This document is an excerpt from the EUR-Lex website
Document 02011R1233-20230228
Regulation (EU) No 1233/2011 of the European Parliament and of the Council of 16 November 2011 on the application of certain guidelines in the field of officially supported export credits and repealing Council Decisions 2001/76/EC and 2001/77/EC
Consolidated text: Regulation (EU) No 1233/2011 of the European Parliament and of the Council of 16 November 2011 on the application of certain guidelines in the field of officially supported export credits and repealing Council Decisions 2001/76/EC and 2001/77/EC
Regulation (EU) No 1233/2011 of the European Parliament and of the Council of 16 November 2011 on the application of certain guidelines in the field of officially supported export credits and repealing Council Decisions 2001/76/EC and 2001/77/EC
02011R1233 — EN — 28.02.2023 — 004.002
This text is meant purely as a documentation tool and has no legal effect. The Union's institutions do not assume any liability for its contents. The authentic versions of the relevant acts, including their preambles, are those published in the Official Journal of the European Union and available in EUR-Lex. Those official texts are directly accessible through the links embedded in this document
REGULATION (EU) No 1233/2011 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 16 November 2011 (OJ L 326 8.12.2011, p. 45) |
Amended by:
|
|
Official Journal |
||
No |
page |
date |
||
COMMISSION DELEGATED REGULATION (EU) No 727/2013 of 14 March 2013 |
L 207 |
1 |
2.8.2013 |
|
COMMISSION DELEGATED REGULATION (EU) 2016/155 of 29 September 2015 |
L 36 |
1 |
11.2.2016 |
|
COMMISSION DELEGATED REGULATION (EU) 2018/179 of 25 September 2017 |
L 37 |
1 |
9.2.2018 |
|
COMMISSION DELEGATED REGULATION (EU) 2023/262 of 7 September 2022 |
L 38 |
1 |
8.2.2023 |
Corrected by:
REGULATION (EU) No 1233/2011 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL
of 16 November 2011
on the application of certain guidelines in the field of officially supported export credits and repealing Council Decisions 2001/76/EC and 2001/77/EC
Article 1
Application of the Arrangement
The guidelines contained in the Arrangement on Officially Supported Export Credits (‘the Arrangement’) shall apply in the Union. The text of the Arrangement is annexed to this Regulation.
Article 2
Delegation of power
The Commission shall adopt delegated acts in accordance with Article 3 to amend Annex II as a result of amendments to the guidelines agreed upon by the Participants to the Arrangement.
Where, in the case of amendments to Annex II as a result of amendments to the guidelines agreed upon by the Participants to the Arrangement, imperative grounds of urgency so require, the procedure provided for in Article 4 shall apply to delegated acts adopted pursuant to this Article.
Article 3
Exercise of the delegation
Article 4
Urgency procedure
Article 5
Transparency and reporting
The transparency and reporting measures to be applied in the Union are set out in Annex I.
Article 6
Repeal
Decisions 2001/76/EC and 2001/77/EC are hereby repealed.
Article 7
Entry into force
This Regulation shall enter into force on the day following its publication in the Official Journal of the European Union.
This Regulation shall be binding in its entirety and directly applicable in all Member States.
ANNEX I
1. Without prejudice to the prerogatives of the Member States' institutions exercising the supervision of the national export credit programs, each Member State shall make available to the Commission an Annual Activity Report in order to step up transparency at Union level. Member States shall report, in accordance with their national legislative framework, on assets and liabilities, claims paid and recoveries, new commitments, exposures and premium charges. Where contingent liabilities might arise from officially supported export credit activities, those activities shall be reported as part of the Annual Activity Report.
2. In the Annual Activity Report, Member States shall describe how environmental risks, which can carry other relevant risks, are taken into account in the officially supported export credit activities of their ECAs.
3. The Commission shall produce an annual review for the European Parliament based on this information, including an evaluation regarding the compliance of ECAs with Union objectives and obligations.
4. The Commission, according to its competencies shall provide to the European Parliament an annual report on negotiations undertaken, where the Commission has negotiating authorisation in the various forums of international cooperation, to establish global standards in the field of officially supported export credits.
The first reporting period, under the scope of this Regulation, covers the year 2011.
ANNEX II
TABLE OF CONTENTS |
|
ANNEX |
|
CHAPTER I: GENERAL PROVISIONS |
|
1. |
PURPOSE |
2. |
STATUS |
3. |
PARTICIPATION |
4. |
INFORMATION AVAILABLE TO NON-PARTICIPANTS |
5. |
SCOPE OF APPLICATION |
6. |
SECTOR UNDERSTANDINGS |
7. |
PROJECT FINANCE |
8. |
WITHDRAWAL |
9. |
MONITORING |
CHAPTER II: FINANCIAL TERMS AND CONDITIONS FOR EXPORT CREDITS |
|
10. |
DOWN PAYMENT, MAXIMUM OFFICIAL SUPPORT AND LOCAL COSTS |
11. |
CLASSIFICATION OF COUNTRIES FOR MAXIMUM REPAYMENT TERMS |
12. |
MAXIMUM REPAYMENT TERMS |
13. |
REPAYMENT TERMS FOR NON-NUCLEAR POWER PLANTS |
14. |
REPAYMENT OF PRINCIPAL AND PAYMENT OF INTEREST |
15. |
INTEREST RATES, PREMIUM RATES AND OTHER FEES |
16. |
VALIDITY PERIOD FOR EXPORT CREDITS |
17. |
ACTION TO AVOID OR MINIMISE LOSSES |
18. |
MATCHING |
19. |
MINIMUM FIXED INTEREST RATES UNDER OFFICIAL FINANCING SUPPORT |
20. |
CONSTRUCTION OF CIRRs |
21. |
VALIDITY OF CIRRs |
22. |
APPLICATION OF CIRRs |
23. |
PREMIUM FOR CREDIT RISK |
24. |
MINIMUM PREMIUM RATES FOR CREDIT RISK |
25. |
COUNTRY RISK CLASSIFICATION |
26. |
SOVEREIGN RISK ASSESSMENT |
27. |
BUYER RISK CLASSIFICATION |
28. |
CLASSIFICATION OF MULTILATERAL AND REGIONAL INSTITUTIONS |
29. |
PERCENTAGE AND QUALITY OF OFFICIAL EXPORT CREDIT COVER |
30. |
COUNTRY RISK MITIGATION TECHNIQUES |
31. |
BUYER RISK CREDIT ENHANCEMENTS |
32. |
REVIEW OF THE VALIDITY OF THE MINIMUM PREMIUM RATES FOR CREDIT RISK |
CHAPTER III: PROVISIONS FOR TIED AID |
|
33. |
GENERAL PRINCIPLES |
34. |
FORMS OF TIED AID |
35. |
ASSOCIATED FINANCING |
36. |
COUNTRY ELIGIBILITY FOR TIED AID |
37. |
PROJECT ELIGIBILITY |
38. |
MINIMUM CONCESSIONALITY LEVEL |
39. |
EXEMPTIONS FROM COUNTRY OR PROJECT ELIGIBILITY FOR TIED AID |
40. |
CALCULATION OF CONCESSIONALITY LEVEL OF TIED AID |
41. |
VALIDITY PERIOD FOR TIED AID |
42. |
MATCHING |
CHAPTER IV: PROCEDURES |
|
SECTION 1: COMMON PROCEDURES FOR EXPORT CREDITS AND TRADE-RELATED AID |
|
43. |
NOTIFICATIONS |
44. |
INFORMATION ON OFFICIAL SUPPORT |
45. |
PROCEDURES FOR MATCHING |
46. |
SPECIAL CONSULTATIONS |
SECTION 2: PROCEDURES FOR EXPORT CREDITS |
|
47. |
PRIOR NOTIFICATION WITH DISCUSSION |
48. |
PRIOR NOTIFICATION |
SECTION 3: PROCEDURES FOR TRADE-RELATED AID |
|
49. |
PRIOR NOTIFICATION |
50. |
PROMPT NOTIFICATION |
SECTION 4: CONSULTATION PROCEDURES FOR TIED AID |
|
51. |
PURPOSE OF CONSULTATIONS |
52. |
SCOPE AND TIMING OF CONSULTATIONS |
53. |
OUTCOME OF CONSULTATIONS |
SECTION 5: INFORMATION EXCHANGE FOR EXPORT CREDITS AND TRADE-RELATED AID |
|
54. |
CONTACT POINTS |
55. |
SCOPE OF ENQUIRIES |
56. |
SCOPE OF RESPONSES |
57. |
FACE-TO-FACE CONSULTATIONS |
58. |
PROCEDURES AND FORMAT OF COMMON LINES |
59. |
RESPONSES TO COMMON LINE PROPOSALS |
60. |
ACCEPTANCE OF COMMON LINES |
61. |
DISAGREEMENT ON COMMON LINES |
62. |
EFFECTIVE DATE OF COMMON LINE |
63. |
VALIDITY OF COMMON LINES |
SECTION 6: OPERATIONAL PROVISIONS FOR THE COMMUNICATION OF MINIMUM INTEREST RATES (CIRRs) |
|
64. |
COMMUNICATION OF MINIMUM INTEREST RATES |
65. |
EFFECTIVE DATE FOR APPLICATION OF INTEREST RATES |
66. |
IMMEDIATE CHANGES IN INTEREST RATES |
SECTION 7: REVIEWS |
|
67. |
REGULAR REVIEW OF THE ARRANGEMENT |
68. |
REVIEW OF MINIMUM INTEREST RATES |
69. |
REVIEW OF MINIMUM PREMIUM RATES AND RELATED ISSUES |
ANNEX I: SECTOR UNDERSTANDING ON EXPORT CREDITS FOR SHIPS |
|
ANNEX II: SECTOR UNDERSTANDING ON EXPORT CREDITS FOR NUCLEAR POWER PLANTS |
|
ANNEX III: SECTOR UNDERSTANDING ON EXPORT CREDITS FOR CIVIL AIRCRAFT |
|
ANNEX IV: SECTOR UNDERSTANDING ON EXPORT CREDITS FOR RENEWABLE ENERGY, CLIMATE CHANGE MITIGATION AND ADAPTATION, AND WATER PROJECTS |
|
ANNEX V: SECTOR UNDERSTANDING ON EXPORT CREDITS FOR RAIL INFRASTRUCTURE |
|
ANNEX VI: SECTOR UNDERSTANDING ON EXPORT CREDITS FOR COAL-FIRED ELECTRICITY GENERATION PROJECTS |
|
ANNEX VII: TERMS AND CONDITIONS APPLICABLE TO PROJECT FINANCE TRANSACTIONS |
|
ANNEX VIII: INFORMATION TO BE PROVIDED FOR NOTIFICATIONS |
|
ANNEX IX: CALCULATION OF THE MINIMUM PREMIUM RATES |
|
ANNEX X: MARKET BENCHMARKS FOR TRANSACTIONS IN CATEGORY ZERO COUNTRIES |
|
ANNEX XI: CRITERIA AND CONDITIONS GOVERNING THE APPLICATION OF A THIRD PARTY REPAYMENT GUARANTEE AND THE CLASSIFICATION OF MULTILATERAL OR REGIONAL INSTITUTIONS |
|
ANNEX XII: BUYER RISK CATEGORIES QUALITATIVE DESCRIPTIONS |
|
ANNEX XIII: CRITERIA AND CONDITIONS GOVERNING THE APPLICATION OF COUNTRY RISK MITIGATION TECHNIQUES AND BUYER RISK CREDIT ENHANCEMENTS |
|
ANNEX XIV: CHECKLIST OF DEVELOPMENTAL QUALITY |
|
ANNEX XV: LIST OF DEFINITIONS |
CHAPTER I
GENERAL PROVISIONS
1. PURPOSE
The main purpose of the Arrangement on Officially Supported Export Credits, referred to throughout this document as the Arrangement, is to provide a framework for the orderly use of officially supported export credits.
The Arrangement seeks to foster a level playing field for official support, as defined in Article 5(a), in order to encourage competition among exporters based on quality and price of goods and services exported rather than on the most favourable officially supported financial terms and conditions.
2. STATUS
The Arrangement, developed within the OECD framework, initially came into effect in April 1978 and is of indefinite duration. The Arrangement is a Gentlemen's Agreement among the Participants; it is not an OECD Act ( 1 ), although it receives the administrative support of the OECD Secretariat (hereafter: ‘the Secretariat’).
3. PARTICIPATION
The Participants to the Arrangement currently are: Australia, Canada, the European Union, Japan, Korea, New Zealand, Norway, Switzerland and the United States. Other OECD Members and non-members may be invited to become Participants by the current Participants.
4. INFORMATION AVAILABLE TO NON-PARTICIPANTS
The Participants undertake to share information with non-Participants on notifications related to official support as set out in Article 5(a).
A Participant shall, on the basis of reciprocity, reply to a request from a non-Participant in a competitive situation on the financial terms and conditions offered for its official support, as it would reply to a request from a Participant.
5. SCOPE OF APPLICATION
The Arrangement shall apply to all official support provided by or on behalf of a government for export of goods and/or services, including financial leases, which have a repayment term of two years or more.
Official support may be provided in different forms:
Export credit guarantee or insurance (pure cover).
Official financing support:
Any combination of the above.
The Arrangement shall apply to tied aid; the procedures set out in Chapter IV shall also apply to trade-related untied aid.
The Arrangement does not apply to exports of Military Equipment and Agricultural Commodities.
Official support shall not be provided if there is clear evidence that the contract has been structured with a purchaser in a country which is not the final destination of the goods, primarily with the aim of obtaining more favourable repayment terms.
6. SECTOR UNDERSTANDINGS
The following Sector Understandings are part of the Arrangement:
A Participant to either Annex I, II, IV or V may apply the respective provisions for official support for export of goods and/or services covered by the relevant Sector Understandings. Where a Sector Understanding does not include a corresponding provision to that of the Arrangement, a Participant to that Sector Understanding shall apply the provision of the Arrangement.
For the export of goods and/or services covered by Annex III, the Participants that are also Participants to that Sector Understanding shall apply the provisions of that Sector Understanding.
For the export of goods and/or services covered by Annex VI, the corresponding provisions of that Annex shall be applied in lieu of those of the Arrangement. Where Annex VI does not include a corresponding provision to that of the Arrangement, a Participant to that Sector Understanding shall apply the provisions of the Arrangement.
7. PROJECT FINANCE
The Participants may apply the terms and conditions set out in Annex VII to the export of goods and/or services for transactions that meet the criteria set out in Appendix 1 of Annex VII.
Paragraph (a) above applies to the export of goods and services covered by the Sector Understanding on Export Credits for Nuclear Power Plants, the Sector Understanding on Export Credits for Renewable Energy, Climate Change Mitigation and Adaptation, and Water Projects, the Sector Understanding on Export Credits for Railway Infrastructure, and the Sector Understanding on Export Credits for Coal-Fired Electricity Generation Projects.
Paragraph (a) above does not apply to the export of goods and services covered by the Sector Understanding on Export Credits for Civil Aircraft or the Sector Understanding on Export Credits for Ships.
8. WITHDRAWAL
A Participant may withdraw by notifying the Secretariat in writing by means of instant communication, e.g. the OECD On-Line Information System (OLIS). The withdrawal takes effect 180 calendar days after receipt of the notification by the Secretariat.
9. MONITORING
The Secretariat shall monitor the implementation of the Arrangement.
CHAPTER II
FINANCIAL TERMS AND CONDITIONS FOR EXPORT CREDITS
Financial terms and conditions for export credits encompass all the provisions set out in this Chapter which shall be read in conjunction one with the other.
The Arrangement sets out limitations on terms and conditions that may be officially supported. The Participants recognise that more restrictive financial terms and conditions than those provided for by the Arrangement traditionally apply to certain trade or industrial sectors. The Participants shall continue to respect such customary financial terms and conditions, in particular the principle by which repayment terms do not exceed the useful life of the goods.
10. DOWN PAYMENT, MAXIMUM OFFICIAL SUPPORT AND LOCAL COSTS
The Participants shall require purchasers of goods and services which are the subject of official support to make down payments of a minimum of 15 % of the export contract value at or before the starting point of credit as defined in Annex XV. For the assessment of down payments, the export contract value may be reduced proportionally if the transaction includes goods and services from a third country which are not officially supported. Financing/insurance of 100 % of the premium is permissible. Premium may or may not be included in the export contract value. Retention payments made after the starting point of credit are not regarded as down payment in this context.
Official support for such down payments shall only take the form of insurance or guarantee against the usual pre-credit risks.
Except as provided for in paragraphs (b) and (d), the Participants shall not provide official support in excess of 85 % of the export contract value, including third country supply but excluding local costs.
The Participants may provide official support for local costs, provided that:
Official support provided for local costs shall not exceed 30 % of the export contract value.
It shall not be provided on terms more favourable/less restrictive than those agreed for the related exports.
Where official support for local cost exceeds 15 % of the export contract value, such official support shall be subject to prior notification, pursuant to Article 48, specifying the nature of the local costs being supported.
11. CLASSIFICATION OF COUNTRIES FOR MAXIMUM REPAYMENT TERMS
Category I countries are High Income ( 2 ) OECD countries. All other countries are in Category II.
The following operational criteria and procedures apply when classifying countries:
Classification for Arrangement purposes is determined by per capita GNI as calculated by the World Bank for the purposes of the World Bank classification of borrowing countries.
In cases where the World Bank does not have enough information to publish per capita GNI data, the World Bank shall be asked to estimate whether the country in question has per capita GNI above or below the current threshold. The country shall be classified according to the estimate unless the Participants decide to act otherwise.
If a country is reclassified in accordance with Article 11(a), the reclassification will take effect two weeks after the conclusions drawn from the above-mentioned data from the World Bank have been communicated to all Participants by the Secretariat.
In cases where the World Bank revises figures, such revisions shall be disregarded in relation to the Arrangement. Nevertheless, the classification of a country may be changed by way of a Common Line and Participants would favourably consider a change due to errors and omissions in the figures subsequently recognised in the same calendar year in which the figures were first distributed by the Secretariat.
A country will change category only after its World Bank category has remained unchanged for two consecutive years.
12. MAXIMUM REPAYMENT TERMS
Without prejudice to Article 13, the maximum repayment term varies according to the classification of the country of destination determined by the criteria in Article 11.
For Category I countries, the maximum repayment term is five years, with the possibility of agreeing up to eight-and-a-half years when the procedures for prior notification set out in Article 48 are followed.
For Category II countries, the maximum repayment term is 10 years.
In the event of a contract involving more than one country of destination the Participants should seek to establish a Common Line in accordance with the procedures in Articles 58 to 63 to reach agreement on appropriate terms.
13. REPAYMENT TERMS FOR NON-NUCLEAR POWER PLANTS
For non-nuclear power plants not covered by Annex VI, the maximum repayment term shall be 12 years. If a Participant intends to support a repayment term longer than that provided for in Article 12, the Participant shall give prior notification in accordance with the procedure in Article 48.
Non-nuclear power plants are complete power stations, or parts thereof, not fuelled by nuclear power; they include all components, equipment, materials and services (including the training of personnel) directly required for the construction and commissioning of such non-nuclear power stations. This does not include items for which the buyer is usually responsible, in particular costs associated with land development, roads, construction villages, power lines, and switchyard and water supply located outside the power plant site boundary, as well as costs arising in the buyer's country from official approval procedures (e.g. site permits, construction permit, fuel loading permits), except:
in cases where the buyer of the switchyard is the same as the buyer of the power plant, the maximum repayment term for the original switchyard shall be the same as that for the non-nuclear power plant (i.e. 12 years); and
the maximum repayment term for sub-stations, transformers and transmission lines with a minimum voltage threshold of 100 kV shall be the same as that for the non-nuclear power plant.
14. REPAYMENT OF PRINCIPAL AND PAYMENT OF INTEREST
The principal sum of an export credit shall be repaid in equal instalments.
Principal shall be repaid and interest shall be paid no less frequently than every six months and the first instalment of principal and interest shall be made no later than six months after the starting point of credit.
For export credits provided in support of lease transactions, equal repayments of principal and interest combined may be applied in lieu of equal repayments of principal as set out in paragraph (a).
On an exceptional and duly justified basis, export credits may be provided on terms other than those set out in paragraphs (a) through (c) above. The provision of such support shall be explained by an imbalance in the timing of the funds available to the obligor and the debt service profile available under an equal, semi-annual repayment schedule, and shall comply with the following criteria:
No single repayment of principal or series of principal payments within a six-month period shall exceed 25 % of the principal sum of the credit.
Principal shall be repaid no less frequently than every 12 months. The first repayment of principal shall be made no later than 12 months after the starting point of credit and no less than 2 % of the principal sum of the credit shall have been repaid 12 months after the starting point of credit.
Interest shall be paid no less frequently than every 12 months and the first interest payment shall be made no later than six months after the starting point of credit.
The maximum weighted average life of the repayment period shall not exceed:
The Participant shall give prior notification in accordance with Article 48 that explains the reason for not providing support according to paragraphs (a) through (c) above.
Interest due after the starting point of credit shall not be capitalised
15. INTEREST RATES, PREMIUM RATES AND OTHER FEES
Interest excludes:
any payment by way of premium or other charge for insuring or guaranteeing supplier credits or financial credits;
any payment by way of banking fees or commissions relating to the export credit other than annual or semi-annual bank charges that are payable throughout the repayment period; and
withholding taxes imposed by the importing country.
Where official support is provided by means of direct credits/financing or refinancing, the premium either may be added to the face value of the interest rate or may be a separate charge; both components are to be specified separately to the Participants.
16. VALIDITY PERIOD FOR EXPORT CREDITS
Financial terms and conditions for an individual export credit or line of credit, other than the validity period for the Commercial Interest Reference Rates (CIRRs) set out in Article 21, shall not be fixed for a period exceeding six months prior to final commitment.
17. ACTION TO AVOID OR MINIMISE LOSSES
The Arrangement does not prevent export credit authorities or financing institutions from agreeing to less restrictive financial terms and conditions than those provided for by the Arrangement, if such action is taken after the contract award (when the export credit agreement and ancillary documents have already become effective) and is intended solely to avoid or minimise losses from events which could give rise to non-payment or claims.
18. MATCHING
Taking into account a Participant's international obligations and consistent with the purpose of the Arrangement, a Participant may match, according to the procedures set out in Article 45, financial terms and conditions offered by a Participant or a non-Participant. Financial terms and conditions provided in accordance with this Article are considered to be in conformity with the provisions of Chapters I, II and, when applicable, Annexes I, II, III, IV, V, VI and VII.
19. MINIMUM FIXED INTEREST RATES UNDER OFFICIAL FINANCING SUPPORT
The Participants providing official financing support for fixed rate loans shall apply the relevant CIRRs as minimum interest rates. CIRRs are interest rates established according to the following principles:
CIRRs should represent final commercial lending interest rates in the domestic market of the currency concerned;
CIRRs should closely correspond to the rate for first class domestic borrowers;
CIRRs should be based on the funding cost of fixed interest rate finance;
CIRRs should not distort domestic competitive conditions; and
CIRRs should closely correspond to a rate available to first class foreign borrowers.
The provision of official financing support shall not offset or compensate, in part or in full, for the appropriate credit risk premium to be charged for the risk of non-repayment pursuant to the provisions of Article 23.
20. CONSTRUCTION OF CIRRS
Each Participant wishing to establish a CIRR shall initially select one of the following two base rate systems for its national currency:
three-year government bond yields for a repayment term of up to and including five years; five-year government bond yields for over five and up to and including eight-and-a-half years; and seven-year government bond yields for over eight-and-a-half years; or
five-year government bond yields for all maturities.
Exceptions to the base rate system shall be agreed by the Participants.
CIRRs shall be set at a fixed margin of 100 basis points above each Participant's base rate unless Participants have agreed otherwise.
Other Participants shall use the CIRR set for a particular currency should they decide to finance in that currency.
A Participant may change its base-rate system after giving six months' advance notice and with the counsel of the Participants.
A Participant or a non-Participant may request that a CIRR be established for the currency of a non-Participant. In consultation with the interested non-Participant, a Participant or the Secretariat on behalf of that non-Participant may make a proposal for the construction of the CIRR in that currency using Common Line procedures in accordance with Articles 58 to 63.
21. VALIDITY OF CIRRS
The interest rate applying to a transaction shall not be fixed for a period longer than 120 days. A margin of 20 basis points shall be added to the relevant CIRR if the terms and conditions of the official financing support are fixed before the contract date.
22. APPLICATION OF CIRRS
Where official financing support is provided for floating rate loans, banks and other financing institutions shall not be allowed to offer the option of the lower of either the CIRR (at time of the original contract) or the short-term market rate throughout the life of the loan.
In the event of a voluntary, early repayment of a loan of or any portion thereof, the borrower shall compensate the government institution providing official financing support for all costs and losses incurred as a result of such early repayment, including the cost to the government institution of replacing the part of the fixed rate cash inflow interrupted by the early repayment.
23. PREMIUM FOR CREDIT RISK
The Participants shall charge premium, in addition to interest charges, to cover the risk of non-repayment of export credits. The premium rates charged by the Participants shall be risk-based, shall converge and shall not be inadequate to cover long-term operating costs and losses.
24. MINIMUM PREMIUM RATES FOR CREDIT RISK
The Participants shall charge no less than the applicable Minimum Premium Rate (MPR) for Credit Risk.
The applicable MPR is determined according to the following factors:
MPRs are expressed in percentages of the principal value of the credit as if premium were collected in full at the date of the first drawdown of the credit. An explanation of how to calculate the MPRs, including the mathematical formula, is provided in Annex IX.
Irrespective of the destination country the premium rates charged by Participants for Market Benchmark transactions, i.e., involving ultimate obligors/guarantors (i.e. credit risk entities) in Category 0 countries, High Income OECD Countries and High Income Euro Area Countries ( 3 ) shall be determined on a case-by-case basis. In order to ensure that the premium rates charged for transactions involving obligors, and where appropriate guarantors, in such countries do not undercut private market pricing, the Participants shall adhere to the following procedures, using agreed conventions to translate the relevant benchmark pricing into premium rates:
Where a Participant provides official support as part of a syndicated loan package that is structured as either an asset-backed ( 4 ) or project finance ( 5 ) transaction, then:
To qualify as a syndicated loan package, all of the following conditions must be met:
For all other Market Benchmark Transactions, the following procedures shall apply:
The ‘highest risk’ countries in Category 7 shall, in principle, be subject to premium rates in excess of the MPRs established for that Category; these premium rates shall be determined by the Participant providing official support.
In calculating the MPR for a transaction, the applicable country risk classification shall be the classification of the obligor's country and the applicable buyer risk classification shall be the classification of the obligor ( 10 ), unless:
The criteria and conditions relating to the application of a third party guarantee according to the situations described in the first and second tirets of paragraph (e) above are set out in Annex XI.
The HOR convention used in the calculation of an MPR is one-half of the disbursement period plus the entire repayment period and assumes a regular export credit repayment profile, i.e. repayment in equal semi-annual instalments of principal plus accrued interest beginning six months after the starting point of credit. For export credits with non-standard repayment profiles, the equivalent repayment period (expressed in terms of equal, semi-annual instalments) is calculated using the following formula: equivalent repayment period = (average weighted life of the repayment period – 0,25)/0,5.
The Participant choosing to apply an MPR associated with a third party guarantor located in a country other than that of the obligor shall give prior notification according to Article 47. The Participant choosing to apply a MPR associated with a Multilateral or Regional Institution acting as a guarantor shall give prior notification in accordance with Article 48.
25. COUNTRY RISK CLASSIFICATION
With the exception of High Income OECD countries and High Income Euro Area countries, countries shall be classified according to the likelihood of whether they will service their external debts (i.e. country credit risk).
The five elements of country credit risk are:
Countries are classified into one of eight Country Risk Categories (0-7). MPRs have been established for Categories 1 through 7, but not for Category 0, as the level of country risk is considered to be negligible for countries in this Category. The credit risk associated with transactions in Category 0 countries is predominantly related to the risk of the obligor/guarantor.
The classification of countries ( 12 ) is achieved through the Country Risk Classification Methodology, which is comprised of:
Country Risk Classifications shall be monitored on an on-going basis and reviewed at least annually and changes resulting from the Country Risk Classification Methodology shall be immediately communicated by the Secretariat. When a country is re-classified in a lower or higher Country Risk Category, the Participants shall, no later than five working days after the re-classification has been communicated by the Secretariat, charge premium rates at or above the MPRs associated with the new Country Risk Category.
The country risk classifications shall be made public by the Secretariat.
26. SOVEREIGN RISK ASSESSMENT
For all countries classified through the Country Risk Classification Methodology according to Article 25 (d), the risk of the sovereign shall be assessed in order to identify, on an exceptional basis, those sovereigns:
The identification of sovereigns meeting the criteria listed in paragraph (a) above shall be undertaken according to the Sovereign Risk Assessment Methodology that has been developed and agreed by the Participants.
The list of sovereigns identified as meeting the criteria listed in paragraph (a) above shall be monitored on an on-going basis and reviewed at least annually and changes resulting from the Sovereign Risk Assessment Methodology shall be immediately communicated by the Secretariat.
The list of sovereigns identified under paragraph (b) above shall be made public by the Secretariat.
27. BUYER RISK CLASSIFICATION
Obligors and, as appropriate, guarantors in countries classified in Country Risk Categories 1-7 shall be classified into one of the buyer risk categories that have been established in relation to the country of the obligor/guarantor ( 13 ). The matrix of buyer risk categories into which obligors and guarantors shall be classified is provided in Annex IX. Qualitative descriptions of the buyer risk categories are provided in Annex XII.
Buyer-risk classifications shall be based on the senior unsecured credit rating of the obligor/guarantor as determined by the Participant.
Notwithstanding paragraph (a) above, transactions supported according to the terms and conditions of Annex VII and transactions having a credit value of SDR 5 million or less may be classified on a transaction basis, i.e. after the application of any buyer risk credit enhancements; however, such transactions, regardless of how they are classified, are not eligible for any discounts for the application of buyer risk credit enhancements.
Sovereign obligors and guarantors are classified in buyer risk category SOV/CC0.
On an exceptional basis, non-sovereign obligors and guarantors may be classified in the ‘Better than Sovereign’ (SOV+) buyer risk category ( 14 ) if:
The Participants shall give prior notification according to Article 48 for transactions:
In the event of competition for a specific transaction, whereby the obligor/guarantor has been classified by competing Participants in different buyer risk categories, the competing Participants shall seek to arrive at a common buyer risk classification. If agreement on a common classification is not reached, the Participant(s) having classified the obligor/guarantor in a higher buyer risk classification are not prohibited from applying the lower buyer risk classification.
28. CLASSIFICATION OF MULTILATERAL AND REGIONAL INSTITUTIONS
Multilateral and Regional Institutions shall be classified into one of eight Country Risk Categories (0-7) ( 16 ) and reviewed as appropriate; such applicable classifications shall be made public by the Secretariat.
29. PERCENTAGE AND QUALITY OF OFFICIAL EXPORT CREDIT COVER
The MPRs are differentiated to take account of the differing quality of export credit products and percentage of cover provided by the Participants as set out in Annex IX. The differentiation is based on the exporter's perspective (i.e. to neutralise the competitive effect arising from the differing qualities of product provided to the exporter/financial institution).
The quality of an export credit product is a function of whether the product is insurance, guarantee or direct credit/financing, and for insurance products whether cover of interest during the claims waiting period (i.e. the period between the due date of payment by the obligor and the date that the insurer is liable to reimburse the exporter/financial institution) is provided without a surcharge.
All existing export credit products offered by the Participants shall be classified into one of the three product categories which are:
30. COUNTRY RISK MITIGATION TECHNIQUES
The Participants may apply the following country risk mitigation techniques, the specific application of which is set out in Annex XIII:
The Participant applying an MPR reflecting the use of country risk mitigation shall give prior notification according to Article 47.
No country risk mitigation shall be applied to Market Benchmark transactions.
31. BUYER RISK CREDIT ENHANCEMENTS
The Participants may apply the following buyer risk credit enhancements (BRCE) which allow for the application of a Credit Enhancement Factor (CEF) greater than 0:
Definitions of the BRCE and maximum CEF values for both Category 1-7 obligors as well as Market Benchmark obligors are set out in Annex XIII.
BRCEs may be used alone or in combination with the following restrictions:
The Participants shall give prior notification according to Article 48 for transactions with a non-sovereign obligor/guarantor having a credit of greater than SDR 5 million where BRCEs result in the application of a CEF of greater than 0, or whenever BRCEs are used in a Market Benchmark transaction that result in pricing below the corresponding TCMB MPR.
32. REVIEW OF THE VALIDITY OF THE MINIMUM PREMIUM RATES FOR CREDIT RISK
To assess the adequacy of MPRs and to allow, if necessary, for adjustments, either upwards or downwards, Premium Feedback Tools (PFTs), shall be used in parallel to monitor and adjust the MPRs on a regular basis.
The PFTs shall assess the adequacy of the MPRs in terms of both the actual experience of institutions providing official export credits as well as private market information on the pricing of credit risk.
A comprehensive review of all aspects of the premium rules of the Arrangement, with a special emphasis on the Market Benchmark Pricing Rules, shall take place no later than 31 December 2018.
CHAPTER III
PROVISIONS FOR TIED AID
33. GENERAL PRINCIPLES
The Participants have agreed to have complementary policies for export credits and tied aid. Export credit policies should be based on open competition and the free play of market forces. Tied aid policies should provide needed external resources to countries, sectors or projects with little or no access to market financing. Tied aid policies should ensure best value for money, minimise trade distortion, and contribute to developmentally effective use of these resources.
The tied aid provisions of the Arrangement do not apply to the aid programmes of multilateral or regional institutions.
Principles do not prejudge the views of the Development Assistance Committee (DAC) on the quality of tied and untied aid.
A Participant may request additional information relevant to the tying status of any form of aid. If there is uncertainty as to whether a certain financing practice falls within the scope of the definition of tied aid set out in Annex XV, the donor country shall furnish evidence in support of any claim to the effect that the aid is in fact ‘untied’ in accordance with the definition in Annex XV.
34. FORMS OF TIED AID
Tied aid can take the form of:
Official Development Assistance (ODA) loans as defined in the ‘DAC Guiding Principles for Associated Financing and Tied and Partially Untied Official Development Assistance (1987)’;
ODA grants as defined in the ‘DAC Guiding Principles for Associated Financing and Tied and Partially Untied Official Development Assistance (1987)’; and
Other Official Flows (OOF), which includes grants and loans but excludes officially supported export credits that are in conformity with the Arrangement; or
Any association, e.g. mixture, in law or in fact, within the control of the donor, the lender or the borrower involving two or more of the preceding, and/or the following financing components:
an export credit that is officially supported by way of direct credit/financing, refinancing, interest rate support, guarantee or insurance to which the Arrangement applies; and
other funds at or near market terms, or down payment from the purchaser.
35. ASSOCIATED FINANCING
Associated financing may take various forms including mixed credits, mixed financing, joint financing, parallel financing or single integrated transactions. The main characteristics are that they all feature:
Association or linkage ‘in fact’ is determined by such factors as:
The following practices shall not prevent the determination of an association or linkage ‘in fact’:
36. COUNTRY ELIGIBILITY FOR TIED AID
There shall be no tied aid to countries whose per capita GNI, according to the World Bank data, is above the upper limit for lower middle income countries. The World Bank recalculates this threshold on an annual basis ( 17 ). A country will be reclassified only after its World Bank category has been unchanged for two consecutive years.
The following operational criteria and procedures apply when classifying countries:
Classification for Arrangement purposes is determined by per capita GNI as calculated by the World Bank for the purposes of the World Bank classification of borrowing countries; this classification shall be made public by the Secretariat.
In cases where the World Bank does not have enough information to publish per capita GNI data, the World Bank shall be asked to estimate whether the country in question has per capita GNI above or below the current threshold. The country shall be classified according to the estimate unless the Participants decide to act otherwise.
If a country's eligibility for tied aid does change in accordance with paragraph (a) above, the reclassification shall take effect two weeks after the conclusions drawn from the above mentioned World Bank data have been communicated to all Participants by the Secretariat. Before the effective date of reclassification, no tied aid financing for a newly eligible country may be notified; after that date, no tied aid financing for a newly promoted country may be notified, except that individual transactions covered under a prior committed credit line may be notified until the expiry of the credit line (which shall be no more than one year from the effective date).
In cases where the World Bank revises figures such revisions shall be disregarded in relation to the Arrangement. Nevertheless, the classification of a country may be changed by way of a Common Line, in accordance with the appropriate procedures in Articles 58 to 63, and the Participants would favourably consider a change due to errors and omissions in the figures subsequently recognised in the same calendar year as the figures that were first distributed by the Secretariat.
37. PROJECT ELIGIBILITY
Tied aid shall not be extended to public or private projects that normally should be commercially viable if financed on market or Arrangement terms.
The key tests for such aid eligibility are:
The key tests under paragraph (b) above are intended to describe how a project should be evaluated to determine whether it should be financed with such aid or with export credits on market or Arrangement terms. Through the consultation process described in Articles 51 to 53, a body of experience is expected to develop over time that will more precisely define, for both export credit and aid agencies, ex ante guidance as to the line between the two categories of projects.
38. MINIMUM CONCESSIONALITY LEVEL
The Participants shall not provide tied aid that has a concessionality level of less than 35 %, or 50 % if the beneficiary country is a Least Developed Country (LDC), except for the cases set out below, which are also exempt from the notification procedures set out in Articles 49(a) and 50(a):
Technical assistance: tied aid where the official development aid component consists solely of technical cooperation that is less than either 3 % of the total value of the transaction or SDR 1 million, whichever is lower; and
Small projects: capital projects of less than SDR 1 million that are funded entirely by development assistance grants.
39. EXEMPTIONS FROM COUNTRY OR PROJECT ELIGIBILITY FOR TIED AID
The provisions of Articles 36 and 37 do not apply to tied aid where the concessionality level is 80 % or more except for tied aid that forms part of an associated financing package, described in Article 35.
The provisions of Article 37 do not apply to tied aid with a value of less than SDR 2 million except for tied aid that forms part of an associated financing package, described in Article 35.
Tied aid for LDCs as defined by the United Nations is not subject to the provisions of Articles 36 and 37.
The Participants shall give favourable consideration to an acceleration of tied aid procedures in line with the specific circumstances:
Notwithstanding Articles 36 and 37, a Participant may, exceptionally, provide support by one of the following means:
40. CALCULATION OF CONCESSIONALITY LEVEL OF TIED AID
The concessionality level of tied aid is calculated using the same method as for the grant element used by the DAC, except that:
The discount rate used to calculate the concessionality level of a loan in a given currency, i.e. the Differentiated Discount Rate (DDR), is subject to annual change on 15 January and is calculated as follows:
R |
M |
less than 15 years |
0,75 |
from 15 years up to, but not including 20 years |
1,00 |
from 20 years up to but not including 30 years |
1,15 |
from 30 years and above |
1,25 |
The base date for the calculation of the concessionality level is the starting point of credit as set out in Annex XV.
For the purpose of calculating the overall concessionality level of an associated financing package, the concessionality levels of the following credits, funds and payments are considered to be zero:
Payments on or before the starting point of credit that are not considered down payment shall be included in the calculation of the concessionality level.
The discount rate in matching: in matching aid, identical matching means matching with an identical concessionality level that is recalculated with the discount rate in force at the time of matching.
Local costs and third country procurement shall be included in the calculation of concessionality level only if they are financed by the donor country.
The overall concessionality level of a package is determined by multiplying the nominal value of each component of the package by the respective concessionality level of each component, adding the results, and dividing this total by the aggregate nominal value of the components.
The discount rate for a given aid loan is the rate in effect at the time of notification. However, in cases of prompt notification, the discount rate is the one in effect at the time when the terms and conditions of the aid loan were fixed. A change in the discount rate during the life of a loan does not change its concessionality level.
If a change of currency is made before the contract is concluded, the notification shall be revised. The discount rate used to calculate the concessionality level will be the one applicable at the date of revision. A revision is not necessary if the alternative currency and all the necessary information for calculation of the concessionality level are indicated in the original notification.
Notwithstanding paragraph (g) above, the discount rate used to calculate the concessionality level of individual transactions initiated under an aid credit line shall be the rate that was originally notified for the credit line.
41. VALIDITY PERIOD FOR TIED AID
The Participants shall not fix terms and conditions for tied aid, whether this relates to the financing of individual transactions or to an aid protocol, an aid credit line or to a similar agreement, for more than two years. In the case of an aid protocol, an aid credit line or similar agreement, the validity period shall commence at the date of its signature, to be notified in accordance with Article 50; the extension of a credit line shall be notified as if it were a new transaction with a note explaining that it is an extension and that it is renewed at terms allowed at the time of the notification of the extension. In the case of individual transactions, including those notified under an aid protocol, an aid credit line or similar agreement, the validity period shall commence at the date of notification of the commitment in accordance with Article 49 or 50, as appropriate.
When a country has become ineligible for 17-year World Bank Loans for the first time, the validity period of existing and new tied aid protocols and credit lines notified shall be restricted to one year after the date of the potential reclassification in accordance with procedures in Article 36(b).
Renewal of such protocols and credit lines is possible only on terms which are in accordance with the provisions of Articles 36 and 37 of the Arrangement following:
In these circumstances, the existing terms and conditions can be maintained notwithstanding a change in the discount rate set out in Article 40.
42. MATCHING
Taking into account a Participant's international obligations and consistent with the purpose of the Arrangement, a Participant may match, according to the procedures set out in Article 45, financial terms and conditions offered by a Participant or a non-Participant.
CHAPTER IV
PROCEDURES
SECTION 1
Common procedures for export credits and trade-related aid
43. NOTIFICATIONS
The notifications set out by the procedures in the Arrangement shall be made in accordance with, and include the information contained in Annex VIII, and shall be copied to the Secretariat.
44. INFORMATION ON OFFICIAL SUPPORT
As soon as a Participant commits the official support which it has notified in accordance with the procedures in Articles 47 to 50, it shall inform all other Participants accordingly by including the notification reference number on the relevant reporting form.
In an exchange of information in accordance with Articles 55 to 57, a Participant shall inform the other Participants of the credit terms and conditions that it envisages supporting for a particular transaction and may request similar information from the other Participants.
45. PROCEDURES FOR MATCHING
Before matching financial terms and conditions assumed to be offered by a Participant or a non-Participant pursuant to Articles 18 and 42, a Participant shall make every reasonable effort, including as appropriate by use of the face-to-face consultations described in Article 57, to verify that these terms and conditions are officially supported and shall comply with the following:
The Participant shall notify all other Participants of the terms and conditions it intends to support following the same notification procedures required for the matched terms and conditions. In the case of matching a non-Participant, the matching Participant shall follow the same notification procedures that would have been required had the matched terms been offered by a Participant.
Notwithstanding subparagraph (1) above, if the applicable notification procedure would require the matching Participant to withhold its commitment beyond the final bid closing date, then the matching Participant shall give notice of its intention to match as early as possible.
If the initiating Participant moderates or withdraws its intention to support the notified terms and conditions, it shall immediately inform all other Participants accordingly.
A Participant intending to offer identical financial terms and conditions to those notified according to Articles 47 and 48 may do so once the waiting period stipulated therein has expired. This Participant shall give notification of its intention as early as possible.
46. SPECIAL CONSULTATIONS
A Participant that has reasonable grounds to believe that financial terms and conditions offered by another Participant (the initiating Participant) are more generous than those provided for in the Arrangement shall inform the Secretariat; the Secretariat shall immediately make available such information.
The initiating Participant shall clarify the financial terms and conditions of its offer within two working days following the issue of the information from the Secretariat.
Following clarification by the initiating Participant, any Participant may request that a special consultation meeting of the Participants be organised by the Secretariat within five working days to discuss the issue.
Pending the outcome of the special consultation meeting of the Participants, financial terms and conditions benefiting from official support shall not become effective.
SECTION 2
Procedures for export credits
47. PRIOR NOTIFICATION WITH DISCUSSION
A Participant shall notify all other Participants at least ten calendar days before issuing any commitment in accordance with Annex VIII if:
If any other Participant requests a discussion during this period, the initiating Participant shall wait an additional ten calendar days.
A Participant shall inform all other Participants of its final decision following a discussion to facilitate the review of the body of experience in accordance with Article 69. The Participants shall maintain records of their experience with regard to premium rates notified in accordance with paragraph (a) above.
48. PRIOR NOTIFICATION
A Participant shall, in accordance with Annex VIII, notify all other Participants at least ten calendar days before issuing any commitment if it intends to:
Provide support in accordance with Article 10(d)(3).
Support a repayment term of more than five years to a Category I country.
Provide support in accordance with Article 13(a).
Provide support in accordance with Article 14(d).
Apply a premium rate in accordance with the provisions of Article 24(c)(1) when participating as part of a syndicated loan package.
Apply a premium rate lower than the corresponding premium determined by the TCMB model, in accordance with the second tiret of Article 24(c)(2).
Provide support in Market Benchmark transactions, where a Participant classifies the obligor/guarantor as better than the best rating from an Accredited CRA; or if there is no rating from an Accredited CRA, where a Participant classifies a transaction as CC2 or better, or a credit rating letter equivalent to AAA to A-, or equal to or more favourable than the best Accredited CRA rating of the sovereign in the obligor's/guarantor's domicile.
Apply a premium rate in accordance with the second tiret of Article 24(e), whereby the applicable country risk classification and buyer risk category used to calculate the MPR have been determined by the involvement as obligor or guarantor of a classified multilateral or regional institution.
Apply a premium rate in accordance with Article 27(e) whereby the selected buyer risk category used to calculate the MPR for a transaction:
Apply a premium rate in accordance with Article 31(a) for transactions with a non-sovereign obligor/guarantor having a credit of greater than SDR 5million, whereby the use of buyer risk credit enhancements results in the application of a CEF of greater than 0, or whenever BRCEs are used in a Market Benchmark transaction that result in pricing below the corresponding TCMB MPR.
Provide support in accordance with Article 8(a) of Annex II.
Provide support in accordance with Article 10(a)(1) of Annex IV.
Provide support in accordance with Article 5(b) of Annex V.
Provide support in accordance with Article 4(a) of Annex VI.
If the initiating Participant moderates or withdraws its intention to provide support for such transaction, it shall immediately inform all other Participants.
SECTION 3
Procedures for trade-related aid
49. PRIOR NOTIFICATION
A Participant shall give prior notification in accordance with Annex VIII if it intends to provide official support for:
Prior notification shall be made at the latest 30 working days before the bid closing or commitment date, whichever is the earlier.
If the initiating Participant moderates or withdraws its intention to support the notified terms and conditions, it shall immediately inform all other Participants accordingly.
The provision of this Article shall apply to tied aid that forms part of an associated financing package, as described in Article 35.
50. PROMPT NOTIFICATION
A Participant shall promptly notify all other Participants, i.e. within two working days of the commitment, in accordance with Annex VIII, if it provides official support for tied aid with a value of either:
A Participant shall also promptly notify all other Participants when an aid protocol, credit line or similar agreement is signed.
Prior notification need not be given if a Participant intends to match financial terms and conditions that were subject to a prompt notification.
SECTION 4
Consultation procedures for tied aid
51. PURPOSE OF CONSULTATIONS
A Participant seeking clarification about possible trade motivation for tied aid may request that a full Aid Quality Assessment (detailed in Annex XIV) be supplied.
Furthermore, a Participant may request consultations with other Participants, in accordance with Article 52. These include face-to-face consultations as outlined in Article 57 in order to discuss:
52. SCOPE AND TIMING OF CONSULTATIONS
During consultations, a Participant may request, among other items, the following information:
The consultation shall be completed and the findings on both questions in Article 51 notified by the Secretariat to all Participants at least ten working days before the bid closing date or commitment date, whichever comes first. If there is disagreement among the consulting parties, the Secretariat shall invite other Participants to express their views within five working days. It shall report these views to the notifying Participant, which should reconsider going forward if there appears to be no substantial support for an aid offer.
53. OUTCOME OF CONSULTATIONS
A donor which wishes to proceed with a project despite the lack of substantial support shall provide prior notification of its intentions to other Participants, no later than 60 calendar days after the completion of the Consultation, i.e. acceptance of the Chairman's conclusion. The donor shall also write a letter to the Secretary-General of the OECD outlining the results of the consultations and explaining the overriding non-trade related national interest that forces this action. The Participants expect that such an occurrence will be unusual and infrequent.
The donor shall immediately notify the Participants that it has sent a letter to the Secretary-General of the OECD, a copy of which shall be included with the notification. Neither the donor nor any other Participant shall make a tied aid commitment until ten working days after this notification to Participants has been issued. For projects for which competing commercial offers were identified during the consultation process, the aforementioned ten-working-day period shall be extended to 15 days.
The Secretariat shall monitor the progress and results of consultations.
SECTION 5
Information exchange for export credits and trade-related aid
54. CONTACT POINTS
All communications shall be made between the designated contact points in each country by means of instant communication, e.g. OLIS, and shall be treated in confidence.
55. SCOPE OF ENQUIRIES
A Participant may ask another Participant about the attitude it takes with respect to a third country, an institution in a third country or a particular method of doing business.
A Participant which has received an application for official support may address an enquiry to another Participant, giving the most favourable credit terms and conditions that the enquiring Participant would be willing to support.
If an enquiry is made to more than one Participant, it shall contain a list of addressees.
A copy of all enquiries shall be sent to the Secretariat.
56. SCOPE OF RESPONSES
The Participant to which an enquiry is addressed shall respond within seven calendar days and provide as much information as possible. The reply shall include the best indication that the Participant can give of the decision it is likely to take. If necessary, the full reply shall follow as soon as possible. Copies shall be sent to the other addressees of the enquiry and to the Secretariat.
If an answer to an enquiry subsequently becomes invalid for any reason, because for example:
a reply shall be made without delay and copied to all other addressees of the enquiry and to the Secretariat.
57. FACE-TO-FACE CONSULTATIONS
A Participant shall agree within ten working days to requests for face-to-face consultations.
A request for face-to-face consultations shall be made available to Participants and non-Participants. The consultations shall take place as soon as possible after the expiry of the ten-working-day period.
The Chairman of the Participants shall coordinate with the Secretariat on any necessary follow-up action, e.g. a Common Line. The Secretariat shall promptly make available the outcome of the consultation.
58. PROCEDURES AND FORMAT OF COMMON LINES
Common Line proposals are addressed only to the Secretariat. A proposal for a Common Line shall be sent to all Participants and, where tied aid is involved, all DAC contact points by the Secretariat. The identity of the initiator is not revealed on the Common Line Register on the Bulletin Board of the OLIS. However, the Secretariat may orally reveal the identity of the initiator to a Participant or DAC member on demand. The Secretariat shall keep a record of such requests.
The Common Line proposal shall be dated and shall be in the following format:
A Common Line proposal put forward in accordance with Article 36(b)(4) shall be addressed to the Secretariat and copied to other Participants. The Participant making the Common Line proposal shall provide a full explanation of the reasons why it considers that the classification of a country should differ from the procedure set out in Article 36(b).
The Secretariat shall make publicly available the agreed Common Lines.
59. RESPONSES TO COMMON LINE PROPOSALS
Responses shall be made within 20 calendar days, although the Participants are encouraged to respond to a Common Line proposal as quickly as possible.
A response may be a request for additional information, acceptance, and rejection, a proposal for modification of the Common Line or an alternative Common Line proposal.
A Participant which advises that it has no position because it has not been approached by an exporter, or by the authorities in the recipient country in case of aid for the project, shall be deemed to have accepted the Common Line proposal.
60. ACCEPTANCE OF COMMON LINES
After a period of 20 calendar days, the Secretariat shall inform all Participants of the status of the Common Line proposal. If not all Participants have accepted the Common Line, but no Participant has rejected it, the proposal shall be left open for a further period of eight calendar days.
After this further period, a Participant which has not explicitly rejected the Common Line proposal shall be deemed to have accepted the Common Line. Nevertheless, a Participant, including the initiating Participant, may make its acceptance of the Common Line conditional on the explicit acceptance by one or more Participants.
If a Participant does not accept one or more elements of a Common Line it implicitly accepts all other elements of the Common Line. It is understood that such a partial acceptance may lead other Participants to change their attitude towards a proposed Common Line. All Participants are free to offer or match terms and conditions not covered by a Common Line.
A Common Line which has not been accepted may be reconsidered using the procedures in Articles 58 and 59. In these circumstances, the Participants are not bound by their original decision.
61. DISAGREEMENT ON COMMON LINES
If the initiating Participant and a Participant which has proposed a modification or alternative cannot agree on a Common Line within the additional eight-calendar day period, this period can be extended by their mutual consent. The Secretariat shall inform all Participants of any such extension.
62. EFFECTIVE DATE OF COMMON LINE
The Secretariat shall inform all Participants either that the Common Line will go into effect or that it has been rejected; the Common Line will take effect three calendar days after this announcement. The Secretariat shall make available on OLIS a permanently updated record of all Common Lines which have been agreed or are undecided.
63. VALIDITY OF COMMON LINES
A Common Line, once agreed, shall be valid for a period of two years from its effective date, unless the Secretariat is informed that it is no longer of interest, and that this is accepted by all Participants. A Common Line shall remain valid for a further two-year period if a Participant seeks an extension within 14 calendar days of the original date of expiry. Subsequent extensions may be agreed through the same procedure. A Common Line agreed in accordance with Article 36(b)(4) shall be valid until World Bank data for the following year is available.
The Secretariat shall monitor the status of Common Lines and shall keep the Participants informed accordingly, through the maintenance of the listing ‘The Status of Valid Common Lines’ on OLIS. Accordingly, the Secretariat, inter alia, shall:
SECTION 6
Operational provisions for the communication of minimum interest rates (CIRRs)
64. COMMUNICATION OF MINIMUM INTEREST RATES
CIRRs for currencies that are determined according to the provisions of Article 20 shall be sent by means of instant communication at least monthly to the Secretariat for circulation to all Participants.
Such notification shall reach the Secretariat no later than five days after the end of each month covered by this information. The Secretariat shall then inform immediately all Participants of the applicable rates and make them publicly available.
65. EFFECTIVE DATE FOR APPLICATION OF INTEREST RATES
Any changes in the CIRRs shall enter into effect on the fifteenth day after the end of each month.
66. IMMEDIATE CHANGES IN INTEREST RATES
When market developments require the notification of an amendment to a CIRR during the course of a month, the amended rate shall be implemented 10 days after notification of this amendment has been received by the Secretariat.
SECTION 7
Reviews
67. REGULAR REVIEW OF THE ARRANGEMENT
The Participants shall review regularly the functioning of the Arrangement. In the review, the Participants shall examine, inter alia, notification procedures, implementation and operation of the DDR system, rules and procedures on tied aid, questions of matching, prior commitments and possibilities of wider participation in the Arrangement.
This review shall be based on information of the Participants' experience and on their suggestions for improving the operation and efficacy of the Arrangement. The Participants shall take into account the objectives of the Arrangement and the prevailing economic and monetary situation. The information and suggestions that Participants wish to put forward for this review shall reach the Secretariat no later than 45 calendar days before the date of review.
68. REVIEW OF MINIMUM INTEREST RATES
The Participants shall periodically review the system for setting CIRRs in order to ensure that the notified rates reflect current market conditions and meet the aims underlying the establishment of the rates in operation. Such reviews shall also cover the margin to be added when these rates are applied.
A Participant may submit to the Chairman of the Participants a substantiated request for an extraordinary review in case this Participant considers that the CIRR for one or more than one currency no longer reflect current market conditions.
69. REVIEW OF MINIMUM PREMIUM RATES AND RELATED ISSUES
The Participants shall regularly monitor and review all aspects of the premium rules and procedures. This shall include:
The Country Risk Classification and Sovereign Risk Assessment Methodologies to review their validity in the light of experience;
The level of the MPRs to ensure that they remain an accurate measure of credit risk, taking into account both the actual experience of institutions providing official export credits as well as private market information on the pricing of credit risk;
The differentiations in the MPRs which take account of the differing quality of export credit products and percentage of cover provided; and
The body of experience related to the use of country risk mitigation and buyer risk credit enhancements and the continued validity and appropriateness of their specific impact on the MPRs.
ANNEX I
SECTOR UNDERSTANDING ON EXPORT CREDITS FOR SHIPS
CHAPTER I
SCOPE OF THE SECTOR UNDERSTANDING
1. PARTICIPATION
The Participants to the Sector Understanding are: Australia, the European Union, Japan, Korea, New Zealand and Norway.
2. SCOPE OF APPLICATION
This Sector Understanding, which complements the Arrangement, sets out specific guidelines for officially supported export credits relating to export contracts of:
Any new sea-going vessel of 100 gt and above used for the transportation of goods or persons, or for the performance of a specialised service (for example, fishing vessels, fish factory ships, ice breakers and as dredgers, that present in a permanent way by their means of propulsion and direction (steering) all the characteristics of self-navigability in the high sea), tugs of 365 kw and over and to unfinished shells of ships that are afloat and mobile. The Sector Understanding does not cover military vessels. Floating docks and mobile offshore units are not covered by the Sector Understanding, but should problems arise in connection with export credits for such structures, the Participants to the Sector Understanding (hereinafter the ‘Participants’), after consideration of substantiated requests by any Participant, may decide that they shall be covered.
Any conversion of a ship. Ship conversion means any conversion of sea-going vessels of more than 1 000 gt on condition that conversion operations entail radical alterations to the cargo plan, the hull or the propulsion system.
Although hovercraft-type vessels are not included in the Sector Understanding, Participants are allowed to grant export credits for hovercraft vessels on equivalent conditions to those prevailing in the Sector Understanding. They commit themselves to apply this possibility moderately and not to grant such credit conditions to hovercraft vessels in cases where it is established that no competition is offered under the conditions of the Sector Understanding.
In the Sector Understanding, the term ‘hovercraft’ is defined as follows: an amphibious vehicle of at least 100 tons designed to be supported wholly by air expelled from the vehicle forming a plenum contained within a flexible skirt around the periphery of the vehicle and the ground or water surface beneath the vehicle, and capable of being propelled and controlled by airscrews or ducted air from fans or similar devices.
It is understood that the granting of export credits at conditions equivalent to those prevailing in this Sector Understanding should be limited to those hovercraft vessels used on maritime routes and non-land routes, except for reaching terminal facilities standing at a maximum distance of one kilometre from the water.
CHAPTER II
PROVISIONS FOR EXPORT CREDITS AND TIED AID
3. MAXIMUM REPAYMENT TERM
The maximum repayment term, irrespective of country classification, is 12 years after delivery.
4. CASH PAYMENT
The Participants shall require a minimum cash payment of 20 % of the contract price by delivery.
5. REPAYMENT OF PRINCIPAL AND PAYMENT OF INTEREST
The principal sum of an export credit shall be repaid in equal instalments at regular intervals of normally six months and a maximum of 12 months.
Interest shall be paid no less frequently than every six months and the first payment of interest shall be made no later than six months after the starting point of credit.
For export credits provided in support of lease transactions, equal repayments of principal and interest combined may be applied in lieu of equal repayments of principal as set out in paragraph (a).
Interest due after the starting point of credit shall not be capitalised.
A Participant to this Sector Understanding intending to support a payment of interest on different terms than those set out in paragraph (b) shall give prior notification at least ten calendar days before issuing any commitment, in accordance with Annex VIII of the Arrangement.
6. MINIMUM PREMIUM
The provisions of the Arrangement in relation to minimum premium benchmarks shall not be applied until such provisions have been further reviewed by the Participants to this Sector Understanding.
7. PROJECT FINANCE
The provisions of Article 7 and of Annex VII to the Arrangement shall not be applied until such provisions have been further reviewed by the Participants to this Sector Understanding.
8. AID
Any Participant desiring to provide aid must, in addition to the provisions of the Arrangement, confirm that the ship is not operated under an open registry during the repayment term and that appropriate assurance has been obtained that the ultimate owner resides in the receiving country, is not a non-operational subsidiary of a foreign interest and has undertaken not to sell the ship without his government's approval.
CHAPTER III
PROCEDURES
9. NOTIFICATION
For the purpose of transparency each Participant shall, in addition to the provisions of the Arrangement and the IBRD/Berne Union/OECD Creditor Reporting System, provide annually information on its system for the provision of official support and of the means of implementation of this Sector Understanding, including the schemes in force.
10. REVIEW
The Sector Understanding shall be reviewed annually or upon request by any Participant within the context of the OECD Working Party on Shipbuilding, and a report made to the Participants to the Arrangement.
To facilitate coherence and consistency between the Arrangement and this Sector Understanding and taking into account the nature of the shipbuilding industry, the Participants to this Sector Understanding and to the Arrangement will consult and coordinate as appropriate.
Upon a decision by the Participants to the Arrangement to change the Arrangement, the Participants to this Sector Understanding (the Participants) will examine such a decision and consider its relevance to this Sector Understanding. Pending such consideration the amendments to the Arrangement will not apply to this Sector Understanding. In case the Participants can accept the amendments to the Arrangement they shall report this in writing to the Participants to the Arrangement. In case the Participants cannot accept the amendments to the Arrangement as far as their application to shipbuilding is concerned they shall inform the Participants to the Arrangement of their objections and enter into consultations with them with a view to seeking a resolution of the issues. In case no agreement can be reached between the two groups, the views of the Participants as regards the application of the amendments to shipbuilding shall prevail.
Attachment
Commitments for future work
In addition to the Future Work of the Arrangement, the Participants to this Sector Understanding agree:
To develop an illustrative list of types of ships which are generally considered non-commercially viable, taking into account the disciplines on tied aid set out in the Arrangement.
To review the provisions of the Arrangement in relation to minimum premium benchmarks with a view to incorporating them into this Sector Understanding.
To discuss, subject to the developments in relevant international negotiations, the inclusion of other disciplines on minimum interest rates including a special CIRR and floating rates.
To review the applicability to this Sector Understanding of provisions of the Arrangement in relation to Project Finance.
To discuss whether:
may be used in relation to the repayment profile contained in Article 5 of this Sector Understanding.
ANNEX II
CHAPTER I
General provisions
1. PURPOSE
1. The main purpose of the Arrangement on Officially Supported Export Credits, referred to throughout this document as the Arrangement, is to provide a framework for the orderly use of officially supported export credits.
2. The Arrangement seeks to foster a level playing field for official support, as defined in Article 5 a), in order to encourage competition among exporters based on quality and price of goods and services exported rather than on the most favourable officially supported financial terms and conditions.
2. STATUS
The Arrangement, developed within the OECD framework, initially came into effect in April 1978 and is of indefinite duration. The Arrangement is a Gentlemen’s Agreement among the Participants; it is not an OECD Act ( 18 ), although it receives the administrative support of the OECD Secretariat (hereafter: ‘the Secretariat’).
3. PARTICIPATION
The Participants to the Arrangement currently are: Australia, Canada, the European Union, Japan, Korea, New Zealand, Norway, Switzerland, Turkey, the United Kingdom and the United States. Other OECD Members and non-members may be invited to become Participants by the current Participants.
4. INFORMATION AVAILABLE TO NON-PARTICIPANTS
The Participants undertake to share information with non-Participants on notifications related to official support as set out in Article 5 a).
A Participant shall, on the basis of reciprocity, reply to a request from a non-Participant in a competitive situation on the financial terms and conditions offered for its official support, as it would reply to a request from a Participant.
5. SCOPE OF APPLICATION
The Arrangement shall apply to all official support provided by or on behalf of a government for export of goods and/or services, including financial leases, which have a repayment term of two years or more.
Official support may be provided in different forms:
Export credit guarantee or insurance (pure cover).
Official financing support:
Any combination of the above.
The Arrangement shall apply to tied aid; the procedures set out in Chapter IV shall also apply to trade-related untied aid.
The Arrangement does not apply to exports of military equipment and agricultural commodities.
Official support shall not be provided if there is clear evidence that the contract has been structured with a purchaser in a country which is not the final destination of the goods, primarily with the aim of obtaining more favourable repayment terms.
6. PROHIBITIONS ON ARRANGEMENT SUPPORT
Participants shall not provide officially supported export credits or tied aid for:
The export of new coal-fired electricity generation plants or parts thereof, comprising all components, equipment, materials and services (including the training of personnel) directly required for the construction and commissioning of such power stations. The addition of a new coal-fired electricity generation unit to an existing plant is deemed to be a new coal-fired electricity generation plant.
The export supply of equipment to existing coal-fired electricity generation plants, unless all the following conditions are met:
The purpose of the equipment supplied is air pollution abatement, water pollution abatement, or CO2 emissions abatement.
The equipment supplied induces neither an extension of the useful lifetime of the plant nor a capacity increase.
The prohibitions set out in paragraphs a) and b) above do not apply to coal-fired electricity generation plants that operate with effective carbon capture utilisation and storage (CCUS) facilities or the retrofitting of existing coal-fired electricity generation plants to install CCUS, as provided for under Project Class A of Appendix II to Annex IV.
Participants agree to undertake a review, upon request by a Participant, of non-CCUS CO2 emission abatement technologies which may be developed in the future, for purposes of exceptions from paragraphs a) and b) above. The inclusion of any future exception shall be based on a consensus decision by the Participants.
This Article shall be reviewed no later than 31 December 2022, in order to contribute to the common goal of addressing climate change, taking into account:
The most recent reports on climate science and the implications for global infrastructure investment decisions of holding the increase in the global average temperature to well below 2 degrees Celsius above pre-industrial levels and pursuing efforts to limit the temperature increase to 1,5 degrees Celsius above pre-industrial levels;
Officially supported export credits or tied aid support to other coal-related projects;
Availability of CCUS technology; and
Availability of non-CCUS CO2 abatement technologies.
7. SECTOR UNDERSTANDINGS
The following Sector Understandings are part of the Arrangement:
A Participant to either Annex I, II, IV or V may apply the respective provisions for official support for export of goods and/or services covered by the relevant Sector Understandings. Where a Sector Understanding does not include a corresponding provision to that of the Arrangement, a Participant to that Sector Understanding shall apply the provision of the Arrangement.
For the export of goods and/or services covered by Annex III, the Participants that are also Participants to that Sector Understanding shall apply the provisions of that Sector Understanding.
8. PROJECT FINANCE
The Participants may apply the terms and conditions set out in Annex VI to the export of goods and/or services for transactions that meet the criteria set out in Appendix 1 of Annex VI.
Paragraph a) above applies to the export of goods and services covered by the Sector Understanding on Export Credits for Nuclear Power Plants, the Sector Understanding on Export Credits for Renewable Energy, Climate Change Mitigation and Adaptation, and Water Projects, and the Sector Understanding on Export Credits for Rail Infrastructure.
Paragraph a) above does not apply to the export of goods and services covered by the Sector Understanding on Export Credits for Civil Aircraft or the Sector Understanding on Export Credits for Ships.
9. WITHDRAWAL
A Participant may withdraw by notifying the Secretariat in writing by means of instant communication, e.g. using the electronic mail system that is maintained by the Secretariat to facilitate communications amongst Participants and the Secretariat. The withdrawal takes effect 180 calendar days after receipt of the notification by the Secretariat.
10. MONITORING
The Secretariat shall monitor the implementation of the Arrangement.
CHAPTER II
Financial terms and conditions for export credits
Financial terms and conditions for export credits encompass all the provisions set out in this Chapter which shall be read in conjunction one with the other. The Arrangement sets out limitations on terms and conditions that may be officially supported. The Participants recognise that more restrictive financial terms and conditions than those provided for by the Arrangement traditionally apply to certain trade or industrial sectors. The Participants shall continue to respect such customary financial terms and conditions, in particular the principle by which repayment terms do not exceed the useful life of the goods.
11. CLASSIFICATION OF COUNTRIES FOR MAXIMUM REPAYMENT TERMS AND LOCAL COSTS SUPPORT
Category I countries are High Income ( 19 ) OECD countries. All other countries are in Category II.
The following operational criteria and procedures apply when classifying countries:
Classification for Arrangement purposes is determined by per capita GNI as calculated by the World Bank for the purposes of the World Bank classification of borrowing countries.
In cases where the World Bank does not have enough information to publish per capita GNI data, the World Bank shall be asked to estimate whether the country in question has per capita GNI above or below the current threshold. The country shall be classified according to the estimate unless the Participants decide to act otherwise.
If a country is reclassified in accordance with Article 11 a), the reclassification will take effect two weeks after the conclusions drawn from the abovementioned data from the World Bank have been communicated to all Participants by the Secretariat.
In cases where the World Bank revises figures, such revisions shall be disregarded in relation to the Arrangement. Nevertheless, the classification of a country may be changed by way of a Common Line and Participants would favourably consider a change due to errors and omissions in the figures subsequently recognised in the same calendar year in which the figures were first distributed by the Secretariat.
A country will change category only after its World Bank category has remained unchanged for two consecutive years.
12. DOWN PAYMENT, MAXIMUM OFFICIAL SUPPORT AND LOCAL COSTS
The Participants shall require purchasers of goods and services, which are the subject of official support, to make down payments of a minimum of 15 % of the export contract value at or before the starting point of credit as defined in Annex XIV. For the assessment of down payments, the export contract value may be reduced proportionally if the transaction includes goods and services from a third country which are not officially supported. Financing/insurance of 100 % of the premium is permissible. Premium may or may not be included in the export contract value. Retention payments made after the starting point of credit are not regarded as down payment in this context.
Official support for such down payments shall only take the form of insurance or guarantee against the usual pre-credit risks.
Except as provided for in paragraphs b) and d), the Participants shall not provide official support in excess of 85 % of the export contract value, including third country supply but excluding local costs.
The Participants may provide official support for local costs, under the following conditions:
The maximum amount of official support for local costs shall not exceed:
Official support for local costs shall not be provided on terms more favourable/less restrictive than those agreed for the related exports.
Where official support for local costs exceeds 15 % of the export contract value, such official support shall be subject to prior notification, pursuant to Article 46, specifying the nature of the local costs being supported.
13. MAXIMUM REPAYMENT TERMS
Without prejudice to Article 14, the maximum repayment term varies according to the classification of the country of destination determined by the criteria in Article 11.
For Category I countries, the maximum repayment term is eight-and-a-half years.
For Category II countries, the maximum repayment term is 10 years.
In the event of a contract involving more than one country of destination the Participants should seek to establish a Common Line in accordance with the procedures in Articles 56 to 61 to reach agreement on appropriate terms.
14. REPAYMENT TERMS FOR NON-NUCLEAR POWER PLANTS
For non-nuclear power plants, the maximum repayment term shall be 12 years. If a Participant intends to support a repayment term longer than that provided for in Article 13, the Participant shall give prior notification in accordance with the procedure in Article 46.
Non-nuclear power plants are complete power stations, or parts thereof, not fuelled by nuclear power; they include all components, equipment, materials and services (including the training of personnel) directly required for the construction and commissioning of such non-nuclear power stations. This does not include items for which the buyer is usually responsible, in particular costs associated with land development, roads, construction villages, power lines, and switchyard and water supply located outside the power plant site boundary, as well as costs arising in the buyer’s country from official approval procedures (e.g. site permits, construction permit, fuel loading permits), except:
in cases where the buyer of the switchyard is the same as the buyer of the power plant, the maximum repayment term for the original switchyard shall be the same as that for the non-nuclear power plant (i.e. 12 years); and
the maximum repayment term for sub-stations, transformers and transmission lines with a minimum voltage threshold of 100 kV shall be the same as that for the non-nuclear power plant.
15. REPAYMENT OF PRINCIPAL AND PAYMENT OF INTEREST
The principal sum of an export credit shall normally be repaid in equal instalments or, when appropriate (e.g. when support is provided for lease transactions or for the export of stand-alone machinery or equipment), equal repayments of principal and interest combined.
Principal shall be repaid and interest shall be paid no less frequently than every six months and the first instalment of principal and interest shall be made no later than six months after the starting point of credit.
On an exceptional and duly justified basis, export credits may be provided on terms other than those set out in paragraphs a) and b) above. The provision of such support shall be explained by an imbalance in the timing of the funds available to the obligor and the debt service profile available under an equal, semi-annual repayment schedule, and shall comply with the following criteria:
No single repayment of principal or series of principal payments within a six-month period shall exceed 25 % of the principal sum of the credit.
Principal shall be repaid no less frequently than every 12 months. The first repayment of principal shall be made no later than 12 months after the starting point of credit and no less than 2 % of the principal sum of the credit shall have been repaid 12 months after the starting point of credit.
Interest shall be paid no less frequently than every 12 months and the first interest payment shall be made no later than six months after the starting point of credit.
The maximum weighted average life of the repayment period shall not exceed:
The Participant shall give prior notification in accordance with Article 46 that explains the reason for not providing support according to paragraphs a) through b) above.
Interest due after the starting point of credit shall not be capitalised.
16. INTEREST RATES, PREMIUM RATES AND OTHER FEES
Interest excludes:
any payment by way of premium or other charge for insuring or guaranteeing supplier credits or financial credits;
any payment by way of banking fees or commissions relating to the export credit other than annual or semi-annual bank charges that are payable throughout the repayment period; and
withholding taxes imposed by the importing country.
Where official support is provided by means of direct credits/financing or refinancing, the premium either may be added to the face value of the interest rate or may be a separate charge; both components are to be specified separately to the Participants.
17. VALIDITY PERIOD FOR EXPORT CREDITS
Financial terms and conditions for an individual export credit or line of credit, other than the validity period for the Commercial Interest Reference Rates (CIRRs) set out in Annex XV, shall not be fixed for a period exceeding six months prior to final commitment.
18. ACTION TO AVOID OR MINIMISE LOSSES
The Arrangement does not prevent export credit authorities or financing institutions from agreeing to less restrictive financial terms and conditions than those provided for by the Arrangement, if such action is taken after the contract award (when the export credit agreement and ancillary documents have already become effective) and is intended solely to avoid or minimise losses from events which could give rise to non-payment or claims.
19. MATCHING
Taking into account a Participant’s international obligations and consistent with the purpose of the Arrangement, a Participant may match, according to the procedures set out in Article 43, financial terms and conditions offered by a Participant or a non-Participant. Financial terms and conditions provided in accordance with this Article are considered to be in conformity with the provisions of Chapters I, II and, when applicable, Annexes I, II, III, IV, V and VI.
20. MINIMUM FIXED INTEREST RATES UNDER OFFICIAL FINANCING SUPPORT
The Participants providing official financing support for fixed rate loans shall apply the relevant CIRRs as minimum interest rates. CIRRs are interest rates established according to the following principles:
CIRRs should represent final commercial lending interest rates in the domestic market of the currency concerned;
CIRRs should closely correspond to the rate for first class domestic borrowers;
CIRRs should be based on the funding cost of fixed interest rate finance;
CIRRs should not distort domestic competitive conditions; and
CIRRs should closely correspond to a rate available to first class foreign borrowers.
The provision of official financing support shall not offset or compensate, in part or in full, for the appropriate credit risk premium to be charged for the risk of non-repayment pursuant to the provisions of Article 22.
21. CONSTRUCTION AND APPLICATION OF CIRRs
The CIRR for official financing support provided under the Arrangement and all of its Annexes other than the Sector Understanding on Export Credits for Civil Aircraft (Annex III) is determined and applied according to the provisions of Annex XV.
22. PREMIUM FOR CREDIT RISK
The Participants shall charge premium, in addition to interest charges, to cover the risk of non-repayment of export credits. The premium rates charged by the Participants shall be risk-based, shall converge and shall not be inadequate to cover long-term operating costs and losses.
23. MINIMUM PREMIUM RATES FOR CREDIT RISK
The Participants shall charge no less than the applicable Minimum Premium Rate (MPR) for Credit Risk.
The applicable MPR is determined according to the following factors:
MPRs are expressed in percentages of the principal value of the credit as if premium were collected in full at the date of the first drawdown of the credit. An explanation of how to calculate the MPRs, including the mathematical formula, is provided in Annex VIII.
Irrespective of the destination country, the premium rates charged by Participants for Market Benchmark Transactions, i.e. transactions involving ultimate obligors/guarantors (i.e. credit risk entities) in Category 0 Countries, High Income OECD Countries and High Income Euro Area Countries ( 20 ), or involving a multilateral or regional institution that the Participants agree is generally exempt from the monetary control and transfer regulations of the country in which it is located ( 21 ) shall be determined on a case-by-case basis. In order to ensure that the premium rates charged for transactions involving obligors, and where appropriate guarantors, in such countries do not undercut private market pricing, the Participants shall adhere to the following procedures, using agreed conventions to translate the relevant benchmark pricing into premium rates:
Where a Participant provides official support as part of a syndicated loan package that is structured as either an asset-backed ( 22 ) or project finance ( 23 ) transaction, then:
To qualify as a syndicated loan package, all of the following conditions must be met:
For all other Market Benchmark Transactions, the following procedures shall apply:
The ‘highest risk’ countries in Category 7 shall, in principle, be subject to premium rates in excess of the MPRs established for that Category; these premium rates shall be determined by the Participant providing official support.
In calculating the MPR for a transaction, the applicable country risk classification shall be the classification of the obligor’s country and the applicable buyer risk classification shall be the classification of the obligor ( 28 ), unless security in the form of an irrevocable, unconditional, on-demand, legally valid and enforceable guarantee of the total debt repayment obligation for the entire duration of the credit is provided by a third party that is creditworthy in relation to the size of the guaranteed debt. In the case of a third party guarantee, a Participant may choose to apply the country risk classification of the country in which the guarantor is located and the buyer risk category of the guarantor ( 29 ).
The criteria and conditions relating to the application of a third party guarantee according to the situations described in the first and second tirets of paragraph e) above are set out in Annex X.
The HOR convention used in the calculation of an MPR is one-half of the disbursement period plus the entire repayment period and assumes a regular export credit repayment profile, i.e. repayment in equal semi-annual instalments of principal plus accrued interest beginning six months after the starting point of credit. For export credits with non-standard repayment profiles, the equivalent repayment period (expressed in terms of equal, semi-annual instalments) is calculated using the following formula: equivalent repayment period = (average weighted life of the repayment period ‒ 0,25)/0,5.
The Participant choosing to apply an MPR associated with a third party guarantor located in a country other than that of the obligor shall give prior notification according to Article 45.
24. COUNTRY RISK CLASSIFICATION
With the exception of High Income OECD countries and High Income Euro Area countries, countries shall be classified according to the likelihood of whether they will service their external debts (i.e. country credit risk).
The five elements of country credit risk are:
Countries are classified into one of eight Country Risk Categories (0–7). MPRs have been established for Categories 1 through 7, but not for Category 0, as the level of country risk is considered to be negligible for countries in this Category. The credit risk associated with transactions in Category 0 countries is predominantly related to the risk of the obligor/guarantor.
The classification of countries ( 30 ) is achieved through the Country Risk Classification Methodology, which is comprised of:
Country Risk Classifications shall be monitored on an ongoing basis and reviewed at least annually and changes resulting from the Country Risk Classification Methodology shall be immediately communicated by the Secretariat. When a country is re-classified in a lower or higher Country Risk Category, the Participants shall, no later than five working days after the re classification has been communicated by the Secretariat, charge premium rates at or above the MPRs associated with the new Country Risk Category.
The country risk classifications shall be made public by the Secretariat.
25. SOVEREIGN RISK ASSESSMENT
For all countries classified through the Country Risk Classification Methodology according to Article 24 d), the risk of the sovereign shall be assessed in order to identify, on an exceptional basis, those sovereigns:
The identification of sovereigns meeting the criteria listed in paragraph a) above shall be undertaken according to the Sovereign Risk Assessment Methodology that has been developed and agreed by the Participants.
The list of sovereigns identified as meeting the criteria listed in paragraph a) above shall be monitored on an ongoing basis and reviewed at least annually and changes resulting from the Sovereign Risk Assessment Methodology shall be immediately communicated by the Secretariat.
The list of sovereigns identified under paragraph b) above shall be made public by the Secretariat.
26. BUYER RISK CLASSIFICATION
Obligors and, as appropriate, guarantors in countries classified in Country Risk Categories 1–7 shall be classified into one of the buyer risk categories that have been established in relation to the country of the obligor/ guarantor ( 31 ). The matrix of buyer risk categories into which obligors and guarantors shall be classified is provided in Annex VIII. Qualitative descriptions of the buyer risk categories are provided in Annex XI.
Buyer-risk classifications shall be based on the senior unsecured credit rating of the obligor/guarantor as determined by the Participant.
Notwithstanding paragraph a) above, transactions supported according to the terms and conditions of Annex VI and transactions having a credit value of SDR 5 million or less may be classified on a transaction basis, i.e. after the application of any buyer risk credit enhancements; however, such transactions, regardless of how they are classified, are not eligible for any discounts for the application of buyer risk credit enhancements.
Sovereign obligors and guarantors are classified in buyer risk category SOV/CC0.
On an exceptional basis, non-sovereign obligors and guarantors may be classified in the ‘Better than Sovereign’ (SOV+) buyer risk category if ( 32 ):
The Participants shall give prior notification according to Article 46 for transactions:
In the event of competition for a specific transaction, whereby the obligor/guarantor has been classified by competing Participants in different buyer risk categories, the competing Participants shall seek to arrive at a common buyer risk classification. If agreement on a common classification is not reached, the Participant(s) having classified the obligor/guarantor in a higher buyer risk classification are not prohibited from applying the lower buyer risk classification.
27. PERCENTAGE AND QUALITY OF OFFICIAL EXPORT CREDIT COVER
The MPRs are differentiated to take account of the differing quality of export credit products and percentage of cover provided by the Participants as set out in Annex VIII. The differentiation is based on the exporter’s perspective (i.e. to neutralise the competitive effect arising from the differing qualities of product provided to the exporter/financial institution).
The quality of an export credit product is a function of whether the product is insurance, guarantee or direct credit/financing, and for insurance products whether cover of interest during the claims waiting period (i.e. the period between the due date of payment by the obligor and the date that the insurer is liable to reimburse the exporter/financial institution) is provided without a surcharge.
All existing export credit products offered by the Participants shall be classified into one of the three product categories which are:
28. COUNTRY RISK MITIGATION TECHNIQUES
The Participants may apply the following country risk mitigation techniques, the specific application of which is set out in Annex XII:
The Participant applying an MPR reflecting the use of country risk mitigation shall give prior notification according to Article 45.
No country risk mitigation shall be applied to Market Benchmark transactions.
29. BUYER RISK CREDIT ENHANCEMENTS
The Participants may apply the following buyer risk credit enhancements (BRCE) which allow for the application of a Credit Enhancement Factor (CEF) greater than 0:
Definitions of the BRCE and maximum CEF values for both Category 1–7 obligors as well as Market Benchmark obligors are set out in Annex XII.
BRCEs may be used alone or in combination with the following restrictions:
The Participants shall give prior notification according to Article 45 for transactions with a non-sovereign obligor/guarantor where BRCEs result in the application of a CEF of greater than 0, or whenever BRCEs are used in a Market Benchmark transaction that result in pricing below the corresponding TCMB MPR.
30. REVIEW OF THE VALIDITY OF THE MINIMUM PREMIUM RATES FOR CREDIT RISK
To assess the adequacy of MPRs and to allow, if necessary, for adjustments, either upwards or downwards, Premium Feedback Tools (PFTs), shall be used in parallel to monitor and adjust the MPRs on a regular basis.
The PFTs shall assess the adequacy of the MPRs in terms of both the actual experience of institutions providing official export credits as well as private market information on the pricing of credit risk.
A comprehensive review of all aspects of the premium rules of the Arrangement, with a special emphasis on the Market Benchmark Pricing Rules, shall take place no later than 31 December 2019 ( 34 ).
CHAPTER III
Provisions for tied aid
31. GENERAL PRINCIPLES
The Participants have agreed to have complementary policies for export credits and tied aid. Export credit policies should be based on open competition and the free play of market forces. Tied aid policies should provide needed external resources to countries, sectors or projects with little or no access to market financing. Tied aid policies should ensure best value for money, minimise trade distortion, and contribute to developmentally effective use of these resources.
The tied aid provisions of the Arrangement do not apply to the aid programmes of multilateral or regional institutions.
These principles do not prejudge the views of the Development Assistance Committee (DAC) on the quality of tied and untied aid.
A Participant may request additional information relevant to the tying status of any form of aid. If there is uncertainty as to whether a certain financing practice falls within the scope of the definition of tied aid set out in Annex XIV, the donor country shall furnish evidence in support of any claim to the effect that the aid is in fact ‘untied’ in accordance with the definition in Annex XIV.
32. FORMS OF TIED AID
Tied aid can take the form of:
Official Development Assistance (ODA) loans as defined in the ‘DAC Guiding Principles for Associated Financing and Tied and Partially Untied Official Development Assistance (1987)’;
ODA grants as defined in the ‘DAC Guiding Principles for Associated Financing and Tied and Partially Untied Official Development Assistance (1987)’; and
Other Official Flows (OOF), which includes grants and loans but excludes officially supported export credits that are in conformity with the Arrangement; or
Any association, e.g. mixture, in law or in fact, within the control of the donor, the lender or the borrower involving two or more of the preceding, and/or the following financing components:
an export credit that is officially supported by way of direct credit/financing, refinancing, interest rate support, guarantee or insurance to which the Arrangement applies; and
other funds at or near market terms, or down payment from the purchaser.
33. ASSOCIATED FINANCING
Associated financing may take various forms including mixed credits, mixed financing, joint financing, parallel financing or single integrated transactions. The main characteristics are that they all feature:
Association or linkage ‘in fact’ is determined by such factors as:
The following practices shall not prevent the determination of an association or linkage ‘in fact’:
34. COUNTRY ELIGIBILITY FOR TIED AID
There shall be no tied aid to countries whose per capita GNI, according to the World Bank data, is above the upper limit for lower middle income countries. The World Bank recalculates this threshold on an annual basis ( 35 ). A country will be reclassified only after its World Bank category has been unchanged for two consecutive years.
The following operational criteria and procedures apply when classifying countries:
Classification for Arrangement purposes is determined by per capita GNI as calculated by the World Bank for the purposes of the World Bank classification of borrowing countries; this classification shall be made public by the Secretariat.
In cases where the World Bank does not have enough information to publish per capita GNI data, the World Bank shall be asked to estimate whether the country in question has per capita GNI above or below the current threshold. The country shall be classified according to the estimate unless the Participants decide to act otherwise.
If a country’s eligibility for tied aid does change in accordance with paragraph a) above, the reclassification shall take effect two weeks after the conclusions drawn from the above mentioned World Bank data have been communicated to all Participants by the Secretariat. Before the effective date of reclassification, no tied aid financing for a newly eligible country may be notified; after that date, no tied aid financing for a newly promoted country may be notified, except that individual transactions covered under a prior committed credit line may be notified until the expiry of the credit line (which shall be no more than one year from the effective date).
In cases where the World Bank revises figures such revisions shall be disregarded in relation to the Arrangement. Nevertheless, the classification of a country may be changed by way of a Common Line, in accordance with the appropriate procedures in Articles 56 to 61, and the Participants would favourably consider a change due to errors and omissions in the figures subsequently recognised in the same calendar year as the figures that were first distributed by the Secretariat.
35. PROJECT ELIGIBILITY
Tied aid shall not be extended to public or private projects that normally should be commercially viable if financed on market or Arrangement terms.
The key tests for such aid eligibility are:
The key tests under paragraph b) above are intended to describe how a project should be evaluated to determine whether it should be financed with such aid or with export credits on market or Arrangement terms. Through the consultation process described in Articles 49 to 51, a body of experience is expected to develop over time that will more precisely define, for both export credit and aid agencies, ex ante guidance as to the line between the two categories of projects.
36. MINIMUM CONCESSIONALITY LEVEL
The Participants shall not provide tied aid that has a concessionality level of less than 35 %, or 50 % if the beneficiary country is a Least Developed Country (LDC), except for the cases set out below, which are also exempt from the notification procedures set out in Articles 47 a) and 48 a):
Technical assistance: tied aid where the official development aid component consists solely of technical cooperation that is less than either 3 % of the total value of the transaction or SDR 1 million, whichever is lower; and
Small projects: capital projects of less than SDR 1 million that are funded entirely by development assistance grants.
37. EXEMPTIONS FROM COUNTRY OR PROJECT ELIGIBILITY FOR TIED AID
The provisions of Articles 34 and 35 do not apply to tied aid where the concessionality level is 80 % or more except for tied aid that forms part of an associated financing package, described in Article 33.
The provisions of Article 35 do not apply to tied aid with a value of less than SDR 2 million except for tied aid that forms part of an associated financing package, described in Article 33.
Tied aid for LDCs as defined by the United Nations is not subject to the provisions of Articles 34 and 35.
The Participants shall give favourable consideration to an acceleration of tied aid procedures in line with the specific circumstances:
Notwithstanding Articles 34 and 35, a Participant may, exceptionally, provide support by one of the following means:
38. CALCULATION OF CONCESSIONALITY LEVEL OF TIED AID
The concessionality level of tied aid is calculated using the same method as for the grant element used by the DAC, except that:
The discount rate used to calculate the concessionality level of a loan in a given currency, i.e. the Differentiated Discount Rate (DDR), is subject to annual change on 15 January and is calculated as follows:
R |
M |
less than 15 years |
0,75 |
from 15 years up to, but not including 20 years |
1,00 |
from 20 years up to but not including 30 years |
1,15 |
from 30 years and above |
1,25 |
The base date for the calculation of the concessionality level is the starting point of credit as set out in Annex XIV.
For the purpose of calculating the overall concessionality level of an associated financing package, the concessionality levels of the following credits, funds and payments are considered to be zero:
Payments on or before the starting point of credit that are not considered down payment shall be included in the calculation of the concessionality level.
The discount rate in matching: in matching aid, identical matching means matching with an identical concessionality level that is recalculated with the discount rate in force at the time of matching.
Local costs and third country procurement shall be included in the calculation of concessionality level only if they are financed by the donor country.
The overall concessionality level of a package is determined by multiplying the nominal value of each component of the package by the respective concessionality level of each component, adding the results, and dividing this total by the aggregate nominal value of the components.
The discount rate for a given aid loan is the rate in effect at the time of notification. However, in cases of prompt notification, the discount rate is the one in effect at the time when the terms and conditions of the aid loan were fixed. A change in the discount rate during the life of a loan does not change its concessionality level.
If a change of currency is made before the contract is concluded, the notification shall be revised. The discount rate used to calculate the concessionality level will be the one applicable at the date of revision. A revision is not necessary if the alternative currency and all the necessary information for calculation of the concessionality level are indicated in the original notification.
Notwithstanding paragraph g) above, the discount rate used to calculate the concessionality level of individual transactions initiated under an aid credit line shall be the rate that was originally notified for the credit line.
39. VALIDITY PERIOD FOR TIED AID
The Participants shall not fix terms and conditions for tied aid, whether this relates to the financing of individual transactions or to an aid protocol, an aid credit line or to a similar agreement, for more than two years. In the case of an aid protocol, an aid credit line or similar agreement, the validity period shall commence at the date of its signature, to be notified in accordance with Article 48; the extension of a credit line shall be notified as if it were a new transaction with a note explaining that it is an extension and that it is renewed at terms allowed at the time of the notification of the extension. In the case of individual transactions, including those notified under an aid protocol, an aid credit line or similar agreement, the validity period shall commence at the date of notification of the commitment in accordance with Article 47 or 48, as appropriate.
When a country has become ineligible for 17-year World Bank Loans for the first time, the validity period of existing and new tied aid protocols and credit lines notified shall be restricted to one year after the date of the potential reclassification in accordance with procedures in Article 34 b).
Renewal of such protocols and credit lines is possible only on terms which are in accordance with the provisions of Articles 34 and 35 of the Arrangement following:
In these circumstances, the existing terms and conditions can be maintained notwithstanding a change in the discount rate set out in Article 38.
40. MATCHING
Taking into account a Participant’s international obligations and consistent with the purpose of the Arrangement, a Participant may match, according to the procedures set out in Article 43, financial terms and conditions offered by a Participant or a non-Participant.
CHAPTER IV
Procedures
41. NOTIFICATIONS
The notifications set out by the procedures in the Arrangement shall be made in accordance with, and include the information contained in Annex VII, and shall be copied to the Secretariat.
42. INFORMATION ON OFFICIAL SUPPORT
As soon as a Participant commits the official support which it has notified in accordance with the procedures in Articles 45 to 48, it shall inform all other Participants accordingly by including the notification reference number on the relevant reporting form.
In an exchange of information in accordance with Articles 53 to 55, a Participant shall inform the other Participants of the credit terms and conditions that it envisages supporting for a particular transaction and may request similar information from the other Participants.
43. PROCEDURES FOR MATCHING
Before matching financial terms and conditions assumed to be offered by a Participant or a non-Participant pursuant to Articles 17 and 40, a Participant shall make every reasonable effort, including as appropriate by use of the face-to-face consultations described in Article 55, to verify that these terms and conditions are officially supported and shall comply with the following:
The Participant shall notify all other Participants of the terms and conditions it intends to support following the same notification procedures required for the matched terms and conditions. In the case of matching a non-Participant, the matching Participant shall follow the same notification procedures that would have been required had the matched terms been offered by a Participant.
Notwithstanding subparagraph 1) above, if the applicable notification procedure would require the matching Participant to withhold its commitment beyond the final bid closing date, then the matching Participant shall give notice of its intention to match as early as possible.
If the initiating Participant moderates or withdraws its intention to support the notified terms and conditions, it shall immediately inform all other Participants accordingly.
A Participant intending to offer identical financial terms and conditions to those notified according to Articles 45 and 46 may do so once the waiting period stipulated therein has expired. This Participant shall give notification of its intention as early as possible.
44. SPECIAL CONSULTATIONS
A Participant that has reasonable grounds to believe that financial terms and conditions offered by another Participant (the initiating Participant) are more generous than those provided for in the Arrangement shall inform the Secretariat; the Secretariat shall immediately make available such information.
The initiating Participant shall clarify the financial terms and conditions of its offer within two working days following the issue of the information from the Secretariat.
Following clarification by the initiating Participant, any Participant may request that a special consultation meeting of the Participants be organised by the Secretariat within five working days to discuss the issue.
Pending the outcome of the special consultation meeting of the Participants, financial terms and conditions benefiting from official support shall not become effective.
45. PRIOR NOTIFICATION WITH DISCUSSION
A Participant shall notify all other Participants at least ten calendar days before issuing any commitment with a credit value of greater than SDR 2 million in accordance with Annex VII if:
If any other Participant requests a discussion during this period, the initiating Participant shall wait an additional ten calendar days.
A Participant shall inform all other Participants of its final decision following a discussion to facilitate the review of the body of experience in accordance with Article 64. The Participants shall maintain records of their experience with regard to premium rates notified in accordance with paragraph a) above.
46. PRIOR NOTIFICATION
A Participant shall, in accordance with Annex VII, notify all other Participants at least ten calendar days before issuing any commitment with a credit value of greater than SDR 2 million if it intends to:
Provide support in accordance with Article 12 d) 3).
Provide support in accordance with Article 14 a).
Provide support in accordance with Article 15 c).
Apply a premium rate in accordance with the provisions of Article 22 c) 1) when participating as part of a syndicated loan package.
Apply a premium rate lower than the corresponding premium determined by the TCMB model, in accordance with the second tiret of Article 23 c) 2).
Provide support in Market Benchmark transactions, where a Participant classifies the obligor/guarantor as better than the best rating from an Accredited CRA; or if there is no rating from an Accredited CRA, where a Participant classifies a transaction as CC2 or better, or a credit rating letter equivalent to AAA to A-, or equal to or more favourable than the best Accredited CRA rating of the sovereign in the obligor’s/guarantor’s domicile.
Apply a premium rate in accordance with Article 26 e) whereby the selected buyer risk category used to calculate the MPR for a transaction:
Apply a premium rate in accordance with Article 29 a) for transactions with a non-sovereign obligor/guarantor, whereby the use of buyer risk credit enhancements results in the application of a CEF of greater than 0, or whenever BRCEs are used in a Market Benchmark transaction that result in pricing below the corresponding TCMB MPR.
Provide support in accordance with Article 6 a) of Annex II.
Provide support in accordance with Article 7 a) 1) of Annex IV.
Provide support in accordance with Article 4 b) of Annex V.
If the initiating Participant moderates or withdraws its intention to provide support for such transaction, it shall immediately inform all other Participants.
47. PRIOR NOTIFICATION
A Participant shall give prior notification in accordance with Annex VII if it intends to provide official support for:
Prior notification shall be made at the latest 30 working days before the bid closing or commitment date, whichever is the earlier.
If the initiating Participant moderates or withdraws its intention to support the notified terms and conditions, it shall immediately inform all other Participants accordingly.
The provision of this Article shall apply to tied aid that forms part of an associated financing package, as described in Article 33.
48. PROMPT NOTIFICATION
A Participant shall promptly notify all other Participants, i.e. within two working days of the commitment, in accordance with Annex VII, if it provides official support for tied aid with a value of either:
A Participant shall also promptly notify all other Participants when an aid protocol, credit line or similar agreement is signed.
Prior notification need not be given if a Participant intends to match financial terms and conditions that were subject to a prompt notification.
49. PURPOSE OF CONSULTATIONS
A Participant seeking clarification about possible trade motivation for tied aid may request that a full Aid Quality Assessment (detailed in Annex XIII) be supplied.
Furthermore, a Participant may request consultations with other Participants, in accordance with Article 50. These include face-to-face consultations as outlined in Article 55 in order to discuss:
50. SCOPE AND TIMING OF CONSULTATIONS
During consultations, a Participant may request, among other items, the following information:
The consultation shall be completed and the findings on both questions in Article 48 notified by the Secretariat to all Participants at least ten working days before the bid closing date or commitment date, whichever comes first. If there is disagreement among the consulting parties, the Secretariat shall invite other Participants to express their views within five working days. It shall report these views to the notifying Participant, which should reconsider going forward if there appears to be no substantial support for an aid offer.
51. OUTCOME OF CONSULTATIONS
A donor that wishes to proceed with a project despite the lack of substantial support shall provide prior notification of its intentions to other Participants, no later than 60 calendar days after the completion of the Consultation, i.e. acceptance of the Chairman’s conclusion. The donor shall also write a letter to the Secretary-General of the OECD outlining the results of the consultations and explaining the overriding non-trade related national interest that forces this action. The Participants expect that such an occurrence will be unusual and infrequent.
The donor shall immediately notify the Participants that it has sent a letter to the Secretary-General of the OECD, a copy of which shall be included with the notification. Neither the donor nor any other Participant shall make a tied aid commitment until ten working days after this notification to Participants has been issued. For projects for which competing commercial offers were identified during the consultation process, the aforementioned ten working-day period shall be extended to 15 days.
The Secretariat shall monitor the progress and results of consultations.
52. CONTACT POINTS
All communications shall be made between the designated contact points in each country by means of instant communication, e.g. electronic mail, and shall be treated in confidence.
53. SCOPE OF ENQUIRIES
A Participant may ask another Participant about the attitude it takes with respect to a third country, an institution in a third country or a particular method of doing business.
A Participant that has received an application for official support may address an enquiry to another Participant, giving the most favourable credit terms and conditions that the enquiring Participant would be willing to support.
If an enquiry is made to more than one Participant, it shall contain a list of addressees.
A copy of all enquiries shall be sent to the Secretariat.
54. SCOPE OF RESPONSES
The Participant to which an enquiry is addressed shall respond within seven calendar days and provide as much information as possible. The reply shall include the best indication that the Participant can give of the decision it is likely to take. If necessary, the full reply shall follow as soon as possible. Copies shall be sent to the other addressees of the enquiry and to the Secretariat.
If an answer to an enquiry subsequently becomes invalid for any reason, because for example:
a reply shall be made without delay and copied to all other addressees of the enquiry and to the Secretariat.
55. FACE-TO-FACE CONSULTATIONS
A Participant shall agree within ten working days to requests for face-to-face consultations.
A request for face-to-face consultations shall be made available to Participants and non-Participants. The consultations shall take place as soon as possible after the expiry of the ten working-day period.
The Chairman of the Participants shall coordinate with the Secretariat on any necessary follow-up action, e.g. a Common Line. The Secretariat shall promptly make available the outcome of the consultation.
56. PROCEDURES AND FORMAT OF COMMON LINES
Common Line proposals are addressed only to the Secretariat. A proposal for a Common Line shall be sent to all Participants and, where tied aid is involved, all DAC contact points by the Secretariat. The identity of the initiator is not revealed on the Common Line Register on the electronic Bulletin Board maintained by the Secretariat on the OECD Network Environment. However, the Secretariat may orally reveal the identity of the initiator to a Participant or DAC member on demand. The Secretariat shall keep a record of such requests.
The Common Line proposal shall be dated and shall be in the following format:
A Common Line proposal put forward in accordance with Article 34 b) 4) shall be addressed to the Secretariat and copied to other Participants. The Participant making the Common Line proposal shall provide a full explanation of the reasons why it considers that the classification of a country should differ from the procedure set out in Article 34 b).
The Secretariat shall make publicly available the agreed Common Lines.
57. RESPONSES TO COMMON LINE PROPOSALS
Responses shall be made within 20 calendar days, although the Participants are encouraged to respond to a Common Line proposal as quickly as possible.
A response may be a request for additional information, acceptance, and rejection, a proposal for modification of the Common Line or an alternative Common Line proposal.
A Participant that advises that it has no position because it has not been approached by an exporter, or by the authorities in the recipient country in case of aid for the project, shall be deemed to have accepted the Common Line proposal.
58. ACCEPTANCE OF COMMON LINES
After a period of 20 calendar days, the Secretariat shall inform all Participants of the status of the Common Line proposal. If not all Participants have accepted the Common Line, but no Participant has rejected it, the proposal shall be left open for a further period of eight calendar days.
After this further period, a Participant that has not explicitly rejected the Common Line proposal shall be deemed to have accepted the Common Line. Nevertheless, a Participant, including the initiating Participant, may make its acceptance of the Common Line conditional on the explicit acceptance by one or more Participants.
If a Participant does not accept one or more elements of a Common Line it implicitly accepts all other elements of the Common Line. It is understood that such a partial acceptance may lead other Participants to change their attitude towards a proposed Common Line. All Participants are free to offer or match terms and conditions not covered by a Common Line.
A Common Line that has not been accepted may be reconsidered using the procedures in Articles 56 and 57. In these circumstances, the Participants are not bound by their original decision.
59. DISAGREEMENT ON COMMON LINES
If the initiating Participant and a Participant which has proposed a modification or alternative cannot agree on a Common Line within the additional eight-calendar day period, this period can be extended by their mutual consent. The Secretariat shall inform all Participants of any such extension.
60. EFFECTIVE DATE OF COMMON LINE
The Secretariat shall inform all Participants either that the Common Line will go into effect or that it has been rejected; the Common Line will take effect three calendar days after this announcement. The Secretariat shall make available on the electronic bulletin board a permanently updated record of all Common Lines that have been agreed or are undecided.
61. VALIDITY OF COMMON LINES
A Common Line, once agreed, shall be valid for a period of two years from its effective date, unless the Secretariat is informed that it is no longer of interest, and that this is accepted by all Participants. A Common Line shall remain valid for a further two-year period if a Participant seeks an extension within 14 calendar days of the original date of expiry. Subsequent extensions may be agreed through the same procedure. A Common Line agreed in accordance with Article 34 b) 4) shall be valid until World Bank data for the following year is available.
The Secretariat shall monitor the status of Common Lines and shall keep the Participants informed accordingly, through the maintenance of the listing ‘The Status of Valid Common Lines’ on the electronic bulletin board. Accordingly, the Secretariat, inter alia, shall:
62. REGULAR REVIEW OF THE ARRANGEMENT
The Participants shall review regularly the functioning of the Arrangement. In the review, the Participants shall examine, inter alia, notification procedures, implementation and operation of the DDR system, rules and procedures on tied aid, questions of matching, prior commitments and possibilities of wider participation in the Arrangement.
This review shall be based on information of the Participants’ experience and on their suggestions for improving the operation and efficacy of the Arrangement. The Participants shall take into account the objectives of the Arrangement and the prevailing economic and monetary situation. The information and suggestions that Participants wish to put forward for this review shall reach the Secretariat no later than 45 calendar days before the date of review.
63. REVIEW OF MINIMUM INTEREST RATES
The Participants shall periodically review the system for setting CIRRs in order to ensure that the notified rates reflect current market conditions and meet the aims underlying the establishment of the rates in operation. Such reviews shall also cover the margin to be added when these rates are applied.
A Participant may submit to the Chairman of the Participants a substantiated request for an extraordinary review in case this Participant considers that the CIRR for one or more than one currency no longer reflect current market conditions.
64. REVIEW OF MINIMUM PREMIUM RATES AND RELATED ISSUES
The Participants shall regularly monitor and review all aspects of the premium rules and procedures. This shall include:
The Country Risk Classification and Sovereign Risk Assessment Methodologies to review their validity in the light of experience;
The level of the MPRs to ensure that they remain an accurate measure of credit risk, taking into account both the actual experience of institutions providing official export credits as well as private market information on the pricing of credit risk;
The differentiations in the MPRs which take account of the differing quality of export credit products and percentage of cover provided; and
The body of experience related to the use of country risk mitigation and buyer risk credit enhancements and the continued validity and appropriateness of their specific impact on the MPRs.
65. REVIEW OF OFFICIAL SUPPORT FOR LOCAL COSTS
The Participants shall review the provisions on local costs support by no later than 20 April 2024.
ANNEX III
SECTOR UNDERSTANDING ON EXPORT CREDITS FOR CIVIL AIRCRAFT
PART 1
GENERAL PROVISIONS
1. PURPOSE
The purpose of this Sector Understanding is to provide a framework for the predictable, consistent and transparent use of officially supported export credits for the sale or lease of aircraft and other goods and services specified in Article 4(a) below. This Sector Understanding seeks to foster a level playing field for such export credits, in order to encourage competition among exporters based on quality and price of goods and services exported rather than on the most favourable officially supported financial terms and conditions.
This Sector Understanding sets out the most favourable terms and conditions on which officially supported export credits may be provided.
To this aim, this Sector Understanding seeks to establish a balanced equilibrium that, on all markets:
Equalises competitive financial conditions between the Participants,
Neutralises official support among the Participants as a factor in the choice among competing goods and services specified in Article 4(a) below, and
Avoids distortion of competition among the Participants to this Sector Understanding and any other sources of financing.
The Participants to this Sector Understanding (the Participants) acknowledge that the provisions included in this Sector Understanding have been developed for the sole purpose of this Sector Understanding and such provisions do not prejudice the other parts of the Arrangement on Officially Supported Export Credits (the Arrangement) and their evolution.
2. STATUS
This Sector Understanding is a Gentlemen's Agreement among its Participants and is Annex III to the Arrangement; it forms an integral part of the Arrangement and it succeeds the Sector Understanding which came into effect in July 2007.
3. PARTICIPATION
The Participants currently are: Australia, Brazil, Canada, the European Union, Japan, Korea, New Zealand, Norway, Switzerland and the United States. Any non-Participant may become a Participant in accordance with the procedures set out in Appendix I.
4. SCOPE OF APPLICATION
This Sector Understanding shall apply to all official support provided by or on behalf of a government, and which has a repayment term of two years or more, for the export of:
New civil aircraft and engines installed thereon, including buyer furnished equipment.
Used, converted, and refurbished civil aircraft and engines installed thereon, including, in each case, buyer furnished equipment.
Spare engines.
Spare parts for civil aircraft and engines.
Maintenance and service contracts for civil aircraft and engines.
Conversion, major modifications and refurbishment of civil aircraft.
Engine kits.
Official support may be provided in different forms:
Export credit guarantee or insurance (pure cover).
Official financing support:
Any combination of the above.
This Sector Understanding shall not apply to official support for:
The exports of new or used military aircraft and related goods and services listed in paragraph (a) above, including when used for military purposes.
New or used flight simulators.
5. INFORMATION AVAILABLE TO NON-PARTICIPANTS
A Participant shall, on the basis of reciprocity, reply to a request from a non-Participant in a competitive situation on the financial terms and conditions offered for its official support as it would reply to a request from a Participant.
6. AID SUPPORT
The Participants shall not provide aid support, except for humanitarian purposes, through a Common Line procedure.
7. ACTIONS TO AVOID OR MINIMISE LOSSES
This Sector Understanding does not prevent its Participants from agreeing to less restrictive financial terms and conditions than those provided for by this Sector Understanding, if such action is taken after the export credit agreement and ancillary documents have already become effective and is intended solely to avoid or minimise losses from events which could give rise to non-payment or claims. A Participant shall notify all other Participants and the OECD Secretariat (the Secretariat), within 20 working days following the Participant's agreement with the buyer/borrower, of the modified financial terms and conditions. The notification shall contain information, including the motivation, on the new financial terms and conditions, using the reporting form set out in Appendix IV.
PART 2
NEW AIRCRAFT
CHAPTER I
Coverage
8. NEW AIRCRAFT
For the purpose of this Sector Understanding, a new aircraft is:
An aircraft, including buyer furnished equipment, and the engines installed on such aircraft owned by the manufacturer and not delivered nor previously used for its intended purpose of carrying passengers and/or freight and
Spare engines and spare parts when contemplated as part of the original aircraft order in accordance with the provisions of Article 20(a) below.
Notwithstanding the provisions of paragraph (a) above, a Participant may support terms appropriate to new aircraft for transactions where, with the prior knowledge of that Participant, interim financing arrangements had been put in place because the provision of official support had been delayed; such delay shall not be longer than 18 months. In such cases, the repayment term and the final repayment date shall be the same as if the sale or lease of the aircraft would have been officially supported from the date the aircraft was originally delivered.
CHAPTER II
Financial terms and conditions
Financial terms and conditions for export credits encompass all the provisions set out in this Chapter, which shall be read in conjunction one with the other.
9. ELIGIBLE CURRENCIES
The currencies which are eligible for official financing support are euro, Japanese yen, UK pound sterling, US dollar, and other fully convertible currencies for which data are available to construct the minimum interest rates mentioned in Appendix III.
10. DOWN PAYMENT AND MAXIMUM OFFICIAL SUPPORT
For transactions with buyers/borrowers classified in Risk Category 1 (as per Table 1 of Appendix II), the Participants shall:
Require a minimum down payment of 20 % of the net price of the aircraft at or before the starting point of credit;
Not provide official support in excess of 80 % of the net price of the aircraft.
For transactions with buyers/borrowers classified in Risk Categories 2 to 8 (as per Table 1 of Appendix II), the Participants shall:
Require a minimum down payment of 15 % of the net price of the aircraft at or before the starting point of credit;
Not provide official support in excess of 85 % of the net price of the aircraft.
A Participant which applies Article 8(b) above shall reduce the maximum amount of official support by the amount of principal of the instalments deemed due from the starting point of the credit so as to ensure that, at the time of disbursement, the amount outstanding is the same as if such an officially supported export credit was provided at the time of delivery. In such circumstances, prior to delivery the Participant shall have received an application for official support.
11. MINIMUM PREMIUM RATES
The Participants providing official support shall charge, for the credit amount officially supported, no less than the minimum premium rate set out in accordance with Appendix II.
The Participants shall use, whenever necessary, the agreed premium rate conversion model to convert between per annum spreads calculated on the outstanding amount of the official support and single up-front premium rates calculated on the original amount of the official support.
12. MAXIMUM REPAYMENT TERM
The maximum repayment term shall be 12 years for all new aircraft.
On an exceptional basis, and with a prior notification, a maximum repayment term of up to 15 years shall be allowed. In this case, a surcharge of 35 % to the minimum premium rates calculated in accordance with Appendix II shall apply.
There shall be no extension of the repayment term by way of sharing of rights in the security on a pari passu basis with commercial lenders for the officially supported export credit.
13. REPAYMENT OF PRINCIPAL AND PAYMENT OF INTEREST
The Participants shall apply a profile of repayment of principal and payment of interest as specified in subparagraph (1) or (2) below.
Repayment of principal and payment of interest combined shall be made in equal instalments:
Repayment of principal shall be made in equal instalments with interest payable on declining balances:
Notwithstanding paragraph (a) above, and subject to a prior notification, the repayment of principal may be structured to include a final payment of all outstanding amounts on a specified date. In such case, repayments of principal prior to the final payment will be structured as set out in paragraph (a) above, based on an amortisation period not greater than the maximum repayment term allowed for the goods and services being supported.
Notwithstanding paragraph (a) above, repayment of principal may be structured on terms less favourable to the obligor.
Interest due after the starting point of credit shall not be capitalised.
14. MINIMUM INTEREST RATES
The Participants providing official financing support shall apply either a minimum floating interest rate or a minimum fixed interest rate, in accordance with the provisions of Appendix III.
For jet aircraft of a net price of at least USD 35 million, official financing support on CIRR basis shall only be provided in exceptional circumstances. A Participant intending to provide such support shall notify all other Participants at least 20 calendar days before final commitment, identifying the borrower.
Interest rate excludes any payment by way of premium referred to in Article 11 above, and fees referred to in Article 16 below.
15. INTEREST RATE SUPPORT
The Participants providing interest rate support shall comply with the financial terms and conditions of this Sector Understanding and shall require any bank or any other financial institution which is a party to the interest supported transaction to participate in that transaction only on terms that are consistent in all respects with the financial terms and conditions of this Sector Understanding.
16. FEES
Subject to the limits of the premium holding period, the Participants providing official support in the form of pure cover shall charge a premium holding fee on the un-drawn portion of the official support during the premium holding period, as follows:
For the first six months of the holding period: zero basis points per annum.
For the second six months of the holding period: 12,5 basis points per annum.
For the third and final six months of the holding period: 25 basis points per annum.
The Participants providing official support in the form of direct credit/financing shall charge the following fees:
Arrangement/Structuring fee: 25 basis points on the disbursed amount payable at the time of each disbursement.
Commitment and premium holding fee: 20 basis points per annum on the un-drawn portion of the officially supported export credit to be disbursed, during the premium holding period, payable in arrears.
Administration fee: five basis points per annum on the amount of official support outstanding payable in arrears. Alternatively, the Participants may elect to have this fee payable as an up-front fee, on the amount disbursed, at the time of each disbursement pursuant to the provisions of Article 11(b) above.
17. CO-FINANCING
Notwithstanding Articles 14 and 16 above, in a co-financing where official support is provided by way of direct credit and pure cover, and where pure cover represents at least 35 % of the officially supported amount, the Participant providing direct credit shall apply the same financial terms and conditions, including fees, as those provided by the financial institution under pure cover, to generate an all-in cost equivalence between the pure cover provider and the direct lender. In such circumstances, the Participant providing such support shall report the financial terms and conditions supported, including fees, in accordance with the reporting form set out in Appendix IV.
PART 3
USED AIRCRAFT, SPARE ENGINES, SPARE PARTS, MAINTENANCE AND SERVICE CONTRACTS
CHAPTER I
Coverage
18. USED AIRCRAFT AND OTHER GOODS AND SERVICES
This Part of the Sector Understanding shall apply to used aircraft and to spare engines, spare parts, conversion, major modification, refurbishing, maintenance and service contracts in conjunction with both new and used aircraft and engine kits.
CHAPTER II
Financial terms and conditions
The financial terms and conditions to be applied, other than the maximum repayment term, shall be in accordance with the provisions set out in Part 2 of this Sector Understanding.
19. SALE OF USED AIRCRAFT
Subject to paragraph (b) below, the maximum repayment term for used aircraft shall be established in accordance with the age of the aircraft, as set out in the following table:
Age of Aircraft (years since the date of original manufacture) |
Maximum Repayment Terms for Asset-Backed or Sovereign Transactions (years) |
Maximum Repayment Terms for Transactions neither Asset-Backed nor Sovereign (years) |
1 |
10 |
8,5 |
2 |
9 |
7,5 |
3 |
8 |
6,5 |
4 |
7 |
6 |
5-8 |
6 |
5,5 |
Over 8 |
5 |
5 |
The maximum repayment term for aircraft that have undergone conversion, provided the transaction meets all the requirements of Article 19 of Appendix II and provided further that official support, if any, provided in respect of such conversion was not provided in accordance with Article 21(a) below, shall be established in accordance with the period of time since the date of conversion and the age of the aircraft, as set out in the following table:
Maximum Repayment Terms for Asset-Backed Converted Aircraft (years)
Period of Time Since the Date of Conversion (years) |
Age of Aircraft (years since the date of original manufacture) |
|||||
1 |
2 |
3 |
4 |
5-8 |
Over 8 |
|
0 (Newly converted) |
10 |
9 |
8 |
8 |
8 |
8 |
1 |
10 |
9 |
8 |
7 |
7 |
7 |
2 |
— |
9 |
8 |
7 |
6 |
6 |
3 or more |
— |
— |
8 |
7 |
6 |
5 |
20. SPARE ENGINES AND SPARE PARTS
When purchased, or ordered in connection with the engines to be installed on a new aircraft, the official support for spare engines may be provided on the same terms and conditions as for the aircraft.
When purchased with new aircraft, the official support for spare parts may be provided on the same terms and conditions as for the aircraft up to a maximum 5 % of the net price of the new aircraft and installed engines; paragraph (d) below shall apply to official support for spare parts in excess of the 5 % limit.
When spare engines are not purchased with a new aircraft, the maximum repayment term shall be eight years. For spare engines with a unit value of USD 10 million or more, the repayment term may be increased to 10 years, provided the transaction meets all the requirements of Article 19 of Appendix II.
When other spare parts are not purchased with a new aircraft, the maximum repayment term shall be:
Five years with a contract value of USD 5 million or more.
Two years with a contract value of less than USD 5 million.
21. CONTRACTS FOR CONVERSION/MAJOR MODIFICATION/REFURBISHING
If a transaction for conversion:
Is valued at USD 5 million or more, and
Is valued at less than USD 5 million, a Participant may offer official support with a repayment term of up to two years.
If a transaction is for a major modification, or refurbishment, a Participant may offer official support with a repayment term of up to:
Five years if the contract value is USD 5 million or more;
Two years, if the contract value is less than USD 5 million.
22. MAINTENANCE AND SERVICE CONTRACTS
The Participants may offer official support with a repayment term of up to three years.
23. ENGINE KITS
The Participants may offer official support with a repayment term of up to five years.
PART 4
TRANSPARENCY PROCEDURES
All communications shall be made between the designated contact points in each Participant country by means of instant communication, e.g. the OECD On-Line Information System (OLIS). Unless otherwise agreed, all information exchanged under this Part of the Sector Understanding shall be treated by all Participants as confidential.
24. INFORMATION ON OFFICIAL SUPPORT
Within one month after the date of a final commitment, a Participant shall submit the information required in Appendix IV to all other Participants, with a copy to the Secretariat.
In order to establish the margin benchmark in accordance with Appendix III Article 8(b), information on pure cover margins, as outlined in Appendix III Articles 8(c) and (d), shall be submitted to the Secretariat no later than five days after the end of each month.
25. REQUESTS FOR INFORMATION
A Participant may ask another Participant for information about the use of its officially supported export credits for the sale or lease of aircraft covered by this Sector Understanding.
A Participant which has received an application for official support may address an enquiry to another Participant, giving the most favourable credit terms and conditions that the enquiring Participant would be willing to support.
The Participant to which such an enquiry is addressed shall respond within seven calendar days and provide reciprocal information to the fullest extent possible. The reply shall include the best indication that the Participant can give of the decision it is likely to take. If necessary, the full reply shall follow as soon as possible.
Copies of all enquiries and responses shall be sent to the Secretariat.
26. FACE-TO-FACE CONSULTATIONS
In a competitive situation, a Participant may request face-to-face consultations with one or more Participants.
Any Participant shall agree within ten working days to such requests.
The consultations shall take place as soon as possible after the expiry of the ten working-day period.
The Chairman of the Participants shall coordinate with the Secretariat on any necessary follow-up action. The Secretariat shall promptly make available to all Participants the outcome of the consultation.
27. SPECIAL CONSULTATIONS
A Participant (the initiating Participant) that has reasonable grounds to believe that financial terms and conditions offered by another Participant (the responding Participant) are more generous than those provided for in this Sector Understanding shall inform the Secretariat; the Secretariat shall immediately make available such information to the responding Participant.
The responding Participant shall clarify the financial terms and conditions of the official support being considered within five working days following the issue of the information from the Secretariat.
Following clarification by the responding Participant, the initiating Participant may request that a special consultation with the responding Participant be organised by the Secretariat within five working days to discuss the issue.
The responding Participant shall wait for the outcome of the consultation which shall be determined on the day of such consultation before proceeding any further with the transaction.
28. PROCEDURES AND FORMAT OF COMMON LINES
Common Line proposals shall be addressed to the Secretariat only. The identity of the initiator is not revealed on the Common Line register on the OLIS. However, the Secretariat may orally reveal the identity of the initiator to a Participant on demand. The Secretariat shall keep a record of such requests.
The Common Line proposal shall be dated and shall be in the following format:
Reference number, followed by Common Line.
Name of the importing country and buyer/borrower.
Name or description of the transaction as precise as possible to clearly identify the transaction.
Common Line proposal for the most generous terms and conditions to be supported.
Nationality and names of known competing bidders.
Bid closing date and tender number to the extent it is known.
Other relevant information, including reasons for proposing the Common Line and as appropriate, special circumstances.
29. RESPONSES TO COMMON LINE PROPOSALS
Responses shall be made within 20 calendar days, although the Participants are encouraged to respond to a Common Line proposal as quickly as possible.
A response may be acceptance, rejection, a request for additional information, a proposal for modification of the Common Line or an alternative Common Line proposal.
A Participant which remains silent or advises that it has no position shall be deemed to have accepted the Common Line proposal.
30. ACCEPTANCE OF COMMON LINES
After a period of 20 calendar days, the Secretariat shall inform all Participants of the status of the Common Line proposal. If not all Participants have accepted the Common Line, but no Participant has rejected it, the proposal shall be left open for a further period of eight calendar days.
After this further period, a Participant which has not explicitly rejected the Common Line proposal shall be deemed to have accepted the Common Line. Nevertheless, a Participant, including the initiating Participant, may make its acceptance of the Common Line conditional on the explicit acceptance by one or more Participants.
If a Participant does not accept one or more elements of a Common Line it implicitly accepts all other elements of the Common Line.
31. DISAGREEMENT ON COMMON LINES
If the initiating Participant and a Participant which has proposed a modification or alternative cannot agree on a Common Line within the additional eight calendar-day period mentioned in Article 30 above, this period can be extended by their mutual consent. The Secretariat shall inform all Participants of any such extension.
A Common Line which has not been accepted may be reconsidered using the procedures in Articles 28 to 30 above. In these circumstances, the Participants are not bound by their original decision.
32. EFFECTIVE DATE OF COMMON LINE
The Secretariat shall inform all Participants either that the Common Line will go into effect or that it has been rejected; the agreed Common Line will take effect three calendar days after this announcement.
33. VALIDITY OF COMMON LINES
Unless agreed otherwise, a Common Line, once agreed, shall be valid for a period of two years from its effective date, unless the Secretariat is informed that it is no longer of interest, and that such situation is accepted by all Participants.
If a Participant seeks an extension within 14 calendar days of the original date of expiry and in the absence of disagreement, a Common Line shall remain valid for a further two-year period; subsequent extensions may be agreed through the same procedure.
The Secretariat shall monitor the status of Common Lines and shall keep the Participants informed accordingly, through the maintenance of the listing ‘The Status of Valid Common Lines’ on OLIS. Accordingly, the Secretariat, inter alia, shall issue, on a quarterly basis, a list of Common Lines due to expire in the following quarter.
Upon the request of a non-Participant which produces competing aircraft, the Secretariat shall make available valid Common Lines to that non-Participant.
34. MATCHING
Taking into account a Participant's international obligations, a Participant may match financial terms and conditions of official support offered by a non-Participant.
In the event of matching non-conforming terms and conditions offered by a non-Participant:
The matching Participant shall make every effort to verify such terms and conditions.
The matching Participant shall inform the Secretariat and all other Participants of the nature and outcome of such efforts, as well as of the terms and conditions it intends to support, at least ten calendar days before issuing any commitment.
If a competing Participant requests a discussion during this ten calendar-day period, the matching Participant shall wait an additional ten calendar days before issuing any commitment on such terms.
If a matching Participant modifies or withdraws its intention to support the notified terms and conditions, it shall immediately inform all other Participants accordingly.
PART 5
MONITORING AND REVIEW
35. MONITORING
The Secretariat shall monitor the implementation of this Sector Understanding and report to the Participants on an annual basis.
Each transaction deemed eligible under Article 39(a) shall be reported in accordance with the provisions of Article 24(a) and Appendix IV.
Each transaction deemed eligible under Article 39(b) shall be reported in accordance with the provisions of Article 24(a) and Appendix IV, in addition to which:
The reporting Participant shall indicate the link between that transaction and the transition list.
The transition lists shall be monitored on a semi-annual basis; to that end, the Secretariat shall meet with each Participant, with a view to:
36. REVIEW
The Participants shall review the procedures and provisions of this Sector Understanding, against the criteria, and at the times, set out in paragraphs (a) and (b) below.
The Participants shall undertake the review of this Sector Understanding as follows:
In calendar year 2019 and every fourth year thereafter, in each case with three months prior notice given by the Secretariat.
At the request of a Participant after due consultation, provided that three months prior notice has been given by the Secretariat and the requesting Participant provides a written explanation of the reason for, and objectives of, the review as well as a summary of the consultations preceding its request.
Modalities of update of minimum premium rates and minimum interest rates are set out in Appendixes II and III respectively.
Fees set out in Article 16 shall be part of reviews.
The review set out in subparagraph (a)(1) above shall consider:
The extent to which the purposes of this Sector Understanding, as set out in Article 1 above, have been achieved and any other issue a Participant may wish to bring forward for discussion.
In view of the elements in subparagraph (b)(1) above, whether amendments to any aspect of this Sector Understanding are justified.
In recognition of the importance of the review process, to ensure that the terms and conditions of this Sector Understanding continue to meet the needs of the Participants, each Participant reserves the right to withdraw from this Sector Understanding in accordance with Article 40 below.
37. FUTURE WORK
Consideration will be given to:
Examining Participants' practices in providing official support before the starting point of credit.
The provisions applicable to indirect loans.
An extension of maximum repayments terms under Article 19 for used aircraft that have undergone significant refurbishment prior to sale.
An extension of maximum repayment terms under Article 21 for larger contract values.
The provisions applicable to ‘refurbishing’ (Article 21) and ‘services’ (Article 22).
The Cape Town eligibility process.
The definition of ‘Interested Participant’.
PART 6
FINAL PROVISIONS
38. ENTRY INTO FORCE
The effective date of this Sector Understanding is 1 February 2011.
39. TRANSITIONAL ARRANGEMENTS
Notwithstanding Article 38 above, the Participants may provide official support on the terms and conditions set out as follows:
The Participants may provide official support on the terms and conditions set out in the Aircraft Sector Understanding in force as of 1 July 2007 (‘the 2007 ASU’) if the following conditions are fulfilled:
The goods and services shall be subject to a firm contract concluded not later than 31 December 2010.
The goods and services shall be physically delivered not later than 31 December 2012 for 2007 ASU Category 1 aircraft and 31 December 2013 for 2007 ASU Category 2 and 3 aircraft.
For each final commitment notified, a 20 basis points per annum commitment fee shall be charged from the earlier of the date of the final commitment or 31 January 2011 (2007 ASU Category 1 aircraft)/30 June 2011 (2007 ASU Category 2 and 3 aircraft), until the aircraft is delivered. This commitment fee shall be in lieu of the fees set out in Articles 17(a) and (b)(2) of the 2007 ASU. This commitment fee shall be charged in addition to the minimum premium charged.
The Participants may provide official support on terms and conditions applicable prior to the effective date of this Sector Understanding if the following conditions are fulfilled:
The goods and services shall be subject to a firm contract concluded not later than 31 December 2010.
Such official support is limited to deliveries of 69 2007 ASU Category 1 aircraft per Participant and 92 2007 ASU Category 2 aircraft per Participant.
In order to benefit from the terms and conditions set out in this paragraph, aircraft mentioned in subparagraph (b)(2) above shall be registered on lists (hereafter ‘transition lists’) which shall be notified by the Participants to the Secretariat prior to the entry into force of this Sector Understanding. Such transition lists shall include:
Information under the first, second and fourth tirets above shall be shared with all Participants; information under the third tiret above shall be managed exclusively by the Secretariat and the Chairman.
For each aircraft on transition lists:
The Participants may provide officially supported export credits on the terms and conditions set out in the Aircraft Sector Understanding prevailing prior to the 2007 ASU only for deliveries of aircraft scheduled to occur on or prior to 31 December 2010, in accordance with firm contracts concluded not later than 30 April 2007 and notified to the Secretariat not later than 30 June 2007.
The implementation of this Article shall be monitored in accordance with Articles 35(b) and (c).
40. WITHDRAWAL
A Participant may withdraw from this Sector Understanding by notifying the Secretariat in writing by means of instant communication, e.g. the OLIS. The withdrawal takes effect six months after receipt of the notification by the Secretariat. Withdrawal will not affect agreements reached on individual transactions entered into prior to the effective date of the withdrawal.
Appendix I
Participation in the Aircraft Sector Understanding
1. The Participants encourage non-Participants that are developing a manufacturing capacity for civil aircraft to apply the disciplines of this Sector Understanding. In this context the Participants invite non-Participants to enter into a dialogue with them regarding the conditions of joining the ASU.
2. The Secretariat should ensure that a non-Participant interested in participating in this Sector Understanding is provided with full information on the terms and conditions associated with becoming a Participant to this Sector Understanding.
3. The non-Participant would then be invited by the Participants to take part in the activities in pursuance of this Sector Understanding and to attend, as an observer, the relevant meetings. Such an invitation would be for a maximum of two years and could be renewed once for a further two years. During this period the non-Participant shall be invited to provide a review of its export credit system, especially for the export of civil aircraft.
4. At the end of that period, the non-Participant shall indicate whether it wishes to become a Participant in this Sector Understanding and to follow its disciplines; in the case of such confirmation, the non-Participant shall contribute, on an annual basis, to the costs associated with the implementation of this Sector Understanding.
5. The interested non-Participant shall be considered a Participant 30 working days after the confirmation referred to in Article 4 of this Appendix.
Appendix II
Minimum premium rates
This Appendix sets out the procedures to be used when determining the pricing of official support for a transaction subject to this Sector Understanding. Section 1 sets out the risk classification procedures; Section 2 sets out the minimum premium rates to be charged for new and used aircraft, and Section 3 sets out the minimum premium rates to be charged for spare engines, spare parts, conversion/major modification/refurbishing, maintenance and service contracts, and engine kits.
SECTION 1
Procedures for risk classification
1. The Participants have agreed on a list of risk classifications (the List) for buyers/borrowers; such risk classifications reflect the senior unsecured credit rating of buyers/borrowers using a common rating scale such as that of one of the credit rating agencies (CRA).
2. The risk classifications will be made by experts nominated by the Participants against the risk categories set out in Table 1 of this Appendix.
3. The List shall be binding at any stage of the transaction (e.g. campaign and delivery), subject to the provisions of Article 15 of this Appendix.
I. ESTABLISHMENT OF THE LIST OF RISK CLASSIFICATIONS
4. The List shall be developed and agreed among the Participants prior to the entry into force of this Sector Understanding; it shall be maintained by the Secretariat and made available to all the Participants on a confidential basis.
5. Upon request, the Secretariat may, on a confidential basis, inform an aircraft-producing non-Participant of the risk classification of a buyer/borrower; in this case, the Secretariat shall inform all Participants of the request. A non-Participant may, at any time, propose additions to the List to the Secretariat. A non-Participant proposing an addition to the List may participate in the risk-classification procedure as if it were an interested Participant.
II. UPDATE OF THE LIST OF RISK CLASSIFICATIONS
6. Subject to the provisions of Article 15 of this Appendix, the List may be updated on an ad hoc basis in the event that either a Participant signals, in any form, its intention to apply another risk classification than that on the List, or a Participant needs a risk classification for a buyer/borrower that is not yet on the List ( 36 ) ( 37 ).
7. Any Participant shall, before any use of an alternative or new risk classification, send a request to the Secretariat for updating the List on the basis of an alternative or new risk classification. The Secretariat will circulate this request to all Participants within two working days, without mentioning the identity of the Participant who submitted the request.
8. A period of ten ( 38 ) working days is allowed for interested Participants either to agree to or to challenge any proposed change to the List; a failure to respond within this period is considered as an agreement to the proposal. If at the end of the ten-day period, no challenge has been made to the proposal, the proposed change in the List is deemed to have been agreed. The Secretariat will modify the List accordingly and send an OLIS message within five working days; the revised List shall be binding from the date of that message.
III. RESOLUTION OF DISAGREEMENTS
9. In the event of a challenge to a proposed risk classification, interested Participants shall, at an expert level, make their best efforts to come to an agreement on the risk classification within a further period of ten working days after notification of a disagreement. All means necessary to resolve the disagreement should be explored, with the assistance of the Secretariat if necessary (e.g. conference calls or face-to-face consultations). If interested Participants agree to a risk classification within this ten working-day period, they shall inform the Secretariat of the outcome upon which the Secretariat will update the List accordingly and send an OLIS message in the following five working days. The adjusted List shall be binding from the date of that message.
10. In case the disagreement is not resolved among the experts within ten working days, the issue will be referred to the Participants for decision on an appropriate risk classification, in a period that shall not exceed five working days.
11. In the absence of a final agreement, a Participant may have recourse to a CRA to determine the risk classification of the buyer/borrower. In such cases, the Chairman of the Participants shall address a communication on behalf of the Participants to the buyer/borrower, within ten working days. The communication shall include the terms of reference for the risk assessment consultation as agreed among the Participants. The resulting risk classification will be registered in the List and become binding immediately following the Secretariat's OLIS message to finalise the update procedure within five working days.
12. Unless otherwise agreed, the cost of such recourse to a CRA shall be borne by the interested buyer/borrower.
13. During the procedures set out in Articles 9 to 11 of this Appendix, the prevailing risk classification (when available on the List) shall remain applicable.
IV. VALIDITY PERIOD OF CLASSIFICATIONS
14. The valid risk classifications are the prevailing risk classifications as recorded in the List maintained by the Secretariat; indications and commitments of premium rates shall only be made in accordance with those risk classifications.
15. Risk classifications have a 12-month maximum validity period from the date recorded in the List by the Secretariat for the purpose of the Participants providing indication and final commitments of premium rates; the validity period for a specific transaction may be extended by an additional 18 months once a commitment or a final commitment has occurred and premium holding fees are charged. Risk classifications may be subject to revision during the 12-month validity period in case of material changes to the risk profile of the buyer/borrower, such as a modification of a rating delivered by a CRA.
16. Unless any Participant requests its update, at least 20 working days before the end of the relevant risk classification validity period, the Secretariat shall remove that risk classification from the next succeeding updated List. The Secretariat will circulate this update request to all Participants within two working days, without mentioning the identity of the Participant who submitted the request, and the procedures set out in Articles 9 to 11 of this Appendix shall apply.
V. BUYER/BORROWER RISK CLASSIFICATION REQUEST
17. If, at the campaign stage, a buyer/borrower requests an indication of its risk classification and if it is not yet on the List, that buyer/borrower may ask for an indicative risk classification from a CRA at its own expense. This risk classification shall not be included in the List; it may be used by the Participants as a basis for their own risk assessment.
SECTION 2
Minimum premium rates for new and used aircraft
I. ESTABLISHMENT OF THE MINIMUM PREMIUM RATES
18. Articles 19 to 61 of this Appendix set out the minimum premium rates corresponding to the risk classification of a buyer/borrower (or, if a different entity, the primary source of repayment of the transaction).
19. The Participants may provide official support at or above the minimum premium rate provided that all the conditions below are fulfilled:
The transaction is asset-backed, meeting all of the following criteria:
A first priority security interest on or in connection with the aircraft and engines.
In the case of a lease structure, assignment and/or a first priority security interest in connection with the lease payments.
Cross default and cross collateralisation of all aircraft and engines owned legally and beneficially by the same parties under the proposed financing, whenever possible under the applicable legal regime.
The transaction is structured to include, as a minimum, risk mitigants as set out in Table 1 below:
Table 1
Risk Mitigants
ASU Risk Category |
Risk Ratings |
Risk Mitigants |
|
TOTAL |
Of which at least ‘A’ |
||
1 |
AAA to BBB- |
0 |
0 |
2 |
BB+ and BB |
0 |
0 |
3 |
BB- |
1 |
1 |
4 |
B+ |
2 |
1 |
5 |
B |
2 |
1 |
6 |
B- |
3 |
2 |
7 |
CCC |
4 |
3 |
8 |
CC to C |
4 |
3 |
20. For purposes of Article 19 of this Appendix:
The Participants may select from the following risk mitigants:
Reduced advance rate: each reduction of five percentage points from the advance rates referred to in Articles 10(a) and (b) of this Sector Understanding is equivalent to one ‘A’ risk mitigant. In this case, the Participant shall not provide official support in any form in excess of the reduced advance rate.
Straight line amortisation: repayment of principal in equal instalments is equivalent to one risk mitigant.
Reduced repayment term: a repayment term which does not exceed 10 years is equivalent to one risk mitigant, irrespective of the maximum repayment term allowed.
Security deposit: each security deposit in an amount equal to one quarterly instalment of principal and interest is equivalent to one risk mitigant. The security deposit can be in the form of cash or a standby letter of credit.
Lease payments in advance: lease payments in an amount equal to one quarterly instalment of principal and interest shall be paid one quarter in advance of each repayment date.
Maintenance reserves in a form and amount reflective of market best practices.
Subject to a prior notification, up to one of the ‘A’ risk-mitigants may be replaced by a 15 % surcharge on the applicable minimum premium rate.
21. Minimum premium rates to be applied to a transaction can be set prior to delivery, either at commitment, final commitment or otherwise at the commencement of a premium holding period with a defined duration. Final upfront premium rate, per annum spread, or a combination thereof to be applied to the transaction will comply with the minimum premium rate so established as well as mandatory risk mitigants prescribed in Article 19(b) of this Appendix as of the date on which the minimum premium rates were set. Such terms shall apply for the full length of the premium holding period and may only be revised following the expiry of that period, at which time the minimum premium rates and mandatory risk mitigants prescribed by the ASU then in force will apply and may be set for a subsequent premium holding period.
22. Pursuant to Article 11 of this Sector Understanding, the minimum premium rates to be applied are composed of minimum risk-based rates (RBR) to which a market reflective surcharge (MRS) shall be added, in accordance with Articles 23 to 36 below.
23. As of the entry into force of this Sector Understanding, the RBRs are:
Table 2
Risk-Based Rates
ASU Risk Category |
Spreads (bps) |
Upfront (%) |
1 |
89 |
4,98 |
2 |
98 |
5,49 |
3 |
116 |
6,52 |
4 |
133 |
7,49 |
5 |
151 |
8,53 |
6 |
168 |
9,51 |
7 |
185 |
10,50 |
8 |
194 |
11,03 |
24. The RBRs rates shall be reset on an annual basis, based on 4-year moving average of the annual Moody's Loss Given Default (LGD). The appropriate LGD for this reset is based on the 1st Lien Senior Secured Bank Loans, and shall be calculated as follows:
Table 3
LGD Mapping
4-year Moving Average |
LGD Considered |
≥ 45 % |
25 % |
≥ 35 % < 45 % |
23 % |
≥ 30 % < 35 % |
21 % |
< 30 % |
19 % |
25. A RBR adjustment factor shall be determined as follows:
26. The RBR adjustment factor shall be multiplied by the RBRs set out in Table 2 above, in order to determine the reset RBRs.
27. The first reset process will take place in the first quarter of 2012 and the resulting RBRs will become effective as of 15 April 2012.
28. The RBRs resulting from subsequent reset processes will be effective as of 15 April of each following year. Once the RBRs resulting from the annual reset have been determined, the Secretariat shall inform immediately all Participants of the applicable rates and make them publicly available.
29. For each risk category, a Market Reflective Surcharge shall be calculated as follows:
MRS = B * [(0,5 * MCS) – RBR]
where:
30. Where risk categories include more than one risk rating, the spreads shall be averaged. In risk category 1, the BBB- spread shall be used.
31. The MCS spreads shall be discounted by 50 % to account for the asset-security. The MCS discounted spreads shall then be adjusted by a blend factor ranging from 70 % to 35 % as per Table 4 below, applied on the difference between the MCS discounted spreads and the RBR. Any negative spreads resulting from the blending shall not be deducted.
Table 4
Blend Factors
Risk-Ratings |
ASU Risk Category |
Blend Factor (%) |
AAA |
1 |
70 |
AA |
1 |
70 |
A |
1 |
70 |
BBB+ |
1 |
70 |
BBB |
1 |
70 |
BBB- |
1 |
70 |
BB+ |
2 |
65 |
BB |
2 |
65 |
BB- |
3 |
50 |
B+ |
4 |
45 |
B |
5 |
40 |
B- |
6 |
35 |
CCC |
7 |
35 |
CC |
8 |
35 |
C |
8 |
35 |
32. The MRS shall be updated on a quarterly basis, as follows:
33. The MRS shall be applied only if and when it is positive and exceeds 25 basis points.
34. The increase in minimum premium rates resulting from the MRS update shall not exceed 10 % of the previous quarterly minimum premium rates. The minimum premium rates (which result from adding the risk-based rates and the market reflective surcharge) shall not exceed the risk-based rates by more than 100 %.
35. In order to determine the minimum premium rates:
36. The applicable minimum premium rates as of the initial effective date of this Sector Understanding (1 February 2011) are set out in Table 5 below.
Table 5
Minimum Premium Rates
(12-year repayment term, asset-backed transactions)
Risk Category |
Risk Classification |
Minimum Premium Rates |
|
Per Annum Spreads (bps) |
Up-Front (%) |
||
1 |
AAA to BBB- |
137 |
7,72 |
2 |
BB+ and BB |
184 |
10,44 |
3 |
BB- |
194 |
11,03 |
4 |
B+ |
208 |
11,85 |
5 |
B |
234 |
13,38 |
6 |
B- |
236 |
13,50 |
7 |
CCC |
252 |
14,45 |
8 |
CC to C |
257 |
14,74 |
II. REDUCTIONS OF THE MINIMUM PREMIUM
37. Subject to the provisions of Article 38 of this Appendix, a reduction of the minimum premium rates established in accordance with sub-Section I above shall be allowed if:
The asset-backed transaction relates to an aircraft object within the meaning of the Cape Town Protocol on Matters Specific to Aircraft Equipment,
The operator of the aircraft object (and, if different, the borrower/buyer or lessor if, in the view of the Participant providing the official support, the structure of the transaction so warrants) is situated in a State which, at the time of disbursement in respect of the aircraft object, appears on the list of States which qualify for the reduction of the minimum premium rates (‘Cape Town List’), and where applicable, in a territorial unit of that State that qualifies under Article 40 of this Appendix, and
The transaction relates to an aircraft object registered on the International Registry established pursuant to the Cape Town Convention, and the Aircraft Protocol thereto (Cape Town Convention or CTC).
38. The reduction of the minimum premium rates established in accordance with sub-Section I above shall not exceed 10 % of the applicable minimum premium rate.
39. In order to be included on the Cape Town List, a State shall:
Be a Contracting Party to the Cape Town Convention;
Have made the qualifying declarations set out in Annex 1 to this Appendix; and
Have implemented the Cape Town Convention, including the qualifying declarations, in its laws and regulations, as required, in such a way that the Cape Town Convention commitments are appropriately translated into national law.
40. To qualify under Article 37 of this Appendix, a territorial unit shall:
Be a territorial unit to which the Cape Town Convention has been extended;
Be a territorial unit in respect of which the qualifying declarations set out in Annex 1 to this Appendix apply; and
Have implemented the Cape Town Convention, including the qualifying declarations, in its laws and regulations, as required, in such a way that the Cape Town Convention commitments are appropriately translated into national law.
41. An initial agreed Cape Town List shall be provided by the Participants to the Secretariat prior to the entry into force of this Sector Understanding. Updates to the Cape Town List shall be made in accordance with Articles 42 to 54 of this Appendix.
42. Any Participant or non-Participant which provides official support for aircraft may propose to the Secretariat the addition of a State to the Cape Town List. Such proposal shall include, with respect to such State:
All the relevant information in respect of the date of deposit of the Cape Town Convention ratification or accession instruments with the Depositary;
A copy of the declarations made by the State which is proposed to be added to the Cape Town List;
All relevant information in respect of the date on which the Cape Town Convention and the qualifying declarations have entered into force;
An analysis which outlines the steps that the State which is proposed to be added to the Cape Town List has taken to implement the Cape Town Convention including the qualifying declarations in its laws and regulations, as required to ensure that the Cape Town Convention commitments are appropriately translated into national law; and
A duly completed questionnaire, the form of which is attached at Annex 2 of this Appendix (‘CTC Questionnaire’) completed by at least one law firm qualified to give legal advice in relation to the relevant jurisdiction of the State which is proposed to be added to the Cape Town List. The completed CTC Questionnaire shall specify:
The name(s) and office address(es) of the responding law firm(s);
The law firm's relevant experience, which could include experience in legislative and constitutional processes as they relate to the implementation of international treaties in the State, and specific experience in CTC related issues including any experience in advising either a government on implementation and enforcement of the Cape Town Convention or the private sector, or enforcement of creditor's rights in the State which is proposed to be added to the Cape Town List;
Whether the law firm is involved or intends to be involved in any transactions that may benefit from a reduction of minimum premium rates if the proposed State is added to the CTC list ( 39 ); and
The date on which the CTC Questionnaire has been completed.
43. The Secretariat shall circulate an OLIS message within five working days containing the proposal.
44. Any Participant or non-Participant which provides official support for aircraft may propose that a State be removed from the Cape Town List if they are of the view that such State has taken actions that are inconsistent with, or failed to take actions that are required by virtue of, that State's Cape Town Convention commitments. To that end, the Participant or non-Participant shall include in a proposal for removal from the Cape Town List, a full description of the circumstances that have given rise to the proposal for deletion, such as any State actions that are inconsistent with its Cape Town Convention commitments, or any failure to maintain or enforce legislation required by virtue of that State's Cape Town Convention commitments. The Participant or non-Participant who submits the proposal for removal from the Cape Town List shall provide any supporting documentation that may be available, and the Secretariat shall circulate an OLIS message within five working days containing such proposal.
45. Any Participant or non-Participant which provides official support for aircraft may propose the reinstatement of a State that has been previously removed from the Cape Town List, where such reinstatement is justified by subsequent corrective actions or events. Such a proposal shall be accompanied by a description of the circumstances that gave rise to the removal of the State as well as a report of the subsequent corrective actions in support of reinstatement. The Secretariat shall circulate an OLIS message within five working days containing such proposal.
46. The Participants may either agree to or challenge a proposal brought forward under Articles 42 to 45 of this Appendix within 20 working days from the date of submission of the proposal (‘Period 1’).
47. If at the end of Period 1, and in the case of Article 44 of this Appendix unless the proposal has been withdrawn by the proposing Participant or non-Participant providing evidence of corrective actions or events, no challenge has been made to the proposal, the proposed update to the Cape Town List is deemed to have been accepted by all Participants. The Secretariat will modify the Cape Town List accordingly and send an OLIS message within five working days. The updated Cape Town List shall take effect on the date of that message.
48. In the event of a challenge to the proposed update of the Cape Town List, the challenging Participant or Participants shall, within Period 1, provide a written explanation of the basis of the challenge. Following circulation by the OECD Secretariat to all Participants of the written challenge, the Participants shall make best efforts to come to an agreement within a further ten working day period (‘Period 2’).
49. The Participants shall inform the Secretariat of the outcome of their discussions. If an agreement is reached during Period 2, the Secretariat will, if necessary, update the Cape Town List accordingly and send an OLIS message in the following five working days. The updated Cape Town List shall take effect on the date of that message.
50. If no agreement is reached during Period 2, the Chairman of the Participants to this Sector Understanding (hereafter ‘the Chairman’) will make her/his best efforts to facilitate a consensus between the Participants, within twenty working days (‘Period 3’) immediately following Period 2. If at the end of Period 3, no consensus is reached, a final resolution shall be achieved through the following procedures:
The Chairman shall make a written recommendation with respect to the proposed update of the Cape Town List. The Chairman's recommendation shall reflect the majority view emerging from the views openly expressed by at least the Participants which provide official support for aircraft exports. In the absence of a majority view, the Chairman shall make a recommendation based exclusively on the views expressed by the Participants and shall set out in writing the basis for the recommendation, including in the case of ineligibility, the eligibility criteria that were not met.
The Chairman's recommendation shall not disclose any information relating to Participants' views or positions expressed in the context of the process set out in Articles 42 to 51 of this Appendix, and
The Participants shall accept the recommendation of the Chairman.
51. If, following a proposal submitted under Article 42 of this Appendix, the Participants or Chairman has determined that a State is not eligible to be added to the Cape Town List, a Participant or non-Participant may submit another proposal requesting that the Participants reconsider the State's eligibility. The proposing Participant or non-Participant shall address the reasons substantiating the original determination of ineligibility. The proposing Participant or non-Participant shall also obtain and provide an updated CTC questionnaire. This new proposal shall be subject to the process set out in Articles 46 to 52 of this Appendix.
52. In the event of any change to the list of qualified countries pursuant to the procedures set out in Article 50 of this Appendix, the Secretariat shall issue an OLIS message containing the updated Cape Town List within five working days of such change. The updated Cape Town List shall take effect on the date of that message.
53. The addition, withdrawal or reinstatement of a State to the Cape Town List after disbursement in respect of an aircraft shall not affect MPRs established regarding such aircraft.
54. In the context of the process set out in Articles 42 to 52 of this Appendix, the Participants shall not disclose any information relating to views or positions expressed.
55. The Participants shall monitor the implementation of Articles 42 to 54 of this Appendix and review it in the first half of 2012, annually thereafter or upon the request of any Participant.
56. For new and used aircraft, the following adjustments to the applicable minimum premium rates may be applied:
A discount of five basis points (per annum spreads) or 0,29 % (up-front) to the applicable minimum premium rates may be applied for officially supported transactions in the form of conditional insurance cover.
The minimum premium rates shall be applied on the covered principal amount.
III. NON-ASSET-BACKED TRANSACTIONS
57. Notwithstanding the provisions of Article 19(a) of this Appendix, the Participants may provide officially supported export credits for non-asset backed transactions, provided either of the following conditions is fulfilled:
In the case of non-sovereign transactions:
The maximum value of the export contract receiving official support is USD 15 million;
The maximum repayment term shall be 10 years;
No third party has a security interest in the assets being financed; and
A minimum surcharge of 30 % shall be applied to the minimum premium rates established in accordance with sub-Section I above.
In the case of a transaction with a sovereign or backed by an irrevocable and unconditional sovereign guarantee, a minimum surcharge shall, in accordance with Table 6 below, be applied to the minimum premium rates set out in accordance with sub-Section I above.
Table 6
Risk Category |
Surcharge (%) |
1 |
0 |
2 |
0 |
3 |
0 |
4 |
10 |
5 |
15 |
6 |
15 |
7 |
25 |
8 |
25 |
58. The provisions of Articles 37 to 53 of this Appendix do not apply to officially supported export credits provided pursuant to Article 57 of this Appendix.
SECTION 3
Minimum premium rates for goods and services other than used aircraft covered by Part 3 of this Sector Understanding
59. When providing official support for all goods and services other than used aircraft covered by Part 3 of this Sector Understanding, the minimum premium rates shall be as follows:
In the case of asset-backed transactions, the minimum premium rates shall be equal to the prevailing minimum spreads established in accordance with sub-Section I above and, in the case of pure cover, converted to upfront fees using the conversion model and the appropriate tenor.
In the case of non-asset-backed transactions, the minimum premium rates shall be equal to the prevailing minimum spreads established in accordance with sub-Section I above to which a surcharge of 30 % will be added, and, in the case of pure cover, converted to upfront fees using the conversion model and the appropriate tenor.
60. The provisions of Articles 37 to 53 of this Appendix shall apply to official support for asset-backed spare engines covered by Article 20(a) and (c) of this Sector Understanding and support under the first tiret of Article 21(a)(1) of this Sector Understanding.
61. The provision of Article 56 of this Appendix shall also apply to official support for all goods and services other than used aircraft covered by Part 3 of this Sector Understanding.
ANNEX 1
QUALIFYING DECLARATIONS
1. For the purpose of Section 2 of Appendix II, the term ‘qualifying declarations’, and all other references thereto in this Sector Understanding, means that a Contracting party to the Cape Town Convention (Contracting Party):
Has made the declarations in Article 2 of this Annex, and
Has not made the declarations in Article 3 of this Annex.
2. The declarations for the purpose of Article 1(a) of this Annex are:
Insolvency: State Party declares that it will apply the entirety of Alternative A under Article XI of the Aircraft Protocol to all types of insolvency proceeding and that the waiting period for the purposes of Article XI(3) of that Alternative shall be no more than 60 calendar days.
Deregistration: State Party declares that it will apply Article XIII of the Aircraft Protocol.
Choice of Law: State Party declares that it will apply Article VIII of the Aircraft Protocol.
And at least one of the following (though both are encouraged):
Method for Exercising Remedies: State Party declares under Convention Article 54(2) that any remedies available to the creditor under any provision of the Convention which are not expressed under the relevant provisions thereof to require application to a court may be exercised without leave of the court (the insertion ‘without court action and’ to be recommended (but not required) before the words ‘leave of the court’);
Timely Remedies: State Party declares that it will apply Article X of the Aircraft Protocol in its entirety (though clause 5 thereof, which is to be encouraged, is not required) and that the number of working days to be used for the purposes of the time-limit laid down in Article X(2) of the Aircraft Protocol shall be in respect of:
The remedies specified in Articles 13(1)(a), (b) and (c) of the Convention (preservation of the aircraft objects and their value; possession, control or custody of the aircraft objects; and immobilisation of the aircraft objects), not more than that equal to ten calendar days, and
The remedies specified in Articles 13(1)(d) and (e) of the Convention (lease or management of the aircraft objects and the income thereof and sale and application of proceeds from the aircraft equipment), not more than that equal to 30 calendar days.
3. The declarations referred to in Article 1(b) of this Annex are the following:
Relief Pending Final Determination: State Party shall not have made a declaration under Article 55 of the Convention opting out of Article 13 or Article 43 of the Convention; provided, however, that, if State Party made the declarations set out under Article 2(d) of this Annex, the making of a declaration under Article 55 of the Convention shall not prevent application of the Cape Town Convention discount.
Rome Convention: State Party shall not have made a declaration under Article XXXII of the Aircraft Protocol opting out of Article XXIV of the Aircraft Protocol; and
Lease Remedy: State Party shall not have made a declaration under Article 54(1) of the Convention preventing lease as a remedy.
4. Regarding Article XI of the Aircraft Protocol, for Member States of the European Union, the qualifying declaration set out in Article 2(a) of this Annex shall be deemed made by a Member State, for purposes hereof, if the national law of such Member State was amended to reflect the terms of Alternative A under Article XI of the Aircraft Protocol (with a maximum 60 calendar days waiting period). As regards the qualifying declarations set out in Articles 2(c) and (e) of this Annex, these shall be deemed satisfied, for the purpose of this Sector Understanding, if the laws of the European Union or the relevant Member States are substantially similar to that set out in such Articles of this Annex. In the case of Article 2(c) of this Annex, the laws of the European Union (EC Regulation (EC) No 593/2008 on the Law Applicable to Contractual Obligations) are agreed to be substantially similar to Article VIII of the Aircraft Protocol.
ANNEX 2
CAPE TOWN CONVENTION QUESTIONNAIRE
I. PRELIMINARY INFORMATION
Please provide the following information:
The name and full address of the law firm completing the questionnaire.
The law firm's relevant experience, which could include experience in legislative and constitutional processes as they relate to the implementation of international treaties in the State, and specific experience in CTC related issues including any experience in advising either a government on implementation and enforcement of the Cape Town Convention or the private sector, or enforcement of creditor's rights in the State which is proposed to be added to the Cape Town List;
Whether the law firm is involved or intends to be involved in any transactions that may benefit from a reduction of minimum premium rates if the proposed State is added to the CTC list ( 40 );
The date on which this questionnaire was completed.
II. QUESTIONS
1. Qualifying declarations
1.1 Has the State ( 41 ) made each of the qualifying declarations in accordance with the requirements of Annex 1 to Appendix II of the Sector Understanding on Export Credits for Civil Aircraft (‘ASU’) (each a ‘Qualifying Declaration’)? In particular, regarding the declarations concerning ‘Method for Exercising Remedies’ (Article 2(d)) and ‘Timely Remedies’ (Article 2(e)), please specify if one or both of these have been made.
1.2 Please describe the way in which the declarations made differ, if at all, from the requirements referred to in Question 1.1.
1.3 Please confirm that the State has not made any of the declarations listed in Article 3 of Annex 1 to Appendix II of the ASU.
2. Ratification
2.1 Has the State ratified, accepted, approved or acceded to the Cape Town Convention and Aircraft Protocol (‘Convention’)? Please could you state the date of ratification/accession and briefly describe the State's process of accession to or ratification of the Convention?
2.2 Do the Convention and Qualifying Declarations (‘QD’) made have the force of law in the whole territory of the State without any further act, implementing legislation or the passing of any further law or regulation?
2.3 If so, please briefly explain the process that gives the Convention and QDs the force of law.
3. Effect of national and local law
3.1 Describe and list, if applicable, the implementing legislation and regulation(s) with respect to the Convention and each QD made by the State.
3.2 Would the Convention and QDs made, as translated into national law ( 42 ) (‘Convention and QDs’), overrule or have priority over any conflicting national law, regulation, order, judicial precedent or regulatory practice. If so, please describe the process by which this happens ( 43 ), and if not, please provide details.
3.3 Are there any existing gaps in the implementation of the Convention and QDs? If so, please describe ( 44 ).
4. Court and administrative decisions
4.1 Please describe any matters, including judicial, regulatory, or administrative practice which could be expected to result in the courts, authorities or administrative bodies failing to give full force and effect to the Convention and QDs ( 45 ) ( 46 ).
4.2 To your knowledge, has there been any judicial or administrative enforcement action taken by a creditor under the Convention? If so, please describe the action and indicate whether it was successful.
4.3 To your knowledge, since ratification/implementation, have the courts in that State refused in any instance to enforce loan obligations of a debtor or guarantor in the State contrary to the Convention and QDs?
4.4 To your knowledge, are there any other matters that may impact whether courts and administrative bodies should be expected to act in a manner consistent with the Convention and QDs? If so, please specify.
Appendix III
Minimum interest rates
The provision of official financing support shall not offset or compensate, in part or in full, for the appropriate premium rate to be charged for the risk of non-repayment pursuant to the provisions of Appendix II.
1. MINIMUM FLOATING INTEREST RATE
The minimum floating interest rate shall be, as appropriate, the EURIBOR, the Bank Bill Swap Rate, i.e. BBSY, the London Inter-Bank Offered Rate, i.e. LIBOR, as compiled by the British Bankers' Association (BBA) with the currency and the maturity corresponding to the frequency of interest payment of officially supported export credit, or the Canadian Dealer Offered Rate (CDOR), to which a margin benchmark calculated in accordance with Article 8 of this Appendix, shall be added.
The floating interest rate setup mechanism shall vary according to the repayment profile chosen, as follows:
When the repayment of principal and the payment of interest are combined in equal instalments, the relevant EURIBOR/BBSY/LIBOR/CDOR effective two business days prior to the loan drawdown date, according to the relevant currency and payment frequency shall be used to calculate the entire payment schedule, as if it were a fixed rate. The principal payment schedule shall then be fixed as well as the first interest payment. The second interest payment, and so on, shall be calculated based on the relevant EURIBOR/BBSY/LIBOR/CDOR effective two business days before the prior payment date over the outstanding principal balance initially established.
When the repayment of principal is made in equal instalments, the relevant EURIBOR/BBSY/LIBOR/CDOR, according to the relevant currency and payment frequency, effective two business days before the loan drawdown date and prior to each payment date shall be used to calculate the following interest payment over the outstanding principal balance.
Where official financing support is provided for floating rate loans, buyers/borrowers may have the option to switch from a floating rate to a fixed rate provided that the following conditions are fulfilled:
The option is restricted to switching to the swap rate only;
The option to switch shall only be exercised upon request, only once, and shall be reported accordingly with a reference to the reporting form initially sent to the Secretariat pursuant to Article 24 of this Understanding.
2. MINIMUM FIXED INTEREST RATE
The minimum fixed interest rate shall be either:
The swap rate, concerning the relevant currency of the officially supported export credit and with a maturity equal to the interpolated rate for the two closest available annual periods to the weighted average life of the loan. The interest rate shall be set two business days prior to each drawdown date.
OR
The Commercial Interest Reference Rate (CIRR) established according to the provisions set out in Articles 3 to 7 of this Appendix,
to which, in both cases, the margin benchmark, calculated in accordance with Article 8(f) of this Appendix, shall be added.
3. CONSTRUCTION OF CIRR
A CIRR is established for any of the eligible currencies set out in Article 9 of this Sector Understanding and calculated by adding a fixed margin of 120 basis points to one of the following three yields (the base rates):
Five-year government bond yields for a repayment term up to and including nine years,
Seven-year government bond yields for over nine and up to and including 12 years, or
Nine-year government bond yields for over 12 and up to and including 15 years.
CIRR shall be calculated monthly using data from the previous month and notified to the Secretariat, no later than five days after the end of each month. The Secretariat shall then inform immediately all Participants of the applicable rates and make them publicly available. CIRR shall take effect on the 15th day of each month.
A Participant or a non-Participant may request that a CIRR be established for the currency of a non-Participant. In consultation with the non-Participant, a Participant or the Secretariat on behalf of that non-Participant may make a proposal for the construction of the CIRR in that currency using the Common Line procedures set out in Articles 28 to 33 of this Sector Understanding.
4. VALIDITY PERIOD OF CIRR
Holding the CIRR: the CIRR applying to a transaction shall not be held for a period longer than six months from its selection (export contract date or any application date thereafter) to the credit agreement date. If the credit agreement is not signed within that limit, and the CIRR is reset for an additional six months, the new CIRR shall be committed at the rate prevailing at the date of reset.
After the credit agreement date, the CIRR shall be applied for drawing periods which do not exceed six months. After the first six-month drawing period, the CIRR is reset for the next six months; the new CIRR shall be the one prevailing at the first day of the new six-month period and cannot be lower than the CIRR originally selected (procedure to be replicated for each subsequent six-month period of drawings).
5. APPLICATION OF MINIMUM INTEREST RATES
Within the provisions of the credit agreement the borrower shall not be allowed an option to switch from an officially supported floating rate financing to a pre-selected CIRR financing, nor be allowed to switch between a pre-selected CIRR and the short term market rate quoted on any interest payment date throughout the life of the loan.
6. EARLY REPAYMENT OF FIXED INTEREST RATE LOANS
In the event of a voluntary, early repayment of a fixed interest rate loan as determined in Article 2 of this Appendix, or any portion thereof or when the CIRR applied under the credit agreement is modified into a floating or a swap rate, the borrower shall compensate the institution providing official financing support for all costs and losses incurred as a result of such actions, including the cost to the government institution of replacing the part of the fixed rate cash inflow interrupted by the early repayment.
7. IMMEDIATE CHANGES IN INTEREST RATES
When market developments require the notification of an amendment to a CIRR during the course of a month, the amended rate shall be implemented ten working days after notification of this amendment has been received by the Secretariat.
8. MARGIN BENCHMARK
A three-month LIBOR margin benchmark shall be calculated monthly in accordance with paragraph (b), using data notified to the Secretariat in accordance with paragraph (c), and shall take effect on the 15th day of each month. Once calculated, the margin benchmark shall be notified by the Secretariat to the Participants and shall be made publicly available.
The three-month LIBOR margin benchmark shall be a rate equivalent to the average of the lowest 50 % of the margins over: (i) three-month LIBOR charged for floating rate transactions and (ii) three-month LIBOR as interpolated by swapping the fixed rate issuance to a floating rate equivalent charged for fixed rate transactions or capital market issuances. In either case, the margins included in the monthly benchmark reports submitted by relevant Participants shall be those from the three full calendar months preceding the effective date set out in paragraph (a) above. Transactions/issuances that are used in the calculation of the margin benchmark shall meet the following conditions:
100 % unconditional guarantee transactions denominated in US dollars; and
Official support provided in respect of aircraft valued at or above USD 35 million (or its equivalent in any other eligible currency).
Participants shall report a margin at the time it becomes known and that margin will remain on the Participant's margin benchmark report for three full calendar months. In the case of individual transactions with multiple pricing events, there shall be no attempt to match subsequent pricing events to ex post notifications.
Participants shall notify transactions as of the date on which the long-term margin is realised. For bank mandated deals (including PEFCO), the date on which the margin is realised would be the earliest of the following: (i) issuance of a final commitment by the Participant, (ii) setting of the margin post-commitment, (iii) loan drawdown, and (iv) setting of the long-term margin post-drawdown. In the case of several drawdowns occurring under the same bank mandate at the same margin, notification shall only be made in respect of the first aircraft. For loans funded by way of capital market issuance, the date on which the margin is realised shall be the date on which the long-term rate is set which is typically the bond issuance date. In the case of several drawdowns occurring under the same bond and at the same margin, notification shall only be made in respect of the first aircraft.
The three-month LIBOR margin benchmark shall be applicable to a floating rate transaction and shall be set at final commitment.
For a fixed rate transaction, the margin benchmark applicable to the transaction shall be determined by swapping the three-month LIBOR margin benchmark into an equivalent spread over the applicable fixed rate, as determined in Article 2 of this Appendix, on the final commitment date and shall be set as of that date.
The Participants shall monitor the margin benchmark and shall review the margin benchmark mechanism upon the request of any Participant.
Appendix IV
Reporting form
(a) Basic Information
1. Notifying country
2. Notification date
3. Name of notifying authority/agency
4. Identification number
(b) Buyer/Borrower/Guarantor Information
5. Name and country of buyer
6. Name and country of borrower
7. Name and country of guarantor
8. Status of buyer/borrower/guarantor, e.g. sovereign, private bank, other private
9. Risk classification of buyer/borrower/guarantor
(c) Financial Terms and Conditions
10. In what form is official support provided, e.g. pure cover, official financing support
11. If official financing support is provided, is it a direct credit/refinancing/interest rate support
12. Description of the transaction supported, including the manufacturer, aircraft model and number of aircraft; indication of whether the transaction falls under the transitional arrangements set out in Article 39(a) or (b) of this Understanding.
13. Final commitment date
14. Currency of credit
15. Credit amount, according to the following scale in USD millions:
Category |
Credit Amount |
I |
0-200 |
II |
200-400 |
III |
400-600 |
IV |
600-900 |
V |
900-1 200 |
VI |
1 200 -1 500 |
VII |
1 500 -2 000 (*1) |
(*1)
Indicate the number of USD 300 million multiples in excess of USD 2 000 million. |
16. Percentage of official support
17. Repayment term
18. Repayment profile and frequency — including, where appropriate, weighted average life
19. Length of time between the starting point of credit and the first repayment of principal
20. Interest rates:
21. Total premium charged by way of:
22. In the case of direct credit/financing, fees charged by way of:
23. Premium holding period
24. In the case of pure cover, premium holding fees
25. Transaction structuring terms: risk mitigants/premium surcharge applied
26. As appropriate, an indication of the impact of the Cape Town Convention on the premium rate applied
Appendix V
List of definitions
All-In Cost Equivalence : the net present value of premium rates, interest rate costs and fees charged for a direct credit as a percentage of the direct credit amount is equal to the net present value of the sum of premium rates, interest rate costs and fees charged under pure cover as a percentage of the credit amount under pure cover.
Asset-Backed : a transaction that meets the conditions set out in 19(a) of Appendix II.
Buyer/Borrower : includes (but is not limited to) commercial entities such as airlines and lessors, as well as sovereign entities (or if a different entity, the primary source of repayment of the transaction).
Buyer Furnished Equipment : equipment furnished by the buyer and incorporated in the aircraft during the manufacture/refurbishment process, on or before delivery, as evidenced by the Bill of Sale from the manufacturer.
Cape Town Convention : refers to the Cape Town Convention on International Interests in Mobile Equipment and the Protocol thereto on Matters specific to Aircraft Equipment.
Commitment : any statement, in whatever form, whereby the willingness or intention to provide official support is communicated to the recipient country, the buyer, the borrower, the exporter or the financial institution, including without limitation, eligibility letters, marketing letters.
Common Line : agreement of the Participants for a given transaction, or in special circumstances on specific financial terms and conditions for official support; such common line shall prevail over the relevant provisions of this Sector Understanding only for the transaction or in the circumstances specified in the common line.
Conditional Insurance Cover : official support which in the case of a default on payment for defined risks provides indemnification to the beneficiary after a specified waiting period; during the waiting period the beneficiary does not have the right to payment from the Participant. Payment under conditional insurance cover is subject to the validity and the exceptions of the underlying documentation and of the underlying transaction.
Conversion : A major change in the type design of an aircraft through its conversion into a different type of aircraft (including the conversion of a passenger aircraft into a water bomber, cargo aircraft, search and rescue, surveillance aircraft, or business jet), subject to certification by the responsible Civil Aviation Authority.
Country Risk Classification : the prevailing country risk classification of the Participants to the Arrangement on Officially Supported Export Credits as published on the OECD website.
Credit Rating Agency : one of the internationally reputable rating agencies or any other rating agency that is acceptable to the Participants.
Engine Kits : a set of parts introduced to improve reliability, durability and/or on-wing performance procurement through introduction of technology.
Export Credit : an insurance, guarantee or financing arrangement which enables a foreign buyer of exported goods and/or services to defer payment over a period of time; an export credit may take the form of a supplier credit extended by the exporter, or of a buyer credit, where the exporter's bank or other financial institution lends to the buyer (or its bank).
Final Commitment : a final commitment exists when the Participant commits to precise and complete financial terms and conditions, either through a reciprocal agreement or by a unilateral act.
Firm Contract : an agreement between the manufacturer and the person taking delivery of the aircraft or engines as buyer, or, in connection with a sale-leaseback arrangement, as lessee under a lease with a term of at least five years, setting forth a binding commitment (excluding those relating to then unexercised options), where non-performance entails legal liability.
Interested Participant : a Participant which (i) provides official support for airframe or aircraft engines completely or partially manufactured in its territory, (ii) has an existing substantial commercial interest or has experience with the buyer/borrower concerned, or (iii) has been requested by a manufacturer/exporter to provide official support to the buyer/borrower in question.
Interest Rate Support : can take the form of an arrangement between on the one hand a government, or an institution acting for or on behalf of a government and, on the other hand, banks or other financial institutions which allows the provision of fixed rate export finance at or above the relevant minimum fixed interest rate.
Major Modification/Refurbishing : operations of reconfiguration or upgrading of either a passenger or cargo aircraft.
Net Price : the price for an item invoiced by the manufacturer or supplier thereof, after accounting for all price discounts and other cash credits, less all other credits or concessions of any kind related or fairly allocable thereto, as stated in a binding representation by each of the aircraft and engine manufacturers — the engine manufacturer representation is required only when it is relevant according to the form of the purchase agreement — or service provider, as the case may be, and supported by documentation required by the provider of official support to confirm that net price. All import duties and taxes (e.g. VAT) are not included in the net price.
New Aircraft : see Article 8(a) of this Sector Understanding.
Non-Asset-Backed : a transaction that does not meet the conditions set out in 19(a) of Appendix II.
Non-Sovereign Transaction : a transaction that does not meet the description set out in Article 57(b) of Appendix II.
Premium Holding Period : subject to Article 37(b) of Appendix II, period(s) during which a premium rate and related mandatory risk mitigants offered for a transaction are being maintained; not to exceed 18 months from the date it has been set until the final disbursement.
Premium Rate Conversion Model : model agreed by and made available to the Participants, to be used for the purpose of this Sector Understanding in order to convert up-front premium fees into spreads and vice versa, in which the interest rate and the discount rate used shall be 4,6 %; such rate shall be reviewed regularly by the Participants.
Prior Notification : a notification made at least ten calendar days before issuing any commitment, using the reporting form set out in Appendix IV.
Pure Cover : Official support provided by or on behalf of a government by a way of export credit guarantee or insurance only, i.e. which does not benefit from official financing support.
Repayment Term : the period beginning at the Starting Point of Credit and ending on the contractual date of the final repayment of principal.
Sovereign Transaction : a transaction that meets the description set out in Article 57(b) of Appendix II.
Starting Point of Credit : for the sale of aircraft including helicopters, spare engines and parts, at the latest the actual date when the buyer takes physical possession of the goods, or the weighted mean date when the buyer takes physical possession of the goods. For services, the latest starting point of credit is the date of the submission of the invoices to the client or acceptance of service by the client.
Swap Rate : a fixed rate equal to the semi-annual rate to swap floating rate debt to fixed rate debt (Offer side), posted on any independent market index provider, such as Telerate, Bloomberg, Reuters, or its equivalent, at 11:00 am New York time, two business days prior to the loan drawdown date.
Weighted Average Life : the time it takes to retire one-half of the principal of a credit; this is calculated as the sum of time (in years) between the starting point of credit and each principal repayment weighted by the portion of principal repaid at each repayment date.
ANNEX IV
SECTOR UNDERSTANDING ON EXPORT CREDITS FOR RENEWABLE ENERGY, CLIMATE CHANGE MITIGATION AND ADAPTATION, AND WATER PROJECTS
The purpose of this Sector Understanding is to provide adequate financial terms and conditions to projects in selected sectors identified including under international initiatives as significantly contributing to climate change mitigation, including renewable energy, greenhouse gas (GHG) emissions' reduction and high energy efficiency projects, climate change adaptation, as well as water projects. The Participants to this Sector Understanding agree that the financial terms and conditions of the Sector Understanding, which complements the Arrangement, shall be implemented in a way that is consistent with the Purpose of the Arrangement.
CHAPTER I
SCOPE OF THE SECTOR UNDERSTANDING
1. SCOPE OF APPLICATION FOR PROJECTS IN RENEWABLE ENERGY SECTORS ELIGIBLE TO APPENDIX I
This Sector Understanding sets out the financial terms and conditions that apply to officially supported export credits relating to contracts in the eligible sectors listed in Appendix I of this Sector Understanding for:
The export of complete renewable energies plants or parts thereof, comprising all components, equipment, materials and services (including the training of personnel) directly required for the construction and commissioning of such plants.
The modernisation of existing renewable energies plants in cases where the economic life of the plant is likely to be extended by at least the repayment period to be awarded. If this criterion is not met, the terms of the Arrangement apply.
This Sector Understanding does not apply to items located outside the power plant site boundary for which the buyer is usually responsible, in particular, water supply not directly linked to the power production plant, costs associated with land development, roads, construction villages, power lines and switchyard, as well as costs arising in the buyer's country from official approval procedures (e.g. site permits, construction permit), except:
In cases where the buyer of the switchyard is the same as the buyer of the power plant and the contract is concluded in relation to the original switchyard for that power plant, the terms and conditions for the original switchyard shall not exceed those for the renewable energies power plant; and
The terms and conditions for sub-stations, transformers and transmission lines with a minimum voltage threshold of 60 kV located outside the renewable energies power plant site boundary shall not be more generous than those for the renewable energies power plant.
2. SCOPE OF APPLICATION FOR PROJECTS IN CLIMATE CHANGE MITIGATION SECTORS ELIGIBLE TO APPENDIX II
This Sector Understanding sets out the financial terms and conditions that apply to officially supported export credits relating to contracts in a sector listed in Appendix II of this Sector Understanding. This list of sectors and, when applicable, corresponding technology-neutral performance criteria used to define a project's eligibility, may be modified over time in accordance with the review provisions set out in Article 12 of this Sector Understanding.
Such contracts shall relate to the export of complete projects or parts thereof, comprising all components, equipment, materials and services (including the training of personnel) directly required for the construction and commissioning of an identifiable project, providing that:
The project should result in low to zero carbon emissions, or CO2 equivalent, and/or in high energy efficiency;
The project should be designed to meet, as a minimum, the performance standards as set out in Appendix II; and
The terms and conditions provided shall be extended only to address specific financial disadvantages encountered by a project, and shall be based on the individual financial needs and specific market conditions of each project.
3. SCOPE OF APPLICATION FOR ADAPTATION PROJECTS ELIGIBLE TO APPENDIX III
This Sector Understanding sets out the financial terms and conditions that apply to officially supported export credits relating to contracts for projects which meet the criteria set out in Appendix III of this Sector Understanding.
Such contracts shall relate to the export of complete projects or parts thereof, comprising all components, equipment, materials and services (including the training of personnel) directly required for the execution and commissioning of an identifiable project, providing that:
The conditions set out in Appendix III are met;
The terms and conditions provided shall be extended only to address specific financial disadvantages encountered by a project, and shall be based on the individual financial needs and specific market conditions of each project.
This Sector Understanding applies to the modernisation of existing projects, to take into consideration adaptation concerns, in cases where the economic life of the project is likely to be extended by at least the repayment period to be awarded. If this criterion is not met, the terms of the Arrangement apply.
4. SCOPE OF APPLICATION FOR WATER PROJECTS
This Sector Understanding sets out the financial terms and conditions that apply to officially supported export credits relating to contracts for the export of complete projects or parts thereof related to the supply of water for human use and wastewater treatment facilities:
Infrastructure for the supply of drinking water to municipalities, including to households and small businesses, i.e. water purification for the purpose of obtaining drinking water and distribution network (including leakage control).
Wastewater collection and treatment facilities, i.e. collection and treatment of household and industrial wastewater and sewage, including processes for the re-use or recycling of water and the treatment of sludge directly associated with these activities.
The modernisation of such facilities in cases where the economic life of the plant is likely to be extended by at least the repayment period to be awarded. If this criterion is not met, the provisions of the Arrangement apply.
CHAPTER II
PROVISIONS FOR EXPORT CREDITS
5. MAXIMUM REPAYMENT TERMS
For officially supported export credits relating to contracts in the sectors listed in Appendix I, and for water projects defined in Article 4 of this Sector Understanding, the maximum repayment term is 18 years.
For officially supported export credits relating to contracts of a value of at least SDR 10 million in the project classes listed in Appendix II, the maximum repayment term is set out as follows:
For contracts in Project Class A: 18 years.
For contracts in Project Class B and Project Class C: 15 years.
For officially supported export credits relating to contracts of a value of less than SDR 10 million in the project classes listed in Appendix II, the maximum repayment term is set out as follows:
For Category I countries as defined in Article 11 of the Arrangement, the maximum repayment term is five years, with the possibility of agreeing up to eight-and-a-half years when the procedures for prior notification set out in Article 10 of this Sector Understanding are followed.
For Category II countries, the maximum repayment term is 10 years.
Notwithstanding subparagraphs (1) and (2) above, for non-nuclear power plants as defined in Article 13 of the Arrangement, the maximum repayment term is 12 years.
For officially supported export credits relating to contracts of a value of at least SDR 10 million for projects supported in conformity with Appendix III, the maximum repayment term is 15 years.
6. REPAYMENT OF PRINCIPAL AND PAYMENT OF INTEREST
The Participants shall apply a profile of repayment of principal and payment of interest as specified in subparagraphs (1) or (2) below:
Repayment of principal shall be made in equal instalments.
Repayment of principal and payment of interest combined shall be made in equal instalments.
Principal shall be repaid and interest shall be paid no less frequently than every six months and the first instalment of principal and interest shall be made no later than six months after the starting point of credit.
On an exceptional and duly justified basis, official support may be provided on terms other than those set out in paragraphs (a) and (b) above. The provision of such support shall be explained by an imbalance in the timing of the funds available to the obligor and the debt service profile available under an equal, semi-annual repayment schedule, and shall comply with the following criteria:
No single repayment of principal or series of principal payments within a six-month period shall exceed 25 % of the principal sum of the credit.
Principal shall be repaid no less frequently than every 12 months. The first repayment of principal shall be made no later than 18 months after the starting point of credit and no less than 2 % of the principal sum of the credit shall have been repaid 18 months after the starting point of credit.
Interest shall be paid no less frequently than every 12 months and the first interest payment shall be made no later than six months after the starting point of credit.
The maximum weighted average life of the repayment period shall not exceed 60 % of the maximum available tenor.
Interest due after the starting point of credit shall not be capitalised.
7. MINIMUM INTEREST RATES
A Participant providing official financing support for fixed rates loans shall apply the following minimum interest rates:
Repayment term (years) |
Standard minimum interest rates |
Minimum interest rates for projects with long construction periods, i.e.: — New large hydro-power projects — Appendix II Project Class A — Appendix III Adaptation Projects |
||
Government bonds (years) |
Margin (bps) |
Government bonds (years) |
Margin (bps) |
|
< 11 |
Relevant CIRR in accordance with Article 20 of the Arrangement |
|||
11 to 12 |
7 |
100 |
7 |
100 |
13 |
7 |
120 |
8 |
120 |
14 |
8 |
120 |
9 |
120 |
15 |
8 |
120 |
9 |
120 |
16 |
9 |
120 |
10 |
125 |
17 |
9 |
120 |
10 |
130 |
18 |
10 |
120 |
10 |
130 |
8. ELIGIBLE CURRENCIES
The currencies that are eligible for official financing support are those which are fully convertible and for which data are available to construct the minimum interest rates mentioned in Article 7 of this Sector Understanding, and in Article 20 of the Arrangement for repayment terms less than 11 years.
9. LOCAL COSTS
For officially supported export credits relating to contracts of a value of at least SDR 10 million, official support provided for local costs shall not exceed 30 % of the export contract value.
For officially supported export credits relating to contracts of a value of less than SDR 10 million:
For the sectors listed in Appendix I of this Sector Understanding, official support provided for local costs shall not exceed 45 % of the export contract value.
For the sectors listed in Appendix II and for water projects defined in Article 4 of this Sector Understanding, official support provided for local costs shall not exceed 30 % of the export contract value.
Where official support for local cost exceeds 15 % of the export contract value, such official support shall be subject to prior notification, pursuant to Article 10 of this Sector Understanding, specifying the nature of the local costs being supported.
CHAPTER III
PROCEDURES
10. PRIOR NOTIFICATION
A Participant intending to provide support in accordance with the provisions of this Sector Understanding, shall give prior notification at least ten calendar days before issuing any commitment, in accordance with:
Article 48 of the Arrangement if the support is extended pursuant to Article 1, 2 or 4 of this Sector Understanding;
Article 47 of the Arrangement if the support is extended pursuant to Article 3 of this Sector Understanding.
For projects falling in the Project Classes listed in Appendix II of this Sector Understanding, such notifications shall include an enhanced description of the project in order to demonstrate how the project complies with the criteria for support, as set out in Article 2(b) of this Sector Understanding.
For projects supported in conformity with Appendix III of this Sector Understanding, such notification shall include:
An enhanced description of the project in order to demonstrate how the project complies with the criteria for support, as set out in Article 3(b) of this Sector Understanding, and
Access to the outcome of the independent third-party review required in Appendix III.
Notwithstanding paragraph (a)(1) above, if the notifying Participant intends to provide support with a repayment term in excess of 15 years and/or in accordance with Article 6(c) of this Sector Understanding, it shall give prior notification at least ten calendar days before issuing any commitment in accordance with Article 47 of the Arrangement.
A Participant shall inform all other Participants of its final decision following a discussion, to facilitate the review of the body of experience.
CHAPTER IV
MONITORING AND REVIEW
11. FUTURE WORK
The Participants agree to examine the following issues:
Term-adjusted risk-premia.
Conditions for low emission/high energy efficiency fossil fuel power plants including definition of CCS-readiness.
Net zero energy buildings.
Fuel cell projects.
12. MONITORING AND REVIEW
The Secretariat shall report annually on the implementation of this Sector Understanding.
The Participants shall regularly review the scope and other provisions of this Sector Understanding and at the latest by the end of 2017.
Appendix II of this Sector Understanding shall be reviewed at regular intervals, including upon the request of a Participant, with the view to assessing whether any Project Class and/or Type should be added to, or removed from, or whether any thresholds should be changed in, that Appendix. Proposals for new Project Classes and/or Types shall be supported by information on how projects within such a Class/Type should fulfil the criteria set out in Article 2(b) and shall follow the methodology set out in Appendix IV of this Sector Understanding.
The Participants shall undertake a review of Appendix III of this Sector Understanding no later than by 30 June 2018, with a view to assessing the international initiatives related to adaptation, market conditions, and the body of experience developed from the notification process to determine if the definitions, project criteria, terms and conditions should be continued and or amended.
After 31 December 2018, the terms and conditions related to Appendix III shall be discontinued unless the Participants agree otherwise.
Appendix I
Renewable energies sectors
The following renewable energies sectors shall be eligible for the financial terms and conditions set out in this Sector Understanding provided that their impacts are addressed in accordance with the 2012 Recommendation on Common Approaches on Officially Supported Export Credits and Environmental and Social Due Diligence ( 47 ) (as subsequently amended by Members of the OECD Working Group on Export Credits and Credit Guarantee (ECG) and adopted by the OECD Council):
Wind energy ( 48 ).
Geothermal energy.
Tidal and tidal stream power.