EUR-Lex Access to European Union law
This document is an excerpt from the EUR-Lex website
Document 32006E0184
Council Joint Action 2006/184/CFSP of 27 February 2006 in support of the Biological and Toxin Weapons Convention, in the framework of the EU Strategy against the Proliferation of Weapons of Mass Destruction
Council Joint Action 2006/184/CFSP of 27 February 2006 in support of the Biological and Toxin Weapons Convention, in the framework of the EU Strategy against the Proliferation of Weapons of Mass Destruction
Council Joint Action 2006/184/CFSP of 27 February 2006 in support of the Biological and Toxin Weapons Convention, in the framework of the EU Strategy against the Proliferation of Weapons of Mass Destruction
OJ L 65, 7.3.2006, p. 51–55
(ES, CS, DA, DE, ET, EL, EN, FR, IT, LV, LT, HU, NL, PL, PT, SK, SL, FI, SV)
OJ L 270M, 29.9.2006, p. 311–315
(MT)
Special edition in Bulgarian: Chapter 18 Volume 004 P. 214 - 218
Special edition in Romanian: Chapter 18 Volume 004 P. 214 - 218
No longer in force, Date of end of validity: 26/08/2007
7.3.2006 |
EN |
Official Journal of the European Union |
L 65/51 |
COUNCIL JOINT ACTION 2006/184/CFSP
of 27 February 2006
in support of the Biological and Toxin Weapons Convention, in the framework of the EU Strategy against the Proliferation of Weapons of Mass Destruction
THE COUNCIL OF THE EUROPEAN UNION,
Having regard to the Treaty on European Union, and in particular Article 14 thereof,
Whereas:
(1) |
On 12 December 2003, the European Council adopted the EU Strategy against the Proliferation of Weapons of Mass Destruction, Chapter III of which contains a list of measures to combat such proliferation. |
(2) |
The European Union is actively implementing the EU Strategy and is giving effect to the measures listed in Chapter III thereof, in particular those related to reinforcing the Biological and Toxin Weapons Convention (BTWC), including supporting national implementation of the BTWC, and continuing the reflection on the verification mechanism. |
(3) |
The submission of Confidence Building Measures (CBMs) constitutes an important element to increase transparency in the implementation of the BTWC and an EU Action Plan has been agreed upon to improve the number of CBMs submitted by Member States and to encourage all Member States to submit lists of appropriate experts and laboratories to the United Nations Secretary-General (UNSG), the results of which could serve to define the contents of further Joint Actions in this field. |
(4) |
The Review Conference of the BTWC in 2006 will be a good opportunity to agree on specific, practical and realistic measures to strengthen both the BTWC and compliance with it. In this regard, the European Union remains committed to developing measures to verify compliance with the BTWC. In the absence of negotiations on such a verification mechanism however, much useful work remains to be done within the perimeters of the intersessional BTWC work programme. |
(5) |
The Commission is entrusted with the supervision of the proper implementation of the EU financial contribution, |
HAS ADOPTED THIS JOINT ACTION:
Article 1
1. For the purpose of giving immediate and practical application to some elements of the EU Strategy against the Proliferation of Weapons of Mass Destruction, the European Union shall support the BTWC, with the following objectives:
— |
promotion of the universality of the BTWC, |
— |
support for implementation of the BTWC by the States Parties. |
2. The projects corresponding to measures of the EU Strategy are those that aim at:
— |
promotion of the universality of the BTWC by carrying out activities, including regional and sub-regional workshops and seminars, aimed at increasing the membership of the BTWC, |
— |
assistance to States Parties for the national implementation of the BTWC, in order to ensure that States Parties transpose the international obligations of the BTWC into their national legislation and administrative measures. |
A detailed description of the abovementioned projects is set out in the Annex.
Article 2
1. The Presidency shall be responsible for the implementation of the Joint Action in full association with the Commission. The Commission shall supervise the proper implementation of the financial contribution referred to in Article 3.
2. In order to carry out the objectives specified in Article 1(1), the Presidency shall be assisted by the Secretary-General/High Representative for CFSP (SG/HR), who will be responsible for the political coordination of the implementation of the projects referred to in Article 1(2).
3. The technical implementation of the projects referred to in Article 1(2) shall be entrusted to the Graduate Institute of International Studies, Geneva, which shall perform its tasks under the responsibility of the Presidency and under the control of the SG/HR.
Article 3
1. The financial reference amount for the two projects listed in Article 1(2) shall be EUR 867 000.
2. The expenditure financed by the amount stipulated in paragraph 1 shall be managed in accordance with the Community procedures and rules applicable to the general budget of the European Union with the exception that any pre-financing shall not remain the property of the Community.
3. For the purpose of implementing the projects referred to in Article 1(2), the Commission shall conclude a financing arrangement with the Graduate Institute of International Studies, Geneva, referred to in Article 2(3).
Article 4
The Presidency, assisted by the SG/HR, shall report to Council on the implementation of this Joint Action on the basis of regular reports prepared by the Graduate Institute of International Studies, Geneva. The Commission shall be fully associated and shall provide information on the financial implementation of the projects referred to in Article 1(2).
Article 5
This Joint Action shall enter into force on the day of its adoption.
It shall expire 18 months after its adoption.
Article 6
This Joint Action shall be published in the Official Journal of the European Union.
Done at Brussels, 27 February 2006.
For the Council
The President
U. PLASSNIK
ANNEX
1. Objective
Overall objective: to support the universalisation of the BTWC and, in particular, to promote the accession to the BTWC by States not Party (signatory States as well as non-signatory States) and to support the implementation of the BTWC by the States Parties.
Description: EU assistance to the BTWC will be focused on the following areas identified by the European BTWC States Parties as requiring urgent action:
(i) |
Promotion of the universality of the BTWC; |
(ii) |
Support for implementation of the BTWC by the States Parties. |
The projects described below will benefit exclusively from EU support.
2. Project description
2.1. Project 1: Promotion of the universality of the BTWC
|
Project purpose: Enhanced membership of the BTWC through regional and sub-regional workshops. The aim of the workshops will be to encourage greater membership and thereby enhanced implementation of the BTWC in these regions and to explain the benefits and consequences of acceding to the BTWC and to understand the needs of the States not Party to the BTWC in order to assist their accession and offer EU technical and drafting assistance to States in need. |
|
Project results:
|
|
Project description: The project provides for the organisation of five regional workshops in 2006 - 2007 in three consecutive stages. The first preparatory stage consists in establishing the contacts with relevant actors (diplomatic and expert community), holding preparatory meetings and drafting information packages, carrying forward research and implementation status review in targeted countries and creating an internet-based Information and Collaboration Management System of the project. The aim of the second stage is to raise awareness of the relevance of the BTWC among the diplomatic community and more widely among national administrations of selected countries and found the grounds for effective participation of the countries concerned in the third stage of the project. To this end, the series of meetings with diplomats of selected countries will be organised in Brussels, Geneva, The Hague and New York, where the BTWC-related diplomatic activities usually take place. Five regional workshops are foreseen in the third stage of the project:
|
|
Estimated Cost: EUR 509 661 |
2.2. Project 2: Assistance to States Parties for the national implementation of the BTWC
|
Project purpose: To ensure that States Parties transpose the international obligations of the BTWC into their national legislation and administrative measures. |
|
Project results: In accordance with what was identified by the States Parties within the ‘BTWC intersessional Process’, three common elements in their national implementing approaches must be achieved:
|
|
Project description: The project is aimed at filling a gap which exists in the BTWC implementation, such as the absence of legal advisory network or implementation Action Plan, non-existence of national focal points for the BTWC implementation, insecurity as regards the minimal national implementation standards of the BTWC. In order to cope with these shortcomings, the project foresees the preparatory phase which includes the establishment of the pool of EU legal experts and research and consultation activities. Following implementation, assistance actions will be taken as a next step:
|
|
Estimated Cost: EUR 277 431 |
3. Duration
The total estimated duration for the implementation of this Joint Action is 18 months.
4. Beneficiaries
The beneficiaries of universality-related activity are States not Party to the BTWC (both signatory States and non-signatory States). The beneficiaries of implementation-related activities are States Parties to the BTWC.
5. Implementing entity
The Graduate Institute of International Studies, Geneva (through its Bioweapons Prevention Project, BWPP, Director, Dr Zanders) is entrusted with the technical implementation of the two projects, in the framework of the political coordination by the Secretary-General/High Representative through his Personal Representative on non-proliferation of Weapons of Mass Destruction. The regional workshops and consultations foreseen will be organised with the support of the EU Institute for Security Studies. In carrying out its activities, the BWPP shall cooperate, as appropriate, with local missions of Member States and the Commission.
6. Estimated required means
The EU contribution will cover 100 % of the implementation of the projects as described in this Annex. The estimated costs are as follows:
Project 1 |
EUR 509 661 |
Project 2 |
EUR 277 431 |
Administrative costs (7 % of the direct cost) |
EUR 55 096 |
TOTAL COST (excluding contingencies): |
EUR 842 188 |
In addition, a contingency reserve of about 3 % of eligible costs (EUR 24 812) is included.
TOTAL COST (including contingencies): |
EUR 867 000 |
7. Financial reference amount to cover the cost of the projects
The total cost of the projects is EUR 867 000.