This document is an excerpt from the EUR-Lex website
Document 32024D1956
Commission Implementing Decision (EU) 2024/1956 of 16 July 2024 amending Implementing Decision (EU) 2016/2323 establishing the European List of ship recycling facilities pursuant to Regulation (EU) No 1257/2013 of the European Parliament and of the Council on ship recycling
Commission Implementing Decision (EU) 2024/1956 of 16 July 2024 amending Implementing Decision (EU) 2016/2323 establishing the European List of ship recycling facilities pursuant to Regulation (EU) No 1257/2013 of the European Parliament and of the Council on ship recycling
Commission Implementing Decision (EU) 2024/1956 of 16 July 2024 amending Implementing Decision (EU) 2016/2323 establishing the European List of ship recycling facilities pursuant to Regulation (EU) No 1257/2013 of the European Parliament and of the Council on ship recycling
C/2024/4912
OJ L, 2024/1956, 17.7.2024, ELI: http://data.europa.eu/eli/dec_impl/2024/1956/oj (BG, ES, CS, DA, DE, ET, EL, EN, FR, GA, HR, IT, LV, LT, HU, MT, NL, PL, PT, RO, SK, SL, FI, SV)
In force
Official Journal |
EN L series |
2024/1956 |
17.7.2024 |
COMMISSION IMPLEMENTING DECISION (EU) 2024/1956
of 16 July 2024
amending Implementing Decision (EU) 2016/2323 establishing the European List of ship recycling facilities pursuant to Regulation (EU) No 1257/2013 of the European Parliament and of the Council on ship recycling
(Text with EEA relevance)
THE EUROPEAN COMMISSION,
Having regard to the Treaty on the Functioning of the European Union,
Having regard to Regulation (EU) No 1257/2013 of the European Parliament and of the Council of 20 November 2013 on ship recycling and amending Regulation (EC) No 1013/2006 and Directive 2009/16/EC (1), and in particular Article 16 thereof,
Whereas:
(1) |
Article 6(2), point (a), of Regulation (EU) No 1257/2013 requires ship owners to ensure that ships destined to be recycled are only recycled at ship recycling facilities included in the European List of ship recycling facilities (‘European List’) published pursuant to Article 16(2) of that Regulation. |
(2) |
The European List is set out in Commission Implementing Decision (EU) 2016/2323 (2). |
(3) |
The authorisations of Arise Recycling AS, a ship recycling facility located in Norway, is due to expire on 1 October 2024. The Commission has received information from Norway that the authorisation to conduct ship recycling granted to that facility has been verified, in accordance with Article 14 of Regulation (EU) No 1257/2013. The European List should therefore be updated accordingly. |
(4) |
The authorisation of Sagro Aannemingsmaatschappij Zeeland B.V. located in the Netherlands expired on 28 March 2024 and the competent authority informed the Commission that the facility did not request to renew its permit. That facility should therefore be removed from the European List. |
(5) |
The authorisation of UAB Demeksa located in Lithuania expired on 25 May 2024 and the competent authority informed the Commission that the facility did not request to renew its permit. That facility should therefore be removed from the European List. |
(6) |
The authorisation of Ship and Industrial Service Ltd located in Bulgaria expired on 25 January 2024 and the competent authority informed the Commission that the facility is ceasing its activity. That facility should therefore be removed from the European List. |
(7) |
Denmark informed the Commission that the facility JATOB ApS has changed name to Jatob Frederikshavn ApS and the Netherlands informed the Commission about a change in the method of recycling for Damen Verolme Rotterdam B.V. Furthermore, Kiliçlar asked to add an information in their contact details. The European List should therefore be updated to reflect these changes. |
(8) |
The Commission has received two applications, in accordance with Article 15(1) of Regulation (EU) No 1257/2013, for Dortel Gemi Söküm Demir Celik San. Ve Tic. Ltd. Şti. and Ege Gemi Söküm San Ve Metal San.Tic. A.Ş., ship recycling facilities located in Türkiye, to be included in the European List. Having assessed the information and supporting evidence provided and gathered in accordance with Article 15 of that Regulation, the Commission considers that the facilities comply with the requirements set out in Article 13 of that Regulation to conduct ship recycling and to be included in the European List. The European List should therefore be updated to include those facilities. |
(9) |
Anadolu Gemi Sokum located in Türkiye has demonstrated that it complies with the requirements of the Regulation with respect to the safe and environmentally sound dismantling of floating platforms and included specific procedure in its ship recycling facility plan. The limitation related to the dismantling of rigs should therefore be removed in the European List. At the same time, it should be recalled that the yards remain bound by the limit of the width of the vessels they can receive. The limit set by the width of the vessel could only be considered to be removed following the review of a cooperation agreement with an EU listed neighbouring ship recycling facility which would cover in a satisfactory way the nature and conditions of such cooperation. To be consistent with the terminology used under the definition in Article 3(1), point (1), of Regulation (EU) No 1257/2013, and taking into account the need for specific dismantling procedures, the limitations for ‘rigs’ should be replaced by a limitation for ‘floating platforms’. The European List should therefore be updated to reflect these changes. |
(10) |
Implementing Decision (EU) 2016/2323 should therefore be amended accordingly. |
(11) |
The measures provided for in this Decision are in accordance with the opinion of the Committee established by Article 25 of Regulation (EU) No 1257/2013, |
HAS ADOPTED THIS DECISION:
Article 1
The Annex to Implementing Decision (EU) 2016/2323 is replaced by the text in the Annex to this Decision.
Article 2
This Decision shall enter into force on the third day following that of its publication in the Official Journal of the European Union.
Done at Brussels, 16 July 2024.
For the Commission
The President
Ursula VON DER LEYEN
(1) OJ L 330, 10.12.2013, p. 1, ELI: http://data.europa.eu/eli/reg/2013/1257/oj.
(2) Commission Implementing Decision (EU) 2016/2323 of 19 December 2016 establishing the European List of ship recycling facilities pursuant to Regulation (EU) No 1257/2013 of the European Parliament and of the Council on ship recycling (OJ L 345, 20.12.2016, p. 119, ELI: http://data.europa.eu/eli/dec_impl/2016/2323/oj).
ANNEX
‘ANNEX
The European List of ship recycling facilities referred to in Article 16 of Regulation (EU) No 1257/2013
Part A
Ship recycling facilities located in a Member State
Name of the facility |
Method of recycling |
Type and size of ships that can be recycled |
Limitations and conditions under which the ship recycling facility operates, including as regards hazardous waste management |
Details on the explicit or tacit procedure for the approval of the ship recycling plan by the competent authority (1) |
Maximum annual ship recycling output, calculated as the sum of the weight of ships expressed in LDT that have been recycled in a given year in that facility (2) |
Date of expiry of inclusion in the European List (3) |
|||||||||
BELGIUM |
|||||||||||||||
Phone: +32(0)9/251 25 21 Email: peter.wyntin@galloo.com |
Alongside (wet berth), slope |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: 265 meters Width: 37 meters Draught: 12,5 meters |
|
Tacit approval, with a maximum review period of 30 days |
34 000 (4) |
31 March 2025 |
|||||||||
DENMARK |
|||||||||||||||
Phone: +45 7592 0000 Email: fayard@fayard.dk |
Drydock |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: 415 meters Width: 90 meters Draught: 7,8 meters |
The ship recycling facility is regulated in accordance with applicable legislation and with the conditions set out in Environmental Permit of 7 November 2018 issued by the Municipality of Kerteminde. The Environmental Permit includes conditions for operating hours, special operating conditions, handling and storage of waste and also includes a condition that the activity must be carried out in a dry dock. |
Tacit approval, with a maximum review period of 14 days. |
916,34 (5) |
22 May 2028 |
|||||||||
Phone: +45 86326393 Email: recycling@fornaes.dk |
Alongside, drydock |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: 150 meters Width: 25 meters Draught: 7 meters GT: 10 000 |
The municipality of Norddjurs has the right to allocate hazardous waste for environmentally approved reception facilities. |
Tacit approval, with a maximum review period of 14 days. |
30 000 (6) |
12 May 2026 |
|||||||||
Jatob Frederikshavn ApS Langerak 12 9900 Frederikshavn Denmark Phone: +45 8668 1689 Email: post@jatob.dk mathias@jatob.dk |
Alongside, slipway |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: 150 meters Width: 30 meters Draught: 6 meters |
Handling and storage of waste fractions is given by Environmental Authorization. Intermediate storage of hazardous waste may occur for up to one year at the site. |
Tacit approval, with a maximum review period of 14 days. |
13 000 (7) |
9 March 2025 |
|||||||||
www.modernamericanrecyclingservices.com/ Phone: +45 30307763 Email: kim@mars-eu.dk |
Slipway |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: 400 meters Width: 90 meters Draught: 14 meters |
The conditions under which the ship recycling facility operates are defined in the Environmental Permit of 9 March 2018 and Addendum to Environmental Permit of 12 July 2022 issued by the Municipality of Frederikshavn. The Municipality of Frederikshavn has the right to allocate hazardous waste to environmentally approved reception facilities. The facility must not store hazardous waste for more than one year. |
Tacit approval, with a review period of 14 days. |
60 000 (8) |
27 January 2028 |
|||||||||
Phone: +45 75128888 E-mail: |
Alongside, slipway |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: 200 meters * Width: 48 meters Draught: 7,5 meters (* If length > 170 meters, acceptation from the Municipality of Esbjerg is required) |
The conditions under which the ship recycling facility operates are defined in the Environmental Permit of 4 June 2015 issued by the Municipality of Esbjerg. The Municipality of Esbjerg has the right to allocate hazardous waste to environmentally approved reception facilities. |
Tacit approval, with a maximum review period of 14 days |
20 000 (9) |
11 March 2026 |
|||||||||
ESTONIA |
|||||||||||||||
Phone: +372 610 2933 Fax: +372 610 2444 Email: refonda@blrt.ee |
Afloat at the quayside and in the floating dock |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: 197 meters Width: 32 meters Draught: 9,6 meters |
Waste permit No. KL-511809. Hazardous waste management licence No 0546. Rules of the Vene-Balti Port, Manual on Ships Recycling MSR-Refonda. Environmental Management System, Waste management EP 4.4.6-1-13 The facility can recycle only the hazardous materials for which it has been licensed. |
Tacit approval, with a maximum review period of 30 days. |
24 364 (10) |
15 February 2026 |
|||||||||
SPAIN |
|||||||||||||||
Phone: +34 944971552 Email: dina@dinascrapping.com |
Alongside, dismantling ramp |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: 120 meters Width: 20 meters Draught: 6 meters |
The limitations are included in the integrated environmental authorisation. |
Tacit approval. The competent authority for approval is the environmental authority of the Autonomous Community where the facility is located. |
2 086 (11) |
3 March 2026 |
|||||||||
Phone: +34 630 14 44 16 Email: abarredo@ddr-vessels.com |
Alongside, dismantling ramp |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: 169,9 meters (Ships above that size which can operate a zero rollover or negative ramp movement may be accepted depending on the outcome of a detailed feasibility study) Width: 25 meters |
The limitations are included in the integrated environmental authorisation. |
Tacit approval. The competent authority for approval is the environmental authority of the Autonomous Community where the facility is located. |
3 600 (12) |
28 July 2025 |
|||||||||
FRANCE |
|||||||||||||||
Phone: (+33) (0)7 69 79 12 80 Email: |
Alongside, drydock |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: 140 meters Width: 25 meters Depth: 5 meters |
Environmental limitations are defined in the prefectural authorisation. |
Explicit approval – The competent authority for the approval decision is the minister of environment |
1 500 (13) |
21 September 2027 |
|||||||||
Phone: +33(0)2 35 95 16 34 Email: normandie@baudelet.fr |
Floating and slipway |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: 150 meters Width: 18 meters Depth: 7 meters LDT: 7 000 |
Environmental limitations are defined in the prefectural authorisation. |
Explicit approval – The competent authority for the approval decision is the minister of environment. |
7 730 (14) |
29 December 2026 |
|||||||||
Phone: +33(0)5 56 90 58 00 Email: maintenance@bordeaux-port.fr |
Alongside, drydock |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: 240 meters Width: 37 meters Depth: 17 meters |
Environmental limitations are defined in the prefectural authorisation. |
Explicit approval – The competent authority for the approval decision is the minister of environment. |
9 000 (15) |
27 September 2026 |
|||||||||
Phone: +33(0)2 98 01 11 06 Email: navaleo@navaleo.fr |
Alongside, drydock |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: 225 meters Width: 34 meters Depth: 27 meters |
Environmental limitations are defined in the prefectural authorisation. |
Explicit approval – The competent authority for the approval decision is the minister of environment. |
15 000 (16) |
19 June 2025 |
|||||||||
ITALY |
|||||||||||||||
Phone: +39 (0)10 251561 Email: |
Alongside, drydock |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: 350 meters Width: 75 meters Depth: 16 meters GT: 130 000 |
The limitations and restrictions are included in the integrated environmental authorisation. |
Explicit approval |
38 564 (17) |
6 June 2028 |
|||||||||
LATVIA |
|||||||||||||||
Phone: +371 29410506 Email: galaksisn@inbox.lv |
Alongside (wet berth), drydock |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: 165 meters Width:22 meters Depth: 7 meters GT: 12 000 |
See national permit No. LI12IB0053 |
Explicit approval - written notification in 30 working days |
2 490 (18) |
17 July 2024 |
|||||||||
LITHUANIA |
|||||||||||||||
Phone: +370 (46) 365776 Fax: +370 (46) 365776 Email: uab.apk@gmail.com |
Alongside (wet berth) |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: 130 meters Width: 35 meters Depth: 10 meters GT: 3 500 |
See national permit No. TL-KL.1-15/2015 |
Explicit approval - written notification in 30 working days |
1 500 (19) |
12 March 2025 |
|||||||||
Phone: +370 685 32607 Email: armar.uab@gmail.com |
Alongside (wet berth) |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: 80 meters Width: 16 meters Depth: 5 meters GT: 1 500 |
See national permit No. TL-KL.1-51/2017 |
Explicit approval - written notification in 30 working days |
3 910 (20) |
12 April 2027 |
|||||||||
Phone: +370 (46) 483940 / 483891 Fax: +370 (46) 483891 Email: refonda@wsy.lt |
Alongside (wet berth) |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: 230 meters Width: 55 meters Depth: 14 meters GT: 70 000 |
See national permit No. (11.2)-30-161/2011/TL-KL.1-18/2015 |
Explicit approval - written notification in 30 working days |
20 140 (21) |
30 April 2025 |
|||||||||
THE NETHERLANDS |
|||||||||||||||
Phone: +31 (0)181 23 4353 Email: hein.mangroe@damen.com |
Preparatory actions along the quayside, placed into drydock for scrapping |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: 400 meters Width: 90 meters Depth: 12 meters Height: 90 meters |
The site has a permit to operate; this permit contains limitations and conditions to operate in an environmental sound manner. |
Explicit approval |
0 (22) |
21 May 2026 |
|||||||||
Phone: +31 23 558 1937 Email: info@decomamsterdam.nl |
Preparatory actions along the quayside, lifted onshore for scrapping |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: 240 meters Width: 50 meters Draught: 9 meters |
The site has a permit to operate; this permit contains limitations and conditions to operate in an environmental sound manner. |
Explicit approval |
17 500 (23) |
5 October 2026 |
|||||||||
Phone: +31 113352510 Email: info@hsd.nl |
Preparatory actions along the quayside, lifted onshore for scrapping |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: 175 meters Width: 40 meters Depth: 10 meters |
The site has a permit to operate; this permit contains limitations and conditions to operate in an environmental sound manner. |
Explicit approval |
30 000 (24) |
26 January 2026 |
|||||||||
NORWAY |
|||||||||||||||
|
Alongside, slipway, dry/wet-dock |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013. Maximum ship dimensions: Length: 360 meters Width: No limit Depth: No limit |
See national permit No. 2019.0501.T |
Explicit approval |
0 (25) |
20 July 2029 |
|||||||||
|
Alongside, quayside |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: 500 meters Width: no limit Depth: no limit |
See national permit No. 2005.0038.T |
Explicit approval |
31 000 (26) |
10 December 2028 (27) |
|||||||||
tlf: +4790098185 |
Drydock (indoors), slipway |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: 230 meters Width: 25 meters Depth: 20 meters |
See national permit No. 2018.0833.T Major dismantling operations must be performed indoors. The only dismantling and cutting operations that are allowed outside in open air are minor operations necessary to fit ships to the indoor facility. See permit for further details. |
Explicit approval |
30 000 (28) |
10 December 2028 (29) |
|||||||||
|
Alongside, slipway |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: 170 meters Width: 35 meters Depth: No limit |
See national permit No 2021.0011.T |
Explicit approval |
0 (30) |
9 April 2026 |
|||||||||
Phone: +47 400 39 479 Email: knut@fosengjenvinning.no |
Alongside |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013, with the exception of floating platforms or vessels used for extracting hydrocarbons Maximum ship dimensions: Length: 150 meters Width: 20 meters Depth: 7 meters |
See national permit No. 2006.0250.T |
Explicit approval |
8 000 (31) |
10 December 2028 (32) |
|||||||||
|
Alongside (wet berth), slipway |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: 230 meters Width: No limit Depth: No limit |
See national permit No. 2013.0111.T |
Explicit approval |
60 000 (33) |
10 December 2028 (34) |
|||||||||
|
Floating slipway. Optional depending on complexity, in addition: 1. Dismantling by quay and subsequent scrapping on impermeable floors with effective drainage system. 2. Drydock |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: 150 meters Width: 34 meters Draught: 5 meters / increasing depending on method of recycling. |
See national permit No. 2017.0864.T Maximum 8 000 LDT on floating slipway. Ships exceeding 8 000 LDT need to be dismantled using another method of recycling |
Explicit approval |
25 000 (35) |
10 December 2028 (36) |
|||||||||
FINLAND |
|||||||||||||||
Phone: +358 2 44 511 Email try@turkurepairyard.com |
Alongside, drydock |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: 250 meters Width: 40 meters Draught: 7,9 meters |
The limitations are included in the national environmental permit. |
Explicit approval |
20 000 (37) |
14 December 2025 |
|||||||||
UNITED KINGDOM – NORTHERN IRELAND |
|||||||||||||||
Phone +44(0)2890534189 Fax +44(0)2890458515 |
Dry dock and wet berth |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: 556 meters Width: 93 meters Draught: 7,5 meters DWT: 550 000 |
The site is authorised by way of a waste management licence, authorisation number LN/20/11 that limits the operations and places conditions on the operator of the facility. |
Explicit approval |
12 000 (38) |
16 June 2025 |
Part B
Ship recycling facilities located in a third country
Name of the facility |
Method of recycling |
Type and size of ships that can be recycled |
Limitations and conditions under which the ship recycling facility operates, including as regards hazardous waste management |
Details on the explicit or tacit procedure for the approval of the ship recycling plan by the competent authority (39) |
Maximum annual ship recycling output, calculated as the sum of the weight of ships expressed in LDT that have been recycled in a given year in that facility (40) |
Date of expiry of inclusion in the European List (41) |
||||||
TÜRKIYE |
||||||||||||
Phone: +90 232 618 21 02 Email: info@anadolugs.com |
Landing |
Ships as defined in Article 3(1), point (1), of Regulation (EU) No 1257/2013. Maximum ship dimensions: Length: no limit Width: 55 metres Draught: 12 metres |
The site has a Ship Dismantling Permit, issued by the Ministry of Environment, Urbanisation and Climate Change, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport and Infrastructure, which contain limitations and conditions under which the facility operates. |
Tacit approval, with a maximum review period of 15 days. The ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship. The SRP is neither explicitly approved nor rejected as a standalone document. |
111 823 (42) |
17 August 2028 |
||||||
Phone: +90 232 618 21 07 – 08 - 09 Email: info@avsargemiltd.com |
Landing |
Ships as defined in Article 3(1), point (1), of Regulation (EU) No 1257/2013, with the exception of floating platforms. Maximum ship dimensions: Length: no limit Width: 50 meters Draught: 15 meters |
The site has a Ship Dismantling Permit, issued by the Ministry of Environment, Urbanisation and Climate Change, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport and Infrastructure, which contain limitations and conditions under which the facility operates. |
Tacit approval, with a maximum review period of 15 days. The ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship. The SRP is neither explicitly approved nor rejected as a standalone document. |
54 224 (43) |
2 December 2025 |
||||||
Phone: +90 232 618 22 20 Email: bms@bmsgemi.com |
Landing |
Ships as defined in Article 3(1), point (1), of Regulation (EU) No 1257/2013, with the exception of floating platforms Maximum ship dimensions: Length: no limit Width: 49 metres Draught: 10 metres |
The site has a Ship Dismantling Permit, issued by the Ministry of Environment, Urbanisation and Climate Change, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport and Infrastructure, which contain limitations and conditions under which the facility operates. |
Tacit approval, with a maximum review period of 15 days. The ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship. The SRP is neither explicitly approved nor rejected as a standalone document. |
37 132 (44) |
17 August 2028 |
||||||
Phone: +90 232 618 2118 Email: info@dortelgemi.com |
Landing |
Ships as defined in Article 3(1), point (1), of Regulation (EU) No 1257/2013, with the exception of floating platforms Maximum ship dimensions: Length: no limit Width: 49 metres Draught: 25 metres |
The site has a Ship Dismantling Permit, issued by the Ministry of Environment, Urbanisation and Climate Change, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport and Infrastructure, which contain limitations and conditions under which the facility operates. |
Tacit approval, with a maximum review period of 15 days. The ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship. The SRP is neither explicitly approved nor rejected as a standalone document. |
41 268 (45) |
20 July 2029 |
||||||
Phone: +90 232 618 21 62 Email: pamirtaner@egecelik.com |
Landing |
Ships as defined in Article 3(1), point (1), of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: no limit Width: 50 meters Draught: 15 meters |
The site has a Ship Dismantling Permit, issued by the Ministry of Environment, Urbanisation and Climate Change, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport and Infrastructure, which contain limitations and conditions under which the facility operates. |
Tacit approval, with a maximum review period of 15 days. The ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship. The SRP is neither explicitly approved nor rejected as a standalone document. |
55 503 (46) |
12 February 2025 |
||||||
Phone: +90 232 618 20 11 Email: info@egegemi.com.tr |
Landing |
Ships as defined in Article 3(1), point (1), of Regulation (EU) No 1257/2013, with the exception of floating platforms Maximum ship dimensions: Length: no limit Width: 49 meters Draught: 25 meters |
The site has a Ship Dismantling Permit, issued by the Ministry of Environment, Urbanisation and Climate Change, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport and Infrastructure, which contain limitations and conditions under which the facility operates. |
Tacit approval, with a maximum review period of 15 days. The ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship. The SRP is neither explicitly approved nor rejected as a standalone document. |
34 986 (47) |
20 July 2029 |
||||||
Phone: +90 232 618 20 30 Email: info@leyal.com.tr |
Landing |
Ships as defined in Article 3(1), point (1),of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: no limit Width: 100 meters Draught: 15 meters |
The site has a Ship Dismantling Permit, issued by the Ministry of Environment, Urbanisation and Climate Change, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport and Infrastructure, which contain limitations and conditions under which the facility operates. |
Tacit approval, with a maximum review period of 15 days The ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship. The SRP is neither explicitly approved nor rejected as a standalone document. |
64 815 (48) |
10 December 2028 |
||||||
Phone: +90 232 618 20 65 Email: demtas@leyal.com.tr |
Landing |
Ships as defined in Article 3(1), point (1), of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: no limit Width: 63 meters Draught: 15 meters |
The site has a Ship Dismantling Permit, issued by Ministry of Environment, Urbanisation and Climate Change, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport and Infrastructure, which contain limitations and conditions under which the facility operates. |
Tacit approval, with a maximum review period of 15 days The ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship. The SRP is neither explicitly approved nor rejected as a standalone document. |
57 275 (49) |
10 December 2028 |
||||||
Phone: +90 232 618 22 17 Email: gemisokum@kiliclar.com.tr |
Landing |
Ships as defined in Article 3(1), point (1), of Regulation (EU) No 1257/2013, with the exception of floating platforms Maximum ship dimensions: Length: no limit Width: 49 metres Draught: 15 metres |
The site has a Ship Dismantling Permit, issued by Ministry of Environment, Urbanisation and Climate Change, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport and Infrastructure, which contain limitations and conditions under which the facility operates. |
Tacit approval, with a maximum review period of 15 days. The ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship. The SRP is neither explicitly approved nor rejected as a standalone document. |
16 711 (50) |
17 August 2028 |
||||||
Phone: +90 232 618 21 05 Email: oge@ogegemi.com |
Landing |
Ships as defined in Article 3(1), point (1), of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: no limit Width: 70 meters Draught: 15 meters |
The site has a Ship Dismantling Permit, issued by Ministry of Environment, Urbanisation and Climate Change, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport and Infrastructure, which contain limitations and conditions under which the facility operates. |
Tacit approval, with a maximum review period of 15 days. The ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship. The SRP is neither explicitly approved nor rejected as a standalone document. |
62 471 (51) |
12 February 2025 |
||||||
Phone: +90 232 618 2092 Email: info@sokship.com |
Landing |
Ships as defined in Article 3(1), point (1), of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: no limit Width: 90 meters Draught: 15 meters |
The site has a Ship Dismantling Permit, issued by Ministry of Environment, Urbanisation and Climate Change, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport and Infrastructure, which contain limitations and conditions under which the facility operates. |
Tacit approval, with a maximum review period of 15 days. The ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship. The SRP is neither explicitly approved nor rejected as a standalone document. |
66 167 (52) |
12 February 2025 |
||||||
UNITED KINGDOM |
||||||||||||
Phone: + 44 (0)131 454 3380; + 44 (0)7834 658 588 Email: Phil@dalesmarine.co.uk |
Drydock and wet berth |
Ships as defined in Article 3(1), point (1), of Regulation (EU) No 1257/2013, with the exception of floating platforms Maximum ship dimensions: Length: 165 meters Width: 20 meters Draught: 7,7 meters |
The site is authorised by way of a waste management licence, authorisation number WML/L/1157331 that limits the operations and places conditions on the operator of the facility. |
Explicit approval |
5 019 (53) |
22 May 2027 |
||||||
Phone: +44 (0)139 777 3840 Email: enquiries@kishornportltd.com |
Drydock |
Ships as defined in Article 3(1), point (1), of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: 160 meters Width: 160 meters Draught: 13.8 meters LDT: 26 448 |
The site is authorised by way of a waste management licence, authorisation number WML/L/1175043 Modification 01’ and ‘WML/L/1175043 Modification 02’ that limits the operations and places conditions on the operator of the facility. |
Explicit approval |
38 148 (54) |
22 May 2027 |
||||||
UNITED STATES OF AMERICA |
||||||||||||
Phone: +1 956-831-2299 |
Alongside (wet berth), slope |
Ships as defined in Article 3(1), point (1), of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: 366 meters Width: 48 meters Draught: 9 meters |
The conditions under which the facility is authorised to operate are defined in permits, certificates and authorizations issued to the facility by the Environmental Protection Agency, the Texas Commission of Environmental Quality, the Texas General Land Office and the U.S Coast Guard. The U.S. Toxic Substances Control Act prohibits the import into the US of foreign flagged vessels that contain PCB concentrations greater than 50 parts per million. The facility has two slips with ramps for final vessel recycling (East Slip and West Slip). Ships flying a flag of EU Member States shall be recycled exclusively on the East Slip ramp. |
There is currently no procedure in US law related to the approval of ship recycling plans |
120 000 (55) |
10 December 2028 |
(1) As referred to in Article 7(3) of Regulation (EU) No 1257/2013.
(2) As referred to in Article 32(1), point (a), third sentence, of Regulation (EU) No 1257/2013.
(3) The date of expiry of inclusion in the European List corresponds to the date of expiry of the permit or authorisation granted to the facility in the Member State.
(4) According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 50 000 LDT per year.
(5) According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 30 000 LDT per year.
(6) According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 50 000 LDT per year.
(7) According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 30 000 LDT per year.
(8) According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 200 000 LDT per year.
(9) According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 50 000 LDT per year.
(10) According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 36 000 LDT per year.
(11) According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 6 000 LDT per year.
(12) According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 60 000 LDT per year.
(13) According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 15 000 LDT per year.
(14) According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 12 000 LDT per year.
(15) According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 23 000 LDT per year.
(16) According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 40 000 LDT per year.
(17) According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 60 000 LDT per year.
(18) According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 10 000 LDT per year.
(19) According to its permit, the facility is authorised to recycle a maximum 30 000 LDT per year.
(20) According to its permit, the facility is authorised to recycle a maximum 6 000 LDT per year.
(21) According to its permit, the facility is authorised to recycle a maximum 45 000 LDT per year.
(22) According to its permit, the theoretical maximum annual ship recycling capacity of the facility is 100 000 LDT per year.
(23) According to its permit, the theoretical maximum annual ship recycling capacity of the facility is 47 500 LDT per year.
(24) According to its permit, the theoretical maximum annual ship recycling capacity of the facility is 100 000 LDT per year.
(25) According to its permit, the facility is authorised to recycle a maximum 75 000 LDT per year.
(26) According to its permit, the facility is authorised to recycle a maximum 75 000 LDT per year.
(27) This date of expiry is set by reference to a period of validity corresponding to five years from the date of entry into force of this Decision.
(28) According to its permit, the facility is authorised to recycle a maximum 30 000 LDT per year.
(29) This date of expiry is set by reference to a period of validity corresponding to five years from the date of entry into force of this Decision.
(30) According to its permit, the facility is authorised to recycle a maximum 30 000 LDT per year.
(31) According to its permit, the facility is authorised to recycle a maximum 10 000 LDT per year.
(32) This date of expiry is set by reference to a period of validity corresponding to five years from the date of entry into force of this Decision.
(33) According to its permit, the facility is authorised to recycle a maximum 85 000 LDT per year.
(34) This date of expiry is set by reference to a period of validity corresponding to five years from the date of entry into force of this Decision.
(35) According to its permit, the facility is authorised to recycle a maximum 85 000 LDT per year
(36) This date of expiry is set by reference to a period of validity corresponding to five years from the date of entry into force of this Decision.
(37) According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 40 000 LDT per year
(38) According to its permit, the facility is authorised to recycle a maximum of 300 000 LDT per year.
(39) As referred to in Article 7(3) of Regulation (EU) No 1257/2013.
(40) As referred to in Article 32(1), point (a), third sentence, of Regulation (EU) No 1257/2013.
(41) The inclusion of a ship recycling facility located in a third country in the European List is valid for a period of five years from the date of entry into force of the relevant Commission Implementing Decision which provides for the inclusion of that facility, unless otherwise stated.
(42) The theoretical maximum annual ship recycling capacity of the facility is 120 000 LDT per year.
(43) The theoretical maximum annual ship recycling capacity of the facility is 60 000 LDT per year.
(44) The theoretical maximum annual ship recycling capacity of the facility is 75 000 LDT per year.
(45) The theoretical maximum annual ship recycling capacity of the facility is 75 000 LDT per year.
(46) The theoretical maximum annual ship recycling capacity of the facility is 60 000 LDT per year.
(47) The theoretical maximum annual ship recycling capacity of the facility is 70 000 LDT per year.
(48) The theoretical maximum annual ship recycling capacity of the facility is 80 000 LDT per year.
(49) The theoretical maximum annual ship recycling capacity of the facility is 70 000 LDT per year.
(50) The theoretical maximum annual ship recycling capacity of the facility is 30 000 LDT per year.
(51) The theoretical maximum annual ship recycling capacity of the facility is 90 000 LDT per year.
(52) The theoretical maximum annual ship recycling capacity of the facility is 100 000 LDT per year.
(53) According to its permit, the facility is authorised to recycle a maximum of 7 275 LDT per year.
(54) According to its permit, the facility is authorised to recycle a maximum of 38 148 LDT per year.
(55) The theoretical maximum annual ship recycling capacity of the facility is 120 000 LDT per year.
ELI: http://data.europa.eu/eli/dec_impl/2024/1956/oj
ISSN 1977-0677 (electronic edition)