This document is an excerpt from the EUR-Lex website
Document 32020D0095
Commission Implementing Decision (EU) 2020/95 of 22 January 2020 amending Implementing Decision (EU) 2016/2323 establishing the European List of ship recycling facilities pursuant to Regulation (EU) No 1257/2013 of the European Parliament and of the Council (Text with EEA relevance)
Commission Implementing Decision (EU) 2020/95 of 22 January 2020 amending Implementing Decision (EU) 2016/2323 establishing the European List of ship recycling facilities pursuant to Regulation (EU) No 1257/2013 of the European Parliament and of the Council (Text with EEA relevance)
Commission Implementing Decision (EU) 2020/95 of 22 January 2020 amending Implementing Decision (EU) 2016/2323 establishing the European List of ship recycling facilities pursuant to Regulation (EU) No 1257/2013 of the European Parliament and of the Council (Text with EEA relevance)
C/2020/200
OJ L 18, 23.1.2020, p. 6–25
(BG, ES, CS, DA, DE, ET, EL, EN, FR, HR, IT, LV, LT, HU, MT, PL, PT, RO, SK, SL, FI, SV)
OJ L 18, 23.1.2020, p. 6–26
(NL)
In force
23.1.2020 |
EN |
Official Journal of the European Union |
L 18/6 |
COMMISSION IMPLEMENTING DECISION (EU) 2020/95
of 22 January 2020
amending Implementing Decision (EU) 2016/2323 establishing the European List of ship recycling facilities pursuant to Regulation (EU) No 1257/2013 of the European Parliament and of the Council
(Text with EEA relevance)
THE EUROPEAN COMMISSION,
Having regard to the Treaty on the Functioning of the European Union,
Having regard to Regulation (EU) No 1257/2013 of the European Parliament and of the Council of 20 November 2013 on ship recycling and amending Regulation (EC) No 1013/2006 and Directive 2009/16/EC (1), and in particular Article 16 thereof,
Whereas:
(1) |
Article 6(2) of Regulation (EU) No 1257/2013 requires ship owners to ensure that ships destined to be recycled are only recycled at ship recycling facilities included in the European List of ship recycling facilities published pursuant to Article 16 of that Regulation. |
(2) |
The European List is set out in Commission Implementing Decision (EU) 2016/2323 (2). |
(3) |
Latvia has informed the Commission that a ship recycling facility (3) located in its territory has been authorised by the competent authority in accordance with Article 14 of Regulation (EU) No 1257/2013. Latvia has provided the Commission with all information relevant for that facility to be included in the European List. The European List should therefore be updated to include that facility. |
(4) |
Lithuania has informed the Commission that a ship recycling facility (4) located in its territory has been authorised by the competent authority in accordance with Article 14 of Regulation (EU) No 1257/2013. Lithuania has provided the Commission with all information relevant for that facility to be included in the European List. The European List should therefore be updated to include that facility. |
(5) |
The Netherlands has informed the Commission that a ship recycling facility (5) located in its territory has been authorised by the competent authority in accordance with Article 14 of Regulation (EU) No 1257/2013. The Netherlands has provided the Commission with all information relevant for that facility to be included in the European List. The European List should therefore be updated to include that facility. |
(6) |
Norway has informed the Commission that a ship recycling facility (6) located in its territory has been authorised by the competent authority in accordance with Article 14 of Regulation (EU) No 1257/2013. Norway has provided the Commission with all information relevant for that facility to be included in the European List. The European List should therefore be updated to include that facility. |
(7) |
The Commission has received applications, in accordance with Article 15(1) of Regulation (EU) No 1257/2013, for three ship recycling facilities (7) located in Turkey to be included in the European List. Having assessed the information and supporting evidence provided or gathered in accordance with Article 15 of that Regulation, the Commission considers that the facilities comply with the requirements set out in Article 13 of that Regulation to conduct ship recycling and to be included in the European List. The European List should therefore be updated to include those facilities. |
(8) |
Belgium and Portugal have informed the Commission that the period of validity of the authorisation granted by their competent authorities to the Belgian and Portuguese ship recycling facility included in the European List (8) has been extended. The date of expiry of the inclusion of those facilities in the European List should therefore be updated to reflect that extension. |
(9) |
Implementing Decision (EU) 2016/2323 should therefore be amended accordingly. |
(10) |
The measures provided for in this Decision are in accordance with the opinion of the Committee established by Article 25 of Regulation (EU) No 1257/2013, |
HAS ADOPTED THIS DECISION:
Article 1
The Annex to Implementing Decision (EU) 2016/2323 is replaced by the text in the Annex to this Decision.
Article 2
This Decision shall enter into force on the twentieth day following that of its publication in the Official Journal of the European Union.
Done at Brussels, 22 January 2020.
For the Commission
The President
Ursula VON DER LEYEN
(1) OJ L 330, 10.12.2013, p. 1.
(2) Commission Implementing Decision (EU) 2016/2323 of 19 December 2016 establishing the European List of ship recycling facilities pursuant to Regulation (EU) No 1257/2013 of the European Parliament and of the Council on ship recycling (OJ L 345, 20.12.2016, p. 119).
(3) ‘Galaksis N’, Ltd.
(4) UAB Demeksa.
(5) Sagro Aannemingsmaatschappij Zeeland B.V.
(6) ADRS Decom Gulen.
(7) ÖGE GEMİ SÖKÜM İTH. İHR. TİC. SAN.AŞ.; Sök Denizcilik Tic. Ltd. Sti and EGE CELIK SAN. VE TIC. A.S.
(8) NV Galloo Recycling Ghent (BE) and Navalria — Docas, Construções e Reparações Navais (PT).
ANNEX
‘ANNEX
THE EUROPEAN LIST OF SHIP RECYCLING FACILITIES REFERRED TO IN ARTICLE 16 OF REGULATION (EU) NO 1257/2013
PART A
Ship recycling facilities located in a Member State
Name of the facility |
Method of recycling |
Type and size of ships that can be recycled |
Limitations and conditions under which the ship recycling facility operates, including as regards hazardous waste management |
Details on the explicit or tacit procedure for the approval of the ship recycling plan by the competent authority (1) |
Maximum annual ship recycling output, calculated as the sum of the weight of ships expressed in LDT that have been recycled in a given year in that facility (2) |
Date of expiry of inclusion in the European List (3) |
|||||||
BELGIUM |
|||||||||||||
NV Galloo Recycling Ghent
Phone: +32(0)9/251 25 21 Email: peter.wyntin@galloo.com |
Alongside (wet berth), slope |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: 265 meters Width: 37 meters Draught: 12,5 meters |
|
Tacit approval, with a maximum review period of 30 days |
34 000 (4) |
31 March 2025 |
|||||||
DENMARK |
|||||||||||||
FAYARD A/S
www.fayard.dk Phone: +45 7592 0000 Email: fayard@fayard.dk |
Drydock |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: 415 meters Width: 90 meters Draught: 7,8 meters |
The ship recycling facility is regulated in accordance with applicable legislation and with the conditions set out in Environmental Permit of 7 November 2018 issued by the Municipality of Kerteminde. The Environmental Permit includes conditions for operating hours, special operating conditions, handling and storage of waste and also includes a condition that the activity must be carried out in a dry dock. |
Tacit approval, with a maximum review period of 14 days. |
0 (5) |
7 November 2023 |
|||||||
Fornæs ApS
www.fornaes.dk Phone: +45 86326393 Email: recycling@fornaes.dk |
Alongside, drydock |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: 150 meters Width: 25 meters Draught: 6 meters GT: 10 000 |
The municipality of Norddjurs has the right to allocate Hazardous waste for environmentally approved reception facilities. |
Tacit approval, with a maximum review period of 14 days. |
30 000 (6) |
30 June 2021 |
|||||||
Modern American Recycling Services Europe (M.A.R.S)
Website: http://www.modernamericanrecyclingservices.com/ Email: kim@mars-eu.dk |
Slipway |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: 290 meters Width: 90 meters Draught: 14 meters |
The conditions under which the ship recycling facility operates are defined in the Environmental Permit of 9 March 2018 issued by the Municipality of Frederikshavn The Municipality of Frederikshavn has the right to allocate hazardous waste to environmentally approved reception facilities, as set out in the Environmental Permit for the ship recycling facility. The facility must not store hazardous waste for more than one year. |
Tacit approval, with a maximum review period of 14 days. |
0 (7) |
23 August 2023 |
|||||||
Smedegaarden A/S
www.smedegaarden.net |
Alongside, drydock |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: 170 meters Width: 40 meters Draught: 7,5 meters |
|
Tacit approval, with a maximum review period of 14 days |
20 000 (8) |
15 September 2021 |
|||||||
Stena Recycling A/S
Phone: +45 20699190 Website: https://www.stenarecycling.dk/ Email: jakob.kristensen@stenarecycling.com |
Drydock |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013. Maximum ship dimensions: Length: 40 meters Width: 40 meters Draught: 10 meters |
The conditions under which the ship recycling facility operates are defined in the Environmental Permit of 5 October 2017 issued by Esbjerg Municipality. Esbjerg Municipality has the right to allocate hazardous waste to environmentally approved reception facilities, as set out in the Environmental Permit for the ship recycling facility |
Tacit approval, with a maximum review period of 14 days |
0 (9) |
7 February 2024 |
|||||||
ESTONIA |
|||||||||||||
BLRT Refonda Baltic OÜ
Phone: +372 610 2933 Fax +372 610 2444 Email: refonda@blrt.ee www.refonda.ee |
Afloat at the quayside and in the floating dock |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: 197 meters Width: 32 meters Draught: 9,6 meters GT: 28 000 |
Waste permit No. L.JÄ/327249. Hazardous waste management licence No 0222. Rules of the Vene-Balti Port, Manual on Ships Recycling MSR-Refonda. Environmental Management System, Waste management EP 4.4.6-1-13 The facility can recycle only the hazardous materials for which it has been licensed. |
Tacit approval, with a maximum review period of 30 days. |
21 852 (10) |
15 February 2021 |
|||||||
SPAIN |
|||||||||||||
DDR VESSELS XXI, S.L.
Phone: +34 630 14 44 16 Email: abarredo@ddr-vessels.es |
Dismantling ramp |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013. Maximum ship dimensions: Length: 169,9 meters (Ships above that size which can operate a zero rollover or negative ramp movement may be accepted depending on the outcome of a detailed feasibility study) |
The limitations are included in the integrated environmental authorisation. |
Explicit approval — The competent authority for the approval decision is the Harbour Masters Office |
0 (11) |
28 July 2020 |
|||||||
FRANCE |
|||||||||||||
Démonaval Recycling
Phone: (+ 33) (0)7 69 79 12 80 Email: patrick@demonaval-recycling.fr |
Alongside, drydock |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: 140 meters Width: 25 meters Depth: 5 meters |
Environmental limitations are defined in the prefectural authorisation. |
Explicit approval — The competent authority for the approval decision is the minister of environment |
0 (12) |
11 December 2022 |
|||||||
GARDET & DE BEZENAC Recycling /Groupe BAUDELET ENVIRONNEMENT — GIE MUG
Phone: +33(0)2 35 95 16 34 Email: infos@gardet-bezenac.com |
Floating and slipway |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: 150 meters Width: 18 meters Depth: 7 meters LDT: 7 000 |
Environmental limitations are defined in the prefectural authorisation. |
Explicit approval — The competent authority for the approval decision is the minister of environment. |
16 000 (13) |
30 December 2021 |
|||||||
Grand Port Maritime de Bordeaux
Phone: +33(0)5 56 90 58 00 Email: maintenance@bordeaux-port.fr |
Alongside, drydock |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: 240 meters Width: 37 meters Depth: 17 meters |
Environmental limitations are defined in the prefectural authorisation. |
Explicit approval — The competent authority for the approval decision is the minister of environment. |
18 000 (14) |
21 October 2021 |
|||||||
Les Recycleurs bretons
Phone: +33(0)2 98 01 11 06 Email: navaleo@navaleo.fr |
Alongside, drydock |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: 225 meters Width: 34 meters Depth: 27 meters |
Environmental limitations are defined in the prefectural authorisation. |
Explicit approval — The competent authority for the approval decision is the minister of environment. |
5 500 (15) |
24 May 2021 |
|||||||
ITALY |
|||||||||||||
San Giorgio del Porto S.p.A.
Phone:+39 (0)10 251561 Email: segreteria@sgdp.it; sangiorgiodelporto@legalmail.it www.sgdp.it |
Alongside, drydock |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: 350 meters Width: 75 meters Depth: 16 meters GT: 130 000 |
The limitations and restrictions are included in the integrated environmental authorisation. |
Explicit approval |
38 564 (16) |
6 June 2023 |
|||||||
LATVIA |
|||||||||||||
A/S “Tosmares kuģubūvētava”
Phone: +371 63401919 Email: shipyard@tosmare.lv |
Alongside (wet berth), drydock |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: 165 meters Width:22 meters Depth: 7 meters GT: 12 000 |
See national permit No. LI10IB0024. |
Explicit approval — written notification in 30 working days |
0 (17) |
11 June 2020 |
|||||||
“Galaksis N”, Ltd.
Phone: +371 29410506 Email: galaksisn@inbox.lv |
Alongside (wet berth), drydock |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: 165 meters Width:22 meters Depth: 7 meters GT: 12 000 |
See national permit No. LI12IB0053 |
Explicit approval — written notification in 30 working days |
0 (18) |
17 July 2024 |
|||||||
LITHUANIA |
|||||||||||||
UAB APK
Phone: +370 (46) 365776 Fax +370 (46) 365776 Email: uab.apk@gmail.com |
Alongside (wet berth) |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: 130 meters Width: 35 meters Depth: 10 meters GT: 3 500 |
See national permit No. TL-KL.1-15/2015 |
Explicit approval — written notification in 30 working days |
1 500 (19) |
17 March 2020 |
|||||||
UAB Armar
Phone: +370 685 32607 Email: armar.uab@gmail.com; albatrosas33@gmail.com |
Alongside (wet berth) |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions (berth 127A): Length: 80 meters Width: 16 meters Depth: 6 meters GT: 1 500 Maximum ship dimensions (berth 131A): Length: 80 meters Width: 16 meters Depth: 5 meters GT: 1 500 |
See national permit No. TL-KL.1-16/2015 (berth 127A) See national permit No. TL-KL.1-51/2017 (berth 131A) |
Explicit approval — written notification in 30 working days |
3 910 (20) |
17 March 2020 (berth 127A) 19 April 2022 (berth 131A) |
|||||||
UAB Demeksa
Phone: +370 630 69903 Email: uabdemeksa@gmail.com |
Alongside (wet berth) |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: 58 meters; Width: 16 meters; Depth: 5 meters; GT: 3500 |
See national permit No. TL-KL.1-64/2019 |
Explicit approval — written notification in 30 working days |
0 (21) |
22 May 2024 |
|||||||
UAB Vakaru refonda
Phone: +370 (46) 483940/483891 Fax +370 (46) 483891 Email: refonda@wsy.lt |
Alongside (wet berth) |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: 230 meters Width: 55 meters Depth: 14 meters GT: 70 000 |
See national permit No. (11.2)-30-161/2011/TL-KL.1-18/2015 |
Explicit approval — written notification in 30 working days |
20 140 (22) |
21 May 2020 |
|||||||
THE NETHERLANDS |
|||||||||||||
Damen Verolme Rotterdam B.V.
Phone: +31 18 123 43 53 Email: praveen.badloo@damen.com |
Drydock |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: 405 meters Width: 90 meters Depth: 11,6 meters |
The site has a permit to operate; this permit contains limitations and conditions to operate in an environmental sound manner. |
Explicit approval |
52 000 (23) |
21 July 2021 |
|||||||
Sagro Aannemingsmaatschappij Zeeland B.V.
Phone: +31 113 351 710 Email: slf@sagro.nl |
Preparatory actions along the quayside, lifted onshore for scrapping |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: 120 meters Width: 20 meters Depth: 6 meters |
The site has a permit to operate; this permit contains limitations and conditions to operate in an environmental sound manner. |
Explicit approval |
15 000 (24) |
28 March 2024 |
|||||||
Scheepssloperij Nederland B.V.
Phone: +31 78 673 60 55 Email: info@sloperij-nederland.nl |
Wet mooring and slipway |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: 200 meters Width: 33 meters Depth: 6 meters Height: 45 meters (Botlekbridge) |
The site has a permit to operate; this permit contains limitations and conditions to operate in an environmental sound manner. Preparatory actions take place along the quayside, until the hull can be towed onto the slipway using a winch which has a pulling capacity of 2 000 tonnes. |
Explicit approval |
9 300 (25) |
27 September 2021 |
|||||||
NORWAY |
|||||||||||||
ADRS Decom Gulen Facility address:
Office address: Statsminister Michelsens vei 38, 5230 Paradis, Norway https://adrs.no/ |
Alongside, slipway, dry/wet-dock |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013. Maximum ship dimensions: Length: 360 meters Width: No limit Depth: No limit |
See national permit No 2019.0501.T |
Explicit approval |
0 (26) |
1 October 2024 |
|||||||
AF Offshore Decom Raunesvegen 597, 5578 Nedre Vats Norway https://afgruppen.no/selskaper/af-offshore-decom/ |
Alongside |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: 290 meters Width: no limit Depth: no limit |
See national permit No 2005.0038.T |
Explicit approval |
31 000 (27) |
28 January 2024 |
|||||||
Green Yard AS Angholmen, 4485 Feda, Norway www.greenyard.no |
Drydock (indoors), slipway |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: 230 meters Width: 25 meters Depth: 20 meters |
See national permit No 2018.0833.T Major dismantling operations must be performed indoors. The only dismantling and cutting operations that are allowed outside in open air are minor operations necessary to fit ships to the indoor facility. See permit for further details. |
Explicit approval |
0 (28) |
28 January 2024 |
|||||||
Kvaerner AS (Stord) Eldøyane 59, 5411 Stord, Norway www.kvaerner.com |
Alongside (wet berth), slipway |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: 230 meters Width: No limit Depth: No limit |
See national permit No 2013.0111.T |
Explicit approval |
43 000 (29) |
28 January 2024 |
|||||||
Lutelandet Industrihamn Lutelandet Offshore AS 6964 Korssund, Norway www.lutelandetoffshore.com |
Alongside |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: No limit Width: No limit Depth: No limit |
See national permit No 2014.0646.T |
Explicit approval |
14 000 (30) |
28 January 2024 |
|||||||
Norscrap West AS Hanøytangen 122, 5310 Hauglandhella, Norway www.norscrap.no |
Alongside, floating slipway, drydock |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: 150 meters Width: 34 meters Depth: no limit |
See national permit No 2017.0864.T Maximum 8000 LDT on floating slipway. Ships exceeding 8000 LDT need to be reduced prior to pulling in the slipway |
Explicit approval |
4 500 (31) |
1 March 2024 |
|||||||
PORTUGAL |
|||||||||||||
Navalria — Docas, Construções e Reparações Navais
Phone: +351 234 378 970, +351 232 767 700 Email: info@navalria.pt |
Drydock |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: 104 meters Width: 6,5 meters Draught: 6,5 meters |
Conditions applied to the activity are defined in specifications annexed to Title AL n° 5/2015/CCDRC, of 26 January 2016. Decontamination and dismantling take place on a horizontal plane and inclined plane, according to the ship’s size. The horizontal plane has a nominal capacity of 700 tonnes. The inclined plane has a nominal capacity of 900 tonnes. |
Explicit approval |
1 900 (32) |
26 July 2020 |
|||||||
FINLAND |
|||||||||||||
Turun Korjaustelakka Oy (Turku Repair Yard Ltd)
Phone: +358 2 44 511 Email try@turkurepairyard.com |
Alongside, drydock |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: 250 meters Width: 40 meters Draught: 7,9 meters |
The limitations are included in the national environmental permit. |
Explicit approval |
20 000 (33) |
1 October 2023 |
|||||||
UNITED KINGDOM |
|||||||||||||
Able UK Limited
Phone: +44(0)1642 806080 Email: info@ableuk.com |
Ship dismantling and associated treatment authorised with dry dock and wet berth |
Any ship within the dimensions authorised within the permit. Maximum ship dimensions: Length: 337.5 meters Beam: 120 meters Draft: 6,65 meters |
The facility has a Ship Recycling Facility Plan that meets the requirements of Regulation (EU) No 1257/2013. The site is authorised by way of a permit (Reference EPR/VP3296ZM) that limits the operations and places conditions on the operator of the facility. |
Explicit approval |
66 340 (34) |
6 October 2020 |
|||||||
Dales Marine Services Ltd
Contact: Phone: +44(0)131 454 3380 Email: leithadmin@dalesmarine.co.uk; b.robertson@dalesmarine.co.uk |
Ship dismantling and associated treatment authorised within a drydock, and wet berth |
Any ship up to a maximum of 7 000 tonnes Maximum ship dimensions: Length: 165 meters Beam: 21 meters Draft: 7,7 meters |
The facility has a Ship Recycling Facility Plan that meets the requirements of Regulation (EU) No 1257/2013. The site is authorised by way of a licence (Ref: WML L 1157331) that limits the operations and places conditions on the operator of the facility. |
Explicit approval |
7 275 (35) |
2 November 2022 |
|||||||
Harland and Wolff Heavy Industries Limited
Phone: +44(0)2890 458456 Email: trevor.hutchinson@harland-wolff.com |
Ship dismantling and associated treatment authorised with dry dock, and wet berth |
Any ship with the dimensions detailed in the agreed Working Plan. Maximum ship dimensions: The main dock (the largest) is 556 m x 93 m x 1,2 m DWT, and can take vessels up to this size. This largest dry dock is 1,2 million DWT. |
The facility has a Ship Recycling Facility Plan that meets the requirements of Regulation (EU) No 1257/2013. The site is authorised by way of a waste management licence, authorisation number LN/07/21/V2 that limits the operations and places conditions on the operator of the facility. |
Explicit approval |
13 200 (36) |
3 August 2020 |
|||||||
Swansea Drydock Ltd
Phone: +44(0)1792 654592 Email: info@swanseadrydocks.com |
Ship dismantling and associated treatment authorised with dry dock, and wet berth |
Any ship within the dimensions authorised within the permit. Maximum ship dimensions: Length: 200 meters Beam: 27 meters Draft: 7 meters |
Site has a Ship Recycling Facility Plan that meets with the requirements of Regulation (EU) No 1257/2013. The site is authorised by way of a permit (Reference EPR/UP3298VL) that limits the operations and places conditions on the operator of the facility. |
Explicit approval |
7 275 (37) |
2 July 2020 |
PART B
Ship recycling facilities located in a third country
Name of the facility |
Method of recycling |
Type and size of ships that can be recycled |
Limitations and conditions under which the ship recycling facility operates, including as regards hazardous waste management |
Details on the explicit or tacit procedure for the approval of the ship recycling plan by the competent authority (38) |
Maximum annual ship recycling output, calculated as the sum of the weight of ships expressed in LDT that have been recycled in a given year in that facility (39) |
Date of expiry of inclusion in the European List (40) |
||||
TURKEY |
||||||||||
Isiksan Gemi Sokum Pazarlama Ve Tic. Ltd. Sti.
Phone: +90 232 618 21 65 Email: info@isiksangemi.com |
Landing |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: no limit Width: 75 meters Draught: 17 meters |
The site has a Ship Dismantling Permit, issued by the Ministry of Environment and Urban Planning, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport, Maritime Affairs and Communication, which contain limitations and conditions under which the facility operates. Hazardous wastes are handled by SRAT (Ship Recycling Association of Turkey) which operates under the necessary licence issued by the Ministry of Environment and Urban Planning. |
Tacit approval The ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship. The SRP is neither explicitly approved nor rejected as a standalone document. |
91 851 (41) |
7 July 2024 |
||||
EGE CELIK SAN. VE TIC. A.S.
Phone: +90 232 618 2162 Email: pamirtaner@egecelik.com |
Landing |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: no limit Width: 50 meters Draught: 15 meters |
The site has a Ship Dismantling Permit, issued by the Ministry of Environment and Urban Planning, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport, Maritime Affairs and Communication, which contain limitations and conditions under which the facility operates. Hazardous wastes are handled by SRAT (Ship Recycling Association of Turkey) which operates under the necessary licence issued by the Ministry of Environment and Urban Planning. |
Tacit approval The ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship. The SRP is neither explicitly approved nor rejected as a standalone document |
55 503 (42) |
12 February 2025 |
||||
LEYAL GEMİ SÖKÜM SANAYİ ve TİCARET LTD.
Phone: +90 232 618 2030 Email: info@leyal.com.tr |
Landing |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: no limit Width: 100 meters Draught: 15 meters |
The site has a Ship Dismantling Permit, issued by the Ministry of Environment and Urban Planning, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport, Maritime Affairs and Communication, which contain limitations and conditions under which the facility operates. Hazardous wastes are handled by SRAT (Ship Recycling Association of Turkey) which operates under the necessary licence issued by the Ministry of Environment and Urban Planning. |
Tacit approval The ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship. The SRP is neither explicitly approved nor rejected as a standalone document. |
55 495 (43) |
9 December 2023 |
||||
LEYAL-DEMTAŞ GEMİ SÖKÜM SANAYİ ve TİCARET A.Ş.
Phone: +90 232 618 2065 Email: demtas@leyal.com.tr |
Landing |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: no limit Width: 63 meters Draught: 15 meters |
The site has a Ship Dismantling Permit, issued by the Ministry of Environment and Urban Planning, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport, Maritime Affairs and Communication, which contain limitations and conditions under which the facility operates. Hazardous wastes are handled by SRAT (Ship Recycling Association of Turkey) which operates under the necessary licence issued by the Ministry of Environment and Urban Planning. |
Tacit approval The ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship. The SRP is neither explicitly approved nor rejected as a standalone document. |
50 350 (44) |
9 December 2023 |
||||
ÖGE GEMİ SÖKÜM İTH. İHR. TİC. SAN.AŞ.
Phone: +90 232 618 2105 Email: oge@ogegemi.com www.ogegemi.com |
Landing |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: no limit Width: 70 meters Draught: 15 meters |
The site has a Ship Dismantling Permit, issued by the Ministry of Environment and Urban Planning, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport, Maritime Affairs and Communication, which contain limitations and conditions under which the facility operates. Hazardous wastes are handled by SRAT (Ship Recycling Association of Turkey) which operates under the necessary licence issued by the Ministry of Environment and Urban Planning. |
Tacit approval The ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship. The SRP is neither explicitly approved nor rejected as a standalone document. |
62 471 (45) |
12 February 2025 |
||||
Sök Denizcilik Tic. Ltd. Sti
Phone: +90 232 618 2092 Email: info@sokship.com |
Landing |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: no limit Width: 90 meters Draught: 15 meters |
The site has a Ship Dismantling Permit, issued by the Ministry of Environment and Urban Planning, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport, Maritime Affairs and Communication, which contain limitations and conditions under which the facility operates. Hazardous wastes are handled by SRAT (Ship Recycling Association of Turkey) which operates under the necessary licence issued by the Ministry of Environment and Urban Planning. |
Tacit approval The ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship. The SRP is neither explicitly approved nor rejected as a standalone document. |
66 167 (46) |
12 February 2025 |
||||
UNITED STATES OF AMERICA |
||||||||||
International Shipbreaking Limited L.L.C
Phone: 956-831-2299 Email: chris.green@internationalshipbreaking.com robert.berry@internationalshipbreaking.com |
Alongside (wet berth), slope |
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Length: 335 meters Width: 48 meters Draught: 9 meters |
The conditions under which the facility is authorised to operate are defined in permits, certificates and authorisations issued to the facility by the Environmental Protection Agency, the Texas Commission of Environmental Quality, the Texas General Land Office and the U.S Coast Guard. The U.S. Toxic Substances Control Act prohibits the import into the US of foreign flagged vessels that contain PCB concentrations greater than 50 parts per million. The facility has two slips with ramps for final vessel recycling (East Slip and West Slip). Ships flying a flag of EU Member States shall be recycled exclusively on the East Slip ramp. |
There is currently no procedure in US law related to the approval of ship recycling plans |
120 000 (47) |
9 December 2023 |
(1) As referred to in Article 7(3) of Regulation (EU) No 1257/2013 on ship recycling.
(2) As referred to in the third sentence of Article 32(1)(a) of Regulation (EU) No 1257/2013.
(3) The date of expiry of inclusion in the European List corresponds to the date of expiry of the permit or authorisation granted to the facility in the Member State.
(4) According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 50 000 LDT per year.
(5) According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 30 000 LDT per year.
(6) According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 50 000 LDT per year.
(7) According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 200 000 LDT per year.
(8) According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 50 000 LDT per year.
(9) According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 45 000 LDT per year.
(10) According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 15 000 LDT per year.
(11) According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 60 000 LDT per year.
(12) According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 15 000 LDT per year.
(13) According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 18 000 LDT per year.
(14) According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 23 000 LDT per year.
(15) According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 10 000 LDT per year.
(16) According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 60 000 LDT per year.
(17) According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 15 000 LDT per year.
(18) According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 10 000 LDT per year.
(19) According to its permit, the facility is authorised to recycle a maximum 30 000 LDT per year.
(20) According to its permits, the facility is authorised to recycle a maximum 12 000 LDT per year (6 000 LDT per berth).
(21) According to its permit, the facility is authorised to recycle a maximum 10 000 LDT per year.
(22) According to its permit, the facility is authorised to recycle a maximum 45 000 LDT per year.
(23) According to its permit, the theoretical maximum annual ship recycling capacity of the facility is 100 000 LDT per year.
(24) According to its permit, the theoretical maximum annual ship recycling capacity of the facility is 100 000 LDT per year.
(25) According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 45 000 LDT per year.
(26) According to its permit, the facility is authorised to recycle a maximum 75 000 LDT per year.
(27) According to its permit, the facility is authorised to recycle a maximum 75 000 LDT per year.
(28) According to its permit, the facility is authorised to recycle a maximum 30 000 LDT per year.
(29) According to its permit, the facility is authorised to recycle a maximum 85 000 LDT per year.
(30) According to its permit, the facility is authorised to recycle a maximum 200 000 LDT per year.
(31) According to its permit, the facility is authorised to recycle a maximum 100 000 LDT per year.
(32) According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 5 000 LDT per year.
(33) According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 40 000 LDT per year.
(34) According to its permit, the facility is authorised to recycle a maximum of 230 000 LDT per year.
(35) According to its permit, the facility is authorised to recycle a maximum of 7 275 LDT per year.
(36) According to its permit, the facility is authorised to recycle a maximum of 300 000 LDT per year.
(37) According to its permit, the facility is authorised to recycle a maximum of 74 999 LDT per year.
(38) As referred to in Article 7(3) of Regulation (EU) No 1257/2013 on ship recycling.
(39) As referred to in the third sentence of Article 32(1)(a) of Regulation (EU) No 1257/2013.
(40) The inclusion of a ship recycling facility located in a third country in the European List is valid for a period of five years from the date of entry into force of the relevant Commission Implementing Decision which provides for the inclusion of that facility, unless otherwise stated.
(41) The theoretical maximum annual ship recycling capacity of the facility is 120 000 LDT per year.
(42) The theoretical maximum annual ship recycling capacity of the facility is 60 000 LDT per year.
(43) The theoretical maximum annual ship recycling capacity of the facility is 80 000 LDT per year.
(44) The theoretical maximum annual ship recycling capacity of the facility is 60 000 LDT per year.
(45) The theoretical maximum annual ship recycling capacity of the facility is 90 000 LDT per year.
(46) The theoretical maximum annual ship recycling capacity of the facility is 100 000 LDT per year.
(47) The theoretical maximum annual ship recycling capacity of the facility is 120 000 LDT per year.’