    Consolidated text: Commission Decision of 25 January 2012 on the technical specification for interoperability relating to the control-command and signalling subsystems (notified under document C(2012) 172) (Text with EEA relevance) (2012/88/EU)

    ELI: http://data.europa.eu/eli/dec/2012/88(1)/2017-01-26

    02012D0088 — EN — 26.01.2017 — 003.001


    This text is meant purely as a documentation tool and has no legal effect. The Union's institutions do not assume any liability for its contents. The authentic versions of the relevant acts, including their preambles, are those published in the Official Journal of the European Union and available in EUR-Lex. Those official texts are directly accessible through the links embedded in this document

    ►B

    COMMISSION DECISION

    of 25 January 2012

    on the technical specification for interoperability relating to the control-command and signalling subsystems

    (notified under document C(2012) 172)

    (Text with EEA relevance)

    (2012/88/EU)

    (OJ L 051 23.2.2012, p. 1)

    Amended by:

     

     

    Official Journal

      No

    page

    date

     M1

    COMMISSION DECISION 2012/696/EU of 6 November 2012

      L 311

    3

    10.11.2012

    ►M2

    COMMISSION DECISION (EU) 2015/14 Text with EEA relevance of 5 January 2015

      L 3

    44

    7.1.2015

    ►M3

    COMMISSION REGULATION (EU) 2016/919 of 27 May 2016

      L 158

    1

    15.6.2016




    ▼B

    ▼M2

    COMMISSION DECISION

    of 25 January 2012

    on the technical specification for interoperability relating to the control-command and signalling subsystems

    ▼B

    (notified under document C(2012) 172)

    (Text with EEA relevance)

    (2012/88/EU)

    ▼M3 —————

    ▼B




    ANNEX III

    TABLE OF CONTENTS

    ▼M3 —————

    ▼B

    7.3.2.3.

    High-speed network

    ▼M3 —————

    ▼B

    7.3.2.3.    High-speed network

    It is mandatory to fit ERTMS/ETCS track-side when:

    1. installing for the first time the train protection part of a Control-Command and Signalling Track-side Subsystem (with or without a Class B system); or

    2. upgrading the existing train protection part of a Control-Command and Signalling Track-side Subsystem, where this would change the functions, performance and/or interoperability-relevant interfaces (air gaps) of the existing legacy system. This does not apply to modifications deemed necessary to mitigate safety-related defects in the legacy installation.

    It is recommended that ERTMS/ETCS be installed whenever the infrastructure or energy sub-system of a section of line already in service is to be upgraded, renewed or maintained, provided the installation of ERTMS/ETCS on that section of line represents less than 10 % of the total upgrade/renewal/maintenance investment.