Commission Decision (EU) 2015/14 of 5 January 2015 amending Decision 2012/88/EU on the technical specification for interoperability relating to the control-command and signalling subsystems of the trans-European rail system (notified under document C(2014) 9909) Text with EEA relevance
Commission Decision (EU) 2015/14 of 5 January 2015 amending Decision 2012/88/EU on the technical specification for interoperability relating to the control-command and signalling subsystems of the trans-European rail system (notified under document C(2014) 9909) Text with EEA relevance
Commission Decision (EU) 2015/14 of 5 January 2015 amending Decision 2012/88/EU on the technical specification for interoperability relating to the control-command and signalling subsystems of the trans-European rail system (notified under document C(2014) 9909) Text with EEA relevance
OJ L 3, 7.1.2015, p. 44–58
(BG, ES, CS, DA, DE, ET, EL, EN, FR, HR, IT, LV, LT, HU, MT, NL, PL, PT, RO, SK, SL, FI, SV)
No longer in force, Date of end of validity: 04/07/2016; Implicitly repealed by 32016R0919
7.1.2015 |
EN |
Official Journal of the European Union |
L 3/44 |
COMMISSION DECISION (EU) 2015/14
of 5 January 2015
amending Decision 2012/88/EU on the technical specification for interoperability relating to the control-command and signalling subsystems of the trans-European rail system
(notified under document C(2014) 9909)
(Text with EEA relevance)
THE EUROPEAN COMMISSION,
Having regard to the Treaty on the Functioning of the European Union,
Having regard to Directive 2008/57/EC of the European Parliament and of the Council of 17 June 2008 on the interoperability of the rail system within the Community (1), and in particular Article 6 thereof,
Whereas:
(1) |
With Decision C(2010) 2576 (2), the Commission gave the European Railway Agency (the Agency) a mandate to develop and review the technical specifications for interoperability (TSI) with a view to extending their scope to the entire rail system in the Union in accordance with Article 1(4) of Directive 2008/57/EC. On 10 January 2013 the Agency submitted its recommendation amending the TSI relating to the control-command and signalling subsystems of the trans-European rail system. |
(2) |
According to Article 8(4) of Directive 2008/57/EC on TSI scope extension, a Member State should not apply the revised TSI in the case of projects at an advanced stage of development or subject to a contract in the course of performance, which was out of the scope of the previous TSI. |
(3) |
The revised control-command and signalling TSI (CCS TSI) should apply to networks with 1 435 mm, 1 520 mm, 1 524 mm, 1 600 mm, and 1 668 mm nominal track gauge. This would provide interoperability within one-track-gauge systems and make it possible to develop and operate vehicles for multiple metric gauges. It would also make it possible to develop and use control-command and signalling subsystems and interoperability constituents independently of the track gauge. A high percentage of vehicles run both on the trans-European rail network and on the off-TEN rail network. The parameters of the on-board and the track-side control-command and signalling subsystems should therefore be the same for the whole network. |
(4) |
Certain open points related to the compatibility of train detection systems may be closed, taking into account requirements for different track gauges (specification referenced as Index 77 in Annex A). The open point related to safety requirements for ETCS Driver-Machine Interface (DMI) function may be closed and progress have been made to clarify the open point on ‘reliability/availability’. |
(5) |
The provisions on assessment of interoperability constituents and subsystems, in the case where requirements are partially fulfilled, need to be clarified. |
(6) |
In its role of system authority for the European Rail Traffic Management System (ERTMS), the Agency has prepared an update of the mandatory ERTMS specifications referenced in Annex A to the CCS TSI. Until the time the specifications related to train interface (FFFIS — Form Fit Functional Interface Specification) have reached, at both sides of the interface, a level of consensus among all stakeholders to be considered as mandatory, the Agency should refer to them in the application guide so that they can be used in call for tenders. |
(7) |
The Agency should publish tests specifications related to baseline 3 as soon as possible. |
(8) |
Errors have been detected in the text of Commission Decision 2012/88/EU (3) and need to be corrected. |
(9) |
The availability and quality of the GSM-R signals is essential for railway operations. |
(10) |
GSM-R roaming to public networks is an optional function. If it is used in a Member State, its implementation should be indicated in line number 1.1.1.3.3.3 of the register of railway infrastructure in accordance with Commission Implementing Decision 2014/880/EU (4). |
(11) |
The measures provided for in this Decision are in conformity with the opinion of the Committee established in accordance with Article 29(1) of Directive 2008/57/EC, |
HAS ADOPTED THIS DECISION:
Article 1
Decision 2012/88/EU is amended as follows:
(1) |
the title is replaced by the following: ‘Commission Decision 2012/88/EU of 25 January 2012 on the technical specification for interoperability relating to the control-command and signalling subsystems’; |
(2) |
Annex III is amended as follows:
|
Article 2
The following Article is added to Decision 2012/88/EU:
‘Article 7a
1. By 1 July 2015 the European Railway Agency shall publish the mandatory specifications referred to in Table A2 of Annex A to this Decision, at Index 37b and 37c, column “Set of specifications # 2”.
Before their publication, it shall send to the Commission a technical opinion on the insertion of these documents in Table A2 of Annex A to this Decision, with reference, name and version. The Commission shall inform accordingly the Committee established under Article 29 of Directive 2008/57/EC.
2. The European Railway Agency shall publish the specifications related to train interface (FFFIS — Form Fit Functional Interface Specification — Index 81 and 82 of Table A2 of Annex A to this Decision) when it considers that they are mature. The European Railway Agency shall regularly report on the assessment of this maturity to the Committee established under Article 29 of Directive 2008/57/EC. Before their publication, it shall send to the Commission a technical opinion on the insertion of these documents in Table A2 of Annex A to this Decision, with reference, name and version. The Commission shall inform accordingly the Committee established under Article 29 of Directive 2008/57/EC.’
Article 3
This Decision shall apply from 1 July 2015.
This Decision is addressed to the Member States and to the European Railway Agency.
Done at Brussels, 5 January 2015.
For the Commission
Violeta BULC
Member of the Commission
(1) OJ L 191, 18.7.2008, p. 1.
(2) Commission Decision C(2010) 2576 final of 29 April 2010 concerning a mandate to the European Railway Agency to develop and review Technical Specifications for Interoperability with a view to extending their scope to the whole rail system in the European Union.
(3) Commission Decision 2012/88/EU of 25 January 2012 on the technical specification for interoperability relating to the control-command and signalling subsystems of the trans-European rail system (OJ L 51, 23.2.2012, p. 1).
(4) Commission Implementing Decision 2014/880/EU of 26 November 2014 on the common specifications of the register of railway infrastructure and repealing Implementing Decision 2011/633/EU (OJ L 356, 12.12.2014, p. 489).
ANNEX
Annex A to Decision 2012/88/EU is amended as follows:
(1) |
the following line is deleted in Table A1:
|
(2) |
the following line in Table A1 is modified as follows:
|
(3) |
Table A2 is replaced by the following table and related notes:
; |
(4) |
Table A 3 is replaced by the following table and a related note.
|