CBAM scope and to the relevant CBAM factor introduced in Regulation (EU) 2023/956 should be reflected in the corresponding gradual phase-out of free allocation. |
(19) |
Directive (EU) 2023/959 removes the concept of electricity generators from 1 January 2026 and their specific treatment in terms of free allocation from the EU ETS. It is therefore necessary to delete related provisions in Delegated Regulation (EU) 2019/331 accordingly. |
(20) |
To maintain the level playing field between incumbent installations and new entrants, it is necessary to reflect changes in the respective rules for new entrants as regards historical activity levels and free allocation of allowances. |
(21) |
To provide further incentives to reduce greenhouse gas emissions a provision on conditionality of free allocation on implementation of energy efficiency improvement measures was introduced in Article 10a, third subparagraph, of Directive 2003/87/EC, which needs to be supplemented. Recommendations included in energy audit reports or certified energy management systems, referred to in Article 10a(1), third subparagraph, of that Directive, which are at company-level, require a translation to installation level. To ensure legal certainty, the competent authority should only consider those recommendations as implemented when the implementation has been completed and the verifier has confirmed the completion. In order to safeguard the incentive given by the introduction of the conditionality, an installation should be granted the possibility to recover the reduced free allocation after having implemented the recommended measures as part of the annual activity level report and after the implementation of the recommended measures has been verified. An annual cycle for reviewing the conditionality of non-compliant installations that follows the reporting of the annual activity levels should be established. Operators of non-compliant installations facing the 20 % reduction of free allocation should provide verified evidence to the competent authority on the implementation of all recommended measures to ensure recovery of free allocation reduced due to conditionality. |
(22) |
Following the introduction of new rules on the conditionality of free allocation on climate neutrality plans pursuant to Article 10a(1) and Article 10b(4) of Directive 2003/87/EC, the procedural steps of the conditionality are to be supplemented. In accordance with Article 10a(1), fifth subparagraph, of that Directive, the operators are to establish climate-neutrality plans by 1 May 2024. In order to align the conditionality with the existing procedure of application for free allocation, the climate-neutrality plans should be submitted by 30 May 2024, or as appropriate depending on the alternative time-limit for the submission of such applications set by Member States. In accordance with Article 10a(1) of Directive 2003/87/EC, the installations concerned by this conditionality are those whose greenhouse gas emission levels are higher than the 80th percentile of emission levels for the relevant product benchmarks in the years 2016 and 2017. For this purpose, the calculation for the determination of the revised benchmark values in accordance with Commission Implementing Regulation (EU) 2021/447 (9) should be used. That determination is based on verified information on the greenhouse gas efficiency of installations reported pursuant to Article 11 of Directive 2003/87/EC for the years 2016 and 2017. As benchmarks are defined at sub-installation level, it is appropriate to introduce a threshold for small sub-installations below which the conditionality does not apply, provided that the sub-installation does not contribute to more than 20 % of the total preliminary free allocation of the installation. |
(23) |
To incentivise and expedite the reduction of greenhouse gas emissions originated from district heating, Article 10b(4) of Directive 2003/87/EC sets out further rules for the conditionality on climate-neutrality plans in case of district heating installations. As a result, the ETS installations providing heat to district heating systems may apply for additional free allocation in the period from 2026 to 2030. In order to provide operators of district heating sub-installations applying for additional free allocation with certainty on the further conditions regarding significant greenhouse gas emission reduction achievement before 2030, the value of the additional free allowances needs to be fixed for the size of the investment to be made. In order to be consistent, carbon price used in the determination of the monetary value of those allowances should be used similarly to Article 10c(3) of Directive 2003/87/EC. To provide clarity on the level and type of investment required from the operators and to ensure equal treatment of all installations concerned, significant reduction of greenhouse gas emission should be established using a linear trajectory of the average linear reduction factor over the period between the mid-point of the 2019-2023 baseline period, namely 2021, and 2030 in accordance with Article 9 of Directive 2003/87/EC. This methodology leads to the same reduction requirement for all operators of district heating concerned and does not require installation-specific reduction rates to be established. |
(24) |
In order to safeguard the incentives of the double-conditionality and to avoid unreasonable consequences, the conditionality of free allocation on implementation of energy efficiency improvement measures and the conditionality of free allocation on climate-neutrality plans should not be cumulative. This means that the reduction by 20 % in free allocation should apply if one or both conditionalities are not met under Article 10a(1), third and fifth subparagraphs of Directive 2003/87/EC. |
(25) |
In accordance with Article 10b(4) of Directive 2003/87/EC, Commission Implementing Regulation (EU) 2023/2441 (10) sets out the minimum content and format of the climate-neutrality plans. It is also appropriate to review the climate-neutrality plans at regular intervals, in order to give the possibility to revise and replace intermediate targets and milestones taking into account new technologies and emission reductions already achieved or not achieved, as defined for each verification period in 2025 and every five years thereafter, as long as they remain suited to the climate-neutrality objective as defined by Article 2 of Regulation (EU) 2021/1119. |
(26) |
For transparency reasons, climate-neutrality plans should be published by competent authorities. The publication of climate-neutrality plans provides for an increased awareness and understanding of greenhouse gas reduction within the installation. In order to protect commercially sensitive information, operators of installations should be able to request the deletion of certain commercially sensitive elements from the version of the climate-neutrality plans to be made publicly available. Such requests should be duly justified. |
(27) |
To facilitate implementation of rules for mergers and splits of installations and considering the specificities of the installations concerned in view of free allocation rules, it is appropriate to provide more flexibility to cover justified cases of different allocation levels before and after the merger or split by removing the requirement to have the same level of allocation after the merger or split. |
(28) |
To avoid unjustified free allocation to installations that no longer operate, no free allocation should be granted for the proportion of the calendar year after the day of cessation of operations. |
(29) |
To strengthen incentives for reducing greenhouse gas emissions and improving energy efficiency and to ensure a level playing field for new and existing technologies, Directive 2003/87/EC provides for a review of the determined Union-wide ex-ante benchmarks with a view to potentially modifying the definitions and system boundaries of existing product benchmarks. The review has taken place and identified a number of benchmarks where modifications to definitions and system boundaries should be introduced to provide such additional incentives or technical clarifications. |
(30) |
Following the review, to incentivise low-carbon technologies for the production of agglomerated iron ore products as feed into primary steel production and to consider the needs of green steel technologies, it is appropriate to open the sintered ore benchmark to alternative products. To maximise those incentives, the label of the benchmark and the definitions of products covered and of system boundaries should be kept technology neutral. |
(31) |
Following the review, to incentivise low- and zero-carbon technologies for the production of primary steel and to create a level playing field for the existing coke-based blast furnace route and the direct reduction technology, the hot metal benchmark should be modified in terms of additions to the definitions of products covered and of the system boundaries. |
(32) |
Following the review, to incentivise low-carbon technologies for the production of alternative hydraulic binders as substitutes for white and grey cement clinker, it is appropriate to open the grey cement clinker and white cement clinker benchmarks to alternative products. Products covered by other product benchmarks and by-products or waste resulting from other processes should not be considered to avoid undue allocation. |
(33) |
Following the review, to facilitate harmonised implementation of free allocation rules in terms of treatment of emissions from carbon dioxide reactors, for the soda ash benchmark it should be clarified that those processes are covered by the system boundary of that product benchmark. |
(34) |
Following the review, to avoid double counting in terms of free allocation to the production of steel from iron sponge and to ensure that the product benchmarks for hot metal, EAF carbon steel and EAF high alloy steel do not overlap, it is necessary to exclude steel produced from iron sponge from the definition of the EAF carbon steel and EAF high alloy steel benchmarks. |
(35) |
Following the review, to incentivise low- and zero-carbon technologies for the production of hydrogen and to create a level playing field for existing and new technologies such as water electrolysis, Directive (EU) 2023/959 extended the activity description for the production of hydrogen to include the production of green hydrogen and lowered the production threshold. The hydrogen benchmark should be modified accordingly. However, the electrolysis processes where hydrogen is a by-product should not benefit from free allocation under the hydrogen or ammonia benchmark as these technologies are not new and serve a primary purpose other than hydrogen production. To further clarify the free allocation rules, it is appropriate to explicitly exclude hydrogen used for the production of ammonia from the hydrogen product benchmark. |
(36) |
Following the review, to further harmonise the implementation of free allocation rules for the production of lime and dolime and to ensure consistency with the annual reporting of emissions, it is appropriate to delete the references to conservative estimates for the content of free calcium oxide and magnesium oxide. |
(37) |
To better reflect the energy intensity of the production of mixes of ethylene oxide and ethylene glycols and of the composition of gas mixes of hydrogen and carbon monoxide, it is appropriate to adjust the calculation of the historical activity levels for the ethylene oxide/ethylene glycol and hydrogen product benchmarks. |
(38) |
To reflect the changes in allocation rules, including the revision of product benchmarks, the introduction of conditionality of free allocation and the phase-out of free allocation due to the CBAM, the scope for data collection in the context of applications for free allocation should be adjusted accordingly. Similar changes are necessary for the minimum content of the monitoring methodology plans. |
(39) |
Delegated Regulation (EU) 2019/331 should therefore be amended accordingly. |
(40) |
The amendments set out in this Regulation should apply to allocations relating to the period from 1 January 2024. However, to reduce undue administrative burden and ensure predictability of free allocation levels, for new entrants whose applications for free allocation were submitted by 31 December 2023 to the Commission and incumbent installations, provisions concerning definitions of benchmarks, waste incinerators, CBAM, small sub-installations, exchangeability of fuel and electricity, recovery of heat from fuel benchmark sub-installations and process emissions sub-installations, historical activity level for incumbent installations, allocation at installation level for incumbent installations, allocation for process emissions not covered by product benchmarks, the removal of the concept of electricity generators, and allocation in respect of steam cracking and vinyl chloride monomer, should apply to allocations relating to the period from 1 January 2026. Free allocation for the period until 31 December 2025 should remain unaffected by the amendments. To ensure equal treatment and a level playing field for new entrants with different dates of applications for allocations, specific application rules should be introduced. For new entrants whose applications for free allocation are submitted on or after 1 January 2024, the amendments to this Regulation should apply to allocations relating to the period from 1 January 2024 while for allocations relating to the period until 31 December 2023 the Regulation in its version applicable on 31 December 2023 applies. |
(41) |
Given that free allocation is calculated based on full calendar years and that most amendments to Directive 2003/87/EC introduced by Directive (EU) 2023/959 apply from 1 January 2024, this Regulation should apply from 1 January 2024. |
(42) |
This Regulation should enter into force as a matter of urgency as operators are required to comply with its rules on baseline data reporting as of April, May or June 2024 as required by Article 4(1) of Delegated Regulation (EU) 2019/331, |
HAS ADOPTED THIS REGULATION:
Article 1
Delegated Regulation (EU) 2019/331 is amended as follows:
(1) |
Article 2 is amended as follows:
|
(2) |
in Article 4, paragraph 2 is amended as follows:
|
(3) |
Article 6 is replaced by the following: ‘Article 6 The operator of an installation, applying for or receiving free allocation pursuant to Article 10a of Directive 2003/87/EC shall monitor the data to be submitted as listed in Annex IV to this Regulation, based on a monitoring methodology plan approved by the competent authority.’ |
(4) |
Article 10 is amended as follows:
|
(5) |
Article 14 is amended as follows:
|
(6) |
Article 15 is amended as follows:
|
(7) |
Article 16 is amended as follows:
|
(8) |
in Article 17, points (a) to (f) are replaced by the following:
|
(9) |
Article 18(1) is amended as follows:
|
(10) |
Articles 19, 20 and 21 are replaced by the following: ‘Article 19 Allocation in respect of steam cracking By way of derogation from Article 16(2), point (a), and Article 18(1), point (a), the preliminary annual number of emission allowances allocated free of charge for a product benchmark sub-installation and relating to the production of high value chemicals (HVC) shall correspond to the value of the steam cracking product benchmark for the relevant allocation period multiplied by the historical activity level determined in accordance with Annex III. To the result of that calculation, 1,78 tonnes of carbon dioxide per tonne of hydrogen times the median historical production of hydrogen from supplemental feed expressed in tonnes of hydrogen, 0,24 tonnes of carbon dioxide per tonne of ethylene times the median historical production of ethylene from supplemental feed expressed in tonnes of ethylene, and 0,16 tonnes of carbon dioxide per tonne of HVC times the median historical production of other high value chemicals than hydrogen and ethylene from supplemental feed expressed in tonnes of HVC, shall be added. Article 20 Allocation in respect of vinyl chloride monomer By way of derogation from Article 16(2), point (a), and Article 18(1), point (a), the preliminary annual number of emission allowances allocated free of charge for a sub-installation and relating to the production of vinyl chloride monomer (VCM) shall correspond to the value of the VCM benchmark for the relevant allocation period multiplied by the historical activity level for VCM production expressed as tonnes and multiplied by the quotient of the direct emissions for the production of VCM including emissions from net imported heat, calculated on the basis of the historical net heat import expressed as terajoules times the value of the heat benchmark for the relevant allocation period, over the baseline period referred to in Article 15(2) or of the first calendar year after the calendar year where the start of normal operation occurs referred to in Article 17, point (a), as appropriate, expressed as tonnes of carbon dioxide equivalent and the sum of those direct emissions and the hydrogen-related emissions for the production of VCM over the baseline period referred to in Article 15(2) or of the first calendar year after the calendar year where the start of normal operation occurs referred to in Article 17, point (a), as appropriate, expressed as tonnes of carbon dioxide equivalent calculated on the basis of the historical heat consumption stemming from hydrogen combustion expressed as terajoules times the value of the heat benchmark for the relevant allocation period. Article 21 Heat flows between installations Where a product-benchmark sub-installation encompasses measurable heat imported from an installation or other entity not included in the EU ETS or only included for the purposes of Articles 14 and 15 of Directive 2003/87/EC, the preliminary annual number of emission allowances allocated free of charge for the product benchmark sub-installation concerned determined pursuant to Article 16(2), point (a), or Article 18(1), point (a), as appropriate, shall be reduced by the amount of heat historically imported from an installation or other entity not included in the EU ETS or only included for the purposes of Articles 14 and 15 of that Directive in the year concerned multiplied by the value of the heat benchmark for measurable heat for the relevant allocation period.’ |
(11) |
Article 22 is deleted; |
(12) |
the following Articles are inserted: ‘Article 22a Conditionality of free allocation on implementation of energy efficiency improvement measures 1. The final annual amount of emission allowances allocated free of charge, determined pursuant to Article 16(8) of this Regulation to the installation referred to in Article 10a(1), third subparagraph, of Directive 2003/87/EC, shall be reduced by 20 % in accordance with Article 10a(1) of that Directive if the operator cannot demonstrate to the satisfaction of the competent authority that all recommendations under Article 8 of Directive 2012/27/EU of the European Parliament and of the Council (*2) have been implemented. By way of derogation from the first subparagraph, no such reduction shall apply if the operator can demonstrate to the satisfaction of the competent authority that any of the following conditions apply:
2. The operator shall establish, implement, document and maintain a procedure for implementing recommendations and, where applicable, demonstrating the application of the conditions as referred to in paragraph 1. 3. The verifier shall check as part of the verification of the baseline data report referred to in Article 4(2) whether the recommendations referred to in paragraph 1, first subparagraph, are implemented and whether the conditions set out in paragraph 1, second subparagraph, are met, where applicable. Where relevant, the verifier shall check, as part of the verification of the annual activity level report in accordance with Article 7 of Commission Implementing Regulation (EU) 2018/2067 (*3), whether the recommendations referred to in paragraph 1, first subparagraph, are implemented and whether the conditions set out in paragraph 1, second subparagraph, are met, where applicable. 4. The competent authority shall only consider the recommendations referred to in paragraph 1, first subparagraph, as implemented where all of the following conditions are met:
Article 22b Conditionality of free allocation on climate-neutrality plans 1. For the purposes of Article 10a(1), fifth subparagraph, of Directive 2003/87/EC, the final annual number of emission allowances allocated free of charge, determined pursuant to Article 16(8) of this Regulation, shall be reduced by 20 % for an installation with product benchmark sub-installations where the greenhouse gas emission levels of at least one of those product-benchmark sub-installations were higher than the 80th percentile of emission levels for the relevant product benchmarks in the years 2016 and 2017. By way of derogation from the first subparagraph, no such reduction shall apply if the following conditions are fulfilled:
2. Paragraph 1, first subparagraph, shall not apply where the relevant product benchmark sub-installation does not contribute to more than 20 % of the sum of all sub-installations’ preliminary annual numbers of emission allowances allocated free of charge in respect of the period from 2021 to 2025, calculated in accordance with Article 16, paragraphs 2 to 5. 3. For the purposes of Article 10b(4), second, third and fourth subparagraphs, of Directive 2003/87/EC, the preliminary annual number of emission allowances allocated free of charge to a district heating sub-installation, calculated in accordance with Article 16, paragraphs 2 and 3, of this Regulation, shall be increased by 30 % of the number calculated in accordance with paragraph 2 of Article 16, where the operator of a district heating sub-installation has submitted an application in accordance with Article 4 of this Regulation and where, in respect of the period until the end of 2025 or in respect of the period from 2026 to 2030, all of the following conditions are met:
For the purposes of point (b), the economic value of the additional 30 % allowances shall be determined by multiplying the additional number of free allowances over the period from 2026 to 2030 by the average price of allowances on the common auction platform in the calendar year preceding the application referred to in Article 4(2) and multiplied by the factor determined in accordance with Article 14(6), as applicable to the installation. For the purposes of point (c), emission reductions are significant where the specific emissions, expressed as tonnes of CO2 per terajoules of district heating supplied, of the installation or district heating company are reduced below the average specific emissions during the relevant baseline period with an emission reduction rate equivalent to the application of the linear reduction factors referred to in Article 9 of Directive 2003/87/EC, starting from the mid-point of the relevant baseline period. 4. The competent authority shall check, by 30 September 2024, that the content and format of the climate-neutrality plans referred to in paragraphs 1 and 3 of this Article comply with Implementing Regulation (EU) 2023/2441. Article 22c Non-cumulative nature of the 20 % reduction in Articles 22a and 22b The 20 % reduction referred to in Articles 22a and 22b shall be applied to an installation only once in the relevant allocation period. Article 22d Update of the climate-neutrality plan 1. The operators shall, at periods specified in the climate-neutrality plan referred to in Article 22b and whenever necessary, evaluate the effectiveness of the climate-neutrality plan regarding greenhouse gas emissions reductions and implement corrective actions where appropriate to ensure that the milestones and targets are met. Any update shall only affect future milestones and targets. 2. Where the climate-neutrality plan is updated with respect to milestones and targets, the operator shall submit the updated plan to the competent authority without undue delay. Article 22e Publication of the climate-neutrality plan 1. Competent authorities shall publish the climate-neutrality plan submitted pursuant to Article 22b. 2. If an operator considers that the climate-neutrality plan contains commercially sensitive elements which, if disclosed, would harm its commercial interests, the operator may request the competent authority not to publish those elements. Where the request is justified the competent authority shall publish the climate-neutrality plan without those elements. (*2) Directive 2012/27/EU of the European Parliament and of the Council of 25 October 2012 on energy efficiency, amending Directives 2009/125/EC and 2010/30/EU and repealing Directives 2004/8/EC and 2006/32/EC (OJ L 315, 14.11.2012, p. 1, ELI: http://data.europa.eu/eli/dir/2012/27/2023-05-04)." (*3) Commission Implementing Regulation (EU) 2018/2067 of 19 December 2018 on the verification of data and on the accreditation of verifiers pursuant to Directive 2003/87/EC of the European Parliament and of the Council (OJ L 334, 31.12.2018, p. 94, ELI: http://data.europa.eu/eli/reg_impl/2018/2067/2021-01-01).’ " ; |
(13) |
in Article 23, paragraph 4 is replaced by the following: ‘4. The Commission shall adopt a Decision based on the notification received, shall inform the relevant competent authority and shall introduce the changes, where appropriate, into the Union Registry set up pursuant to Article 19 of Directive 2003/87/EC and the transaction log, referred to in Article 20 of that Directive.’ |
(14) |
Article 25(4) is deleted; |
(15) |
Article 26 is amended as follows:
|
(16) |
Annex I is amended in accordance with Annex I to this Regulation; |
(17) |
Annex III is replaced by the text in Annex II to this Regulation; |
(18) |
Annex IV is amended in accordance with Annex III to this Regulation; |
(19) |
Annex VI is amended in accordance with Annex IV to this Regulation; |
(20) |
Annex VII is amended in accordance with Annex V to this Regulation; |
(21) |
the text set out in Annex VI to this Regulation is added as Annex VIII. |
Article 2
Entry into force and application
This Regulation shall enter into force on the day of its publication in the Official Journal of the European Union. It shall apply to allocations relating to the period from 1 January 2024.
However, Article 1, points (1), (4)(a), (4)(b), (4)(c)(ii), (4)(d)(i), (4)(d)(ii), (4)(d)(iv), (6) and (7), (10) and (11) and points (16) and (17) shall apply to allocations relating to the period from 1 January 2026 to new entrants whose applications were submitted by 31 December 2023 and to incumbent installations.
This Regulation shall be binding in its entirety and directly applicable in all Member States.
Done at Brussels, 30 January 2024.
For the Commission
The President
Ursula VON DER LEYEN
(1) OJ L 275, 25.10.2003, p. 32.
(2) Directive (EU) 2023/959 of the European Parliament and of the Council of 10 May 2023 amending Directive 2003/87/EC establishing a system for greenhouse gas emission allowance trading within the Union and Decision (EU) 2015/1814 concerning the establishment and operation of a market stability reserve for the Union greenhouse gas emission trading system (OJ L 130, 16.5.2023, p. 134).
(3) Regulation (EU) 2021/1119 of the European Parliament and of the Council of 30 June 2021 establishing the framework for achieving climate neutrality and amending Regulations (EC) No 401/2009 and (EU) 2018/1999 (‘European Climate Law’) (OJ L 243, 9.7.2021, p. 1).
(4) Commission Delegated Regulation (EU) 2019/331 of 19 December 2018 determining transitional Union-wide rules for harmonised free allocation of emission allowances pursuant to Article 10a of Directive 2003/87/EC of the European Parliament and of the Council (OJ L 59, 27.2.2019, p. 8).
(5) Judgment of the Court (Fifth Chamber) of 25 November 2021, Case C-271/20, Aurubis AG v Bundesrepublik Deutschland, ECLI:EU:C:2021:959.
(6) Regulation (EU) 2023/956 of the European Parliament and of the Council of 10 May 2023 establishing a carbon border adjustment mechanism (OJ L 130, 16.5.2023, p. 52).
(7) Council Regulation (EEC) No 2658/87 of 23 July 1987 on the tariff and statistical nomenclature and on the Common Customs Tariff (OJ L 256, 7.9.1987, p. 1).
(8) Commission Implementing Regulation (EU) 2019/1842 of 31 October 2019 laying down rules for the application of Directive 2003/87/EC of the European Parliament and of the Council as regards further arrangements for the adjustments to free allocation of emission allowances due to activity level changes (OJ L 282, 4.11.2019, p. 20).
(9) Commission Implementing Regulation (EU) 2021/447 of 12 March 2021 determining revised benchmark values for free allocation of emission allowances for the period from 2021 to 2025 pursuant to Article 10a(2) of Directive 2003/87/EC of the European Parliament and of the Council (OJ L 87, 15.3.2021, p. 29).
(10) Commission Implementing Regulation (EU) 2023/2441 of 31 October 2023 laying down rules for the application of Directive 2003/87/EC of the European Parliament and of the Council as regards the content and format of climate-neutrality plans needed for granting free allocation of emission allowances (OJ L, 2023/2441, 3.11.2023, ELI: http://data.europa.eu/eli/reg_impl/2023/2441/oj).
ANNEX I
Annex I to Delegated Regulation (EU) 2019/331 is amended as follows:
(1) |
Section 1 is amended as follows:
|
(2) |
Section 2 is replaced by the following:
If no other reference is given, all product benchmarks refer to 1 tonne of product produced expressed as saleable (net) production and to 100 % purity of the substance concerned. All definitions of processes and emissions covered (system boundaries) include flares where they occur.’. |
ANNEX II
Annex III to Delegated Regulation (EU) 2019/331 is replaced by the following:
‘ANNEX III
Historical activity level for specific benchmarks referred to in Articles 15(8) and 17(f)
1.
The product-related historical activity level for the baseline period for products to which the refinery product benchmark as referred to in Annex I applies on the basis of the different CWT functions, their definitions, the basis for throughput as well as the CWT factors as listed in Annex II, shall be determined according to the following formula:
whereby:
HALCWT |
: |
historical activity level expressed as CWT |
TPi,k |
: |
throughput of the CWT function i in year k of the baseline period |
CWTi |
: |
CWT factor of the CWT function i |
TPAD,k |
: |
throughput of the CWT function “Atmospheric Crude Distillation” in year k of the baseline period |
2.
The product-related historical activity level for the baseline period for products to which the lime product benchmark as referred to in Annex I applies shall be determined according to the following formula:
whereby:
HALlime,standard |
: |
historical activity level for lime production expressed in tons of standard pure lime |
mCaO,k |
: |
content of free CaO in the produced lime in year k of the baseline period expressed as mass-% |
mMgO,k |
: |
content of free MgO in the produced lime in year k of the baseline period expressed as mass-% |
HALlime,uncorrected,k |
: |
uncorrected historical activity level for lime production in year k of the baseline period expressed in tonnes of lime |
3.
The product-related historical activity level for the baseline period for products to which the dolime product benchmark as referred to in Annex I applies shall be determined according to the following formula:
whereby:
HALdolime,standard |
: |
historical activity level for dolime production expressed in tonnes of standard pure dolime |
mCaO,k |
: |
content of free CaO in the produced dolime in year k of the baseline period expressed as mass-% |
mMgO,k |
: |
content of free MgO in the produced dolime in year k of the baseline period expressed as mass-% |
HALdolime,uncorrected,k |
: |
uncorrected historical activity level for dolime production in year k of the baseline period expressed in tonnes of lime |
4.
The product-related historical activity level for the baseline period for products to which the steam cracking product benchmark as referred to in Annex I applies shall be determined according to the following formula:
whereby:
HALHVC,net |
: |
historical activity level for high value chemicals net of high value chemicals produced from supplemental feed expressed in tonnes of HVC |
HALHVC,total,k |
: |
historical activity level for total high value chemicals production in year k of the baseline period expressed in tonnes of HVC |
HSFH,k |
: |
historical supplemental feed of hydrogen in year k of the baseline period expressed in tonnes of hydrogen |
HSFE,k |
: |
historical supplemental feed of ethylene in year k of the baseline period expressed in tonnes of ethylene |
HSFO,k |
: |
historical supplemental feed of other high value chemicals than hydrogen and ethylene in year k of the baseline period expressed in tonnes of HVC |
5.
The product-related historical activity level for the baseline period for products to which the aromatics product benchmark as referred to in Annex I applies on the basis of the different CWT functions, their definitions, the basis for throughput as well as the CWT factors as listed in Annex II shall be determined according to the following formula:
whereby:
HALCWT |
: |
historical activity level expressed as CWT |
TPi,k |
: |
throughput of the CWT function i in year k of the baseline period |
CWTi |
: |
CWT factor of the CWT function i |
6.
Where a mixture of hydrogen and carbon monoxide is produced, the product-related historical activity level for the baseline period for products to which the hydrogen product benchmark as referred to in Annex I applies shall be determined according to the following formula:
whereby:
HALH2 |
: |
historical activity level for hydrogen production referred to 100 % hydrogen |
HALH2,act |
: |
actual hydrogen production |
HALH2, WGS |
: |
additional hydrogen production under theoretical complete water gas shift (WGS) reaction, calculated via the stoichiometric ratio as HALCO, act × 0,071967 t H2/tCO for the WGS reaction |
HALCO, act |
: |
actual carbon monoxide production |
Emact |
: |
actual emissions related to hydrogen production |
EmWGS |
: |
additional emissions related to hydrogen production from theoretical complete WGS reaction |
The actual emissions related to hydrogen production shall be determined as follows:
whereby:
Emact |
: |
actual emissions related to hydrogen production |
DirEmact |
: |
actual direct emissions excluding heat-related emissions, prior to any carbon capture for use or geological storage. For emissions stemming from biomass, the emissions shall be calculated as the energy content from biomass multiplied with the emission factor of natural gas instead of the actual emissions |
Heatexport,act |
: |
actual net heat export |
BMheat |
: |
the value of the heat benchmark for measurable heat for the relevant allocation period |
The additional emissions related to hydrogen production from theoretical complete water gas shift shall be determined as follows:
whereby:
COWGS |
: |
the amount of CO produced prior to the additional theoretical conversion into CO2 via the WGS reaction |
MCO2 |
: |
molecular mass of CO2 (44,01 g/mol) |
MCO |
: |
molecular mass of CO (28,01 g/mol) |
Heatexport,WGS |
: |
theoretical additional net heat export after full WGS reaction assuming 99,5 % heat recovery, calculated via the reaction enthalpy of the WGS reaction (–20,439 GJ/t H2 produced) multiplied with HALH2,WGS and with the 99,5 % efficiency of recovery |
BMheat |
: |
the value of the heat benchmark for measurable heat for the relevant allocation period |
7.
The product-related historical activity level for the baseline period for products to which the synthesis gas (syngas) product benchmark as referred to in Annex I applies shall be determined according to the following formula:
whereby:
HALsyngas |
: |
historical activity level for synthesis gas production referred to 47 % hydrogen |
VFH2,k |
: |
historical production volume fraction of pure hydrogen in the total volume of hydrogen and carbon monoxide in year k of the baseline period |
HALH2+CO,k |
: |
historical activity level for synthesis gas production referred to historical hydrogen content expressed as norm cubic meters per year referring to 0 °C and 101,325 kPa in year k of the baseline period |
8.
The product-related historical activity level for the baseline period for products to which the ethylene oxide/ethylene glycols product benchmark as referred to in Annex I applies shall be determined according to the following formula:
whereby:
HALEO/EG |
: |
historical activity level for ethylene oxide/ethylene glycols production expressed in tonnes of ethylene oxide equivalents |
HALi,k: |
: |
historical activity level for the production of the ethylene oxide or glycol i in year k of the baseline period expressed in tonnes |
CFEOE,I |
: |
conversion factor for the ethylene oxide or glycol i relative to ethylene oxide |
Following conversion factors shall be applied:
Ethylene oxide: 0,926 |
Monoethylene glycol: 0,717 |
Diethylene glycol: 1,174 |
Triethylene glycol: 1,429 |
ANNEX III
Annex IV to Delegated Regulation (EU) 2019/331 is amended as follows:
(1) |
in Section 1.3 the following point is added:
|
(2) |
Section 1.4 is replaced by the following:
|
(3) |
Section 2.3 is amended as follows:
|
(4) |
in Section 2.4, point (a) is replaced by the following:
|
(5) |
Section 2.5 is amended as follows:
|
(6) |
Section 2.6 is amended as follows:
|
(7) |
Section 2.7 is amended as follows:
|
(8) |
Section 3.1 is amended as follows:
|
(9) |
in Section 3.2, the following point is inserted:
|
ANNEX IV
Annex VI to Delegated Regulation (EU) 2019/331 is amended as follows:
(1) |
point 1 is amended as follows:
|
(2) |
in point 2, point (a) is replaced by the following:
|
ANNEX V
Annex VII to Delegated Regulation (EU) 2019/331 is amended as follows:
(1) |
the second subparagraph of Section 4.2 is replaced by the following: ‘The competent authority shall consider costs unreasonable where the operator’s cost estimation exceeds the benefit of a specific determination methodology. To that end, the benefit shall be calculated by multiplying an improvement factor with a reference price referred to in Article 18, paragraph 1 of Commission Implementing Regulation (EU) 2018/2066 (*1) and costs shall include an appropriate depreciation period based on the economic lifetime of the equipment, where applicable. (*1) Commission Implementing Regulation (EU) 2018/2066 of 19 December 2018 on the monitoring and reporting of greenhouse gas emissions pursuant to Directive 2003/87/EC of the European Parliament and of the Council and amending Commission Regulation (EU) No 601/2012 (OJ L 334, 31.12.2018, p. 1).’;" |
(2) |
Section 9 is replaced by the following:
|
(3) |
Section 10 is amended as follows:
|
(*1) Commission Implementing Regulation (EU) 2018/2066 of 19 December 2018 on the monitoring and reporting of greenhouse gas emissions pursuant to Directive 2003/87/EC of the European Parliament and of the Council and amending Commission Regulation (EU) No 601/2012 (OJ L 334, 31.12.2018, p. 1).’;’
ANNEX VI
‘ANNEX VIII
Determination of eligible Member States pursuant to Article 22b(3)
Installations in certain Member States may benefit from additional free allocation for district heating pursuant to Article 10b(4) of Directive 2003/87/EC.
1. METHODOLOGY
According to Article 10b(4) of Directive 2003/87/EC, the following condition shall be met for the average of the years 2014 to 2018, for Member States to be eligible for additional free allocation pursuant to Article 22b(3):
2. ELIGIBLE MEMBER STATES
According to the methodology described in point 1, installations located in the following Member States may benefit from additional free allocation pursuant to Article 22b(3):
(a) |
Bulgaria; |
(b) |
Czechia; |
(c) |
Latvia; |
(d) |
Poland. |
ELI: http://data.europa.eu/eli/reg_del/2024/873/oj
ISSN 1977-0677 (electronic edition)