Choose the experimental features you want to try

This document is an excerpt from the EUR-Lex website

Document 62009TO0196

    Summary of the Order

    Order of the President of the Court of First Instance of 10 July 2009 — TerreStar Europe v Commission

    (Case T-196/09 R)

    ‛Application for interim measures — Decision on the selection of operators of pan-European systems providing mobile satellite services — Application for suspension of operation of the measure and interim relief — No urgency’

    1. 

    Applications for interim measures — Suspension of operation of a measure — Interim measures — Conditions for granting — Prima facie case — Urgency — Cumulative nature (Arts 225(1) EC, 242 EC and 243 EC; Rules of Procedure of the Court of First Instance, Art. 104(2)) (see. paras 24-26)

    2. 

    Applications for interim measures — Suspension of operation of a measure — Interim measures — Conditions for granting — Urgency — Serious and irreparable damage (Arts 242 EC and 243 EC; Rules of Procedure of the Court of First Instance, Art. 104(2)) (see paras 53-54)

    3. 

    Applications for interim measures — Suspension of operation of a measure — Interim measures — Conditions for granting — Urgency — Serious and irreparable damage — Financial loss (Arts 242 EC, 243 EC and 288 EC; Rules of Procedure of the Court of First Instance, Art. 104(2)) (see paras 70-75, 80-83)

    4. 

    Applications for interim measures — Suspension of operation of a measure — Interim measures — Conditions for granting — Urgency (Arts 242 EC and 243 EC; Rules of Procedure of the Court of First Instance, Art. 104(2)) (see para. 85)

    Re:

    In essence, APPLICATION for suspension of operation of Commission Decision 2009/449/EC of 13 May 2009 on the selection of operators of pan-European systems providing mobile satellite services (MSS) (OJ 2009 L 149, p. 65).

    Operative part

    1. 

    The application for interim measures is dismissed.

    2. 

    The costs are reserved.

    Top